<response><row><row _id="row-c63t.whpv_87aj" _uuid="00000000-0000-0000-DBCF-ECDED7E83C67" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-c63t.whpv_87aj"><date_reported_as_of>2015-02-01T00:00:00</date_reported_as_of><pid>94</pid><project_name>New Ferry Boat Construction</project_name><description>Replace the two Barberi class boats and the John F. Kennedy boat which are approaching the end of their useful lives with new Staten Island ferries. Replacement is needed to continue reliable service.</description><category>Ferries</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2014-09-15T00:00:00</design_start><budget_forecast>244317052.00</budget_forecast><latest_budget_changes>-16306318.00</latest_budget_changes><total_budget_changes>-238419180.00</total_budget_changes><forecast_completion>2020-02-11T00:00:00</forecast_completion><latest_schedule_changes>-505</latest_schedule_changes><total_schedule_changes>549</total_schedule_changes></row><row _id="row-tuxu-xtbg~ckvm" _uuid="00000000-0000-0000-3296-C6D6EEF2E3FD" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-tuxu-xtbg~ckvm"><date_reported_as_of>2015-08-01T00:00:00</date_reported_as_of><pid>94</pid><project_name>New Ferry Boat Construction</project_name><description>Replace one Barberi class boat and the John F. Kennedy boat which are approaching the end of their useful lives with new Staten Island ferries. Replacement is needed to continue reliable service.</description><category>Ferries</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2014-09-15T00:00:00</design_start><budget_forecast>327552000.00</budget_forecast><latest_budget_changes>83234948.00</latest_budget_changes><total_budget_changes>-238419180.00</total_budget_changes><forecast_completion>2020-02-11T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>549</total_schedule_changes></row><row _id="row-5z99~53nd_7u7e" _uuid="00000000-0000-0000-0520-955B4D97DC56" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-5z99~53nd_7u7e"><date_reported_as_of>2016-01-01T00:00:00</date_reported_as_of><pid>94</pid><project_name>New Ferry Boat Construction</project_name><description>Replace one Barberi class boat and the John F. Kennedy boat which are approaching the end of their useful lives with new Staten Island ferries. Replacement is needed to continue reliable service.</description><category>Ferries</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2014-09-15T00:00:00</design_start><budget_forecast>331987272.61</budget_forecast><latest_budget_changes>4435272.61</latest_budget_changes><total_budget_changes>-238419180.00</total_budget_changes><forecast_completion>2020-04-23T00:00:00</forecast_completion><latest_schedule_changes>72</latest_schedule_changes><total_schedule_changes>549</total_schedule_changes></row><row _id="row-g9y2.vi4b-gjdn" _uuid="00000000-0000-0000-F9B4-3EF2415281CC" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-g9y2.vi4b-gjdn"><date_reported_as_of>2016-06-01T00:00:00</date_reported_as_of><pid>94</pid><project_name>New Ferry Boat Construction</project_name><description>Replace one Barberi class boat and the John F. Kennedy boat which are approaching the end of their useful lives with new Staten Island ferries. Replacement is needed to continue reliable service.</description><category>Ferries</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction Procurement</current_phase><design_start>2014-09-15T00:00:00</design_start><budget_forecast>347408272.61</budget_forecast><latest_budget_changes>15421000.00</latest_budget_changes><total_budget_changes>-238419180.00</total_budget_changes><forecast_completion>2020-03-16T00:00:00</forecast_completion><latest_schedule_changes>-38</latest_schedule_changes><total_schedule_changes>549</total_schedule_changes></row><row _id="row-5gnv.uggz.2sy9" _uuid="00000000-0000-0000-9150-8DF15C915028" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-5gnv.uggz.2sy9"><date_reported_as_of>2016-11-01T00:00:00</date_reported_as_of><pid>94</pid><project_name>New Ferry Boat Construction</project_name><description>Replace one Barberi class boat and the John F. Kennedy boat which are approaching the end of their useful lives with new Staten Island ferries. Replacement is needed to continue reliable service.</description><category>Ferries</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction Procurement</current_phase><design_start>2014-09-15T00:00:00</design_start><budget_forecast>350642272.61</budget_forecast><latest_budget_changes>3234000.00</latest_budget_changes><total_budget_changes>-238419180.00</total_budget_changes><forecast_completion>2020-03-16T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>549</total_schedule_changes></row><row _id="row-7mae_c9wk~ka9i" _uuid="00000000-0000-0000-C629-0F3A3E1E5D3A" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-7mae_c9wk~ka9i"><date_reported_as_of>2017-04-01T00:00:00</date_reported_as_of><pid>94</pid><project_name>New Ferry Boat Construction</project_name><description>Replace one Barberi class boat and the John F. Kennedy boat which are approaching the end of their useful lives with new Staten Island ferries. Replacement is needed to continue reliable service.</description><category>Ferries</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction Procurement</current_phase><design_start>2014-09-15T00:00:00</design_start><budget_forecast>348488982.47</budget_forecast><latest_budget_changes>-2153290.14</latest_budget_changes><total_budget_changes>-238419180.00</total_budget_changes><forecast_completion>2020-03-16T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>549</total_schedule_changes></row><row _id="row-gsma-mavz~eq7g" _uuid="00000000-0000-0000-FB95-D613046B3845" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-gsma-mavz~eq7g"><date_reported_as_of>2017-09-01T00:00:00</date_reported_as_of><pid>94</pid><project_name>New Ferry Boat Construction</project_name><description>Replace one Barberi class boat and the John F. Kennedy boat which are approaching the end of their useful lives with new Staten Island ferries. Replacement is needed to continue reliable service.</description><category>Ferries</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><design_start>2014-09-15T00:00:00</design_start><budget_forecast>348374272.00</budget_forecast><latest_budget_changes>-114710.47</latest_budget_changes><total_budget_changes>-238419180.00</total_budget_changes><forecast_completion>2021-02-28T00:00:00</forecast_completion><latest_schedule_changes>349</latest_schedule_changes><total_schedule_changes>549</total_schedule_changes></row><row _id="row-sand-u5qw~x59p" _uuid="00000000-0000-0000-7FDE-CAB36AD2FEF6" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-sand-u5qw~x59p"><date_reported_as_of>2018-03-01T00:00:00</date_reported_as_of><pid>94</pid><project_name>New Ferry Boat Construction</project_name><description>Replace one Barberi class boat and the John F. Kennedy boat which are approaching the end of their useful lives with new Staten Island ferries. Replacement is needed to continue reliable service.</description><category>Ferries</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><design_start>2014-09-15T00:00:00</design_start><budget_forecast>344078847.00</budget_forecast><latest_budget_changes>-4295425.00</latest_budget_changes><total_budget_changes>-238419180.00</total_budget_changes><forecast_completion>2021-02-28T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>549</total_schedule_changes></row><row _id="row-h825-j9ew~7m62" _uuid="00000000-0000-0000-1B42-782E922A9E42" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-h825-j9ew~7m62"><date_reported_as_of>2018-08-01T00:00:00</date_reported_as_of><pid>94</pid><project_name>New Ferry Boat Construction</project_name><description>Replace one Barberi class boat and the John F. Kennedy boat which are approaching the end of their useful lives with new Staten Island ferries. Replacement is needed to continue reliable service.</description><category>Ferries</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><design_start>2014-09-15T00:00:00</design_start><budget_forecast>285010000.00</budget_forecast><latest_budget_changes>-59068847.00</latest_budget_changes><total_budget_changes>-238419180.00</total_budget_changes><forecast_completion>2021-02-08T00:00:00</forecast_completion><latest_schedule_changes>-20</latest_schedule_changes><total_schedule_changes>549</total_schedule_changes></row><row _id="row-9hvp~hcaw.2y2p" _uuid="00000000-0000-0000-A925-E7A0232CA959" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-9hvp~hcaw.2y2p"><date_reported_as_of>2019-01-01T00:00:00</date_reported_as_of><pid>94</pid><project_name>New Ferry Boat Construction</project_name><description>Replace one Barberi class boat and the John F. Kennedy boat which are approaching the end of their useful lives with new Staten Island ferries. Replacement is needed to continue reliable service.</description><category>Ferries</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><design_start>2014-09-15T00:00:00</design_start><budget_forecast>327889390.00</budget_forecast><latest_budget_changes>42879390.00</latest_budget_changes><total_budget_changes>-238419180.00</total_budget_changes><forecast_completion>2021-02-28T00:00:00</forecast_completion><latest_schedule_changes>20</latest_schedule_changes><total_schedule_changes>549</total_schedule_changes></row><row _id="row-ewkg_u5xg_ewd4" _uuid="00000000-0000-0000-35E2-0BE3BFF2DFD8" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ewkg_u5xg_ewd4"><date_reported_as_of>2019-05-01T00:00:00</date_reported_as_of><pid>94</pid><project_name>New Ferry Boat Construction</project_name><description>Replace one Barberi class boat and the John F. Kennedy boat which are approaching the end of their useful lives with new Staten Island ferries. Replacement is needed to continue reliable service.</description><category>Ferries</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><design_start>2014-09-15T00:00:00</design_start><budget_forecast>349869872.00</budget_forecast><latest_budget_changes>21980482.00</latest_budget_changes><total_budget_changes>-238419180.00</total_budget_changes><forecast_completion>2021-08-06T00:00:00</forecast_completion><latest_schedule_changes>159</latest_schedule_changes><total_schedule_changes>549</total_schedule_changes></row><row _id="row-8u6p.kpkz-vuwh" _uuid="00000000-0000-0000-0277-C731F6C8976B" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-8u6p.kpkz-vuwh"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>94</pid><project_name>New Ferry Boat Construction</project_name><description>Replace one Barberi class boat and the John F. Kennedy boat which are approaching the end of their useful lives with new Staten Island ferries. Replacement is needed to continue reliable service.</description><category>Ferries</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><design_start>2014-09-15T00:00:00</design_start><budget_forecast>349399872.00</budget_forecast><latest_budget_changes>-470000.00</latest_budget_changes><total_budget_changes>-238419180.00</total_budget_changes><total_schedule_changes>549</total_schedule_changes></row><row _id="row-rerg_jbex.br9s" _uuid="00000000-0000-0000-176C-BFC6B61856A4" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-rerg_jbex.br9s"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>94</pid><project_name>New Ferry Boat Construction</project_name><description>Replace one Barberi class boat and the John F. Kennedy boat which are approaching the end of their useful lives with new Staten Island ferries. Replacement is needed to continue reliable service.</description><category>Ferries</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><design_start>2014-09-15T00:00:00</design_start><budget_forecast>349848872.00</budget_forecast><latest_budget_changes>449000.00</latest_budget_changes><total_budget_changes>-238419180.00</total_budget_changes><forecast_completion>2020-08-08T00:00:00</forecast_completion><latest_schedule_changes>-363</latest_schedule_changes><total_schedule_changes>549</total_schedule_changes></row><row _id="row-z7h8_4vgw-mnhp" _uuid="00000000-0000-0000-CB0C-D97E96C7F3B5" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-z7h8_4vgw-mnhp"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>94</pid><project_name>New Ferry Boat Construction</project_name><description>Replace one Barberi class boat and the John F. Kennedy boat which are approaching the end of their useful lives with new Staten Island ferries. Replacement is needed to continue reliable service.</description><category>Ferries</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><design_start>2014-09-15T00:00:00</design_start><budget_forecast>359998872.00</budget_forecast><latest_budget_changes>10150000.00</latest_budget_changes><total_budget_changes>-238419180.00</total_budget_changes><total_schedule_changes>549</total_schedule_changes></row><row _id="row-6p94-7xbp_z437" _uuid="00000000-0000-0000-4AA0-A72555D848C3" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-6p94-7xbp_z437"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>94</pid><project_name>New Ferry Boat Construction</project_name><description>Replace one Barberi class boat and the John F. Kennedy boat which are approaching the end of their useful lives with new Staten Island ferries. Replacement is needed to continue reliable service.</description><category>Ferries</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><design_start>2014-09-15T00:00:00</design_start><budget_forecast>367250523.00</budget_forecast><latest_budget_changes>7251651.00</latest_budget_changes><total_budget_changes>-238419180.00</total_budget_changes><forecast_completion>2021-12-06T00:00:00</forecast_completion><latest_schedule_changes>485</latest_schedule_changes><total_schedule_changes>549</total_schedule_changes></row><row _id="row-ryxj~ta5s.s99q" _uuid="00000000-0000-0000-ED73-29FFD92FDDD0" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ryxj~ta5s.s99q"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>94</pid><project_name>New Ferry Boat Construction</project_name><category>Ferries</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><total_budget_changes>-238419180.00</total_budget_changes><total_schedule_changes>549</total_schedule_changes></row><row _id="row-mvna-v7fe~vh9q" _uuid="00000000-0000-0000-0385-EE8E3022646D" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-mvna-v7fe~vh9q"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>94</pid><project_name>New Ferry Boat Construction</project_name><description>Replace one Barberi class boat and the John F. Kennedy boat which are approaching the end of their useful lives with new Staten Island ferries. Replacement is needed to continue reliable service.</description><category>Ferries</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><design_start>2014-09-15T00:00:00</design_start><budget_forecast>23683112.00</budget_forecast><latest_budget_changes>-343567411.00</latest_budget_changes><total_budget_changes>-238419180.00</total_budget_changes><forecast_completion>2021-12-06T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>549</total_schedule_changes></row><row _id="row-srqu_pvkj~vrsh" _uuid="00000000-0000-0000-5E95-C048FAA0F32A" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-srqu_pvkj~vrsh"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>94</pid><project_name>New Ferry Boat Construction</project_name><description>Replace one Barberi class boat and the John F. Kennedy boat which are approaching the end of their useful lives with new Staten Island ferries. Replacement is needed to continue reliable service.</description><category>Ferries</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><design_start>2014-09-15T00:00:00</design_start><budget_forecast>23683112.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-238419180.00</total_budget_changes><forecast_completion>2022-08-31T00:00:00</forecast_completion><latest_schedule_changes>268</latest_schedule_changes><total_schedule_changes>549</total_schedule_changes></row><row _id="row-rnjg~g4ze.qmje" _uuid="00000000-0000-0000-ABF6-3D22D09F694A" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-rnjg~g4ze.qmje"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>94</pid><project_name>New Ferry Boat Construction</project_name><description>Replace one Barberi class boat and the John F. Kennedy boat which are approaching the end of their useful lives with new Staten Island ferries. Replacement is needed to continue reliable service.</description><category>Ferries</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><design_start>2014-09-15T00:00:00</design_start><budget_forecast>272617513.00</budget_forecast><latest_budget_changes>248934401.00</latest_budget_changes><total_budget_changes>-238419180.00</total_budget_changes><forecast_completion>2022-09-04T00:00:00</forecast_completion><latest_schedule_changes>4</latest_schedule_changes><total_schedule_changes>549</total_schedule_changes></row><row _id="row-fm6w.wp22.9dya" _uuid="00000000-0000-0000-BB4E-6B8251FBB9C7" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-fm6w.wp22.9dya"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>94</pid><project_name>New Ferry Boat Construction</project_name><description>Replace one Barberi class boat and the John F. Kennedy boat which are approaching the end of their useful lives with new Staten Island ferries. Replacement is needed to continue reliable service.</description><category>Ferries</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><design_start>2014-09-15T00:00:00</design_start><budget_forecast>22170190.00</budget_forecast><latest_budget_changes>-250447323.00</latest_budget_changes><total_budget_changes>-238419180.00</total_budget_changes><forecast_completion>2022-12-31T00:00:00</forecast_completion><latest_schedule_changes>118</latest_schedule_changes><total_schedule_changes>549</total_schedule_changes></row><row _id="row-regk.7kw9-kjst" _uuid="00000000-0000-0000-D023-CE0A7A6689B0" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-regk.7kw9-kjst"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>94</pid><project_name>New Ferry Boat Construction</project_name><description>Replace one Barberi class boat and the John F. Kennedy boat which are approaching the end of their useful lives with new Staten Island ferries. Replacement is needed to continue reliable service.</description><category>Ferries</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><design_start>2014-09-15T00:00:00</design_start><budget_forecast>22204190.00</budget_forecast><latest_budget_changes>34000.00</latest_budget_changes><total_budget_changes>-238419180.00</total_budget_changes><total_schedule_changes>549</total_schedule_changes></row><row _id="row-6878.pv7d-wjze" _uuid="00000000-0000-0000-0071-7DDADD28C70D" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-6878.pv7d-wjze"><date_reported_as_of>2013-09-01T00:00:00</date_reported_as_of><pid>97</pid><project_name>Bruckner Expressway Westchester Creek Bridge Reconstruction</project_name><description>Replace existing bridge with a wider double-leaf bascule bridge.</description><category>Bridges, Streets and Roadways</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DEP, DOT</client_agency><current_phase>Design</current_phase><design_start>2012-07-23T00:00:00</design_start><budget_forecast>151775497.00</budget_forecast><total_budget_changes>142277136.00</total_budget_changes><forecast_completion>2019-11-20T00:00:00</forecast_completion><total_schedule_changes>2086</total_schedule_changes></row><row _id="row-ytqk.jn2g~2p3g" _uuid="00000000-0000-0000-4C85-7A888008FE26" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ytqk.jn2g~2p3g"><date_reported_as_of>2014-01-01T00:00:00</date_reported_as_of><pid>97</pid><project_name>Bruckner Expressway Westchester Creek Bridge Reconstruction</project_name><description>This project will replace the existing bridge with a new wider double-leaf bascule bridge.</description><category>Bridges, Streets and Roadways</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DEP, DOT</client_agency><current_phase>Design</current_phase><design_start>2012-07-23T00:00:00</design_start><budget_forecast>152871246.00</budget_forecast><latest_budget_changes>1095749.00</latest_budget_changes><total_budget_changes>142277136.00</total_budget_changes><forecast_completion>2019-11-20T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>2086</total_schedule_changes></row><row _id="row-pxyu~5xp5-kseh" _uuid="00000000-0000-0000-C365-F3F29EA08733" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-pxyu~5xp5-kseh"><date_reported_as_of>2014-05-01T00:00:00</date_reported_as_of><pid>97</pid><project_name>Bruckner Expressway Westchester Creek Bridge Reconstruction</project_name><description>This project will replace the existing bridge with a new, wider double-leaf bascule bridge.</description><category>Bridges, Streets and Roadways</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DEP, DOT</client_agency><current_phase>Design</current_phase><design_start>2012-07-23T00:00:00</design_start><budget_forecast>195217224.00</budget_forecast><latest_budget_changes>42345978.00</latest_budget_changes><total_budget_changes>142277136.00</total_budget_changes><forecast_completion>2020-07-21T00:00:00</forecast_completion><latest_schedule_changes>244</latest_schedule_changes><total_schedule_changes>2086</total_schedule_changes></row><row _id="row-7dmh~wjis.b435" _uuid="00000000-0000-0000-4BF5-3B4A9E1F7A82" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-7dmh~wjis.b435"><date_reported_as_of>2015-02-01T00:00:00</date_reported_as_of><pid>97</pid><project_name>Bruckner Expressway Westchester Creek Bridge Reconstruction</project_name><description>This project will replace the existing bridge with a new, wider double-leaf bascule bridge.</description><category>Bridges, Streets and Roadways</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DEP, DOT</client_agency><current_phase>Design</current_phase><design_start>2012-07-23T00:00:00</design_start><budget_forecast>198569961.00</budget_forecast><latest_budget_changes>3352737.00</latest_budget_changes><total_budget_changes>142277136.00</total_budget_changes><forecast_completion>2020-10-14T00:00:00</forecast_completion><latest_schedule_changes>85</latest_schedule_changes><total_schedule_changes>2086</total_schedule_changes></row><row _id="row-qh9u-x66s-s5cr" _uuid="00000000-0000-0000-CB49-F9E674884E7B" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-qh9u-x66s-s5cr"><date_reported_as_of>2015-08-01T00:00:00</date_reported_as_of><pid>97</pid><project_name>Bruckner Expressway Westchester Creek Bridge Reconstruction</project_name><description>This project will replace the existing bridge with a new, wider double-leaf bascule bridge.</description><category>Bridges, Streets and Roadways</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DEP, DOT</client_agency><current_phase>Design</current_phase><design_start>2012-07-23T00:00:00</design_start><budget_forecast>198843972.62</budget_forecast><latest_budget_changes>274011.62</latest_budget_changes><total_budget_changes>142277136.00</total_budget_changes><forecast_completion>2020-08-17T00:00:00</forecast_completion><latest_schedule_changes>-58</latest_schedule_changes><total_schedule_changes>2086</total_schedule_changes></row><row _id="row-mvxt~xwkc~9b9b" _uuid="00000000-0000-0000-41AC-5EBEACD5FA67" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-mvxt~xwkc~9b9b"><date_reported_as_of>2016-01-01T00:00:00</date_reported_as_of><pid>97</pid><project_name>Bruckner Expressway Westchester Creek Bridge Reconstruction</project_name><description>This project will replace the existing bridge with a new, wider double-leaf bascule bridge.</description><category>Bridges, Streets and Roadways</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DEP, DOT</client_agency><current_phase>Design</current_phase><design_start>2012-07-23T00:00:00</design_start><budget_forecast>247449772.62</budget_forecast><latest_budget_changes>48605800.00</latest_budget_changes><total_budget_changes>142277136.00</total_budget_changes><forecast_completion>2021-03-04T00:00:00</forecast_completion><latest_schedule_changes>199</latest_schedule_changes><total_schedule_changes>2086</total_schedule_changes></row><row _id="row-wpkd.idfd-2jn7" _uuid="00000000-0000-0000-4027-1F84061751A6" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-wpkd.idfd-2jn7"><date_reported_as_of>2016-06-01T00:00:00</date_reported_as_of><pid>97</pid><project_name>Bruckner Expressway Westchester Creek Bridge Reconstruction</project_name><description>This project will replace the existing bridge with a new, wider double-leaf bascule bridge.</description><category>Bridges, Streets and Roadways</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DEP, DOT</client_agency><current_phase>Design</current_phase><design_start>2012-07-23T00:00:00</design_start><budget_forecast>268299502.49</budget_forecast><latest_budget_changes>20849729.87</latest_budget_changes><total_budget_changes>142277136.00</total_budget_changes><forecast_completion>2021-03-04T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>2086</total_schedule_changes></row><row _id="row-dnxg_wuwx-8ntq" _uuid="00000000-0000-0000-7338-56D6377C393A" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-dnxg_wuwx-8ntq"><date_reported_as_of>2016-11-01T00:00:00</date_reported_as_of><pid>97</pid><project_name>Bruckner Expressway Westchester Creek Bridge Reconstruction</project_name><description>Replace the existing bridge with a new, wider double-leaf bascule bridge in the Bronx.</description><category>Bridges, Streets and Roadways</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DEP, DOT</client_agency><current_phase>Design</current_phase><design_start>2012-07-23T00:00:00</design_start><budget_forecast>335764502.49</budget_forecast><latest_budget_changes>67465000.00</latest_budget_changes><total_budget_changes>142277136.00</total_budget_changes><forecast_completion>2021-03-04T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>2086</total_schedule_changes></row><row _id="row-bqra_uzpf_ym4n" _uuid="00000000-0000-0000-C04D-68EA35766E4D" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-bqra_uzpf_ym4n"><date_reported_as_of>2017-04-01T00:00:00</date_reported_as_of><pid>97</pid><project_name>Bruckner Expressway Westchester Creek Bridge Reconstruction</project_name><description>Replace the existing bridge with a new, wider double-leaf bascule bridge in the Bronx.</description><category>Bridges, Streets and Roadways</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DEP, DOT</client_agency><current_phase>Construction Procurement</current_phase><design_start>2012-07-23T00:00:00</design_start><budget_forecast>324042014.70</budget_forecast><latest_budget_changes>-11722487.79</latest_budget_changes><total_budget_changes>142277136.00</total_budget_changes><forecast_completion>2021-07-22T00:00:00</forecast_completion><latest_schedule_changes>140</latest_schedule_changes><total_schedule_changes>2086</total_schedule_changes></row><row _id="row-kze2_9hpt~aixd" _uuid="00000000-0000-0000-86B3-88CD6096FECF" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-kze2_9hpt~aixd"><date_reported_as_of>2017-09-01T00:00:00</date_reported_as_of><pid>97</pid><project_name>Bruckner Expressway Westchester Creek Bridge Reconstruction</project_name><description>Replace the existing bridge with a new, wider double-leaf bascule bridge in the Bronx.</description><category>Bridges, Streets and Roadways</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DEP, DOT</client_agency><current_phase>Construction</current_phase><design_start>2012-07-23T00:00:00</design_start><budget_forecast>323745502.00</budget_forecast><latest_budget_changes>-296512.70</latest_budget_changes><total_budget_changes>142277136.00</total_budget_changes><forecast_completion>2021-07-14T00:00:00</forecast_completion><latest_schedule_changes>-8</latest_schedule_changes><total_schedule_changes>2086</total_schedule_changes></row><row _id="row-his5~tgav-bdvp" _uuid="00000000-0000-0000-8EF6-D7F85BAD7FF0" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-his5~tgav-bdvp"><date_reported_as_of>2018-03-01T00:00:00</date_reported_as_of><pid>97</pid><project_name>Bruckner Expressway Westchester Creek Bridge Reconstruction</project_name><description>Replace the existing bridge with a new, wider double-leaf bascule bridge in the Bronx.</description><category>Bridges, Streets and Roadways</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DEP, DOT</client_agency><current_phase>Construction</current_phase><design_start>2012-07-23T00:00:00</design_start><budget_forecast>296672102.00</budget_forecast><latest_budget_changes>-27073400.00</latest_budget_changes><total_budget_changes>142277136.00</total_budget_changes><forecast_completion>2021-06-30T00:00:00</forecast_completion><latest_schedule_changes>-14</latest_schedule_changes><total_schedule_changes>2086</total_schedule_changes></row><row _id="row-pymg.p6wu~xgj9" _uuid="00000000-0000-0000-D7D3-507577662177" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-pymg.p6wu~xgj9"><date_reported_as_of>2018-08-01T00:00:00</date_reported_as_of><pid>97</pid><project_name>Bruckner Expressway Westchester Creek Bridge Reconstruction</project_name><description>Replace the existing bridge with a new, wider double-leaf bascule bridge in the Bronx.</description><category>Bridges, Streets and Roadways</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DEP, DOT</client_agency><current_phase>Construction</current_phase><design_start>2012-07-23T00:00:00</design_start><budget_forecast>302903499.00</budget_forecast><latest_budget_changes>6231397.00</latest_budget_changes><total_budget_changes>142277136.00</total_budget_changes><forecast_completion>2021-06-30T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>2086</total_schedule_changes></row><row _id="row-ihps-68rp~9xnz" _uuid="00000000-0000-0000-1A4B-7B2339487306" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ihps-68rp~9xnz"><date_reported_as_of>2019-01-01T00:00:00</date_reported_as_of><pid>97</pid><project_name>Bruckner Expressway Westchester Creek Bridge Reconstruction</project_name><description>Replace the existing bridge with a new, wider double-leaf bascule bridge in the Bronx.</description><category>Bridges, Streets and Roadways</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DEP, DOT</client_agency><current_phase>Construction</current_phase><design_start>2012-07-23T00:00:00</design_start><budget_forecast>288898080.00</budget_forecast><latest_budget_changes>-14005419.00</latest_budget_changes><total_budget_changes>142277136.00</total_budget_changes><forecast_completion>2021-06-30T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>2086</total_schedule_changes></row><row _id="row-perc.j39c-2dmp" _uuid="00000000-0000-0000-4E05-1D3EFE66AA0A" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-perc.j39c-2dmp"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>97</pid><project_name>Bruckner Expressway Westchester Creek Bridge Reconstruction</project_name><description>Replace the existing bridge with a new, wider double-leaf bascule bridge in the Bronx.</description><category>Bridges, Streets and Roadways</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DEP, DOT</client_agency><current_phase>Construction</current_phase><design_start>2012-07-23T00:00:00</design_start><budget_forecast>292568253.00</budget_forecast><latest_budget_changes>-161852.00</latest_budget_changes><total_budget_changes>142277136.00</total_budget_changes><forecast_completion>2022-11-30T00:00:00</forecast_completion><latest_schedule_changes>1106</latest_schedule_changes><total_schedule_changes>2086</total_schedule_changes></row><row _id="row-apev_jsjk~ptra" _uuid="00000000-0000-0000-6689-010813CAA636" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-apev_jsjk~ptra"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>97</pid><project_name>Bruckner Expressway Westchester Creek Bridge Reconstruction</project_name><category>Bridges, Streets and Roadways</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DEP, DOT</client_agency><total_budget_changes>142277136.00</total_budget_changes><total_schedule_changes>2086</total_schedule_changes></row><row _id="row-btk7.prjw~v2et" _uuid="00000000-0000-0000-1B44-538855453480" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-btk7.prjw~v2et"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>97</pid><project_name>Bruckner Expressway Westchester Creek Bridge Reconstruction</project_name><description>Replace the existing bridge with a new, wider double-leaf bascule bridge in the Bronx.</description><category>Bridges, Streets and Roadways</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DEP, DOT</client_agency><current_phase>Construction</current_phase><design_start>2012-07-23T00:00:00</design_start><budget_forecast>296250051.00</budget_forecast><latest_budget_changes>3681798.00</latest_budget_changes><total_budget_changes>142277136.00</total_budget_changes><forecast_completion>2022-11-30T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>2086</total_schedule_changes></row><row _id="row-3h35~pcab.mg23" _uuid="00000000-0000-0000-67D1-685601F0F8AF" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-3h35~pcab.mg23"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>97</pid><project_name>Bruckner Expressway Westchester Creek Bridge Reconstruction</project_name><description>Replace the existing bridge with a new, wider double-leaf bascule bridge in the Bronx.</description><category>Bridges, Streets and Roadways</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DEP, DOT</client_agency><current_phase>Construction</current_phase><design_start>2012-07-23T00:00:00</design_start><budget_forecast>293205552.00</budget_forecast><latest_budget_changes>-3044499.00</latest_budget_changes><total_budget_changes>142277136.00</total_budget_changes><forecast_completion>2022-11-30T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>2086</total_schedule_changes></row><row _id="row-f3wi.9xtc.pq4a" _uuid="00000000-0000-0000-A621-F957E21B82AD" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-f3wi.9xtc.pq4a"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>97</pid><project_name>Bruckner Expressway Westchester Creek Bridge Reconstruction</project_name><description>Replace the existing bridge with a new, wider double-leaf bascule bridge in the Bronx.</description><category>Bridges, Streets and Roadways</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DEP, DOT</client_agency><current_phase>Construction</current_phase><design_start>2012-07-23T00:00:00</design_start><budget_forecast>293047573.00</budget_forecast><latest_budget_changes>-157979.00</latest_budget_changes><total_budget_changes>142277136.00</total_budget_changes><forecast_completion>2022-11-30T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>2086</total_schedule_changes></row><row _id="row-nrw2~b74y.4zn6" _uuid="00000000-0000-0000-2195-DE51C719C586" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-nrw2~b74y.4zn6"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>97</pid><project_name>Bruckner Expressway Westchester Creek Bridge Reconstruction</project_name><description>Replace the existing bridge with a new, wider double-leaf bascule bridge in the Bronx.</description><category>Bridges, Streets and Roadways</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DEP, DOT</client_agency><current_phase>Construction</current_phase><design_start>2012-07-23T00:00:00</design_start><budget_forecast>291658898.00</budget_forecast><latest_budget_changes>-1388675.00</latest_budget_changes><total_budget_changes>142277136.00</total_budget_changes><forecast_completion>2023-12-27T00:00:00</forecast_completion><latest_schedule_changes>392</latest_schedule_changes><total_schedule_changes>2086</total_schedule_changes></row><row _id="row-ex53~qjxi~hjvk" _uuid="00000000-0000-0000-D34E-60930BB98C70" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ex53~qjxi~hjvk"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>97</pid><project_name>Bruckner Expressway Westchester Creek Bridge Reconstruction</project_name><description>Replace the existing bridge with a new, wider double-leaf bascule bridge in the Bronx.</description><category>Bridges, Streets and Roadways</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DEP, DOT</client_agency><current_phase>Construction</current_phase><design_start>2012-07-23T00:00:00</design_start><budget_forecast>297884658.00</budget_forecast><latest_budget_changes>6225760.00</latest_budget_changes><total_budget_changes>142277136.00</total_budget_changes><forecast_completion>2023-12-27T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>2086</total_schedule_changes></row><row _id="row-ka83-vur9.xa98" _uuid="00000000-0000-0000-E414-984F3B4C5520" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ka83-vur9.xa98"><date_reported_as_of>2013-09-01T00:00:00</date_reported_as_of><pid>101</pid><project_name>Roosevelt Avenue Bridge Superstructure and Substructure Repairs</project_name><description>Repair/replacement of bridge superstructure and substructure and new concrete-filled steel grid deck.</description><category>Bridges</category><borough>Queens</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2003-03-10T00:00:00</design_start><budget_forecast>123384000.00</budget_forecast><total_budget_changes>23798213.00</total_budget_changes><forecast_completion>2018-02-11T00:00:00</forecast_completion><total_schedule_changes>2003</total_schedule_changes></row><row _id="row-w7ku-ftpa.r9gh" _uuid="00000000-0000-0000-7A24-E973A7F114F6" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-w7ku-ftpa.r9gh"><date_reported_as_of>2014-01-01T00:00:00</date_reported_as_of><pid>101</pid><project_name>Roosevelt Avenue Bridge Superstructure and Substructure Repairs</project_name><description>This project includes repair/replacement of the bridge superstructure and substructure and new concrete-filled steel grid deck.</description><category>Bridges</category><borough>Queens</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2003-03-10T00:00:00</design_start><budget_forecast>121403787.00</budget_forecast><latest_budget_changes>-1980213.00</latest_budget_changes><total_budget_changes>23798213.00</total_budget_changes><forecast_completion>2018-12-09T00:00:00</forecast_completion><latest_schedule_changes>301</latest_schedule_changes><total_schedule_changes>2003</total_schedule_changes></row><row _id="row-iwk4-d2g8_w8a4" _uuid="00000000-0000-0000-3DED-242844D4FE1C" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-iwk4-d2g8_w8a4"><date_reported_as_of>2014-05-01T00:00:00</date_reported_as_of><pid>101</pid><project_name>Roosevelt Avenue Bridge Superstructure and Substructure Repairs</project_name><description>This project includes repair/replacement of the bridge superstructure and substructure and a new concrete-filled steel grid deck.</description><category>Bridges</category><borough>Queens</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2003-03-10T00:00:00</design_start><budget_forecast>147808339.00</budget_forecast><latest_budget_changes>26404552.00</latest_budget_changes><total_budget_changes>23798213.00</total_budget_changes><forecast_completion>2018-03-29T00:00:00</forecast_completion><latest_schedule_changes>-255</latest_schedule_changes><total_schedule_changes>2003</total_schedule_changes></row><row _id="row-juf7~c9td~cmaf" _uuid="00000000-0000-0000-688C-BDD1EFD32E3E" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-juf7~c9td~cmaf"><date_reported_as_of>2015-02-01T00:00:00</date_reported_as_of><pid>101</pid><project_name>Roosevelt Avenue Bridge Superstructure and Substructure Repairs</project_name><description>Repair the bridge superstructure and substructure and install a new concrete-filled steel grid deck.</description><category>Bridges</category><borough>Queens</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction Procurement</current_phase><design_start>2003-03-10T00:00:00</design_start><budget_forecast>142097340.00</budget_forecast><latest_budget_changes>-5710999.00</latest_budget_changes><total_budget_changes>23798213.00</total_budget_changes><forecast_completion>2023-01-11T00:00:00</forecast_completion><latest_schedule_changes>1749</latest_schedule_changes><total_schedule_changes>2003</total_schedule_changes></row><row _id="row-ydzn.7xgf-mstq" _uuid="00000000-0000-0000-9487-D0C061AAA176" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ydzn.7xgf-mstq"><date_reported_as_of>2015-08-01T00:00:00</date_reported_as_of><pid>101</pid><project_name>Roosevelt Avenue Bridge Superstructure and Substructure Repairs</project_name><description>Repair the bridge superstructure and substructure and install a new concrete-filled steel grid deck.</description><category>Bridges</category><borough>Queens</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><design_start>2003-03-10T00:00:00</design_start><budget_forecast>201932563.81</budget_forecast><latest_budget_changes>59835223.81</latest_budget_changes><total_budget_changes>23798213.00</total_budget_changes><forecast_completion>2019-05-07T00:00:00</forecast_completion><latest_schedule_changes>-1345</latest_schedule_changes><total_schedule_changes>2003</total_schedule_changes></row><row _id="row-fk7p_dm8n.4b65" _uuid="00000000-0000-0000-0BBD-FD4078D7912C" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-fk7p_dm8n.4b65"><date_reported_as_of>2016-01-01T00:00:00</date_reported_as_of><pid>101</pid><project_name>Roosevelt Avenue Bridge Superstructure and Substructure Repairs</project_name><description>Repair the bridge superstructure and substructure and install a new concrete-filled steel grid deck.</description><category>Bridges</category><borough>Queens</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><design_start>2003-03-10T00:00:00</design_start><budget_forecast>107601528.81</budget_forecast><latest_budget_changes>-94331035.00</latest_budget_changes><total_budget_changes>23798213.00</total_budget_changes><forecast_completion>2019-05-07T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>2003</total_schedule_changes></row><row _id="row-89rw_hxf7.824h" _uuid="00000000-0000-0000-96AE-DB4CB3838732" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-89rw_hxf7.824h"><date_reported_as_of>2016-06-01T00:00:00</date_reported_as_of><pid>101</pid><project_name>Roosevelt Avenue Bridge Superstructure and Substructure Repairs</project_name><description>Repair the bridge superstructure and substructure and install a new concrete-filled steel grid deck.</description><category>Bridges</category><borough>Queens</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><design_start>2003-03-10T00:00:00</design_start><budget_forecast>108380157.24</budget_forecast><latest_budget_changes>778628.43</latest_budget_changes><total_budget_changes>23798213.00</total_budget_changes><forecast_completion>2019-05-07T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>2003</total_schedule_changes></row><row _id="row-ixvs.6gt6_mx6f" _uuid="00000000-0000-0000-A259-B2E474FD01D1" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ixvs.6gt6_mx6f"><date_reported_as_of>2016-11-01T00:00:00</date_reported_as_of><pid>101</pid><project_name>Roosevelt Avenue Bridge Superstructure and Substructure Repairs</project_name><description>Repair the bridge superstructure and substructure and install a new concrete-filled steel grid deck.</description><category>Bridges</category><borough>Queens</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><design_start>2003-03-10T00:00:00</design_start><budget_forecast>106791910.24</budget_forecast><latest_budget_changes>-1588247.00</latest_budget_changes><total_budget_changes>23798213.00</total_budget_changes><forecast_completion>2019-05-27T00:00:00</forecast_completion><latest_schedule_changes>20</latest_schedule_changes><total_schedule_changes>2003</total_schedule_changes></row><row _id="row-s2s4.e6x3.g6vt" _uuid="00000000-0000-0000-98AA-870D14165BEF" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-s2s4.e6x3.g6vt"><date_reported_as_of>2017-04-01T00:00:00</date_reported_as_of><pid>101</pid><project_name>Roosevelt Avenue Bridge Superstructure and Substructure Repairs</project_name><description>Repair the bridge superstructure and substructure and install a new concrete-filled steel grid deck.</description><category>Bridges</category><borough>Queens</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><design_start>2003-03-10T00:00:00</design_start><budget_forecast>106740014.24</budget_forecast><latest_budget_changes>-51896.00</latest_budget_changes><total_budget_changes>23798213.00</total_budget_changes><forecast_completion>2019-05-07T00:00:00</forecast_completion><latest_schedule_changes>-20</latest_schedule_changes><total_schedule_changes>2003</total_schedule_changes></row><row _id="row-t4kw-qu5a.p9k4" _uuid="00000000-0000-0000-6741-2E1B1247A4A2" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-t4kw-qu5a.p9k4"><date_reported_as_of>2017-09-01T00:00:00</date_reported_as_of><pid>101</pid><project_name>Roosevelt Avenue Bridge Superstructure and Substructure Repairs</project_name><description>Repair the bridge superstructure and substructure and install a new concrete-filled steel grid deck.</description><category>Bridges</category><borough>Queens</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><design_start>2003-03-10T00:00:00</design_start><budget_forecast>105436907.00</budget_forecast><latest_budget_changes>-1303107.24</latest_budget_changes><total_budget_changes>23798213.00</total_budget_changes><forecast_completion>2019-05-27T00:00:00</forecast_completion><latest_schedule_changes>20</latest_schedule_changes><total_schedule_changes>2003</total_schedule_changes></row><row _id="row-4t3p_ss9y_i8vw" _uuid="00000000-0000-0000-6CD1-799D070BDAE0" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-4t3p_ss9y_i8vw"><date_reported_as_of>2018-03-01T00:00:00</date_reported_as_of><pid>101</pid><project_name>Roosevelt Avenue Bridge Superstructure and Substructure Repairs</project_name><description>Repair the bridge superstructure and substructure and install a new concrete-filled steel grid deck.</description><category>Bridges</category><borough>Queens</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><design_start>2003-03-10T00:00:00</design_start><budget_forecast>104792618.00</budget_forecast><latest_budget_changes>-644289.00</latest_budget_changes><total_budget_changes>23798213.00</total_budget_changes><forecast_completion>2019-05-27T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>2003</total_schedule_changes></row><row _id="row-38m7_f7nq~ca5e" _uuid="00000000-0000-0000-2023-EB97BF030381" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-38m7_f7nq~ca5e"><date_reported_as_of>2018-08-01T00:00:00</date_reported_as_of><pid>101</pid><project_name>Roosevelt Avenue Bridge Superstructure and Substructure Repairs</project_name><description>Repair the bridge superstructure and substructure and install a new concrete-filled steel grid deck.</description><category>Bridges</category><borough>Queens</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><design_start>2003-03-10T00:00:00</design_start><budget_forecast>106569120.00</budget_forecast><latest_budget_changes>1776502.00</latest_budget_changes><total_budget_changes>23798213.00</total_budget_changes><forecast_completion>2018-12-17T00:00:00</forecast_completion><latest_schedule_changes>-161</latest_schedule_changes><total_schedule_changes>2003</total_schedule_changes></row><row _id="row-jnt9_xiu3_usrb" _uuid="00000000-0000-0000-9981-1E4E632C73A8" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-jnt9_xiu3_usrb"><date_reported_as_of>2019-01-01T00:00:00</date_reported_as_of><pid>101</pid><project_name>Roosevelt Avenue Bridge Superstructure and Substructure Repairs</project_name><description>Repair the bridge superstructure and substructure and install a new concrete-filled steel grid deck.</description><category>Bridges</category><borough>Queens</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><design_start>2003-03-10T00:00:00</design_start><budget_forecast>108591109.00</budget_forecast><latest_budget_changes>2021989.00</latest_budget_changes><total_budget_changes>23798213.00</total_budget_changes><forecast_completion>2020-08-28T00:00:00</forecast_completion><latest_schedule_changes>620</latest_schedule_changes><total_schedule_changes>2003</total_schedule_changes></row><row _id="row-b94f.mxtq_5awg" _uuid="00000000-0000-0000-576F-7E51CC910983" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-b94f.mxtq_5awg"><date_reported_as_of>2019-05-01T00:00:00</date_reported_as_of><pid>101</pid><project_name>Roosevelt Avenue Bridge Superstructure and Substructure Repairs</project_name><description>Repair the bridge superstructure and substructure and install a new concrete-filled steel grid deck.</description><category>Bridges</category><borough>Queens</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><design_start>2003-03-10T00:00:00</design_start><budget_forecast>114154298.00</budget_forecast><latest_budget_changes>5563189.00</latest_budget_changes><total_budget_changes>23798213.00</total_budget_changes><forecast_completion>2020-08-28T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>2003</total_schedule_changes></row><row _id="row-5u8b-mgzf.ddfx" _uuid="00000000-0000-0000-BA30-8399B86F7E31" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-5u8b-mgzf.ddfx"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>101</pid><project_name>Roosevelt Avenue Bridge Superstructure and Substructure Repairs</project_name><description>Repair the bridge superstructure and substructure and install a new concrete-filled steel grid deck.</description><category>Bridges</category><borough>Queens</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><design_start>2003-03-10T00:00:00</design_start><budget_forecast>118060110.00</budget_forecast><latest_budget_changes>3905812.00</latest_budget_changes><total_budget_changes>23798213.00</total_budget_changes><total_schedule_changes>2003</total_schedule_changes></row><row _id="row-3d3w_gbeu_6zer" _uuid="00000000-0000-0000-5A8E-7A925C081A7A" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-3d3w_gbeu_6zer"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>101</pid><project_name>Roosevelt Avenue Bridge Superstructure and Substructure Repairs</project_name><description>Repair the bridge superstructure and substructure and install a new concrete-filled steel grid deck.</description><category>Bridges</category><borough>Queens</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><design_start>2003-03-10T00:00:00</design_start><budget_forecast>117201667.00</budget_forecast><latest_budget_changes>-858443.00</latest_budget_changes><total_budget_changes>23798213.00</total_budget_changes><forecast_completion>2020-08-28T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>2003</total_schedule_changes></row><row _id="row-ghgx-3n26_spxt" _uuid="00000000-0000-0000-E52C-ECA5169DDBCA" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ghgx-3n26_spxt"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>101</pid><project_name>Roosevelt Avenue Bridge Superstructure and Substructure Repairs</project_name><description>Repair the bridge superstructure and substructure and install a new concrete-filled steel grid deck.</description><category>Bridges</category><borough>Queens</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><design_start>2003-03-10T00:00:00</design_start><budget_forecast>119994667.00</budget_forecast><latest_budget_changes>2793000.00</latest_budget_changes><total_budget_changes>23798213.00</total_budget_changes><total_schedule_changes>2003</total_schedule_changes></row><row _id="row-475t.7u3x~q95j" _uuid="00000000-0000-0000-16CF-80D0AACA6949" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-475t.7u3x~q95j"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>101</pid><project_name>Roosevelt Avenue Bridge Superstructure and Substructure Repairs</project_name><description>Repair the bridge superstructure and substructure and install a new concrete-filled steel grid deck.</description><category>Bridges</category><borough>Queens</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><design_start>2003-03-10T00:00:00</design_start><budget_forecast>128041268.00</budget_forecast><latest_budget_changes>8046601.00</latest_budget_changes><total_budget_changes>23798213.00</total_budget_changes><total_schedule_changes>2003</total_schedule_changes></row><row _id="row-wzdf.sar6_xsti" _uuid="00000000-0000-0000-BE26-3B78E712208D" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-wzdf.sar6_xsti"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>101</pid><project_name>Roosevelt Avenue Bridge Superstructure and Substructure Repairs</project_name><category>Bridges</category><borough>Queens</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><total_budget_changes>23798213.00</total_budget_changes><total_schedule_changes>2003</total_schedule_changes></row><row _id="row-hprk_bskx_pf2j" _uuid="00000000-0000-0000-6948-F0C5B24D463B" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-hprk_bskx_pf2j"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>101</pid><project_name>Roosevelt Avenue Bridge Superstructure and Substructure Repairs</project_name><description>Repair the bridge superstructure and substructure and install a new concrete-filled steel grid deck.</description><category>Bridges</category><borough>Queens</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><design_start>2003-03-10T00:00:00</design_start><budget_forecast>138864733.00</budget_forecast><latest_budget_changes>10823465.00</latest_budget_changes><total_budget_changes>23798213.00</total_budget_changes><forecast_completion>2022-12-06T00:00:00</forecast_completion><latest_schedule_changes>830</latest_schedule_changes><total_schedule_changes>2003</total_schedule_changes></row><row _id="row-4jjz-xrak~zzq9" _uuid="00000000-0000-0000-6F82-EE82A2DA6D7F" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-4jjz-xrak~zzq9"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>101</pid><project_name>Roosevelt Avenue Bridge Superstructure and Substructure Repairs</project_name><description>Repair the bridge superstructure and substructure and install a new concrete-filled steel grid deck.</description><category>Bridges</category><borough>Queens</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><design_start>2003-03-10T00:00:00</design_start><budget_forecast>142216437.00</budget_forecast><latest_budget_changes>3351704.00</latest_budget_changes><total_budget_changes>23798213.00</total_budget_changes><forecast_completion>2022-12-08T00:00:00</forecast_completion><latest_schedule_changes>2</latest_schedule_changes><total_schedule_changes>2003</total_schedule_changes></row><row _id="row-7s8f~jwmn.5v8d" _uuid="00000000-0000-0000-0898-53EE94540B93" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-7s8f~jwmn.5v8d"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>101</pid><project_name>Roosevelt Avenue Bridge Superstructure and Substructure Repairs</project_name><description>Repair the bridge superstructure and substructure and install a new concrete-filled steel grid deck.</description><category>Bridges</category><borough>Queens</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><design_start>2003-03-10T00:00:00</design_start><budget_forecast>139898843.00</budget_forecast><latest_budget_changes>-2317594.00</latest_budget_changes><total_budget_changes>23798213.00</total_budget_changes><forecast_completion>2022-12-08T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>2003</total_schedule_changes></row><row _id="row-6z9u.qcfq_5gn3" _uuid="00000000-0000-0000-4510-30AE73834F07" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-6z9u.qcfq_5gn3"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>101</pid><project_name>Roosevelt Avenue Bridge Superstructure and Substructure Repairs</project_name><description>Repair the bridge superstructure and substructure and install a new concrete-filled steel grid deck.</description><category>Bridges</category><borough>Queens</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><design_start>2003-03-10T00:00:00</design_start><budget_forecast>161859565.00</budget_forecast><latest_budget_changes>21960722.00</latest_budget_changes><total_budget_changes>23798213.00</total_budget_changes><forecast_completion>2023-08-07T00:00:00</forecast_completion><latest_schedule_changes>242</latest_schedule_changes><total_schedule_changes>2003</total_schedule_changes></row><row _id="row-gtn9~d5zu~ybye" _uuid="00000000-0000-0000-4888-9E8B368183C3" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-gtn9~d5zu~ybye"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>101</pid><project_name>Roosevelt Avenue Bridge Superstructure and Substructure Repairs</project_name><description>Repair the bridge superstructure and substructure and install a new concrete-filled steel grid deck.</description><category>Bridges</category><borough>Queens</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><design_start>2003-03-10T00:00:00</design_start><budget_forecast>147182213.00</budget_forecast><latest_budget_changes>-14677352.00</latest_budget_changes><total_budget_changes>23798213.00</total_budget_changes><forecast_completion>2023-08-07T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>2003</total_schedule_changes></row><row _id="row-dq5t~k8v2_hdf2" _uuid="00000000-0000-0000-723B-D0B39863B0D3" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-dq5t~k8v2_hdf2"><date_reported_as_of>2013-09-01T00:00:00</date_reported_as_of><pid>106</pid><project_name>Broadway Bridge over Harlem River Replacement</project_name><description>Replace deteriorated members of lift span superstructure, concrete deck replacement, and replacement of lift electrical and mechanical systems, fenders etc.</description><category>Bridges</category><borough>Bronx, Manhattan</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2005-04-01T00:00:00</design_start><budget_forecast>109236000.00</budget_forecast><total_budget_changes>39724388.00</total_budget_changes><forecast_completion>2019-08-05T00:00:00</forecast_completion><total_schedule_changes>2797</total_schedule_changes></row><row _id="row-v6u7_88t3-q4rp" _uuid="00000000-0000-0000-05A2-81DF0734AC2E" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-v6u7_88t3-q4rp"><date_reported_as_of>2014-01-01T00:00:00</date_reported_as_of><pid>106</pid><project_name>Broadway Bridge over Harlem River Replacement</project_name><description>This project will replace deteriorated members of lift span superstructure, concrete deck replacement, and replacement of lift electrical and mechanical systems, fenders.</description><category>Bridges</category><borough>Bronx, Manhattan</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2005-04-01T00:00:00</design_start><budget_forecast>107027029.00</budget_forecast><latest_budget_changes>-2208971.00</latest_budget_changes><total_budget_changes>39724388.00</total_budget_changes><forecast_completion>2019-08-05T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>2797</total_schedule_changes></row><row _id="row-izfs_zqdk.cna3" _uuid="00000000-0000-0000-E60C-03AC0C4AC869" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-izfs_zqdk.cna3"><date_reported_as_of>2014-05-01T00:00:00</date_reported_as_of><pid>106</pid><project_name>Broadway Bridge over Harlem River Replacement</project_name><description>This project will replace deteriorated members of lift span superstructure, concrete deck, lift electrical and mechanical systems, and fenders.</description><category>Bridges</category><borough>Bronx, Manhattan</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2005-04-01T00:00:00</design_start><budget_forecast>110325563.00</budget_forecast><latest_budget_changes>3298534.00</latest_budget_changes><total_budget_changes>39724388.00</total_budget_changes><forecast_completion>2019-08-05T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>2797</total_schedule_changes></row><row _id="row-5cak.5ffy-n55w" _uuid="00000000-0000-0000-C48E-F6B09E00EF6C" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-5cak.5ffy-n55w"><date_reported_as_of>2015-02-01T00:00:00</date_reported_as_of><pid>106</pid><project_name>Broadway Bridge over Harlem River Replacement</project_name><description>Replace deteriorated members of lift span superstructure, concrete deck, lift electrical and mechanical systems, and fenders.</description><category>Bridges</category><borough>Bronx, Manhattan</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2005-04-01T00:00:00</design_start><budget_forecast>109215563.00</budget_forecast><latest_budget_changes>-1110000.00</latest_budget_changes><total_budget_changes>39724388.00</total_budget_changes><forecast_completion>2020-11-13T00:00:00</forecast_completion><latest_schedule_changes>466</latest_schedule_changes><total_schedule_changes>2797</total_schedule_changes></row><row _id="row-ymvp.zg2z_jx23" _uuid="00000000-0000-0000-AD1E-0AE17E8A71A2" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ymvp.zg2z_jx23"><date_reported_as_of>2015-08-01T00:00:00</date_reported_as_of><pid>106</pid><project_name>Broadway Bridge over Harlem River Replacement</project_name><description>Replace deteriorated members of lift span superstructure, concrete deck, lift electrical and mechanical systems, and fenders.</description><category>Bridges</category><borough>Bronx, Manhattan</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2005-04-01T00:00:00</design_start><budget_forecast>109294563.00</budget_forecast><latest_budget_changes>79000.00</latest_budget_changes><total_budget_changes>39724388.00</total_budget_changes><forecast_completion>2021-01-12T00:00:00</forecast_completion><latest_schedule_changes>60</latest_schedule_changes><total_schedule_changes>2797</total_schedule_changes></row><row _id="row-eqba-gury~x8nn" _uuid="00000000-0000-0000-2275-245A2071B1EC" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-eqba-gury~x8nn"><date_reported_as_of>2016-01-01T00:00:00</date_reported_as_of><pid>106</pid><project_name>Broadway Bridge over Harlem River Replacement</project_name><description>Replace deteriorated members of lift span superstructure, concrete deck, lift electrical and mechanical systems, and fenders.</description><category>Bridges</category><borough>Bronx, Manhattan</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2005-04-01T00:00:00</design_start><budget_forecast>168353563.00</budget_forecast><latest_budget_changes>59059000.00</latest_budget_changes><total_budget_changes>39724388.00</total_budget_changes><forecast_completion>2020-11-13T00:00:00</forecast_completion><latest_schedule_changes>-60</latest_schedule_changes><total_schedule_changes>2797</total_schedule_changes></row><row _id="row-n4ea-iwjy_ehf3" _uuid="00000000-0000-0000-C65F-B9536500B236" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-n4ea-iwjy_ehf3"><date_reported_as_of>2016-06-01T00:00:00</date_reported_as_of><pid>106</pid><project_name>Broadway Bridge over Harlem River Replacement</project_name><description>Replace deteriorated members of lift span superstructure, concrete deck, lift electrical and mechanical systems, and fenders.</description><category>Bridges</category><borough>Bronx, Manhattan</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2005-04-01T00:00:00</design_start><budget_forecast>169946545.64</budget_forecast><latest_budget_changes>1592982.64</latest_budget_changes><total_budget_changes>39724388.00</total_budget_changes><forecast_completion>2020-11-13T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>2797</total_schedule_changes></row><row _id="row-umry~pid9_t8x2" _uuid="00000000-0000-0000-A7A4-90782DDFA553" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-umry~pid9_t8x2"><date_reported_as_of>2016-11-01T00:00:00</date_reported_as_of><pid>106</pid><project_name>Broadway Bridge over Harlem River Replacement</project_name><description>Replace deteriorated members of lift span superstructure, concrete deck, lift electrical and mechanical systems, and fenders.</description><category>Bridges</category><borough>Bronx, Manhattan</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2005-04-01T00:00:00</design_start><budget_forecast>169681545.64</budget_forecast><latest_budget_changes>-265000.00</latest_budget_changes><total_budget_changes>39724388.00</total_budget_changes><forecast_completion>2020-11-13T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>2797</total_schedule_changes></row><row _id="row-nfsi_ci2f.ypck" _uuid="00000000-0000-0000-E117-7B2F73C3B5BD" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-nfsi_ci2f.ypck"><date_reported_as_of>2017-04-01T00:00:00</date_reported_as_of><pid>106</pid><project_name>Broadway Bridge over Harlem River Replacement</project_name><description>Replace deteriorated members of lift span superstructure, concrete deck, lift electrical and mechanical systems, and fenders.</description><category>Bridges</category><borough>Bronx, Manhattan</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2005-04-01T00:00:00</design_start><budget_forecast>168597456.72</budget_forecast><latest_budget_changes>-1084088.92</latest_budget_changes><total_budget_changes>39724388.00</total_budget_changes><forecast_completion>2020-11-13T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>2797</total_schedule_changes></row><row _id="row-rjyc-npbp~mfy7" _uuid="00000000-0000-0000-49E3-9FB8557A04D8" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-rjyc-npbp~mfy7"><date_reported_as_of>2017-09-01T00:00:00</date_reported_as_of><pid>106</pid><project_name>Broadway Bridge over Harlem River Replacement</project_name><description>Replace deteriorated members of lift span superstructure, concrete deck, lift electrical and mechanical systems, and fenders.</description><category>Bridges</category><borough>Bronx, Manhattan</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2005-04-01T00:00:00</design_start><budget_forecast>191951546.00</budget_forecast><latest_budget_changes>23354089.28</latest_budget_changes><total_budget_changes>39724388.00</total_budget_changes><forecast_completion>2021-10-17T00:00:00</forecast_completion><latest_schedule_changes>338</latest_schedule_changes><total_schedule_changes>2797</total_schedule_changes></row><row _id="row-8z8v.d3dg-frdj" _uuid="00000000-0000-0000-EAD1-B6CF62883C6E" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-8z8v.d3dg-frdj"><date_reported_as_of>2018-03-01T00:00:00</date_reported_as_of><pid>106</pid><project_name>Broadway Bridge over Harlem River Replacement</project_name><description>Replace deteriorated members of lift span superstructure, concrete deck, lift electrical and mechanical systems, and fenders.</description><category>Bridges</category><borough>Bronx, Manhattan</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction Procurement</current_phase><design_start>2005-04-01T00:00:00</design_start><budget_forecast>200270457.00</budget_forecast><latest_budget_changes>8318911.00</latest_budget_changes><total_budget_changes>39724388.00</total_budget_changes><forecast_completion>2021-07-22T00:00:00</forecast_completion><latest_schedule_changes>-87</latest_schedule_changes><total_schedule_changes>2797</total_schedule_changes></row><row _id="row-cgwq_hher_bgay" _uuid="00000000-0000-0000-0DEF-E93344DA6D23" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-cgwq_hher_bgay"><date_reported_as_of>2018-08-01T00:00:00</date_reported_as_of><pid>106</pid><project_name>Broadway Bridge over Harlem River Replacement</project_name><description>Replace deteriorated members of lift span superstructure, concrete deck, lift electrical and mechanical systems, and fenders.</description><category>Bridges</category><borough>Bronx, Manhattan</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><design_start>2005-04-01T00:00:00</design_start><budget_forecast>198192458.00</budget_forecast><latest_budget_changes>-2077999.00</latest_budget_changes><total_budget_changes>39724388.00</total_budget_changes><forecast_completion>2021-07-19T00:00:00</forecast_completion><latest_schedule_changes>-3</latest_schedule_changes><total_schedule_changes>2797</total_schedule_changes></row><row _id="row-rzhh_jgsn-7zai" _uuid="00000000-0000-0000-1009-247F83831192" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-rzhh_jgsn-7zai"><date_reported_as_of>2019-01-01T00:00:00</date_reported_as_of><pid>106</pid><project_name>Broadway Bridge over Harlem River Replacement</project_name><description>Replace deteriorated members of lift span superstructure, concrete deck, lift electrical and mechanical systems, and fenders.</description><category>Bridges</category><borough>Bronx, Manhattan</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><design_start>2005-04-01T00:00:00</design_start><budget_forecast>189133980.00</budget_forecast><latest_budget_changes>-9058478.00</latest_budget_changes><total_budget_changes>39724388.00</total_budget_changes><forecast_completion>2021-07-19T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>2797</total_schedule_changes></row><row _id="row-hkpn.egdn_m282" _uuid="00000000-0000-0000-BC54-1439DC16016A" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-hkpn.egdn_m282"><date_reported_as_of>2019-05-01T00:00:00</date_reported_as_of><pid>106</pid><project_name>Broadway Bridge over Harlem River Replacement</project_name><description>Replace deteriorated members of lift span superstructure, concrete deck, lift electrical and mechanical systems, and fenders.</description><category>Bridges</category><borough>Bronx, Manhattan</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><design_start>2005-04-01T00:00:00</design_start><budget_forecast>190133979.00</budget_forecast><latest_budget_changes>999999.00</latest_budget_changes><total_budget_changes>39724388.00</total_budget_changes><forecast_completion>2022-03-25T00:00:00</forecast_completion><latest_schedule_changes>249</latest_schedule_changes><total_schedule_changes>2797</total_schedule_changes></row><row _id="row-vcm7~nje6-6yn2" _uuid="00000000-0000-0000-AD25-FFD5BDE00646" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-vcm7~nje6-6yn2"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>106</pid><project_name>Broadway Bridge over Harlem River Replacement</project_name><description>Replace deteriorated members of lift span superstructure, concrete deck, lift electrical and mechanical systems, and fenders.</description><category>Bridges</category><borough>Bronx, Manhattan</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><design_start>2005-04-01T00:00:00</design_start><budget_forecast>184323980.00</budget_forecast><latest_budget_changes>-5809999.00</latest_budget_changes><total_budget_changes>39724388.00</total_budget_changes><total_schedule_changes>2797</total_schedule_changes></row><row _id="row-hais~queq-xdwd" _uuid="00000000-0000-0000-9B02-2F039891CB5A" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-hais~queq-xdwd"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>106</pid><project_name>Broadway Bridge over Harlem River Replacement</project_name><description>Replace deteriorated members of lift span superstructure, concrete deck, lift electrical and mechanical systems, and fenders.</description><category>Bridges</category><borough>Bronx, Manhattan</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><design_start>2005-04-01T00:00:00</design_start><budget_forecast>184923519.00</budget_forecast><latest_budget_changes>599539.00</latest_budget_changes><total_budget_changes>39724388.00</total_budget_changes><total_schedule_changes>2797</total_schedule_changes></row><row _id="row-tkpx~76jd-8wdr" _uuid="00000000-0000-0000-4679-1A0619094CEE" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-tkpx~76jd-8wdr"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>106</pid><project_name>Broadway Bridge over Harlem River Replacement</project_name><description>Replace deteriorated members of lift span superstructure, concrete deck, lift electrical and mechanical systems, and fenders.</description><category>Bridges</category><borough>Bronx, Manhattan</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><design_start>2005-04-01T00:00:00</design_start><budget_forecast>184958519.00</budget_forecast><latest_budget_changes>35000.00</latest_budget_changes><total_budget_changes>39724388.00</total_budget_changes><forecast_completion>2021-07-19T00:00:00</forecast_completion><latest_schedule_changes>-249</latest_schedule_changes><total_schedule_changes>2797</total_schedule_changes></row><row _id="row-26b9.vfte.7seu" _uuid="00000000-0000-0000-6627-5354809A0383" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-26b9.vfte.7seu"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>106</pid><project_name>Broadway Bridge over Harlem River Replacement</project_name><description>Replace deteriorated members of lift span superstructure, concrete deck, lift electrical and mechanical systems, and fenders.</description><category>Bridges</category><borough>Bronx, Manhattan</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><design_start>2005-04-01T00:00:00</design_start><budget_forecast>184818519.00</budget_forecast><latest_budget_changes>-140000.00</latest_budget_changes><total_budget_changes>39724388.00</total_budget_changes><forecast_completion>2023-02-01T00:00:00</forecast_completion><latest_schedule_changes>562</latest_schedule_changes><total_schedule_changes>2797</total_schedule_changes></row><row _id="row-nv9g.jdn6_9k92" _uuid="00000000-0000-0000-478A-5D0A53D74D07" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-nv9g.jdn6_9k92"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>106</pid><project_name>Broadway Bridge over Harlem River Replacement</project_name><category>Bridges</category><borough>Bronx, Manhattan</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><total_budget_changes>39724388.00</total_budget_changes><total_schedule_changes>2797</total_schedule_changes></row><row _id="row-fehc_7kuy-fpz4" _uuid="00000000-0000-0000-7C42-6D503A1EBEB3" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-fehc_7kuy-fpz4"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>106</pid><project_name>Broadway Bridge over Harlem River Replacement</project_name><description>Replace deteriorated members of lift span superstructure, concrete deck, lift electrical and mechanical systems, and fenders.</description><category>Bridges</category><borough>Bronx, Manhattan</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><design_start>2005-04-01T00:00:00</design_start><budget_forecast>183862519.00</budget_forecast><latest_budget_changes>-956000.00</latest_budget_changes><total_budget_changes>39724388.00</total_budget_changes><forecast_completion>2027-04-02T00:00:00</forecast_completion><latest_schedule_changes>1521</latest_schedule_changes><total_schedule_changes>2797</total_schedule_changes></row><row _id="row-8vr2-bp5b.kup3" _uuid="00000000-0000-0000-486C-3AD2F5DF12F2" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-8vr2-bp5b.kup3"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>106</pid><project_name>Broadway Bridge over Harlem River Replacement</project_name><description>Replace deteriorated members of lift span superstructure, concrete deck, lift electrical and mechanical systems, and fenders.</description><category>Bridges</category><borough>Bronx, Manhattan</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><design_start>2005-04-01T00:00:00</design_start><budget_forecast>165082519.00</budget_forecast><latest_budget_changes>-18780000.00</latest_budget_changes><total_budget_changes>39724388.00</total_budget_changes><forecast_completion>2027-04-02T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>2797</total_schedule_changes></row><row _id="row-bmgf-ynar.ife5" _uuid="00000000-0000-0000-C266-567BA6328E1B" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-bmgf-ynar.ife5"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>106</pid><project_name>Broadway Bridge over Harlem River Replacement</project_name><description>Replace deteriorated members of lift span superstructure, concrete deck, lift electrical and mechanical systems, and fenders.</description><category>Bridges</category><borough>Bronx, Manhattan</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><design_start>2005-04-01T00:00:00</design_start><budget_forecast>157492984.00</budget_forecast><latest_budget_changes>-7589535.00</latest_budget_changes><total_budget_changes>39724388.00</total_budget_changes><forecast_completion>2027-04-02T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>2797</total_schedule_changes></row><row _id="row-pq6w.hecc~rfze" _uuid="00000000-0000-0000-8E82-8A5F3F46FB2C" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-pq6w.hecc~rfze"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>106</pid><project_name>Broadway Bridge over Harlem River Replacement</project_name><description>Replace deteriorated members of lift span superstructure, concrete deck, lift electrical and mechanical systems, and fenders.</description><category>Bridges</category><borough>Bronx, Manhattan</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><design_start>2005-04-01T00:00:00</design_start><budget_forecast>150048610.00</budget_forecast><latest_budget_changes>-7444374.00</latest_budget_changes><total_budget_changes>39724388.00</total_budget_changes><forecast_completion>2027-04-02T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>2797</total_schedule_changes></row><row _id="row-w372.44k5-tgac" _uuid="00000000-0000-0000-2E23-4C055FB2DC27" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-w372.44k5-tgac"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>106</pid><project_name>Broadway Bridge over Harlem River Replacement</project_name><description>Replace deteriorated members of lift span superstructure, concrete deck, lift electrical and mechanical systems, and fenders.</description><category>Bridges</category><borough>Bronx, Manhattan</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><design_start>2005-04-01T00:00:00</design_start><budget_forecast>148960388.00</budget_forecast><latest_budget_changes>-1088222.00</latest_budget_changes><total_budget_changes>39724388.00</total_budget_changes><forecast_completion>2027-04-02T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>2797</total_schedule_changes></row><row _id="row-s7m5_9cp6_sydu" _uuid="00000000-0000-0000-2559-0B2F9F4FD45E" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-s7m5_9cp6_sydu"><date_reported_as_of>2013-09-01T00:00:00</date_reported_as_of><pid>112</pid><project_name>Westchester Avenue Bridge over Hutch River Parkway Rehabilitation</project_name><description>Rehabilitation of abutments, piers, approaches, and steel superstructure and replace reinforced concrete deck.</description><category>Bridges, Streets and Roadways</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>1995-01-17T00:00:00</design_start><budget_forecast>58259000.00</budget_forecast><total_budget_changes>20945057.00</total_budget_changes><forecast_completion>2019-03-22T00:00:00</forecast_completion><total_schedule_changes>1592</total_schedule_changes></row><row _id="row-r2vf_9qjk~hhv6" _uuid="00000000-0000-0000-9D0D-4FAE39CA6FFF" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-r2vf_9qjk~hhv6"><date_reported_as_of>2014-01-01T00:00:00</date_reported_as_of><pid>112</pid><project_name>Westchester Avenue Bridge over Hutch River Parkway Rehabilitation</project_name><description>Westchester Avenue Bridge over Hutch River Parkway Rehabilitation. Rehabilitation of abutments, piers, approaches, and steel superstructure and replace reinforced concrete deck.</description><category>Bridges, Streets and Roadways</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>1995-01-17T00:00:00</design_start><budget_forecast>62914686.00</budget_forecast><latest_budget_changes>4655686.00</latest_budget_changes><total_budget_changes>20945057.00</total_budget_changes><forecast_completion>2019-07-06T00:00:00</forecast_completion><latest_schedule_changes>106</latest_schedule_changes><total_schedule_changes>1592</total_schedule_changes></row><row _id="row-nixs~wggq.2g49" _uuid="00000000-0000-0000-EBBA-3FCF8BE0ABD4" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-nixs~wggq.2g49"><date_reported_as_of>2014-05-01T00:00:00</date_reported_as_of><pid>112</pid><project_name>Westchester Avenue Bridge over Hutch River Parkway Rehabilitation</project_name><description>Rehabilitation of abutments, piers, approaches, and steel superstructure and replacement of reinforced concrete deck.</description><category>Bridges, Streets and Roadways</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>1995-01-17T00:00:00</design_start><budget_forecast>62500136.00</budget_forecast><latest_budget_changes>-414550.00</latest_budget_changes><total_budget_changes>20945057.00</total_budget_changes><forecast_completion>2020-05-01T00:00:00</forecast_completion><latest_schedule_changes>300</latest_schedule_changes><total_schedule_changes>1592</total_schedule_changes></row><row _id="row-h6xk.nidh-ynaw" _uuid="00000000-0000-0000-564D-3ED7958690C1" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-h6xk.nidh-ynaw"><date_reported_as_of>2015-02-01T00:00:00</date_reported_as_of><pid>112</pid><project_name>Westchester Avenue Bridge over Hutch River Parkway Rehabilitation</project_name><description>Repair abutments, piers, approaches, and the steel superstructure. Replace reinforced concrete deck.</description><category>Bridges, Streets and Roadways</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>1995-01-17T00:00:00</design_start><budget_forecast>62601664.00</budget_forecast><latest_budget_changes>101528.00</latest_budget_changes><total_budget_changes>20945057.00</total_budget_changes><forecast_completion>2019-07-01T00:00:00</forecast_completion><latest_schedule_changes>-305</latest_schedule_changes><total_schedule_changes>1592</total_schedule_changes></row><row _id="row-bk73_yrvw.byka" _uuid="00000000-0000-0000-0F8D-AB16577AC598" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-bk73_yrvw.byka"><date_reported_as_of>2015-08-01T00:00:00</date_reported_as_of><pid>112</pid><project_name>Westchester Avenue Bridge over Hutch River Parkway Rehabilitation</project_name><description>Repair abutments, piers, approaches, and the steel superstructure. Replace reinforced concrete deck.</description><category>Bridges, Streets and Roadways</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>1995-01-17T00:00:00</design_start><budget_forecast>63911397.37</budget_forecast><latest_budget_changes>1309733.37</latest_budget_changes><total_budget_changes>20945057.00</total_budget_changes><forecast_completion>2020-05-01T00:00:00</forecast_completion><latest_schedule_changes>305</latest_schedule_changes><total_schedule_changes>1592</total_schedule_changes></row><row _id="row-2hw3.xmnv~q887" _uuid="00000000-0000-0000-6619-DD8BB421E2C1" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-2hw3.xmnv~q887"><date_reported_as_of>2016-01-01T00:00:00</date_reported_as_of><pid>112</pid><project_name>Westchester Avenue Bridge over Hutch River Parkway Rehabilitation</project_name><description>Repair abutments, piers, approaches, and the steel superstructure. Replace reinforced concrete deck.</description><category>Bridges, Streets and Roadways</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>1995-01-17T00:00:00</design_start><budget_forecast>63857397.37</budget_forecast><latest_budget_changes>-54000.00</latest_budget_changes><total_budget_changes>20945057.00</total_budget_changes><forecast_completion>2020-05-01T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1592</total_schedule_changes></row><row _id="row-zrc3_tfdi_r9r2" _uuid="00000000-0000-0000-BFAF-D59D030D6B6C" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-zrc3_tfdi_r9r2"><date_reported_as_of>2016-06-01T00:00:00</date_reported_as_of><pid>112</pid><project_name>Westchester Avenue Bridge over Hutch River Parkway Rehabilitation</project_name><description>Repair abutments, piers, approaches, and the steel superstructure. Replace reinforced concrete deck.</description><category>Bridges, Streets and Roadways</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>1995-01-17T00:00:00</design_start><budget_forecast>65745169.00</budget_forecast><latest_budget_changes>1887771.63</latest_budget_changes><total_budget_changes>20945057.00</total_budget_changes><forecast_completion>2020-11-01T00:00:00</forecast_completion><latest_schedule_changes>184</latest_schedule_changes><total_schedule_changes>1592</total_schedule_changes></row><row _id="row-6hbc_an9u~ubpx" _uuid="00000000-0000-0000-5684-9E25429888D0" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-6hbc_an9u~ubpx"><date_reported_as_of>2016-11-01T00:00:00</date_reported_as_of><pid>112</pid><project_name>Westchester Avenue Bridge over Hutch River Parkway Rehabilitation</project_name><description>Repair abutments, piers, approaches, and the steel superstructure; replace reinforced concrete deck.</description><category>Bridges, Streets and Roadways</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><design_start>1995-01-17T00:00:00</design_start><budget_forecast>123782169.00</budget_forecast><latest_budget_changes>58037000.00</latest_budget_changes><total_budget_changes>20945057.00</total_budget_changes><forecast_completion>2021-09-13T00:00:00</forecast_completion><latest_schedule_changes>316</latest_schedule_changes><total_schedule_changes>1592</total_schedule_changes></row><row _id="row-hy8t-28ny~wn2q" _uuid="00000000-0000-0000-4F26-82EC744208D3" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-hy8t-28ny~wn2q"><date_reported_as_of>2017-04-01T00:00:00</date_reported_as_of><pid>112</pid><project_name>Westchester Avenue Bridge over Hutch River Parkway Rehabilitation</project_name><description>Repair abutments, piers, approaches, and steel superstructure located in Pelham Bay, Bronx; replace reinforced concrete deck.</description><category>Bridges, Streets and Roadways</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><design_start>1995-01-17T00:00:00</design_start><budget_forecast>80133352.29</budget_forecast><latest_budget_changes>-43648816.71</latest_budget_changes><total_budget_changes>20945057.00</total_budget_changes><forecast_completion>2021-09-13T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1592</total_schedule_changes></row><row _id="row-nnvi.cxk7~ye7j" _uuid="00000000-0000-0000-A12B-2FEDE3A6F2E5" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-nnvi.cxk7~ye7j"><date_reported_as_of>2017-09-01T00:00:00</date_reported_as_of><pid>112</pid><project_name>Westchester Avenue Bridge over Hutch River Parkway Rehabilitation</project_name><description>Repair abutments, piers, approaches, and steel superstructure located in Pelham Bay, Bronx; replace reinforced concrete deck.</description><category>Bridges, Streets and Roadways</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><design_start>1995-01-17T00:00:00</design_start><budget_forecast>78620169.00</budget_forecast><latest_budget_changes>-1513183.29</latest_budget_changes><total_budget_changes>20945057.00</total_budget_changes><forecast_completion>2021-09-13T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1592</total_schedule_changes></row><row _id="row-cb9q-wrdw~n933" _uuid="00000000-0000-0000-D42B-1AFFD1745A09" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-cb9q-wrdw~n933"><date_reported_as_of>2018-03-01T00:00:00</date_reported_as_of><pid>112</pid><project_name>Westchester Avenue Bridge over Hutch River Parkway Rehabilitation</project_name><description>Repair abutments, piers, approaches, and steel superstructure located in Pelham Bay, Bronx; replace reinforced concrete deck.</description><category>Bridges, Streets and Roadways</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><design_start>1995-01-17T00:00:00</design_start><budget_forecast>80310944.00</budget_forecast><latest_budget_changes>1690775.00</latest_budget_changes><total_budget_changes>20945057.00</total_budget_changes><forecast_completion>2021-09-13T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1592</total_schedule_changes></row><row _id="row-fneh-iy29~si3c" _uuid="00000000-0000-0000-E31E-810390D93286" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-fneh-iy29~si3c"><date_reported_as_of>2018-08-01T00:00:00</date_reported_as_of><pid>112</pid><project_name>Westchester Avenue Bridge over Hutch River Parkway Rehabilitation</project_name><description>Repair abutments, piers, approaches, and steel superstructure located in Pelham Bay, Bronx; replace reinforced concrete deck.</description><category>Bridges, Streets and Roadways</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><design_start>1995-01-17T00:00:00</design_start><budget_forecast>86866222.00</budget_forecast><latest_budget_changes>6555278.00</latest_budget_changes><total_budget_changes>20945057.00</total_budget_changes><forecast_completion>2021-09-13T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1592</total_schedule_changes></row><row _id="row-f6b8.zmny_ueit" _uuid="00000000-0000-0000-9BEF-0FDF0AD29A0D" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-f6b8.zmny_ueit"><date_reported_as_of>2019-01-01T00:00:00</date_reported_as_of><pid>112</pid><project_name>Westchester Avenue Bridge over Hutch River Parkway Rehabilitation</project_name><description>Repair abutments, piers, approaches, and steel superstructure located in Pelham Bay, Bronx; replace reinforced concrete deck.</description><category>Bridges, Streets and Roadways</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><design_start>1995-01-17T00:00:00</design_start><budget_forecast>80943222.00</budget_forecast><latest_budget_changes>-5923000.00</latest_budget_changes><total_budget_changes>20945057.00</total_budget_changes><forecast_completion>2021-09-13T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1592</total_schedule_changes></row><row _id="row-7456_u7n6-avqa" _uuid="00000000-0000-0000-4B01-C6CAD445DB00" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-7456_u7n6-avqa"><date_reported_as_of>2019-05-01T00:00:00</date_reported_as_of><pid>112</pid><project_name>Westchester Avenue Bridge over Hutch River Parkway Rehabilitation</project_name><description>Repair abutments, piers, approaches, and steel superstructure located in Pelham Bay, Bronx; replace reinforced concrete deck.</description><category>Bridges, Streets and Roadways</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><design_start>1995-01-17T00:00:00</design_start><budget_forecast>82693222.00</budget_forecast><latest_budget_changes>1750000.00</latest_budget_changes><total_budget_changes>20945057.00</total_budget_changes><forecast_completion>2021-09-13T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1592</total_schedule_changes></row><row _id="row-tzyw_s4xs.byre" _uuid="00000000-0000-0000-46FE-F971BA46A751" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-tzyw_s4xs.byre"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>112</pid><project_name>Westchester Avenue Bridge over Hutch River Parkway Rehabilitation</project_name><description>Repair abutments, piers, approaches, and steel superstructure located in Pelham Bay, Bronx; replace reinforced concrete deck.</description><category>Bridges, Streets and Roadways</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><design_start>1995-01-17T00:00:00</design_start><budget_forecast>81833276.00</budget_forecast><latest_budget_changes>-859946.00</latest_budget_changes><total_budget_changes>20945057.00</total_budget_changes><total_schedule_changes>1592</total_schedule_changes></row><row _id="row-2kim-ec2c~n3fb" _uuid="00000000-0000-0000-EDB9-AB43188F4C57" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-2kim-ec2c~n3fb"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>112</pid><project_name>Westchester Avenue Bridge over Hutch River Parkway Rehabilitation</project_name><description>Repair abutments, piers, approaches, and steel superstructure located in Pelham Bay, Bronx; replace reinforced concrete deck.</description><category>Bridges, Streets and Roadways</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><design_start>1995-01-17T00:00:00</design_start><budget_forecast>82178674.00</budget_forecast><latest_budget_changes>345398.00</latest_budget_changes><total_budget_changes>20945057.00</total_budget_changes><total_schedule_changes>1592</total_schedule_changes></row><row _id="row-r2ae~wpie~ncc8" _uuid="00000000-0000-0000-E2FC-25F4AE2BADF7" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-r2ae~wpie~ncc8"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>112</pid><project_name>Westchester Avenue Bridge over Hutch River Parkway Rehabilitation</project_name><description>Repair abutments, piers, approaches, and steel superstructure located in Pelham Bay, Bronx; replace reinforced concrete deck.</description><category>Bridges, Streets and Roadways</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><design_start>1995-01-17T00:00:00</design_start><budget_forecast>81753674.00</budget_forecast><latest_budget_changes>-425000.00</latest_budget_changes><total_budget_changes>20945057.00</total_budget_changes><total_schedule_changes>1592</total_schedule_changes></row><row _id="row-8sg9.q4y7_52ea" _uuid="00000000-0000-0000-F4E1-2352ACC1C1AD" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-8sg9.q4y7_52ea"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>112</pid><project_name>Westchester Avenue Bridge over Hutch River Parkway Rehabilitation</project_name><description>Repair abutments, piers, approaches, and steel superstructure located in Pelham Bay, Bronx; replace reinforced concrete deck.</description><category>Bridges, Streets and Roadways</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><design_start>1995-01-17T00:00:00</design_start><budget_forecast>81771450.00</budget_forecast><latest_budget_changes>17776.00</latest_budget_changes><total_budget_changes>20945057.00</total_budget_changes><forecast_completion>2022-07-23T00:00:00</forecast_completion><latest_schedule_changes>313</latest_schedule_changes><total_schedule_changes>1592</total_schedule_changes></row><row _id="row-gx2i~iqyi~xqc9" _uuid="00000000-0000-0000-0A61-FAC2C1AB17F8" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-gx2i~iqyi~xqc9"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>112</pid><project_name>Westchester Avenue Bridge over Hutch River Parkway Rehabilitation</project_name><category>Bridges, Streets and Roadways</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><total_budget_changes>20945057.00</total_budget_changes><total_schedule_changes>1592</total_schedule_changes></row><row _id="row-7srh.wnck_r9be" _uuid="00000000-0000-0000-013A-0383B4FB2E5E" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-7srh.wnck_r9be"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>112</pid><project_name>Westchester Avenue Bridge over Hutch River Parkway Rehabilitation</project_name><description>Repair abutments, piers, approaches, and steel superstructure located in Pelham Bay, Bronx; replace reinforced concrete deck.</description><category>Bridges, Streets and Roadways</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><design_start>1995-01-17T00:00:00</design_start><budget_forecast>82171450.00</budget_forecast><latest_budget_changes>400000.00</latest_budget_changes><total_budget_changes>20945057.00</total_budget_changes><forecast_completion>2022-07-23T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1592</total_schedule_changes></row><row _id="row-56ih_bsgu-m2x9" _uuid="00000000-0000-0000-5A2A-BA2C5C4DBEA8" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-56ih_bsgu-m2x9"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>112</pid><project_name>Westchester Avenue Bridge over Hutch River Parkway Rehabilitation</project_name><description>Repair abutments, piers, approaches, and steel superstructure located in Pelham Bay, Bronx; replace reinforced concrete deck.</description><category>Bridges, Streets and Roadways</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><design_start>1995-01-17T00:00:00</design_start><budget_forecast>88676271.00</budget_forecast><latest_budget_changes>6504821.00</latest_budget_changes><total_budget_changes>20945057.00</total_budget_changes><forecast_completion>2022-07-23T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1592</total_schedule_changes></row><row _id="row-sq7y~83s5-r7wk" _uuid="00000000-0000-0000-170C-ABA1E316B300" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-sq7y~83s5-r7wk"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>112</pid><project_name>Westchester Avenue Bridge over Hutch River Parkway Rehabilitation</project_name><description>Repair abutments, piers, approaches, and steel superstructure located in Pelham Bay, Bronx; replace reinforced concrete deck.</description><category>Bridges, Streets and Roadways</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><design_start>1995-01-17T00:00:00</design_start><budget_forecast>82262363.00</budget_forecast><latest_budget_changes>-6413908.00</latest_budget_changes><total_budget_changes>20945057.00</total_budget_changes><forecast_completion>2022-07-23T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1592</total_schedule_changes></row><row _id="row-crpd~yyd9.5wtf" _uuid="00000000-0000-0000-28A6-511143A866E6" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-crpd~yyd9.5wtf"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>112</pid><project_name>Westchester Avenue Bridge over Hutch River Parkway Rehabilitation</project_name><description>Repair abutments, piers, approaches, and steel superstructure located in Pelham Bay, Bronx; replace reinforced concrete deck.</description><category>Bridges, Streets and Roadways</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><design_start>1995-01-17T00:00:00</design_start><budget_forecast>78733057.00</budget_forecast><latest_budget_changes>-3529306.00</latest_budget_changes><total_budget_changes>20945057.00</total_budget_changes><forecast_completion>2023-07-31T00:00:00</forecast_completion><latest_schedule_changes>373</latest_schedule_changes><total_schedule_changes>1592</total_schedule_changes></row><row _id="row-ruwh~aa6h_jbvw" _uuid="00000000-0000-0000-0714-70FA448F4F65" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ruwh~aa6h_jbvw"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>112</pid><project_name>Westchester Avenue Bridge over Hutch River Parkway Rehabilitation</project_name><description>Repair abutments, piers, approaches, and steel superstructure located in Pelham Bay, Bronx; replace reinforced concrete deck.</description><category>Bridges, Streets and Roadways</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><design_start>1995-01-17T00:00:00</design_start><budget_forecast>79204057.00</budget_forecast><latest_budget_changes>471000.00</latest_budget_changes><total_budget_changes>20945057.00</total_budget_changes><forecast_completion>2023-07-31T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1592</total_schedule_changes></row><row _id="row-evcg-jhx4_pcya" _uuid="00000000-0000-0000-66CD-FFF266549E2F" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-evcg-jhx4_pcya"><date_reported_as_of>2015-02-01T00:00:00</date_reported_as_of><pid>113</pid><project_name>Riverside Drive/West 158th Street Bridge Rehabilitation</project_name><description>Deck replacement of the Riverside Drive Viaduct / Bridge over W. 158th Street.</description><category>Bridges, Streets and Roadways</category><borough>Manhattan</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2014-10-22T00:00:00</design_start><budget_forecast>61507424.00</budget_forecast><latest_budget_changes>6801424.00</latest_budget_changes><total_budget_changes>96922794.00</total_budget_changes><forecast_completion>2021-12-17T00:00:00</forecast_completion><latest_schedule_changes>901</latest_schedule_changes><total_schedule_changes>2152</total_schedule_changes></row><row _id="row-urxk-rnnr.b6cp" _uuid="00000000-0000-0000-F3B2-0F7BB6B1A963" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-urxk-rnnr.b6cp"><date_reported_as_of>2015-08-01T00:00:00</date_reported_as_of><pid>113</pid><project_name>Riverside Drive/West 158th Street Bridge Rehabilitation</project_name><description>Deck replacement of the Riverside Drive Viaduct / Bridge over W. 158th Street.</description><category>Bridges, Streets and Roadways</category><borough>Manhattan</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2014-10-22T00:00:00</design_start><budget_forecast>64057424.18</budget_forecast><latest_budget_changes>2550000.18</latest_budget_changes><total_budget_changes>96922794.00</total_budget_changes><forecast_completion>2021-12-17T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>2152</total_schedule_changes></row><row _id="row-a59m-3ymy_dcvx" _uuid="00000000-0000-0000-D000-B71488D2EDB1" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-a59m-3ymy_dcvx"><date_reported_as_of>2016-01-01T00:00:00</date_reported_as_of><pid>113</pid><project_name>Riverside Drive/West 158th Street Bridge Rehabilitation</project_name><description>Deck replacement of the Riverside Drive Viaduct / Bridge over W. 158th Street.</description><category>Bridges, Streets and Roadways</category><borough>Manhattan</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2014-10-22T00:00:00</design_start><budget_forecast>83857407.18</budget_forecast><latest_budget_changes>19799983.00</latest_budget_changes><total_budget_changes>96922794.00</total_budget_changes><forecast_completion>2020-07-13T00:00:00</forecast_completion><latest_schedule_changes>-522</latest_schedule_changes><total_schedule_changes>2152</total_schedule_changes></row><row _id="row-5exk.vejr-2rmq" _uuid="00000000-0000-0000-483B-C9E7F0D0ACC4" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-5exk.vejr-2rmq"><date_reported_as_of>2016-06-01T00:00:00</date_reported_as_of><pid>113</pid><project_name>Riverside Drive/West 158th Street Bridge Rehabilitation</project_name><description>Deck replacement of the Riverside Drive Viaduct / Bridge over W. 158th Street.</description><category>Bridges, Streets and Roadways</category><borough>Manhattan</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2014-10-22T00:00:00</design_start><budget_forecast>84072407.18</budget_forecast><latest_budget_changes>215000.00</latest_budget_changes><total_budget_changes>96922794.00</total_budget_changes><forecast_completion>2021-12-17T00:00:00</forecast_completion><latest_schedule_changes>522</latest_schedule_changes><total_schedule_changes>2152</total_schedule_changes></row><row _id="row-fp9y-tjt8_zdce" _uuid="00000000-0000-0000-29E1-0DF970FCBDBC" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-fp9y-tjt8_zdce"><date_reported_as_of>2016-11-01T00:00:00</date_reported_as_of><pid>113</pid><project_name>Riverside Drive/West 158th Street Bridge Rehabilitation</project_name><description>Deck replacement of the Riverside Drive Viaduct / Bridge over W. 158th Street.</description><category>Bridges, Streets and Roadways</category><borough>Manhattan</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2014-10-22T00:00:00</design_start><budget_forecast>85356602.68</budget_forecast><latest_budget_changes>1284195.50</latest_budget_changes><total_budget_changes>96922794.00</total_budget_changes><forecast_completion>2021-12-17T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>2152</total_schedule_changes></row><row _id="row-eb24.tffx.d43r" _uuid="00000000-0000-0000-5D17-62B4346F3640" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-eb24.tffx.d43r"><date_reported_as_of>2017-04-01T00:00:00</date_reported_as_of><pid>113</pid><project_name>Riverside Drive/West 158th Street Bridge Rehabilitation</project_name><description>Replace deck of the Riverside Drive viaduct/ bridge over West 158th Street.</description><category>Bridges, Streets and Roadways</category><borough>Manhattan</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2014-10-22T00:00:00</design_start><budget_forecast>145663602.68</budget_forecast><latest_budget_changes>60307000.00</latest_budget_changes><total_budget_changes>96922794.00</total_budget_changes><forecast_completion>2021-12-17T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>2152</total_schedule_changes></row><row _id="row-ckrv~cqaq-x4bd" _uuid="00000000-0000-0000-1F70-D5391B7298AE" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ckrv~cqaq-x4bd"><date_reported_as_of>2017-09-01T00:00:00</date_reported_as_of><pid>113</pid><project_name>Riverside Drive/West 158th Street Bridge Rehabilitation</project_name><description>Replace deck of the Riverside Drive viaduct/ bridge over West 158th Street.</description><category>Bridges, Streets and Roadways</category><borough>Manhattan</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2014-10-22T00:00:00</design_start><budget_forecast>162834407.00</budget_forecast><latest_budget_changes>17170804.32</latest_budget_changes><total_budget_changes>96922794.00</total_budget_changes><forecast_completion>2021-12-02T00:00:00</forecast_completion><latest_schedule_changes>-15</latest_schedule_changes><total_schedule_changes>2152</total_schedule_changes></row><row _id="row-cqm8_u893.6n4t" _uuid="00000000-0000-0000-B311-67452E202A74" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-cqm8_u893.6n4t"><date_reported_as_of>2018-03-01T00:00:00</date_reported_as_of><pid>113</pid><project_name>Riverside Drive/West 158th Street Bridge Rehabilitation</project_name><description>Replace deck of the Riverside Drive viaduct/ bridge over West 158th Street.</description><category>Bridges, Streets and Roadways</category><borough>Manhattan</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2014-10-22T00:00:00</design_start><budget_forecast>159357469.00</budget_forecast><latest_budget_changes>-3476938.00</latest_budget_changes><total_budget_changes>96922794.00</total_budget_changes><forecast_completion>2021-12-16T00:00:00</forecast_completion><latest_schedule_changes>14</latest_schedule_changes><total_schedule_changes>2152</total_schedule_changes></row><row _id="row-mig9-eavz~he5v" _uuid="00000000-0000-0000-7734-DAA1307DBCCF" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-mig9-eavz~he5v"><date_reported_as_of>2018-08-01T00:00:00</date_reported_as_of><pid>113</pid><project_name>Riverside Drive/West 158th Street Bridge Rehabilitation</project_name><description>Replace deck of the Riverside Drive viaduct/ bridge over West 158th Street.</description><category>Bridges, Streets and Roadways</category><borough>Manhattan</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction Procurement</current_phase><design_start>2014-10-22T00:00:00</design_start><budget_forecast>251414563.00</budget_forecast><latest_budget_changes>92057094.00</latest_budget_changes><total_budget_changes>96922794.00</total_budget_changes><forecast_completion>2022-01-17T00:00:00</forecast_completion><latest_schedule_changes>32</latest_schedule_changes><total_schedule_changes>2152</total_schedule_changes></row><row _id="row-j4u3-ajn5_343u" _uuid="00000000-0000-0000-8E24-DCE68B0BB16F" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-j4u3-ajn5_343u"><date_reported_as_of>2019-01-01T00:00:00</date_reported_as_of><pid>113</pid><project_name>Riverside Drive/West 158th Street Bridge Rehabilitation</project_name><description>Replace deck of the Riverside Drive viaduct/ bridge over West 158th Street.</description><category>Bridges, Streets and Roadways</category><borough>Manhattan</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><design_start>2014-10-22T00:00:00</design_start><budget_forecast>127568850.22</budget_forecast><latest_budget_changes>-123845712.78</latest_budget_changes><total_budget_changes>96922794.00</total_budget_changes><forecast_completion>2022-06-27T00:00:00</forecast_completion><latest_schedule_changes>161</latest_schedule_changes><total_schedule_changes>2152</total_schedule_changes></row><row _id="row-qnrq-f86p.ewuu" _uuid="00000000-0000-0000-DA6D-5D3A691E0C61" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-qnrq-f86p.ewuu"><date_reported_as_of>2019-05-01T00:00:00</date_reported_as_of><pid>113</pid><project_name>Riverside Drive/West 158th Street Bridge Rehabilitation</project_name><description>Replace deck of the Riverside Drive viaduct/ bridge over West 158th Street.</description><category>Bridges, Streets and Roadways</category><borough>Manhattan</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><design_start>2014-10-22T00:00:00</design_start><budget_forecast>160245510.00</budget_forecast><latest_budget_changes>32676659.78</latest_budget_changes><total_budget_changes>96922794.00</total_budget_changes><forecast_completion>2022-06-27T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>2152</total_schedule_changes></row><row _id="row-ivnk_uz7w-563p" _uuid="00000000-0000-0000-9776-7B81C10643A1" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ivnk_uz7w-563p"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>113</pid><project_name>Riverside Drive/West 158th Street Bridge Rehabilitation</project_name><description>Replace deck of the Riverside Drive viaduct/ bridge over West 158th Street.</description><category>Bridges, Streets and Roadways</category><borough>Manhattan</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><design_start>2014-10-22T00:00:00</design_start><budget_forecast>159495510.00</budget_forecast><latest_budget_changes>-750000.00</latest_budget_changes><total_budget_changes>96922794.00</total_budget_changes><total_schedule_changes>2152</total_schedule_changes></row><row _id="row-tkr3~2g2k_mv84" _uuid="00000000-0000-0000-890C-5456C4089E6B" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-tkr3~2g2k_mv84"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>113</pid><project_name>Riverside Drive/West 158th Street Bridge Rehabilitation</project_name><description>Replace deck of the Riverside Drive viaduct/ bridge over West 158th Street.</description><category>Bridges, Streets and Roadways</category><borough>Manhattan</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><design_start>2014-10-22T00:00:00</design_start><budget_forecast>159993029.00</budget_forecast><latest_budget_changes>497519.00</latest_budget_changes><total_budget_changes>96922794.00</total_budget_changes><forecast_completion>2022-06-27T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>2152</total_schedule_changes></row><row _id="row-dhin.4gwr_55fr" _uuid="00000000-0000-0000-0D60-41433DB7AEC1" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-dhin.4gwr_55fr"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>113</pid><project_name>Riverside Drive/West 158th Street Bridge Rehabilitation</project_name><description>Replace deck of the Riverside Drive viaduct/ bridge over West 158th Street.</description><category>Bridges, Streets and Roadways</category><borough>Manhattan</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><design_start>2014-10-22T00:00:00</design_start><budget_forecast>159713029.00</budget_forecast><latest_budget_changes>-280000.00</latest_budget_changes><total_budget_changes>96922794.00</total_budget_changes><forecast_completion>2022-06-27T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>2152</total_schedule_changes></row><row _id="row-hqkj_wz54_jgia" _uuid="00000000-0000-0000-85AA-A7B9AE4B11F3" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-hqkj_wz54_jgia"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>113</pid><project_name>Riverside Drive/West 158th Street Bridge Rehabilitation</project_name><description>Replace deck of the Riverside Drive viaduct/ bridge over West 158th Street.</description><category>Bridges, Streets and Roadways</category><borough>Manhattan</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><design_start>2014-10-22T00:00:00</design_start><budget_forecast>135702340.00</budget_forecast><latest_budget_changes>-24010689.00</latest_budget_changes><total_budget_changes>96922794.00</total_budget_changes><forecast_completion>2022-06-27T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>2152</total_schedule_changes></row><row _id="row-n96d_ytbd.zuzm" _uuid="00000000-0000-0000-9D16-E455FE9D4D19" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-n96d_ytbd.zuzm"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>113</pid><project_name>Riverside Drive/West 158th Street Bridge Rehabilitation</project_name><category>Bridges, Streets and Roadways</category><borough>Manhattan</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><total_budget_changes>96922794.00</total_budget_changes><total_schedule_changes>2152</total_schedule_changes></row><row _id="row-cuf3~tuig.gket" _uuid="00000000-0000-0000-60D9-C371470E48AB" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-cuf3~tuig.gket"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>113</pid><project_name>Riverside Drive/West 158th Street Bridge Rehabilitation</project_name><description>Replace deck of the Riverside Drive viaduct/ bridge over West 158th Street.</description><category>Bridges, Streets and Roadways</category><borough>Manhattan</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><design_start>2014-10-22T00:00:00</design_start><budget_forecast>135684340.00</budget_forecast><latest_budget_changes>-18000.00</latest_budget_changes><total_budget_changes>96922794.00</total_budget_changes><forecast_completion>2023-10-13T00:00:00</forecast_completion><latest_schedule_changes>473</latest_schedule_changes><total_schedule_changes>2152</total_schedule_changes></row><row _id="row-bstf-cnk6-ei6m" _uuid="00000000-0000-0000-31FD-AD6528DC42F9" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-bstf-cnk6-ei6m"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>113</pid><project_name>Riverside Drive/West 158th Street Bridge Rehabilitation</project_name><description>Replace deck of the Riverside Drive viaduct/ bridge over West 158th Street.</description><category>Bridges, Streets and Roadways</category><borough>Manhattan</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><design_start>2014-10-22T00:00:00</design_start><budget_forecast>144908026.00</budget_forecast><latest_budget_changes>9223686.00</latest_budget_changes><total_budget_changes>96922794.00</total_budget_changes><forecast_completion>2023-10-13T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>2152</total_schedule_changes></row><row _id="row-4q66_sx6n_96rs" _uuid="00000000-0000-0000-7700-77A1CFFF35C6" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-4q66_sx6n_96rs"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>113</pid><project_name>Riverside Drive/West 158th Street Bridge Rehabilitation</project_name><description>Replace deck of the Riverside Drive viaduct/ bridge over West 158th Street.</description><category>Bridges, Streets and Roadways</category><borough>Manhattan</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><design_start>2014-10-22T00:00:00</design_start><budget_forecast>153137026.00</budget_forecast><latest_budget_changes>8229000.00</latest_budget_changes><total_budget_changes>96922794.00</total_budget_changes><forecast_completion>2023-07-15T00:00:00</forecast_completion><latest_schedule_changes>-90</latest_schedule_changes><total_schedule_changes>2152</total_schedule_changes></row><row _id="row-e937~azgt_rz87" _uuid="00000000-0000-0000-1B70-F2B96081BF4B" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-e937~azgt_rz87"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>113</pid><project_name>Riverside Drive/West 158th Street Bridge Rehabilitation</project_name><description>Replace deck of the Riverside Drive viaduct/ bridge over West 158th Street.</description><category>Bridges, Streets and Roadways</category><borough>Manhattan</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><design_start>2014-10-22T00:00:00</design_start><budget_forecast>144569858.00</budget_forecast><latest_budget_changes>-8567168.00</latest_budget_changes><total_budget_changes>96922794.00</total_budget_changes><forecast_completion>2025-05-21T00:00:00</forecast_completion><latest_schedule_changes>676</latest_schedule_changes><total_schedule_changes>2152</total_schedule_changes></row><row _id="row-fx36-3pw4~kt9i" _uuid="00000000-0000-0000-19FD-BABE4EC97DDB" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-fx36-3pw4~kt9i"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>113</pid><project_name>Riverside Drive/West 158th Street Bridge Rehabilitation</project_name><description>Replace deck of the Riverside Drive viaduct/ bridge over West 158th Street.</description><category>Bridges, Streets and Roadways</category><borough>Manhattan</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><design_start>2014-10-22T00:00:00</design_start><budget_forecast>151628794.00</budget_forecast><latest_budget_changes>7058936.00</latest_budget_changes><total_budget_changes>96922794.00</total_budget_changes><forecast_completion>2025-05-21T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>2152</total_schedule_changes></row><row _id="row-kyc5_65kb-abn8" _uuid="00000000-0000-0000-7B09-7F66E816664C" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-kyc5_65kb-abn8"><date_reported_as_of>2016-01-01T00:00:00</date_reported_as_of><pid>114</pid><project_name>Madison Avenue Bridge Reconstruction</project_name><description>Replace the electrical and mechanical systems of the Madison Avenue Bridge.</description><category>Bridges</category><borough>Manhattan, Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2011-02-14T00:00:00</design_start><budget_forecast>53092095.93</budget_forecast><latest_budget_changes>-1417209.07</latest_budget_changes><total_budget_changes>2036997.00</total_budget_changes><forecast_completion>2019-07-03T00:00:00</forecast_completion><latest_schedule_changes>320</latest_schedule_changes><total_schedule_changes>1628</total_schedule_changes></row><row _id="row-xuhr_2d6q-myag" _uuid="00000000-0000-0000-4057-59F6888F73BB" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-xuhr_2d6q-myag"><date_reported_as_of>2016-06-01T00:00:00</date_reported_as_of><pid>114</pid><project_name>Madison Avenue Bridge Reconstruction</project_name><description>Replace the electrical and mechanical systems of the Madison Avenue Bridge.</description><category>Bridges</category><borough>Manhattan, Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2011-02-14T00:00:00</design_start><budget_forecast>52342089.93</budget_forecast><latest_budget_changes>-750006.00</latest_budget_changes><total_budget_changes>2036997.00</total_budget_changes><forecast_completion>2019-07-03T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1628</total_schedule_changes></row><row _id="row-sgn9~j2rm_bcit" _uuid="00000000-0000-0000-0DCC-08687CA02F87" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-sgn9~j2rm_bcit"><date_reported_as_of>2016-11-01T00:00:00</date_reported_as_of><pid>114</pid><project_name>Madison Avenue Bridge Reconstruction</project_name><description>Replace the electrical and mechanical systems of the Madison Avenue Bridge.</description><category>Bridges</category><borough>Manhattan, Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2011-02-14T00:00:00</design_start><budget_forecast>53044089.93</budget_forecast><latest_budget_changes>702000.00</latest_budget_changes><total_budget_changes>2036997.00</total_budget_changes><forecast_completion>2019-07-03T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1628</total_schedule_changes></row><row _id="row-66t9_gjm7~ta2a" _uuid="00000000-0000-0000-ABF5-D4A398DD384E" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-66t9_gjm7~ta2a"><date_reported_as_of>2017-04-01T00:00:00</date_reported_as_of><pid>114</pid><project_name>Madison Avenue Bridge Reconstruction</project_name><description>Replace the electrical and mechanical systems of the Madison Avenue Bridge.</description><category>Bridges</category><borough>Manhattan, Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2011-02-14T00:00:00</design_start><budget_forecast>55163089.93</budget_forecast><latest_budget_changes>2119000.00</latest_budget_changes><total_budget_changes>2036997.00</total_budget_changes><forecast_completion>2019-07-03T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1628</total_schedule_changes></row><row _id="row-3cbj~h3s7-ccdi" _uuid="00000000-0000-0000-6B0D-B7B2BFC15BA7" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-3cbj~h3s7-ccdi"><date_reported_as_of>2017-09-01T00:00:00</date_reported_as_of><pid>114</pid><project_name>Madison Avenue Bridge Reconstruction</project_name><description>Replace the electrical and mechanical systems of the Madison Avenue Bridge.</description><category>Bridges</category><borough>Manhattan, Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2011-02-14T00:00:00</design_start><budget_forecast>44694090.00</budget_forecast><latest_budget_changes>-10468999.93</latest_budget_changes><total_budget_changes>2036997.00</total_budget_changes><forecast_completion>2020-08-18T00:00:00</forecast_completion><latest_schedule_changes>412</latest_schedule_changes><total_schedule_changes>1628</total_schedule_changes></row><row _id="row-fa7m.5w5g_iw2k" _uuid="00000000-0000-0000-F33D-DA297E9A5113" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-fa7m.5w5g_iw2k"><date_reported_as_of>2018-03-01T00:00:00</date_reported_as_of><pid>114</pid><project_name>Madison Avenue Bridge Reconstruction</project_name><description>Replace the electrical and mechanical systems of the Madison Avenue Bridge.</description><category>Bridges</category><borough>Manhattan, Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction Procurement</current_phase><design_start>2011-02-14T00:00:00</design_start><budget_forecast>44742221.00</budget_forecast><latest_budget_changes>48131.00</latest_budget_changes><total_budget_changes>2036997.00</total_budget_changes><forecast_completion>2020-07-11T00:00:00</forecast_completion><latest_schedule_changes>-38</latest_schedule_changes><total_schedule_changes>1628</total_schedule_changes></row><row _id="row-cq96~9fq9-hqid" _uuid="00000000-0000-0000-29FD-3CEB42283241" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-cq96~9fq9-hqid"><date_reported_as_of>2018-08-01T00:00:00</date_reported_as_of><pid>114</pid><project_name>Madison Avenue Bridge Reconstruction</project_name><description>Replace the electrical and mechanical systems of the Madison Avenue Bridge.</description><category>Bridges</category><borough>Manhattan, Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><design_start>2011-02-14T00:00:00</design_start><budget_forecast>76589599.00</budget_forecast><latest_budget_changes>31847378.00</latest_budget_changes><total_budget_changes>2036997.00</total_budget_changes><forecast_completion>2022-03-14T00:00:00</forecast_completion><latest_schedule_changes>611</latest_schedule_changes><total_schedule_changes>1628</total_schedule_changes></row><row _id="row-mjmm~erfg-492f" _uuid="00000000-0000-0000-49B8-FA9164D07995" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-mjmm~erfg-492f"><date_reported_as_of>2019-01-01T00:00:00</date_reported_as_of><pid>114</pid><project_name>Madison Avenue Bridge Reconstruction</project_name><description>Replace the electrical and mechanical systems of the Madison Avenue Bridge.</description><category>Bridges</category><borough>Manhattan, Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><design_start>2011-02-14T00:00:00</design_start><budget_forecast>54167599.00</budget_forecast><latest_budget_changes>-22422000.00</latest_budget_changes><total_budget_changes>2036997.00</total_budget_changes><forecast_completion>2022-03-14T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1628</total_schedule_changes></row><row _id="row-3eqq-6au7.wbuy" _uuid="00000000-0000-0000-62E9-14060EA1285D" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-3eqq-6au7.wbuy"><date_reported_as_of>2019-05-01T00:00:00</date_reported_as_of><pid>114</pid><project_name>Madison Avenue Bridge Reconstruction</project_name><description>Replace the electrical and mechanical systems of the Madison Avenue Bridge.</description><category>Bridges</category><borough>Manhattan, Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><design_start>2011-02-14T00:00:00</design_start><budget_forecast>55017599.00</budget_forecast><latest_budget_changes>850000.00</latest_budget_changes><total_budget_changes>2036997.00</total_budget_changes><forecast_completion>2022-04-13T00:00:00</forecast_completion><latest_schedule_changes>30</latest_schedule_changes><total_schedule_changes>1628</total_schedule_changes></row><row _id="row-pv8d_38pr.mv7i" _uuid="00000000-0000-0000-4DBF-064C293ED371" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-pv8d_38pr.mv7i"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>114</pid><project_name>Madison Avenue Bridge Reconstruction</project_name><description>Replace the electrical and mechanical systems of the Madison Avenue Bridge.</description><category>Bridges</category><borough>Manhattan, Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><design_start>2011-02-14T00:00:00</design_start><budget_forecast>59689598.00</budget_forecast><latest_budget_changes>4671999.00</latest_budget_changes><total_budget_changes>2036997.00</total_budget_changes><total_schedule_changes>1628</total_schedule_changes></row><row _id="row-jqww.s2as_2pfg" _uuid="00000000-0000-0000-ABD9-D3E08F8B8287" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-jqww.s2as_2pfg"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>114</pid><project_name>Madison Avenue Bridge Reconstruction</project_name><description>Replace the electrical and mechanical systems of the Madison Avenue Bridge.</description><category>Bridges</category><borough>Manhattan, Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><design_start>2011-02-14T00:00:00</design_start><budget_forecast>59094994.00</budget_forecast><latest_budget_changes>-594604.00</latest_budget_changes><total_budget_changes>2036997.00</total_budget_changes><total_schedule_changes>1628</total_schedule_changes></row><row _id="row-qqbf-kf55_vwae" _uuid="00000000-0000-0000-88DA-DB6AAF837CAE" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-qqbf-kf55_vwae"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>114</pid><project_name>Madison Avenue Bridge Reconstruction</project_name><description>Replace the electrical and mechanical systems of the Madison Avenue Bridge.</description><category>Bridges</category><borough>Manhattan, Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><design_start>2011-02-14T00:00:00</design_start><budget_forecast>59244994.00</budget_forecast><latest_budget_changes>150000.00</latest_budget_changes><total_budget_changes>2036997.00</total_budget_changes><total_schedule_changes>1628</total_schedule_changes></row><row _id="row-jb8v_vtfu~aiy8" _uuid="00000000-0000-0000-D207-91789E362C71" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-jb8v_vtfu~aiy8"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>114</pid><project_name>Madison Avenue Bridge Reconstruction</project_name><description>Replace the electrical and mechanical systems of the Madison Avenue Bridge.</description><category>Bridges</category><borough>Manhattan, Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><design_start>2011-02-14T00:00:00</design_start><budget_forecast>58076041.00</budget_forecast><latest_budget_changes>-1168953.00</latest_budget_changes><total_budget_changes>2036997.00</total_budget_changes><forecast_completion>2022-04-13T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1628</total_schedule_changes></row><row _id="row-2gvp-gh5n-mfe9" _uuid="00000000-0000-0000-98C1-D648103BD6BE" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-2gvp-gh5n-mfe9"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>114</pid><project_name>Madison Avenue Bridge Reconstruction</project_name><category>Bridges</category><borough>Manhattan, Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><total_budget_changes>2036997.00</total_budget_changes><total_schedule_changes>1628</total_schedule_changes></row><row _id="row-m97m-fxcs_56wh" _uuid="00000000-0000-0000-1971-AB6F96680900" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-m97m-fxcs_56wh"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>114</pid><project_name>Madison Avenue Bridge Reconstruction</project_name><description>Replace the electrical and mechanical systems of the Madison Avenue Bridge.</description><category>Bridges</category><borough>Manhattan, Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><design_start>2011-02-14T00:00:00</design_start><budget_forecast>59352041.00</budget_forecast><latest_budget_changes>1276000.00</latest_budget_changes><total_budget_changes>2036997.00</total_budget_changes><total_schedule_changes>1628</total_schedule_changes></row><row _id="row-4npq~8nyi_qu2d" _uuid="00000000-0000-0000-04FC-5C983AE8113F" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-4npq~8nyi_qu2d"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>114</pid><project_name>Madison Avenue Bridge Reconstruction</project_name><description>Replace the electrical and mechanical systems of the Madison Avenue Bridge.</description><category>Bridges</category><borough>Manhattan, Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><design_start>2011-02-14T00:00:00</design_start><budget_forecast>60746302.00</budget_forecast><latest_budget_changes>1394261.00</latest_budget_changes><total_budget_changes>2036997.00</total_budget_changes><forecast_completion>2023-01-31T00:00:00</forecast_completion><latest_schedule_changes>293</latest_schedule_changes><total_schedule_changes>1628</total_schedule_changes></row><row _id="row-vjah.yp7w_kc3q" _uuid="00000000-0000-0000-6D88-3AA8EBBFA3EB" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-vjah.yp7w_kc3q"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>114</pid><project_name>Madison Avenue Bridge Reconstruction</project_name><description>Replace the electrical and mechanical systems of the Madison Avenue Bridge.</description><category>Bridges</category><borough>Manhattan, Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><design_start>2011-02-14T00:00:00</design_start><budget_forecast>55717842.00</budget_forecast><latest_budget_changes>-5028460.00</latest_budget_changes><total_budget_changes>2036997.00</total_budget_changes><forecast_completion>2023-01-31T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1628</total_schedule_changes></row><row _id="row-ut2q.nzir_2re6" _uuid="00000000-0000-0000-78D3-1A94B1468739" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ut2q.nzir_2re6"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>114</pid><project_name>Madison Avenue Bridge Reconstruction</project_name><description>Replace the electrical and mechanical systems of the Madison Avenue Bridge.</description><category>Bridges</category><borough>Manhattan, Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><design_start>2011-02-14T00:00:00</design_start><budget_forecast>55424399.00</budget_forecast><latest_budget_changes>-293443.00</latest_budget_changes><total_budget_changes>2036997.00</total_budget_changes><forecast_completion>2023-01-31T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1628</total_schedule_changes></row><row _id="row-gqsy.kgg4.kr6a" _uuid="00000000-0000-0000-76B2-1E44F1099CB2" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-gqsy.kgg4.kr6a"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>114</pid><project_name>Madison Avenue Bridge Reconstruction</project_name><description>Replace the electrical and mechanical systems of the Madison Avenue Bridge.</description><category>Bridges</category><borough>Manhattan, Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><design_start>2011-02-14T00:00:00</design_start><budget_forecast>56546302.00</budget_forecast><latest_budget_changes>1121903.00</latest_budget_changes><total_budget_changes>2036997.00</total_budget_changes><forecast_completion>2023-01-31T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1628</total_schedule_changes></row><row _id="row-w3ta.huau.ykka" _uuid="00000000-0000-0000-2A31-D05741E3C302" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-w3ta.huau.ykka"><date_reported_as_of>2013-09-01T00:00:00</date_reported_as_of><pid>120</pid><project_name>Grand Concourse Metro North Railroad Bridge Construction</project_name><description>Rehabilitate existing bridge sub and superstructure separating the NYCDOT Roadway Bridge and NYCT components. Provide new steel plate girders, concrete deck, pedestals, backwalls, sidewalks and bridge railing.</description><category>Bridges</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2000-02-14T00:00:00</design_start><budget_forecast>50286000.00</budget_forecast><total_budget_changes>22682117.00</total_budget_changes><forecast_completion>2020-10-02T00:00:00</forecast_completion><total_schedule_changes>836</total_schedule_changes></row><row _id="row-ytx6_chax~nae7" _uuid="00000000-0000-0000-0462-10D876920AFF" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ytx6_chax~nae7"><date_reported_as_of>2014-01-01T00:00:00</date_reported_as_of><pid>120</pid><project_name>Grand Concourse Metro North Railroad Bridge Construction</project_name><description>This project includes the rehabilitation of the existing bridge and separation of the NYCDOT and NYCT components. Includes new steel plate girders, concrete deck, pedestals, backwalls, sidewalks and bridge railing.</description><category>Bridges</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2000-02-14T00:00:00</design_start><budget_forecast>50286000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>22682117.00</total_budget_changes><forecast_completion>2020-05-09T00:00:00</forecast_completion><latest_schedule_changes>-146</latest_schedule_changes><total_schedule_changes>836</total_schedule_changes></row><row _id="row-bxkx-xhsc.i65t" _uuid="00000000-0000-0000-F8C4-B95ABA237D1F" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-bxkx-xhsc.i65t"><date_reported_as_of>2014-05-01T00:00:00</date_reported_as_of><pid>120</pid><project_name>Grand Concourse Metro North Railroad Bridge Construction</project_name><description>This project includes the rehabilitation of the existing bridge and separation of the NYCDOT and NYCT components. Includes new steel plate girders, concrete deck, pedestals, backwalls, sidewalks and bridge railing.</description><category>Bridges</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2000-02-14T00:00:00</design_start><budget_forecast>52260602.00</budget_forecast><latest_budget_changes>1974602.00</latest_budget_changes><total_budget_changes>22682117.00</total_budget_changes><forecast_completion>2020-05-09T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>836</total_schedule_changes></row><row _id="row-tf9d~46vb.q4q2" _uuid="00000000-0000-0000-D5AD-599A3816EA0D" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-tf9d~46vb.q4q2"><date_reported_as_of>2015-02-01T00:00:00</date_reported_as_of><pid>120</pid><project_name>Grand Concourse Metro North Railroad Bridge Construction</project_name><description>Repair the existing bridge and separate the NYCDOT and NYCT components. Includes new steel plate girders, concrete deck, pedestals, backwalls, sidewalks, and bridge railing.</description><category>Bridges</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2000-02-14T00:00:00</design_start><budget_forecast>53648551.00</budget_forecast><latest_budget_changes>1387949.00</latest_budget_changes><total_budget_changes>22682117.00</total_budget_changes><forecast_completion>2020-05-09T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>836</total_schedule_changes></row><row _id="row-355h-7trb-6kfg" _uuid="00000000-0000-0000-3289-E9B5A2835769" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-355h-7trb-6kfg"><date_reported_as_of>2015-08-01T00:00:00</date_reported_as_of><pid>120</pid><project_name>Grand Concourse Metro North Railroad Bridge Construction</project_name><description>Repair the existing bridge and separate the NYCDOT and NYCT components. Includes new steel plate girders, concrete deck, pedestals, backwalls, sidewalks, and bridge railing.</description><category>Bridges</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2000-02-14T00:00:00</design_start><budget_forecast>65710551.35</budget_forecast><latest_budget_changes>12062000.35</latest_budget_changes><total_budget_changes>22682117.00</total_budget_changes><forecast_completion>2020-12-17T00:00:00</forecast_completion><latest_schedule_changes>222</latest_schedule_changes><total_schedule_changes>836</total_schedule_changes></row><row _id="row-e999~5a7x~upsn" _uuid="00000000-0000-0000-95A1-861B0D0F5442" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-e999~5a7x~upsn"><date_reported_as_of>2016-01-01T00:00:00</date_reported_as_of><pid>120</pid><project_name>Grand Concourse Metro North Railroad Bridge Construction</project_name><description>Repair the existing bridge and separate the NYCDOT and NYCT components. Includes new steel plate girders, concrete deck, pedestals, backwalls, sidewalks, and bridge railing.</description><category>Bridges</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2000-02-14T00:00:00</design_start><budget_forecast>65434551.35</budget_forecast><latest_budget_changes>-276000.00</latest_budget_changes><total_budget_changes>22682117.00</total_budget_changes><forecast_completion>2020-07-21T00:00:00</forecast_completion><latest_schedule_changes>-149</latest_schedule_changes><total_schedule_changes>836</total_schedule_changes></row><row _id="row-my4v-gzep_fdia" _uuid="00000000-0000-0000-DA44-4E7497C8282D" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-my4v-gzep_fdia"><date_reported_as_of>2016-06-01T00:00:00</date_reported_as_of><pid>120</pid><project_name>Grand Concourse Metro North Railroad Bridge Construction</project_name><description>Repair the existing bridge and separate the NYCDOT and NYCT components. Includes new steel plate girders, concrete deck, pedestals, backwalls, sidewalks, and bridge railing.</description><category>Bridges</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2000-02-14T00:00:00</design_start><budget_forecast>65702486.60</budget_forecast><latest_budget_changes>267935.25</latest_budget_changes><total_budget_changes>22682117.00</total_budget_changes><forecast_completion>2020-05-09T00:00:00</forecast_completion><latest_schedule_changes>-73</latest_schedule_changes><total_schedule_changes>836</total_schedule_changes></row><row _id="row-ex8n-mbdj.e2ef" _uuid="00000000-0000-0000-6D4B-D23D242C8467" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ex8n-mbdj.e2ef"><date_reported_as_of>2016-11-01T00:00:00</date_reported_as_of><pid>120</pid><project_name>Grand Concourse Metro North Railroad Bridge Construction</project_name><description>Repair the existing bridge and separate the NYCDOT and NYCT components. Includes new steel plate girders, concrete deck, pedestals, backwalls, sidewalks, and bridge railing.</description><category>Bridges</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2000-02-14T00:00:00</design_start><budget_forecast>70687486.60</budget_forecast><latest_budget_changes>4985000.00</latest_budget_changes><total_budget_changes>22682117.00</total_budget_changes><forecast_completion>2020-06-30T00:00:00</forecast_completion><latest_schedule_changes>52</latest_schedule_changes><total_schedule_changes>836</total_schedule_changes></row><row _id="row-8aiw.typx_w5bs" _uuid="00000000-0000-0000-863D-AE18A50A1BEB" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-8aiw.typx_w5bs"><date_reported_as_of>2017-04-01T00:00:00</date_reported_as_of><pid>120</pid><project_name>Grand Concourse Metro North Railroad Bridge Construction</project_name><description>Repair the existing bridge and separate the NYCDOT and NYCT components. Includes new steel plate girders, concrete deck, pedestals, backwalls, sidewalks, and bridge railing.</description><category>Bridges</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2000-02-14T00:00:00</design_start><budget_forecast>71533240.57</budget_forecast><latest_budget_changes>845753.97</latest_budget_changes><total_budget_changes>22682117.00</total_budget_changes><forecast_completion>2021-03-05T00:00:00</forecast_completion><latest_schedule_changes>248</latest_schedule_changes><total_schedule_changes>836</total_schedule_changes></row><row _id="row-wf5r-2bmr_fazm" _uuid="00000000-0000-0000-FBB3-2C61F46E7607" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-wf5r-2bmr_fazm"><date_reported_as_of>2017-09-01T00:00:00</date_reported_as_of><pid>120</pid><project_name>Grand Concourse Metro North Railroad Bridge Construction</project_name><description>Repair the existing bridge and separate the NYCDOT and NYCT components. Includes new steel plate girders, concrete deck, pedestals, backwalls, sidewalks, and bridge railing.</description><category>Bridges</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2000-02-14T00:00:00</design_start><budget_forecast>66085487.00</budget_forecast><latest_budget_changes>-5447753.57</latest_budget_changes><total_budget_changes>22682117.00</total_budget_changes><forecast_completion>2021-03-23T00:00:00</forecast_completion><latest_schedule_changes>18</latest_schedule_changes><total_schedule_changes>836</total_schedule_changes></row><row _id="row-3utt_aki6_rca2" _uuid="00000000-0000-0000-5C5C-CACBDEAD123E" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-3utt_aki6_rca2"><date_reported_as_of>2018-03-01T00:00:00</date_reported_as_of><pid>120</pid><project_name>Grand Concourse Metro North Railroad Bridge Construction</project_name><description>Repair the existing bridge and separate the NYCDOT and NYCT components. Includes new steel plate girders, concrete deck, pedestals, backwalls, sidewalks, and bridge railing.</description><category>Bridges</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2000-02-14T00:00:00</design_start><budget_forecast>66713241.00</budget_forecast><latest_budget_changes>627754.00</latest_budget_changes><total_budget_changes>22682117.00</total_budget_changes><forecast_completion>2021-06-15T00:00:00</forecast_completion><latest_schedule_changes>84</latest_schedule_changes><total_schedule_changes>836</total_schedule_changes></row><row _id="row-qrk3-ch84-kd5d" _uuid="00000000-0000-0000-8C55-FD06B7131873" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-qrk3-ch84-kd5d"><date_reported_as_of>2018-08-01T00:00:00</date_reported_as_of><pid>120</pid><project_name>Grand Concourse Metro North Railroad Bridge Construction</project_name><description>Repair the existing bridge and separate the NYCDOT and NYCT components. Includes new steel plate girders, concrete deck, pedestals, backwalls, sidewalks, and bridge railing.</description><category>Bridges</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2000-02-14T00:00:00</design_start><budget_forecast>72673351.00</budget_forecast><latest_budget_changes>5960110.00</latest_budget_changes><total_budget_changes>22682117.00</total_budget_changes><forecast_completion>2021-10-16T00:00:00</forecast_completion><latest_schedule_changes>123</latest_schedule_changes><total_schedule_changes>836</total_schedule_changes></row><row _id="row-6krw~3sji~anj7" _uuid="00000000-0000-0000-D257-54D8B4D1C070" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-6krw~3sji~anj7"><date_reported_as_of>2019-01-01T00:00:00</date_reported_as_of><pid>120</pid><project_name>Grand Concourse Metro North Railroad Bridge Construction</project_name><description>Repair the existing bridge and separate the NYCDOT and NYCT components. Includes new steel plate girders, concrete deck, pedestals, backwalls, sidewalks, and bridge railing.</description><category>Bridges</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2000-02-14T00:00:00</design_start><budget_forecast>71762351.00</budget_forecast><latest_budget_changes>-911000.00</latest_budget_changes><total_budget_changes>22682117.00</total_budget_changes><forecast_completion>2022-07-03T00:00:00</forecast_completion><latest_schedule_changes>260</latest_schedule_changes><total_schedule_changes>836</total_schedule_changes></row><row _id="row-pu8x~vcri_kk5k" _uuid="00000000-0000-0000-B14F-6FDA8DA575DF" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-pu8x~vcri_kk5k"><date_reported_as_of>2019-05-01T00:00:00</date_reported_as_of><pid>120</pid><project_name>Grand Concourse Metro North Railroad Bridge Construction</project_name><description>Repair the existing bridge and separate the NYCDOT and NYCT components. Includes new steel plate girders, concrete deck, pedestals, backwalls, sidewalks, and bridge railing.</description><category>Bridges</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction Procurement</current_phase><design_start>2000-02-14T00:00:00</design_start><budget_forecast>72332349.00</budget_forecast><latest_budget_changes>569998.00</latest_budget_changes><total_budget_changes>22682117.00</total_budget_changes><forecast_completion>2022-05-29T00:00:00</forecast_completion><latest_schedule_changes>-35</latest_schedule_changes><total_schedule_changes>836</total_schedule_changes></row><row _id="row-memn_ar79_ijym" _uuid="00000000-0000-0000-6B4C-2401D542D5E1" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-memn_ar79_ijym"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>120</pid><project_name>Grand Concourse Metro North Railroad Bridge Construction</project_name><description>Repair the existing bridge and separate the NYCDOT and NYCT components. Includes new steel plate girders, concrete deck, pedestals, backwalls, sidewalks, and bridge railing.</description><category>Bridges</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction Procurement</current_phase><design_start>2000-02-14T00:00:00</design_start><budget_forecast>116716055.00</budget_forecast><latest_budget_changes>44383706.00</latest_budget_changes><total_budget_changes>22682117.00</total_budget_changes><total_schedule_changes>836</total_schedule_changes></row><row _id="row-wx2z.jfdf~vmva" _uuid="00000000-0000-0000-0B3E-68E09ED752BD" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-wx2z.jfdf~vmva"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>120</pid><project_name>Grand Concourse Metro North Railroad Bridge Construction</project_name><description>Repair the existing bridge and separate the NYCDOT and NYCT components. Includes new steel plate girders, concrete deck, pedestals, backwalls, sidewalks, and bridge railing.</description><category>Bridges</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction Procurement</current_phase><design_start>2000-02-14T00:00:00</design_start><budget_forecast>74191379.00</budget_forecast><latest_budget_changes>-42524676.00</latest_budget_changes><total_budget_changes>22682117.00</total_budget_changes><total_schedule_changes>836</total_schedule_changes></row><row _id="row-p2t3_rr5y.pabh" _uuid="00000000-0000-0000-AF9C-53DAA12742FA" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-p2t3_rr5y.pabh"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>120</pid><project_name>Grand Concourse Metro North Railroad Bridge Construction</project_name><description>Repair the existing bridge and separate the NYCDOT and NYCT components. Includes new steel plate girders, concrete deck, pedestals, backwalls, sidewalks, and bridge railing.</description><category>Bridges</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><design_start>2000-02-14T00:00:00</design_start><budget_forecast>74551379.00</budget_forecast><latest_budget_changes>360000.00</latest_budget_changes><total_budget_changes>22682117.00</total_budget_changes><forecast_completion>2023-01-16T00:00:00</forecast_completion><latest_schedule_changes>232</latest_schedule_changes><total_schedule_changes>836</total_schedule_changes></row><row _id="row-vuc4_djac-dxpy" _uuid="00000000-0000-0000-E266-9831FE3BEBDE" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-vuc4_djac-dxpy"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>120</pid><project_name>Grand Concourse Metro North Railroad Bridge Construction</project_name><description>Repair the existing bridge and separate the NYCDOT and NYCT components. Includes new steel plate girders, concrete deck, pedestals, backwalls, sidewalks, and bridge railing.</description><category>Bridges</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><design_start>2000-02-14T00:00:00</design_start><budget_forecast>121437179.00</budget_forecast><latest_budget_changes>46885800.00</latest_budget_changes><total_budget_changes>22682117.00</total_budget_changes><forecast_completion>2023-01-16T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>836</total_schedule_changes></row><row _id="row-cf25~8gr2-m8dn" _uuid="00000000-0000-0000-2CE0-2F421F240187" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-cf25~8gr2-m8dn"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>120</pid><project_name>Grand Concourse Metro North Railroad Bridge Construction</project_name><category>Bridges</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><total_budget_changes>22682117.00</total_budget_changes><total_schedule_changes>836</total_schedule_changes></row><row _id="row-e5sp.6z5k_wa29" _uuid="00000000-0000-0000-8321-E87D16197AAA" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-e5sp.6z5k_wa29"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>120</pid><project_name>Grand Concourse Metro North Railroad Bridge Construction</project_name><description>Repair the existing bridge and separate the NYCDOT and NYCT components. Includes new steel plate girders, concrete deck, pedestals, backwalls, sidewalks, and bridge railing.</description><category>Bridges</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><design_start>2000-02-14T00:00:00</design_start><budget_forecast>75217179.00</budget_forecast><latest_budget_changes>-46220000.00</latest_budget_changes><total_budget_changes>22682117.00</total_budget_changes><forecast_completion>2023-01-15T00:00:00</forecast_completion><latest_schedule_changes>-1</latest_schedule_changes><total_schedule_changes>836</total_schedule_changes></row><row _id="row-asdr.22k9_3z5s" _uuid="00000000-0000-0000-FD03-C01A93961818" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-asdr.22k9_3z5s"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>120</pid><project_name>Grand Concourse Metro North Railroad Bridge Construction</project_name><description>Repair the existing bridge and separate the NYCDOT and NYCT components. Includes new steel plate girders, concrete deck, pedestals, backwalls, sidewalks, and bridge railing.</description><category>Bridges</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><design_start>2000-02-14T00:00:00</design_start><budget_forecast>77916679.00</budget_forecast><latest_budget_changes>2699500.00</latest_budget_changes><total_budget_changes>22682117.00</total_budget_changes><forecast_completion>2023-01-16T00:00:00</forecast_completion><latest_schedule_changes>1</latest_schedule_changes><total_schedule_changes>836</total_schedule_changes></row><row _id="row-rvpp_5sxs.ash6" _uuid="00000000-0000-0000-736E-5CBE2AC62E4C" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-rvpp_5sxs.ash6"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>120</pid><project_name>Grand Concourse Metro North Railroad Bridge Construction</project_name><description>Repair the existing bridge and separate the NYCDOT and NYCT components. Includes new steel plate girders, concrete deck, pedestals, backwalls, sidewalks, and bridge railing.</description><category>Bridges</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><design_start>2000-02-14T00:00:00</design_start><budget_forecast>73341117.00</budget_forecast><latest_budget_changes>-4575562.00</latest_budget_changes><total_budget_changes>22682117.00</total_budget_changes><forecast_completion>2023-01-16T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>836</total_schedule_changes></row><row _id="row-vj6y-hamj~fvdk" _uuid="00000000-0000-0000-BDC6-E1D379F66329" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-vj6y-hamj~fvdk"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>120</pid><project_name>Grand Concourse Metro North Railroad Bridge Construction</project_name><description>Repair the existing bridge and separate the NYCDOT and NYCT components. Includes new steel plate girders, concrete deck, pedestals, backwalls, sidewalks, and bridge railing.</description><category>Bridges</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><design_start>2000-02-14T00:00:00</design_start><budget_forecast>73500117.00</budget_forecast><latest_budget_changes>159000.00</latest_budget_changes><total_budget_changes>22682117.00</total_budget_changes><forecast_completion>2023-01-16T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>836</total_schedule_changes></row><row _id="row-sqxa-gxb7~yr69" _uuid="00000000-0000-0000-E2E8-92AF0CD88E62" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-sqxa-gxb7~yr69"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>120</pid><project_name>Grand Concourse Metro North Railroad Bridge Construction</project_name><description>Repair the existing bridge and separate the NYCDOT and NYCT components. Includes new steel plate girders, concrete deck, pedestals, backwalls, sidewalks, and bridge railing.</description><category>Bridges</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><design_start>2000-02-14T00:00:00</design_start><budget_forecast>72968117.00</budget_forecast><latest_budget_changes>-532000.00</latest_budget_changes><total_budget_changes>22682117.00</total_budget_changes><forecast_completion>2023-01-16T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>836</total_schedule_changes></row><row _id="row-rpkj-urx4-szfa" _uuid="00000000-0000-0000-D712-B4653A0DD6AB" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-rpkj-urx4-szfa"><date_reported_as_of>2017-09-01T00:00:00</date_reported_as_of><pid>131</pid><project_name>49th Avenue Bridge Replacement</project_name><description>Replace the 49th Avenue bridge over Long Island Railroad and Amtrak in Hunters Point, Queens.</description><category>Bridges, Streets and Roadways</category><borough>Queens</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2017-08-15T00:00:00</design_start><budget_forecast>81252000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>32902419.00</total_budget_changes><forecast_completion>2023-02-02T00:00:00</forecast_completion><latest_schedule_changes>-634</latest_schedule_changes><total_schedule_changes>1449</total_schedule_changes></row><row _id="row-kuy4_3rd8-i3nm" _uuid="00000000-0000-0000-1769-8710BC3A7501" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-kuy4_3rd8-i3nm"><date_reported_as_of>2018-03-01T00:00:00</date_reported_as_of><pid>131</pid><project_name>49th Avenue Bridge Replacement</project_name><description>Replace the 49th Avenue bridge over Long Island Railroad and Amtrak in Hunters Point, Queens.</description><category>Bridges, Streets and Roadways</category><borough>Queens</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2017-08-15T00:00:00</design_start><budget_forecast>82095000.00</budget_forecast><latest_budget_changes>843000.00</latest_budget_changes><total_budget_changes>32902419.00</total_budget_changes><forecast_completion>2023-05-08T00:00:00</forecast_completion><latest_schedule_changes>95</latest_schedule_changes><total_schedule_changes>1449</total_schedule_changes></row><row _id="row-z4un-ebg3_wjt2" _uuid="00000000-0000-0000-7955-6FC146BE6E07" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-z4un-ebg3_wjt2"><date_reported_as_of>2018-08-01T00:00:00</date_reported_as_of><pid>131</pid><project_name>49th Avenue Bridge Replacement</project_name><description>Replace the 49th Avenue bridge over Long Island Railroad and Amtrak in Hunters Point, Queens.</description><category>Bridges, Streets and Roadways</category><borough>Queens</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2017-08-15T00:00:00</design_start><budget_forecast>81595000.00</budget_forecast><latest_budget_changes>-500000.00</latest_budget_changes><total_budget_changes>32902419.00</total_budget_changes><forecast_completion>2024-06-13T00:00:00</forecast_completion><latest_schedule_changes>402</latest_schedule_changes><total_schedule_changes>1449</total_schedule_changes></row><row _id="row-v8zu~hgtp-c4vv" _uuid="00000000-0000-0000-967F-D30898F3D8E7" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-v8zu~hgtp-c4vv"><date_reported_as_of>2019-01-01T00:00:00</date_reported_as_of><pid>131</pid><project_name>49th Avenue Bridge Replacement</project_name><description>Replace the 49th Avenue bridge over Long Island Railroad and Amtrak in Hunters Point, Queens.</description><category>Bridges, Streets and Roadways</category><borough>Queens</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2017-08-15T00:00:00</design_start><budget_forecast>82478000.00</budget_forecast><latest_budget_changes>883000.00</latest_budget_changes><total_budget_changes>32902419.00</total_budget_changes><forecast_completion>2024-01-22T00:00:00</forecast_completion><latest_schedule_changes>-143</latest_schedule_changes><total_schedule_changes>1449</total_schedule_changes></row><row _id="row-wp62~irn6_uykx" _uuid="00000000-0000-0000-9621-386A739B315D" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-wp62~irn6_uykx"><date_reported_as_of>2019-05-01T00:00:00</date_reported_as_of><pid>131</pid><project_name>49th Avenue Bridge Replacement</project_name><description>Replace the 49th Avenue bridge over Long Island Railroad and Amtrak in Hunters Point, Queens.</description><category>Bridges, Streets and Roadways</category><borough>Queens</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2017-08-15T00:00:00</design_start><budget_forecast>116774000.00</budget_forecast><latest_budget_changes>34296000.00</latest_budget_changes><total_budget_changes>32902419.00</total_budget_changes><forecast_completion>2024-07-13T00:00:00</forecast_completion><latest_schedule_changes>173</latest_schedule_changes><total_schedule_changes>1449</total_schedule_changes></row><row _id="row-em44.z5m3-rk3c" _uuid="00000000-0000-0000-A21F-2ED90F506004" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-em44.z5m3-rk3c"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>131</pid><project_name>49th Avenue Bridge Replacement</project_name><description>Replace the 49th Avenue bridge over Long Island Railroad and Amtrak in Hunters Point, Queens.</description><category>Bridges, Streets and Roadways</category><borough>Queens</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2017-08-15T00:00:00</design_start><budget_forecast>117274000.00</budget_forecast><latest_budget_changes>500000.00</latest_budget_changes><total_budget_changes>32902419.00</total_budget_changes><total_schedule_changes>1449</total_schedule_changes></row><row _id="row-knyz_visc-8g4i" _uuid="00000000-0000-0000-E3FC-3089EC7C78E7" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-knyz_visc-8g4i"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>131</pid><project_name>49th Avenue Bridge Replacement</project_name><description>Replace the 49th Avenue bridge over Long Island Railroad and Amtrak in Hunters Point, Queens.</description><category>Bridges, Streets and Roadways</category><borough>Queens</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2017-08-15T00:00:00</design_start><budget_forecast>117524000.00</budget_forecast><latest_budget_changes>250000.00</latest_budget_changes><total_budget_changes>32902419.00</total_budget_changes><total_schedule_changes>1449</total_schedule_changes></row><row _id="row-8y5d_pdhq.k8wp" _uuid="00000000-0000-0000-1B76-71B44815379B" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-8y5d_pdhq.k8wp"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>131</pid><project_name>49th Avenue Bridge Replacement</project_name><description>Replace the 49th Avenue bridge over Long Island Railroad and Amtrak in Hunters Point, Queens.</description><category>Bridges, Streets and Roadways</category><borough>Queens</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2017-08-15T00:00:00</design_start><budget_forecast>117874000.00</budget_forecast><latest_budget_changes>350000.00</latest_budget_changes><total_budget_changes>32902419.00</total_budget_changes><forecast_completion>2025-06-02T00:00:00</forecast_completion><latest_schedule_changes>324</latest_schedule_changes><total_schedule_changes>1449</total_schedule_changes></row><row _id="row-i382_ft8x-ucyh" _uuid="00000000-0000-0000-DB66-AC65F9FE6D91" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-i382_ft8x-ucyh"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>131</pid><project_name>49th Avenue Bridge Replacement</project_name><description>Replace the 49th Avenue bridge over Long Island Railroad and Amtrak in Hunters Point, Queens.</description><category>Bridges, Streets and Roadways</category><borough>Queens</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2017-08-15T00:00:00</design_start><budget_forecast>118083419.00</budget_forecast><latest_budget_changes>209419.00</latest_budget_changes><total_budget_changes>32902419.00</total_budget_changes><forecast_completion>2026-02-09T00:00:00</forecast_completion><latest_schedule_changes>252</latest_schedule_changes><total_schedule_changes>1449</total_schedule_changes></row><row _id="row-fcnv-6f5d-7biu" _uuid="00000000-0000-0000-D0CD-42B100675692" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-fcnv-6f5d-7biu"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>131</pid><project_name>49th Avenue Bridge Replacement</project_name><category>Bridges, Streets and Roadways</category><borough>Queens</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><total_budget_changes>32902419.00</total_budget_changes><total_schedule_changes>1449</total_schedule_changes></row><row _id="row-u364_tdqx-pe82" _uuid="00000000-0000-0000-FB8C-C0EA8CB458A6" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-u364_tdqx-pe82"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>131</pid><project_name>49th Avenue Bridge Replacement</project_name><description>Replace the 49th Avenue bridge over Long Island Railroad and Amtrak in Hunters Point, Queens.</description><category>Bridges, Streets and Roadways</category><borough>Queens</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2017-08-15T00:00:00</design_start><budget_forecast>120742419.00</budget_forecast><latest_budget_changes>2659000.00</latest_budget_changes><total_budget_changes>32902419.00</total_budget_changes><forecast_completion>2025-07-31T00:00:00</forecast_completion><latest_schedule_changes>-193</latest_schedule_changes><total_schedule_changes>1449</total_schedule_changes></row><row _id="row-er5c-2dy3-yjjv" _uuid="00000000-0000-0000-7E50-CF5CF2E05645" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-er5c-2dy3-yjjv"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>131</pid><project_name>49th Avenue Bridge Replacement</project_name><description>Replace the 49th Avenue bridge over Long Island Railroad and Amtrak in Hunters Point, Queens.</description><category>Bridges, Streets and Roadways</category><borough>Queens</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2017-08-15T00:00:00</design_start><budget_forecast>218648019.00</budget_forecast><latest_budget_changes>97905600.00</latest_budget_changes><total_budget_changes>32902419.00</total_budget_changes><forecast_completion>2027-03-15T00:00:00</forecast_completion><latest_schedule_changes>592</latest_schedule_changes><total_schedule_changes>1449</total_schedule_changes></row><row _id="row-hx5g.gbf9-3aib" _uuid="00000000-0000-0000-3340-8A472927DA6A" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-hx5g.gbf9-3aib"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>131</pid><project_name>49th Avenue Bridge Replacement</project_name><description>Replace the 49th Avenue bridge over Long Island Railroad and Amtrak in Hunters Point, Queens.</description><category>Bridges, Streets and Roadways</category><borough>Queens</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2017-08-15T00:00:00</design_start><budget_forecast>113934419.00</budget_forecast><latest_budget_changes>-104713600.00</latest_budget_changes><total_budget_changes>32902419.00</total_budget_changes><forecast_completion>2027-04-05T00:00:00</forecast_completion><latest_schedule_changes>21</latest_schedule_changes><total_schedule_changes>1449</total_schedule_changes></row><row _id="row-eyyu~fbpi~kubw" _uuid="00000000-0000-0000-1C0F-33ED435D1706" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-eyyu~fbpi~kubw"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>131</pid><project_name>49th Avenue Bridge Replacement</project_name><description>Replace the 49th Avenue bridge over Long Island Railroad and Amtrak in Hunters Point, Queens.</description><category>Bridges, Streets and Roadways</category><borough>Queens</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2017-08-15T00:00:00</design_start><budget_forecast>113624419.00</budget_forecast><latest_budget_changes>-310000.00</latest_budget_changes><total_budget_changes>32902419.00</total_budget_changes><forecast_completion>2028-07-08T00:00:00</forecast_completion><latest_schedule_changes>460</latest_schedule_changes><total_schedule_changes>1449</total_schedule_changes></row><row _id="row-daf9-qzg9~whyv" _uuid="00000000-0000-0000-ADF8-104CA5E1072D" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-daf9-qzg9~whyv"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>131</pid><project_name>49th Avenue Bridge Replacement</project_name><description>Replace the 49th Avenue bridge over Long Island Railroad and Amtrak in Hunters Point, Queens.</description><category>Bridges, Streets and Roadways</category><borough>Queens</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2017-08-15T00:00:00</design_start><budget_forecast>114154419.00</budget_forecast><latest_budget_changes>530000.00</latest_budget_changes><total_budget_changes>32902419.00</total_budget_changes><forecast_completion>2028-10-16T00:00:00</forecast_completion><latest_schedule_changes>100</latest_schedule_changes><total_schedule_changes>1449</total_schedule_changes></row><row _id="row-ivqn_3xnp-6gk3" _uuid="00000000-0000-0000-261D-08C51AFC48C9" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ivqn_3xnp-6gk3"><date_reported_as_of>2013-09-01T00:00:00</date_reported_as_of><pid>170</pid><project_name>Bergen Avenue Street Reconstruction</project_name><description>Roadway reconstruction Bergen Avenue and vicinity, includes sections of: Avenues N, T, U, V, W, X and Y; 66th Street and 69th through 75th Streets; Veterans Avenue and Royce Street.</description><category>Streets and Roadways</category><borough>Brooklyn</borough><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2012-12-03T00:00:00</design_start><budget_forecast>33727000.00</budget_forecast><total_budget_changes>45837000.00</total_budget_changes><forecast_completion>2024-07-16T00:00:00</forecast_completion><total_schedule_changes>-388</total_schedule_changes></row><row _id="row-a984-64dg-zj4q" _uuid="00000000-0000-0000-84A4-C70AB76A567A" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-a984-64dg-zj4q"><date_reported_as_of>2014-01-01T00:00:00</date_reported_as_of><pid>170</pid><project_name>Bergen Avenue Street Reconstruction</project_name><description>Roadway reconstruction Bergen Avenue and vicinity, includes sections of: Avenues N, T, U, V, W, X and Y; 66th Street and 69th through 75th Streets; Veterans Avenue and Royce Street.</description><category>Streets and Roadways</category><borough>Brooklyn</borough><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2012-12-03T00:00:00</design_start><budget_forecast>32922000.00</budget_forecast><latest_budget_changes>-805000.00</latest_budget_changes><total_budget_changes>45837000.00</total_budget_changes><forecast_completion>2024-07-16T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>-388</total_schedule_changes></row><row _id="row-5mx5-7ben~kgqu" _uuid="00000000-0000-0000-7893-1AA0BA494610" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-5mx5-7ben~kgqu"><date_reported_as_of>2014-05-01T00:00:00</date_reported_as_of><pid>170</pid><project_name>Bergen Avenue Street Reconstruction</project_name><description>Roadway reconstruction Bergen Avenue and vicinity, includes sections of: Avenues N, T, U, V, W, X and Y; 66th Street and 69th through 75th Streets; Veterans Avenue and Royce Street.</description><category>Streets and Roadways</category><borough>Brooklyn</borough><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2012-12-03T00:00:00</design_start><budget_forecast>32996000.00</budget_forecast><latest_budget_changes>74000.00</latest_budget_changes><total_budget_changes>45837000.00</total_budget_changes><forecast_completion>2024-07-16T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>-388</total_schedule_changes></row><row _id="row-nup9~unnb_yeqp" _uuid="00000000-0000-0000-CE1E-2163123CCD4F" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-nup9~unnb_yeqp"><date_reported_as_of>2015-02-01T00:00:00</date_reported_as_of><pid>170</pid><project_name>Bergen Avenue Street Reconstruction</project_name><description>Roadway reconstruction Bergen Avenue and vicinity, includes sections of: Avenues N, T, U, V, W, X and Y; 66th Street and 69th through 75th Streets; Veterans Avenue and Royce Street.</description><category>Streets and Roadways</category><borough>Brooklyn</borough><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2012-12-03T00:00:00</design_start><budget_forecast>19872000.00</budget_forecast><latest_budget_changes>-13124000.00</latest_budget_changes><total_budget_changes>45837000.00</total_budget_changes><forecast_completion>2025-07-18T00:00:00</forecast_completion><latest_schedule_changes>367</latest_schedule_changes><total_schedule_changes>-388</total_schedule_changes></row><row _id="row-k2qf-kiuc-wmcg" _uuid="00000000-0000-0000-6644-E89ED81EB18F" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-k2qf-kiuc-wmcg"><date_reported_as_of>2015-08-01T00:00:00</date_reported_as_of><pid>170</pid><project_name>Bergen Avenue Street Reconstruction</project_name><description>Roadway reconstruction Bergen Avenue and vicinity, includes sections of: Avenues N, T, U, V, W, X and Y; 66th Street and 69th through 75th Streets; Veterans Avenue and Royce Street.</description><category>Streets and Roadways</category><borough>Brooklyn</borough><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2012-12-03T00:00:00</design_start><budget_forecast>20390000.00</budget_forecast><latest_budget_changes>518000.00</latest_budget_changes><total_budget_changes>45837000.00</total_budget_changes><forecast_completion>2025-07-18T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>-388</total_schedule_changes></row><row _id="row-wy5c_q7kk-h9wf" _uuid="00000000-0000-0000-A71D-E447AD9816AA" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-wy5c_q7kk-h9wf"><date_reported_as_of>2016-01-01T00:00:00</date_reported_as_of><pid>170</pid><project_name>Bergen Avenue Street Reconstruction</project_name><description>Roadway reconstruction Bergen Avenue and vicinity, includes sections of: Avenues N, T, U, V, W, X and Y; 66th Street and 69th through 75th Streets; Veterans Avenue and Royce Street.</description><category>Streets and Roadways</category><borough>Brooklyn</borough><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2012-12-03T00:00:00</design_start><budget_forecast>22384000.00</budget_forecast><latest_budget_changes>1994000.00</latest_budget_changes><total_budget_changes>45837000.00</total_budget_changes><forecast_completion>2026-07-18T00:00:00</forecast_completion><latest_schedule_changes>365</latest_schedule_changes><total_schedule_changes>-388</total_schedule_changes></row><row _id="row-76f5_ife3.8vnz" _uuid="00000000-0000-0000-EC7E-17096641513B" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-76f5_ife3.8vnz"><date_reported_as_of>2016-06-01T00:00:00</date_reported_as_of><pid>170</pid><project_name>Bergen Avenue Street Reconstruction</project_name><description>Roadway reconstruction Bergen Avenue and vicinity, includes sections of: Avenues N, T, U, V, W, X and Y; 66th Street and 69th through 75th Streets; Veterans Avenue and Royce Street.</description><category>Streets and Roadways</category><borough>Brooklyn</borough><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2012-12-03T00:00:00</design_start><budget_forecast>34959000.00</budget_forecast><latest_budget_changes>12575000.00</latest_budget_changes><total_budget_changes>45837000.00</total_budget_changes><forecast_completion>2026-07-18T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>-388</total_schedule_changes></row><row _id="row-6f38~eshb~j4qv" _uuid="00000000-0000-0000-B600-D6B64C569168" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-6f38~eshb~j4qv"><date_reported_as_of>2016-11-01T00:00:00</date_reported_as_of><pid>170</pid><project_name>Bergen Avenue Street Reconstruction</project_name><description>Roadway reconstruction Bergen Avenue and vicinity, includes sections of: Avenues N, T, U, V, W, X and Y; 66th Street and 69th through 75th Streets; Veterans Avenue and Royce Street.</description><category>Streets and Roadways</category><borough>Brooklyn</borough><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2012-12-03T00:00:00</design_start><budget_forecast>58706000.00</budget_forecast><latest_budget_changes>23747000.00</latest_budget_changes><total_budget_changes>45837000.00</total_budget_changes><forecast_completion>2026-11-13T00:00:00</forecast_completion><latest_schedule_changes>118</latest_schedule_changes><total_schedule_changes>-388</total_schedule_changes></row><row _id="row-74m5.fxv5.ndcm" _uuid="00000000-0000-0000-4D12-CCA818B90CE4" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-74m5.fxv5.ndcm"><date_reported_as_of>2017-04-01T00:00:00</date_reported_as_of><pid>170</pid><project_name>Bergen Avenue Street Reconstruction</project_name><description>Roadway reconstruction Bergen Avenue and vicinity, includes sections of: Avenues N, T, U, V, W, X and Y; 66th Street and 69th through 75th Streets; Veterans Avenue and Royce Street.</description><category>Streets and Roadways</category><borough>Brooklyn</borough><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2012-12-03T00:00:00</design_start><budget_forecast>88468000.00</budget_forecast><latest_budget_changes>29762000.00</latest_budget_changes><total_budget_changes>45837000.00</total_budget_changes><forecast_completion>2027-02-12T00:00:00</forecast_completion><latest_schedule_changes>91</latest_schedule_changes><total_schedule_changes>-388</total_schedule_changes></row><row _id="row-2bj2~s7zh~wguy" _uuid="00000000-0000-0000-D7D8-EAF51EA60C54" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-2bj2~s7zh~wguy"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>1198</pid><project_name>GI - GRAVESEND BAY CSO - PHASE II</project_name><description>GREEN INFRASTRUCTURE IN OH-015 GRAVESEND BAY CSO PH 2</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Design</current_phase><design_start>2017-10-30T00:00:00</design_start><budget_forecast>42088000.00</budget_forecast><latest_budget_changes>690000.00</latest_budget_changes><total_budget_changes>13699000.00</total_budget_changes><forecast_completion>2024-11-10T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>29</total_schedule_changes></row><row _id="row-f86q.g2mz_8d74" _uuid="00000000-0000-0000-BEBF-97982F0391C3" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-f86q.g2mz_8d74"><date_reported_as_of>2017-09-01T00:00:00</date_reported_as_of><pid>170</pid><project_name>Bergen Avenue Street Reconstruction</project_name><description>Roadway reconstruction Bergen Avenue and vicinity, includes sections of: Avenues N, T, U, V, W, X and Y; 66th Street and 69th through 75th Streets; Veterans Avenue and Royce Street.</description><category>Streets and Roadways</category><borough>Brooklyn</borough><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2012-12-03T00:00:00</design_start><budget_forecast>88883000.00</budget_forecast><latest_budget_changes>415000.00</latest_budget_changes><total_budget_changes>45837000.00</total_budget_changes><forecast_completion>2027-07-15T00:00:00</forecast_completion><latest_schedule_changes>153</latest_schedule_changes><total_schedule_changes>-388</total_schedule_changes></row><row _id="row-uk5t_55kh-rfna" _uuid="00000000-0000-0000-89CE-2D9A64248BD4" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-uk5t_55kh-rfna"><date_reported_as_of>2018-03-01T00:00:00</date_reported_as_of><pid>170</pid><project_name>Bergen Avenue Street Reconstruction</project_name><description>Roadway reconstruction Bergen Avenue and vicinity, includes sections of: Avenues N, T, U, V, W, X and Y; 66th Street and 69th through 75th Streets; Veterans Avenue and Royce Street.</description><category>Streets and Roadways</category><borough>Brooklyn</borough><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Construction Procurement</current_phase><design_start>2012-12-03T00:00:00</design_start><budget_forecast>88883000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>45837000.00</total_budget_changes><forecast_completion>2020-07-30T00:00:00</forecast_completion><latest_schedule_changes>-2541</latest_schedule_changes><total_schedule_changes>-388</total_schedule_changes></row><row _id="row-rybf.tr4p~52m3" _uuid="00000000-0000-0000-6160-1C6F24173670" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-rybf.tr4p~52m3"><date_reported_as_of>2018-08-01T00:00:00</date_reported_as_of><pid>170</pid><project_name>Bergen Avenue Street Reconstruction</project_name><description>Roadway reconstruction Bergen Avenue and vicinity, includes sections of: Avenues N, T, U, V, W, X and Y; 66th Street and 69th through 75th Streets; Veterans Avenue and Royce Street.</description><category>Streets and Roadways</category><borough>Brooklyn</borough><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Construction Procurement</current_phase><design_start>2012-12-03T00:00:00</design_start><budget_forecast>34598000.00</budget_forecast><latest_budget_changes>-54285000.00</latest_budget_changes><total_budget_changes>45837000.00</total_budget_changes><forecast_completion>2021-02-25T00:00:00</forecast_completion><latest_schedule_changes>210</latest_schedule_changes><total_schedule_changes>-388</total_schedule_changes></row><row _id="row-u494-ujh4_e8dz" _uuid="00000000-0000-0000-200F-56569F770799" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-u494-ujh4_e8dz"><date_reported_as_of>2019-01-01T00:00:00</date_reported_as_of><pid>170</pid><project_name>Bergen Avenue Street Reconstruction</project_name><description>Roadway reconstruction Bergen Avenue and vicinity, includes sections of: Avenues N, T, U, V, W, X and Y; 66th Street and 69th through 75th Streets; Veterans Avenue and Royce Street.</description><category>Streets and Roadways</category><borough>Brooklyn</borough><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Construction</current_phase><design_start>2012-12-03T00:00:00</design_start><budget_forecast>33352000.00</budget_forecast><latest_budget_changes>-1246000.00</latest_budget_changes><total_budget_changes>45837000.00</total_budget_changes><forecast_completion>2023-06-24T00:00:00</forecast_completion><latest_schedule_changes>849</latest_schedule_changes><total_schedule_changes>-388</total_schedule_changes></row><row _id="row-94zu_2nmv.4bt5" _uuid="00000000-0000-0000-4734-D2F1462730B8" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-94zu_2nmv.4bt5"><date_reported_as_of>2019-05-01T00:00:00</date_reported_as_of><pid>170</pid><project_name>Bergen Avenue Street Reconstruction</project_name><description>Reconstruction of Bergen Avenue Area, including Storm Sewers, Water Mains, Street Lighting, Traffic Signal  Work, and reconstruction of new outfall at East Mill Basin.</description><category>Streets and Roadways</category><borough>Brooklyn</borough><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Construction</current_phase><design_start>2012-12-03T00:00:00</design_start><budget_forecast>36317000.00</budget_forecast><latest_budget_changes>2965000.00</latest_budget_changes><total_budget_changes>45837000.00</total_budget_changes><forecast_completion>2023-06-24T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>-388</total_schedule_changes></row><row _id="row-2d59_fmp8.py2f" _uuid="00000000-0000-0000-1A28-538AAF7AEDBF" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-2d59_fmp8.py2f"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>170</pid><project_name>Bergen Avenue Street Reconstruction</project_name><description>Reconstruction of Bergen Avenue Area, including Storm Sewers, Water Mains, Street Lighting, Traffic Signal  Work, and reconstruction of new outfall at East Mill Basin.</description><category>Streets and Roadways</category><borough>Brooklyn</borough><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Construction</current_phase><design_start>2012-12-03T00:00:00</design_start><budget_forecast>90383000.00</budget_forecast><latest_budget_changes>54066000.00</latest_budget_changes><total_budget_changes>45837000.00</total_budget_changes><forecast_completion>2023-06-24T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>-388</total_schedule_changes></row><row _id="row-jqcr_6mpq_dmhh" _uuid="00000000-0000-0000-4016-A3FB1688418D" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-jqcr_6mpq_dmhh"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>170</pid><project_name>Bergen Avenue Street Reconstruction</project_name><category>Streets and Roadways</category><borough>Brooklyn</borough><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><total_budget_changes>45837000.00</total_budget_changes><total_schedule_changes>-388</total_schedule_changes></row><row _id="row-x8w7-hgge~eh99" _uuid="00000000-0000-0000-1F0F-47D17B05591C" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-x8w7-hgge~eh99"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>170</pid><project_name>Bergen Avenue Street Reconstruction</project_name><category>Streets and Roadways</category><borough>Brooklyn</borough><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><total_budget_changes>45837000.00</total_budget_changes><total_schedule_changes>-388</total_schedule_changes></row><row _id="row-t3cq~tjpt.y4dz" _uuid="00000000-0000-0000-38E9-3C698535284B" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-t3cq~tjpt.y4dz"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>170</pid><project_name>Bergen Avenue Street Reconstruction</project_name><category>Streets and Roadways</category><borough>Brooklyn</borough><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><total_budget_changes>45837000.00</total_budget_changes><total_schedule_changes>-388</total_schedule_changes></row><row _id="row-effp-g5kz.9dx7" _uuid="00000000-0000-0000-B547-33CD815D810E" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-effp-g5kz.9dx7"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>170</pid><project_name>Bergen Avenue Street Reconstruction</project_name><category>Streets and Roadways</category><borough>Brooklyn</borough><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><total_budget_changes>45837000.00</total_budget_changes><total_schedule_changes>-388</total_schedule_changes></row><row _id="row-45jf.sn6c-x7as" _uuid="00000000-0000-0000-8679-887AD23B4A84" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-45jf.sn6c-x7as"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>170</pid><project_name>Bergen Avenue Street Reconstruction</project_name><description>Reconstruction of Bergen Avenue Area, including Storm Sewers, Water Mains, Street Lighting, Traffic Signal  Work, and reconstruction of new outfall at East Mill Basin.</description><category>Streets and Roadways</category><borough>Brooklyn</borough><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Construction</current_phase><design_start>2012-12-03T00:00:00</design_start><budget_forecast>81937000.00</budget_forecast><latest_budget_changes>-8446000.00</latest_budget_changes><total_budget_changes>45837000.00</total_budget_changes><forecast_completion>2023-06-24T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>-388</total_schedule_changes></row><row _id="row-99h2~wfe5_gn53" _uuid="00000000-0000-0000-D531-BC2ED1B7C9F7" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-99h2~wfe5_gn53"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>170</pid><project_name>Bergen Avenue Street Reconstruction</project_name><description>Reconstruction of Bergen Avenue Area, including Storm Sewers, Water Mains, Street Lighting, Traffic Signal  Work, and reconstruction of new outfall at East Mill Basin.</description><category>Streets and Roadways</category><borough>Brooklyn</borough><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Construction</current_phase><design_start>2012-12-03T00:00:00</design_start><budget_forecast>81502000.00</budget_forecast><latest_budget_changes>-435000.00</latest_budget_changes><total_budget_changes>45837000.00</total_budget_changes><forecast_completion>2023-06-24T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>-388</total_schedule_changes></row><row _id="row-25a3~ahbk~evt4" _uuid="00000000-0000-0000-36A2-35B8EF4AF534" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-25a3~ahbk~evt4"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>170</pid><project_name>Bergen Avenue Street Reconstruction</project_name><description>Reconstruction of Bergen Avenue Area, including Storm Sewers, Water Mains, Street Lighting, Traffic Signal  Work, and reconstruction of new outfall at East Mill Basin.</description><category>Streets and Roadways</category><borough>Brooklyn</borough><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Construction</current_phase><design_start>2012-12-03T00:00:00</design_start><budget_forecast>79864000.00</budget_forecast><latest_budget_changes>-1638000.00</latest_budget_changes><total_budget_changes>45837000.00</total_budget_changes><forecast_completion>2023-06-24T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>-388</total_schedule_changes></row><row _id="row-eife_zg59-j9st" _uuid="00000000-0000-0000-D15C-ACF81681A8DC" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-eife_zg59-j9st"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>170</pid><project_name>Bergen Avenue Street Reconstruction</project_name><description>Reconstruction of Bergen Avenue Area, including Storm Sewers, Water Mains, Street Lighting, Traffic Signal  Work, and reconstruction of new outfall at East Mill Basin.</description><category>Streets and Roadways</category><borough>Brooklyn</borough><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Construction</current_phase><design_start>2012-12-03T00:00:00</design_start><budget_forecast>79564000.00</budget_forecast><latest_budget_changes>-300000.00</latest_budget_changes><total_budget_changes>45837000.00</total_budget_changes><forecast_completion>2023-06-24T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>-388</total_schedule_changes></row><row _id="row-7jhs~rp8f~4f6s" _uuid="00000000-0000-0000-74E4-F20F9C531D10" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-7jhs~rp8f~4f6s"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>170</pid><project_name>Bergen Avenue Street Reconstruction</project_name><description>Reconstruction of Bergen Avenue Area, including Storm Sewers, Water Mains, Street Lighting, Traffic Signal  Work, and reconstruction of new outfall at East Mill Basin.</description><category>Streets and Roadways</category><borough>Brooklyn</borough><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Construction</current_phase><design_start>2012-12-03T00:00:00</design_start><budget_forecast>79564000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>45837000.00</total_budget_changes><forecast_completion>2023-06-24T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>-388</total_schedule_changes></row><row _id="row-z3qx~y7e3_y9d9" _uuid="00000000-0000-0000-66A5-05C09CC6E480" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-z3qx~y7e3_y9d9"><date_reported_as_of>2013-09-01T00:00:00</date_reported_as_of><pid>180</pid><project_name>Pelham Parkway Roadway Reconstruction, Phase 2</project_name><description>Reconstruction of Pelham Parkway from the Bronx River Parkway to the Hutchinson River Parkway, including the north service road from Bronx Park East to Eastchester Road.</description><category>Streets and Roadways</category><borough>Bronx</borough><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2002-02-20T00:00:00</design_start><budget_forecast>33369000.00</budget_forecast><total_budget_changes>125164000.00</total_budget_changes><forecast_completion>2016-02-13T00:00:00</forecast_completion><total_schedule_changes>2869</total_schedule_changes></row><row _id="row-nqxm.n5z4.ttk7" _uuid="00000000-0000-0000-B9D2-A31BA6E8B56D" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-nqxm.n5z4.ttk7"><date_reported_as_of>2014-01-01T00:00:00</date_reported_as_of><pid>180</pid><project_name>Pelham Parkway Roadway Reconstruction, Phase 2</project_name><description>Reconstruction of Pelham Parkway from the Bronx River Parkway to the Hutchinson River Parkway, including the north service road from Bronx Park East to Eastchester Road.</description><category>Streets and Roadways</category><borough>Bronx</borough><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2002-02-20T00:00:00</design_start><budget_forecast>33419000.00</budget_forecast><latest_budget_changes>50000.00</latest_budget_changes><total_budget_changes>125164000.00</total_budget_changes><forecast_completion>2016-02-13T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>2869</total_schedule_changes></row><row _id="row-kknz.fmbu_rzcn" _uuid="00000000-0000-0000-7839-70DAC7BFEDD5" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-kknz.fmbu_rzcn"><date_reported_as_of>2014-05-01T00:00:00</date_reported_as_of><pid>180</pid><project_name>Pelham Parkway Roadway Reconstruction, Phase 2</project_name><description>Reconstruction of Pelham Parkway from the Bronx River Parkway to the Hutchinson River Parkway, including the north service road from Bronx Park East to Eastchester Road.</description><category>Streets and Roadways</category><borough>Bronx</borough><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2002-02-20T00:00:00</design_start><budget_forecast>33664000.00</budget_forecast><latest_budget_changes>245000.00</latest_budget_changes><total_budget_changes>125164000.00</total_budget_changes><forecast_completion>2017-02-12T00:00:00</forecast_completion><latest_schedule_changes>365</latest_schedule_changes><total_schedule_changes>2869</total_schedule_changes></row><row _id="row-9qik.euvj-zrf7" _uuid="00000000-0000-0000-6205-4AEB607E93A0" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-9qik.euvj-zrf7"><date_reported_as_of>2015-02-01T00:00:00</date_reported_as_of><pid>180</pid><project_name>Pelham Parkway Roadway Reconstruction, Phase 2</project_name><description>Reconstruction of Pelham Parkway from the Bronx River Parkway to the Hutchinson River Parkway, including the north service road from Bronx Park East to Eastchester Road.</description><category>Streets and Roadways</category><borough>Bronx</borough><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2002-02-20T00:00:00</design_start><budget_forecast>36507404.00</budget_forecast><latest_budget_changes>2843404.00</latest_budget_changes><total_budget_changes>125164000.00</total_budget_changes><forecast_completion>2017-05-15T00:00:00</forecast_completion><latest_schedule_changes>92</latest_schedule_changes><total_schedule_changes>2869</total_schedule_changes></row><row _id="row-7hqx-wqn8.3czi" _uuid="00000000-0000-0000-BD24-17CD975F9091" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-7hqx-wqn8.3czi"><date_reported_as_of>2015-08-01T00:00:00</date_reported_as_of><pid>180</pid><project_name>Pelham Parkway Roadway Reconstruction, Phase 2</project_name><description>Reconstruction of Pelham Parkway from the Bronx River Parkway to the Hutchinson River Parkway, including the north service road from Bronx Park East to Eastchester Road.</description><category>Streets and Roadways</category><borough>Bronx</borough><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2002-02-20T00:00:00</design_start><budget_forecast>33814000.00</budget_forecast><latest_budget_changes>-2693404.00</latest_budget_changes><total_budget_changes>125164000.00</total_budget_changes><forecast_completion>2018-01-09T00:00:00</forecast_completion><latest_schedule_changes>239</latest_schedule_changes><total_schedule_changes>2869</total_schedule_changes></row><row _id="row-djq6~958h-6pma" _uuid="00000000-0000-0000-A2AD-83E8C788BC4A" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-djq6~958h-6pma"><date_reported_as_of>2016-01-01T00:00:00</date_reported_as_of><pid>180</pid><project_name>Pelham Parkway Roadway Reconstruction, Phase 2</project_name><description>Reconstruction of Pelham Parkway from the Bronx River Parkway to the Hutchinson River Parkway, including the north service road from Bronx Park East to Eastchester Road.</description><category>Streets and Roadways</category><borough>Bronx</borough><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2002-02-20T00:00:00</design_start><budget_forecast>34791000.00</budget_forecast><latest_budget_changes>977000.00</latest_budget_changes><total_budget_changes>125164000.00</total_budget_changes><forecast_completion>2018-04-13T00:00:00</forecast_completion><latest_schedule_changes>94</latest_schedule_changes><total_schedule_changes>2869</total_schedule_changes></row><row _id="row-awc3_fviq.2z2a" _uuid="00000000-0000-0000-1937-18D2A8C4C15E" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-awc3_fviq.2z2a"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1198</pid><project_name>GI - GRAVESEND BAY CSO - PHASE II</project_name><description>GREEN INFRASTRUCTURE IN OH-015 GRAVESEND BAY CSO PH 2</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Design</current_phase><design_start>2017-10-30T00:00:00</design_start><budget_forecast>55026000.00</budget_forecast><latest_budget_changes>12938000.00</latest_budget_changes><total_budget_changes>13699000.00</total_budget_changes><forecast_completion>2024-12-09T00:00:00</forecast_completion><latest_schedule_changes>29</latest_schedule_changes><total_schedule_changes>29</total_schedule_changes></row><row _id="row-tpqr-kau3~25b6" _uuid="00000000-0000-0000-F8F4-5AD04CE096E1" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-tpqr-kau3~25b6"><date_reported_as_of>2016-06-01T00:00:00</date_reported_as_of><pid>180</pid><project_name>Pelham Parkway Roadway Reconstruction, Phase 2</project_name><description>Reconstruction of Pelham Parkway from the Bronx River Parkway to the Hutchinson River Parkway, including the north service road from Bronx Park East to Eastchester Road.</description><category>Streets and Roadways</category><borough>Bronx</borough><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2002-02-20T00:00:00</design_start><budget_forecast>35211000.00</budget_forecast><latest_budget_changes>420000.00</latest_budget_changes><total_budget_changes>125164000.00</total_budget_changes><forecast_completion>2018-07-20T00:00:00</forecast_completion><latest_schedule_changes>98</latest_schedule_changes><total_schedule_changes>2869</total_schedule_changes></row><row _id="row-cfmt.ufp7-f5di" _uuid="00000000-0000-0000-3B8E-25AE9A68F845" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-cfmt.ufp7-f5di"><date_reported_as_of>2016-11-01T00:00:00</date_reported_as_of><pid>180</pid><project_name>Pelham Parkway Roadway Reconstruction, Phase 2</project_name><description>Reconstruction of Pelham Parkway from the Bronx River Parkway to the Hutchinson River Parkway, including the north service road from Bronx Park East to Eastchester Road.</description><category>Streets and Roadways</category><borough>Bronx</borough><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Construction Procurement</current_phase><design_start>2002-02-20T00:00:00</design_start><budget_forecast>130762000.00</budget_forecast><latest_budget_changes>95551000.00</latest_budget_changes><total_budget_changes>125164000.00</total_budget_changes><forecast_completion>2018-05-27T00:00:00</forecast_completion><latest_schedule_changes>-54</latest_schedule_changes><total_schedule_changes>2869</total_schedule_changes></row><row _id="row-872a.hwf8.c83g" _uuid="00000000-0000-0000-FE94-2BC52E2950A0" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-872a.hwf8.c83g"><date_reported_as_of>2017-04-01T00:00:00</date_reported_as_of><pid>180</pid><project_name>Pelham Parkway Roadway Reconstruction, Phase 2</project_name><description>Reconstruction of Pelham Parkway from the Bronx River Parkway to the Hutchinson River Parkway, including the north service road from Bronx Park East to Eastchester Road.</description><category>Streets and Roadways</category><borough>Bronx</borough><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Construction Procurement</current_phase><design_start>2002-02-20T00:00:00</design_start><budget_forecast>134439000.00</budget_forecast><latest_budget_changes>3677000.00</latest_budget_changes><total_budget_changes>125164000.00</total_budget_changes><forecast_completion>2018-06-16T00:00:00</forecast_completion><latest_schedule_changes>20</latest_schedule_changes><total_schedule_changes>2869</total_schedule_changes></row><row _id="row-g8sw_x6jc_imqu" _uuid="00000000-0000-0000-B374-CCE733396245" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-g8sw_x6jc_imqu"><date_reported_as_of>2017-09-01T00:00:00</date_reported_as_of><pid>180</pid><project_name>Pelham Parkway Roadway Reconstruction, Phase 2</project_name><description>Reconstruction of Pelham Parkway from the Bronx River Parkway to the Hutchinson River Parkway, including the north service road from Bronx Park East to Eastchester Road.</description><category>Streets and Roadways</category><borough>Bronx</borough><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Construction</current_phase><design_start>2002-02-20T00:00:00</design_start><budget_forecast>139615000.00</budget_forecast><latest_budget_changes>5176000.00</latest_budget_changes><total_budget_changes>125164000.00</total_budget_changes><forecast_completion>2021-07-31T00:00:00</forecast_completion><latest_schedule_changes>1141</latest_schedule_changes><total_schedule_changes>2869</total_schedule_changes></row><row _id="row-be8f-zbxu.sf6a" _uuid="00000000-0000-0000-5255-9263E10E9D78" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-be8f-zbxu.sf6a"><date_reported_as_of>2018-03-01T00:00:00</date_reported_as_of><pid>180</pid><project_name>Pelham Parkway Roadway Reconstruction, Phase 2</project_name><description>Reconstruction of Pelham Parkway from the Bronx River Parkway to the Hutchinson River Parkway, including the north service road from Bronx Park East to Eastchester Road.</description><category>Streets and Roadways</category><borough>Bronx</borough><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Construction</current_phase><design_start>2002-02-20T00:00:00</design_start><budget_forecast>139615000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>125164000.00</total_budget_changes><forecast_completion>2021-07-31T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>2869</total_schedule_changes></row><row _id="row-g264_txfg-yh4f" _uuid="00000000-0000-0000-A388-5632E32857E0" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-g264_txfg-yh4f"><date_reported_as_of>2018-08-01T00:00:00</date_reported_as_of><pid>180</pid><project_name>Pelham Parkway Roadway Reconstruction, Phase 2</project_name><description>Reconstruction of Pelham Parkway from the Bronx River Parkway to the Hutchinson River Parkway, including the north service road from Bronx Park East to Eastchester Road.</description><category>Streets and Roadways</category><borough>Bronx</borough><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Construction</current_phase><design_start>2002-02-20T00:00:00</design_start><budget_forecast>137369000.00</budget_forecast><latest_budget_changes>-2246000.00</latest_budget_changes><total_budget_changes>125164000.00</total_budget_changes><forecast_completion>2021-07-31T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>2869</total_schedule_changes></row><row _id="row-9hsa_w95i_qqjx" _uuid="00000000-0000-0000-68A7-45DDE8A3ED0C" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-9hsa_w95i_qqjx"><date_reported_as_of>2019-01-01T00:00:00</date_reported_as_of><pid>180</pid><project_name>Pelham Parkway Roadway Reconstruction, Phase 2</project_name><description>Reconstruction of Pelham Parkway from the Bronx River Parkway to the Hutchinson River Parkway, including the north service road from Bronx Park East to Eastchester Road.</description><category>Streets and Roadways</category><borough>Bronx</borough><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Construction</current_phase><design_start>2002-02-20T00:00:00</design_start><budget_forecast>142142000.00</budget_forecast><latest_budget_changes>4773000.00</latest_budget_changes><total_budget_changes>125164000.00</total_budget_changes><forecast_completion>2023-03-21T00:00:00</forecast_completion><latest_schedule_changes>598</latest_schedule_changes><total_schedule_changes>2869</total_schedule_changes></row><row _id="row-crzy.kt8b_taub" _uuid="00000000-0000-0000-5DA2-A5F2CCB0D479" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-crzy.kt8b_taub"><date_reported_as_of>2019-05-01T00:00:00</date_reported_as_of><pid>180</pid><project_name>Pelham Parkway Roadway Reconstruction, Phase 2</project_name><description>Pelham Pkwy main road  W/B from Bronx River Pkwy to Hutchinson River Pkwy    Pelham Pkwy North Service Rd. (S/R) from Bronx Park East to Eastchester Rd.    Stillwell Ave from westbound mainline to north service road</description><category>Streets and Roadways</category><borough>Bronx</borough><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Construction</current_phase><design_start>2002-02-15T00:00:00</design_start><budget_forecast>144559000.00</budget_forecast><latest_budget_changes>2417000.00</latest_budget_changes><total_budget_changes>125164000.00</total_budget_changes><forecast_completion>2023-03-31T00:00:00</forecast_completion><latest_schedule_changes>10</latest_schedule_changes><total_schedule_changes>2869</total_schedule_changes></row><row _id="row-jugs.624f~sfmi" _uuid="00000000-0000-0000-7309-12723CEFBCE8" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-jugs.624f~sfmi"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>180</pid><project_name>Pelham Parkway Roadway Reconstruction, Phase 2</project_name><description>Pelham Pkwy main road  W/B from Bronx River Pkwy to Hutchinson River Pkwy    Pelham Pkwy North Service Rd. (S/R) from Bronx Park East to Eastchester Rd.    Stillwell Ave from westbound mainline to north service road</description><category>Streets and Roadways</category><borough>Bronx</borough><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Construction</current_phase><design_start>2002-02-15T00:00:00</design_start><budget_forecast>150046000.00</budget_forecast><latest_budget_changes>5487000.00</latest_budget_changes><total_budget_changes>125164000.00</total_budget_changes><forecast_completion>2023-03-31T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>2869</total_schedule_changes></row><row _id="row-n5vn-uhnh_gg6y" _uuid="00000000-0000-0000-8EBB-0DCC624E5EB3" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-n5vn-uhnh_gg6y"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>180</pid><project_name>Pelham Parkway Roadway Reconstruction, Phase 2</project_name><category>Streets and Roadways</category><borough>Bronx</borough><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><total_budget_changes>125164000.00</total_budget_changes><total_schedule_changes>2869</total_schedule_changes></row><row _id="row-q4rx.9f8h.b7xs" _uuid="00000000-0000-0000-6352-6299F6671362" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-q4rx.9f8h.b7xs"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>180</pid><project_name>Pelham Parkway Roadway Reconstruction, Phase 2</project_name><category>Streets and Roadways</category><borough>Bronx</borough><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><total_budget_changes>125164000.00</total_budget_changes><total_schedule_changes>2869</total_schedule_changes></row><row _id="row-33t9-kp8j~drkv" _uuid="00000000-0000-0000-F382-5E5B8B0C1B6B" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-33t9-kp8j~drkv"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>180</pid><project_name>Pelham Parkway Roadway Reconstruction, Phase 2</project_name><category>Streets and Roadways</category><borough>Bronx</borough><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><total_budget_changes>125164000.00</total_budget_changes><total_schedule_changes>2869</total_schedule_changes></row><row _id="row-iuu7_vx7i-uz7e" _uuid="00000000-0000-0000-3E0C-24A635298FFB" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-iuu7_vx7i-uz7e"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>180</pid><project_name>Pelham Parkway Roadway Reconstruction, Phase 2</project_name><category>Streets and Roadways</category><borough>Bronx</borough><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><total_budget_changes>125164000.00</total_budget_changes><total_schedule_changes>2869</total_schedule_changes></row><row _id="row-4ysc-ez5x.q6se" _uuid="00000000-0000-0000-A262-E7E6F65391F6" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-4ysc-ez5x.q6se"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>180</pid><project_name>Pelham Parkway Roadway Reconstruction, Phase 2</project_name><description>Pelham Pkwy main road  W/B from Bronx River Pkwy to Hutchinson River Pkwy    Pelham Pkwy North Service Rd. (S/R) from Bronx Park East to Eastchester Rd.    Stillwell Ave from westbound mainline to north service road</description><category>Streets and Roadways</category><borough>Bronx</borough><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Construction</current_phase><design_start>2002-02-15T00:00:00</design_start><budget_forecast>155442000.00</budget_forecast><latest_budget_changes>5396000.00</latest_budget_changes><total_budget_changes>125164000.00</total_budget_changes><forecast_completion>2023-12-22T00:00:00</forecast_completion><latest_schedule_changes>266</latest_schedule_changes><total_schedule_changes>2869</total_schedule_changes></row><row _id="row-a3ii~nyh6_y33j" _uuid="00000000-0000-0000-53D2-CD42DA0FF3F1" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-a3ii~nyh6_y33j"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>180</pid><project_name>Pelham Parkway Roadway Reconstruction, Phase 2</project_name><description>Pelham Pkwy main road  W/B from Bronx River Pkwy to Hutchinson River Pkwy    Pelham Pkwy North Service Rd. (S/R) from Bronx Park East to Eastchester Rd.    Stillwell Ave from westbound mainline to north service road</description><category>Streets and Roadways</category><borough>Bronx</borough><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Construction</current_phase><design_start>2002-02-15T00:00:00</design_start><budget_forecast>155812000.00</budget_forecast><latest_budget_changes>370000.00</latest_budget_changes><total_budget_changes>125164000.00</total_budget_changes><forecast_completion>2023-12-22T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>2869</total_schedule_changes></row><row _id="row-r7is-n6tu-6ucf" _uuid="00000000-0000-0000-FC84-CE29DCBFB49B" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-r7is-n6tu-6ucf"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>180</pid><project_name>Pelham Parkway Roadway Reconstruction, Phase 2</project_name><description>Pelham Pkwy main road  W/B from Bronx River Pkwy to Hutchinson River Pkwy    Pelham Pkwy North Service Rd. (S/R) from Bronx Park East to Eastchester Rd.    Stillwell Ave from westbound mainline to north service road</description><category>Streets and Roadways</category><borough>Bronx</borough><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Construction</current_phase><design_start>2002-02-15T00:00:00</design_start><budget_forecast>158429000.00</budget_forecast><latest_budget_changes>2617000.00</latest_budget_changes><total_budget_changes>125164000.00</total_budget_changes><forecast_completion>2023-12-22T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>2869</total_schedule_changes></row><row _id="row-kyfj_5yxy~fa7k" _uuid="00000000-0000-0000-59B3-63AC883D6EE6" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-kyfj_5yxy~fa7k"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>180</pid><project_name>Pelham Parkway Roadway Reconstruction, Phase 2</project_name><description>Pelham Pkwy main road  W/B from Bronx River Pkwy to Hutchinson River Pkwy    Pelham Pkwy North Service Rd. (S/R) from Bronx Park East to Eastchester Rd.    Stillwell Ave from westbound mainline to north service road</description><category>Streets and Roadways</category><borough>Bronx</borough><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Construction</current_phase><design_start>2002-02-15T00:00:00</design_start><budget_forecast>158533000.00</budget_forecast><latest_budget_changes>104000.00</latest_budget_changes><total_budget_changes>125164000.00</total_budget_changes><forecast_completion>2023-12-22T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>2869</total_schedule_changes></row><row _id="row-e632.fxi9_d2h3" _uuid="00000000-0000-0000-0581-18E73F281189" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-e632.fxi9_d2h3"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>180</pid><project_name>Pelham Parkway Roadway Reconstruction, Phase 2</project_name><description>Pelham Pkwy main road  W/B from Bronx River Pkwy to Hutchinson River Pkwy    Pelham Pkwy North Service Rd. (S/R) from Bronx Park East to Eastchester Rd.    Stillwell Ave from westbound mainline to north service road</description><category>Streets and Roadways</category><borough>Bronx</borough><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Construction</current_phase><design_start>2002-02-15T00:00:00</design_start><budget_forecast>158533000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>125164000.00</total_budget_changes><forecast_completion>2023-12-22T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>2869</total_schedule_changes></row><row _id="row-wdz8_63hj-yx54" _uuid="00000000-0000-0000-1D53-80C8CD2B6DE8" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-wdz8_63hj-yx54"><date_reported_as_of>2013-09-01T00:00:00</date_reported_as_of><pid>191</pid><project_name>Wyckoff Avenue Street Reconstruction</project_name><description>Street reconstruction: Wyckoff Avenue between Flushing and Cooper Avenues in Brooklyn and Queens.</description><category>Streets and Roadways</category><borough>Brooklyn</borough><managing_agency>DDC</managing_agency><client_agency>Trans. &amp; Env. Protection</client_agency><current_phase>Design</current_phase><design_start>2008-06-10T00:00:00</design_start><budget_forecast>33171000.00</budget_forecast><total_budget_changes>43926000.00</total_budget_changes><forecast_completion>2026-07-16T00:00:00</forecast_completion><total_schedule_changes>226</total_schedule_changes></row><row _id="row-gjh6.iwp2~yvty" _uuid="00000000-0000-0000-3992-C80CD8653CAB" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-gjh6.iwp2~yvty"><date_reported_as_of>2014-01-01T00:00:00</date_reported_as_of><pid>191</pid><project_name>Wyckoff Avenue Street Reconstruction</project_name><description>Reconstruction of Wyckoff Avenue from Flushing Avenue to Cooper Avenue, in the Boroughs of Brooklyn and Queens.</description><category>Streets and Roadways</category><borough>Brooklyn</borough><managing_agency>DDC</managing_agency><client_agency>Trans. &amp; Env. Protection</client_agency><current_phase>Design</current_phase><design_start>2008-06-10T00:00:00</design_start><budget_forecast>28727000.00</budget_forecast><latest_budget_changes>-4444000.00</latest_budget_changes><total_budget_changes>43926000.00</total_budget_changes><forecast_completion>2035-07-16T00:00:00</forecast_completion><latest_schedule_changes>3287</latest_schedule_changes><total_schedule_changes>226</total_schedule_changes></row><row _id="row-hpwe.y5t5-hhdm" _uuid="00000000-0000-0000-B0EA-B0E6F2AA7F2D" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-hpwe.y5t5-hhdm"><date_reported_as_of>2014-05-01T00:00:00</date_reported_as_of><pid>191</pid><project_name>Wyckoff Avenue Street Reconstruction</project_name><description>Reconstruction of Wyckoff Avenue from Flushing Avenue to Cooper Avenue, in the Boroughs of Brooklyn and Queens.</description><category>Streets and Roadways</category><borough>Brooklyn</borough><managing_agency>DDC</managing_agency><client_agency>Trans. &amp; Env. Protection</client_agency><current_phase>Design</current_phase><design_start>2008-06-10T00:00:00</design_start><budget_forecast>28787000.00</budget_forecast><latest_budget_changes>60000.00</latest_budget_changes><total_budget_changes>43926000.00</total_budget_changes><forecast_completion>2035-07-16T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>226</total_schedule_changes></row><row _id="row-d2ct~u55u_u9qc" _uuid="00000000-0000-0000-78BF-4A898CD686DE" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-d2ct~u55u_u9qc"><date_reported_as_of>2015-02-01T00:00:00</date_reported_as_of><pid>191</pid><project_name>Wyckoff Avenue Street Reconstruction</project_name><description>Reconstruction of Wyckoff Avenue from Flushing Avenue to Cooper Avenue, in the Boroughs of Brooklyn and Queens.</description><category>Streets and Roadways</category><borough>Brooklyn</borough><managing_agency>DDC</managing_agency><client_agency>Trans. &amp; Env. Protection</client_agency><current_phase>Design</current_phase><design_start>2008-06-10T00:00:00</design_start><budget_forecast>37180000.00</budget_forecast><latest_budget_changes>8393000.00</latest_budget_changes><total_budget_changes>43926000.00</total_budget_changes><forecast_completion>2036-01-14T00:00:00</forecast_completion><latest_schedule_changes>182</latest_schedule_changes><total_schedule_changes>226</total_schedule_changes></row><row _id="row-fwsy~ceet.9u82" _uuid="00000000-0000-0000-1973-11DE16ABC213" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-fwsy~ceet.9u82"><date_reported_as_of>2015-08-01T00:00:00</date_reported_as_of><pid>191</pid><project_name>Wyckoff Avenue Street Reconstruction</project_name><description>Reconstruction of Wyckoff Avenue from Flushing Avenue to Cooper Avenue, in the Boroughs of Brooklyn and Queens.</description><category>Streets and Roadways</category><borough>Brooklyn</borough><managing_agency>DDC</managing_agency><client_agency>Trans. &amp; Env. Protection</client_agency><current_phase>Design</current_phase><design_start>2008-06-10T00:00:00</design_start><budget_forecast>37230000.00</budget_forecast><latest_budget_changes>50000.00</latest_budget_changes><total_budget_changes>43926000.00</total_budget_changes><forecast_completion>2028-05-31T00:00:00</forecast_completion><latest_schedule_changes>-2784</latest_schedule_changes><total_schedule_changes>226</total_schedule_changes></row><row _id="row-9qy9~pir5_8zzj" _uuid="00000000-0000-0000-FC18-83AA8D856B3C" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-9qy9~pir5_8zzj"><date_reported_as_of>2016-01-01T00:00:00</date_reported_as_of><pid>191</pid><project_name>Wyckoff Avenue Street Reconstruction</project_name><description>Reconstruction of Wyckoff Avenue from Flushing Avenue to Cooper Avenue, in the Boroughs of Brooklyn and Queens.</description><category>Streets and Roadways</category><borough>Brooklyn</borough><managing_agency>DDC</managing_agency><client_agency>Trans. &amp; Env. Protection</client_agency><current_phase>Design</current_phase><design_start>2008-06-10T00:00:00</design_start><budget_forecast>45453000.00</budget_forecast><latest_budget_changes>8223000.00</latest_budget_changes><total_budget_changes>43926000.00</total_budget_changes><forecast_completion>2028-06-30T00:00:00</forecast_completion><latest_schedule_changes>30</latest_schedule_changes><total_schedule_changes>226</total_schedule_changes></row><row _id="row-kdu4~jf35.juv7" _uuid="00000000-0000-0000-2430-D52CFD3BD232" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-kdu4~jf35.juv7"><date_reported_as_of>2016-06-01T00:00:00</date_reported_as_of><pid>191</pid><project_name>Wyckoff Avenue Street Reconstruction</project_name><description>Reconstruction of Wyckoff Avenue from Flushing Avenue to Cooper Avenue, in the Boroughs of Brooklyn and Queens.</description><category>Streets and Roadways</category><borough>Brooklyn</borough><managing_agency>DDC</managing_agency><client_agency>Trans. &amp; Env. Protection</client_agency><current_phase>Design</current_phase><design_start>2008-06-10T00:00:00</design_start><budget_forecast>45953000.00</budget_forecast><latest_budget_changes>500000.00</latest_budget_changes><total_budget_changes>43926000.00</total_budget_changes><forecast_completion>2029-06-30T00:00:00</forecast_completion><latest_schedule_changes>365</latest_schedule_changes><total_schedule_changes>226</total_schedule_changes></row><row _id="row-nbua_qa2q.jhvk" _uuid="00000000-0000-0000-6F14-AC870133ABC4" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-nbua_qa2q.jhvk"><date_reported_as_of>2016-11-01T00:00:00</date_reported_as_of><pid>191</pid><project_name>Wyckoff Avenue Street Reconstruction</project_name><description>Reconstruction of Wyckoff Avenue from Flushing Avenue to Cooper Avenue, in the Boroughs of Brooklyn and Queens.</description><category>Streets and Roadways</category><borough>Brooklyn</borough><managing_agency>DDC</managing_agency><client_agency>Trans. &amp; Env. Protection</client_agency><current_phase>Design</current_phase><design_start>2008-06-10T00:00:00</design_start><budget_forecast>9527000.00</budget_forecast><latest_budget_changes>-36426000.00</latest_budget_changes><total_budget_changes>43926000.00</total_budget_changes><forecast_completion>2029-08-30T00:00:00</forecast_completion><latest_schedule_changes>61</latest_schedule_changes><total_schedule_changes>226</total_schedule_changes></row><row _id="row-hmeb.2jhq.74ti" _uuid="00000000-0000-0000-4635-829578E185FD" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-hmeb.2jhq.74ti"><date_reported_as_of>2017-04-01T00:00:00</date_reported_as_of><pid>191</pid><project_name>Wyckoff Avenue Street Reconstruction</project_name><description>Reconstruction of Wyckoff Avenue from Flushing Avenue to Cooper Avenue, in the Boroughs of Brooklyn and Queens.</description><category>Streets and Roadways</category><borough>Brooklyn</borough><managing_agency>DDC</managing_agency><client_agency>Trans. &amp; Env. Protection</client_agency><current_phase>Design</current_phase><design_start>2008-06-10T00:00:00</design_start><budget_forecast>46929000.00</budget_forecast><latest_budget_changes>37402000.00</latest_budget_changes><total_budget_changes>43926000.00</total_budget_changes><forecast_completion>2030-01-13T00:00:00</forecast_completion><latest_schedule_changes>136</latest_schedule_changes><total_schedule_changes>226</total_schedule_changes></row><row _id="row-hbs9~9k5v-7zk3" _uuid="00000000-0000-0000-930A-B92C7A5CF427" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-hbs9~9k5v-7zk3"><date_reported_as_of>2017-09-01T00:00:00</date_reported_as_of><pid>191</pid><project_name>Wyckoff Avenue Street Reconstruction</project_name><description>Reconstruction of Wyckoff Avenue from Flushing Avenue to Cooper Avenue, in the Boroughs of Brooklyn and Queens.</description><category>Streets and Roadways</category><borough>Brooklyn</borough><managing_agency>DDC</managing_agency><client_agency>Trans. &amp; Env. Protection</client_agency><current_phase>Design</current_phase><design_start>2008-06-10T00:00:00</design_start><budget_forecast>47099000.00</budget_forecast><latest_budget_changes>170000.00</latest_budget_changes><total_budget_changes>43926000.00</total_budget_changes><forecast_completion>2030-01-13T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>226</total_schedule_changes></row><row _id="row-zuz6-qfff~u4qt" _uuid="00000000-0000-0000-1DF0-87E056D9FF1D" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-zuz6-qfff~u4qt"><date_reported_as_of>2018-03-01T00:00:00</date_reported_as_of><pid>191</pid><project_name>Wyckoff Avenue Street Reconstruction</project_name><description>Reconstruction of Wyckoff Avenue from Flushing Avenue to Cooper Avenue, in the Boroughs of Brooklyn and Queens.</description><category>Streets and Roadways</category><borough>Brooklyn</borough><managing_agency>DDC</managing_agency><client_agency>Trans. &amp; Env. Protection</client_agency><current_phase>Design</current_phase><design_start>2008-06-10T00:00:00</design_start><budget_forecast>47099000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>43926000.00</total_budget_changes><forecast_completion>2030-06-30T00:00:00</forecast_completion><latest_schedule_changes>168</latest_schedule_changes><total_schedule_changes>226</total_schedule_changes></row><row _id="row-7b5y.dtaa.hgv3" _uuid="00000000-0000-0000-34B4-FAECF12D1423" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-7b5y.dtaa.hgv3"><date_reported_as_of>2018-08-01T00:00:00</date_reported_as_of><pid>191</pid><project_name>Wyckoff Avenue Street Reconstruction</project_name><description>Reconstruction of Wyckoff Avenue from Flushing Avenue to Cooper Avenue, in the Boroughs of Brooklyn and Queens.</description><category>Streets and Roadways</category><borough>Brooklyn</borough><managing_agency>DDC</managing_agency><client_agency>Trans. &amp; Env. Protection</client_agency><current_phase>Design</current_phase><design_start>2008-06-10T00:00:00</design_start><budget_forecast>35397000.00</budget_forecast><latest_budget_changes>-11702000.00</latest_budget_changes><total_budget_changes>43926000.00</total_budget_changes><forecast_completion>2030-06-30T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>226</total_schedule_changes></row><row _id="row-fgdi.ct5n.weg9" _uuid="00000000-0000-0000-BF48-E11738753D7C" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-fgdi.ct5n.weg9"><date_reported_as_of>2019-01-01T00:00:00</date_reported_as_of><pid>191</pid><project_name>Wyckoff Avenue Street Reconstruction</project_name><description>Reconstruction of Wyckoff Avenue from Flushing Avenue to Cooper Avenue, in the Boroughs of Brooklyn and Queens.</description><category>Streets and Roadways</category><borough>Brooklyn</borough><managing_agency>DDC</managing_agency><client_agency>Trans. &amp; Env. Protection</client_agency><current_phase>Design</current_phase><design_start>2008-06-10T00:00:00</design_start><budget_forecast>74148000.00</budget_forecast><latest_budget_changes>38751000.00</latest_budget_changes><total_budget_changes>43926000.00</total_budget_changes><forecast_completion>2030-12-29T00:00:00</forecast_completion><latest_schedule_changes>182</latest_schedule_changes><total_schedule_changes>226</total_schedule_changes></row><row _id="row-67c9-mrxd~ecsc" _uuid="00000000-0000-0000-D385-F7D60F638F74" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-67c9-mrxd~ecsc"><date_reported_as_of>2019-05-01T00:00:00</date_reported_as_of><pid>191</pid><project_name>Wyckoff Avenue Street Reconstruction</project_name><description>Reconstruction of Wyckoff Avenue from Flushing Avenue to Cooper Avenue, in the Boroughs of Brooklyn and Queens..</description><category>Streets and Roadways</category><borough>Brooklyn</borough><managing_agency>DDC</managing_agency><client_agency>Trans. &amp; Env. Protection</client_agency><current_phase>Design</current_phase><design_start>2017-03-29T00:00:00</design_start><budget_forecast>43745000.00</budget_forecast><latest_budget_changes>-30403000.00</latest_budget_changes><total_budget_changes>43926000.00</total_budget_changes><forecast_completion>2023-03-29T00:00:00</forecast_completion><latest_schedule_changes>-2832</latest_schedule_changes><total_schedule_changes>226</total_schedule_changes></row><row _id="row-kbyi~phtq-pthq" _uuid="00000000-0000-0000-5C9A-3F31B2B4AAB2" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-kbyi~phtq-pthq"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>191</pid><project_name>Wyckoff Avenue Street Reconstruction</project_name><description>Reconstruction of Wyckoff Avenue from Flushing Avenue to Cooper Avenue, in the Boroughs of Brooklyn and Queens..</description><category>Streets and Roadways</category><borough>Brooklyn</borough><managing_agency>DDC</managing_agency><client_agency>Trans. &amp; Env. Protection</client_agency><current_phase>Design</current_phase><design_start>2017-03-29T00:00:00</design_start><budget_forecast>74075000.00</budget_forecast><latest_budget_changes>30330000.00</latest_budget_changes><total_budget_changes>43926000.00</total_budget_changes><forecast_completion>2023-03-29T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>226</total_schedule_changes></row><row _id="row-7r8b.2icc~k4d9" _uuid="00000000-0000-0000-3E36-1C5B3E6FF141" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-7r8b.2icc~k4d9"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>191</pid><project_name>Wyckoff Avenue Street Reconstruction</project_name><category>Streets and Roadways</category><borough>Brooklyn</borough><managing_agency>DDC</managing_agency><client_agency>Trans. &amp; Env. Protection</client_agency><total_budget_changes>43926000.00</total_budget_changes><total_schedule_changes>226</total_schedule_changes></row><row _id="row-gzxn.zn5w-a5ic" _uuid="00000000-0000-0000-C797-A69A32CDE0C5" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-gzxn.zn5w-a5ic"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>191</pid><project_name>Wyckoff Avenue Street Reconstruction</project_name><category>Streets and Roadways</category><borough>Brooklyn</borough><managing_agency>DDC</managing_agency><client_agency>Trans. &amp; Env. Protection</client_agency><total_budget_changes>43926000.00</total_budget_changes><total_schedule_changes>226</total_schedule_changes></row><row _id="row-3uuk_hkh9.wegb" _uuid="00000000-0000-0000-1677-EB17566A3D59" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-3uuk_hkh9.wegb"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>191</pid><project_name>Wyckoff Avenue Street Reconstruction</project_name><category>Streets and Roadways</category><borough>Brooklyn</borough><managing_agency>DDC</managing_agency><client_agency>Trans. &amp; Env. Protection</client_agency><total_budget_changes>43926000.00</total_budget_changes><total_schedule_changes>226</total_schedule_changes></row><row _id="row-wtyk_yfvg_tzre" _uuid="00000000-0000-0000-8A64-A9A128839AF5" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-wtyk_yfvg_tzre"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>191</pid><project_name>Wyckoff Avenue Street Reconstruction</project_name><category>Streets and Roadways</category><borough>Brooklyn</borough><managing_agency>DDC</managing_agency><client_agency>Trans. &amp; Env. Protection</client_agency><total_budget_changes>43926000.00</total_budget_changes><total_schedule_changes>226</total_schedule_changes></row><row _id="row-2t3k-ftab~jyyw" _uuid="00000000-0000-0000-AB52-CD916ED8F2E5" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-2t3k-ftab~jyyw"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>191</pid><project_name>Wyckoff Avenue Street Reconstruction</project_name><description>Reconstruction of Wyckoff Avenue from Flushing Avenue to Cooper Avenue, in the Boroughs of Brooklyn and Queens..</description><category>Streets and Roadways</category><borough>Brooklyn</borough><managing_agency>DDC</managing_agency><client_agency>Trans. &amp; Env. Protection</client_agency><current_phase>Design</current_phase><design_start>2017-03-29T00:00:00</design_start><budget_forecast>73992000.00</budget_forecast><latest_budget_changes>-83000.00</latest_budget_changes><total_budget_changes>43926000.00</total_budget_changes><forecast_completion>2028-03-30T00:00:00</forecast_completion><latest_schedule_changes>1828</latest_schedule_changes><total_schedule_changes>226</total_schedule_changes></row><row _id="row-5b98~w6gg~7sva" _uuid="00000000-0000-0000-08C6-238E0A1ECAEE" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-5b98~w6gg~7sva"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>191</pid><project_name>Wyckoff Avenue Street Reconstruction</project_name><description>Reconstruction of Wyckoff Avenue from Flushing Avenue to Cooper Avenue, in the Boroughs of Brooklyn and Queens..</description><category>Streets and Roadways</category><borough>Brooklyn</borough><managing_agency>DDC</managing_agency><client_agency>Trans. &amp; Env. Protection</client_agency><current_phase>Design</current_phase><design_start>2017-03-29T00:00:00</design_start><budget_forecast>73992000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>43926000.00</total_budget_changes><forecast_completion>2028-03-30T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>226</total_schedule_changes></row><row _id="row-t8jy.82me.hxq6" _uuid="00000000-0000-0000-8EB2-81E1D43910AB" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-t8jy.82me.hxq6"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>191</pid><project_name>Wyckoff Avenue Street Reconstruction</project_name><description>Reconstruction of Wyckoff Avenue from Flushing Avenue to Cooper Avenue, in the Boroughs of Brooklyn and Queens..</description><category>Streets and Roadways</category><borough>Brooklyn</borough><managing_agency>DDC</managing_agency><client_agency>Trans. &amp; Env. Protection</client_agency><current_phase>Design</current_phase><design_start>2017-03-29T00:00:00</design_start><budget_forecast>76517000.00</budget_forecast><latest_budget_changes>2525000.00</latest_budget_changes><total_budget_changes>43926000.00</total_budget_changes><forecast_completion>2028-03-30T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>226</total_schedule_changes></row><row _id="row-qg7n-8tph-cdku" _uuid="00000000-0000-0000-BE2E-31ECD2B84F97" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-qg7n-8tph-cdku"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>191</pid><project_name>Wyckoff Avenue Street Reconstruction</project_name><description>Reconstruction of Wyckoff Avenue from Flushing Avenue to Cooper Avenue, in the Boroughs of Brooklyn and Queens..</description><category>Streets and Roadways</category><borough>Brooklyn</borough><managing_agency>DDC</managing_agency><client_agency>Trans. &amp; Env. Protection</client_agency><current_phase>Design</current_phase><design_start>2017-03-29T00:00:00</design_start><budget_forecast>77097000.00</budget_forecast><latest_budget_changes>580000.00</latest_budget_changes><total_budget_changes>43926000.00</total_budget_changes><forecast_completion>2027-02-27T00:00:00</forecast_completion><latest_schedule_changes>-397</latest_schedule_changes><total_schedule_changes>226</total_schedule_changes></row><row _id="row-6ewf~6skm~hj98" _uuid="00000000-0000-0000-AB90-17C9DE0808EF" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-6ewf~6skm~hj98"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>191</pid><project_name>Wyckoff Avenue Street Reconstruction</project_name><description>Reconstruction of Wyckoff Avenue from Flushing Avenue to Cooper Avenue, in the Boroughs of Brooklyn and Queens..</description><category>Streets and Roadways</category><borough>Brooklyn</borough><managing_agency>DDC</managing_agency><client_agency>Trans. &amp; Env. Protection</client_agency><current_phase>Design</current_phase><design_start>2017-03-29T00:00:00</design_start><budget_forecast>77097000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>43926000.00</total_budget_changes><forecast_completion>2027-02-27T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>226</total_schedule_changes></row><row _id="row-i9a7.4wzw~vifu" _uuid="00000000-0000-0000-CCCD-68806050EC88" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-i9a7.4wzw~vifu"><date_reported_as_of>2013-09-01T00:00:00</date_reported_as_of><pid>193</pid><project_name>Dumbo and Vinegar Hill Area Roadway Reconstruction and Renovation</project_name><description>Reconstruction and restoration of Belgian block roadways in the DUMBO and Vinegar Hill communities concurrent with installation of new water main, combined sewers and storm sewers, plus construction of the Pearl Street Triangle Plaza.</description><category>Streets and Roadways</category><borough>Brooklyn</borough><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2012-06-07T00:00:00</design_start><budget_forecast>33600000.00</budget_forecast><total_budget_changes>96724000.00</total_budget_changes><forecast_completion>2015-07-09T00:00:00</forecast_completion><total_schedule_changes>3253</total_schedule_changes></row><row _id="row-4tn5-rujk_ajzv" _uuid="00000000-0000-0000-694D-F80EDDFDFED9" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-4tn5-rujk_ajzv"><date_reported_as_of>2014-01-01T00:00:00</date_reported_as_of><pid>193</pid><project_name>Dumbo and Vinegar Hill Area Roadway Reconstruction and Renovation</project_name><description>Reconstruction and restoration of Belgian block roadways in the DUMBO and Vinegar Hill communities concurrent with installation of new water main, combined sewers and storm sewers, plus construction of the Pearl Street Triangle Plaza.</description><category>Streets and Roadways</category><borough>Brooklyn</borough><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2012-06-07T00:00:00</design_start><budget_forecast>36285000.00</budget_forecast><latest_budget_changes>2685000.00</latest_budget_changes><total_budget_changes>96724000.00</total_budget_changes><forecast_completion>2015-11-23T00:00:00</forecast_completion><latest_schedule_changes>137</latest_schedule_changes><total_schedule_changes>3253</total_schedule_changes></row><row _id="row-p897.ah4v-uahw" _uuid="00000000-0000-0000-8F4C-AA567B0FED16" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-p897.ah4v-uahw"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1198</pid><project_name>GI - GRAVESEND BAY CSO - PHASE II</project_name><description>GREEN INFRASTRUCTURE IN OH-015 GRAVESEND BAY CSO PH 2</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction Procurement</current_phase><design_start>2017-10-30T00:00:00</design_start><budget_forecast>55026000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>13699000.00</total_budget_changes><forecast_completion>2024-12-09T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>29</total_schedule_changes></row><row _id="row-g47k_peyk_ru5w" _uuid="00000000-0000-0000-7233-4C460AC204EB" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-g47k_peyk_ru5w"><date_reported_as_of>2014-05-01T00:00:00</date_reported_as_of><pid>193</pid><project_name>Dumbo and Vinegar Hill Area Roadway Reconstruction and Renovation</project_name><description>Reconstruction and restoration of Belgian block roadways in the DUMBO and Vinegar Hill communities concurrent with installation of new water main, combined sewers and storm sewers, plus construction of the Pearl Street Triangle Plaza.</description><category>Streets and Roadways</category><borough>Brooklyn</borough><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2012-06-07T00:00:00</design_start><budget_forecast>36674000.00</budget_forecast><latest_budget_changes>389000.00</latest_budget_changes><total_budget_changes>96724000.00</total_budget_changes><forecast_completion>2016-04-24T00:00:00</forecast_completion><latest_schedule_changes>153</latest_schedule_changes><total_schedule_changes>3253</total_schedule_changes></row><row _id="row-zdhz-hr7k~nn9a" _uuid="00000000-0000-0000-BFF6-EA61F7ADD22C" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-zdhz-hr7k~nn9a"><date_reported_as_of>2015-02-01T00:00:00</date_reported_as_of><pid>193</pid><project_name>Dumbo and Vinegar Hill Area Roadway Reconstruction and Renovation</project_name><description>Reconstruction and restoration of Belgian block roadways in the DUMBO and Vinegar Hill communities concurrent with installation of new water main, combined sewers and storm sewers, plus construction of the Pearl Street Triangle Plaza.</description><category>Streets and Roadways</category><borough>Brooklyn</borough><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2012-06-07T00:00:00</design_start><budget_forecast>49317000.00</budget_forecast><latest_budget_changes>12643000.00</latest_budget_changes><total_budget_changes>96724000.00</total_budget_changes><forecast_completion>2017-04-09T00:00:00</forecast_completion><latest_schedule_changes>350</latest_schedule_changes><total_schedule_changes>3253</total_schedule_changes></row><row _id="row-yysi.aisi_7t24" _uuid="00000000-0000-0000-DBAF-F92393899A46" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-yysi.aisi_7t24"><date_reported_as_of>2015-08-01T00:00:00</date_reported_as_of><pid>193</pid><project_name>Dumbo and Vinegar Hill Area Roadway Reconstruction and Renovation</project_name><description>Reconstruction and restoration of Belgian block roadways in the DUMBO and Vinegar Hill communities concurrent with installation of new water main, combined sewers and storm sewers, plus construction of the Pearl Street Triangle Plaza.</description><category>Streets and Roadways</category><borough>Brooklyn</borough><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2012-06-07T00:00:00</design_start><budget_forecast>48317000.00</budget_forecast><latest_budget_changes>-1000000.00</latest_budget_changes><total_budget_changes>96724000.00</total_budget_changes><forecast_completion>2017-11-08T00:00:00</forecast_completion><latest_schedule_changes>213</latest_schedule_changes><total_schedule_changes>3253</total_schedule_changes></row><row _id="row-cmtt_e5f3_2sat" _uuid="00000000-0000-0000-204C-F1F3B4141316" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-cmtt_e5f3_2sat"><date_reported_as_of>2016-01-01T00:00:00</date_reported_as_of><pid>193</pid><project_name>Dumbo and Vinegar Hill Area Roadway Reconstruction and Renovation</project_name><description>Reconstruction and restoration of Belgian block roadways in the DUMBO and Vinegar Hill communities concurrent with installation of new water main, combined sewers and storm sewers, plus construction of the Pearl Street Triangle Plaza.</description><category>Streets and Roadways</category><borough>Brooklyn</borough><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2012-06-07T00:00:00</design_start><budget_forecast>46683000.00</budget_forecast><latest_budget_changes>-1634000.00</latest_budget_changes><total_budget_changes>96724000.00</total_budget_changes><forecast_completion>2018-02-08T00:00:00</forecast_completion><latest_schedule_changes>92</latest_schedule_changes><total_schedule_changes>3253</total_schedule_changes></row><row _id="row-drjk-hgeh~gtes" _uuid="00000000-0000-0000-5780-F4F46A3C898F" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-drjk-hgeh~gtes"><date_reported_as_of>2016-06-01T00:00:00</date_reported_as_of><pid>193</pid><project_name>Dumbo and Vinegar Hill Area Roadway Reconstruction and Renovation</project_name><description>Reconstruction and restoration of Belgian block roadways in the DUMBO and Vinegar Hill communities concurrent with installation of new water main, combined sewers and storm sewers, plus construction of the Pearl Street Triangle Plaza.</description><category>Streets and Roadways</category><borough>Brooklyn</borough><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2012-06-07T00:00:00</design_start><budget_forecast>47094000.00</budget_forecast><latest_budget_changes>411000.00</latest_budget_changes><total_budget_changes>96724000.00</total_budget_changes><forecast_completion>2018-11-23T00:00:00</forecast_completion><latest_schedule_changes>288</latest_schedule_changes><total_schedule_changes>3253</total_schedule_changes></row><row _id="row-4ww9-6r48~npij" _uuid="00000000-0000-0000-393B-2533D822AC21" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-4ww9-6r48~npij"><date_reported_as_of>2016-11-01T00:00:00</date_reported_as_of><pid>193</pid><project_name>Dumbo and Vinegar Hill Area Roadway Reconstruction and Renovation</project_name><description>Reconstruction and restoration of Belgian block roadways in the DUMBO and Vinegar Hill communities concurrent with installation of new water main, combined sewers and storm sewers, plus construction of the Pearl Street Triangle Plaza.</description><category>Streets and Roadways</category><borough>Brooklyn</borough><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2012-06-07T00:00:00</design_start><budget_forecast>60750000.00</budget_forecast><latest_budget_changes>13656000.00</latest_budget_changes><total_budget_changes>96724000.00</total_budget_changes><forecast_completion>2018-11-23T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>3253</total_schedule_changes></row><row _id="row-ve74.jvh2_ritv" _uuid="00000000-0000-0000-F248-29F6EC0A17BA" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ve74.jvh2_ritv"><date_reported_as_of>2017-04-01T00:00:00</date_reported_as_of><pid>193</pid><project_name>Dumbo and Vinegar Hill Area Roadway Reconstruction and Renovation</project_name><description>Reconstruction and restoration of Belgian block roadways in the DUMBO and Vinegar Hill communities concurrent with installation of new water main, combined sewers and storm sewers, plus construction of the Pearl Street Triangle Plaza.</description><category>Streets and Roadways</category><borough>Brooklyn</borough><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2012-06-07T00:00:00</design_start><budget_forecast>19553000.00</budget_forecast><latest_budget_changes>-41197000.00</latest_budget_changes><total_budget_changes>96724000.00</total_budget_changes><forecast_completion>2019-04-25T00:00:00</forecast_completion><latest_schedule_changes>153</latest_schedule_changes><total_schedule_changes>3253</total_schedule_changes></row><row _id="row-wjun.57w9-bu4d" _uuid="00000000-0000-0000-B545-556873DF5CB4" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-wjun.57w9-bu4d"><date_reported_as_of>2017-09-01T00:00:00</date_reported_as_of><pid>193</pid><project_name>Dumbo and Vinegar Hill Area Roadway Reconstruction and Renovation</project_name><description>Reconstruction and restoration of Belgian block roadways in the DUMBO and Vinegar Hill communities concurrent with installation of new water main, combined sewers and storm sewers, plus construction of the Pearl Street Triangle Plaza.</description><category>Streets and Roadways</category><borough>Brooklyn</borough><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2012-06-07T00:00:00</design_start><budget_forecast>60780000.00</budget_forecast><latest_budget_changes>41227000.00</latest_budget_changes><total_budget_changes>96724000.00</total_budget_changes><forecast_completion>2019-04-25T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>3253</total_schedule_changes></row><row _id="row-y2yr~7d9q~2ye2" _uuid="00000000-0000-0000-D194-157E4EB6EF91" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-y2yr~7d9q~2ye2"><date_reported_as_of>2018-03-01T00:00:00</date_reported_as_of><pid>193</pid><project_name>Dumbo and Vinegar Hill Area Roadway Reconstruction and Renovation</project_name><description>Reconstruction and restoration of Belgian block roadways in the DUMBO and Vinegar Hill communities concurrent with installation of new water main, combined sewers and storm sewers, plus construction of the Pearl Street Triangle Plaza.</description><category>Streets and Roadways</category><borough>Brooklyn</borough><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Construction Procurement</current_phase><design_start>2012-06-07T00:00:00</design_start><budget_forecast>60780000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>96724000.00</total_budget_changes><forecast_completion>2019-09-13T00:00:00</forecast_completion><latest_schedule_changes>141</latest_schedule_changes><total_schedule_changes>3253</total_schedule_changes></row><row _id="row-36hv_avpv.d3jk" _uuid="00000000-0000-0000-36BA-927E5C951837" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-36hv_avpv.d3jk"><date_reported_as_of>2018-08-01T00:00:00</date_reported_as_of><pid>193</pid><project_name>Dumbo and Vinegar Hill Area Roadway Reconstruction and Renovation</project_name><description>Reconstruction and restoration of Belgian block roadways in the DUMBO and Vinegar Hill communities concurrent with installation of new water main, combined sewers and storm sewers, plus construction of the Pearl Street Triangle Plaza.</description><category>Streets and Roadways</category><borough>Brooklyn</borough><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Construction Procurement</current_phase><design_start>2012-06-07T00:00:00</design_start><budget_forecast>113352000.00</budget_forecast><latest_budget_changes>52572000.00</latest_budget_changes><total_budget_changes>96724000.00</total_budget_changes><forecast_completion>2020-03-21T00:00:00</forecast_completion><latest_schedule_changes>190</latest_schedule_changes><total_schedule_changes>3253</total_schedule_changes></row><row _id="row-hnc2-uuja~2sg8" _uuid="00000000-0000-0000-F262-D841ABB894DD" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-hnc2-uuja~2sg8"><date_reported_as_of>2019-01-01T00:00:00</date_reported_as_of><pid>193</pid><project_name>Dumbo and Vinegar Hill Area Roadway Reconstruction and Renovation</project_name><description>Reconstruction and restoration of Belgian block roadways in the DUMBO and Vinegar Hill communities concurrent with installation of new water main, combined sewers and storm sewers, plus construction of the Pearl Street Triangle Plaza.</description><category>Streets and Roadways</category><borough>Brooklyn</borough><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Construction</current_phase><design_start>2012-06-07T00:00:00</design_start><budget_forecast>119917000.00</budget_forecast><latest_budget_changes>6565000.00</latest_budget_changes><total_budget_changes>96724000.00</total_budget_changes><forecast_completion>2024-06-04T00:00:00</forecast_completion><latest_schedule_changes>1536</latest_schedule_changes><total_schedule_changes>3253</total_schedule_changes></row><row _id="row-ba7t.pkr9-r82z" _uuid="00000000-0000-0000-A034-276E4E3FAA88" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ba7t.pkr9-r82z"><date_reported_as_of>2019-05-01T00:00:00</date_reported_as_of><pid>193</pid><project_name>Dumbo and Vinegar Hill Area Roadway Reconstruction and Renovation</project_name><description>Reconstruction DUMBO/Vinegar Hill Area including Trunk and Distribution water main replacement; Installation of HLSS and Combined Sewer replacement; Restoration of Belgian block in Water Street; Street lighting and Traffic Signal work.</description><category>Streets and Roadways</category><borough>Brooklyn</borough><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Construction</current_phase><design_start>2012-06-07T00:00:00</design_start><budget_forecast>114950000.00</budget_forecast><latest_budget_changes>-4967000.00</latest_budget_changes><total_budget_changes>96724000.00</total_budget_changes><forecast_completion>2024-06-04T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>3253</total_schedule_changes></row><row _id="row-tcfj-cygk-ica9" _uuid="00000000-0000-0000-8DA4-389F55C1295E" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-tcfj-cygk-ica9"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>193</pid><project_name>Dumbo and Vinegar Hill Area Roadway Reconstruction and Renovation</project_name><description>Reconstruction DUMBO/Vinegar Hill Area including Trunk and Distribution water main replacement; Installation of HLSS and Combined Sewer replacement; Restoration of Belgian block in Water Street; Street lighting and Traffic Signal work.</description><category>Streets and Roadways</category><borough>Brooklyn</borough><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Construction</current_phase><design_start>2012-06-07T00:00:00</design_start><budget_forecast>122502000.00</budget_forecast><latest_budget_changes>7552000.00</latest_budget_changes><total_budget_changes>96724000.00</total_budget_changes><forecast_completion>2024-06-04T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>3253</total_schedule_changes></row><row _id="row-wrud~2x75~xrvr" _uuid="00000000-0000-0000-C04B-3EFCC7243EED" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-wrud~2x75~xrvr"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>193</pid><project_name>Dumbo and Vinegar Hill Area Roadway Reconstruction and Renovation</project_name><category>Streets and Roadways</category><borough>Brooklyn</borough><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><total_budget_changes>96724000.00</total_budget_changes><total_schedule_changes>3253</total_schedule_changes></row><row _id="row-vpdv_idq6_evzp" _uuid="00000000-0000-0000-B871-4D791B63D725" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-vpdv_idq6_evzp"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>193</pid><project_name>Dumbo and Vinegar Hill Area Roadway Reconstruction and Renovation</project_name><category>Streets and Roadways</category><borough>Brooklyn</borough><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><total_budget_changes>96724000.00</total_budget_changes><total_schedule_changes>3253</total_schedule_changes></row><row _id="row-f7tk_m8in_4ky5" _uuid="00000000-0000-0000-BB5E-11CB432BD730" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-f7tk_m8in_4ky5"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>193</pid><project_name>Dumbo and Vinegar Hill Area Roadway Reconstruction and Renovation</project_name><category>Streets and Roadways</category><borough>Brooklyn</borough><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><total_budget_changes>96724000.00</total_budget_changes><total_schedule_changes>3253</total_schedule_changes></row><row _id="row-nupx-gekj.x4pm" _uuid="00000000-0000-0000-99C9-6C65CACE9049" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-nupx-gekj.x4pm"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>193</pid><project_name>Dumbo and Vinegar Hill Area Roadway Reconstruction and Renovation</project_name><category>Streets and Roadways</category><borough>Brooklyn</borough><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><total_budget_changes>96724000.00</total_budget_changes><total_schedule_changes>3253</total_schedule_changes></row><row _id="row-4rwp~t22w~qa5v" _uuid="00000000-0000-0000-9866-D0862CB653DF" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-4rwp~t22w~qa5v"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>193</pid><project_name>Dumbo and Vinegar Hill Area Roadway Reconstruction and Renovation</project_name><description>Reconstruction DUMBO/Vinegar Hill Area including Trunk and Distribution water main replacement; Installation of HLSS and Combined Sewer replacement; Restoration of Belgian block in Water Street; Street lighting and Traffic Signal work.</description><category>Streets and Roadways</category><borough>Brooklyn</borough><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Construction</current_phase><design_start>2012-06-07T00:00:00</design_start><budget_forecast>129468000.00</budget_forecast><latest_budget_changes>6966000.00</latest_budget_changes><total_budget_changes>96724000.00</total_budget_changes><forecast_completion>2024-06-04T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>3253</total_schedule_changes></row><row _id="row-b8kn_x6za~5de5" _uuid="00000000-0000-0000-8658-8E8F3362960D" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-b8kn_x6za~5de5"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>193</pid><project_name>Dumbo and Vinegar Hill Area Roadway Reconstruction and Renovation</project_name><description>Reconstruction DUMBO/Vinegar Hill Area including Trunk and Distribution water main replacement; Installation of HLSS and Combined Sewer replacement; Restoration of Belgian block in Water Street; Street lighting and Traffic Signal work.</description><category>Streets and Roadways</category><borough>Brooklyn</borough><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Construction</current_phase><design_start>2012-06-07T00:00:00</design_start><budget_forecast>129480000.00</budget_forecast><latest_budget_changes>12000.00</latest_budget_changes><total_budget_changes>96724000.00</total_budget_changes><forecast_completion>2024-06-04T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>3253</total_schedule_changes></row><row _id="row-ti2v.d6b3-vc7n" _uuid="00000000-0000-0000-3373-504AFDFC031A" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ti2v.d6b3-vc7n"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>193</pid><project_name>Dumbo and Vinegar Hill Area Roadway Reconstruction and Renovation</project_name><description>Reconstruction DUMBO/Vinegar Hill Area including Trunk and Distribution water main replacement; Installation of HLSS and Combined Sewer replacement; Restoration of Belgian block in Water Street; Street lighting and Traffic Signal work.</description><category>Streets and Roadways</category><borough>Brooklyn</borough><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Construction</current_phase><design_start>2012-06-07T00:00:00</design_start><budget_forecast>130410000.00</budget_forecast><latest_budget_changes>930000.00</latest_budget_changes><total_budget_changes>96724000.00</total_budget_changes><forecast_completion>2024-06-04T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>3253</total_schedule_changes></row><row _id="row-g7sa~pxpb.vb85" _uuid="00000000-0000-0000-C247-CD900423E684" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-g7sa~pxpb.vb85"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>193</pid><project_name>Dumbo and Vinegar Hill Area Roadway Reconstruction and Renovation</project_name><description>Reconstruction DUMBO/Vinegar Hill Area including Trunk and Distribution water main replacement; Installation of HLSS and Combined Sewer replacement; Restoration of Belgian block in Water Street; Street lighting and Traffic Signal work.</description><category>Streets and Roadways</category><borough>Brooklyn</borough><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Construction</current_phase><design_start>2012-06-07T00:00:00</design_start><budget_forecast>131339000.00</budget_forecast><latest_budget_changes>929000.00</latest_budget_changes><total_budget_changes>96724000.00</total_budget_changes><forecast_completion>2024-06-04T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>3253</total_schedule_changes></row><row _id="row-svet.uybk_na7i" _uuid="00000000-0000-0000-E841-9644D81B5DFF" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-svet.uybk_na7i"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>193</pid><project_name>Dumbo and Vinegar Hill Area Roadway Reconstruction and Renovation</project_name><description>Reconstruction DUMBO/Vinegar Hill Area including Trunk and Distribution water main replacement; Installation of HLSS and Combined Sewer replacement; Restoration of Belgian block in Water Street; Street lighting and Traffic Signal work.</description><category>Streets and Roadways</category><borough>Brooklyn</borough><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Construction</current_phase><design_start>2012-06-07T00:00:00</design_start><budget_forecast>130324000.00</budget_forecast><latest_budget_changes>-1015000.00</latest_budget_changes><total_budget_changes>96724000.00</total_budget_changes><forecast_completion>2024-06-04T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>3253</total_schedule_changes></row><row _id="row-d3tc.jpya_8ije" _uuid="00000000-0000-0000-3755-370CEFEC7B2E" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-d3tc.jpya_8ije"><date_reported_as_of>2013-09-01T00:00:00</date_reported_as_of><pid>204</pid><project_name>Edgewood Triangle Roadway Reconstruction</project_name><description>Reconstruct roadway and extend storm and sanitary sewers in portions of Brookville Boulevard, Edgewood Street, 147th Avenue, and adjacent streets west of 241st Street.</description><category>Streets and Roadways</category><borough>Queens</borough><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2013-02-13T00:00:00</design_start><budget_forecast>28136000.00</budget_forecast><total_budget_changes>106503000.00</total_budget_changes><forecast_completion>2018-10-10T00:00:00</forecast_completion><total_schedule_changes>3597</total_schedule_changes></row><row _id="row-6uyd_emmz~qtqw" _uuid="00000000-0000-0000-202F-5F5279D04AD1" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-6uyd_emmz~qtqw"><date_reported_as_of>2014-01-01T00:00:00</date_reported_as_of><pid>204</pid><project_name>Edgewood Triangle Roadway Reconstruction</project_name><description>Reconstruct roadway and extend storm and sanitary sewers in portions of Brookville Boulevard, Edgewood Street, 147th Avenue, and adjacent streets west of 241st Street.</description><category>Streets and Roadways</category><borough>Queens</borough><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2013-02-13T00:00:00</design_start><budget_forecast>28136000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>106503000.00</total_budget_changes><forecast_completion>2018-10-10T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>3597</total_schedule_changes></row><row _id="row-z972-wkwg-x52m" _uuid="00000000-0000-0000-D577-AB09206C0088" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-z972-wkwg-x52m"><date_reported_as_of>2014-05-01T00:00:00</date_reported_as_of><pid>204</pid><project_name>Edgewood Triangle Roadway Reconstruction</project_name><description>Reconstruct roadway and extend storm and sanitary sewers in portions of Brookville Boulevard, Edgewood Street, 147th Avenue, and adjacent streets west of 241st Street.</description><category>Streets and Roadways</category><borough>Queens</borough><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2013-02-13T00:00:00</design_start><budget_forecast>28571000.00</budget_forecast><latest_budget_changes>435000.00</latest_budget_changes><total_budget_changes>106503000.00</total_budget_changes><forecast_completion>2018-10-10T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>3597</total_schedule_changes></row><row _id="row-kcmu.y5x5.xtm2" _uuid="00000000-0000-0000-36C1-D096586B4FEB" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-kcmu.y5x5.xtm2"><date_reported_as_of>2015-02-01T00:00:00</date_reported_as_of><pid>204</pid><project_name>Edgewood Triangle Roadway Reconstruction</project_name><description>Reconstruct roadway and extend storm and sanitary sewers in portions of Brookville Boulevard, Edgewood Street, 147th Avenue, and adjacent streets west of 241st Street.</description><category>Streets and Roadways</category><borough>Queens</borough><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2013-02-13T00:00:00</design_start><budget_forecast>29387000.00</budget_forecast><latest_budget_changes>816000.00</latest_budget_changes><total_budget_changes>106503000.00</total_budget_changes><forecast_completion>2019-09-07T00:00:00</forecast_completion><latest_schedule_changes>332</latest_schedule_changes><total_schedule_changes>3597</total_schedule_changes></row><row _id="row-itqr-ai2r_hrbx" _uuid="00000000-0000-0000-32A3-6D0E15E5ED78" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-itqr-ai2r_hrbx"><date_reported_as_of>2015-08-01T00:00:00</date_reported_as_of><pid>204</pid><project_name>Edgewood Triangle Roadway Reconstruction</project_name><description>Reconstruct roadway and extend storm and sanitary sewers in portions of Brookville Boulevard, Edgewood Street, 147th Avenue, and adjacent streets west of 241st Street.</description><category>Streets and Roadways</category><borough>Queens</borough><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2013-02-13T00:00:00</design_start><budget_forecast>29883000.00</budget_forecast><latest_budget_changes>496000.00</latest_budget_changes><total_budget_changes>106503000.00</total_budget_changes><forecast_completion>2019-09-26T00:00:00</forecast_completion><latest_schedule_changes>19</latest_schedule_changes><total_schedule_changes>3597</total_schedule_changes></row><row _id="row-hhpt_88pz_775j" _uuid="00000000-0000-0000-C7D5-116275A6AD4C" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-hhpt_88pz_775j"><date_reported_as_of>2016-01-01T00:00:00</date_reported_as_of><pid>204</pid><project_name>Edgewood Triangle Roadway Reconstruction</project_name><description>Reconstruct roadway and extend storm and sanitary sewers in portions of Brookville Boulevard, Edgewood Street, 147th Avenue, and adjacent streets west of 241st Street.</description><category>Streets and Roadways</category><borough>Queens</borough><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2013-02-13T00:00:00</design_start><budget_forecast>32908000.00</budget_forecast><latest_budget_changes>3025000.00</latest_budget_changes><total_budget_changes>106503000.00</total_budget_changes><forecast_completion>2020-07-25T00:00:00</forecast_completion><latest_schedule_changes>303</latest_schedule_changes><total_schedule_changes>3597</total_schedule_changes></row><row _id="row-jqnm_bs6b.2x2r" _uuid="00000000-0000-0000-82F3-72B333EE8BB8" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-jqnm_bs6b.2x2r"><date_reported_as_of>2016-06-01T00:00:00</date_reported_as_of><pid>204</pid><project_name>Edgewood Triangle Roadway Reconstruction</project_name><description>Reconstruct roadway and extend storm and sanitary sewers in portions of Brookville Boulevard, Edgewood Street, 147th Avenue, and adjacent streets west of 241st Street.</description><category>Streets and Roadways</category><borough>Queens</borough><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2013-02-13T00:00:00</design_start><budget_forecast>33063000.00</budget_forecast><latest_budget_changes>155000.00</latest_budget_changes><total_budget_changes>106503000.00</total_budget_changes><forecast_completion>2019-09-25T00:00:00</forecast_completion><latest_schedule_changes>-304</latest_schedule_changes><total_schedule_changes>3597</total_schedule_changes></row><row _id="row-ynae_g7n6-73ff" _uuid="00000000-0000-0000-82D6-F2BF2899C610" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ynae_g7n6-73ff"><date_reported_as_of>2016-11-01T00:00:00</date_reported_as_of><pid>204</pid><project_name>Edgewood Triangle Roadway Reconstruction</project_name><description>Reconstruct roadway and extend storm and sanitary sewers in portions of Brookville Boulevard, Edgewood Street, 147th Avenue, and adjacent streets west of 241st Street.</description><category>Streets and Roadways</category><borough>Queens</borough><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2013-02-13T00:00:00</design_start><budget_forecast>58785000.00</budget_forecast><latest_budget_changes>25722000.00</latest_budget_changes><total_budget_changes>106503000.00</total_budget_changes><forecast_completion>2020-07-25T00:00:00</forecast_completion><latest_schedule_changes>304</latest_schedule_changes><total_schedule_changes>3597</total_schedule_changes></row><row _id="row-wmms~qwpg.4yqd" _uuid="00000000-0000-0000-4009-92DE275BB336" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-wmms~qwpg.4yqd"><date_reported_as_of>2017-04-01T00:00:00</date_reported_as_of><pid>204</pid><project_name>Edgewood Triangle Roadway Reconstruction</project_name><description>Reconstruct roadway and extend storm and sanitary sewers in portions of Brookville Boulevard, Edgewood Street, 147th Avenue, and adjacent streets west of 241st Street.</description><category>Streets and Roadways</category><borough>Queens</borough><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2013-02-13T00:00:00</design_start><budget_forecast>33001000.00</budget_forecast><latest_budget_changes>-25784000.00</latest_budget_changes><total_budget_changes>106503000.00</total_budget_changes><forecast_completion>2020-09-06T00:00:00</forecast_completion><latest_schedule_changes>43</latest_schedule_changes><total_schedule_changes>3597</total_schedule_changes></row><row _id="row-3frk~jw2w_auz5" _uuid="00000000-0000-0000-534B-712FFB9A696A" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-3frk~jw2w_auz5"><date_reported_as_of>2017-09-01T00:00:00</date_reported_as_of><pid>204</pid><project_name>Edgewood Triangle Roadway Reconstruction</project_name><description>Reconstruct roadway and extend storm and sanitary sewers in portions of Brookville Boulevard, Edgewood Street, 147th Avenue, and adjacent streets west of 241st Street.</description><category>Streets and Roadways</category><borough>Queens</borough><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2013-02-13T00:00:00</design_start><budget_forecast>33196000.00</budget_forecast><latest_budget_changes>195000.00</latest_budget_changes><total_budget_changes>106503000.00</total_budget_changes><forecast_completion>2021-09-06T00:00:00</forecast_completion><latest_schedule_changes>365</latest_schedule_changes><total_schedule_changes>3597</total_schedule_changes></row><row _id="row-y94x~3bwz.j59i" _uuid="00000000-0000-0000-B0F7-3D4E64BB683F" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-y94x~3bwz.j59i"><date_reported_as_of>2018-03-01T00:00:00</date_reported_as_of><pid>204</pid><project_name>Edgewood Triangle Roadway Reconstruction</project_name><description>Reconstruct roadway and extend storm and sanitary sewers in portions of Brookville Boulevard, Edgewood Street, 147th Avenue, and adjacent streets west of 241st Street.</description><category>Streets and Roadways</category><borough>Queens</borough><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2013-02-13T00:00:00</design_start><budget_forecast>15818000.00</budget_forecast><latest_budget_changes>-17378000.00</latest_budget_changes><total_budget_changes>106503000.00</total_budget_changes><forecast_completion>2022-09-06T00:00:00</forecast_completion><latest_schedule_changes>365</latest_schedule_changes><total_schedule_changes>3597</total_schedule_changes></row><row _id="row-by4f_nafv.azqt" _uuid="00000000-0000-0000-7296-B0A274D2D42C" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-by4f_nafv.azqt"><date_reported_as_of>2018-08-01T00:00:00</date_reported_as_of><pid>204</pid><project_name>Edgewood Triangle Roadway Reconstruction</project_name><description>Reconstruct roadway and extend storm and sanitary sewers in portions of Brookville Boulevard, Edgewood Street, 147th Avenue, and adjacent streets west of 241st Street.</description><category>Streets and Roadways</category><borough>Queens</borough><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2013-02-13T00:00:00</design_start><budget_forecast>81463000.00</budget_forecast><latest_budget_changes>65645000.00</latest_budget_changes><total_budget_changes>106503000.00</total_budget_changes><forecast_completion>2022-09-06T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>3597</total_schedule_changes></row><row _id="row-g85n-f3hs_qzbj" _uuid="00000000-0000-0000-939F-1D2F4E157C18" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-g85n-f3hs_qzbj"><date_reported_as_of>2019-01-01T00:00:00</date_reported_as_of><pid>204</pid><project_name>Edgewood Triangle Roadway Reconstruction</project_name><description>Reconstruct roadway and extend storm and sanitary sewers in portions of Brookville Boulevard, Edgewood Street, 147th Avenue, and adjacent streets west of 241st Street.</description><category>Streets and Roadways</category><borough>Queens</borough><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2013-02-13T00:00:00</design_start><budget_forecast>20346000.00</budget_forecast><latest_budget_changes>-61117000.00</latest_budget_changes><total_budget_changes>106503000.00</total_budget_changes><forecast_completion>2022-08-26T00:00:00</forecast_completion><latest_schedule_changes>-11</latest_schedule_changes><total_schedule_changes>3597</total_schedule_changes></row><row _id="row-s6mi.yhai~fq8u" _uuid="00000000-0000-0000-1433-5318F09DE6E3" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-s6mi.yhai~fq8u"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>1199</pid><project_name>GI - GRAVESEND BAY CSO - PHASE III</project_name><description>GREEN INFRASTRUCTURE IN OH-015 GRAVESEND BAY CSO PH 3</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Design</current_phase><design_start>2017-08-01T00:00:00</design_start><budget_forecast>49504000.00</budget_forecast><total_budget_changes>-372000.00</total_budget_changes><forecast_completion>2025-05-14T00:00:00</forecast_completion><total_schedule_changes>189</total_schedule_changes></row><row _id="row-vj26-nf27.jxwv" _uuid="00000000-0000-0000-EB2A-EC6FDC8CAA6C" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-vj26-nf27.jxwv"><date_reported_as_of>2019-05-01T00:00:00</date_reported_as_of><pid>204</pid><project_name>Edgewood Triangle Roadway Reconstruction</project_name><description>Reconstruct roadway and extend storm and sanitary sewers in portions of Brookville Boulevard, Edgewood Street, 147th Avenue, and adjacent streets west of 241st Street.</description><category>Streets and Roadways</category><borough>Queens</borough><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2013-02-13T00:00:00</design_start><budget_forecast>98423000.00</budget_forecast><latest_budget_changes>78077000.00</latest_budget_changes><total_budget_changes>106503000.00</total_budget_changes><forecast_completion>2024-03-22T00:00:00</forecast_completion><latest_schedule_changes>574</latest_schedule_changes><total_schedule_changes>3597</total_schedule_changes></row><row _id="row-dcsg~httd~8gef" _uuid="00000000-0000-0000-7842-6FCF37CD986F" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-dcsg~httd~8gef"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>204</pid><project_name>Edgewood Triangle Roadway Reconstruction</project_name><description>Reconstruct roadway and extend storm and sanitary sewers in portions of Brookville Boulevard, Edgewood Street, 147th Avenue, and adjacent streets west of 241st Street.</description><category>Streets and Roadways</category><borough>Queens</borough><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2013-02-13T00:00:00</design_start><budget_forecast>98423000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>106503000.00</total_budget_changes><forecast_completion>2024-04-21T00:00:00</forecast_completion><latest_schedule_changes>30</latest_schedule_changes><total_schedule_changes>3597</total_schedule_changes></row><row _id="row-6epc~z8ct_cxit" _uuid="00000000-0000-0000-5A4B-9A92D9CD73B4" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-6epc~z8ct_cxit"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>204</pid><project_name>Edgewood Triangle Roadway Reconstruction</project_name><category>Streets and Roadways</category><borough>Queens</borough><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><total_budget_changes>106503000.00</total_budget_changes><total_schedule_changes>3597</total_schedule_changes></row><row _id="row-yxji_wb7y-r2f6" _uuid="00000000-0000-0000-858E-6583656091BE" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-yxji_wb7y-r2f6"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>204</pid><project_name>Edgewood Triangle Roadway Reconstruction</project_name><category>Streets and Roadways</category><borough>Queens</borough><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><total_budget_changes>106503000.00</total_budget_changes><total_schedule_changes>3597</total_schedule_changes></row><row _id="row-ywj8~68ed~j9xh" _uuid="00000000-0000-0000-88A5-5BA6A006165B" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ywj8~68ed~j9xh"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>204</pid><project_name>Edgewood Triangle Roadway Reconstruction</project_name><category>Streets and Roadways</category><borough>Queens</borough><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><total_budget_changes>106503000.00</total_budget_changes><total_schedule_changes>3597</total_schedule_changes></row><row _id="row-yipk_4jki_k2a9" _uuid="00000000-0000-0000-C25B-1594F27B06BB" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-yipk_4jki_k2a9"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>204</pid><project_name>Edgewood Triangle Roadway Reconstruction</project_name><category>Streets and Roadways</category><borough>Queens</borough><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><total_budget_changes>106503000.00</total_budget_changes><total_schedule_changes>3597</total_schedule_changes></row><row _id="row-dh8h-ujgj.nxmv" _uuid="00000000-0000-0000-151D-E6BF46EF2F63" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-dh8h-ujgj.nxmv"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>204</pid><project_name>Edgewood Triangle Roadway Reconstruction</project_name><description>Reconstruct roadway and extend storm and sanitary sewers in portions of Brookville Boulevard, Edgewood Street, 147th Avenue, and adjacent streets west of 241st Street.</description><category>Streets and Roadways</category><borough>Queens</borough><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2012-08-17T00:00:00</design_start><budget_forecast>94135000.00</budget_forecast><latest_budget_changes>-4288000.00</latest_budget_changes><total_budget_changes>106503000.00</total_budget_changes><forecast_completion>2026-06-15T00:00:00</forecast_completion><latest_schedule_changes>785</latest_schedule_changes><total_schedule_changes>3597</total_schedule_changes></row><row _id="row-m9at-vvz5.k2et" _uuid="00000000-0000-0000-B89D-914A5C16B8F3" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-m9at-vvz5.k2et"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>204</pid><project_name>Edgewood Triangle Roadway Reconstruction</project_name><description>Reconstruct roadway and extend storm and sanitary sewers in portions of Brookville Boulevard, Edgewood Street, 147th Avenue, and adjacent streets west of 241st Street.</description><category>Streets and Roadways</category><borough>Queens</borough><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2012-08-17T00:00:00</design_start><budget_forecast>93875000.00</budget_forecast><latest_budget_changes>-260000.00</latest_budget_changes><total_budget_changes>106503000.00</total_budget_changes><forecast_completion>2027-04-21T00:00:00</forecast_completion><latest_schedule_changes>310</latest_schedule_changes><total_schedule_changes>3597</total_schedule_changes></row><row _id="row-8bkd~xmmg_xp8r" _uuid="00000000-0000-0000-A82F-395A3E192027" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-8bkd~xmmg_xp8r"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>204</pid><project_name>Edgewood Triangle Roadway Reconstruction</project_name><description>Reconstruct roadway and extend storm and sanitary sewers in portions of Brookville Boulevard, Edgewood Street, 147th Avenue, and adjacent streets west of 241st Street.</description><category>Streets and Roadways</category><borough>Queens</borough><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2012-08-17T00:00:00</design_start><budget_forecast>97245000.00</budget_forecast><latest_budget_changes>3370000.00</latest_budget_changes><total_budget_changes>106503000.00</total_budget_changes><forecast_completion>2028-04-18T00:00:00</forecast_completion><latest_schedule_changes>363</latest_schedule_changes><total_schedule_changes>3597</total_schedule_changes></row><row _id="row-jszk-n3ir~9v8p" _uuid="00000000-0000-0000-ED40-376838BF2A61" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-jszk-n3ir~9v8p"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>204</pid><project_name>Edgewood Triangle Roadway Reconstruction</project_name><description>Reconstruct roadway and extend storm and sanitary sewers in portions of Brookville Boulevard, Edgewood Street, 147th Avenue, and adjacent streets west of 241st Street.</description><category>Streets and Roadways</category><borough>Queens</borough><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2012-08-17T00:00:00</design_start><budget_forecast>134639000.00</budget_forecast><latest_budget_changes>37394000.00</latest_budget_changes><total_budget_changes>106503000.00</total_budget_changes><forecast_completion>2028-05-21T00:00:00</forecast_completion><latest_schedule_changes>33</latest_schedule_changes><total_schedule_changes>3597</total_schedule_changes></row><row _id="row-wrx5_ev3b~yga4" _uuid="00000000-0000-0000-144A-D94F55B15029" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-wrx5_ev3b~yga4"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>204</pid><project_name>Edgewood Triangle Roadway Reconstruction</project_name><description>Reconstruct roadway and extend storm and sanitary sewers in portions of Brookville Boulevard, Edgewood Street, 147th Avenue, and adjacent streets west of 241st Street.</description><category>Streets and Roadways</category><borough>Queens</borough><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2012-08-17T00:00:00</design_start><budget_forecast>134639000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>106503000.00</total_budget_changes><forecast_completion>2028-08-15T00:00:00</forecast_completion><latest_schedule_changes>86</latest_schedule_changes><total_schedule_changes>3597</total_schedule_changes></row><row _id="row-t5c9~fyn9~5wi6" _uuid="00000000-0000-0000-A672-8B2391A0E45A" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-t5c9~fyn9~5wi6"><date_reported_as_of>2013-09-01T00:00:00</date_reported_as_of><pid>206</pid><project_name>Roma and Hett Avenue Storm and Sanitary Sewer Installation</project_name><description>Roadway reconstruction and installation of new storm sewers and the replacement of sanitary sewers and water mains in the Midland Beach section, Staten Island</description><category>Sewers</category><borough>Staten Island</borough><managing_agency>DDC</managing_agency><client_agency>Trans. &amp; Env. Protection</client_agency><current_phase>Design</current_phase><design_start>2008-06-19T00:00:00</design_start><budget_forecast>31218000.00</budget_forecast><total_budget_changes>62973000.00</total_budget_changes><forecast_completion>2023-12-30T00:00:00</forecast_completion><total_schedule_changes>-8</total_schedule_changes></row><row _id="row-44w4.qcys_k6ju" _uuid="00000000-0000-0000-7FEF-3200557FDF4D" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-44w4.qcys_k6ju"><date_reported_as_of>2014-01-01T00:00:00</date_reported_as_of><pid>206</pid><project_name>Roma and Hett Avenue Storm and Sanitary Sewer Installation</project_name><description>Roadway reconstruction and installation of new storm sewers and the replacement of sanitary sewers and water mains in the Midland Beach section, Staten Island</description><category>Sewers</category><borough>Staten Island</borough><managing_agency>DDC</managing_agency><client_agency>Trans. &amp; Env. Protection</client_agency><current_phase>Design</current_phase><design_start>2008-06-19T00:00:00</design_start><budget_forecast>47060000.00</budget_forecast><latest_budget_changes>15842000.00</latest_budget_changes><total_budget_changes>62973000.00</total_budget_changes><forecast_completion>2018-01-06T00:00:00</forecast_completion><latest_schedule_changes>-2184</latest_schedule_changes><total_schedule_changes>-8</total_schedule_changes></row><row _id="row-d5u4_5rfu.js88" _uuid="00000000-0000-0000-1100-26506B1699FA" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-d5u4_5rfu.js88"><date_reported_as_of>2014-05-01T00:00:00</date_reported_as_of><pid>206</pid><project_name>Roma and Hett Avenue Storm and Sanitary Sewer Installation</project_name><description>Roadway reconstruction and installation of new storm sewers and the replacement of sanitary sewers and water mains in the Midland Beach section, Staten Island.</description><category>Sewers</category><borough>Staten Island</borough><managing_agency>DDC</managing_agency><client_agency>Trans. &amp; Env. Protection</client_agency><current_phase>Design</current_phase><design_start>2008-06-19T00:00:00</design_start><budget_forecast>47160000.00</budget_forecast><latest_budget_changes>100000.00</latest_budget_changes><total_budget_changes>62973000.00</total_budget_changes><forecast_completion>2018-01-06T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>-8</total_schedule_changes></row><row _id="row-epm4.g3xx.gyrx" _uuid="00000000-0000-0000-5BAD-4E099D706AB8" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-epm4.g3xx.gyrx"><date_reported_as_of>2015-02-01T00:00:00</date_reported_as_of><pid>206</pid><project_name>Roma and Hett Avenue Storm and Sanitary Sewer Installation</project_name><description>Roadway reconstruction and installation of new storm sewers and the replacement of sanitary sewers and water mains in the Midland Beach section, Staten Island.</description><category>Sewers</category><borough>Staten Island</borough><managing_agency>DDC</managing_agency><client_agency>Trans. &amp; Env. Protection</client_agency><current_phase>Design</current_phase><design_start>2008-06-19T00:00:00</design_start><budget_forecast>42421000.00</budget_forecast><latest_budget_changes>-4739000.00</latest_budget_changes><total_budget_changes>62973000.00</total_budget_changes><forecast_completion>2018-01-06T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>-8</total_schedule_changes></row><row _id="row-gzp7.kunu.86ch" _uuid="00000000-0000-0000-5D89-F5BBDDAFA6A0" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-gzp7.kunu.86ch"><date_reported_as_of>2015-08-01T00:00:00</date_reported_as_of><pid>206</pid><project_name>Roma and Hett Avenue Storm and Sanitary Sewer Installation</project_name><description>Roadway reconstruction and installation of new storm sewers and the replacement of sanitary sewers and water mains in the Midland Beach section, Staten Island.</description><category>Sewers</category><borough>Staten Island</borough><managing_agency>DDC</managing_agency><client_agency>Trans. &amp; Env. Protection</client_agency><current_phase>Design</current_phase><design_start>2008-06-19T00:00:00</design_start><budget_forecast>42793000.00</budget_forecast><latest_budget_changes>372000.00</latest_budget_changes><total_budget_changes>62973000.00</total_budget_changes><forecast_completion>2018-11-11T00:00:00</forecast_completion><latest_schedule_changes>309</latest_schedule_changes><total_schedule_changes>-8</total_schedule_changes></row><row _id="row-3yzs~jm5y_9559" _uuid="00000000-0000-0000-13BA-67F2E1B1035F" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-3yzs~jm5y_9559"><date_reported_as_of>2016-01-01T00:00:00</date_reported_as_of><pid>206</pid><project_name>Roma and Hett Avenue Storm and Sanitary Sewer Installation</project_name><description>Roadway reconstruction and installation of new storm sewers and the replacement of sanitary sewers and water mains in the Midland Beach section, Staten Island.</description><category>Sewers</category><borough>Staten Island</borough><managing_agency>DDC</managing_agency><client_agency>Trans. &amp; Env. Protection</client_agency><current_phase>Design</current_phase><design_start>2008-06-19T00:00:00</design_start><budget_forecast>43545000.00</budget_forecast><latest_budget_changes>752000.00</latest_budget_changes><total_budget_changes>62973000.00</total_budget_changes><forecast_completion>2019-10-27T00:00:00</forecast_completion><latest_schedule_changes>350</latest_schedule_changes><total_schedule_changes>-8</total_schedule_changes></row><row _id="row-4jgy~36zm_mij3" _uuid="00000000-0000-0000-3A9D-4EF241A8E7CB" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-4jgy~36zm_mij3"><date_reported_as_of>2016-06-01T00:00:00</date_reported_as_of><pid>206</pid><project_name>Roma and Hett Avenue Storm and Sanitary Sewer Installation</project_name><description>Roadway reconstruction and installation of new storm sewers and the replacement of sanitary sewers and water mains in the Midland Beach section, Staten Island.</description><category>Sewers</category><borough>Staten Island</borough><managing_agency>DDC</managing_agency><client_agency>Trans. &amp; Env. Protection</client_agency><current_phase>Design</current_phase><design_start>2008-06-19T00:00:00</design_start><budget_forecast>43795000.00</budget_forecast><latest_budget_changes>250000.00</latest_budget_changes><total_budget_changes>62973000.00</total_budget_changes><forecast_completion>2019-10-27T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>-8</total_schedule_changes></row><row _id="row-d5x7.bqtv-cxs9" _uuid="00000000-0000-0000-9A50-5A5FF06A6A04" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-d5x7.bqtv-cxs9"><date_reported_as_of>2016-11-01T00:00:00</date_reported_as_of><pid>206</pid><project_name>Roma and Hett Avenue Storm and Sanitary Sewer Installation</project_name><description>Roadway reconstruction and installation of new storm sewers and the replacement of sanitary sewers and water mains in the Midland Beach section, Staten Island.</description><category>Sewers</category><borough>Staten Island</borough><managing_agency>DDC</managing_agency><client_agency>Trans. &amp; Env. Protection</client_agency><current_phase>Design</current_phase><design_start>2008-06-19T00:00:00</design_start><budget_forecast>63915000.00</budget_forecast><latest_budget_changes>20120000.00</latest_budget_changes><total_budget_changes>62973000.00</total_budget_changes><forecast_completion>2019-10-27T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>-8</total_schedule_changes></row><row _id="row-g3cm_dr37~hbzm" _uuid="00000000-0000-0000-47A6-5A02B110D797" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-g3cm_dr37~hbzm"><date_reported_as_of>2017-04-01T00:00:00</date_reported_as_of><pid>206</pid><project_name>Roma and Hett Avenue Storm and Sanitary Sewer Installation</project_name><description>Roadway reconstruction and installation of new storm sewers and the replacement of sanitary sewers and water mains in the Midland Beach section, Staten Island.</description><category>Sewers</category><borough>Staten Island</borough><managing_agency>DDC</managing_agency><client_agency>Trans. &amp; Env. Protection</client_agency><current_phase>Design</current_phase><design_start>2008-06-19T00:00:00</design_start><budget_forecast>62074000.00</budget_forecast><latest_budget_changes>-1841000.00</latest_budget_changes><total_budget_changes>62973000.00</total_budget_changes><forecast_completion>2019-10-27T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>-8</total_schedule_changes></row><row _id="row-7ic9-6wbi_xy6c" _uuid="00000000-0000-0000-4917-6C8EAD5E97FC" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-7ic9-6wbi_xy6c"><date_reported_as_of>2017-09-01T00:00:00</date_reported_as_of><pid>206</pid><project_name>Roma and Hett Avenue Storm and Sanitary Sewer Installation</project_name><description>Roadway reconstruction and installation of new storm sewers and the replacement of sanitary sewers and water mains in the Midland Beach section, Staten Island.</description><category>Sewers</category><borough>Staten Island</borough><managing_agency>DDC</managing_agency><client_agency>Trans. &amp; Env. Protection</client_agency><current_phase>Design</current_phase><design_start>2008-06-19T00:00:00</design_start><budget_forecast>55882000.00</budget_forecast><latest_budget_changes>-6192000.00</latest_budget_changes><total_budget_changes>62973000.00</total_budget_changes><forecast_completion>2019-12-27T00:00:00</forecast_completion><latest_schedule_changes>61</latest_schedule_changes><total_schedule_changes>-8</total_schedule_changes></row><row _id="row-hvdk-7bq7-5zbz" _uuid="00000000-0000-0000-3DB4-C00CB25199D1" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-hvdk-7bq7-5zbz"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>1199</pid><project_name>GI - GRAVESEND BAY CSO - PHASE III</project_name><description>GREEN INFRASTRUCTURE IN OH-015 GRAVESEND BAY CSO PH 3</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Design</current_phase><design_start>2017-08-01T00:00:00</design_start><budget_forecast>40606000.00</budget_forecast><latest_budget_changes>-8898000.00</latest_budget_changes><total_budget_changes>-372000.00</total_budget_changes><forecast_completion>2025-05-14T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>189</total_schedule_changes></row><row _id="row-etsn.7eh5.idgy" _uuid="00000000-0000-0000-B9C0-7B2BAD61D704" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-etsn.7eh5.idgy"><date_reported_as_of>2018-03-01T00:00:00</date_reported_as_of><pid>206</pid><project_name>Roma and Hett Avenue Storm and Sanitary Sewer Installation</project_name><description>Roadway reconstruction and installation of new storm sewers and the replacement of sanitary sewers and water mains in the Midland Beach section, Staten Island.</description><category>Sewers</category><borough>Staten Island</borough><managing_agency>DDC</managing_agency><client_agency>Trans. &amp; Env. Protection</client_agency><current_phase>Construction Procurement</current_phase><design_start>2008-06-19T00:00:00</design_start><budget_forecast>62094000.00</budget_forecast><latest_budget_changes>6212000.00</latest_budget_changes><total_budget_changes>62973000.00</total_budget_changes><forecast_completion>2019-12-20T00:00:00</forecast_completion><latest_schedule_changes>-7</latest_schedule_changes><total_schedule_changes>-8</total_schedule_changes></row><row _id="row-8efc-rwur~seqb" _uuid="00000000-0000-0000-5ED0-7D541F4FC8E6" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-8efc-rwur~seqb"><date_reported_as_of>2018-08-01T00:00:00</date_reported_as_of><pid>206</pid><project_name>Roma and Hett Avenue Storm and Sanitary Sewer Installation</project_name><description>Roadway reconstruction and installation of new storm sewers and the replacement of sanitary sewers and water mains in the Midland Beach section, Staten Island.</description><category>Sewers</category><borough>Staten Island</borough><managing_agency>DDC</managing_agency><client_agency>Trans. &amp; Env. Protection</client_agency><current_phase>Construction Procurement</current_phase><design_start>2008-06-19T00:00:00</design_start><budget_forecast>98030000.00</budget_forecast><latest_budget_changes>35936000.00</latest_budget_changes><total_budget_changes>62973000.00</total_budget_changes><forecast_completion>2020-09-21T00:00:00</forecast_completion><latest_schedule_changes>276</latest_schedule_changes><total_schedule_changes>-8</total_schedule_changes></row><row _id="row-dm4u~sgna-b948" _uuid="00000000-0000-0000-C45F-E968FC0F8C0D" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-dm4u~sgna-b948"><date_reported_as_of>2019-01-01T00:00:00</date_reported_as_of><pid>206</pid><project_name>Roma and Hett Avenue Storm and Sanitary Sewer Installation</project_name><description>Roadway reconstruction and installation of new storm sewers and the replacement of sanitary sewers and water mains in the Midland Beach section, Staten Island.</description><category>Sewers</category><borough>Staten Island</borough><managing_agency>DDC</managing_agency><client_agency>Trans. &amp; Env. Protection</client_agency><current_phase>Construction</current_phase><design_start>2008-06-19T00:00:00</design_start><budget_forecast>85330000.00</budget_forecast><latest_budget_changes>-12700000.00</latest_budget_changes><total_budget_changes>62973000.00</total_budget_changes><forecast_completion>2022-06-28T00:00:00</forecast_completion><latest_schedule_changes>645</latest_schedule_changes><total_schedule_changes>-8</total_schedule_changes></row><row _id="row-nkze.emgk_adf9" _uuid="00000000-0000-0000-29C6-66B1AC94EF89" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-nkze.emgk_adf9"><date_reported_as_of>2019-05-01T00:00:00</date_reported_as_of><pid>206</pid><project_name>Roma and Hett Avenue Storm and Sanitary Sewer Installation</project_name><description>Install storm and sanitary sewers at multiple locations.</description><category>Sewers</category><borough>Staten Island</borough><managing_agency>DDC</managing_agency><client_agency>Trans. &amp; Env. Protection</client_agency><current_phase>Construction</current_phase><design_start>2014-10-15T00:00:00</design_start><budget_forecast>98431000.00</budget_forecast><latest_budget_changes>13101000.00</latest_budget_changes><total_budget_changes>62973000.00</total_budget_changes><forecast_completion>2022-06-28T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>-8</total_schedule_changes></row><row _id="row-ajqb.vugp.9tu5" _uuid="00000000-0000-0000-6894-BF4FBFB68309" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ajqb.vugp.9tu5"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>206</pid><project_name>Roma and Hett Avenue Storm and Sanitary Sewer Installation</project_name><description>Install storm and sanitary sewers at multiple locations.</description><category>Sewers</category><borough>Staten Island</borough><managing_agency>DDC</managing_agency><client_agency>Trans. &amp; Env. Protection</client_agency><current_phase>Construction</current_phase><design_start>2014-10-15T00:00:00</design_start><budget_forecast>98496000.00</budget_forecast><latest_budget_changes>65000.00</latest_budget_changes><total_budget_changes>62973000.00</total_budget_changes><forecast_completion>2022-06-28T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>-8</total_schedule_changes></row><row _id="row-sk5i~ipg4.bf29" _uuid="00000000-0000-0000-9A2E-2270B7D71845" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-sk5i~ipg4.bf29"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>206</pid><project_name>Roma and Hett Avenue Storm and Sanitary Sewer Installation</project_name><category>Sewers</category><borough>Staten Island</borough><managing_agency>DDC</managing_agency><client_agency>Trans. &amp; Env. Protection</client_agency><total_budget_changes>62973000.00</total_budget_changes><total_schedule_changes>-8</total_schedule_changes></row><row _id="row-5smz_tvz2~ydr4" _uuid="00000000-0000-0000-E656-05535D19323E" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-5smz_tvz2~ydr4"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>206</pid><project_name>Roma and Hett Avenue Storm and Sanitary Sewer Installation</project_name><category>Sewers</category><borough>Staten Island</borough><managing_agency>DDC</managing_agency><client_agency>Trans. &amp; Env. Protection</client_agency><total_budget_changes>62973000.00</total_budget_changes><total_schedule_changes>-8</total_schedule_changes></row><row _id="row-8cup-6phz-bg9q" _uuid="00000000-0000-0000-C7CB-1B4656B36353" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-8cup-6phz-bg9q"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>206</pid><project_name>Roma and Hett Avenue Storm and Sanitary Sewer Installation</project_name><category>Sewers</category><borough>Staten Island</borough><managing_agency>DDC</managing_agency><client_agency>Trans. &amp; Env. Protection</client_agency><total_budget_changes>62973000.00</total_budget_changes><total_schedule_changes>-8</total_schedule_changes></row><row _id="row-iw59.939b~4mua" _uuid="00000000-0000-0000-D3B5-A2550CBD03EC" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-iw59.939b~4mua"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>206</pid><project_name>Roma and Hett Avenue Storm and Sanitary Sewer Installation</project_name><category>Sewers</category><borough>Staten Island</borough><managing_agency>DDC</managing_agency><client_agency>Trans. &amp; Env. Protection</client_agency><total_budget_changes>62973000.00</total_budget_changes><total_schedule_changes>-8</total_schedule_changes></row><row _id="row-aws7_visw~gqxk" _uuid="00000000-0000-0000-BB58-0888E83E6338" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-aws7_visw~gqxk"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>206</pid><project_name>Roma and Hett Avenue Storm and Sanitary Sewer Installation</project_name><description>Installation of Storm, Sanitary Sewers in the following Streets:=================================1- Cedar Grove Avenue between Ebbitts Street and new Dorp Lane.2- Milton Avenue between Ebbitts Street and new Dorp Lane.3- Finley Avenue between Ebbitts Street and new Dorp Lane.4- Roma Avenue between Ebbitts Street and new Dorp Lane.5- Hett Avenue between Ebbitts Street and new Dorp Lane.6- Marine Way between Cedar Grove and Milton Avenue7- Beacon Avenue between Roma Avenue and Milton Avenue.8- Dustan Avenue between Marine way and Milton Avenue.9- Garibaldi Avenue between Roma Avenue and Cedar Grove Avenue.10- Cedar Grove Court between Cedar Grove Avenue and Dustan Street.11- Topping Street between Cedar Grove Avenue and Dustan Street.12- Center Way between Cedar Grove Avenue and Dustan Street.13- Neptune Street between Cedar Grove Avenue and Dustan Street.14- Seafoam Street between Cedar Grove Avenue and Dustan Street.15- Waterside Street between Cedar Grove Avenue and Dustan Street.16- Maple Terrace between Cedar Grove Avenue and Dustan Street.17- Herman Street between Cedar Grove Avenue and Dustan Street.18- Neutral Avenue between Cedar Grove Avenue and Dustan Street.19- Milbank Drive between Cedar Grove Avenue and Dustan Street.</description><category>Sewers</category><borough>Staten Island</borough><managing_agency>DDC</managing_agency><client_agency>Trans. &amp; Env. Protection</client_agency><current_phase>Construction</current_phase><design_start>2014-10-15T00:00:00</design_start><budget_forecast>91854000.00</budget_forecast><latest_budget_changes>-6642000.00</latest_budget_changes><total_budget_changes>62973000.00</total_budget_changes><forecast_completion>2023-06-20T00:00:00</forecast_completion><latest_schedule_changes>357</latest_schedule_changes><total_schedule_changes>-8</total_schedule_changes></row><row _id="row-h5d5.bap7~kx79" _uuid="00000000-0000-0000-B840-4EFCC040367D" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-h5d5.bap7~kx79"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>206</pid><project_name>Roma and Hett Avenue Storm and Sanitary Sewer Installation</project_name><description>Installation of Storm, Sanitary Sewers in the following Streets:=================================1- Cedar Grove Avenue between Ebbitts Street and new Dorp Lane.2- Milton Avenue between Ebbitts Street and new Dorp Lane.3- Finley Avenue between Ebbitts Street and new Dorp Lane.4- Roma Avenue between Ebbitts Street and new Dorp Lane.5- Hett Avenue between Ebbitts Street and new Dorp Lane.6- Marine Way between Cedar Grove and Milton Avenue7- Beacon Avenue between Roma Avenue and Milton Avenue.8- Dustan Avenue between Marine way and Milton Avenue.9- Garibaldi Avenue between Roma Avenue and Cedar Grove Avenue.10- Cedar Grove Court between Cedar Grove Avenue and Dustan Street.11- Topping Street between Cedar Grove Avenue and Dustan Street.12- Center Way between Cedar Grove Avenue and Dustan Street.13- Neptune Street between Cedar Grove Avenue and Dustan Street.14- Seafoam Street between Cedar Grove Avenue and Dustan Street.15- Waterside Street between Cedar Grove Avenue and Dustan Street.16- Maple Terrace between Cedar Grove Avenue and Dustan Street.17- Herman Street between Cedar Grove Avenue and Dustan Street.18- Neutral Avenue between Cedar Grove Avenue and Dustan Street.19- Milbank Drive between Cedar Grove Avenue and Dustan Street.</description><category>Sewers</category><borough>Staten Island</borough><managing_agency>DDC</managing_agency><client_agency>Trans. &amp; Env. Protection</client_agency><current_phase>Construction</current_phase><design_start>2014-10-15T00:00:00</design_start><budget_forecast>89620000.00</budget_forecast><latest_budget_changes>-2234000.00</latest_budget_changes><total_budget_changes>62973000.00</total_budget_changes><forecast_completion>2023-10-04T00:00:00</forecast_completion><latest_schedule_changes>106</latest_schedule_changes><total_schedule_changes>-8</total_schedule_changes></row><row _id="row-vxi3.fh24-qqi2" _uuid="00000000-0000-0000-7F3D-93E3559A5A09" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-vxi3.fh24-qqi2"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>206</pid><project_name>Roma and Hett Avenue Storm and Sanitary Sewer Installation</project_name><description>Installation of Storm, Sanitary Sewers in the following Streets:=================================1- Cedar Grove Avenue between Ebbitts Street and new Dorp Lane.2- Milton Avenue between Ebbitts Street and new Dorp Lane.3- Finley Avenue between Ebbitts Street and new Dorp Lane.4- Roma Avenue between Ebbitts Street and new Dorp Lane.5- Hett Avenue between Ebbitts Street and new Dorp Lane.6- Marine Way between Cedar Grove and Milton Avenue7- Beacon Avenue between Roma Avenue and Milton Avenue.8- Dustan Avenue between Marine way and Milton Avenue.9- Garibaldi Avenue between Roma Avenue and Cedar Grove Avenue.10- Cedar Grove Court between Cedar Grove Avenue and Dustan Street.11- Topping Street between Cedar Grove Avenue and Dustan Street.12- Center Way between Cedar Grove Avenue and Dustan Street.13- Neptune Street between Cedar Grove Avenue and Dustan Street.14- Seafoam Street between Cedar Grove Avenue and Dustan Street.15- Waterside Street between Cedar Grove Avenue and Dustan Street.16- Maple Terrace between Cedar Grove Avenue and Dustan Street.17- Herman Street between Cedar Grove Avenue and Dustan Street.18- Neutral Avenue between Cedar Grove Avenue and Dustan Street.19- Milbank Drive between Cedar Grove Avenue and Dustan Street.</description><category>Sewers</category><borough>Staten Island</borough><managing_agency>DDC</managing_agency><client_agency>Trans. &amp; Env. Protection</client_agency><current_phase>Construction</current_phase><design_start>2014-10-15T00:00:00</design_start><budget_forecast>94020000.00</budget_forecast><latest_budget_changes>4400000.00</latest_budget_changes><total_budget_changes>62973000.00</total_budget_changes><forecast_completion>2023-10-04T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>-8</total_schedule_changes></row><row _id="row-96z5_iqte-4gb6" _uuid="00000000-0000-0000-D279-4507D9073B74" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-96z5_iqte-4gb6"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>1199</pid><project_name>GI - GRAVESEND BAY CSO - PHASE III</project_name><description>GREEN INFRASTRUCTURE IN OH-015 GRAVESEND BAY CSO PH 3</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Design</current_phase><design_start>2017-08-01T00:00:00</design_start><budget_forecast>42742000.00</budget_forecast><latest_budget_changes>2136000.00</latest_budget_changes><total_budget_changes>-372000.00</total_budget_changes><forecast_completion>2025-06-11T00:00:00</forecast_completion><latest_schedule_changes>28</latest_schedule_changes><total_schedule_changes>189</total_schedule_changes></row><row _id="row-ex8x.q6nb~i7au" _uuid="00000000-0000-0000-652A-ED5E7E4D8A64" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ex8x.q6nb~i7au"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1199</pid><project_name>GI - GRAVESEND BAY CSO - PHASE III</project_name><description>GREEN INFRASTRUCTURE IN OH-015 GRAVESEND BAY CSO PH 3</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Design</current_phase><design_start>2017-08-01T00:00:00</design_start><budget_forecast>49132000.00</budget_forecast><latest_budget_changes>6390000.00</latest_budget_changes><total_budget_changes>-372000.00</total_budget_changes><forecast_completion>2025-11-19T00:00:00</forecast_completion><latest_schedule_changes>161</latest_schedule_changes><total_schedule_changes>189</total_schedule_changes></row><row _id="row-z5wj.bj2z_r6ag" _uuid="00000000-0000-0000-9E2D-7EC7E61C60E9" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-z5wj.bj2z_r6ag"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1199</pid><project_name>GI - GRAVESEND BAY CSO - PHASE III</project_name><description>GREEN INFRASTRUCTURE IN OH-015 GRAVESEND BAY CSO PH 3</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Design</current_phase><design_start>2017-08-01T00:00:00</design_start><budget_forecast>49132000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-372000.00</total_budget_changes><forecast_completion>2025-11-19T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>189</total_schedule_changes></row><row _id="row-8b7k-933v_bb5s" _uuid="00000000-0000-0000-9807-4C049663B76B" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-8b7k-933v_bb5s"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>206</pid><project_name>Roma and Hett Avenue Storm and Sanitary Sewer Installation</project_name><description>Installation of Storm, Sanitary Sewers in the following Streets:=================================1- Cedar Grove Avenue between Ebbitts Street and new Dorp Lane.2- Milton Avenue between Ebbitts Street and new Dorp Lane.3- Finley Avenue between Ebbitts Street and new Dorp Lane.4- Roma Avenue between Ebbitts Street and new Dorp Lane.5- Hett Avenue between Ebbitts Street and new Dorp Lane.6- Marine Way between Cedar Grove and Milton Avenue7- Beacon Avenue between Roma Avenue and Milton Avenue.8- Dustan Avenue between Marine way and Milton Avenue.9- Garibaldi Avenue between Roma Avenue and Cedar Grove Avenue.10- Cedar Grove Court between Cedar Grove Avenue and Dustan Street.11- Topping Street between Cedar Grove Avenue and Dustan Street.12- Center Way between Cedar Grove Avenue and Dustan Street.13- Neptune Street between Cedar Grove Avenue and Dustan Street.14- Seafoam Street between Cedar Grove Avenue and Dustan Street.15- Waterside Street between Cedar Grove Avenue and Dustan Street.16- Maple Terrace between Cedar Grove Avenue and Dustan Street.17- Herman Street between Cedar Grove Avenue and Dustan Street.18- Neutral Avenue between Cedar Grove Avenue and Dustan Street.19- Milbank Drive between Cedar Grove Avenue and Dustan Street.</description><category>Sewers</category><borough>Staten Island</borough><managing_agency>DDC</managing_agency><client_agency>Trans. &amp; Env. Protection</client_agency><current_phase>Construction</current_phase><design_start>2014-10-15T00:00:00</design_start><budget_forecast>94191000.00</budget_forecast><latest_budget_changes>171000.00</latest_budget_changes><total_budget_changes>62973000.00</total_budget_changes><forecast_completion>2023-12-22T00:00:00</forecast_completion><latest_schedule_changes>79</latest_schedule_changes><total_schedule_changes>-8</total_schedule_changes></row><row _id="row-wcsm-gxwi.22y4" _uuid="00000000-0000-0000-AE07-B5436CE7F82D" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-wcsm-gxwi.22y4"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>206</pid><project_name>Roma and Hett Avenue Storm and Sanitary Sewer Installation</project_name><description>Installation of Storm, Sanitary Sewers in the following Streets:=================================1- Cedar Grove Avenue between Ebbitts Street and new Dorp Lane.2- Milton Avenue between Ebbitts Street and new Dorp Lane.3- Finley Avenue between Ebbitts Street and new Dorp Lane.4- Roma Avenue between Ebbitts Street and new Dorp Lane.5- Hett Avenue between Ebbitts Street and new Dorp Lane.6- Marine Way between Cedar Grove and Milton Avenue7- Beacon Avenue between Roma Avenue and Milton Avenue.8- Dustan Avenue between Marine way and Milton Avenue.9- Garibaldi Avenue between Roma Avenue and Cedar Grove Avenue.10- Cedar Grove Court between Cedar Grove Avenue and Dustan Street.11- Topping Street between Cedar Grove Avenue and Dustan Street.12- Center Way between Cedar Grove Avenue and Dustan Street.13- Neptune Street between Cedar Grove Avenue and Dustan Street.14- Seafoam Street between Cedar Grove Avenue and Dustan Street.15- Waterside Street between Cedar Grove Avenue and Dustan Street.16- Maple Terrace between Cedar Grove Avenue and Dustan Street.17- Herman Street between Cedar Grove Avenue and Dustan Street.18- Neutral Avenue between Cedar Grove Avenue and Dustan Street.19- Milbank Drive between Cedar Grove Avenue and Dustan Street.</description><category>Sewers</category><borough>Staten Island</borough><managing_agency>DDC</managing_agency><client_agency>Trans. &amp; Env. Protection</client_agency><current_phase>Construction</current_phase><design_start>2014-10-15T00:00:00</design_start><budget_forecast>94191000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>62973000.00</total_budget_changes><forecast_completion>2023-12-22T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>-8</total_schedule_changes></row><row _id="row-6y36-vrw6~tigs" _uuid="00000000-0000-0000-B1EA-8168F30738F1" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-6y36-vrw6~tigs"><date_reported_as_of>2013-09-01T00:00:00</date_reported_as_of><pid>267</pid><project_name>Emergency Communications Transformation Program (ECTP) Upgrades and Enhancements</project_name><description>Upgrade and enhancement of emergency infrastructure to improve cross agency communication and reduction in call response time at the City's 9-1-1 call centers.</description><category>IT</category><borough>Citywide</borough><managing_agency>DOITT</managing_agency><client_agency>FDNY, NYPD</client_agency><current_phase>IT</current_phase><budget_forecast>2251691381.12</budget_forecast><total_budget_changes>73735148.87</total_budget_changes><forecast_completion>2017-12-31T00:00:00</forecast_completion><total_schedule_changes>2252</total_schedule_changes></row><row _id="row-87h4-2vfk~7b7p" _uuid="00000000-0000-0000-EC6E-BE93D42864EA" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-87h4-2vfk~7b7p"><date_reported_as_of>2014-01-01T00:00:00</date_reported_as_of><pid>267</pid><project_name>Emergency Communications Transformation Program (ECTP) Upgrades and Enhancements</project_name><description>Upgrade and enhancement of emergency infrastructure to improve cross agency communication and reduction in call response time at the City's 9-1-1 call centers.</description><category>IT</category><borough>Citywide</borough><managing_agency>DOITT</managing_agency><client_agency>FDNY, NYPD</client_agency><current_phase>IT</current_phase><budget_forecast>2274921386.00</budget_forecast><latest_budget_changes>23230004.88</latest_budget_changes><total_budget_changes>73735148.87</total_budget_changes><forecast_completion>2017-12-31T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>2252</total_schedule_changes></row><row _id="row-x7ex_eaiz_up77" _uuid="00000000-0000-0000-607D-5743F4AE3F8A" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-x7ex_eaiz_up77"><date_reported_as_of>2014-05-01T00:00:00</date_reported_as_of><pid>267</pid><project_name>Emergency Communications Transformation Program (ECTP) Upgrades and Enhancements</project_name><description>Upgrade and enhancement of emergency infrastructure to improve cross agency communication and reduction in call response time at the City's 9-1-1 call centers.</description><category>IT</category><borough>Citywide</borough><managing_agency>DOITT</managing_agency><client_agency>FDNY, NYPD</client_agency><current_phase>IT</current_phase><budget_forecast>2271409187.00</budget_forecast><latest_budget_changes>-3512199.00</latest_budget_changes><total_budget_changes>73735148.87</total_budget_changes><forecast_completion>2017-12-31T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>2252</total_schedule_changes></row><row _id="row-eebp_irnz_gghs" _uuid="00000000-0000-0000-5CB0-48367D7BED59" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-eebp_irnz_gghs"><date_reported_as_of>2015-02-01T00:00:00</date_reported_as_of><pid>267</pid><project_name>Emergency Communications Transformation Program (ECTP) Upgrades and Enhancements</project_name><description>Upgrade and enhancement of emergency technology infrastructure to improve interoperability and coordination among public safety agencies and improve call processing time to decrease overall response times.</description><category>IT</category><borough>Citywide</borough><managing_agency>DOITT</managing_agency><client_agency>FDNY, NYPD</client_agency><current_phase>IT</current_phase><budget_forecast>2270999707.00</budget_forecast><latest_budget_changes>-409480.00</latest_budget_changes><total_budget_changes>73735148.87</total_budget_changes><forecast_completion>2017-11-30T00:00:00</forecast_completion><latest_schedule_changes>-31</latest_schedule_changes><total_schedule_changes>2252</total_schedule_changes></row><row _id="row-pvyw~y5kj_6n82" _uuid="00000000-0000-0000-7034-56965587F965" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-pvyw~y5kj_6n82"><date_reported_as_of>2015-08-01T00:00:00</date_reported_as_of><pid>267</pid><project_name>Emergency Communications Transformation Program (ECTP) Upgrades and Enhancements</project_name><description>Upgrade and enhancement of emergency technology infrastructure to improve interoperability and coordination among public safety agencies and improve call processing time to decrease overall response times.</description><category>IT</category><borough>Citywide</borough><managing_agency>DOITT</managing_agency><client_agency>FDNY, NYPD</client_agency><current_phase>IT</current_phase><budget_forecast>2157312712.00</budget_forecast><latest_budget_changes>-113686995.00</latest_budget_changes><total_budget_changes>73735148.87</total_budget_changes><forecast_completion>2017-11-30T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>2252</total_schedule_changes></row><row _id="row-rsh6_77q7-yipf" _uuid="00000000-0000-0000-4FD5-B6B23E355C6E" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-rsh6_77q7-yipf"><date_reported_as_of>2016-01-01T00:00:00</date_reported_as_of><pid>267</pid><project_name>Emergency Communications Transformation Program (ECTP) Upgrades and Enhancements</project_name><description>Upgrade and enhancement of emergency technology infrastructure to improve interoperability and coordination among public safety agencies and improve call processing time to decrease overall response times.</description><category>IT</category><borough>Citywide</borough><managing_agency>DOITT</managing_agency><client_agency>FDNY, NYPD</client_agency><current_phase>IT</current_phase><budget_forecast>2146517283.00</budget_forecast><latest_budget_changes>-10795429.00</latest_budget_changes><total_budget_changes>73735148.87</total_budget_changes><forecast_completion>2017-11-30T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>2252</total_schedule_changes></row><row _id="row-qkxg_yrq9-6arg" _uuid="00000000-0000-0000-CE9E-AB5CB9D9FABD" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-qkxg_yrq9-6arg"><date_reported_as_of>2016-06-01T00:00:00</date_reported_as_of><pid>267</pid><project_name>Emergency Communications Transformation Program (ECTP) Upgrades and Enhancements</project_name><description>Upgrade and enhancement of emergency technology infrastructure to improve interoperability and coordination among public safety agencies and improve call processing time to decrease overall response times.</description><category>IT</category><borough>Citywide</borough><managing_agency>DOITT</managing_agency><client_agency>FDNY, NYPD</client_agency><current_phase>IT</current_phase><budget_forecast>2186648771.00</budget_forecast><latest_budget_changes>40131488.00</latest_budget_changes><total_budget_changes>73735148.87</total_budget_changes><forecast_completion>2017-11-30T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>2252</total_schedule_changes></row><row _id="row-bf57.ctu9-kxq5" _uuid="00000000-0000-0000-C96E-3C02AC091E7F" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-bf57.ctu9-kxq5"><date_reported_as_of>2016-11-01T00:00:00</date_reported_as_of><pid>267</pid><project_name>Emergency Communications Transformation Program (ECTP) Upgrades and Enhancements</project_name><description>Upgrade and enhancement of emergency technology infrastructure to improve interoperability and coordination among public safety agencies and improve call processing time to decrease overall response times.</description><category>IT</category><borough>Citywide</borough><managing_agency>DOITT</managing_agency><client_agency>FDNY, NYPD</client_agency><current_phase>IT</current_phase><budget_forecast>2206638748.00</budget_forecast><latest_budget_changes>19989977.00</latest_budget_changes><total_budget_changes>73735148.87</total_budget_changes><forecast_completion>2017-11-30T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>2252</total_schedule_changes></row><row _id="row-jzf2.m8n3_gkg3" _uuid="00000000-0000-0000-E3FF-ACBAB658F1E4" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-jzf2.m8n3_gkg3"><date_reported_as_of>2017-04-01T00:00:00</date_reported_as_of><pid>267</pid><project_name>Emergency Communications Transformation Program (ECTP) Upgrades and Enhancements</project_name><description>Upgrade and enhancement of emergency technology infrastructure to improve interoperability and coordination among public safety agencies and improve call processing time to decrease overall response times.</description><category>IT</category><borough>Citywide</borough><managing_agency>DOITT</managing_agency><client_agency>FDNY, NYPD</client_agency><current_phase>IT</current_phase><budget_forecast>2208534797.00</budget_forecast><latest_budget_changes>1896049.00</latest_budget_changes><total_budget_changes>73735148.87</total_budget_changes><forecast_completion>2019-12-01T00:00:00</forecast_completion><latest_schedule_changes>731</latest_schedule_changes><total_schedule_changes>2252</total_schedule_changes></row><row _id="row-dfxg-dxhv_fwrd" _uuid="00000000-0000-0000-C05E-A816099D63C5" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-dfxg-dxhv_fwrd"><date_reported_as_of>2017-09-01T00:00:00</date_reported_as_of><pid>267</pid><project_name>Emergency Communications Transformation Program (ECTP) Upgrades and Enhancements</project_name><description>Upgrade and enhancement of emergency technology infrastructure to improve interoperability and coordination among public safety agencies and improve call processing time to decrease overall response times.</description><category>IT</category><borough>Citywide</borough><managing_agency>DOITT</managing_agency><client_agency>FDNY, NYPD</client_agency><current_phase>IT</current_phase><budget_forecast>2211709080.00</budget_forecast><latest_budget_changes>3174283.00</latest_budget_changes><total_budget_changes>73735148.87</total_budget_changes><forecast_completion>2019-12-01T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>2252</total_schedule_changes></row><row _id="row-5qyh-pcit~djxx" _uuid="00000000-0000-0000-B46E-A24258AAAE0F" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-5qyh-pcit~djxx"><date_reported_as_of>2018-03-01T00:00:00</date_reported_as_of><pid>267</pid><project_name>Emergency Communications Transformation Program (ECTP) Upgrades and Enhancements</project_name><description>Upgrade and enhancement of emergency technology infrastructure to improve interoperability and coordination among public safety agencies and improve call processing time to decrease overall response times.</description><category>IT</category><borough>Citywide</borough><managing_agency>DOITT</managing_agency><client_agency>FDNY, NYPD</client_agency><current_phase>IT</current_phase><budget_forecast>2251510261.71</budget_forecast><latest_budget_changes>39801181.71</latest_budget_changes><total_budget_changes>73735148.87</total_budget_changes><forecast_completion>2019-10-31T00:00:00</forecast_completion><latest_schedule_changes>-31</latest_schedule_changes><total_schedule_changes>2252</total_schedule_changes></row><row _id="row-babt_kz72_2sn6" _uuid="00000000-0000-0000-7E2E-B6584E5C144B" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-babt_kz72_2sn6"><date_reported_as_of>2018-08-01T00:00:00</date_reported_as_of><pid>267</pid><project_name>Emergency Communications Transformation Program (ECTP) Upgrades and Enhancements</project_name><description>Upgrade and enhancement of emergency technology infrastructure to improve interoperability and coordination among public safety agencies and improve call processing time to decrease overall response times.</description><category>IT</category><borough>Citywide</borough><managing_agency>DOITT</managing_agency><client_agency>FDNY, NYPD</client_agency><current_phase>IT</current_phase><budget_forecast>2278217251.55</budget_forecast><latest_budget_changes>26706989.84</latest_budget_changes><total_budget_changes>73735148.87</total_budget_changes><forecast_completion>2019-12-31T00:00:00</forecast_completion><latest_schedule_changes>61</latest_schedule_changes><total_schedule_changes>2252</total_schedule_changes></row><row _id="row-bgkc~x927_rzfb" _uuid="00000000-0000-0000-1EDA-CE964F5A16A3" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-bgkc~x927_rzfb"><date_reported_as_of>2019-01-01T00:00:00</date_reported_as_of><pid>267</pid><project_name>Emergency Communications Transformation Program (ECTP) Upgrades and Enhancements</project_name><description>Upgrade and enhancement of emergency technology infrastructure to improve interoperability and coordination among public safety agencies and improve call processing time to decrease overall response times.</description><category>IT</category><borough>Citywide</borough><managing_agency>DOITT</managing_agency><client_agency>FDNY, NYPD</client_agency><current_phase>IT</current_phase><budget_forecast>2246326457.23</budget_forecast><latest_budget_changes>-31890794.32</latest_budget_changes><total_budget_changes>73735148.87</total_budget_changes><forecast_completion>2019-10-31T00:00:00</forecast_completion><latest_schedule_changes>-61</latest_schedule_changes><total_schedule_changes>2252</total_schedule_changes></row><row _id="row-whnw~i52j_emh6" _uuid="00000000-0000-0000-39CC-B82ADBC3CAF1" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-whnw~i52j_emh6"><date_reported_as_of>2019-05-01T00:00:00</date_reported_as_of><pid>267</pid><project_name>Emergency Communications Transformation Program (ECTP) Upgrades and Enhancements</project_name><description>Upgrade and enhancement of emergency technology infrastructure to improve interoperability and coordination among public safety agencies and improve call processing time to decrease overall response times.</description><category>IT</category><borough>Citywide</borough><managing_agency>DOITT</managing_agency><client_agency>FDNY, NYPD</client_agency><current_phase>IT</current_phase><budget_forecast>2249890870.99</budget_forecast><latest_budget_changes>3564413.76</latest_budget_changes><total_budget_changes>73735148.87</total_budget_changes><forecast_completion>2020-03-22T00:00:00</forecast_completion><latest_schedule_changes>143</latest_schedule_changes><total_schedule_changes>2252</total_schedule_changes></row><row _id="row-fs65-yv2b~cgk4" _uuid="00000000-0000-0000-E1FE-B02F963244CD" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-fs65-yv2b~cgk4"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>267</pid><project_name>Emergency Communications Transformation Program (ECTP) Upgrades and Enhancements</project_name><description>Upgrade and enhancement of emergency technology infrastructure to improve interoperability and coordination among public safety agencies and improve call processing time to decrease overall response times.</description><category>IT</category><borough>Citywide</borough><managing_agency>DOITT</managing_agency><client_agency>FDNY, NYPD</client_agency><current_phase>IT</current_phase><budget_forecast>2277311983.63</budget_forecast><latest_budget_changes>27421112.64</latest_budget_changes><total_budget_changes>73735148.87</total_budget_changes><forecast_completion>2020-08-31T00:00:00</forecast_completion><latest_schedule_changes>162</latest_schedule_changes><total_schedule_changes>2252</total_schedule_changes></row><row _id="row-cxqx~34v2-xhqb" _uuid="00000000-0000-0000-010F-0630B265A117" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-cxqx~34v2-xhqb"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>267</pid><project_name>Emergency Communications Transformation Program (ECTP) Upgrades and Enhancements</project_name><description>Upgrade and enhancement of emergency technology infrastructure to improve interoperability and coordination among public safety agencies and improve call processing time to decrease overall response times.</description><category>IT</category><borough>Citywide</borough><managing_agency>DOITT</managing_agency><client_agency>FDNY, NYPD</client_agency><current_phase>IT</current_phase><budget_forecast>2264609611.71</budget_forecast><latest_budget_changes>-12702371.92</latest_budget_changes><total_budget_changes>73735148.87</total_budget_changes><forecast_completion>2020-10-19T00:00:00</forecast_completion><latest_schedule_changes>49</latest_schedule_changes><total_schedule_changes>2252</total_schedule_changes></row><row _id="row-5vae_f32s~445z" _uuid="00000000-0000-0000-2C9C-6B1E484D7251" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-5vae_f32s~445z"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>267</pid><project_name>Emergency Communications Transformation Program (ECTP) Upgrades and Enhancements</project_name><description>Upgrade and enhancement of emergency technology infrastructure to improve interoperability and coordination among public safety agencies and improve call processing time to decrease overall response times.</description><category>IT</category><borough>Citywide</borough><managing_agency>DOITT</managing_agency><client_agency>FDNY, NYPD</client_agency><current_phase>IT</current_phase><budget_forecast>2264616690.73</budget_forecast><latest_budget_changes>7079.02</latest_budget_changes><total_budget_changes>73735148.87</total_budget_changes><forecast_completion>2021-02-15T00:00:00</forecast_completion><latest_schedule_changes>119</latest_schedule_changes><total_schedule_changes>2252</total_schedule_changes></row><row _id="row-tby4_rsuk_ruvb" _uuid="00000000-0000-0000-8FE2-C89DF2DB3913" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-tby4_rsuk_ruvb"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>267</pid><project_name>Emergency Communications Transformation Program (ECTP) Upgrades and Enhancements</project_name><description>Upgrade and enhancement of emergency technology infrastructure to improve interoperability and coordination among public safety agencies and improve call processing time to decrease overall response times.</description><category>IT</category><borough>Citywide</borough><managing_agency>DOITT</managing_agency><client_agency>FDNY, NYPD</client_agency><current_phase>IT</current_phase><budget_forecast>2292599098.73</budget_forecast><latest_budget_changes>27982408.00</latest_budget_changes><total_budget_changes>73735148.87</total_budget_changes><forecast_completion>2021-07-31T00:00:00</forecast_completion><latest_schedule_changes>166</latest_schedule_changes><total_schedule_changes>2252</total_schedule_changes></row><row _id="row-w5hy.5j6w.rbrd" _uuid="00000000-0000-0000-4831-6DFDE9DC97BF" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-w5hy.5j6w.rbrd"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>267</pid><project_name>Emergency Communications Transformation Program (ECTP) Upgrades and Enhancements</project_name><description>Upgrade and enhancement of emergency technology infrastructure to improve interoperability and coordination among public safety agencies and improve call processing time to decrease overall response times.</description><category>IT</category><borough>Citywide</borough><managing_agency>DOITT</managing_agency><client_agency>FDNY, NYPD</client_agency><current_phase>IT</current_phase><budget_forecast>2291308864.74</budget_forecast><latest_budget_changes>-1290233.99</latest_budget_changes><total_budget_changes>73735148.87</total_budget_changes><forecast_completion>2022-12-31T00:00:00</forecast_completion><latest_schedule_changes>518</latest_schedule_changes><total_schedule_changes>2252</total_schedule_changes></row><row _id="row-tqnv_h6sd-s62k" _uuid="00000000-0000-0000-174C-98A870B453C0" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-tqnv_h6sd-s62k"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>267</pid><project_name>Emergency Communications Transformation Program (ECTP) Upgrades and Enhancements</project_name><description>Upgrade and enhancement of emergency technology infrastructure to improve interoperability and coordination among public safety agencies and improve call processing time to decrease overall response times.</description><category>IT</category><borough>Citywide</borough><managing_agency>DOITT</managing_agency><client_agency>FDNY, NYPD</client_agency><current_phase>IT</current_phase><budget_forecast>2311399241.43</budget_forecast><latest_budget_changes>20090376.69</latest_budget_changes><total_budget_changes>73735148.87</total_budget_changes><forecast_completion>2023-03-31T00:00:00</forecast_completion><latest_schedule_changes>90</latest_schedule_changes><total_schedule_changes>2252</total_schedule_changes></row><row _id="row-fig2-f6p8-8453" _uuid="00000000-0000-0000-DD14-32581A710852" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-fig2-f6p8-8453"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>267</pid><project_name>Emergency Communications Transformation Program (ECTP) Upgrades and Enhancements</project_name><description>Upgrade and enhancement of emergency technology infrastructure to improve interoperability and coordination among public safety agencies and improve call processing time to decrease overall response times.</description><category>IT</category><borough>Citywide</borough><managing_agency>DOITT</managing_agency><client_agency>FDNY, NYPD</client_agency><current_phase>IT</current_phase><budget_forecast>2312860015.61</budget_forecast><latest_budget_changes>1460774.18</latest_budget_changes><total_budget_changes>73735148.87</total_budget_changes><forecast_completion>2023-03-31T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>2252</total_schedule_changes></row><row _id="row-grx4.mfkv-uaie" _uuid="00000000-0000-0000-7587-3F34C8ED8772" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-grx4.mfkv-uaie"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>267</pid><project_name>Emergency Communications Transformation Program (ECTP) Upgrades and Enhancements</project_name><description>Upgrade and enhancement of emergency technology infrastructure to improve interoperability and coordination among public safety agencies and improve call processing time to decrease overall response times.</description><category>IT</category><borough>Citywide</borough><managing_agency>DOITT</managing_agency><client_agency>FDNY, NYPD</client_agency><current_phase>IT</current_phase><budget_forecast>2312235952.36</budget_forecast><latest_budget_changes>-624063.25</latest_budget_changes><total_budget_changes>73735148.87</total_budget_changes><forecast_completion>2023-03-31T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>2252</total_schedule_changes></row><row _id="row-y8v9_mrsb-xuhu" _uuid="00000000-0000-0000-8EAE-A467D11653A0" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-y8v9_mrsb-xuhu"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>267</pid><project_name>Emergency Communications Transformation Program (ECTP) Upgrades and Enhancements</project_name><description>Upgrade and enhancement of emergency technology infrastructure to improve interoperability and coordination among public safety agencies and improve call processing time to decrease overall response times.</description><category>IT</category><borough>Citywide</borough><managing_agency>DOITT</managing_agency><client_agency>FDNY, NYPD</client_agency><current_phase>IT</current_phase><budget_forecast>2326601368.81</budget_forecast><latest_budget_changes>14365416.45</latest_budget_changes><total_budget_changes>73735148.87</total_budget_changes><forecast_completion>2023-03-30T00:00:00</forecast_completion><latest_schedule_changes>-1</latest_schedule_changes><total_schedule_changes>2252</total_schedule_changes></row><row _id="row-ua8j-249c-dip4" _uuid="00000000-0000-0000-8830-8DFD09992095" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ua8j-249c-dip4"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>267</pid><project_name>Emergency Communications Transformation Program (ECTP) Upgrades and Enhancements</project_name><description>Upgrade and enhancement of emergency technology infrastructure to improve interoperability and coordination among public safety agencies and improve call processing time to decrease overall response times.</description><category>IT</category><borough>Citywide</borough><managing_agency>DOITT</managing_agency><client_agency>FDNY, NYPD</client_agency><current_phase>IT</current_phase><budget_forecast>2325426529.98</budget_forecast><latest_budget_changes>-1174838.83</latest_budget_changes><total_budget_changes>73735148.87</total_budget_changes><forecast_completion>2024-03-01T00:00:00</forecast_completion><latest_schedule_changes>337</latest_schedule_changes><total_schedule_changes>2252</total_schedule_changes></row><row _id="row-z8rp-nakx~ivpi" _uuid="00000000-0000-0000-7E85-0BFFCE7B5674" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-z8rp-nakx~ivpi"><date_reported_as_of>2014-01-01T00:00:00</date_reported_as_of><pid>313</pid><project_name>Dutch Kills and Lower Newtown Creek Enhanced Aeration Work</project_name><description>This project will construct a blower facility and install a diffused aeration system in Dutch Kills and Newtown Creek to increase dissolved oxygen content in the project area to meet DEC standards for the water body.</description><category>Wastewater Treatment</category><borough>Queens</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2010-06-14T00:00:00</design_start><budget_forecast>38300594.00</budget_forecast><latest_budget_changes>476550.00</latest_budget_changes><total_budget_changes>-4338327.57</total_budget_changes><forecast_completion>2019-04-14T00:00:00</forecast_completion><latest_schedule_changes>-1</latest_schedule_changes><total_schedule_changes>1891</total_schedule_changes></row><row _id="row-28ut.hqik.tc2h" _uuid="00000000-0000-0000-0962-20A8CBD28DCD" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-28ut.hqik.tc2h"><date_reported_as_of>2014-05-01T00:00:00</date_reported_as_of><pid>313</pid><project_name>Dutch Kills and Lower Newtown Creek Enhanced Aeration Work</project_name><description>This project will construct a blower facility and install a diffused aeration system in Dutch Kills and Newtown Creek to increase dissolved oxygen content in the project area to meet DEC standards for the water body.</description><category>Wastewater Treatment</category><borough>Queens</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2010-06-14T00:00:00</design_start><budget_forecast>34899023.00</budget_forecast><latest_budget_changes>-3401571.00</latest_budget_changes><total_budget_changes>-4338327.57</total_budget_changes><forecast_completion>2019-04-14T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1891</total_schedule_changes></row><row _id="row-dc9n_4zut_pf42" _uuid="00000000-0000-0000-F504-19A46003B172" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-dc9n_4zut_pf42"><date_reported_as_of>2015-02-01T00:00:00</date_reported_as_of><pid>313</pid><project_name>Dutch Kills and Lower Newtown Creek Enhanced Aeration Work</project_name><description>This project will construct a blower facility and install a diffused aeration system in Dutch Kills and Newtown Creek to increase dissolved oxygen content in the project area to meet DEC standards for the water body.</description><category>Wastewater Treatment</category><borough>Queens</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2010-06-14T00:00:00</design_start><budget_forecast>34899023.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-4338327.57</total_budget_changes><forecast_completion>2019-04-14T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1891</total_schedule_changes></row><row _id="row-9ppi~j4t8.f3nv" _uuid="00000000-0000-0000-9F43-6F006EF69908" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-9ppi~j4t8.f3nv"><date_reported_as_of>2015-08-01T00:00:00</date_reported_as_of><pid>313</pid><project_name>Dutch Kills and Lower Newtown Creek Enhanced Aeration Work</project_name><description>This project will construct a blower facility and install a diffused aeration system in Dutch Kills and Newtown Creek to increase dissolved oxygen content in the project area to meet DEC standards for the water body.</description><category>Wastewater Treatment</category><borough>Queens</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2014-01-01T00:00:00</design_start><budget_forecast>40484222.00</budget_forecast><latest_budget_changes>5585199.00</latest_budget_changes><total_budget_changes>-4338327.57</total_budget_changes><forecast_completion>2019-04-14T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1891</total_schedule_changes></row><row _id="row-xwb9-avb9-i82q" _uuid="00000000-0000-0000-6835-CBBF3D1FC722" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-xwb9-avb9-i82q"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>1200</pid><project_name>GI-OWLS HEAD TRIBUTARY DRAINAGE AREAS, BROOKLYN</project_name><description>GREEN INFRASTRUCTURE IN OWLS HEAD TRIBUTARY DRAINAGE AREAS, BROOKLYN</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Design</current_phase><design_start>2019-01-02T00:00:00</design_start><budget_forecast>36109000.00</budget_forecast><total_budget_changes>24278000.00</total_budget_changes><forecast_completion>2026-06-01T00:00:00</forecast_completion><total_schedule_changes>396</total_schedule_changes></row><row _id="row-ezca~xj2r~nt6e" _uuid="00000000-0000-0000-D56F-C618783E12F0" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ezca~xj2r~nt6e"><date_reported_as_of>2016-01-01T00:00:00</date_reported_as_of><pid>313</pid><project_name>Dutch Kills and Lower Newtown Creek Enhanced Aeration Work</project_name><description>This project will construct a blower facility and install a diffused aeration system in Dutch Kills and Newtown Creek to increase dissolved oxygen content in the project area to meet DEC standards for the water body.</description><category>Wastewater Treatment</category><borough>Queens</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction Procurement</current_phase><design_start>2014-01-01T00:00:00</design_start><budget_forecast>41509583.00</budget_forecast><latest_budget_changes>1025361.00</latest_budget_changes><total_budget_changes>-4338327.57</total_budget_changes><forecast_completion>2020-01-05T00:00:00</forecast_completion><latest_schedule_changes>266</latest_schedule_changes><total_schedule_changes>1891</total_schedule_changes></row><row _id="row-ik6y_aujv~572s" _uuid="00000000-0000-0000-721F-5CDDB5AF33C9" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ik6y_aujv~572s"><date_reported_as_of>2016-06-01T00:00:00</date_reported_as_of><pid>313</pid><project_name>Dutch Kills and Lower Newtown Creek Enhanced Aeration Work</project_name><description>This project will construct a blower facility and install a diffused aeration system in Dutch Kills and Newtown Creek to increase dissolved oxygen content in the project area to meet DEC standards for the water body.</description><category>Wastewater Treatment</category><borough>Queens</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction Procurement</current_phase><design_start>2014-01-01T00:00:00</design_start><budget_forecast>40468019.00</budget_forecast><latest_budget_changes>-1041564.00</latest_budget_changes><total_budget_changes>-4338327.57</total_budget_changes><forecast_completion>2020-01-05T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1891</total_schedule_changes></row><row _id="row-f7kv~hw76-63qx" _uuid="00000000-0000-0000-0EC8-438635E3BB35" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-f7kv~hw76-63qx"><date_reported_as_of>2016-11-01T00:00:00</date_reported_as_of><pid>313</pid><project_name>Dutch Kills and Lower Newtown Creek Enhanced Aeration Work</project_name><description>This project will construct a blower facility and install a diffused aeration system in Dutch Kills and Newtown Creek to increase dissolved oxygen content in the project area to meet DEC standards for the water body.</description><category>Wastewater Treatment</category><borough>Queens</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction Procurement</current_phase><design_start>2014-01-01T00:00:00</design_start><budget_forecast>42855624.00</budget_forecast><latest_budget_changes>2387605.00</latest_budget_changes><total_budget_changes>-4338327.57</total_budget_changes><forecast_completion>2020-06-01T00:00:00</forecast_completion><latest_schedule_changes>148</latest_schedule_changes><total_schedule_changes>1891</total_schedule_changes></row><row _id="row-8ru6~9dqc.y2m9" _uuid="00000000-0000-0000-45FF-40A4E5A91589" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-8ru6~9dqc.y2m9"><date_reported_as_of>2017-04-01T00:00:00</date_reported_as_of><pid>313</pid><project_name>Dutch Kills and Lower Newtown Creek Enhanced Aeration Work</project_name><description>This project will construct a blower facility and install a diffused aeration system in Dutch Kills and Newtown Creek to increase dissolved oxygen content in the project area to meet DEC standards for the water body.</description><category>Wastewater Treatment</category><borough>Queens</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction Procurement</current_phase><design_start>2014-01-01T00:00:00</design_start><budget_forecast>39918112.00</budget_forecast><latest_budget_changes>-2937512.00</latest_budget_changes><total_budget_changes>-4338327.57</total_budget_changes><forecast_completion>2022-12-12T00:00:00</forecast_completion><latest_schedule_changes>924</latest_schedule_changes><total_schedule_changes>1891</total_schedule_changes></row><row _id="row-mpyd-yivj-spem" _uuid="00000000-0000-0000-BA63-B470016FC834" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-mpyd-yivj-spem"><date_reported_as_of>2017-09-01T00:00:00</date_reported_as_of><pid>313</pid><project_name>Dutch Kills and Lower Newtown Creek Enhanced Aeration Work</project_name><description>This project will construct a blower facility and install a diffused aeration system in Dutch Kills and Newtown Creek to increase dissolved oxygen content in the project area to meet DEC standards for the water body.</description><category>Wastewater Treatment</category><borough>Queens</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction Procurement</current_phase><design_start>2014-01-01T00:00:00</design_start><budget_forecast>40835112.00</budget_forecast><latest_budget_changes>917000.00</latest_budget_changes><total_budget_changes>-4338327.57</total_budget_changes><forecast_completion>2022-12-12T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1891</total_schedule_changes></row><row _id="row-c8zq_a8ik_mbdt" _uuid="00000000-0000-0000-2144-3FAF12E51362" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-c8zq_a8ik_mbdt"><date_reported_as_of>2018-03-01T00:00:00</date_reported_as_of><pid>313</pid><project_name>Dutch Kills and Lower Newtown Creek Enhanced Aeration Work</project_name><description>This project will construct a blower facility and install a diffused aeration system in Dutch Kills and Newtown Creek to increase dissolved oxygen content in the project area to meet DEC standards for the water body.</description><category>Wastewater Treatment</category><borough>Queens</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2014-01-01T00:00:00</design_start><budget_forecast>44611418.00</budget_forecast><latest_budget_changes>3776306.00</latest_budget_changes><total_budget_changes>-4338327.57</total_budget_changes><forecast_completion>2022-07-26T00:00:00</forecast_completion><latest_schedule_changes>-139</latest_schedule_changes><total_schedule_changes>1891</total_schedule_changes></row><row _id="row-s7ms~ee6m.tafu" _uuid="00000000-0000-0000-DA99-4950E6516306" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-s7ms~ee6m.tafu"><date_reported_as_of>2018-08-01T00:00:00</date_reported_as_of><pid>313</pid><project_name>Dutch Kills and Lower Newtown Creek Enhanced Aeration Work</project_name><description>This project will construct a blower facility and install a diffused aeration system in Dutch Kills and Newtown Creek to increase dissolved oxygen content in the project area to meet DEC standards for the water body.</description><category>Wastewater Treatment</category><borough>Queens</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction Procurement</current_phase><design_start>2014-01-01T00:00:00</design_start><budget_forecast>33807921.00</budget_forecast><latest_budget_changes>-10803497.00</latest_budget_changes><total_budget_changes>-4338327.57</total_budget_changes><forecast_completion>2022-12-12T00:00:00</forecast_completion><latest_schedule_changes>139</latest_schedule_changes><total_schedule_changes>1891</total_schedule_changes></row><row _id="row-vv9q-tafc-tt3r" _uuid="00000000-0000-0000-5E27-04BE70A6E88A" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-vv9q-tafc-tt3r"><date_reported_as_of>2019-01-01T00:00:00</date_reported_as_of><pid>313</pid><project_name>Dutch Kills and Lower Newtown Creek Enhanced Aeration Work</project_name><description>This project will upgrade the Borden Ave Pump Station by expanding its footprint; providing replacement equipment; converting dry well to wet well; and providing provisions for future project to expand capacity of pump station to 26 MGD.</description><category>Wastewater Treatment</category><borough>Queens</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2014-01-01T00:00:00</design_start><budget_forecast>35447336.00</budget_forecast><latest_budget_changes>1639415.00</latest_budget_changes><total_budget_changes>-4338327.57</total_budget_changes><forecast_completion>2023-06-15T00:00:00</forecast_completion><latest_schedule_changes>185</latest_schedule_changes><total_schedule_changes>1891</total_schedule_changes></row><row _id="row-7sxz-3x8k~b6je" _uuid="00000000-0000-0000-D6B0-D9E534B4B623" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-7sxz-3x8k~b6je"><date_reported_as_of>2019-05-01T00:00:00</date_reported_as_of><pid>313</pid><project_name>Dutch Kills and Lower Newtown Creek Enhanced Aeration Work</project_name><description>This project will upgrade the Borden Ave Pump Station by expanding its footprint; providing replacement equipment; converting dry well to wet well; and providing provisions for future project to expand capacity of pump station to 26 MGD.</description><category>Wastewater Treatment</category><borough>Queens</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2014-01-01T00:00:00</design_start><budget_forecast>31571569.00</budget_forecast><latest_budget_changes>-3875767.00</latest_budget_changes><total_budget_changes>-4338327.57</total_budget_changes><forecast_completion>2024-01-14T00:00:00</forecast_completion><latest_schedule_changes>213</latest_schedule_changes><total_schedule_changes>1891</total_schedule_changes></row><row _id="row-n5vv.xhfa_aamp" _uuid="00000000-0000-0000-974C-9C9A1096A975" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-n5vv.xhfa_aamp"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>313</pid><project_name>Dutch Kills and Lower Newtown Creek Enhanced Aeration Work</project_name><description>This project will upgrade the Borden Ave Pump Station by expanding its footprint; providing replacement equipment; converting dry well to wet well; and providing provisions for future project to expand capacity of pump station to 26 MGD.</description><category>Wastewater Treatment</category><borough>Queens</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2014-01-01T00:00:00</design_start><budget_forecast>33671569.00</budget_forecast><latest_budget_changes>2100000.00</latest_budget_changes><total_budget_changes>-4338327.57</total_budget_changes><forecast_completion>2024-01-14T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1891</total_schedule_changes></row><row _id="row-tr62.5bzc_a9mw" _uuid="00000000-0000-0000-6EC3-7FF5358FC022" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-tr62.5bzc_a9mw"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>313</pid><project_name>Dutch Kills and Lower Newtown Creek Enhanced Aeration Work</project_name><description>This project will upgrade the Borden Ave Pump Station by expanding its footprint; providing replacement equipment; converting dry well to wet well; and providing provisions for future project to expand capacity of pump station to 26 MGD.</description><category>Wastewater Treatment</category><borough>Queens</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2014-01-01T00:00:00</design_start><budget_forecast>33671569.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-4338327.57</total_budget_changes><forecast_completion>2024-01-14T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1891</total_schedule_changes></row><row _id="row-wha9_8drd_64x8" _uuid="00000000-0000-0000-67CD-66211D73E890" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-wha9_8drd_64x8"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>313</pid><project_name>Dutch Kills and Lower Newtown Creek Enhanced Aeration Work</project_name><description>This project will upgrade the Borden Ave Pump Station by expanding its footprint; providing replacement equipment; converting dry well to wet well; and providing provisions for future project to expand capacity of pump station to 26 MGD.</description><category>Wastewater Treatment</category><borough>Queens</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction Procurement</current_phase><design_start>2014-01-01T00:00:00</design_start><budget_forecast>38071569.00</budget_forecast><latest_budget_changes>4400000.00</latest_budget_changes><total_budget_changes>-4338327.57</total_budget_changes><forecast_completion>2024-12-01T00:00:00</forecast_completion><latest_schedule_changes>322</latest_schedule_changes><total_schedule_changes>1891</total_schedule_changes></row><row _id="row-qqrq-6xns.iqvh" _uuid="00000000-0000-0000-59B2-FFB969CB6F7E" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-qqrq-6xns.iqvh"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>313</pid><project_name>Dutch Kills and Lower Newtown Creek Enhanced Aeration Work</project_name><description>This project will upgrade the Borden Ave Pump Station by expanding its footprint; provide replacement equipment; convert dry well to wet well; line existing 14" FM; and provide provisions for future project to expand capacity of PS to 26 MGD.</description><category>Wastewater Treatment</category><borough>Queens</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction Procurement</current_phase><design_start>2014-01-01T00:00:00</design_start><budget_forecast>38857732.00</budget_forecast><latest_budget_changes>786163.00</latest_budget_changes><total_budget_changes>-4338327.57</total_budget_changes><forecast_completion>2024-11-24T00:00:00</forecast_completion><latest_schedule_changes>-7</latest_schedule_changes><total_schedule_changes>1891</total_schedule_changes></row><row _id="row-acb9.jska~x2fr" _uuid="00000000-0000-0000-C64B-257629122125" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-acb9.jska~x2fr"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>313</pid><project_name>Dutch Kills and Lower Newtown Creek Enhanced Aeration Work</project_name><description>This project will upgrade the Borden Ave Pump Station by expanding its footprint; provide replacement equipment; convert dry well to wet well; line existing 14" FM; and provide provisions for future project to expand capacity of PS to 26 MGD.</description><category>Wastewater Treatment</category><borough>Queens</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction Procurement</current_phase><design_start>2014-01-01T00:00:00</design_start><budget_forecast>38631300.43</budget_forecast><latest_budget_changes>-226431.57</latest_budget_changes><total_budget_changes>-4338327.57</total_budget_changes><forecast_completion>2025-02-15T00:00:00</forecast_completion><latest_schedule_changes>83</latest_schedule_changes><total_schedule_changes>1891</total_schedule_changes></row><row _id="row-6jwk.egwy.qkb4" _uuid="00000000-0000-0000-AE7F-BAD95F6EB11D" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-6jwk.egwy.qkb4"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>313</pid><project_name>Dutch Kills and Lower Newtown Creek Enhanced Aeration Work</project_name><description>This project will upgrade the Borden Ave Pump Station by expanding its footprint; provide replacement equipment; convert dry well to wet well; line existing 14" FM; and provide provisions for future project to expand capacity of PS to 26 MGD.</description><category>Wastewater Treatment</category><borough>Queens</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction Procurement</current_phase><design_start>2014-01-01T00:00:00</design_start><budget_forecast>38631300.43</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-4338327.57</total_budget_changes><forecast_completion>2025-03-21T00:00:00</forecast_completion><latest_schedule_changes>34</latest_schedule_changes><total_schedule_changes>1891</total_schedule_changes></row><row _id="row-rnzy~ezmp.sat6" _uuid="00000000-0000-0000-6D96-135EC145FF21" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-rnzy~ezmp.sat6"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>313</pid><project_name>Dutch Kills and Lower Newtown Creek Enhanced Aeration Work</project_name><category>Wastewater Treatment</category><borough>Queens</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><total_budget_changes>-4338327.57</total_budget_changes><total_schedule_changes>1891</total_schedule_changes></row><row _id="row-eduh.arpg_dfam" _uuid="00000000-0000-0000-1B6D-C002442727EF" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-eduh.arpg_dfam"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>1200</pid><project_name>GI-OWLS HEAD TRIBUTARY DRAINAGE AREAS, BROOKLYN</project_name><description>GREEN INFRASTRUCTURE IN OWLS HEAD TRIBUTARY DRAINAGE AREAS, BROOKLYN</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Design</current_phase><design_start>2019-01-02T00:00:00</design_start><budget_forecast>46419000.00</budget_forecast><latest_budget_changes>10310000.00</latest_budget_changes><total_budget_changes>24278000.00</total_budget_changes><forecast_completion>2026-03-24T00:00:00</forecast_completion><latest_schedule_changes>-69</latest_schedule_changes><total_schedule_changes>396</total_schedule_changes></row><row _id="row-nshv~htjq-b9g5" _uuid="00000000-0000-0000-5342-AE2353C73003" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-nshv~htjq-b9g5"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>1200</pid><project_name>GI-OWLS HEAD TRIBUTARY DRAINAGE AREAS, BROOKLYN</project_name><description>GREEN INFRASTRUCTURE IN OWLS HEAD TRIBUTARY DRAINAGE AREAS, BROOKLYN</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Design</current_phase><design_start>2019-01-02T00:00:00</design_start><budget_forecast>59405000.00</budget_forecast><latest_budget_changes>12986000.00</latest_budget_changes><total_budget_changes>24278000.00</total_budget_changes><forecast_completion>2026-11-29T00:00:00</forecast_completion><latest_schedule_changes>250</latest_schedule_changes><total_schedule_changes>396</total_schedule_changes></row><row _id="row-7haq~tsf4.t67c" _uuid="00000000-0000-0000-7931-12920012A21A" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-7haq~tsf4.t67c"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>313</pid><project_name>Dutch Kills and Lower Newtown Creek Enhanced Aeration Work</project_name><description>This project will upgrade the Borden Ave Pump Station. Footprint of the PS will be increased to ~ 2750 square feet. Convert dry well into wet well. Replace existing non-submersible pumps with submersible pumps while maintaining PS capacity of 3.9 MGD. Provide emergency portable diesel driven 4.5 MGD pump. Installation of new electrical, controls (SCADA), mechanical &amp; HVAC systems. Provisions to support a future project to expand capacity of the PS from 3.9 MGD to 26 MGD. Upgrade resiliency per BWT guidelines. Line existing 14" Force Main</description><category>Wastewater Treatment</category><borough>Queens</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction Procurement</current_phase><design_start>2014-01-01T00:00:00</design_start><budget_forecast>33485716.43</budget_forecast><latest_budget_changes>-5145584.00</latest_budget_changes><total_budget_changes>-4338327.57</total_budget_changes><forecast_completion>2025-08-01T00:00:00</forecast_completion><latest_schedule_changes>133</latest_schedule_changes><total_schedule_changes>1891</total_schedule_changes></row><row _id="row-ht4g-zu42.8e4e" _uuid="00000000-0000-0000-3D19-7FC67F5EDF7B" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ht4g-zu42.8e4e"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>313</pid><project_name>Dutch Kills and Lower Newtown Creek Enhanced Aeration Work</project_name><description>This project will upgrade the Borden Ave Pump Station. Footprint of the PS will be increased to ~ 2750 square feet. Convert dry well into wet well. Replace existing non-submersible pumps with submersible pumps while maintaining PS capacity of 3.9 MGD. Provide emergency portable diesel driven 4.5 MGD pump. Installation of new electrical, controls (SCADA), mechanical &amp; HVAC systems. Provisions to support a future project to expand capacity of the PS from 3.9 MGD to 26 MGD. Upgrade resiliency per BWT guidelines. Line existing 14" Force Main</description><category>Wastewater Treatment</category><borough>Queens</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2014-01-01T00:00:00</design_start><budget_forecast>33485716.43</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-4338327.57</total_budget_changes><forecast_completion>2024-05-30T00:00:00</forecast_completion><latest_schedule_changes>-428</latest_schedule_changes><total_schedule_changes>1891</total_schedule_changes></row><row _id="row-ig7q~4265~imfa" _uuid="00000000-0000-0000-57DD-D2889079FF36" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ig7q~4265~imfa"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>313</pid><project_name>Dutch Kills and Lower Newtown Creek Enhanced Aeration Work</project_name><description>This project will upgrade the Borden Ave Pump Station. Footprint of the PS will be increased to ~ 2750 square feet. Convert dry well into wet well. Replace existing non-submersible pumps with submersible pumps while maintaining PS capacity of 3.9 MGD. Provide emergency portable diesel driven 4.5 MGD pump. Installation of new electrical, controls (SCADA), mechanical &amp; HVAC systems. Provisions to support a future project to expand capacity of the PS from 3.9 MGD to 26 MGD. Upgrade resiliency per BWT guidelines. Line existing 14" Force Main</description><category>Wastewater Treatment</category><borough>Queens</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2014-01-01T00:00:00</design_start><budget_forecast>33485716.43</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-4338327.57</total_budget_changes><forecast_completion>2024-06-18T00:00:00</forecast_completion><latest_schedule_changes>19</latest_schedule_changes><total_schedule_changes>1891</total_schedule_changes></row><row _id="row-g4q3-igx7.z36h" _uuid="00000000-0000-0000-1FB8-EB5FEA46D889" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-g4q3-igx7.z36h"><date_reported_as_of>2013-09-01T00:00:00</date_reported_as_of><pid>347</pid><project_name>West 59th Street Marine Transfer Station Construction, Phase 2</project_name><description>Phase I includes repairs to the inshore platform, replacement of scales and control equipment, dredging around the pier, and site work.</description><category>Sanitation</category><borough>Manhattan</borough><managing_agency>DDC</managing_agency><client_agency>Sanitation</client_agency><current_phase>Construction Procurement</current_phase><design_start>2012-01-17T00:00:00</design_start><budget_forecast>61077000.00</budget_forecast><total_budget_changes>126753576.46</total_budget_changes><forecast_completion>2018-01-28T00:00:00</forecast_completion><total_schedule_changes>1949</total_schedule_changes></row><row _id="row-rtbe.d4dr_a63e" _uuid="00000000-0000-0000-8AB0-7C7BE88CEF92" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-rtbe.d4dr_a63e"><date_reported_as_of>2014-01-01T00:00:00</date_reported_as_of><pid>347</pid><project_name>West 59th Street Marine Transfer Station Construction, Phase 2</project_name><description>Phase I repairs the inshore platform, replaces scales and control equipment, dredging around the pier, &amp; site work. Phase 2 refurbishes existing pier building incl. pier structure, pile caps, fendering, construction of new emergency generator, etc.</description><category>Sanitation</category><borough>Manhattan</borough><managing_agency>DDC</managing_agency><client_agency>Sanitation</client_agency><current_phase>Construction Procurement</current_phase><design_start>2012-01-17T00:00:00</design_start><budget_forecast>61077000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>126753576.46</total_budget_changes><forecast_completion>2018-01-28T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1949</total_schedule_changes></row><row _id="row-3gk9.hvj7-tb36" _uuid="00000000-0000-0000-222C-89D997422873" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-3gk9.hvj7-tb36"><date_reported_as_of>2014-05-01T00:00:00</date_reported_as_of><pid>347</pid><project_name>West 59th Street Marine Transfer Station Construction, Phase 2</project_name><description>Phase I repairs the inshore platform, replaces scales and control equipment, dredging around the pier, &amp; site work. Phase 2 refurbishes existing pier building incl. pier structure, pile caps, fendering, construction of new emergency generator, etc.</description><category>Sanitation</category><borough>Manhattan</borough><managing_agency>DDC</managing_agency><client_agency>Sanitation</client_agency><current_phase>Construction Procurement</current_phase><design_start>2012-01-17T00:00:00</design_start><budget_forecast>89734000.00</budget_forecast><latest_budget_changes>28657000.00</latest_budget_changes><total_budget_changes>126753576.46</total_budget_changes><forecast_completion>2017-10-28T00:00:00</forecast_completion><latest_schedule_changes>-92</latest_schedule_changes><total_schedule_changes>1949</total_schedule_changes></row><row _id="row-inb2_fiep_ea2i" _uuid="00000000-0000-0000-1AFD-D555BC47C081" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-inb2_fiep_ea2i"><date_reported_as_of>2015-02-01T00:00:00</date_reported_as_of><pid>347</pid><project_name>West 59th Street Marine Transfer Station Construction, Phase 2</project_name><description>Phase I repairs the inshore platform, replaces scales and control equipment, dredging around the pier, &amp; site work. Phase 2 refurbishes existing pier building incl. pier structure, pile caps, fendering, construction of new emergency generator, etc.</description><category>Sanitation</category><borough>Manhattan</borough><managing_agency>DDC</managing_agency><client_agency>Sanitation</client_agency><current_phase>Construction Procurement</current_phase><design_start>2012-01-17T00:00:00</design_start><budget_forecast>89734000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>126753576.46</total_budget_changes><forecast_completion>2018-08-18T00:00:00</forecast_completion><latest_schedule_changes>294</latest_schedule_changes><total_schedule_changes>1949</total_schedule_changes></row><row _id="row-rh2y.y6dr-3rk6" _uuid="00000000-0000-0000-C5F3-612ED518C94C" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-rh2y.y6dr-3rk6"><date_reported_as_of>2015-08-01T00:00:00</date_reported_as_of><pid>347</pid><project_name>West 59th Street Marine Transfer Station Construction, Phase 2</project_name><description>Phase I repairs the inshore platform, replaces scales and control equipment, dredging around the pier, &amp; site work. Phase 2 refurbishes existing pier building incl. pier structure, pile caps, fendering, construction of new emergency generator, etc.</description><category>Sanitation</category><borough>Manhattan</borough><managing_agency>DDC</managing_agency><client_agency>Sanitation</client_agency><current_phase>Construction</current_phase><design_start>2012-01-17T00:00:00</design_start><budget_forecast>89734000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>126753576.46</total_budget_changes><forecast_completion>2017-05-18T00:00:00</forecast_completion><latest_schedule_changes>-457</latest_schedule_changes><total_schedule_changes>1949</total_schedule_changes></row><row _id="row-irr3~cjf8.xi8q" _uuid="00000000-0000-0000-30F6-638B994E5FCE" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-irr3~cjf8.xi8q"><date_reported_as_of>2016-01-01T00:00:00</date_reported_as_of><pid>347</pid><project_name>West 59th Street Marine Transfer Station Construction, Phase 2</project_name><description>Phase I repairs the inshore platform, replaces scales and control equipment, dredging around the pier, &amp; site work. Phase 2 refurbishes existing pier building incl. pier structure, pile caps, fendering, construction of new emergency generator, etc.</description><category>Sanitation</category><borough>Manhattan</borough><managing_agency>DDC</managing_agency><client_agency>Sanitation</client_agency><current_phase>Construction</current_phase><design_start>2012-01-17T00:00:00</design_start><budget_forecast>89608000.00</budget_forecast><latest_budget_changes>-126000.00</latest_budget_changes><total_budget_changes>126753576.46</total_budget_changes><forecast_completion>2017-05-18T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1949</total_schedule_changes></row><row _id="row-kb6z_qxhv_4j5f" _uuid="00000000-0000-0000-33A0-B73EA47FE0F0" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-kb6z_qxhv_4j5f"><date_reported_as_of>2016-06-01T00:00:00</date_reported_as_of><pid>347</pid><project_name>West 59th Street Marine Transfer Station Construction, Phase 2</project_name><description>Phase I repairs the inshore platform, replaces scales and control equipment, dredging around the pier, &amp; site work. Phase 2 refurbishes existing pier building incl. pier structure, pile caps, fendering, construction of new emergency generator, etc.</description><category>Sanitation</category><borough>Manhattan</borough><managing_agency>DDC</managing_agency><client_agency>Sanitation</client_agency><current_phase>Construction</current_phase><design_start>2012-01-17T00:00:00</design_start><budget_forecast>86005000.00</budget_forecast><latest_budget_changes>-3603000.00</latest_budget_changes><total_budget_changes>126753576.46</total_budget_changes><forecast_completion>2018-02-22T00:00:00</forecast_completion><latest_schedule_changes>280</latest_schedule_changes><total_schedule_changes>1949</total_schedule_changes></row><row _id="row-cam6~waja~5k65" _uuid="00000000-0000-0000-DE1C-C0511B50F2F3" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-cam6~waja~5k65"><date_reported_as_of>2016-11-01T00:00:00</date_reported_as_of><pid>347</pid><project_name>West 59th Street Marine Transfer Station Construction, Phase 2</project_name><description>Phase I repairs the inshore platform, replaces scales and control equipment, dredging around the pier, &amp; site work. Phase 2 refurbishes existing pier building incl. pier structure, pile caps, fendering, construction of new emergency generator, etc.</description><category>Sanitation</category><borough>Manhattan</borough><managing_agency>DDC</managing_agency><client_agency>Sanitation</client_agency><current_phase>Construction</current_phase><design_start>2012-01-17T00:00:00</design_start><budget_forecast>87563311.00</budget_forecast><latest_budget_changes>1558311.00</latest_budget_changes><total_budget_changes>126753576.46</total_budget_changes><forecast_completion>2018-03-20T00:00:00</forecast_completion><latest_schedule_changes>26</latest_schedule_changes><total_schedule_changes>1949</total_schedule_changes></row><row _id="row-s636_pi3j-ygjr" _uuid="00000000-0000-0000-93A7-437287ADD268" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-s636_pi3j-ygjr"><date_reported_as_of>2017-04-01T00:00:00</date_reported_as_of><pid>347</pid><project_name>West 59th Street Marine Transfer Station Construction, Phase 2</project_name><description>Phase I repairs the inshore platform, replaces scales and control equipment, dredging around the pier, &amp; site work. Phase 2 refurbishes existing pier building incl. pier structure, pile caps, fendering, construction of new emergency generator, etc.</description><category>Sanitation</category><borough>Manhattan</borough><managing_agency>DDC</managing_agency><client_agency>Sanitation</client_agency><current_phase>Construction</current_phase><design_start>2012-01-17T00:00:00</design_start><budget_forecast>84946000.00</budget_forecast><latest_budget_changes>-2617311.00</latest_budget_changes><total_budget_changes>126753576.46</total_budget_changes><forecast_completion>2018-05-08T00:00:00</forecast_completion><latest_schedule_changes>49</latest_schedule_changes><total_schedule_changes>1949</total_schedule_changes></row><row _id="row-wibr.757u_h632" _uuid="00000000-0000-0000-2E67-EB9D2739D874" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-wibr.757u_h632"><date_reported_as_of>2017-09-01T00:00:00</date_reported_as_of><pid>347</pid><project_name>West 59th Street Marine Transfer Station Construction, Phase 2</project_name><description>Phase I repairs the inshore platform, replaces scales and control equipment, dredging around the pier, &amp; site work. Phase 2 refurbishes existing pier building incl. pier structure, pile caps, fendering, construction of new emergency generator, etc.</description><category>Sanitation</category><borough>Manhattan</borough><managing_agency>DDC</managing_agency><client_agency>Sanitation</client_agency><current_phase>Construction</current_phase><design_start>2012-01-17T00:00:00</design_start><budget_forecast>88884000.00</budget_forecast><latest_budget_changes>3938000.00</latest_budget_changes><total_budget_changes>126753576.46</total_budget_changes><forecast_completion>2018-11-26T00:00:00</forecast_completion><latest_schedule_changes>202</latest_schedule_changes><total_schedule_changes>1949</total_schedule_changes></row><row _id="row-un2p_5xyr_yb54" _uuid="00000000-0000-0000-BB2A-CF7372711FF7" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-un2p_5xyr_yb54"><date_reported_as_of>2018-03-01T00:00:00</date_reported_as_of><pid>347</pid><project_name>West 59th Street Marine Transfer Station Construction, Phase 2</project_name><description>Phase I repairs the inshore platform, replaces scales and control equipment, dredging around the pier, &amp; site work. Phase 2 refurbishes existing pier building incl. pier structure, pile caps, fendering, construction of new emergency generator, etc.</description><category>Sanitation</category><borough>Manhattan</borough><managing_agency>DDC</managing_agency><client_agency>Sanitation</client_agency><current_phase>Construction</current_phase><design_start>2012-01-17T00:00:00</design_start><budget_forecast>95281000.00</budget_forecast><latest_budget_changes>6397000.00</latest_budget_changes><total_budget_changes>126753576.46</total_budget_changes><forecast_completion>2018-11-26T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1949</total_schedule_changes></row><row _id="row-jwq2_xyas~gqvx" _uuid="00000000-0000-0000-6A02-787D80F1599B" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-jwq2_xyas~gqvx"><date_reported_as_of>2018-08-01T00:00:00</date_reported_as_of><pid>347</pid><project_name>West 59th Street Marine Transfer Station Construction, Phase 2</project_name><description>Phase I repairs the inshore platform, replaces scales and control equipment, dredging around the pier, &amp; site work. Phase 2 refurbishes existing pier building incl. pier structure, pile caps, fendering, construction of new emergency generator, etc.</description><category>Sanitation</category><borough>Manhattan</borough><managing_agency>DDC</managing_agency><client_agency>Sanitation</client_agency><current_phase>Construction</current_phase><design_start>2012-01-17T00:00:00</design_start><budget_forecast>96419000.00</budget_forecast><latest_budget_changes>1138000.00</latest_budget_changes><total_budget_changes>126753576.46</total_budget_changes><forecast_completion>2019-05-08T00:00:00</forecast_completion><latest_schedule_changes>163</latest_schedule_changes><total_schedule_changes>1949</total_schedule_changes></row><row _id="row-dcex_9std_zmwd" _uuid="00000000-0000-0000-C43D-3CECE9DB60D1" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-dcex_9std_zmwd"><date_reported_as_of>2019-01-01T00:00:00</date_reported_as_of><pid>347</pid><project_name>West 59th Street Marine Transfer Station Construction, Phase 2</project_name><description>Phase I repairs the inshore platform, replaces scales and control equipment, dredging around the pier, &amp; site work. Phase 2 refurbishes existing pier building incl. pier structure, pile caps, fendering, construction of new emergency generator, etc.</description><category>Sanitation</category><borough>Manhattan</borough><managing_agency>DDC</managing_agency><client_agency>Sanitation</client_agency><current_phase>Construction</current_phase><design_start>2012-01-17T00:00:00</design_start><budget_forecast>92634000.00</budget_forecast><latest_budget_changes>-3785000.00</latest_budget_changes><total_budget_changes>126753576.46</total_budget_changes><forecast_completion>2019-11-05T00:00:00</forecast_completion><latest_schedule_changes>181</latest_schedule_changes><total_schedule_changes>1949</total_schedule_changes></row><row _id="row-cp84-95et~um4e" _uuid="00000000-0000-0000-6622-BCC6A186B175" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-cp84-95et~um4e"><date_reported_as_of>2019-05-01T00:00:00</date_reported_as_of><pid>347</pid><project_name>West 59th Street Marine Transfer Station Construction, Phase 2</project_name><description>Project 2 Scope: Refurbishment of the existing pier building including: repair of existing pier structure including pile caps and fendering; construction of new emergency generator, electrical, mechanical, fire pump and fire valve rooms; new exit passageway construction and existing exit passageway refurbishment; re-arrangement and refurbishment of the Operations Building interiors; replacement of fire suppression system throughout the entire pier structure; mechanical, electrical and plumbing system upgrades; refurbishment and painting the existing pier interior steel framing and wall/roof surfaces; recoating the  structure's exterior cladding systems including metal wall and roof  panel system and translucent panel wall cladding system.</description><category>Sanitation</category><borough>Manhattan</borough><managing_agency>DDC</managing_agency><client_agency>Sanitation</client_agency><current_phase>Construction</current_phase><design_start>2012-01-17T00:00:00</design_start><budget_forecast>103201000.00</budget_forecast><latest_budget_changes>10567000.00</latest_budget_changes><total_budget_changes>126753576.46</total_budget_changes><forecast_completion>2020-08-27T00:00:00</forecast_completion><latest_schedule_changes>296</latest_schedule_changes><total_schedule_changes>1949</total_schedule_changes></row><row _id="row-qmtf_hern~a7j3" _uuid="00000000-0000-0000-E191-5C59444A5CB5" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-qmtf_hern~a7j3"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>347</pid><project_name>West 59th Street Marine Transfer Station Construction, Phase 2</project_name><description>Project 2 Scope: Refurbishment of the existing pier building including: repair of existing pier structure including pile caps and fendering; construction of new emergency generator, electrical, mechanical, fire pump and fire valve rooms; new exit passageway construction and existing exit passageway refurbishment; re-arrangement and refurbishment of the Operations Building interiors; replacement of fire suppression system throughout the entire pier structure; mechanical, electrical and plumbing system upgrades; refurbishment and painting the existing pier interior steel framing and wall/roof surfaces; recoating the  structure's exterior cladding systems including metal wall and roof  panel system and translucent panel wall cladding system.</description><category>Sanitation</category><borough>Manhattan</borough><managing_agency>DDC</managing_agency><client_agency>Sanitation</client_agency><current_phase>Construction</current_phase><design_start>2012-01-17T00:00:00</design_start><budget_forecast>103223000.00</budget_forecast><latest_budget_changes>22000.00</latest_budget_changes><total_budget_changes>126753576.46</total_budget_changes><forecast_completion>2020-08-27T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1949</total_schedule_changes></row><row _id="row-em49-nvpj.t9ts" _uuid="00000000-0000-0000-F04F-A80726F1D470" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-em49-nvpj.t9ts"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>347</pid><project_name>West 59th Street Marine Transfer Station Construction, Phase 2</project_name><category>Sanitation</category><borough>Manhattan</borough><managing_agency>DDC</managing_agency><client_agency>Sanitation</client_agency><total_budget_changes>126753576.46</total_budget_changes><total_schedule_changes>1949</total_schedule_changes></row><row _id="row-svbz_edet.u35c" _uuid="00000000-0000-0000-E64D-53C8C2ABCE87" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-svbz_edet.u35c"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>347</pid><project_name>West 59th Street Marine Transfer Station Construction, Phase 2</project_name><category>Sanitation</category><borough>Manhattan</borough><managing_agency>DDC</managing_agency><client_agency>Sanitation</client_agency><total_budget_changes>126753576.46</total_budget_changes><total_schedule_changes>1949</total_schedule_changes></row><row _id="row-idq9_c4sn~nmry" _uuid="00000000-0000-0000-C9AD-73937E7EB35A" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-idq9_c4sn~nmry"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>347</pid><project_name>West 59th Street Marine Transfer Station Construction, Phase 2</project_name><category>Sanitation</category><borough>Manhattan</borough><managing_agency>DDC</managing_agency><client_agency>Sanitation</client_agency><total_budget_changes>126753576.46</total_budget_changes><total_schedule_changes>1949</total_schedule_changes></row><row _id="row-4nna.75sm.7aze" _uuid="00000000-0000-0000-699C-A17580013DF9" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-4nna.75sm.7aze"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>347</pid><project_name>West 59th Street Marine Transfer Station Construction, Phase 2</project_name><category>Sanitation</category><borough>Manhattan</borough><managing_agency>DDC</managing_agency><client_agency>Sanitation</client_agency><total_budget_changes>126753576.46</total_budget_changes><total_schedule_changes>1949</total_schedule_changes></row><row _id="row-4dzi-kzxe_4n2i" _uuid="00000000-0000-0000-C33A-5DF2ED2F5F82" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-4dzi-kzxe_4n2i"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>347</pid><project_name>West 59th Street Marine Transfer Station Construction, Phase 2</project_name><description>Project 2 Scope: Refurbishment of the existing pier building including: repair of existing pier structure including pile caps and fendering; construction of new emergency generator, electrical, mechanical, fire pump and fire valve rooms; new exit passageway construction and existing exit passageway refurbishment; re-arrangement and refurbishment of the Operations Building interiors; replacement of fire suppression system throughout the entire pier structure; mechanical, electrical and plumbing system upgrades; refurbishment and painting the existing pier interior steel framing and wall/roof surfaces; recoating the  structure's exterior cladding systems including metal wall and roof  panel system and translucent panel wall cladding system.</description><category>Sanitation</category><borough>Manhattan</borough><managing_agency>DDC</managing_agency><client_agency>Sanitation</client_agency><current_phase>Construction</current_phase><design_start>2012-01-17T00:00:00</design_start><budget_forecast>187830576.46</budget_forecast><latest_budget_changes>84607576.46</latest_budget_changes><total_budget_changes>126753576.46</total_budget_changes><forecast_completion>2021-08-27T00:00:00</forecast_completion><latest_schedule_changes>365</latest_schedule_changes><total_schedule_changes>1949</total_schedule_changes></row><row _id="row-n599_cz9a~twhc" _uuid="00000000-0000-0000-A121-196AC5661F15" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-n599_cz9a~twhc"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>347</pid><project_name>West 59th Street Marine Transfer Station Construction, Phase 2</project_name><description>Project 2 Scope: Refurbishment of the existing pier building including: repair of existing pier structure including pile caps and fendering; construction of new emergency generator, electrical, mechanical, fire pump and fire valve rooms; new exit passageway construction and existing exit passageway refurbishment; re-arrangement and refurbishment of the Operations Building interiors; replacement of fire suppression system throughout the entire pier structure; mechanical, electrical and plumbing system upgrades; refurbishment and painting the existing pier interior steel framing and wall/roof surfaces; recoating the  structure's exterior cladding systems including metal wall and roof  panel system and translucent panel wall cladding system.</description><category>Sanitation</category><borough>Manhattan</borough><managing_agency>DDC</managing_agency><client_agency>Sanitation</client_agency><current_phase>Construction</current_phase><design_start>2012-01-17T00:00:00</design_start><budget_forecast>93915288.23</budget_forecast><latest_budget_changes>-93915288.23</latest_budget_changes><total_budget_changes>126753576.46</total_budget_changes><forecast_completion>2022-02-28T00:00:00</forecast_completion><latest_schedule_changes>185</latest_schedule_changes><total_schedule_changes>1949</total_schedule_changes></row><row _id="row-td56_9kky~yyg4" _uuid="00000000-0000-0000-7B07-BD303653D9DA" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-td56_9kky~yyg4"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>347</pid><project_name>West 59th Street Marine Transfer Station Construction, Phase 2</project_name><description>Project 2 Scope: Refurbishment of the existing pier building including: repair of existing pier structure including pile caps and fendering; construction of new emergency generator, electrical, mechanical, fire pump and fire valve rooms; new exit passageway construction and existing exit passageway refurbishment; re-arrangement and refurbishment of the Operations Building interiors; replacement of fire suppression system throughout the entire pier structure; mechanical, electrical and plumbing system upgrades; refurbishment and painting the existing pier interior steel framing and wall/roof surfaces; recoating the  structure's exterior cladding systems including metal wall and roof  panel system and translucent panel wall cladding system.</description><category>Sanitation</category><borough>Manhattan</borough><managing_agency>DDC</managing_agency><client_agency>Sanitation</client_agency><current_phase>Construction</current_phase><design_start>2012-01-17T00:00:00</design_start><budget_forecast>187830576.46</budget_forecast><latest_budget_changes>93915288.23</latest_budget_changes><total_budget_changes>126753576.46</total_budget_changes><forecast_completion>2022-08-16T00:00:00</forecast_completion><latest_schedule_changes>169</latest_schedule_changes><total_schedule_changes>1949</total_schedule_changes></row><row _id="row-kewb.4sgj.fqrq" _uuid="00000000-0000-0000-2F1E-5D0354B5A69C" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-kewb.4sgj.fqrq"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1200</pid><project_name>GI-OWLS HEAD TRIBUTARY DRAINAGE AREAS, BROOKLYN</project_name><description>GREEN INFRASTRUCTURE IN OWLS HEAD TRIBUTARY DRAINAGE AREAS, BROOKLYN</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Design</current_phase><design_start>2019-01-02T00:00:00</design_start><budget_forecast>60087000.00</budget_forecast><latest_budget_changes>682000.00</latest_budget_changes><total_budget_changes>24278000.00</total_budget_changes><forecast_completion>2027-07-02T00:00:00</forecast_completion><latest_schedule_changes>215</latest_schedule_changes><total_schedule_changes>396</total_schedule_changes></row><row _id="row-x89z~teda_efj5" _uuid="00000000-0000-0000-648F-242FC0CFD5D4" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-x89z~teda_efj5"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>347</pid><project_name>West 59th Street Marine Transfer Station Construction, Phase 2</project_name><description>Project 2 Scope: Refurbishment of the existing pier building including: repair of existing pier structure including pile caps and fendering; construction of new emergency generator, electrical, mechanical, fire pump and fire valve rooms; new exit passageway construction and existing exit passageway refurbishment; re-arrangement and refurbishment of the Operations Building interiors; replacement of fire suppression system throughout the entire pier structure; mechanical, electrical and plumbing system upgrades; refurbishment and painting the existing pier interior steel framing and wall/roof surfaces; recoating the  structure's exterior cladding systems including metal wall and roof  panel system and translucent panel wall cladding system.</description><category>Sanitation</category><borough>Manhattan</borough><managing_agency>DDC</managing_agency><client_agency>Sanitation</client_agency><current_phase>Construction</current_phase><design_start>2012-01-17T00:00:00</design_start><budget_forecast>187830576.46</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>126753576.46</total_budget_changes><forecast_completion>2022-10-28T00:00:00</forecast_completion><latest_schedule_changes>73</latest_schedule_changes><total_schedule_changes>1949</total_schedule_changes></row><row _id="row-7tfi~bpfm.9tna" _uuid="00000000-0000-0000-E152-DEB519B79D78" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-7tfi~bpfm.9tna"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>347</pid><project_name>West 59th Street Marine Transfer Station Construction, Phase 2</project_name><description>Project 2 Scope: Refurbishment of the existing pier building including: repair of existing pier structure including pile caps and fendering; construction of new emergency generator, electrical, mechanical, fire pump and fire valve rooms; new exit passageway construction and existing exit passageway refurbishment; re-arrangement and refurbishment of the Operations Building interiors; replacement of fire suppression system throughout the entire pier structure; mechanical, electrical and plumbing system upgrades; refurbishment and painting the existing pier interior steel framing and wall/roof surfaces; recoating the  structure's exterior cladding systems including metal wall and roof  panel system and translucent panel wall cladding system.</description><category>Sanitation</category><borough>Manhattan</borough><managing_agency>DDC</managing_agency><client_agency>Sanitation</client_agency><current_phase>Construction</current_phase><design_start>2012-01-17T00:00:00</design_start><budget_forecast>187830576.46</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>126753576.46</total_budget_changes><forecast_completion>2023-05-31T00:00:00</forecast_completion><latest_schedule_changes>215</latest_schedule_changes><total_schedule_changes>1949</total_schedule_changes></row><row _id="row-ik24-5973-tpza" _uuid="00000000-0000-0000-5225-8C599B73B698" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ik24-5973-tpza"><date_reported_as_of>2013-09-01T00:00:00</date_reported_as_of><pid>364</pid><project_name>Hannah Street Pumping Station Construction</project_name><description>This project will reconstruct the Hannah St. Pumping Station, the largest City-owned wastewater collection and pumping station on Staten Island.  Built in 1977, the facility has numerous deficiencies, needing  a comprehensive upgrade.</description><category>Wastewater Treatment</category><borough>Staten Island</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2012-08-03T00:00:00</design_start><budget_forecast>41800000.00</budget_forecast><total_budget_changes>67909196.80</total_budget_changes><forecast_completion>2017-08-11T00:00:00</forecast_completion><total_schedule_changes>3238</total_schedule_changes></row><row _id="row-tavb~cbr9-fvki" _uuid="00000000-0000-0000-F95D-C744800A9307" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-tavb~cbr9-fvki"><date_reported_as_of>2014-01-01T00:00:00</date_reported_as_of><pid>364</pid><project_name>Hannah Street Pumping Station Construction</project_name><description>This project will reconstruct the Hannah St. Pumping Station, the largest City-owned wastewater collection and pumping station on Staten Island.  Built in 1977, the facility has numerous deficiencies, needing  a comprehensive upgrade.</description><category>Wastewater Treatment</category><borough>Staten Island</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2012-08-03T00:00:00</design_start><budget_forecast>40200000.00</budget_forecast><latest_budget_changes>-1600000.00</latest_budget_changes><total_budget_changes>67909196.80</total_budget_changes><forecast_completion>2018-01-31T00:00:00</forecast_completion><latest_schedule_changes>173</latest_schedule_changes><total_schedule_changes>3238</total_schedule_changes></row><row _id="row-tdce~vh7s-s9na" _uuid="00000000-0000-0000-94BF-A35ED5550F78" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-tdce~vh7s-s9na"><date_reported_as_of>2014-05-01T00:00:00</date_reported_as_of><pid>364</pid><project_name>Hannah Street Pumping Station Construction</project_name><description>This project will reconstruct the Hannah St. Pumping Station, the largest City-owned wastewater collection and pumping station on Staten Island.  Built in 1977, the facility has numerous deficiencies, needing  a comprehensive upgrade.</description><category>Wastewater Treatment</category><borough>Staten Island</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2012-08-03T00:00:00</design_start><budget_forecast>42140000.00</budget_forecast><latest_budget_changes>1940000.00</latest_budget_changes><total_budget_changes>67909196.80</total_budget_changes><forecast_completion>2018-01-31T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>3238</total_schedule_changes></row><row _id="row-nb8t.3ubc~h9h6" _uuid="00000000-0000-0000-42E4-21A3211F2667" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-nb8t.3ubc~h9h6"><date_reported_as_of>2015-02-01T00:00:00</date_reported_as_of><pid>364</pid><project_name>Hannah Street Pumping Station Construction</project_name><description>This project will reconstruct the Hannah St. Pumping Station, the largest City-owned wastewater collection and pumping station on Staten Island.  Built in 1977, the facility has numerous deficiencies, needing  a comprehensive upgrade.</description><category>Wastewater Treatment</category><borough>Staten Island</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2012-08-03T00:00:00</design_start><budget_forecast>54200000.00</budget_forecast><latest_budget_changes>12060000.00</latest_budget_changes><total_budget_changes>67909196.80</total_budget_changes><forecast_completion>2018-03-11T00:00:00</forecast_completion><latest_schedule_changes>39</latest_schedule_changes><total_schedule_changes>3238</total_schedule_changes></row><row _id="row-jnwr_qvvw_ixnt" _uuid="00000000-0000-0000-A330-990442EE7779" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-jnwr_qvvw_ixnt"><date_reported_as_of>2015-08-01T00:00:00</date_reported_as_of><pid>364</pid><project_name>Hannah Street Pumping Station Construction</project_name><description>This project will reconstruct the Hannah St. Pumping Station, the largest City-owned wastewater collection and pumping station on Staten Island.  Built in 1977, the facility has numerous deficiencies, needing  a comprehensive upgrade.</description><category>Wastewater Treatment</category><borough>Staten Island</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2012-10-01T00:00:00</design_start><budget_forecast>53900000.00</budget_forecast><latest_budget_changes>-300000.00</latest_budget_changes><total_budget_changes>67909196.80</total_budget_changes><forecast_completion>2019-03-12T00:00:00</forecast_completion><latest_schedule_changes>366</latest_schedule_changes><total_schedule_changes>3238</total_schedule_changes></row><row _id="row-y7e7-gihb-qeqp" _uuid="00000000-0000-0000-9586-8B93F16A10BC" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-y7e7-gihb-qeqp"><date_reported_as_of>2016-01-01T00:00:00</date_reported_as_of><pid>364</pid><project_name>Hannah Street Pumping Station Construction</project_name><description>This project will reconstruct the Hannah St. Pumping Station, the largest City-owned wastewater collection and pumping station on Staten Island.  Built in 1977, the facility has numerous deficiencies, needing  a comprehensive upgrade.</description><category>Wastewater Treatment</category><borough>Staten Island</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2012-10-01T00:00:00</design_start><budget_forecast>53900000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>67909196.80</total_budget_changes><forecast_completion>2019-05-25T00:00:00</forecast_completion><latest_schedule_changes>74</latest_schedule_changes><total_schedule_changes>3238</total_schedule_changes></row><row _id="row-hc7r~u2si_9dgf" _uuid="00000000-0000-0000-BF79-2C8EDB081731" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-hc7r~u2si_9dgf"><date_reported_as_of>2016-06-01T00:00:00</date_reported_as_of><pid>364</pid><project_name>Hannah Street Pumping Station Construction</project_name><description>This project will reconstruct the Hannah St. Pumping Station, the largest City-owned wastewater collection and pumping station on Staten Island.  Built in 1977, the facility has numerous deficiencies, needing  a comprehensive upgrade.</description><category>Wastewater Treatment</category><borough>Staten Island</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2012-10-01T00:00:00</design_start><budget_forecast>54900000.00</budget_forecast><latest_budget_changes>1000000.00</latest_budget_changes><total_budget_changes>67909196.80</total_budget_changes><forecast_completion>2019-08-12T00:00:00</forecast_completion><latest_schedule_changes>79</latest_schedule_changes><total_schedule_changes>3238</total_schedule_changes></row><row _id="row-pjqy.jnxg_kri9" _uuid="00000000-0000-0000-BDA8-9926532B8C07" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-pjqy.jnxg_kri9"><date_reported_as_of>2016-11-01T00:00:00</date_reported_as_of><pid>364</pid><project_name>Hannah Street Pumping Station Construction</project_name><description>This project will reconstruct the Hannah St. Pumping Station, the largest City-owned wastewater collection and pumping station on Staten Island.  Built in 1977, the facility has numerous deficiencies, needing  a comprehensive upgrade.</description><category>Wastewater Treatment</category><borough>Staten Island</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2012-10-01T00:00:00</design_start><budget_forecast>54900000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>67909196.80</total_budget_changes><forecast_completion>2019-12-11T00:00:00</forecast_completion><latest_schedule_changes>121</latest_schedule_changes><total_schedule_changes>3238</total_schedule_changes></row><row _id="row-9rks_4cw2~mpcx" _uuid="00000000-0000-0000-8831-0DEEC9DCE31B" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-9rks_4cw2~mpcx"><date_reported_as_of>2017-04-01T00:00:00</date_reported_as_of><pid>364</pid><project_name>Hannah Street Pumping Station Construction</project_name><description>This project will reconstruct the Hannah St. Pumping Station, the largest City-owned wastewater collection and pumping station on Staten Island.  Built in 1977, the facility has numerous deficiencies, needing  a comprehensive upgrade.</description><category>Wastewater Treatment</category><borough>Staten Island</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2012-10-01T00:00:00</design_start><budget_forecast>55000000.00</budget_forecast><latest_budget_changes>100000.00</latest_budget_changes><total_budget_changes>67909196.80</total_budget_changes><forecast_completion>2020-06-10T00:00:00</forecast_completion><latest_schedule_changes>182</latest_schedule_changes><total_schedule_changes>3238</total_schedule_changes></row><row _id="row-5kbd_bcad.vyr2" _uuid="00000000-0000-0000-ABD5-E8A62BCC5644" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-5kbd_bcad.vyr2"><date_reported_as_of>2017-09-01T00:00:00</date_reported_as_of><pid>364</pid><project_name>Hannah Street Pumping Station Construction</project_name><description>This project will reconstruct the Hannah St. Pumping Station, the largest City-owned wastewater collection and pumping station on Staten Island.  Built in 1977, the facility has numerous deficiencies, needing  a comprehensive upgrade.</description><category>Wastewater Treatment</category><borough>Staten Island</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2012-10-01T00:00:00</design_start><budget_forecast>65920000.00</budget_forecast><latest_budget_changes>10920000.00</latest_budget_changes><total_budget_changes>67909196.80</total_budget_changes><forecast_completion>2020-07-08T00:00:00</forecast_completion><latest_schedule_changes>28</latest_schedule_changes><total_schedule_changes>3238</total_schedule_changes></row><row _id="row-zfuj-dkz7~kq4n" _uuid="00000000-0000-0000-955F-26A93F04AC09" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-zfuj-dkz7~kq4n"><date_reported_as_of>2018-03-01T00:00:00</date_reported_as_of><pid>364</pid><project_name>Hannah Street Pumping Station Construction</project_name><description>This project will reconstruct the Hannah St. Pumping Station, the largest City-owned wastewater collection and pumping station on Staten Island.  Built in 1977, the facility has numerous deficiencies, needing  a comprehensive upgrade.</description><category>Wastewater Treatment</category><borough>Staten Island</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2012-10-01T00:00:00</design_start><budget_forecast>67253660.00</budget_forecast><latest_budget_changes>1333660.00</latest_budget_changes><total_budget_changes>67909196.80</total_budget_changes><forecast_completion>2020-11-01T00:00:00</forecast_completion><latest_schedule_changes>116</latest_schedule_changes><total_schedule_changes>3238</total_schedule_changes></row><row _id="row-kisv-xzh3.db2e" _uuid="00000000-0000-0000-82C9-90A5F6831BB1" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-kisv-xzh3.db2e"><date_reported_as_of>2018-08-01T00:00:00</date_reported_as_of><pid>364</pid><project_name>Hannah Street Pumping Station Construction</project_name><description>This project will reconstruct the Hannah St. Pumping Station, the largest City-owned wastewater collection and pumping station on Staten Island.  Built in 1977, the facility has numerous deficiencies, needing  a comprehensive upgrade.</description><category>Wastewater Treatment</category><borough>Staten Island</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2012-10-01T00:00:00</design_start><budget_forecast>67560558.00</budget_forecast><latest_budget_changes>306898.00</latest_budget_changes><total_budget_changes>67909196.80</total_budget_changes><forecast_completion>2021-07-13T00:00:00</forecast_completion><latest_schedule_changes>254</latest_schedule_changes><total_schedule_changes>3238</total_schedule_changes></row><row _id="row-gech_nd2c-4g2v" _uuid="00000000-0000-0000-ED1E-9B2AFE939589" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-gech_nd2c-4g2v"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1200</pid><project_name>GI-OWLS HEAD TRIBUTARY DRAINAGE AREAS, BROOKLYN</project_name><description>GREEN INFRASTRUCTURE IN OWLS HEAD TRIBUTARY DRAINAGE AREAS, BROOKLYN</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Design</current_phase><design_start>2019-01-02T00:00:00</design_start><budget_forecast>60387000.00</budget_forecast><latest_budget_changes>300000.00</latest_budget_changes><total_budget_changes>24278000.00</total_budget_changes><forecast_completion>2027-07-02T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>396</total_schedule_changes></row><row _id="row-wisp.r6s3-vcsd" _uuid="00000000-0000-0000-CEBB-DEDB6AF270EE" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-wisp.r6s3-vcsd"><date_reported_as_of>2019-01-01T00:00:00</date_reported_as_of><pid>364</pid><project_name>Hannah Street Pumping Station Construction</project_name><description>This project will reconstruct the Hannah St. Pumping Station, the largest City-owned wastewater collection and pumping station on Staten Island.  Built in 1977, the facility has numerous deficiencies, needing  a comprehensive upgrade.</description><category>Wastewater Treatment</category><borough>Staten Island</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2012-10-01T00:00:00</design_start><budget_forecast>69767304.23</budget_forecast><latest_budget_changes>2206746.23</latest_budget_changes><total_budget_changes>67909196.80</total_budget_changes><forecast_completion>2021-12-08T00:00:00</forecast_completion><latest_schedule_changes>148</latest_schedule_changes><total_schedule_changes>3238</total_schedule_changes></row><row _id="row-xuzi-i8c2_6jam" _uuid="00000000-0000-0000-0356-7EDFCFFCB412" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-xuzi-i8c2_6jam"><date_reported_as_of>2019-05-01T00:00:00</date_reported_as_of><pid>364</pid><project_name>Hannah Street Pumping Station Construction</project_name><description>This project will reconstruct the Hannah St. Pumping Station, the largest City-owned wastewater collection and pumping station on Staten Island.  Built in 1977, the facility has numerous deficiencies, needing  a comprehensive upgrade.</description><category>Wastewater Treatment</category><borough>Staten Island</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2012-10-01T00:00:00</design_start><budget_forecast>69767304.23</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>67909196.80</total_budget_changes><forecast_completion>2022-03-16T00:00:00</forecast_completion><latest_schedule_changes>98</latest_schedule_changes><total_schedule_changes>3238</total_schedule_changes></row><row _id="row-jpnk~tkm2~g8i5" _uuid="00000000-0000-0000-F0D4-9CB267ED06ED" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-jpnk~tkm2~g8i5"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>364</pid><project_name>Hannah Street Pumping Station Construction</project_name><description>This project will reconstruct the Hannah St. Pumping Station, the largest City-owned wastewater collection and pumping station on Staten Island.  Built in 1977, the facility has numerous deficiencies, needing  a comprehensive upgrade.</description><category>Wastewater Treatment</category><borough>Staten Island</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2012-10-01T00:00:00</design_start><budget_forecast>68767304.23</budget_forecast><latest_budget_changes>-1000000.00</latest_budget_changes><total_budget_changes>67909196.80</total_budget_changes><forecast_completion>2022-11-20T00:00:00</forecast_completion><latest_schedule_changes>249</latest_schedule_changes><total_schedule_changes>3238</total_schedule_changes></row><row _id="row-bywx-jajc~afu5" _uuid="00000000-0000-0000-C86E-8A6E7D96A024" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-bywx-jajc~afu5"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>364</pid><project_name>Hannah Street Pumping Station Construction</project_name><description>This project will reconstruct the Hannah St. Pumping Station, the largest City-owned wastewater collection and pumping station on Staten Island.  Built in 1977, the facility has numerous deficiencies, needing  a comprehensive upgrade.</description><category>Wastewater Treatment</category><borough>Staten Island</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2012-10-01T00:00:00</design_start><budget_forecast>67867304.23</budget_forecast><latest_budget_changes>-900000.00</latest_budget_changes><total_budget_changes>67909196.80</total_budget_changes><forecast_completion>2023-03-12T00:00:00</forecast_completion><latest_schedule_changes>112</latest_schedule_changes><total_schedule_changes>3238</total_schedule_changes></row><row _id="row-6kfh-98bk~5qsz" _uuid="00000000-0000-0000-FD06-560A5ACFE848" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-6kfh-98bk~5qsz"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>364</pid><project_name>Hannah Street Pumping Station Construction</project_name><description>This project will reconstruct the Hannah St. Pumping Station, the largest City-owned wastewater collection and pumping station on Staten Island.  Built in 1977, the facility has numerous deficiencies, needing  a comprehensive upgrade.</description><category>Wastewater Treatment</category><borough>Staten Island</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction Procurement</current_phase><design_start>2012-10-01T00:00:00</design_start><budget_forecast>67867304.23</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>67909196.80</total_budget_changes><forecast_completion>2022-11-09T00:00:00</forecast_completion><latest_schedule_changes>-123</latest_schedule_changes><total_schedule_changes>3238</total_schedule_changes></row><row _id="row-z8xt~s8yh.5adn" _uuid="00000000-0000-0000-9CE0-F6ADE276530F" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-z8xt~s8yh.5adn"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>364</pid><project_name>Hannah Street Pumping Station Construction</project_name><description>This project will reconstruct the Hannah St. Pumping Station, the largest City-owned wastewater collection and pumping station on Staten Island.  Built in 1977, the facility has numerous deficiencies, needing  a comprehensive upgrade.</description><category>Wastewater Treatment</category><borough>Staten Island</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction Procurement</current_phase><design_start>2012-10-01T00:00:00</design_start><budget_forecast>103976956.23</budget_forecast><latest_budget_changes>36109652.00</latest_budget_changes><total_budget_changes>67909196.80</total_budget_changes><forecast_completion>2023-05-08T00:00:00</forecast_completion><latest_schedule_changes>180</latest_schedule_changes><total_schedule_changes>3238</total_schedule_changes></row><row _id="row-hnsa-tpcy-i6nn" _uuid="00000000-0000-0000-28CB-4352CE3DD939" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-hnsa-tpcy-i6nn"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>364</pid><project_name>Hannah Street Pumping Station Construction</project_name><description>This project will reconstruct the Hannah St. Pumping Station, the largest City-owned wastewater collection and pumping station on Staten Island.  Built in 1977, the facility has numerous deficiencies, needing  a comprehensive upgrade.</description><category>Wastewater Treatment</category><borough>Staten Island</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2012-10-01T00:00:00</design_start><budget_forecast>102992162.23</budget_forecast><latest_budget_changes>-984794.00</latest_budget_changes><total_budget_changes>67909196.80</total_budget_changes><forecast_completion>2024-06-05T00:00:00</forecast_completion><latest_schedule_changes>394</latest_schedule_changes><total_schedule_changes>3238</total_schedule_changes></row><row _id="row-ukri~nip2.x9si" _uuid="00000000-0000-0000-5CBE-583A3B8236CB" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ukri~nip2.x9si"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>364</pid><project_name>Hannah Street Pumping Station Construction</project_name><description>This project will reconstruct the Hannah St. Pumping Station, the largest City-owned wastewater collection and pumping station on Staten Island.  Built in 1977, the facility has numerous deficiencies, needing  a comprehensive upgrade.</description><category>Wastewater Treatment</category><borough>Staten Island</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2012-10-01T00:00:00</design_start><budget_forecast>102992162.23</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>67909196.80</total_budget_changes><forecast_completion>2024-06-05T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>3238</total_schedule_changes></row><row _id="row-z85y.v255-fbri" _uuid="00000000-0000-0000-AA4F-80C681FAE7C0" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-z85y.v255-fbri"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>364</pid><project_name>Hannah Street Pumping Station Construction</project_name><description>This project will reconstruct the Hannah St. Pumping Station, the largest City-owned wastewater collection and pumping station on Staten Island.  Built in 1977, the facility has numerous deficiencies, needing  a comprehensive upgrade.</description><category>Wastewater Treatment</category><borough>Staten Island</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2012-10-01T00:00:00</design_start><budget_forecast>102992162.23</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>67909196.80</total_budget_changes><forecast_completion>2024-06-05T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>3238</total_schedule_changes></row><row _id="row-8zwb_8b56.9536" _uuid="00000000-0000-0000-C715-F709731B8B2E" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-8zwb_8b56.9536"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>364</pid><project_name>Hannah Street Pumping Station Construction</project_name><description>This project will reconstruct the Hannah St. Pumping Station, the largest City-owned wastewater collection and pumping station on Staten Island.  Built in 1977, the facility has numerous deficiencies, needing  a comprehensive upgrade.</description><category>Wastewater Treatment</category><borough>Staten Island</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2012-08-03T00:00:00</design_start><budget_forecast>102992162.23</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>67909196.80</total_budget_changes><forecast_completion>2025-08-22T00:00:00</forecast_completion><latest_schedule_changes>443</latest_schedule_changes><total_schedule_changes>3238</total_schedule_changes></row><row _id="row-m95x~5hth~q7sm" _uuid="00000000-0000-0000-21D4-ED686E29E982" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-m95x~5hth~q7sm"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>364</pid><project_name>Hannah Street Pumping Station Construction</project_name><description>This project will reconstruct the Hannah St. Pumping Station, the largest City-owned wastewater collection and pumping station on Staten Island.  Built in 1977, the facility has numerous deficiencies, needing  a comprehensive upgrade.</description><category>Wastewater Treatment</category><borough>Staten Island</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2012-08-03T00:00:00</design_start><budget_forecast>102992162.23</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>67909196.80</total_budget_changes><forecast_completion>2025-12-31T00:00:00</forecast_completion><latest_schedule_changes>131</latest_schedule_changes><total_schedule_changes>3238</total_schedule_changes></row><row _id="row-byhr_kd47_afqx" _uuid="00000000-0000-0000-A45D-13CDE70A6E3E" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-byhr_kd47_afqx"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>364</pid><project_name>Hannah Street Pumping Station Construction</project_name><description>This project will reconstruct the Hannah St. Pumping Station, the largest City-owned wastewater collection and pumping station on Staten Island.  Built in 1977, the facility has numerous deficiencies, needing  a comprehensive upgrade.</description><category>Wastewater Treatment</category><borough>Staten Island</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2012-08-03T00:00:00</design_start><budget_forecast>109709196.80</budget_forecast><latest_budget_changes>6717034.57</latest_budget_changes><total_budget_changes>67909196.80</total_budget_changes><forecast_completion>2026-06-23T00:00:00</forecast_completion><latest_schedule_changes>174</latest_schedule_changes><total_schedule_changes>3238</total_schedule_changes></row><row _id="row-6c8n-yexy~9skp" _uuid="00000000-0000-0000-D545-7BEDB9776BB1" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-6c8n-yexy~9skp"><date_reported_as_of>2015-02-01T00:00:00</date_reported_as_of><pid>370</pid><project_name>Flatbush Avenue Trunk Watermain Replacement</project_name><description>Replacement of trunk water main on Flatbush Avenue between Sterling place and 8th Avenue in addition to the distribution water main in 6th Avenue between Union Street and Park Place, and sections of adjoining streets.</description><category>Wastewater Treatment</category><borough>Brooklyn</borough><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Design</current_phase><design_start>2014-12-02T00:00:00</design_start><budget_forecast>25804000.00</budget_forecast><latest_budget_changes>5952000.00</latest_budget_changes><total_budget_changes>39272000.00</total_budget_changes><forecast_completion>2018-10-08T00:00:00</forecast_completion><latest_schedule_changes>449</latest_schedule_changes><total_schedule_changes>2266</total_schedule_changes></row><row _id="row-nkfg.mcbh-m8sk" _uuid="00000000-0000-0000-19E0-EA460E2ADA13" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-nkfg.mcbh-m8sk"><date_reported_as_of>2015-08-01T00:00:00</date_reported_as_of><pid>370</pid><project_name>Flatbush Avenue Trunk Watermain Replacement</project_name><description>Replacement of trunk water main on Flatbush Avenue between Sterling place and 8th Avenue in addition to the distribution water main in 6th Avenue between Union Street and Park Place, and sections of adjoining streets.</description><category>Wastewater Treatment</category><borough>Brooklyn</borough><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Design</current_phase><design_start>2014-12-02T00:00:00</design_start><budget_forecast>27688000.00</budget_forecast><latest_budget_changes>1884000.00</latest_budget_changes><total_budget_changes>39272000.00</total_budget_changes><forecast_completion>2018-11-29T00:00:00</forecast_completion><latest_schedule_changes>52</latest_schedule_changes><total_schedule_changes>2266</total_schedule_changes></row><row _id="row-3uut~6qje.9cii" _uuid="00000000-0000-0000-0FDF-37370D0610C6" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-3uut~6qje.9cii"><date_reported_as_of>2016-01-01T00:00:00</date_reported_as_of><pid>370</pid><project_name>Flatbush Avenue Trunk Watermain Replacement</project_name><description>Replacement of trunk water main on Flatbush Avenue between Sterling place and 8th Avenue in addition to the distribution water main in 6th Avenue between Union Street and Park Place, and sections of adjoining streets.</description><category>Wastewater Treatment</category><borough>Brooklyn</borough><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Design</current_phase><design_start>2014-12-02T00:00:00</design_start><budget_forecast>27688000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>39272000.00</total_budget_changes><forecast_completion>2019-06-01T00:00:00</forecast_completion><latest_schedule_changes>184</latest_schedule_changes><total_schedule_changes>2266</total_schedule_changes></row><row _id="row-ddh8-7i8z_bz5c" _uuid="00000000-0000-0000-92FE-8AE6B7E53575" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ddh8-7i8z_bz5c"><date_reported_as_of>2016-06-01T00:00:00</date_reported_as_of><pid>370</pid><project_name>Flatbush Avenue Trunk Watermain Replacement</project_name><description>Replacement of trunk water main on Flatbush Avenue between Sterling place and 8th Avenue in addition to the distribution water main in 6th Avenue between Union Street and Park Place, and sections of adjoining streets.</description><category>Wastewater Treatment</category><borough>Brooklyn</borough><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Design</current_phase><design_start>2014-12-02T00:00:00</design_start><budget_forecast>27738000.00</budget_forecast><latest_budget_changes>50000.00</latest_budget_changes><total_budget_changes>39272000.00</total_budget_changes><forecast_completion>2019-06-01T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>2266</total_schedule_changes></row><row _id="row-ppt7.cdbu_zz2s" _uuid="00000000-0000-0000-2C86-A6977FC54B33" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ppt7.cdbu_zz2s"><date_reported_as_of>2016-11-01T00:00:00</date_reported_as_of><pid>370</pid><project_name>Flatbush Avenue Trunk Watermain Replacement</project_name><description>Replacement of trunk water main on Flatbush Avenue between Sterling place and 8th Avenue in addition to the distribution water main in 6th Avenue between Union Street and Park Place, and sections of adjoining streets.</description><category>Wastewater Treatment</category><borough>Brooklyn</borough><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Design</current_phase><design_start>2014-12-02T00:00:00</design_start><budget_forecast>28144000.00</budget_forecast><latest_budget_changes>406000.00</latest_budget_changes><total_budget_changes>39272000.00</total_budget_changes><forecast_completion>2019-07-01T00:00:00</forecast_completion><latest_schedule_changes>30</latest_schedule_changes><total_schedule_changes>2266</total_schedule_changes></row><row _id="row-2zgf~tn34.8cnf" _uuid="00000000-0000-0000-A7B4-EEE4298D83A9" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-2zgf~tn34.8cnf"><date_reported_as_of>2017-04-01T00:00:00</date_reported_as_of><pid>370</pid><project_name>Flatbush Avenue Trunk Watermain Replacement</project_name><description>Replacement of trunk water main on Flatbush Avenue between Sterling place and 8th Avenue in addition to the distribution water main in 6th Avenue between Union Street and Park Place, and sections of adjoining streets.</description><category>Wastewater Treatment</category><borough>Brooklyn</borough><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction Procurement</current_phase><design_start>2014-12-02T00:00:00</design_start><budget_forecast>51380000.00</budget_forecast><latest_budget_changes>23236000.00</latest_budget_changes><total_budget_changes>39272000.00</total_budget_changes><forecast_completion>2019-07-01T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>2266</total_schedule_changes></row><row _id="row-aaxe_v75e.jryk" _uuid="00000000-0000-0000-15DF-7F56CBC8E087" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-aaxe_v75e.jryk"><date_reported_as_of>2017-09-01T00:00:00</date_reported_as_of><pid>370</pid><project_name>Flatbush Avenue Trunk Watermain Replacement</project_name><description>Replacement of trunk water main on Flatbush Avenue between Sterling place and 8th Avenue in addition to the distribution water main in 6th Avenue between Union Street and Park Place, and sections of adjoining streets.</description><category>Wastewater Treatment</category><borough>Brooklyn</borough><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction</current_phase><design_start>2014-12-02T00:00:00</design_start><budget_forecast>49463000.00</budget_forecast><latest_budget_changes>-1917000.00</latest_budget_changes><total_budget_changes>39272000.00</total_budget_changes><forecast_completion>2021-04-20T00:00:00</forecast_completion><latest_schedule_changes>659</latest_schedule_changes><total_schedule_changes>2266</total_schedule_changes></row><row _id="row-uyxj~9eum~qe7s" _uuid="00000000-0000-0000-3157-58CDE054D922" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-uyxj~9eum~qe7s"><date_reported_as_of>2018-03-01T00:00:00</date_reported_as_of><pid>370</pid><project_name>Flatbush Avenue Trunk Watermain Replacement</project_name><description>Replacement of trunk water main on Flatbush Avenue between Sterling place and 8th Avenue in addition to the distribution water main in 6th Avenue between Union Street and Park Place, and sections of adjoining streets.</description><category>Wastewater Treatment</category><borough>Brooklyn</borough><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction</current_phase><design_start>2014-12-02T00:00:00</design_start><budget_forecast>49463000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>39272000.00</total_budget_changes><forecast_completion>2021-07-12T00:00:00</forecast_completion><latest_schedule_changes>83</latest_schedule_changes><total_schedule_changes>2266</total_schedule_changes></row><row _id="row-wkqr.tfdh-mvsj" _uuid="00000000-0000-0000-D0C1-2666102BAFD7" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-wkqr.tfdh-mvsj"><date_reported_as_of>2018-08-01T00:00:00</date_reported_as_of><pid>370</pid><project_name>Flatbush Avenue Trunk Watermain Replacement</project_name><description>Replacement of trunk water main on Flatbush Avenue between Sterling place and 8th Avenue in addition to the distribution water main in 6th Avenue between Union Street and Park Place, and sections of adjoining streets.</description><category>Wastewater Treatment</category><borough>Brooklyn</borough><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction</current_phase><design_start>2014-12-02T00:00:00</design_start><budget_forecast>49521000.00</budget_forecast><latest_budget_changes>58000.00</latest_budget_changes><total_budget_changes>39272000.00</total_budget_changes><forecast_completion>2021-07-12T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>2266</total_schedule_changes></row><row _id="row-h2rx-xuse_g3kh" _uuid="00000000-0000-0000-C251-3857D3863324" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-h2rx-xuse_g3kh"><date_reported_as_of>2019-01-01T00:00:00</date_reported_as_of><pid>370</pid><project_name>Flatbush Avenue Trunk Watermain Replacement</project_name><description>Replacement of trunk water main on Flatbush Avenue between Sterling place and 8th Avenue in addition to the distribution water main in 6th Avenue between Union Street and Park Place, and sections of adjoining streets.</description><category>Wastewater Treatment</category><borough>Brooklyn</borough><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction</current_phase><design_start>2014-12-02T00:00:00</design_start><budget_forecast>49486000.00</budget_forecast><latest_budget_changes>-35000.00</latest_budget_changes><total_budget_changes>39272000.00</total_budget_changes><forecast_completion>2021-07-12T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>2266</total_schedule_changes></row><row _id="row-g8qq~fmx5_himx" _uuid="00000000-0000-0000-EA9D-439DF6C83C50" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-g8qq~fmx5_himx"><date_reported_as_of>2019-05-01T00:00:00</date_reported_as_of><pid>370</pid><project_name>Flatbush Avenue Trunk Watermain Replacement</project_name><description>72"" Trunk Water Main and Combined Sewer Replacement in Flatbush Ave. between Sterling Pl. and 8th Ave., etc., Borough of Brooklyn.    WM-6 in:</description><category>Wastewater Treatment</category><borough>Brooklyn</borough><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction</current_phase><design_start>2014-11-24T00:00:00</design_start><budget_forecast>49736000.00</budget_forecast><latest_budget_changes>250000.00</latest_budget_changes><total_budget_changes>39272000.00</total_budget_changes><forecast_completion>2021-07-12T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>2266</total_schedule_changes></row><row _id="row-pkde-4rv8-nib3" _uuid="00000000-0000-0000-344C-761622577E00" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-pkde-4rv8-nib3"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>370</pid><project_name>Flatbush Avenue Trunk Watermain Replacement</project_name><description>72" Trunk Water Main and Combined Sewer Replacement in Flatbush Ave. between Sterling Pl. and 8th Ave., etc., Borough of Brooklyn.    WM-6 in:</description><category>Wastewater Treatment</category><borough>Brooklyn</borough><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction</current_phase><design_start>2014-11-24T00:00:00</design_start><budget_forecast>51094000.00</budget_forecast><latest_budget_changes>1358000.00</latest_budget_changes><total_budget_changes>39272000.00</total_budget_changes><forecast_completion>2021-07-12T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>2266</total_schedule_changes></row><row _id="row-utkf_egui-t8m4" _uuid="00000000-0000-0000-B63A-705BF5476E01" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-utkf_egui-t8m4"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>370</pid><project_name>Flatbush Avenue Trunk Watermain Replacement</project_name><category>Wastewater Treatment</category><borough>Brooklyn</borough><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><total_budget_changes>39272000.00</total_budget_changes><total_schedule_changes>2266</total_schedule_changes></row><row _id="row-zefn.q7f4.r68m" _uuid="00000000-0000-0000-9F30-89DA6C01BA73" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-zefn.q7f4.r68m"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>370</pid><project_name>Flatbush Avenue Trunk Watermain Replacement</project_name><category>Wastewater Treatment</category><borough>Brooklyn</borough><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><total_budget_changes>39272000.00</total_budget_changes><total_schedule_changes>2266</total_schedule_changes></row><row _id="row-pzh6~asrq.adya" _uuid="00000000-0000-0000-7B4F-A4CF16995D66" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-pzh6~asrq.adya"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>370</pid><project_name>Flatbush Avenue Trunk Watermain Replacement</project_name><category>Wastewater Treatment</category><borough>Brooklyn</borough><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><total_budget_changes>39272000.00</total_budget_changes><total_schedule_changes>2266</total_schedule_changes></row><row _id="row-dpv9.tntu.zrgr" _uuid="00000000-0000-0000-0B58-A7F6B8C832BD" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-dpv9.tntu.zrgr"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>370</pid><project_name>Flatbush Avenue Trunk Watermain Replacement</project_name><category>Wastewater Treatment</category><borough>Brooklyn</borough><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><total_budget_changes>39272000.00</total_budget_changes><total_schedule_changes>2266</total_schedule_changes></row><row _id="row-ifzy.whb2-799j" _uuid="00000000-0000-0000-F42F-FC41B34D284F" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ifzy.whb2-799j"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>370</pid><project_name>Flatbush Avenue Trunk Watermain Replacement</project_name><description>72" Trunk Water Main and Combined Sewer Replacement in Flatbush Ave. between Sterling Pl. and 8th Ave., etc., Borough of Brooklyn.</description><category>Wastewater Treatment</category><borough>Brooklyn</borough><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction</current_phase><design_start>2014-11-24T00:00:00</design_start><budget_forecast>56555000.00</budget_forecast><latest_budget_changes>5461000.00</latest_budget_changes><total_budget_changes>39272000.00</total_budget_changes><forecast_completion>2023-09-29T00:00:00</forecast_completion><latest_schedule_changes>809</latest_schedule_changes><total_schedule_changes>2266</total_schedule_changes></row><row _id="row-q48j~544a.qfxm" _uuid="00000000-0000-0000-A0CC-0A22F25B52CF" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-q48j~544a.qfxm"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>370</pid><project_name>Flatbush Avenue Trunk Watermain Replacement</project_name><description>72" Trunk Water Main and Combined Sewer Replacement in Flatbush Ave. between Sterling Pl. and 8th Ave., etc., Borough of Brooklyn.</description><category>Wastewater Treatment</category><borough>Brooklyn</borough><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction</current_phase><design_start>2014-11-24T00:00:00</design_start><budget_forecast>56360000.00</budget_forecast><latest_budget_changes>-195000.00</latest_budget_changes><total_budget_changes>39272000.00</total_budget_changes><forecast_completion>2023-09-29T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>2266</total_schedule_changes></row><row _id="row-nrav.qpgf-fcsg" _uuid="00000000-0000-0000-0166-656BC762E754" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-nrav.qpgf-fcsg"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>370</pid><project_name>Flatbush Avenue Trunk Watermain Replacement</project_name><description>72" Trunk Water Main and Combined Sewer Replacement in Flatbush Ave. between Sterling Pl. and 8th Ave., etc., Borough of Brooklyn.</description><category>Wastewater Treatment</category><borough>Brooklyn</borough><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction</current_phase><design_start>2014-11-24T00:00:00</design_start><budget_forecast>57915000.00</budget_forecast><latest_budget_changes>1555000.00</latest_budget_changes><total_budget_changes>39272000.00</total_budget_changes><forecast_completion>2023-09-29T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>2266</total_schedule_changes></row><row _id="row-fiuy-9hz9_77wq" _uuid="00000000-0000-0000-D035-F71187DE999A" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-fiuy-9hz9_77wq"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>370</pid><project_name>Flatbush Avenue Trunk Watermain Replacement</project_name><description>72" Trunk Water Main and Combined Sewer Replacement in Flatbush Ave. between Sterling Pl. and 8th Ave., etc., Borough of Brooklyn.</description><category>Wastewater Treatment</category><borough>Brooklyn</borough><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction</current_phase><design_start>2014-11-24T00:00:00</design_start><budget_forecast>58924000.00</budget_forecast><latest_budget_changes>1009000.00</latest_budget_changes><total_budget_changes>39272000.00</total_budget_changes><forecast_completion>2023-09-29T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>2266</total_schedule_changes></row><row _id="row-fchw_chrw.e4xi" _uuid="00000000-0000-0000-33FA-B460EEDFA01E" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-fchw_chrw.e4xi"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>370</pid><project_name>Flatbush Avenue Trunk Watermain Replacement</project_name><description>72" Trunk Water Main and Combined Sewer Replacement in Flatbush Ave. between Sterling Pl. and 8th Ave., etc., Borough of Brooklyn.</description><category>Wastewater Treatment</category><borough>Brooklyn</borough><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction</current_phase><design_start>2014-11-24T00:00:00</design_start><budget_forecast>59124000.00</budget_forecast><latest_budget_changes>200000.00</latest_budget_changes><total_budget_changes>39272000.00</total_budget_changes><forecast_completion>2023-09-29T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>2266</total_schedule_changes></row><row _id="row-4fqt~zqak-ztbm" _uuid="00000000-0000-0000-7EA0-404D4598A39D" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-4fqt~zqak-ztbm"><date_reported_as_of>2013-09-01T00:00:00</date_reported_as_of><pid>388</pid><project_name>2nd Avenue Watermain Trunk Construction</project_name><description>Installation of trunk and distribution water mains for the 3rd water tunnel shaft 32B at 2nd Avenue.</description><category>Water Supply</category><borough>Manhattan</borough><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Design</current_phase><design_start>2013-09-30T00:00:00</design_start><budget_forecast>60208000.00</budget_forecast><total_budget_changes>-7266000.00</total_budget_changes><forecast_completion>2017-10-13T00:00:00</forecast_completion><total_schedule_changes>2113</total_schedule_changes></row><row _id="row-rqe2~tkvr-evbd" _uuid="00000000-0000-0000-E7E6-AEC7643A951E" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-rqe2~tkvr-evbd"><date_reported_as_of>2014-01-01T00:00:00</date_reported_as_of><pid>388</pid><project_name>2nd Avenue Watermain Trunk Construction</project_name><description>Installation of trunk and distribution water mains for the 3rd water tunnel shaft 32B at 2nd Avenue.</description><category>Water Supply</category><borough>Manhattan</borough><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Design</current_phase><design_start>2013-09-30T00:00:00</design_start><budget_forecast>60208000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-7266000.00</total_budget_changes><forecast_completion>2017-10-13T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>2113</total_schedule_changes></row><row _id="row-9gs4~4873_gmhz" _uuid="00000000-0000-0000-4D23-774C4C0B31BB" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-9gs4~4873_gmhz"><date_reported_as_of>2014-05-01T00:00:00</date_reported_as_of><pid>388</pid><project_name>2nd Avenue Watermain Trunk Construction</project_name><description>Installation of trunk and distribution water mains for the 3rd water tunnel shaft 32B at 2nd Avenue.</description><category>Water Supply</category><borough>Manhattan</borough><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Design</current_phase><design_start>2013-09-30T00:00:00</design_start><budget_forecast>60318000.00</budget_forecast><latest_budget_changes>110000.00</latest_budget_changes><total_budget_changes>-7266000.00</total_budget_changes><forecast_completion>2017-10-13T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>2113</total_schedule_changes></row><row _id="row-yp5a-d4ga~d9dd" _uuid="00000000-0000-0000-5F07-8004D00BE717" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-yp5a-d4ga~d9dd"><date_reported_as_of>2015-02-01T00:00:00</date_reported_as_of><pid>388</pid><project_name>2nd Avenue Watermain Trunk Construction</project_name><description>Installation of trunk and distribution water mains for the 3rd water tunnel shaft 32B at 2nd Avenue.</description><category>Water Supply</category><borough>Manhattan</borough><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Design</current_phase><design_start>2013-09-30T00:00:00</design_start><budget_forecast>59956000.00</budget_forecast><latest_budget_changes>-362000.00</latest_budget_changes><total_budget_changes>-7266000.00</total_budget_changes><forecast_completion>2018-06-15T00:00:00</forecast_completion><latest_schedule_changes>245</latest_schedule_changes><total_schedule_changes>2113</total_schedule_changes></row><row _id="row-5kxw_x2sj~q6ne" _uuid="00000000-0000-0000-D993-6B7DE6A8BC35" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-5kxw_x2sj~q6ne"><date_reported_as_of>2015-08-01T00:00:00</date_reported_as_of><pid>388</pid><project_name>2nd Avenue Watermain Trunk Construction</project_name><description>Installation of trunk and distribution water mains for the 3rd water tunnel shaft 32B at 2nd Avenue.</description><category>Water Supply</category><borough>Manhattan</borough><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Design</current_phase><design_start>2013-09-30T00:00:00</design_start><budget_forecast>60802000.00</budget_forecast><latest_budget_changes>846000.00</latest_budget_changes><total_budget_changes>-7266000.00</total_budget_changes><forecast_completion>2018-07-16T00:00:00</forecast_completion><latest_schedule_changes>31</latest_schedule_changes><total_schedule_changes>2113</total_schedule_changes></row><row _id="row-7cfx-7fut.5h32" _uuid="00000000-0000-0000-51D9-290ECBBD19F4" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-7cfx-7fut.5h32"><date_reported_as_of>2016-01-01T00:00:00</date_reported_as_of><pid>388</pid><project_name>2nd Avenue Watermain Trunk Construction</project_name><description>Installation of trunk and distribution water mains for the 3rd water tunnel shaft 32B at 2nd Avenue.</description><category>Water Supply</category><borough>Manhattan</borough><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction Procurement</current_phase><design_start>2013-09-30T00:00:00</design_start><budget_forecast>60802000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-7266000.00</total_budget_changes><forecast_completion>2018-06-15T00:00:00</forecast_completion><latest_schedule_changes>-31</latest_schedule_changes><total_schedule_changes>2113</total_schedule_changes></row><row _id="row-bw5a~qncz.gybx" _uuid="00000000-0000-0000-A2E3-6E9C04EEB05D" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-bw5a~qncz.gybx"><date_reported_as_of>2016-06-01T00:00:00</date_reported_as_of><pid>388</pid><project_name>2nd Avenue Watermain Trunk Construction</project_name><description>Installation of trunk and distribution water mains for the 3rd water tunnel shaft 32B at 2nd Avenue.</description><category>Water Supply</category><borough>Manhattan</borough><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction Procurement</current_phase><design_start>2013-09-30T00:00:00</design_start><budget_forecast>60663000.00</budget_forecast><latest_budget_changes>-139000.00</latest_budget_changes><total_budget_changes>-7266000.00</total_budget_changes><forecast_completion>2018-10-31T00:00:00</forecast_completion><latest_schedule_changes>138</latest_schedule_changes><total_schedule_changes>2113</total_schedule_changes></row><row _id="row-wuwh_4jcs.g7as" _uuid="00000000-0000-0000-399C-3FD04089CB74" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-wuwh_4jcs.g7as"><date_reported_as_of>2016-11-01T00:00:00</date_reported_as_of><pid>388</pid><project_name>2nd Avenue Watermain Trunk Construction</project_name><description>Installation of trunk and distribution water mains for the 3rd water tunnel shaft 32B at 2nd Avenue.</description><category>Water Supply</category><borough>Manhattan</borough><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction Procurement</current_phase><design_start>2013-09-30T00:00:00</design_start><budget_forecast>49477000.00</budget_forecast><latest_budget_changes>-11186000.00</latest_budget_changes><total_budget_changes>-7266000.00</total_budget_changes><forecast_completion>2019-03-15T00:00:00</forecast_completion><latest_schedule_changes>135</latest_schedule_changes><total_schedule_changes>2113</total_schedule_changes></row><row _id="row-k74z~ryia~6t66" _uuid="00000000-0000-0000-E979-75AA02983BA0" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-k74z~ryia~6t66"><date_reported_as_of>2017-04-01T00:00:00</date_reported_as_of><pid>388</pid><project_name>2nd Avenue Watermain Trunk Construction</project_name><description>Installation of trunk and distribution water mains for the 3rd water tunnel shaft 32B at 2nd Avenue.</description><category>Water Supply</category><borough>Manhattan</borough><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction</current_phase><design_start>2013-09-30T00:00:00</design_start><budget_forecast>49477000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-7266000.00</total_budget_changes><forecast_completion>2019-09-22T00:00:00</forecast_completion><latest_schedule_changes>191</latest_schedule_changes><total_schedule_changes>2113</total_schedule_changes></row><row _id="row-k4cp_6ytz.23gt" _uuid="00000000-0000-0000-FB92-9224A65409E8" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-k4cp_6ytz.23gt"><date_reported_as_of>2017-09-01T00:00:00</date_reported_as_of><pid>388</pid><project_name>2nd Avenue Watermain Trunk Construction</project_name><description>Installation of trunk and distribution water mains for the 3rd water tunnel shaft 32B at 2nd Avenue.</description><category>Water Supply</category><borough>Manhattan</borough><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction</current_phase><design_start>2013-09-30T00:00:00</design_start><budget_forecast>46482000.00</budget_forecast><latest_budget_changes>-2995000.00</latest_budget_changes><total_budget_changes>-7266000.00</total_budget_changes><forecast_completion>2019-09-22T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>2113</total_schedule_changes></row><row _id="row-iq7e_5jrg-xnhu" _uuid="00000000-0000-0000-303A-F78CFF88529E" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-iq7e_5jrg-xnhu"><date_reported_as_of>2018-03-01T00:00:00</date_reported_as_of><pid>388</pid><project_name>2nd Avenue Watermain Trunk Construction</project_name><description>Installation of trunk and distribution water mains for the 3rd water tunnel shaft 32B at 2nd Avenue.</description><category>Water Supply</category><borough>Manhattan</borough><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction Procurement</current_phase><design_start>2013-09-30T00:00:00</design_start><budget_forecast>46482000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-7266000.00</total_budget_changes><forecast_completion>2020-06-03T00:00:00</forecast_completion><latest_schedule_changes>255</latest_schedule_changes><total_schedule_changes>2113</total_schedule_changes></row><row _id="row-yj7k-q54b_j8m4" _uuid="00000000-0000-0000-80B7-7CFB725430C3" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-yj7k-q54b_j8m4"><date_reported_as_of>2018-08-01T00:00:00</date_reported_as_of><pid>388</pid><project_name>2nd Avenue Watermain Trunk Construction</project_name><description>Installation of trunk and distribution water mains for the 3rd water tunnel shaft 32B at 2nd Avenue.</description><category>Water Supply</category><borough>Manhattan</borough><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction</current_phase><design_start>2013-09-30T00:00:00</design_start><budget_forecast>45800000.00</budget_forecast><latest_budget_changes>-682000.00</latest_budget_changes><total_budget_changes>-7266000.00</total_budget_changes><forecast_completion>2021-06-02T00:00:00</forecast_completion><latest_schedule_changes>364</latest_schedule_changes><total_schedule_changes>2113</total_schedule_changes></row><row _id="row-zuwz_cbc5~v88e" _uuid="00000000-0000-0000-26D6-8AF2BF544E24" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-zuwz_cbc5~v88e"><date_reported_as_of>2019-01-01T00:00:00</date_reported_as_of><pid>388</pid><project_name>2nd Avenue Watermain Trunk Construction</project_name><description>Installation of trunk and distribution water mains for the 3rd water tunnel shaft 32B at 2nd Avenue.</description><category>Water Supply</category><borough>Manhattan</borough><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction</current_phase><design_start>2013-09-30T00:00:00</design_start><budget_forecast>45800000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-7266000.00</total_budget_changes><forecast_completion>2021-06-02T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>2113</total_schedule_changes></row><row _id="row-3pj3_6f25~un8e" _uuid="00000000-0000-0000-E0A4-9E3FA4ADF0BB" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-3pj3_6f25~un8e"><date_reported_as_of>2019-05-01T00:00:00</date_reported_as_of><pid>388</pid><project_name>2nd Avenue Watermain Trunk Construction</project_name><description>Trunk and Distribution Main Connection to shaft 32B in 2nd Ave., etc., together with all work incidental thereto, Borough of Manhattan.    2nd Avenue from East 33rd Street to East 37th Street</description><category>Water Supply</category><borough>Manhattan</borough><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction</current_phase><design_start>2013-09-30T00:00:00</design_start><budget_forecast>45800000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-7266000.00</total_budget_changes><forecast_completion>2021-06-02T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>2113</total_schedule_changes></row><row _id="row-kf92_chxm_kpqx" _uuid="00000000-0000-0000-FAD2-BFA04C91F785" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-kf92_chxm_kpqx"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>388</pid><project_name>2nd Avenue Watermain Trunk Construction</project_name><description>Trunk and Distribution Main Connection to shaft 32B in 2nd Ave., etc., together with all work incidental thereto, Borough of Manhattan.    2nd Avenue from East 33rd Street to East 37th Street</description><category>Water Supply</category><borough>Manhattan</borough><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction</current_phase><design_start>2013-09-30T00:00:00</design_start><budget_forecast>48794000.00</budget_forecast><latest_budget_changes>2994000.00</latest_budget_changes><total_budget_changes>-7266000.00</total_budget_changes><forecast_completion>2021-06-02T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>2113</total_schedule_changes></row><row _id="row-7624~p5ru-invz" _uuid="00000000-0000-0000-A65E-E6205A1BCDBA" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-7624~p5ru-invz"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>388</pid><project_name>2nd Avenue Watermain Trunk Construction</project_name><category>Water Supply</category><borough>Manhattan</borough><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><total_budget_changes>-7266000.00</total_budget_changes><total_schedule_changes>2113</total_schedule_changes></row><row _id="row-cswd.vkqc.inf2" _uuid="00000000-0000-0000-DDDD-639420436CAD" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-cswd.vkqc.inf2"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>388</pid><project_name>2nd Avenue Watermain Trunk Construction</project_name><category>Water Supply</category><borough>Manhattan</borough><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><total_budget_changes>-7266000.00</total_budget_changes><total_schedule_changes>2113</total_schedule_changes></row><row _id="row-9ym5.67ng-k89x" _uuid="00000000-0000-0000-D33B-85476C236DAA" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-9ym5.67ng-k89x"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>388</pid><project_name>2nd Avenue Watermain Trunk Construction</project_name><category>Water Supply</category><borough>Manhattan</borough><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><total_budget_changes>-7266000.00</total_budget_changes><total_schedule_changes>2113</total_schedule_changes></row><row _id="row-2e7a.ezdz-skbb" _uuid="00000000-0000-0000-4EC3-C11484C1A6AF" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-2e7a.ezdz-skbb"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>388</pid><project_name>2nd Avenue Watermain Trunk Construction</project_name><category>Water Supply</category><borough>Manhattan</borough><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><total_budget_changes>-7266000.00</total_budget_changes><total_schedule_changes>2113</total_schedule_changes></row><row _id="row-q32r-zghm-km3c" _uuid="00000000-0000-0000-7D8F-D40507CD53CA" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-q32r-zghm-km3c"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>388</pid><project_name>2nd Avenue Watermain Trunk Construction</project_name><description>Trunk and Distribution Main Connection to shaft 32B in 2nd Ave., etc., together with all work incidental thereto, Borough of Manhattan.    2nd Avenue from East 33rd Street to East 37th Street</description><category>Water Supply</category><borough>Manhattan</borough><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction</current_phase><design_start>2013-09-30T00:00:00</design_start><budget_forecast>52660000.00</budget_forecast><latest_budget_changes>3866000.00</latest_budget_changes><total_budget_changes>-7266000.00</total_budget_changes><forecast_completion>2023-07-27T00:00:00</forecast_completion><latest_schedule_changes>785</latest_schedule_changes><total_schedule_changes>2113</total_schedule_changes></row><row _id="row-crhr~ga5g_2h9q" _uuid="00000000-0000-0000-846C-F2489BDFB74A" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-crhr~ga5g_2h9q"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>388</pid><project_name>2nd Avenue Watermain Trunk Construction</project_name><description>Trunk and Distribution Main Connection to shaft 32B in 2nd Ave., etc., together with all work incidental thereto, Borough of Manhattan.    2nd Avenue from East 33rd Street to East 37th Street</description><category>Water Supply</category><borough>Manhattan</borough><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction</current_phase><design_start>2013-09-30T00:00:00</design_start><budget_forecast>52766000.00</budget_forecast><latest_budget_changes>106000.00</latest_budget_changes><total_budget_changes>-7266000.00</total_budget_changes><forecast_completion>2023-07-27T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>2113</total_schedule_changes></row><row _id="row-itzi_i779.8cuf" _uuid="00000000-0000-0000-124E-B0896C387C61" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-itzi_i779.8cuf"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>388</pid><project_name>2nd Avenue Watermain Trunk Construction</project_name><description>Trunk and Distribution Main Connection to shaft 32B in 2nd Ave., etc., together with all work incidental thereto, Borough of Manhattan.    2nd Avenue from East 33rd Street to East 37th Street</description><category>Water Supply</category><borough>Manhattan</borough><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction</current_phase><design_start>2013-09-30T00:00:00</design_start><budget_forecast>52913000.00</budget_forecast><latest_budget_changes>147000.00</latest_budget_changes><total_budget_changes>-7266000.00</total_budget_changes><forecast_completion>2023-07-27T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>2113</total_schedule_changes></row><row _id="row-k6p8-k9jt_dhh9" _uuid="00000000-0000-0000-3B87-D1E5429DB0B8" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-k6p8-k9jt_dhh9"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>388</pid><project_name>2nd Avenue Watermain Trunk Construction</project_name><description>Trunk and Distribution Main Connection to shaft 32B in 2nd Ave., etc., together with all work incidental thereto, Borough of Manhattan.    2nd Avenue from East 33rd Street to East 37th Street</description><category>Water Supply</category><borough>Manhattan</borough><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction</current_phase><design_start>2013-09-30T00:00:00</design_start><budget_forecast>52942000.00</budget_forecast><latest_budget_changes>29000.00</latest_budget_changes><total_budget_changes>-7266000.00</total_budget_changes><forecast_completion>2023-07-27T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>2113</total_schedule_changes></row><row _id="row-37yb_kvku.6tk8" _uuid="00000000-0000-0000-EF9B-9BF37AC0E21F" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-37yb_kvku.6tk8"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>388</pid><project_name>2nd Avenue Watermain Trunk Construction</project_name><description>Trunk and Distribution Main Connection to shaft 32B in 2nd Ave., etc., together with all work incidental thereto, Borough of Manhattan.    2nd Avenue from East 33rd Street to East 37th Street</description><category>Water Supply</category><borough>Manhattan</borough><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction</current_phase><design_start>2013-09-30T00:00:00</design_start><budget_forecast>52942000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-7266000.00</total_budget_changes><forecast_completion>2023-07-27T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>2113</total_schedule_changes></row><row _id="row-ggca~2c4p-bakr" _uuid="00000000-0000-0000-08BF-776CC6701493" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ggca~2c4p-bakr"><date_reported_as_of>2013-09-01T00:00:00</date_reported_as_of><pid>403</pid><project_name>Electronic Medical Records Upgrade</project_name><description>Integrated Clinical Information System (ICIS) Program: Electronic Medical Records (EMR) System</description><category>Health and Hospitals, IT</category><borough>Citywide</borough><managing_agency>HHC</managing_agency><client_agency>H+H</client_agency><current_phase>IT</current_phase><budget_forecast>748878284.00</budget_forecast><total_budget_changes>15184947.00</total_budget_changes><forecast_completion>2018-06-08T00:00:00</forecast_completion><total_schedule_changes>2032</total_schedule_changes></row><row _id="row-vkir.2ci9.2j84" _uuid="00000000-0000-0000-EE50-F1531D20D6D4" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-vkir.2ci9.2j84"><date_reported_as_of>2014-01-01T00:00:00</date_reported_as_of><pid>403</pid><project_name>Electronic Medical Records Upgrade</project_name><description>Integrated Clinical Information System (ICIS) Program: Electronic Medical Records (EMR) System - a single enterprise-wide EMR to meet the needs of HHC's expansive size and improve patient care will replace the legacy EMR, which is over 25 years old.</description><category>Health and Hospitals, IT</category><borough>Citywide</borough><managing_agency>HHC</managing_agency><client_agency>H+H</client_agency><current_phase>IT</current_phase><budget_forecast>748878284.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>15184947.00</total_budget_changes><forecast_completion>2018-12-31T00:00:00</forecast_completion><latest_schedule_changes>206</latest_schedule_changes><total_schedule_changes>2032</total_schedule_changes></row><row _id="row-6hkv-r258~ce2e" _uuid="00000000-0000-0000-6BF8-66AF6C7F7DDA" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-6hkv-r258~ce2e"><date_reported_as_of>2014-05-01T00:00:00</date_reported_as_of><pid>403</pid><project_name>Electronic Medical Records Upgrade</project_name><description>Integrated Clinical Information System (ICIS) Program: Electronic Medical Records (EMR) System - a single enterprise-wide EMR to meet the needs of HHC's expansive size and improve patient care will replace the legacy EMR, which is over 25 years old.</description><category>Health and Hospitals, IT</category><borough>Citywide</borough><managing_agency>HHC</managing_agency><client_agency>H+H</client_agency><current_phase>IT</current_phase><budget_forecast>748878284.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>15184947.00</total_budget_changes><forecast_completion>2018-12-31T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>2032</total_schedule_changes></row><row _id="row-2dcb~uah4-4c6a" _uuid="00000000-0000-0000-78B9-6DED665F7A9E" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-2dcb~uah4-4c6a"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>1201</pid><project_name>GATEWAY ESTATE - PHASE E/BED-805</project_name><description>Reconstruction of Gateway Estates Area (Nehemiah Creek) including sewer, watermain, street lighting and traffic signal work. Phase E</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>HPD</client_agency><current_phase>Construction</current_phase><design_start>2013-11-17T00:00:00</design_start><budget_forecast>35495000.00</budget_forecast><total_budget_changes>38077000.00</total_budget_changes><forecast_completion>2021-11-23T00:00:00</forecast_completion><total_schedule_changes>584</total_schedule_changes></row><row _id="row-dyqu_8xgh_gnan" _uuid="00000000-0000-0000-29D6-8A275FB5DE65" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-dyqu_8xgh_gnan"><date_reported_as_of>2015-02-01T00:00:00</date_reported_as_of><pid>403</pid><project_name>Electronic Medical Records Upgrade</project_name><description>Integrated Clinical Information System (ICIS) Program: Electronic Medical Records (EMR) System - a single enterprise-wide EMR to meet the needs of HHC's expansive size and improve patient care will replace the legacy EMR, which is over 25 years old.</description><category>Health and Hospitals, IT</category><borough>Citywide</borough><managing_agency>HHC</managing_agency><client_agency>H+H</client_agency><current_phase>IT</current_phase><budget_forecast>764063231.00</budget_forecast><latest_budget_changes>15184947.00</latest_budget_changes><total_budget_changes>15184947.00</total_budget_changes><forecast_completion>2018-12-31T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>2032</total_schedule_changes></row><row _id="row-uzpd~v78j~sgvk" _uuid="00000000-0000-0000-FAFA-C908BB58D8BF" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-uzpd~v78j~sgvk"><date_reported_as_of>2015-08-01T00:00:00</date_reported_as_of><pid>403</pid><project_name>Electronic Medical Records Upgrade</project_name><description>The EPIC - EMR Program: Electronic Medical Records (EMR) System - a single enterprise-wide EMR to meet the needs of HHC's expansive size and improve patient care will replace the legacy EMR - QuadraMed, which is over 25 years old.</description><category>Health and Hospitals, IT</category><borough>Citywide</borough><managing_agency>HHC</managing_agency><client_agency>H+H</client_agency><current_phase>IT</current_phase><budget_forecast>764063231.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>15184947.00</total_budget_changes><forecast_completion>2018-12-20T00:00:00</forecast_completion><latest_schedule_changes>-11</latest_schedule_changes><total_schedule_changes>2032</total_schedule_changes></row><row _id="row-utrs.pq2g_dv4z" _uuid="00000000-0000-0000-86A8-7081BE5601F7" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-utrs.pq2g_dv4z"><date_reported_as_of>2016-01-01T00:00:00</date_reported_as_of><pid>403</pid><project_name>Electronic Medical Records Upgrade</project_name><description>The EPIC - EMR Program: Electronic Medical Records (EMR) System - a single enterprise-wide EMR to meet the needs of HHC's expansive size and improve patient care will replace the legacy EMR - QuadraMed, which is over 25 years old.</description><category>Health and Hospitals, IT</category><borough>Citywide</borough><managing_agency>HHC</managing_agency><client_agency>H+H</client_agency><current_phase>IT</current_phase><budget_forecast>764063231.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>15184947.00</total_budget_changes><forecast_completion>2018-12-07T00:00:00</forecast_completion><latest_schedule_changes>-13</latest_schedule_changes><total_schedule_changes>2032</total_schedule_changes></row><row _id="row-icn2~9ie8~xsqp" _uuid="00000000-0000-0000-D381-25D89CA0F7B2" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-icn2~9ie8~xsqp"><date_reported_as_of>2016-06-01T00:00:00</date_reported_as_of><pid>403</pid><project_name>Electronic Medical Records Upgrade</project_name><description>The EPIC - EMR Program: Electronic Medical Records (EMR) System - a single enterprise-wide EMR to meet the needs of HHC's expansive size and improve patient care will replace the legacy EMR - QuadraMed, which is over 25 years old.</description><category>Health and Hospitals, IT</category><borough>Citywide</borough><managing_agency>HHC</managing_agency><client_agency>H+H</client_agency><current_phase>IT</current_phase><budget_forecast>764063231.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>15184947.00</total_budget_changes><forecast_completion>2018-12-07T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>2032</total_schedule_changes></row><row _id="row-qrrq.qms5.9nmz" _uuid="00000000-0000-0000-AC37-7B4E7C50330E" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-qrrq.qms5.9nmz"><date_reported_as_of>2016-11-01T00:00:00</date_reported_as_of><pid>403</pid><project_name>Electronic Medical Records Upgrade</project_name><description>The EPIC - EMR Program: Electronic Medical Records (EMR) System - a single enterprise-wide EMR to meet the needs of HHC's expansive size and improve patient care will replace the legacy EMR - QuadraMed, which is over 25 years old.</description><category>Health and Hospitals, IT</category><borough>Citywide</borough><managing_agency>HHC</managing_agency><client_agency>H+H</client_agency><current_phase>IT</current_phase><budget_forecast>764063231.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>15184947.00</total_budget_changes><forecast_completion>2018-12-07T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>2032</total_schedule_changes></row><row _id="row-t57t~qeaf_kcdf" _uuid="00000000-0000-0000-7583-A92833CA40E4" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-t57t~qeaf_kcdf"><date_reported_as_of>2017-04-01T00:00:00</date_reported_as_of><pid>403</pid><project_name>Electronic Medical Records Upgrade</project_name><description>The EPIC - EMR Program: Electronic Medical Records (EMR) System - a single enterprise-wide EMR to meet the needs of HHC's expansive size and improve patient care will replace the legacy EMR - QuadraMed, which is over 25 years old.</description><category>Health and Hospitals, IT</category><borough>Citywide</borough><managing_agency>HHC</managing_agency><client_agency>H+H</client_agency><current_phase>IT</current_phase><budget_forecast>764063231.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>15184947.00</total_budget_changes><forecast_completion>2018-12-07T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>2032</total_schedule_changes></row><row _id="row-cc4f~rgw7_qb4h" _uuid="00000000-0000-0000-CE09-0CADF0E20E00" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-cc4f~rgw7_qb4h"><date_reported_as_of>2017-09-01T00:00:00</date_reported_as_of><pid>403</pid><project_name>Electronic Medical Records Upgrade</project_name><description>The EPIC - EMR Program: Electronic Medical Records (EMR) System - a single enterprise-wide EMR to meet the needs of HHC's expansive size and improve patient care will replace the legacy EMR - QuadraMed, which is over 25 years old.</description><category>Health and Hospitals, IT</category><borough>Citywide</borough><managing_agency>HHC</managing_agency><client_agency>H+H</client_agency><current_phase>IT</current_phase><budget_forecast>764063231.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>15184947.00</total_budget_changes><forecast_completion>2020-12-31T00:00:00</forecast_completion><latest_schedule_changes>755</latest_schedule_changes><total_schedule_changes>2032</total_schedule_changes></row><row _id="row-qrmu-vs9d-pbzc" _uuid="00000000-0000-0000-6BFA-13469ACB9459" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-qrmu-vs9d-pbzc"><date_reported_as_of>2018-03-01T00:00:00</date_reported_as_of><pid>403</pid><project_name>Electronic Medical Records Upgrade</project_name><description>The EPIC - EMR Program: Electronic Medical Records (EMR) System - a single enterprise-wide EMR to meet the needs of HHC's expansive size and improve patient care will replace the legacy EMR - QuadraMed, which is over 25 years old.</description><category>Health and Hospitals, IT</category><borough>Citywide</borough><managing_agency>HHC</managing_agency><client_agency>H+H</client_agency><current_phase>IT</current_phase><budget_forecast>764063231.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>15184947.00</total_budget_changes><forecast_completion>2020-06-30T00:00:00</forecast_completion><latest_schedule_changes>-184</latest_schedule_changes><total_schedule_changes>2032</total_schedule_changes></row><row _id="row-bgxk_2w3n~3dw6" _uuid="00000000-0000-0000-E7AD-5DCF4E47C951" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-bgxk_2w3n~3dw6"><date_reported_as_of>2018-08-01T00:00:00</date_reported_as_of><pid>403</pid><project_name>Electronic Medical Records Upgrade</project_name><description>The EPIC - EMR Program: Electronic Medical Records (EMR) System - a single enterprise-wide EMR to meet the needs of HHC's expansive size and improve patient care will replace the legacy EMR - QuadraMed, which is over 25 years old.</description><category>Health and Hospitals, IT</category><borough>Citywide</borough><managing_agency>HHC</managing_agency><client_agency>H+H</client_agency><current_phase>IT</current_phase><budget_forecast>764063231.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>15184947.00</total_budget_changes><forecast_completion>2020-05-31T00:00:00</forecast_completion><latest_schedule_changes>-30</latest_schedule_changes><total_schedule_changes>2032</total_schedule_changes></row><row _id="row-4gik-sw6w-8j6d" _uuid="00000000-0000-0000-14AB-AEF781FD1504" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-4gik-sw6w-8j6d"><date_reported_as_of>2019-01-01T00:00:00</date_reported_as_of><pid>403</pid><project_name>Electronic Medical Records Upgrade</project_name><description>The EPIC - EMR Program: Electronic Medical Records (EMR) System - a single enterprise-wide EMR to meet the needs of HHC's expansive size and improve patient care will replace the legacy EMR - QuadraMed, which is over 25 years old.</description><category>Health and Hospitals, IT</category><borough>Citywide</borough><managing_agency>HHC</managing_agency><client_agency>H+H</client_agency><current_phase>IT</current_phase><budget_forecast>764063231.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>15184947.00</total_budget_changes><forecast_completion>2019-11-23T00:00:00</forecast_completion><latest_schedule_changes>-190</latest_schedule_changes><total_schedule_changes>2032</total_schedule_changes></row><row _id="row-jgs3.rc96~jqpk" _uuid="00000000-0000-0000-FF7D-069BDDA0EDF9" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-jgs3.rc96~jqpk"><date_reported_as_of>2019-05-01T00:00:00</date_reported_as_of><pid>403</pid><project_name>Electronic Medical Records Upgrade</project_name><description>The EPIC - EMR Program: Electronic Medical Records (EMR) System - a single enterprise-wide EMR to meet the needs of HHC's expansive size and improve patient care will replace the legacy EMR - QuadraMed, which is over 25 years old.</description><category>Health and Hospitals, IT</category><borough>Citywide</borough><managing_agency>HHC</managing_agency><client_agency>H+H</client_agency><current_phase>IT</current_phase><budget_forecast>764063231.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>15184947.00</total_budget_changes><forecast_completion>2016-04-02T00:00:00</forecast_completion><latest_schedule_changes>-1330</latest_schedule_changes><total_schedule_changes>2032</total_schedule_changes></row><row _id="row-e4n5.rinq~fmy5" _uuid="00000000-0000-0000-7DF3-6220F74698A5" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-e4n5.rinq~fmy5"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>403</pid><project_name>Electronic Medical Records Upgrade</project_name><description>The EPIC - EMR Program: Electronic Medical Records (EMR) System - a single enterprise-wide EMR to meet the needs of HHC's expansive size and improve patient care will replace the legacy EMR - QuadraMed, which is over 25 years old.</description><category>Health and Hospitals, IT</category><borough>Citywide</borough><managing_agency>HHC</managing_agency><client_agency>H+H</client_agency><current_phase>IT</current_phase><budget_forecast>764063231.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>15184947.00</total_budget_changes><forecast_completion>2019-12-07T00:00:00</forecast_completion><latest_schedule_changes>1344</latest_schedule_changes><total_schedule_changes>2032</total_schedule_changes></row><row _id="row-ysa8-8ibd~dbgz" _uuid="00000000-0000-0000-DA10-13F82A656A8B" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ysa8-8ibd~dbgz"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>403</pid><project_name>Electronic Medical Records Upgrade</project_name><description>The EPIC - EMR Program: Electronic Medical Records (EMR) System - a single enterprise-wide EMR to meet the needs of HHC's expansive size and improve patient care will replace the legacy EMR - QuadraMed, which is over 25 years old.</description><category>Health and Hospitals, IT</category><borough>Citywide</borough><managing_agency>HHC</managing_agency><client_agency>H+H</client_agency><current_phase>IT</current_phase><budget_forecast>764063231.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>15184947.00</total_budget_changes><forecast_completion>2020-03-01T00:00:00</forecast_completion><latest_schedule_changes>85</latest_schedule_changes><total_schedule_changes>2032</total_schedule_changes></row><row _id="row-bu4j.xbys_uhki" _uuid="00000000-0000-0000-F730-DA698B8D172C" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-bu4j.xbys_uhki"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>403</pid><project_name>Electronic Medical Records Upgrade</project_name><description>The EPIC - EMR Program: Electronic Medical Records (EMR) System - a single enterprise-wide EMR to meet the needs of HHC's expansive size and improve patient care will replace the legacy EMR - QuadraMed, which is over 25 years old.</description><category>Health and Hospitals, IT</category><borough>Citywide</borough><managing_agency>HHC</managing_agency><client_agency>H+H</client_agency><current_phase>IT</current_phase><budget_forecast>764063231.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>15184947.00</total_budget_changes><forecast_completion>2021-05-30T00:00:00</forecast_completion><latest_schedule_changes>455</latest_schedule_changes><total_schedule_changes>2032</total_schedule_changes></row><row _id="row-vvy2-9b36-rv2e" _uuid="00000000-0000-0000-1D15-DB06049CF773" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-vvy2-9b36-rv2e"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>403</pid><project_name>Electronic Medical Records Upgrade</project_name><description>The EPIC - EMR Program: Electronic Medical Records (EMR) System - a single enterprise-wide EMR to meet the needs of HHC's expansive size and improve patient care will replace the legacy EMR - QuadraMed, which is over 25 years old.</description><category>Health and Hospitals, IT</category><borough>Citywide</borough><managing_agency>HHC</managing_agency><client_agency>H+H</client_agency><current_phase>IT</current_phase><budget_forecast>764063231.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>15184947.00</total_budget_changes><forecast_completion>2021-05-30T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>2032</total_schedule_changes></row><row _id="row-c8yv_ct3u~yueh" _uuid="00000000-0000-0000-FC5F-5E3A05FBD981" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-c8yv_ct3u~yueh"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>403</pid><project_name>Electronic Medical Records Upgrade</project_name><description>The EPIC - EMR Program: Electronic Medical Records (EMR) System - a single enterprise-wide EMR to meet the needs of HHC's expansive size and improve patient care will replace the legacy EMR - QuadraMed, which is over 25 years old.</description><category>Health and Hospitals, IT</category><borough>Citywide</borough><managing_agency>HHC</managing_agency><client_agency>H+H</client_agency><current_phase>IT</current_phase><budget_forecast>764063231.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>15184947.00</total_budget_changes><forecast_completion>2022-12-31T00:00:00</forecast_completion><latest_schedule_changes>580</latest_schedule_changes><total_schedule_changes>2032</total_schedule_changes></row><row _id="row-2jft-b8mk_6y3e" _uuid="00000000-0000-0000-FFFD-098D9662FF48" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-2jft-b8mk_6y3e"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>403</pid><project_name>Electronic Medical Records Upgrade</project_name><description>The EPIC - EMR Program: Electronic Medical Records (EMR) System - a single enterprise-wide EMR to meet the needs of HHC's expansive size and improve patient care will replace the legacy EMR - QuadraMed, which is over 25 years old.</description><category>Health and Hospitals, IT</category><borough>Citywide</borough><managing_agency>HHC</managing_agency><client_agency>H+H</client_agency><current_phase>IT</current_phase><budget_forecast>764063231.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>15184947.00</total_budget_changes><forecast_completion>2022-12-31T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>2032</total_schedule_changes></row><row _id="row-i48m.5acx_s954" _uuid="00000000-0000-0000-3407-B532D046EB34" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-i48m.5acx_s954"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>403</pid><project_name>Electronic Medical Records Upgrade</project_name><description>The EPIC - EMR Program: Electronic Medical Records (EMR) System - a single enterprise-wide EMR to meet the needs of HHC's expansive size and improve patient care will replace the legacy EMR - QuadraMed, which is over 25 years old.</description><category>Health and Hospitals, IT</category><borough>Citywide</borough><managing_agency>HHC</managing_agency><client_agency>H+H</client_agency><current_phase>IT</current_phase><budget_forecast>764063231.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>15184947.00</total_budget_changes><forecast_completion>2022-12-31T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>2032</total_schedule_changes></row><row _id="row-8322_i9ha.w6pd" _uuid="00000000-0000-0000-805A-F0F2BC580337" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-8322_i9ha.w6pd"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>403</pid><project_name>Electronic Medical Records Upgrade</project_name><description>The EPIC - EMR Program: Electronic Medical Records (EMR) System - a single enterprise-wide EMR to meet the needs of HHC's expansive size and improve patient care will replace the legacy EMR - QuadraMed, which is over 25 years old.</description><category>Health and Hospitals, IT</category><borough>Citywide</borough><managing_agency>HHC</managing_agency><client_agency>H+H</client_agency><current_phase>IT</current_phase><budget_forecast>764063231.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>15184947.00</total_budget_changes><forecast_completion>2022-12-31T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>2032</total_schedule_changes></row><row _id="row-dime-wu8p_k343" _uuid="00000000-0000-0000-B3DF-B2157ABFEB2E" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-dime-wu8p_k343"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>403</pid><project_name>Electronic Medical Records Upgrade</project_name><description>The EPIC - EMR Program: Electronic Medical Records (EMR) System - a single enterprise-wide EMR to meet the needs of HHC's expansive size and improve patient care will replace the legacy EMR - QuadraMed, which is over 25 years old.</description><category>Health and Hospitals, IT</category><borough>Citywide</borough><managing_agency>HHC</managing_agency><client_agency>H+H</client_agency><current_phase>IT</current_phase><budget_forecast>764063231.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>15184947.00</total_budget_changes><forecast_completion>2023-12-31T00:00:00</forecast_completion><latest_schedule_changes>365</latest_schedule_changes><total_schedule_changes>2032</total_schedule_changes></row><row _id="row-3sff.izjs.uhmi" _uuid="00000000-0000-0000-DBA1-F3D1A483678D" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-3sff.izjs.uhmi"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>403</pid><project_name>Electronic Medical Records Upgrade</project_name><description>The EPIC - EMR Program: Electronic Medical Records (EMR) System - a single enterprise-wide EMR to meet the needs of HHC's expansive size and improve patient care will replace the legacy EMR - QuadraMed, which is over 25 years old.</description><category>Health and Hospitals, IT</category><borough>Citywide</borough><managing_agency>HHC</managing_agency><client_agency>H+H</client_agency><current_phase>IT</current_phase><budget_forecast>764063231.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>15184947.00</total_budget_changes><forecast_completion>2023-12-31T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>2032</total_schedule_changes></row><row _id="row-hsri-i32w_nmyb" _uuid="00000000-0000-0000-7686-3F1CE98C8444" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-hsri-i32w_nmyb"><date_reported_as_of>2013-09-01T00:00:00</date_reported_as_of><pid>405</pid><project_name>Gilboa Dam Reconstruction, Phase III</project_name><description>Gilboa Dam Reconstruction Project includes construction of a new low level outlet (LLO) consisting of 2,000 feet of tunneling , an access shaft, oulet structure and gate valve controls.</description><category>Water Supply</category><borough>Upstate</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2004-03-18T00:00:00</design_start><budget_forecast>189021811.00</budget_forecast><total_budget_changes>10376533.49</total_budget_changes><forecast_completion>2020-05-28T00:00:00</forecast_completion><total_schedule_changes>1113</total_schedule_changes></row><row _id="row-q7hr~tufb.nsxs" _uuid="00000000-0000-0000-DBD6-BAE4DBB33537" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-q7hr~tufb.nsxs"><date_reported_as_of>2014-01-01T00:00:00</date_reported_as_of><pid>405</pid><project_name>Gilboa Dam Reconstruction, Phase III</project_name><description>Gilboa Dam Reconstruction Project includes construction of a new low level outlet (LLO) consisting of 2,000 feet of tunneling, an access shaft, oulet structure and gate valve controls.</description><category>Water Supply</category><borough>Upstate</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2004-03-18T00:00:00</design_start><budget_forecast>188578811.00</budget_forecast><latest_budget_changes>-443000.00</latest_budget_changes><total_budget_changes>10376533.49</total_budget_changes><forecast_completion>2020-05-28T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1113</total_schedule_changes></row><row _id="row-r8q4.eeb5.rwqu" _uuid="00000000-0000-0000-ADE4-F6ED644AF8EA" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-r8q4.eeb5.rwqu"><date_reported_as_of>2014-05-01T00:00:00</date_reported_as_of><pid>405</pid><project_name>Gilboa Dam Reconstruction, Phase III</project_name><description>Gilboa Dam Reconstruction Project includes construction of a new low level outlet (LLO) consisting of 2,000 feet of tunneling, an access shaft, oulet structure and gate valve controls.</description><category>Water Supply</category><borough>Upstate</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2004-03-18T00:00:00</design_start><budget_forecast>223221213.00</budget_forecast><latest_budget_changes>34642402.00</latest_budget_changes><total_budget_changes>10376533.49</total_budget_changes><forecast_completion>2020-05-02T00:00:00</forecast_completion><latest_schedule_changes>-26</latest_schedule_changes><total_schedule_changes>1113</total_schedule_changes></row><row _id="row-vqrz~ngck~fzh6" _uuid="00000000-0000-0000-0D96-AC186C0070EA" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-vqrz~ngck~fzh6"><date_reported_as_of>2015-02-01T00:00:00</date_reported_as_of><pid>405</pid><project_name>Gilboa Dam Reconstruction, Phase III</project_name><description>Gilboa Dam Reconstruction Project includes construction of a new low level outlet (LLO) consisting of 2,000 feet of tunneling, an access shaft, oulet structure and gate valve controls.</description><category>Water Supply</category><borough>Upstate</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction Procurement</current_phase><design_start>2004-03-18T00:00:00</design_start><budget_forecast>226724491.00</budget_forecast><latest_budget_changes>3503278.00</latest_budget_changes><total_budget_changes>10376533.49</total_budget_changes><forecast_completion>2020-07-20T00:00:00</forecast_completion><latest_schedule_changes>79</latest_schedule_changes><total_schedule_changes>1113</total_schedule_changes></row><row _id="row-w9j5~se5x-zapv" _uuid="00000000-0000-0000-CC72-E624064EAC3D" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-w9j5~se5x-zapv"><date_reported_as_of>2015-08-01T00:00:00</date_reported_as_of><pid>405</pid><project_name>Gilboa Dam Reconstruction, Phase III</project_name><description>Gilboa Dam Reconstruction Project includes construction of a new low level outlet (LLO) consisting of 2,000 feet of tunneling, an access shaft, oulet structure and gate valve controls.</description><category>Water Supply</category><borough>Upstate</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2004-03-18T00:00:00</design_start><budget_forecast>195762213.00</budget_forecast><latest_budget_changes>-30962278.00</latest_budget_changes><total_budget_changes>10376533.49</total_budget_changes><forecast_completion>2020-06-28T00:00:00</forecast_completion><latest_schedule_changes>-22</latest_schedule_changes><total_schedule_changes>1113</total_schedule_changes></row><row _id="row-wtdz~zf4n-8e8i" _uuid="00000000-0000-0000-5BB5-E5A35C0F5DE0" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-wtdz~zf4n-8e8i"><date_reported_as_of>2016-01-01T00:00:00</date_reported_as_of><pid>405</pid><project_name>Gilboa Dam Reconstruction, Phase III</project_name><description>Gilboa Dam Reconstruction Project includes construction of a new low level outlet (LLO) consisting of 2,000 feet of tunneling, an access shaft, oulet structure and gate valve controls.</description><category>Water Supply</category><borough>Upstate</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2004-03-18T00:00:00</design_start><budget_forecast>195807563.00</budget_forecast><latest_budget_changes>45350.00</latest_budget_changes><total_budget_changes>10376533.49</total_budget_changes><forecast_completion>2020-07-24T00:00:00</forecast_completion><latest_schedule_changes>26</latest_schedule_changes><total_schedule_changes>1113</total_schedule_changes></row><row _id="row-8utg_h38s_vmez" _uuid="00000000-0000-0000-C273-80906C2FBA63" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-8utg_h38s_vmez"><date_reported_as_of>2016-06-01T00:00:00</date_reported_as_of><pid>405</pid><project_name>Gilboa Dam Reconstruction, Phase III</project_name><description>Gilboa Dam Reconstruction Project includes construction of a new low level outlet (LLO) consisting of 2,000 feet of tunneling, an access shaft, oulet structure and gate valve controls.</description><category>Water Supply</category><borough>Upstate</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2004-03-18T00:00:00</design_start><budget_forecast>201363038.00</budget_forecast><latest_budget_changes>5555475.00</latest_budget_changes><total_budget_changes>10376533.49</total_budget_changes><forecast_completion>2020-07-27T00:00:00</forecast_completion><latest_schedule_changes>3</latest_schedule_changes><total_schedule_changes>1113</total_schedule_changes></row><row _id="row-tsa3_5hbg-wsv2" _uuid="00000000-0000-0000-DDFE-40FD5187B842" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-tsa3_5hbg-wsv2"><date_reported_as_of>2016-11-01T00:00:00</date_reported_as_of><pid>405</pid><project_name>Gilboa Dam Reconstruction, Phase III</project_name><description>Gilboa Dam Reconstruction Project includes construction of a new low level outlet (LLO) consisting of 2,000 feet of tunneling, an access shaft, oulet structure and gate valve controls.</description><category>Water Supply</category><borough>Upstate</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2004-03-18T00:00:00</design_start><budget_forecast>205536850.30</budget_forecast><latest_budget_changes>4173812.30</latest_budget_changes><total_budget_changes>10376533.49</total_budget_changes><forecast_completion>2020-07-27T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1113</total_schedule_changes></row><row _id="row-jkz3_kpwq-gi47" _uuid="00000000-0000-0000-66EF-372B540E7D02" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-jkz3_kpwq-gi47"><date_reported_as_of>2017-04-01T00:00:00</date_reported_as_of><pid>405</pid><project_name>Gilboa Dam Reconstruction, Phase III</project_name><description>Gilboa Dam Reconstruction Project includes construction of a new low level outlet (LLO) consisting of 2,000 feet of tunneling, an access shaft, oulet structure and gate valve controls.</description><category>Water Supply</category><borough>Upstate</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2004-03-18T00:00:00</design_start><budget_forecast>204690536.30</budget_forecast><latest_budget_changes>-846314.00</latest_budget_changes><total_budget_changes>10376533.49</total_budget_changes><forecast_completion>2020-07-27T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1113</total_schedule_changes></row><row _id="row-x4sq.8f56-w9u8" _uuid="00000000-0000-0000-C373-B4E7F23CC771" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-x4sq.8f56-w9u8"><date_reported_as_of>2017-09-01T00:00:00</date_reported_as_of><pid>405</pid><project_name>Gilboa Dam Reconstruction, Phase III</project_name><description>Gilboa Dam Reconstruction Project includes construction of a new low level outlet (LLO) consisting of 2,000 feet of tunneling, an access shaft, oulet structure and gate valve controls.</description><category>Water Supply</category><borough>Upstate</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2004-03-18T00:00:00</design_start><budget_forecast>205401376.10</budget_forecast><latest_budget_changes>710839.80</latest_budget_changes><total_budget_changes>10376533.49</total_budget_changes><forecast_completion>2020-07-27T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1113</total_schedule_changes></row><row _id="row-xemm.z3dp-m887" _uuid="00000000-0000-0000-BCD5-32BECDB6F1B4" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-xemm.z3dp-m887"><date_reported_as_of>2018-03-01T00:00:00</date_reported_as_of><pid>405</pid><project_name>Gilboa Dam Reconstruction, Phase III</project_name><description>Gilboa Dam Reconstruction Project includes construction of a new low level outlet (LLO) consisting of 2,000 feet of tunneling, an access shaft, oulet structure and gate valve controls.</description><category>Water Supply</category><borough>Upstate</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2004-03-18T00:00:00</design_start><budget_forecast>205460484.72</budget_forecast><latest_budget_changes>59108.62</latest_budget_changes><total_budget_changes>10376533.49</total_budget_changes><forecast_completion>2020-10-12T00:00:00</forecast_completion><latest_schedule_changes>77</latest_schedule_changes><total_schedule_changes>1113</total_schedule_changes></row><row _id="row-hx3x.b8iu.cd8s" _uuid="00000000-0000-0000-2292-A5B591D2F273" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-hx3x.b8iu.cd8s"><date_reported_as_of>2018-08-01T00:00:00</date_reported_as_of><pid>405</pid><project_name>Gilboa Dam Reconstruction, Phase III</project_name><description>Gilboa Dam Reconstruction Project includes construction of a new low level outlet (LLO) consisting of 2,000 feet of tunneling, an access shaft, oulet structure and gate valve controls.</description><category>Water Supply</category><borough>Upstate</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2004-03-18T00:00:00</design_start><budget_forecast>205621973.80</budget_forecast><latest_budget_changes>161489.08</latest_budget_changes><total_budget_changes>10376533.49</total_budget_changes><forecast_completion>2020-10-12T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1113</total_schedule_changes></row><row _id="row-zb56.6kph_akdy" _uuid="00000000-0000-0000-88E9-449940243A1C" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-zb56.6kph_akdy"><date_reported_as_of>2019-01-01T00:00:00</date_reported_as_of><pid>405</pid><project_name>Gilboa Dam Reconstruction, Phase III</project_name><description>Gilboa Dam Reconstruction Project includes construction of a new low level outlet (LLO) consisting of 2,000 feet of tunneling, an access shaft, oulet structure and gate valve controls.</description><category>Water Supply</category><borough>Upstate</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2004-03-18T00:00:00</design_start><budget_forecast>205621973.69</budget_forecast><latest_budget_changes>-0.11</latest_budget_changes><total_budget_changes>10376533.49</total_budget_changes><forecast_completion>2020-12-13T00:00:00</forecast_completion><latest_schedule_changes>62</latest_schedule_changes><total_schedule_changes>1113</total_schedule_changes></row><row _id="row-jqbn-22q4_3mmp" _uuid="00000000-0000-0000-3D6D-D45C685DDA6D" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-jqbn-22q4_3mmp"><date_reported_as_of>2019-05-01T00:00:00</date_reported_as_of><pid>405</pid><project_name>Gilboa Dam Reconstruction, Phase III</project_name><description>Gilboa Dam Reconstruction Project includes construction of a new low level outlet (LLO) consisting of 2,000 feet of tunneling, an access shaft, oulet structure and gate valve controls.</description><category>Water Supply</category><borough>Upstate</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2004-03-18T00:00:00</design_start><budget_forecast>208649861.57</budget_forecast><latest_budget_changes>3027887.88</latest_budget_changes><total_budget_changes>10376533.49</total_budget_changes><forecast_completion>2021-05-22T00:00:00</forecast_completion><latest_schedule_changes>160</latest_schedule_changes><total_schedule_changes>1113</total_schedule_changes></row><row _id="row-stg2_kybh~7bhv" _uuid="00000000-0000-0000-FF73-B62353B9107E" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-stg2_kybh~7bhv"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>405</pid><project_name>Gilboa Dam Reconstruction, Phase III</project_name><description>Gilboa Dam Reconstruction Project includes construction of a new low level outlet (LLO) consisting of 2,000 feet of tunneling, an access shaft, oulet structure and gate valve controls.</description><category>Water Supply</category><borough>Upstate</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2004-03-18T00:00:00</design_start><budget_forecast>207585200.52</budget_forecast><latest_budget_changes>-1064661.05</latest_budget_changes><total_budget_changes>10376533.49</total_budget_changes><forecast_completion>2021-05-16T00:00:00</forecast_completion><latest_schedule_changes>-6</latest_schedule_changes><total_schedule_changes>1113</total_schedule_changes></row><row _id="row-78uz~v5nd.mx7e" _uuid="00000000-0000-0000-BC5F-3E61B84D66EA" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-78uz~v5nd.mx7e"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>405</pid><project_name>Gilboa Dam Reconstruction, Phase III</project_name><description>Gilboa Dam Reconstruction Project includes construction of a new low level outlet (LLO) consisting of 2,000 feet of tunneling, an access shaft, oulet structure and gate valve controls.</description><category>Water Supply</category><borough>Upstate</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2004-03-18T00:00:00</design_start><budget_forecast>204623634.31</budget_forecast><latest_budget_changes>-2961566.21</latest_budget_changes><total_budget_changes>10376533.49</total_budget_changes><forecast_completion>2021-07-09T00:00:00</forecast_completion><latest_schedule_changes>54</latest_schedule_changes><total_schedule_changes>1113</total_schedule_changes></row><row _id="row-24kd.gh4z-x8em" _uuid="00000000-0000-0000-BD8B-FEAAE6D72CA1" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-24kd.gh4z-x8em"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>405</pid><project_name>Gilboa Dam Reconstruction, Phase III</project_name><description>Gilboa Dam Reconstruction Project includes construction of a new low level outlet (LLO) consisting of 2,000 feet of tunneling, an access shaft, oulet structure and gate valve controls.</description><category>Water Supply</category><borough>Upstate</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2004-03-18T00:00:00</design_start><budget_forecast>204633964.18</budget_forecast><latest_budget_changes>10329.87</latest_budget_changes><total_budget_changes>10376533.49</total_budget_changes><forecast_completion>2021-10-18T00:00:00</forecast_completion><latest_schedule_changes>101</latest_schedule_changes><total_schedule_changes>1113</total_schedule_changes></row><row _id="row-8gh6.uaxb.6rb2" _uuid="00000000-0000-0000-6D07-3261C2380503" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-8gh6.uaxb.6rb2"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>405</pid><project_name>Gilboa Dam Reconstruction, Phase III</project_name><description>Gilboa Dam Reconstruction Project includes construction of a new low level outlet (LLO) consisting of 2,000 feet of tunneling, an access shaft, oulet structure and gate valve controls.</description><category>Water Supply</category><borough>Upstate</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2004-03-18T00:00:00</design_start><budget_forecast>204702947.77</budget_forecast><latest_budget_changes>68983.59</latest_budget_changes><total_budget_changes>10376533.49</total_budget_changes><forecast_completion>2022-04-01T00:00:00</forecast_completion><latest_schedule_changes>165</latest_schedule_changes><total_schedule_changes>1113</total_schedule_changes></row><row _id="row-r72i.v4c2.dr52" _uuid="00000000-0000-0000-1DC5-81A0910CBFFF" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-r72i.v4c2.dr52"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>405</pid><project_name>Gilboa Dam Reconstruction, Phase III</project_name><description>Gilboa Dam Reconstruction Project includes construction of a new low level outlet (LLO) consisting of 2,000 feet of tunneling, an access shaft, oulet structure and gate valve controls.</description><category>Water Supply</category><borough>Upstate</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2004-03-18T00:00:00</design_start><budget_forecast>206344514.21</budget_forecast><latest_budget_changes>1641566.44</latest_budget_changes><total_budget_changes>10376533.49</total_budget_changes><forecast_completion>2022-05-16T00:00:00</forecast_completion><latest_schedule_changes>45</latest_schedule_changes><total_schedule_changes>1113</total_schedule_changes></row><row _id="row-n7x3.atcr-xtcr" _uuid="00000000-0000-0000-6180-C3A9DC7C2F05" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-n7x3.atcr-xtcr"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>405</pid><project_name>Gilboa Dam Reconstruction, Phase III</project_name><description>Gilboa Dam Reconstruction Project includes construction of a new low level outlet (LLO) consisting of 2,000 feet of tunneling, an access shaft, oulet structure and gate valve controls.</description><category>Water Supply</category><borough>Upstate</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2004-03-18T00:00:00</design_start><budget_forecast>206670118.67</budget_forecast><latest_budget_changes>325604.46</latest_budget_changes><total_budget_changes>10376533.49</total_budget_changes><forecast_completion>2022-07-03T00:00:00</forecast_completion><latest_schedule_changes>48</latest_schedule_changes><total_schedule_changes>1113</total_schedule_changes></row><row _id="row-yy3z~i9fc.btpu" _uuid="00000000-0000-0000-3A3C-119C0F8F18F7" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-yy3z~i9fc.btpu"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>405</pid><project_name>Gilboa Dam Reconstruction, Phase III</project_name><description>Gilboa Dam Reconstruction Project includes construction of a new low level outlet (LLO) consisting of 2,000 feet of tunneling , an access shaft, oulet structure and gate valve controls.</description><category>Water Supply</category><borough>Upstate</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2004-03-18T00:00:00</design_start><budget_forecast>199070771.81</budget_forecast><latest_budget_changes>-7599346.86</latest_budget_changes><total_budget_changes>10376533.49</total_budget_changes><forecast_completion>2022-10-01T00:00:00</forecast_completion><latest_schedule_changes>90</latest_schedule_changes><total_schedule_changes>1113</total_schedule_changes></row><row _id="row-crte_i9b4-zuvn" _uuid="00000000-0000-0000-0107-247E547BE2CA" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-crte_i9b4-zuvn"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>405</pid><project_name>Gilboa Dam Reconstruction, Phase III</project_name><description>Gilboa Dam Reconstruction Project includes construction of a new low level outlet (LLO) consisting of 2,000 feet of tunneling , an access shaft, oulet structure and gate valve controls.</description><category>Water Supply</category><borough>Upstate</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2004-03-18T00:00:00</design_start><budget_forecast>199070771.81</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>10376533.49</total_budget_changes><forecast_completion>2022-12-12T00:00:00</forecast_completion><latest_schedule_changes>72</latest_schedule_changes><total_schedule_changes>1113</total_schedule_changes></row><row _id="row-7nm7~spbb-caz3" _uuid="00000000-0000-0000-6BE5-BE4A645C9FBE" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-7nm7~spbb-caz3"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>405</pid><project_name>Gilboa Dam Reconstruction, Phase III</project_name><description>Gilboa Dam Reconstruction Project includes construction of a new low level outlet (LLO) consisting of 2,000 feet of tunneling , an access shaft, oulet structure and gate valve controls.</description><category>Water Supply</category><borough>Upstate</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2004-03-18T00:00:00</design_start><budget_forecast>200712336.70</budget_forecast><latest_budget_changes>1641564.89</latest_budget_changes><total_budget_changes>10376533.49</total_budget_changes><forecast_completion>2023-03-26T00:00:00</forecast_completion><latest_schedule_changes>104</latest_schedule_changes><total_schedule_changes>1113</total_schedule_changes></row><row _id="row-8dtb_jxce.fjxb" _uuid="00000000-0000-0000-4D3D-A0C59622E917" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-8dtb_jxce.fjxb"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>405</pid><project_name>Gilboa Dam Reconstruction, Phase III</project_name><description>Gilboa Dam Reconstruction Project includes construction of a new low level outlet (LLO) consisting of 2,000 feet of tunneling , an access shaft, oulet structure and gate valve controls.</description><category>Water Supply</category><borough>Upstate</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2004-03-18T00:00:00</design_start><budget_forecast>199398344.49</budget_forecast><latest_budget_changes>-1313992.21</latest_budget_changes><total_budget_changes>10376533.49</total_budget_changes><forecast_completion>2023-06-15T00:00:00</forecast_completion><latest_schedule_changes>81</latest_schedule_changes><total_schedule_changes>1113</total_schedule_changes></row><row _id="row-7f4z.pc5a~6uqy" _uuid="00000000-0000-0000-114A-87A7E46C1D4D" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-7f4z.pc5a~6uqy"><date_reported_as_of>2013-09-01T00:00:00</date_reported_as_of><pid>406</pid><project_name>Gilboa Dam Reconstruction, Phase IV</project_name><description>This project will rehabilitate the mechanics and the architecture of the Shandaken Tunnel Intake Chamber, which includes the replacement of gates and general site improvements.</description><category>Water Supply</category><borough>Upstate</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2008-12-01T00:00:00</design_start><budget_forecast>37477201.00</budget_forecast><total_budget_changes>33535991.20</total_budget_changes><forecast_completion>2018-08-16T00:00:00</forecast_completion><total_schedule_changes>1684</total_schedule_changes></row><row _id="row-eth4-5nh6~r278" _uuid="00000000-0000-0000-BECE-476D84EE2BE5" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-eth4-5nh6~r278"><date_reported_as_of>2014-01-01T00:00:00</date_reported_as_of><pid>406</pid><project_name>Gilboa Dam Reconstruction, Phase IV</project_name><description>This project will rehabilitate the mechanics and the architecture of the Shandaken Tunnel Intake Chamber, which includes the replacement of gates and general site improvements.</description><category>Water Supply</category><borough>Upstate</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2008-12-01T00:00:00</design_start><budget_forecast>46953495.00</budget_forecast><latest_budget_changes>9476294.00</latest_budget_changes><total_budget_changes>33535991.20</total_budget_changes><forecast_completion>2019-01-06T00:00:00</forecast_completion><latest_schedule_changes>143</latest_schedule_changes><total_schedule_changes>1684</total_schedule_changes></row><row _id="row-cyt2.5csi.2wa2" _uuid="00000000-0000-0000-D073-0E7DC11D6F53" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-cyt2.5csi.2wa2"><date_reported_as_of>2014-05-01T00:00:00</date_reported_as_of><pid>406</pid><project_name>Gilboa Dam Reconstruction, Phase IV</project_name><description>This project will rehabilitate the mechanics and the architecture of the Shandaken Tunnel Intake Chamber, which includes the replacement of gates and general site improvements.</description><category>Water Supply</category><borough>Upstate</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2008-12-01T00:00:00</design_start><budget_forecast>47017495.00</budget_forecast><latest_budget_changes>64000.00</latest_budget_changes><total_budget_changes>33535991.20</total_budget_changes><forecast_completion>2019-06-30T00:00:00</forecast_completion><latest_schedule_changes>175</latest_schedule_changes><total_schedule_changes>1684</total_schedule_changes></row><row _id="row-k3di_aegm.z29j" _uuid="00000000-0000-0000-F15E-50DDCCBFE665" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-k3di_aegm.z29j"><date_reported_as_of>2015-02-01T00:00:00</date_reported_as_of><pid>406</pid><project_name>Gilboa Dam Reconstruction, Phase IV</project_name><description>This project will rehabilitate the mechanics and the architecture of the Shandaken Tunnel Intake Chamber, which includes the replacement of gates and general site improvements.</description><category>Water Supply</category><borough>Upstate</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2008-12-01T00:00:00</design_start><budget_forecast>45648239.00</budget_forecast><latest_budget_changes>-1369256.00</latest_budget_changes><total_budget_changes>33535991.20</total_budget_changes><forecast_completion>2019-11-10T00:00:00</forecast_completion><latest_schedule_changes>133</latest_schedule_changes><total_schedule_changes>1684</total_schedule_changes></row><row _id="row-657d-297u~r6q8" _uuid="00000000-0000-0000-77A2-3DB7C5B16072" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-657d-297u~r6q8"><date_reported_as_of>2015-08-01T00:00:00</date_reported_as_of><pid>406</pid><project_name>Gilboa Dam Reconstruction, Phase IV</project_name><description>This project will rehabilitate the mechanics and the architecture of the Shandaken Tunnel Intake Chamber, which includes the replacement of gates and general site improvements.</description><category>Water Supply</category><borough>Upstate</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2008-12-01T00:00:00</design_start><budget_forecast>45128381.00</budget_forecast><latest_budget_changes>-519858.00</latest_budget_changes><total_budget_changes>33535991.20</total_budget_changes><forecast_completion>2020-04-03T00:00:00</forecast_completion><latest_schedule_changes>145</latest_schedule_changes><total_schedule_changes>1684</total_schedule_changes></row><row _id="row-8vgw_9ezs_xckh" _uuid="00000000-0000-0000-E0EA-1FB385D16D6B" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-8vgw_9ezs_xckh"><date_reported_as_of>2016-01-01T00:00:00</date_reported_as_of><pid>406</pid><project_name>Gilboa Dam Reconstruction, Phase IV</project_name><description>This project will rehabilitate the mechanics and the architecture of the Shandaken Tunnel Intake Chamber, which includes the replacement of gates and general site improvements.</description><category>Water Supply</category><borough>Upstate</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2008-12-01T00:00:00</design_start><budget_forecast>49413678.00</budget_forecast><latest_budget_changes>4285297.00</latest_budget_changes><total_budget_changes>33535991.20</total_budget_changes><forecast_completion>2020-08-08T00:00:00</forecast_completion><latest_schedule_changes>127</latest_schedule_changes><total_schedule_changes>1684</total_schedule_changes></row><row _id="row-jp6f.55ue.nrmv" _uuid="00000000-0000-0000-D85F-897D497FF2CC" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-jp6f.55ue.nrmv"><date_reported_as_of>2016-06-01T00:00:00</date_reported_as_of><pid>406</pid><project_name>Gilboa Dam Reconstruction, Phase IV</project_name><description>This project will rehabilitate the mechanics and the architecture of the Shandaken Tunnel Intake Chamber, which includes the replacement of gates and general site improvements.</description><category>Water Supply</category><borough>Upstate</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2008-12-01T00:00:00</design_start><budget_forecast>50258630.00</budget_forecast><latest_budget_changes>844952.00</latest_budget_changes><total_budget_changes>33535991.20</total_budget_changes><forecast_completion>2020-12-25T00:00:00</forecast_completion><latest_schedule_changes>139</latest_schedule_changes><total_schedule_changes>1684</total_schedule_changes></row><row _id="row-fej4_6pje_6ihy" _uuid="00000000-0000-0000-25E5-3D1C5D5B8D62" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-fej4_6pje_6ihy"><date_reported_as_of>2016-11-01T00:00:00</date_reported_as_of><pid>406</pid><project_name>Gilboa Dam Reconstruction, Phase IV</project_name><description>This project will rehabilitate the mechanics and the architecture of the Shandaken Tunnel Intake Chamber, which includes the replacement of gates and general site improvements.</description><category>Water Supply</category><borough>Upstate</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2008-12-01T00:00:00</design_start><budget_forecast>53848013.00</budget_forecast><latest_budget_changes>3589383.00</latest_budget_changes><total_budget_changes>33535991.20</total_budget_changes><forecast_completion>2021-05-25T00:00:00</forecast_completion><latest_schedule_changes>151</latest_schedule_changes><total_schedule_changes>1684</total_schedule_changes></row><row _id="row-kd9v.yzmz_hidb" _uuid="00000000-0000-0000-7189-37764DB45E93" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-kd9v.yzmz_hidb"><date_reported_as_of>2017-04-01T00:00:00</date_reported_as_of><pid>406</pid><project_name>Gilboa Dam Reconstruction, Phase IV</project_name><description>This project will rehabilitate the mechanics and the architecture of the Shandaken Tunnel Intake Chamber, which includes the replacement of gates and general site improvements.</description><category>Water Supply</category><borough>Upstate</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction Procurement</current_phase><design_start>2008-12-01T00:00:00</design_start><budget_forecast>65207241.00</budget_forecast><latest_budget_changes>11359228.00</latest_budget_changes><total_budget_changes>33535991.20</total_budget_changes><forecast_completion>2021-01-01T00:00:00</forecast_completion><latest_schedule_changes>-144</latest_schedule_changes><total_schedule_changes>1684</total_schedule_changes></row><row _id="row-t57u~kuur~w2e8" _uuid="00000000-0000-0000-F0B2-7F503729EC6D" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-t57u~kuur~w2e8"><date_reported_as_of>2017-09-01T00:00:00</date_reported_as_of><pid>406</pid><project_name>Gilboa Dam Reconstruction, Phase IV</project_name><description>This project will rehabilitate the mechanics and the architecture of the Shandaken Tunnel Intake Chamber, which includes the replacement of gates and general site improvements.</description><category>Water Supply</category><borough>Upstate</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2008-12-01T00:00:00</design_start><budget_forecast>65790424.70</budget_forecast><latest_budget_changes>583183.70</latest_budget_changes><total_budget_changes>33535991.20</total_budget_changes><forecast_completion>2021-10-06T00:00:00</forecast_completion><latest_schedule_changes>278</latest_schedule_changes><total_schedule_changes>1684</total_schedule_changes></row><row _id="row-b5nm.2cdu_dhzf" _uuid="00000000-0000-0000-C488-824CFFFCF929" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-b5nm.2cdu_dhzf"><date_reported_as_of>2018-03-01T00:00:00</date_reported_as_of><pid>406</pid><project_name>Gilboa Dam Reconstruction, Phase IV</project_name><description>This project will rehabilitate the mechanics and the architecture of the Shandaken Tunnel Intake Chamber, which includes the replacement of gates and general site improvements.</description><category>Water Supply</category><borough>Upstate</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2008-12-01T00:00:00</design_start><budget_forecast>64523224.70</budget_forecast><latest_budget_changes>-1267200.00</latest_budget_changes><total_budget_changes>33535991.20</total_budget_changes><forecast_completion>2021-10-06T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1684</total_schedule_changes></row><row _id="row-gky3.7x3k.eaec" _uuid="00000000-0000-0000-28AF-E88096146656" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-gky3.7x3k.eaec"><date_reported_as_of>2018-08-01T00:00:00</date_reported_as_of><pid>406</pid><project_name>Gilboa Dam Reconstruction, Phase IV</project_name><description>This project will rehabilitate the mechanics and the architecture of the Shandaken Tunnel Intake Chamber, which includes the replacement of gates and general site improvements.</description><category>Water Supply</category><borough>Upstate</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2008-12-01T00:00:00</design_start><budget_forecast>66290311.40</budget_forecast><latest_budget_changes>1767086.70</latest_budget_changes><total_budget_changes>33535991.20</total_budget_changes><forecast_completion>2021-10-07T00:00:00</forecast_completion><latest_schedule_changes>1</latest_schedule_changes><total_schedule_changes>1684</total_schedule_changes></row><row _id="row-8qns~inxx-sihp" _uuid="00000000-0000-0000-EB60-39ACE669B72F" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-8qns~inxx-sihp"><date_reported_as_of>2019-01-01T00:00:00</date_reported_as_of><pid>406</pid><project_name>Gilboa Dam Reconstruction, Phase IV</project_name><description>This project will rehabilitate the mechanics and the architecture of the Shandaken Tunnel Intake Chamber, which includes the replacement of gates and general site improvements.</description><category>Water Supply</category><borough>Upstate</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2008-12-01T00:00:00</design_start><budget_forecast>66616096.06</budget_forecast><latest_budget_changes>325784.66</latest_budget_changes><total_budget_changes>33535991.20</total_budget_changes><forecast_completion>2021-10-07T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1684</total_schedule_changes></row><row _id="row-iqup_wkyj.s7vx" _uuid="00000000-0000-0000-52A8-BDE194073A6A" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-iqup_wkyj.s7vx"><date_reported_as_of>2019-05-01T00:00:00</date_reported_as_of><pid>406</pid><project_name>Gilboa Dam Reconstruction, Phase IV</project_name><description>This project will rehabilitate the mechanics and the architecture of the Shandaken Tunnel Intake Chamber, which includes the replacement of gates and general site improvements.</description><category>Water Supply</category><borough>Upstate</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2008-12-01T00:00:00</design_start><budget_forecast>66972781.91</budget_forecast><latest_budget_changes>356685.86</latest_budget_changes><total_budget_changes>33535991.20</total_budget_changes><forecast_completion>2021-10-07T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1684</total_schedule_changes></row><row _id="row-dmkb_2diu_7zru" _uuid="00000000-0000-0000-E911-71DFA840B62B" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-dmkb_2diu_7zru"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>406</pid><project_name>Gilboa Dam Reconstruction, Phase IV</project_name><description>This project will rehabilitate the mechanics and the architecture of the Shandaken Tunnel Intake Chamber, which includes the replacement of gates and general site improvements.</description><category>Water Supply</category><borough>Upstate</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2008-12-01T00:00:00</design_start><budget_forecast>67129022.92</budget_forecast><latest_budget_changes>156241.01</latest_budget_changes><total_budget_changes>33535991.20</total_budget_changes><forecast_completion>2021-01-25T00:00:00</forecast_completion><latest_schedule_changes>-255</latest_schedule_changes><total_schedule_changes>1684</total_schedule_changes></row><row _id="row-26uu_hvj3_5mpj" _uuid="00000000-0000-0000-DCC9-4FA57A9DEED8" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-26uu_hvj3_5mpj"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>406</pid><project_name>Gilboa Dam Reconstruction, Phase IV</project_name><description>This project will rehabilitate the mechanics and the architecture of the Shandaken Tunnel Intake Chamber, which includes the replacement of gates and general site improvements.</description><category>Water Supply</category><borough>Upstate</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2008-12-01T00:00:00</design_start><budget_forecast>67456566.55</budget_forecast><latest_budget_changes>327543.62</latest_budget_changes><total_budget_changes>33535991.20</total_budget_changes><forecast_completion>2021-04-26T00:00:00</forecast_completion><latest_schedule_changes>91</latest_schedule_changes><total_schedule_changes>1684</total_schedule_changes></row><row _id="row-cdqg_atad.cqd9" _uuid="00000000-0000-0000-B61A-E3D8F88DD7BF" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-cdqg_atad.cqd9"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>406</pid><project_name>Gilboa Dam Reconstruction, Phase IV</project_name><description>This project will rehabilitate the mechanics and the architecture of the Shandaken Tunnel Intake Chamber, which includes the replacement of gates and general site improvements.</description><category>Water Supply</category><borough>Upstate</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2008-12-01T00:00:00</design_start><budget_forecast>71088459.90</budget_forecast><latest_budget_changes>3631893.36</latest_budget_changes><total_budget_changes>33535991.20</total_budget_changes><forecast_completion>2021-06-09T00:00:00</forecast_completion><latest_schedule_changes>44</latest_schedule_changes><total_schedule_changes>1684</total_schedule_changes></row><row _id="row-3bnf-pqwf~wmcu" _uuid="00000000-0000-0000-545D-BB7925A1C877" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-3bnf-pqwf~wmcu"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>406</pid><project_name>Gilboa Dam Reconstruction, Phase IV</project_name><description>This project will rehabilitate the mechanics and the architecture of the Shandaken Tunnel Intake Chamber, which includes the replacement of gates and general site improvements.</description><category>Water Supply</category><borough>Upstate</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2008-12-01T00:00:00</design_start><budget_forecast>72000604.60</budget_forecast><latest_budget_changes>912144.70</latest_budget_changes><total_budget_changes>33535991.20</total_budget_changes><forecast_completion>2021-11-24T00:00:00</forecast_completion><latest_schedule_changes>168</latest_schedule_changes><total_schedule_changes>1684</total_schedule_changes></row><row _id="row-i5we.h28q.mz6a" _uuid="00000000-0000-0000-B4E0-999AE232D551" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-i5we.h28q.mz6a"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>406</pid><project_name>Gilboa Dam Reconstruction, Phase IV</project_name><description>This project will rehabilitate the mechanics and the architecture of the Shandaken Tunnel Intake Chamber, which includes the replacement of gates and general site improvements.</description><category>Water Supply</category><borough>Upstate</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2008-12-01T00:00:00</design_start><budget_forecast>72815131.90</budget_forecast><latest_budget_changes>814527.30</latest_budget_changes><total_budget_changes>33535991.20</total_budget_changes><forecast_completion>2022-02-16T00:00:00</forecast_completion><latest_schedule_changes>84</latest_schedule_changes><total_schedule_changes>1684</total_schedule_changes></row><row _id="row-pqwa~6mhg-3qi2" _uuid="00000000-0000-0000-5FA2-508B1A4904D6" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-pqwa~6mhg-3qi2"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>406</pid><project_name>Gilboa Dam Reconstruction, Phase IV</project_name><description>This project will rehabilitate the mechanics and the architecture of the Shandaken Tunnel Intake Chamber, which includes the replacement of gates and general site improvements.</description><category>Water Supply</category><borough>Upstate</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2008-12-01T00:00:00</design_start><budget_forecast>72818170.00</budget_forecast><latest_budget_changes>3038.10</latest_budget_changes><total_budget_changes>33535991.20</total_budget_changes><forecast_completion>2022-02-15T00:00:00</forecast_completion><latest_schedule_changes>-1</latest_schedule_changes><total_schedule_changes>1684</total_schedule_changes></row><row _id="row-hs9d-g3ci-wjux" _uuid="00000000-0000-0000-79E2-679D40ABEC80" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-hs9d-g3ci-wjux"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>406</pid><project_name>Gilboa Dam Reconstruction, Phase IV</project_name><description>This project will rehabilitate the mechanics and the architecture of the Shandaken Tunnel Intake Chamber, which includes the replacement of gates and general site improvements.</description><category>Water Supply</category><borough>Upstate</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2008-12-01T00:00:00</design_start><budget_forecast>73072235.55</budget_forecast><latest_budget_changes>254065.55</latest_budget_changes><total_budget_changes>33535991.20</total_budget_changes><forecast_completion>2022-09-01T00:00:00</forecast_completion><latest_schedule_changes>198</latest_schedule_changes><total_schedule_changes>1684</total_schedule_changes></row><row _id="row-9zzh~a8bf.qjmt" _uuid="00000000-0000-0000-97A5-64FF2759ABD8" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-9zzh~a8bf.qjmt"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>406</pid><project_name>Gilboa Dam Reconstruction, Phase IV</project_name><description>This project will rehabilitate the mechanics and the architecture of the Shandaken Tunnel Intake Chamber, which includes the replacement of gates and general site improvements.</description><category>Water Supply</category><borough>Upstate</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2008-12-01T00:00:00</design_start><budget_forecast>72960489.85</budget_forecast><latest_budget_changes>-111745.70</latest_budget_changes><total_budget_changes>33535991.20</total_budget_changes><forecast_completion>2022-08-29T00:00:00</forecast_completion><latest_schedule_changes>-3</latest_schedule_changes><total_schedule_changes>1684</total_schedule_changes></row><row _id="row-u8gj-kvvi.mbsv" _uuid="00000000-0000-0000-B9B1-42A45ECD5A0D" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-u8gj-kvvi.mbsv"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>406</pid><project_name>Gilboa Dam Reconstruction, Phase IV</project_name><description>This project will rehabilitate the mechanics and the architecture of the Shandaken Tunnel Intake Chamber, which includes the replacement of gates and general site improvements.</description><category>Water Supply</category><borough>Upstate</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2008-12-01T00:00:00</design_start><budget_forecast>71046192.20</budget_forecast><latest_budget_changes>-1914297.65</latest_budget_changes><total_budget_changes>33535991.20</total_budget_changes><forecast_completion>2022-11-27T00:00:00</forecast_completion><latest_schedule_changes>90</latest_schedule_changes><total_schedule_changes>1684</total_schedule_changes></row><row _id="row-tvmr-52yh~z2a6" _uuid="00000000-0000-0000-9805-D5ED62BC0A4C" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-tvmr-52yh~z2a6"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>406</pid><project_name>Gilboa Dam Reconstruction, Phase IV</project_name><description>This project will rehabilitate the mechanics and the architecture of the Shandaken Tunnel Intake Chamber, which includes the replacement of gates and general site improvements.</description><category>Water Supply</category><borough>Upstate</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2008-12-01T00:00:00</design_start><budget_forecast>71013192.20</budget_forecast><latest_budget_changes>-33000.00</latest_budget_changes><total_budget_changes>33535991.20</total_budget_changes><forecast_completion>2023-03-27T00:00:00</forecast_completion><latest_schedule_changes>120</latest_schedule_changes><total_schedule_changes>1684</total_schedule_changes></row><row _id="row-nem7-8avn_vp3x" _uuid="00000000-0000-0000-D616-5F49DF34D1A8" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-nem7-8avn_vp3x"><date_reported_as_of>2013-09-01T00:00:00</date_reported_as_of><pid>409</pid><project_name>Rondout-West Branch Bypass Tunnel Construction Project 2</project_name><description>To address existing leaks in the Delaware Aqueduct, a 3-mile bypass tunnel will be constructed near the town of Roseton and the existing tunnel will be repaired near the town of Wawarsing.</description><category>Water Supply</category><borough>Marlboro</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2012-03-23T00:00:00</design_start><budget_forecast>705914042.00</budget_forecast><total_budget_changes>202552329.25</total_budget_changes><forecast_completion>2024-02-29T00:00:00</forecast_completion><total_schedule_changes>256</total_schedule_changes></row><row _id="row-3puk.bdhk~tkw9" _uuid="00000000-0000-0000-37AC-A74AF9173C69" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-3puk.bdhk~tkw9"><date_reported_as_of>2014-01-01T00:00:00</date_reported_as_of><pid>409</pid><project_name>Rondout-West Branch Bypass Tunnel Construction Project 2</project_name><description>To address existing leaks in the Delaware Aqueduct, a 3-mile bypass tunnel will be constructed near the town of Roseton and the existing tunnel will be repaired near the town of Wawarsing.</description><category>Water Supply</category><borough>Marlboro</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2012-03-23T00:00:00</design_start><budget_forecast>705942366.00</budget_forecast><latest_budget_changes>28324.00</latest_budget_changes><total_budget_changes>202552329.25</total_budget_changes><forecast_completion>2024-05-01T00:00:00</forecast_completion><latest_schedule_changes>62</latest_schedule_changes><total_schedule_changes>256</total_schedule_changes></row><row _id="row-2qt5.9hzm~kast" _uuid="00000000-0000-0000-0E13-118B15026D02" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-2qt5.9hzm~kast"><date_reported_as_of>2014-05-01T00:00:00</date_reported_as_of><pid>409</pid><project_name>Rondout-West Branch Bypass Tunnel Construction Project 2</project_name><description>To address existing leaks in the Delaware Aqueduct, a 3-mile bypass tunnel will be constructed near the town of Roseton and the existing tunnel will be repaired near the town of Wawarsing.</description><category>Water Supply</category><borough>Marlboro</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2012-03-23T00:00:00</design_start><budget_forecast>705669366.00</budget_forecast><latest_budget_changes>-273000.00</latest_budget_changes><total_budget_changes>202552329.25</total_budget_changes><forecast_completion>2024-05-01T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>256</total_schedule_changes></row><row _id="row-cjrg-h5s4.tnnn" _uuid="00000000-0000-0000-BA3E-843512A041FF" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-cjrg-h5s4.tnnn"><date_reported_as_of>2015-02-01T00:00:00</date_reported_as_of><pid>409</pid><project_name>Rondout-West Branch Bypass Tunnel Construction Project 2</project_name><description>To address existing leaks in the Delaware Aqueduct, a 3-mile bypass tunnel will be constructed near the town of Roseton and the existing tunnel will be repaired near the town of Wawarsing.</description><category>Water Supply</category><borough>Marlboro</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2012-03-23T00:00:00</design_start><budget_forecast>731257855.00</budget_forecast><latest_budget_changes>25588489.00</latest_budget_changes><total_budget_changes>202552329.25</total_budget_changes><forecast_completion>2024-08-29T00:00:00</forecast_completion><latest_schedule_changes>120</latest_schedule_changes><total_schedule_changes>256</total_schedule_changes></row><row _id="row-7ysd-n4qb~ar64" _uuid="00000000-0000-0000-BF14-C3B4A38FC152" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-7ysd-n4qb~ar64"><date_reported_as_of>2015-08-01T00:00:00</date_reported_as_of><pid>409</pid><project_name>Rondout-West Branch Bypass Tunnel Construction Project 2</project_name><description>To address existing leaks in the Delaware Aqueduct, a 3-mile bypass tunnel will be constructed near the town of Roseton and the existing tunnel will be repaired near the town of Wawarsing.</description><category>Water Supply</category><borough>Marlboro</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2012-03-23T00:00:00</design_start><budget_forecast>866526960.00</budget_forecast><latest_budget_changes>135269105.00</latest_budget_changes><total_budget_changes>202552329.25</total_budget_changes><forecast_completion>2025-12-05T00:00:00</forecast_completion><latest_schedule_changes>463</latest_schedule_changes><total_schedule_changes>256</total_schedule_changes></row><row _id="row-wdez.jrwu~cewd" _uuid="00000000-0000-0000-85B0-A4A1709C8318" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-wdez.jrwu~cewd"><date_reported_as_of>2016-01-01T00:00:00</date_reported_as_of><pid>409</pid><project_name>Rondout-West Branch Bypass Tunnel Construction Project 2</project_name><description>To address existing leaks in the Delaware Aqueduct, a 3-mile bypass tunnel will be constructed near the town of Roseton and the existing tunnel will be repaired near the town of Wawarsing.</description><category>Water Supply</category><borough>Marlboro</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2012-03-23T00:00:00</design_start><budget_forecast>852452143.20</budget_forecast><latest_budget_changes>-14074816.80</latest_budget_changes><total_budget_changes>202552329.25</total_budget_changes><forecast_completion>2025-12-05T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>256</total_schedule_changes></row><row _id="row-pj9u.i795~ghiq" _uuid="00000000-0000-0000-87BE-377FED7CDC82" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-pj9u.i795~ghiq"><date_reported_as_of>2016-06-01T00:00:00</date_reported_as_of><pid>409</pid><project_name>Rondout-West Branch Bypass Tunnel Construction Project 2</project_name><description>To address existing leaks in the Delaware Aqueduct, a 3-mile bypass tunnel will be constructed near the town of Roseton and the existing tunnel will be repaired near the town of Wawarsing.</description><category>Water Supply</category><borough>Marlboro</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2012-03-23T00:00:00</design_start><budget_forecast>872623278.83</budget_forecast><latest_budget_changes>20171135.63</latest_budget_changes><total_budget_changes>202552329.25</total_budget_changes><forecast_completion>2022-09-26T00:00:00</forecast_completion><latest_schedule_changes>-1166</latest_schedule_changes><total_schedule_changes>256</total_schedule_changes></row><row _id="row-hci5~6fpi.n49v" _uuid="00000000-0000-0000-A073-ADEFDCAF8E7D" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-hci5~6fpi.n49v"><date_reported_as_of>2016-11-01T00:00:00</date_reported_as_of><pid>409</pid><project_name>Rondout-West Branch Bypass Tunnel Construction Project 2</project_name><description>To address existing leaks in the Delaware Aqueduct, a 3-mile bypass tunnel will be constructed near the town of Roseton and the existing tunnel will be repaired near the town of Wawarsing.</description><category>Water Supply</category><borough>Marlboro</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2012-03-23T00:00:00</design_start><budget_forecast>874643997.83</budget_forecast><latest_budget_changes>2020719.00</latest_budget_changes><total_budget_changes>202552329.25</total_budget_changes><forecast_completion>2022-09-26T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>256</total_schedule_changes></row><row _id="row-azvc.tt6q~the8" _uuid="00000000-0000-0000-87D9-F285B9C6B3D5" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-azvc.tt6q~the8"><date_reported_as_of>2017-04-01T00:00:00</date_reported_as_of><pid>409</pid><project_name>Rondout-West Branch Bypass Tunnel Construction Project 2</project_name><description>To address existing leaks in the Delaware Aqueduct, a 3-mile bypass tunnel will be constructed near the town of Roseton and the existing tunnel will be repaired near the town of Wawarsing.</description><category>Water Supply</category><borough>Marlboro</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2012-03-23T00:00:00</design_start><budget_forecast>902209763.56</budget_forecast><latest_budget_changes>27565765.74</latest_budget_changes><total_budget_changes>202552329.25</total_budget_changes><forecast_completion>2023-09-26T00:00:00</forecast_completion><latest_schedule_changes>365</latest_schedule_changes><total_schedule_changes>256</total_schedule_changes></row><row _id="row-62bj_fqid-nj23" _uuid="00000000-0000-0000-CE39-AF648089670C" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-62bj_fqid-nj23"><date_reported_as_of>2017-09-01T00:00:00</date_reported_as_of><pid>409</pid><project_name>Rondout-West Branch Bypass Tunnel Construction Project 2</project_name><description>To address existing leaks in the Delaware Aqueduct, a 3-mile bypass tunnel will be constructed near the town of Roseton and the existing tunnel will be repaired near the town of Wawarsing.</description><category>Water Supply</category><borough>Marlboro</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2012-03-23T00:00:00</design_start><budget_forecast>887887354.44</budget_forecast><latest_budget_changes>-14322409.13</latest_budget_changes><total_budget_changes>202552329.25</total_budget_changes><forecast_completion>2023-09-26T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>256</total_schedule_changes></row><row _id="row-hyvs.h5ig-t9zu" _uuid="00000000-0000-0000-97B3-D9842E181BA7" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-hyvs.h5ig-t9zu"><date_reported_as_of>2018-03-01T00:00:00</date_reported_as_of><pid>409</pid><project_name>Rondout-West Branch Bypass Tunnel Construction Project 2</project_name><description>To address existing leaks in the Delaware Aqueduct, a 3-mile bypass tunnel will be constructed near the town of Roseton and the existing tunnel will be repaired near the town of Wawarsing.</description><category>Water Supply</category><borough>Marlboro</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2012-03-23T00:00:00</design_start><budget_forecast>889665374.54</budget_forecast><latest_budget_changes>1778020.11</latest_budget_changes><total_budget_changes>202552329.25</total_budget_changes><forecast_completion>2023-09-26T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>256</total_schedule_changes></row><row _id="row-akgv.76dq_ivns" _uuid="00000000-0000-0000-572E-23BCDAC98FBB" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-akgv.76dq_ivns"><date_reported_as_of>2018-08-01T00:00:00</date_reported_as_of><pid>409</pid><project_name>Rondout-West Branch Bypass Tunnel Construction Project 2</project_name><description>To address existing leaks in the Delaware Aqueduct, a 3-mile bypass tunnel will be constructed near the town of Roseton and the existing tunnel will be repaired near the town of Wawarsing.</description><category>Water Supply</category><borough>Marlboro</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2012-03-23T00:00:00</design_start><budget_forecast>891537907.44</budget_forecast><latest_budget_changes>1872532.89</latest_budget_changes><total_budget_changes>202552329.25</total_budget_changes><forecast_completion>2023-09-26T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>256</total_schedule_changes></row><row _id="row-xcf5.xeae_ruaa" _uuid="00000000-0000-0000-2C03-E86FEEF355B4" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-xcf5.xeae_ruaa"><date_reported_as_of>2019-01-01T00:00:00</date_reported_as_of><pid>409</pid><project_name>Rondout-West Branch Bypass Tunnel Construction Project 2</project_name><description>To address existing leaks in the Delaware Aqueduct, a 3-mile bypass tunnel will be constructed near the town of Roseton and the existing tunnel will be repaired near the town of Wawarsing.</description><category>Water Supply</category><borough>Marlboro</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2012-03-23T00:00:00</design_start><budget_forecast>883100302.98</budget_forecast><latest_budget_changes>-8437604.45</latest_budget_changes><total_budget_changes>202552329.25</total_budget_changes><forecast_completion>2025-12-06T00:00:00</forecast_completion><latest_schedule_changes>802</latest_schedule_changes><total_schedule_changes>256</total_schedule_changes></row><row _id="row-pekc-jrfm-d8b4" _uuid="00000000-0000-0000-1C22-9C960F551FC9" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-pekc-jrfm-d8b4"><date_reported_as_of>2019-05-01T00:00:00</date_reported_as_of><pid>409</pid><project_name>Rondout-West Branch Bypass Tunnel Construction Project 2</project_name><description>To address existing leaks in the Delaware Aqueduct, a 3-mile bypass tunnel will be constructed near the town of Roseton and the existing tunnel will be repaired near the town of Wawarsing.</description><category>Water Supply</category><borough>Marlboro</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2012-03-23T00:00:00</design_start><budget_forecast>882239631.71</budget_forecast><latest_budget_changes>-860671.27</latest_budget_changes><total_budget_changes>202552329.25</total_budget_changes><forecast_completion>2025-12-06T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>256</total_schedule_changes></row><row _id="row-2d33-jfy3_eie5" _uuid="00000000-0000-0000-9AE8-565B7D606291" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-2d33-jfy3_eie5"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>409</pid><project_name>Rondout-West Branch Bypass Tunnel Construction Project 2</project_name><description>To address existing leaks in the Delaware Aqueduct, a 3-mile bypass tunnel will be constructed near the town of Roseton and the existing tunnel will be repaired near the town of Wawarsing.</description><category>Water Supply</category><borough>Marlboro</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2012-03-23T00:00:00</design_start><budget_forecast>877670452.38</budget_forecast><latest_budget_changes>-4569179.33</latest_budget_changes><total_budget_changes>202552329.25</total_budget_changes><forecast_completion>2025-12-06T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>256</total_schedule_changes></row><row _id="row-c5jk.z3hk.cf6k" _uuid="00000000-0000-0000-F391-5413B5B2747F" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-c5jk.z3hk.cf6k"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>409</pid><project_name>Rondout-West Branch Bypass Tunnel Construction Project 2</project_name><description>To address existing leaks in the Delaware Aqueduct, a 3-mile bypass tunnel will be constructed near the town of Roseton and the existing tunnel will be repaired near the town of Wawarsing.</description><category>Water Supply</category><borough>Marlboro</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2012-03-23T00:00:00</design_start><budget_forecast>882411503.00</budget_forecast><latest_budget_changes>4741050.62</latest_budget_changes><total_budget_changes>202552329.25</total_budget_changes><forecast_completion>2023-09-06T00:00:00</forecast_completion><latest_schedule_changes>-822</latest_schedule_changes><total_schedule_changes>256</total_schedule_changes></row><row _id="row-nicp.rffa-aqn9" _uuid="00000000-0000-0000-9351-7CEDBEA7183E" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-nicp.rffa-aqn9"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>409</pid><project_name>Rondout-West Branch Bypass Tunnel Construction Project 2</project_name><description>To address existing leaks in the Delaware Aqueduct, a 3-mile bypass tunnel will be constructed near the town of Roseton and the existing tunnel will be repaired near the town of Wawarsing.</description><category>Water Supply</category><borough>Marlboro</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2012-03-23T00:00:00</design_start><budget_forecast>881472816.70</budget_forecast><latest_budget_changes>-938686.30</latest_budget_changes><total_budget_changes>202552329.25</total_budget_changes><forecast_completion>2023-09-26T00:00:00</forecast_completion><latest_schedule_changes>20</latest_schedule_changes><total_schedule_changes>256</total_schedule_changes></row><row _id="row-p9t5.kf9u~u9rj" _uuid="00000000-0000-0000-81D8-033A90302EFA" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-p9t5.kf9u~u9rj"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>409</pid><project_name>Rondout-West Branch Bypass Tunnel Construction Project 2</project_name><description>To address existing leaks in the Delaware Aqueduct, a 3-mile bypass tunnel will be constructed near the town of Roseton and the existing tunnel will be repaired near the town of Wawarsing.</description><category>Water Supply</category><borough>Marlboro</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2012-03-23T00:00:00</design_start><budget_forecast>884917571.30</budget_forecast><latest_budget_changes>3444754.60</latest_budget_changes><total_budget_changes>202552329.25</total_budget_changes><forecast_completion>2023-04-28T00:00:00</forecast_completion><latest_schedule_changes>-151</latest_schedule_changes><total_schedule_changes>256</total_schedule_changes></row><row _id="row-j6mu~t9dq_x3yj" _uuid="00000000-0000-0000-FFEA-9161E840B980" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-j6mu~t9dq_x3yj"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>409</pid><project_name>Rondout-West Branch Bypass Tunnel Construction Project 2</project_name><description>To address existing leaks in the Delaware Aqueduct, a 3-mile bypass tunnel will be constructed near the town of Roseton and the existing tunnel will be repaired near the town of Wawarsing.</description><category>Water Supply</category><borough>Marlboro</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2012-03-23T00:00:00</design_start><budget_forecast>889869120.99</budget_forecast><latest_budget_changes>4951549.69</latest_budget_changes><total_budget_changes>202552329.25</total_budget_changes><forecast_completion>2023-09-26T00:00:00</forecast_completion><latest_schedule_changes>151</latest_schedule_changes><total_schedule_changes>256</total_schedule_changes></row><row _id="row-b3v2~qg6m_yjfh" _uuid="00000000-0000-0000-95DA-CA0238FC7AF6" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-b3v2~qg6m_yjfh"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>409</pid><project_name>Rondout-West Branch Bypass Tunnel Construction Project 2</project_name><description>To address existing leaks in the Delaware Aqueduct, a 3-mile bypass tunnel will be constructed near the town of Roseton and the existing tunnel will be repaired near the town of Wawarsing.</description><category>Water Supply</category><borough>Marlboro</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2012-03-23T00:00:00</design_start><budget_forecast>897052715.91</budget_forecast><latest_budget_changes>7183594.92</latest_budget_changes><total_budget_changes>202552329.25</total_budget_changes><forecast_completion>2023-09-26T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>256</total_schedule_changes></row><row _id="row-5bs6.pcmk_596b" _uuid="00000000-0000-0000-F13B-4110425AC6FA" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-5bs6.pcmk_596b"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>409</pid><project_name>Rondout-West Branch Bypass Tunnel Construction Project 2</project_name><description>To address existing leaks in the Delaware Aqueduct, a 3-mile bypass tunnel will be constructed near the town of Roseton and the existing tunnel will be repaired near the town of Wawarsing.</description><category>Water Supply</category><borough>Marlboro</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2012-03-23T00:00:00</design_start><budget_forecast>895056514.00</budget_forecast><latest_budget_changes>-1996201.91</latest_budget_changes><total_budget_changes>202552329.25</total_budget_changes><forecast_completion>2023-10-12T00:00:00</forecast_completion><latest_schedule_changes>16</latest_schedule_changes><total_schedule_changes>256</total_schedule_changes></row><row _id="row-q8je_epji_m4in" _uuid="00000000-0000-0000-851A-664341F9D481" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-q8je_epji_m4in"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>409</pid><project_name>Rondout-West Branch Bypass Tunnel Construction Project 2</project_name><description>To address existing leaks in the Delaware Aqueduct, a 3-mile bypass tunnel will be constructed near the town of Roseton and the existing tunnel will be repaired near the town of Wawarsing.</description><category>Water Supply</category><borough>Marlboro</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2012-03-23T00:00:00</design_start><budget_forecast>893157459.00</budget_forecast><latest_budget_changes>-1899055.00</latest_budget_changes><total_budget_changes>202552329.25</total_budget_changes><forecast_completion>2023-10-14T00:00:00</forecast_completion><latest_schedule_changes>2</latest_schedule_changes><total_schedule_changes>256</total_schedule_changes></row><row _id="row-m7rt~pp2y_r4u9" _uuid="00000000-0000-0000-2FED-9FA694505CE9" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-m7rt~pp2y_r4u9"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>409</pid><project_name>Rondout-West Branch Bypass Tunnel Construction Project 2</project_name><description>To address existing leaks in the Delaware Aqueduct, a 3-mile bypass tunnel will be constructed near the town of Roseton and the existing tunnel will be repaired near the town of Wawarsing.</description><category>Water Supply</category><borough>Marlboro</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2012-03-23T00:00:00</design_start><budget_forecast>907089832.76</budget_forecast><latest_budget_changes>13932373.76</latest_budget_changes><total_budget_changes>202552329.25</total_budget_changes><forecast_completion>2024-10-14T00:00:00</forecast_completion><latest_schedule_changes>366</latest_schedule_changes><total_schedule_changes>256</total_schedule_changes></row><row _id="row-v6hh~6ay4_qck4" _uuid="00000000-0000-0000-05E9-44CC36DFD32A" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-v6hh~6ay4_qck4"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>409</pid><project_name>Rondout-West Branch Bypass Tunnel Construction Project 2</project_name><description>To address existing leaks in the Delaware Aqueduct, a 3-mile bypass tunnel will be constructed near the town of Roseton and the existing tunnel will be repaired near the town of Wawarsing.</description><category>Water Supply</category><borough>Marlboro</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2012-03-23T00:00:00</design_start><budget_forecast>908466371.25</budget_forecast><latest_budget_changes>1376538.49</latest_budget_changes><total_budget_changes>202552329.25</total_budget_changes><forecast_completion>2024-11-11T00:00:00</forecast_completion><latest_schedule_changes>28</latest_schedule_changes><total_schedule_changes>256</total_schedule_changes></row><row _id="row-d8nt.5u4n~3hug" _uuid="00000000-0000-0000-0863-76B3444B410E" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-d8nt.5u4n~3hug"><date_reported_as_of>2014-01-01T00:00:00</date_reported_as_of><pid>423</pid><project_name>North River Wastewater Treatment Plant Cogeneration and Electrification</project_name><description>This project will replace the 10 existing pump and blower engines with electric motors for the main sewage pumps and a new cogeneration facility consisting of 5 new dual fuel engines and electrical service distribution upgrades.</description><category>Wastewater Treatment</category><borough>New York</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2013-07-01T00:00:00</design_start><budget_forecast>152982920.00</budget_forecast><total_budget_changes>134242052.88</total_budget_changes><forecast_completion>2019-05-07T00:00:00</forecast_completion><total_schedule_changes>1712</total_schedule_changes></row><row _id="row-4srr~nucv_vysn" _uuid="00000000-0000-0000-20DA-BEA1D9D9F67D" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-4srr~nucv_vysn"><date_reported_as_of>2014-05-01T00:00:00</date_reported_as_of><pid>423</pid><project_name>North River Wastewater Treatment Plant Cogeneration and Electrification</project_name><description>This project will replace the 10 existing pump and blower engines with electric motors for the main sewage pumps and a new cogeneration facility consisting of 5 new dual fuel engines and electrical service distribution upgrades.</description><category>Wastewater Treatment</category><borough>New York</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2013-07-01T00:00:00</design_start><budget_forecast>156362904.00</budget_forecast><latest_budget_changes>3379984.00</latest_budget_changes><total_budget_changes>134242052.88</total_budget_changes><forecast_completion>2019-11-30T00:00:00</forecast_completion><latest_schedule_changes>207</latest_schedule_changes><total_schedule_changes>1712</total_schedule_changes></row><row _id="row-qrn7_2g8w_cz47" _uuid="00000000-0000-0000-EB25-8D71E47A7FE8" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-qrn7_2g8w_cz47"><date_reported_as_of>2015-02-01T00:00:00</date_reported_as_of><pid>423</pid><project_name>North River Wastewater Treatment Plant Cogeneration and Electrification</project_name><description>This project will replace the 10 existing pump and blower engines with electric motors for the main sewage pumps and a new cogeneration facility consisting of 5 new dual fuel engines and electrical service distribution upgrades.</description><category>Wastewater Treatment</category><borough>New York</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2013-07-01T00:00:00</design_start><budget_forecast>154456595.00</budget_forecast><latest_budget_changes>-1906309.00</latest_budget_changes><total_budget_changes>134242052.88</total_budget_changes><forecast_completion>2020-04-18T00:00:00</forecast_completion><latest_schedule_changes>140</latest_schedule_changes><total_schedule_changes>1712</total_schedule_changes></row><row _id="row-wxmm.w2si~3ugk" _uuid="00000000-0000-0000-93AB-A7DC62DE8AF0" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-wxmm.w2si~3ugk"><date_reported_as_of>2015-08-01T00:00:00</date_reported_as_of><pid>423</pid><project_name>North River Wastewater Treatment Plant Cogeneration and Electrification</project_name><description>This project will replace the 10 existing pump and blower engines with electric motors for the main sewage pumps and a new cogeneration facility consisting of 5 new dual fuel engines and electrical service distribution upgrades.</description><category>Wastewater Treatment</category><borough>New York</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2013-07-01T00:00:00</design_start><budget_forecast>194860876.00</budget_forecast><latest_budget_changes>40404281.00</latest_budget_changes><total_budget_changes>134242052.88</total_budget_changes><forecast_completion>2020-09-13T00:00:00</forecast_completion><latest_schedule_changes>148</latest_schedule_changes><total_schedule_changes>1712</total_schedule_changes></row><row _id="row-mkhm.3htt~fv3c" _uuid="00000000-0000-0000-9C3A-421DD9DDF932" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-mkhm.3htt~fv3c"><date_reported_as_of>2016-01-01T00:00:00</date_reported_as_of><pid>423</pid><project_name>North River Wastewater Treatment Plant Cogeneration and Electrification</project_name><description>This project will replace the 10 existing pump and blower engines with electric motors for the main sewage pumps and a new cogeneration facility consisting of 5 new dual fuel engines and electrical service distribution upgrades.</description><category>Wastewater Treatment</category><borough>New York</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2013-07-01T00:00:00</design_start><budget_forecast>220178933.00</budget_forecast><latest_budget_changes>25318057.00</latest_budget_changes><total_budget_changes>134242052.88</total_budget_changes><forecast_completion>2021-01-26T00:00:00</forecast_completion><latest_schedule_changes>135</latest_schedule_changes><total_schedule_changes>1712</total_schedule_changes></row><row _id="row-5235-sr7t~qgwf" _uuid="00000000-0000-0000-FEE0-0CD05C4F631D" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-5235-sr7t~qgwf"><date_reported_as_of>2016-06-01T00:00:00</date_reported_as_of><pid>423</pid><project_name>North River Wastewater Treatment Plant Cogeneration and Electrification</project_name><description>This project will replace the 10 existing pump and blower engines with electric motors for the main sewage pumps and a new cogeneration facility consisting of 5 new dual fuel engines,  electrical service upgrades and flood protection.</description><category>Wastewater Treatment</category><borough>New York</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2013-07-01T00:00:00</design_start><budget_forecast>225333917.00</budget_forecast><latest_budget_changes>5154984.00</latest_budget_changes><total_budget_changes>134242052.88</total_budget_changes><forecast_completion>2020-12-12T00:00:00</forecast_completion><latest_schedule_changes>-45</latest_schedule_changes><total_schedule_changes>1712</total_schedule_changes></row><row _id="row-48px_j8ki~pgyz" _uuid="00000000-0000-0000-A1BD-44F829D173F1" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-48px_j8ki~pgyz"><date_reported_as_of>2016-11-01T00:00:00</date_reported_as_of><pid>423</pid><project_name>North River Wastewater Treatment Plant Cogeneration and Electrification</project_name><description>This project will replace the 10 existing pump and blower engines with electric motors for the main sewage pumps and a new cogeneration facility consisting of 5 new dual fuel engines,  electrical service upgrades and flood protection.</description><category>Wastewater Treatment</category><borough>New York</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction Procurement</current_phase><design_start>2013-07-01T00:00:00</design_start><budget_forecast>237947280.00</budget_forecast><latest_budget_changes>12613363.00</latest_budget_changes><total_budget_changes>134242052.88</total_budget_changes><forecast_completion>2021-02-01T00:00:00</forecast_completion><latest_schedule_changes>51</latest_schedule_changes><total_schedule_changes>1712</total_schedule_changes></row><row _id="row-kv3h~4sg5-6d62" _uuid="00000000-0000-0000-AC7F-6147141B5D00" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-kv3h~4sg5-6d62"><date_reported_as_of>2017-04-01T00:00:00</date_reported_as_of><pid>423</pid><project_name>North River Wastewater Treatment Plant Cogeneration and Electrification</project_name><description>This project will replace the 10 existing pump and blower engines with electric motors for the main sewage pumps and a new cogeneration facility consisting of 5 new dual fuel engines,  electrical service upgrades and flood protection.</description><category>Wastewater Treatment</category><borough>New York</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction Procurement</current_phase><design_start>2013-07-01T00:00:00</design_start><budget_forecast>225161153.00</budget_forecast><latest_budget_changes>-12786127.00</latest_budget_changes><total_budget_changes>134242052.88</total_budget_changes><forecast_completion>2021-02-08T00:00:00</forecast_completion><latest_schedule_changes>7</latest_schedule_changes><total_schedule_changes>1712</total_schedule_changes></row><row _id="row-48v3.m55g-pwdg" _uuid="00000000-0000-0000-F749-69558C8333C6" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-48v3.m55g-pwdg"><date_reported_as_of>2017-09-01T00:00:00</date_reported_as_of><pid>423</pid><project_name>North River Wastewater Treatment Plant Cogeneration and Electrification</project_name><description>This project will remove the 10 existing pump and blower engines and add electric motors for the main sewage pumps, a new cogeneration facility consisting of 5 new dual fuel engines,  electrical service upgrades and flood protection.</description><category>Wastewater Treatment</category><borough>New York</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2013-07-01T00:00:00</design_start><budget_forecast>228432457.10</budget_forecast><latest_budget_changes>3271304.10</latest_budget_changes><total_budget_changes>134242052.88</total_budget_changes><forecast_completion>2021-03-06T00:00:00</forecast_completion><latest_schedule_changes>26</latest_schedule_changes><total_schedule_changes>1712</total_schedule_changes></row><row _id="row-g3uv-pd24-mi7f" _uuid="00000000-0000-0000-23EC-34A52CAEA4F7" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-g3uv-pd24-mi7f"><date_reported_as_of>2018-03-01T00:00:00</date_reported_as_of><pid>423</pid><project_name>North River Wastewater Treatment Plant Cogeneration and Electrification</project_name><description>This project will remove the 10 existing pump and blower engines and add electric motors for the main sewage pumps, a new cogeneration facility consisting of 5 new dual fuel engines,  electrical service upgrades and flood protection.</description><category>Wastewater Treatment</category><borough>New York</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2013-07-01T00:00:00</design_start><budget_forecast>233428706.00</budget_forecast><latest_budget_changes>4996248.90</latest_budget_changes><total_budget_changes>134242052.88</total_budget_changes><forecast_completion>2021-03-06T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1712</total_schedule_changes></row><row _id="row-fg4y~2z6n.kuse" _uuid="00000000-0000-0000-17BF-107764A09620" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-fg4y~2z6n.kuse"><date_reported_as_of>2018-08-01T00:00:00</date_reported_as_of><pid>423</pid><project_name>North River Wastewater Treatment Plant Cogeneration and Electrification</project_name><description>This project will remove the 10 existing pump and blower engines and add electric motors for the main sewage pumps, a new cogeneration facility consisting of 5 new dual fuel engines,  electrical service upgrades and flood protection.</description><category>Wastewater Treatment</category><borough>New York</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2013-07-01T00:00:00</design_start><budget_forecast>218296715.00</budget_forecast><latest_budget_changes>-15131991.00</latest_budget_changes><total_budget_changes>134242052.88</total_budget_changes><forecast_completion>2022-05-22T00:00:00</forecast_completion><latest_schedule_changes>442</latest_schedule_changes><total_schedule_changes>1712</total_schedule_changes></row><row _id="row-zbdt_dcz6~hzg9" _uuid="00000000-0000-0000-E816-2A11B174E5AD" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-zbdt_dcz6~hzg9"><date_reported_as_of>2019-01-01T00:00:00</date_reported_as_of><pid>423</pid><project_name>North River Wastewater Treatment Plant Cogeneration and Electrification</project_name><description>This project will remove the 10 existing pump and blower engines and add electric motors for the main sewage pumps, a new cogeneration facility consisting of 5 new dual fuel engines,  electrical service upgrades and flood protection.</description><category>Wastewater Treatment</category><borough>New York</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2013-07-01T00:00:00</design_start><budget_forecast>215634036.00</budget_forecast><latest_budget_changes>-2662679.00</latest_budget_changes><total_budget_changes>134242052.88</total_budget_changes><forecast_completion>2022-05-26T00:00:00</forecast_completion><latest_schedule_changes>4</latest_schedule_changes><total_schedule_changes>1712</total_schedule_changes></row><row _id="row-2fea-ci85-u66h" _uuid="00000000-0000-0000-72C4-C379C92BD8ED" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-2fea-ci85-u66h"><date_reported_as_of>2019-05-01T00:00:00</date_reported_as_of><pid>423</pid><project_name>North River Wastewater Treatment Plant Cogeneration and Electrification</project_name><description>This project will remove the 10 existing pump and blower engines and add electric motors for the main sewage pumps, a new cogeneration facility consisting of 5 new dual fuel engines,  electrical service upgrades and flood protection.</description><category>Wastewater Treatment</category><borough>New York</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2013-07-01T00:00:00</design_start><budget_forecast>223508577.37</budget_forecast><latest_budget_changes>7874541.37</latest_budget_changes><total_budget_changes>134242052.88</total_budget_changes><forecast_completion>2022-07-25T00:00:00</forecast_completion><latest_schedule_changes>60</latest_schedule_changes><total_schedule_changes>1712</total_schedule_changes></row><row _id="row-cjqx~gn47_ijgf" _uuid="00000000-0000-0000-D155-BF91B79C95F3" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-cjqx~gn47_ijgf"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>423</pid><project_name>North River Wastewater Treatment Plant Cogeneration and Electrification</project_name><description>NR-COGEN, ACECOGEN, SANDNR</description><category>Wastewater Treatment</category><borough>New York</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2013-07-01T00:00:00</design_start><budget_forecast>246332584.37</budget_forecast><latest_budget_changes>22824007.00</latest_budget_changes><total_budget_changes>134242052.88</total_budget_changes><forecast_completion>2022-08-08T00:00:00</forecast_completion><latest_schedule_changes>14</latest_schedule_changes><total_schedule_changes>1712</total_schedule_changes></row><row _id="row-yu6x_23ih_spc2" _uuid="00000000-0000-0000-9C31-E477114542EA" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-yu6x_23ih_spc2"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>423</pid><project_name>North River Wastewater Treatment Plant Cogeneration and Electrification</project_name><description>NR-COGEN, ACECOGEN, SANDNR</description><category>Wastewater Treatment</category><borough>New York</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2013-07-01T00:00:00</design_start><budget_forecast>255011254.80</budget_forecast><latest_budget_changes>8678670.43</latest_budget_changes><total_budget_changes>134242052.88</total_budget_changes><forecast_completion>2023-01-04T00:00:00</forecast_completion><latest_schedule_changes>149</latest_schedule_changes><total_schedule_changes>1712</total_schedule_changes></row><row _id="row-cdi3-af6j-w4im" _uuid="00000000-0000-0000-5FEB-5672B4A67567" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-cdi3-af6j-w4im"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>423</pid><project_name>North River Wastewater Treatment Plant Cogeneration and Electrification</project_name><description>NR-COGEN, ACECOGEN, SANDNR</description><category>Wastewater Treatment</category><borough>New York</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2013-07-01T00:00:00</design_start><budget_forecast>279097501.00</budget_forecast><latest_budget_changes>24086246.20</latest_budget_changes><total_budget_changes>134242052.88</total_budget_changes><forecast_completion>2022-11-30T00:00:00</forecast_completion><latest_schedule_changes>-35</latest_schedule_changes><total_schedule_changes>1712</total_schedule_changes></row><row _id="row-df3v_j2cm.wgm5" _uuid="00000000-0000-0000-A2DF-57678D426E1C" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-df3v_j2cm.wgm5"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>423</pid><project_name>North River Wastewater Treatment Plant Cogeneration and Electrification</project_name><description>NR-COGEN, ACECOGEN, SANDNR</description><category>Wastewater Treatment</category><borough>New York</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2013-07-01T00:00:00</design_start><budget_forecast>280739179.50</budget_forecast><latest_budget_changes>1641678.50</latest_budget_changes><total_budget_changes>134242052.88</total_budget_changes><forecast_completion>2023-01-15T00:00:00</forecast_completion><latest_schedule_changes>46</latest_schedule_changes><total_schedule_changes>1712</total_schedule_changes></row><row _id="row-iszn-j866~rjyy" _uuid="00000000-0000-0000-ABAB-2E55C91DE68B" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-iszn-j866~rjyy"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>423</pid><project_name>North River Wastewater Treatment Plant Cogeneration and Electrification</project_name><description>NR-COGEN, ACECOGEN, SANDNR</description><category>Wastewater Treatment</category><borough>New York</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2013-07-01T00:00:00</design_start><budget_forecast>277773621.00</budget_forecast><latest_budget_changes>-2965558.50</latest_budget_changes><total_budget_changes>134242052.88</total_budget_changes><forecast_completion>2023-01-15T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1712</total_schedule_changes></row><row _id="row-gqdw~3gj9-wt7g" _uuid="00000000-0000-0000-61EB-4CE8E3016B3E" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-gqdw~3gj9-wt7g"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>423</pid><project_name>North River Wastewater Treatment Plant Cogeneration and Electrification</project_name><description>NR-COGEN, ACECOGEN, SANDNR</description><category>Wastewater Treatment</category><borough>New York</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2013-07-01T00:00:00</design_start><budget_forecast>277744634.70</budget_forecast><latest_budget_changes>-28986.30</latest_budget_changes><total_budget_changes>134242052.88</total_budget_changes><forecast_completion>2023-03-02T00:00:00</forecast_completion><latest_schedule_changes>46</latest_schedule_changes><total_schedule_changes>1712</total_schedule_changes></row><row _id="row-isrb-qi2r-8uv7" _uuid="00000000-0000-0000-6824-977E6CCD7D94" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-isrb-qi2r-8uv7"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>423</pid><project_name>North River Wastewater Treatment Plant Cogeneration and Electrification</project_name><description>This project will replace the 10 existing pump and blower engines with electric motors for the main sewage pumps and a new cogeneration facility consisting of 5 new dual fuel engines and electrical service distribution upgrades.</description><category>Wastewater Treatment</category><borough>New York</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2013-07-01T00:00:00</design_start><budget_forecast>266544770.13</budget_forecast><latest_budget_changes>-11199864.57</latest_budget_changes><total_budget_changes>134242052.88</total_budget_changes><forecast_completion>2023-03-03T00:00:00</forecast_completion><latest_schedule_changes>1</latest_schedule_changes><total_schedule_changes>1712</total_schedule_changes></row><row _id="row-xn8k.qw64~me23" _uuid="00000000-0000-0000-FE8C-F09B14E735E6" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-xn8k.qw64~me23"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>423</pid><project_name>North River Wastewater Treatment Plant Cogeneration and Electrification</project_name><description>This project will replace the 10 existing pump and blower engines with electric motors for the main sewage pumps and a new cogeneration facility consisting of 5 new dual fuel engines and electrical service distribution upgrades.</description><category>Wastewater Treatment</category><borough>New York</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2013-07-01T00:00:00</design_start><budget_forecast>280757676.88</budget_forecast><latest_budget_changes>14212906.75</latest_budget_changes><total_budget_changes>134242052.88</total_budget_changes><forecast_completion>2023-06-28T00:00:00</forecast_completion><latest_schedule_changes>117</latest_schedule_changes><total_schedule_changes>1712</total_schedule_changes></row><row _id="row-qnh8_bwp6~u4jn" _uuid="00000000-0000-0000-C656-3FC833C57819" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-qnh8_bwp6~u4jn"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>423</pid><project_name>North River Wastewater Treatment Plant Cogeneration and Electrification</project_name><description>This project will replace the 10 existing pump and blower engines with electric motors for the main sewage pumps and a new cogeneration facility consisting of 5 new dual fuel engines and electrical service distribution upgrades.</description><category>Wastewater Treatment</category><borough>New York</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2013-07-01T00:00:00</design_start><budget_forecast>285664883.87</budget_forecast><latest_budget_changes>4907206.99</latest_budget_changes><total_budget_changes>134242052.88</total_budget_changes><forecast_completion>2024-01-13T00:00:00</forecast_completion><latest_schedule_changes>199</latest_schedule_changes><total_schedule_changes>1712</total_schedule_changes></row><row _id="row-69gn-657z_bjpp" _uuid="00000000-0000-0000-25DC-E5E1A6A89DF0" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-69gn-657z_bjpp"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>423</pid><project_name>North River Wastewater Treatment Plant Cogeneration and Electrification</project_name><description>This project will replace the 10 existing pump and blower engines with electric motors for the main sewage pumps and a new cogeneration facility consisting of 5 new dual fuel engines and electrical service distribution upgrades.</description><category>Wastewater Treatment</category><borough>New York</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2013-07-01T00:00:00</design_start><budget_forecast>287224972.88</budget_forecast><latest_budget_changes>1560089.01</latest_budget_changes><total_budget_changes>134242052.88</total_budget_changes><forecast_completion>2024-01-13T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1712</total_schedule_changes></row><row _id="row-59b6_a9xy.e5cn" _uuid="00000000-0000-0000-B079-EDC6D2AB4DCD" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-59b6_a9xy.e5cn"><date_reported_as_of>2014-05-01T00:00:00</date_reported_as_of><pid>432</pid><project_name>20th Avenue Storm and Sanitary Sewer Construction</project_name><description>Construction of a new storm sewer in 20th Avenue between 126th Street and US Bulkhead.</description><category>Sewers</category><borough>Queens</borough><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Design</current_phase><design_start>2012-07-10T00:00:00</design_start><budget_forecast>24689000.00</budget_forecast><total_budget_changes>117177000.00</total_budget_changes><forecast_completion>2017-06-30T00:00:00</forecast_completion><total_schedule_changes>2180</total_schedule_changes></row><row _id="row-4cab~qfct_zipm" _uuid="00000000-0000-0000-350C-93364F300B92" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-4cab~qfct_zipm"><date_reported_as_of>2015-02-01T00:00:00</date_reported_as_of><pid>432</pid><project_name>20th Avenue Storm and Sanitary Sewer Construction</project_name><description>Construction of a new storm sewer in 20th Avenue between 126th Street and US Bulkhead.</description><category>Sewers</category><borough>Queens</borough><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Design</current_phase><design_start>2012-07-10T00:00:00</design_start><budget_forecast>54247000.00</budget_forecast><latest_budget_changes>29558000.00</latest_budget_changes><total_budget_changes>117177000.00</total_budget_changes><forecast_completion>2018-01-12T00:00:00</forecast_completion><latest_schedule_changes>196</latest_schedule_changes><total_schedule_changes>2180</total_schedule_changes></row><row _id="row-qsba-y222_2959" _uuid="00000000-0000-0000-1FE5-4E0E5181DF23" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-qsba-y222_2959"><date_reported_as_of>2015-08-01T00:00:00</date_reported_as_of><pid>432</pid><project_name>20th Avenue Storm and Sanitary Sewer Construction</project_name><description>Construction of a new storm sewer in 20th Avenue between 126th Street and US Bulkhead.</description><category>Sewers</category><borough>Queens</borough><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction Procurement</current_phase><design_start>2012-07-10T00:00:00</design_start><budget_forecast>95366000.00</budget_forecast><latest_budget_changes>41119000.00</latest_budget_changes><total_budget_changes>117177000.00</total_budget_changes><forecast_completion>2018-04-02T00:00:00</forecast_completion><latest_schedule_changes>80</latest_schedule_changes><total_schedule_changes>2180</total_schedule_changes></row><row _id="row-n94t-9aun-g75r" _uuid="00000000-0000-0000-E37B-13B1A58C22E3" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-n94t-9aun-g75r"><date_reported_as_of>2016-01-01T00:00:00</date_reported_as_of><pid>432</pid><project_name>20th Avenue Storm and Sanitary Sewer Construction</project_name><description>Construction of a new storm sewer in 20th Avenue between 126th Street and US Bulkhead.</description><category>Sewers</category><borough>Queens</borough><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction Procurement</current_phase><design_start>2012-07-10T00:00:00</design_start><budget_forecast>95653000.00</budget_forecast><latest_budget_changes>287000.00</latest_budget_changes><total_budget_changes>117177000.00</total_budget_changes><forecast_completion>2018-07-23T00:00:00</forecast_completion><latest_schedule_changes>112</latest_schedule_changes><total_schedule_changes>2180</total_schedule_changes></row><row _id="row-b8kv-fdk5.e96h" _uuid="00000000-0000-0000-2CBE-34FAA368113D" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-b8kv-fdk5.e96h"><date_reported_as_of>2016-06-01T00:00:00</date_reported_as_of><pid>432</pid><project_name>20th Avenue Storm and Sanitary Sewer Construction</project_name><description>Construction of a new storm sewer in 20th Avenue between 126th Street and US Bulkhead.</description><category>Sewers</category><borough>Queens</borough><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction Procurement</current_phase><design_start>2012-07-10T00:00:00</design_start><budget_forecast>125932000.00</budget_forecast><latest_budget_changes>30279000.00</latest_budget_changes><total_budget_changes>117177000.00</total_budget_changes><forecast_completion>2019-01-30T00:00:00</forecast_completion><latest_schedule_changes>191</latest_schedule_changes><total_schedule_changes>2180</total_schedule_changes></row><row _id="row-8eeg.ufix~kdex" _uuid="00000000-0000-0000-2231-154353FEB434" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-8eeg.ufix~kdex"><date_reported_as_of>2016-11-01T00:00:00</date_reported_as_of><pid>432</pid><project_name>20th Avenue Storm and Sanitary Sewer Construction</project_name><description>Construction of a new storm sewer in 20th Avenue between 126th Street and US Bulkhead.</description><category>Sewers</category><borough>Queens</borough><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction Procurement</current_phase><design_start>2012-07-10T00:00:00</design_start><budget_forecast>126541891.00</budget_forecast><latest_budget_changes>609891.00</latest_budget_changes><total_budget_changes>117177000.00</total_budget_changes><forecast_completion>2024-08-14T00:00:00</forecast_completion><latest_schedule_changes>2023</latest_schedule_changes><total_schedule_changes>2180</total_schedule_changes></row><row _id="row-g2qc-e2mj-i3h3" _uuid="00000000-0000-0000-15C7-99310456E6F8" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-g2qc-e2mj-i3h3"><date_reported_as_of>2017-04-01T00:00:00</date_reported_as_of><pid>432</pid><project_name>20th Avenue Storm and Sanitary Sewer Construction</project_name><description>Construction of a new storm sewer in 20th Avenue between 126th Street and US Bulkhead.</description><category>Sewers</category><borough>Queens</borough><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction Procurement</current_phase><design_start>2012-07-10T00:00:00</design_start><budget_forecast>126393000.00</budget_forecast><latest_budget_changes>-148891.00</latest_budget_changes><total_budget_changes>117177000.00</total_budget_changes><forecast_completion>2023-08-15T00:00:00</forecast_completion><latest_schedule_changes>-365</latest_schedule_changes><total_schedule_changes>2180</total_schedule_changes></row><row _id="row-zrkf-5rb9-nifw" _uuid="00000000-0000-0000-1889-0295A06DBB88" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-zrkf-5rb9-nifw"><date_reported_as_of>2017-09-01T00:00:00</date_reported_as_of><pid>432</pid><project_name>20th Avenue Storm and Sanitary Sewer Construction</project_name><description>Construction of a new storm sewer in 20th Avenue between 126th Street and US Bulkhead.</description><category>Sewers</category><borough>Queens</borough><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction</current_phase><design_start>2012-07-10T00:00:00</design_start><budget_forecast>126274000.00</budget_forecast><latest_budget_changes>-119000.00</latest_budget_changes><total_budget_changes>117177000.00</total_budget_changes><forecast_completion>2021-06-29T00:00:00</forecast_completion><latest_schedule_changes>-777</latest_schedule_changes><total_schedule_changes>2180</total_schedule_changes></row><row _id="row-63jq~5tja.8rjh" _uuid="00000000-0000-0000-F6FD-30B25BADB454" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-63jq~5tja.8rjh"><date_reported_as_of>2018-03-01T00:00:00</date_reported_as_of><pid>432</pid><project_name>20th Avenue Storm and Sanitary Sewer Construction</project_name><description>Construction of a new storm sewer in 20th Avenue between 126th Street and US Bulkhead.</description><category>Sewers</category><borough>Queens</borough><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction</current_phase><design_start>2012-07-10T00:00:00</design_start><budget_forecast>126274000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>117177000.00</total_budget_changes><forecast_completion>2021-06-29T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>2180</total_schedule_changes></row><row _id="row-mupg~nbay~cdf2" _uuid="00000000-0000-0000-C5B0-B1EB57C10E7C" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-mupg~nbay~cdf2"><date_reported_as_of>2018-08-01T00:00:00</date_reported_as_of><pid>432</pid><project_name>20th Avenue Storm and Sanitary Sewer Construction</project_name><description>Construction of a new storm sewer in 20th Avenue between 126th Street and US Bulkhead.</description><category>Sewers</category><borough>Queens</borough><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction</current_phase><design_start>2012-07-10T00:00:00</design_start><budget_forecast>132311000.00</budget_forecast><latest_budget_changes>6037000.00</latest_budget_changes><total_budget_changes>117177000.00</total_budget_changes><forecast_completion>2021-06-29T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>2180</total_schedule_changes></row><row _id="row-8xjm-zdnn~8aq4" _uuid="00000000-0000-0000-DC4A-46E1E1A73FF3" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-8xjm-zdnn~8aq4"><date_reported_as_of>2019-01-01T00:00:00</date_reported_as_of><pid>432</pid><project_name>20th Avenue Storm and Sanitary Sewer Construction</project_name><description>Construction of a new storm sewer in 20th Avenue between 126th Street and US Bulkhead.</description><category>Sewers</category><borough>Queens</borough><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction</current_phase><design_start>2012-07-10T00:00:00</design_start><budget_forecast>132688000.00</budget_forecast><latest_budget_changes>377000.00</latest_budget_changes><total_budget_changes>117177000.00</total_budget_changes><forecast_completion>2021-06-29T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>2180</total_schedule_changes></row><row _id="row-qczy_v8g3.h7v9" _uuid="00000000-0000-0000-C3B4-C6DB1D4D1A92" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-qczy_v8g3.h7v9"><date_reported_as_of>2019-05-01T00:00:00</date_reported_as_of><pid>432</pid><project_name>20th Avenue Storm and Sanitary Sewer Construction</project_name><description>Storm and sanitary sewers in 20th Ave  between 126th Street and U.S. Bulkhead Line, etc. Water main works.</description><category>Sewers</category><borough>Queens</borough><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction</current_phase><design_start>2012-07-10T00:00:00</design_start><budget_forecast>132588000.00</budget_forecast><latest_budget_changes>-100000.00</latest_budget_changes><total_budget_changes>117177000.00</total_budget_changes><forecast_completion>2021-06-29T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>2180</total_schedule_changes></row><row _id="row-2jtq-7x96-6p7u" _uuid="00000000-0000-0000-DA0D-83FE8914B9EB" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-2jtq-7x96-6p7u"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>432</pid><project_name>20th Avenue Storm and Sanitary Sewer Construction</project_name><description>Storm and sanitary sewers in 20th Ave  between 126th Street and U.S. Bulkhead Line, etc. Water main works.</description><category>Sewers</category><borough>Queens</borough><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction</current_phase><design_start>2012-07-10T00:00:00</design_start><budget_forecast>132588000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>117177000.00</total_budget_changes><forecast_completion>2021-06-29T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>2180</total_schedule_changes></row><row _id="row-zhnf_kqyb_zp85" _uuid="00000000-0000-0000-52B7-90503D135B31" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-zhnf_kqyb_zp85"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>432</pid><project_name>20th Avenue Storm and Sanitary Sewer Construction</project_name><category>Sewers</category><borough>Queens</borough><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><total_budget_changes>117177000.00</total_budget_changes><total_schedule_changes>2180</total_schedule_changes></row><row _id="row-dr58~e65w.cu9x" _uuid="00000000-0000-0000-A6B4-3CE61C1640CE" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-dr58~e65w.cu9x"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>432</pid><project_name>20th Avenue Storm and Sanitary Sewer Construction</project_name><category>Sewers</category><borough>Queens</borough><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><total_budget_changes>117177000.00</total_budget_changes><total_schedule_changes>2180</total_schedule_changes></row><row _id="row-r6r2~ydd6.n36u" _uuid="00000000-0000-0000-98EB-121FC77F2CDB" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-r6r2~ydd6.n36u"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>432</pid><project_name>20th Avenue Storm and Sanitary Sewer Construction</project_name><category>Sewers</category><borough>Queens</borough><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><total_budget_changes>117177000.00</total_budget_changes><total_schedule_changes>2180</total_schedule_changes></row><row _id="row-3cxe.x3jg.43t5" _uuid="00000000-0000-0000-A184-8F903E42A229" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-3cxe.x3jg.43t5"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>432</pid><project_name>20th Avenue Storm and Sanitary Sewer Construction</project_name><category>Sewers</category><borough>Queens</borough><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><total_budget_changes>117177000.00</total_budget_changes><total_schedule_changes>2180</total_schedule_changes></row><row _id="row-3d6m~7757_p7qp" _uuid="00000000-0000-0000-A26A-EA9AFB7DAE29" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-3d6m~7757_p7qp"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>432</pid><project_name>20th Avenue Storm and Sanitary Sewer Construction</project_name><description>Storm and sanitary sewers in 20th Ave  between 126th Street and U.S. Bulkhead Line, etc. Water main works.</description><category>Sewers</category><borough>Queens</borough><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction</current_phase><design_start>2012-07-10T00:00:00</design_start><budget_forecast>137055000.00</budget_forecast><latest_budget_changes>4467000.00</latest_budget_changes><total_budget_changes>117177000.00</total_budget_changes><forecast_completion>2023-06-19T00:00:00</forecast_completion><latest_schedule_changes>720</latest_schedule_changes><total_schedule_changes>2180</total_schedule_changes></row><row _id="row-itih.u4yq.a9p9" _uuid="00000000-0000-0000-C303-1947E55A9BB1" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-itih.u4yq.a9p9"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>432</pid><project_name>20th Avenue Storm and Sanitary Sewer Construction</project_name><description>Storm and sanitary sewers in 20th Ave  between 126th Street and U.S. Bulkhead Line, etc. Water main works.</description><category>Sewers</category><borough>Queens</borough><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction</current_phase><design_start>2012-07-10T00:00:00</design_start><budget_forecast>137046000.00</budget_forecast><latest_budget_changes>-9000.00</latest_budget_changes><total_budget_changes>117177000.00</total_budget_changes><forecast_completion>2023-06-19T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>2180</total_schedule_changes></row><row _id="row-dnmc_dzyy~uskv" _uuid="00000000-0000-0000-3019-A8EFCE8534D1" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-dnmc_dzyy~uskv"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>432</pid><project_name>20th Avenue Storm and Sanitary Sewer Construction</project_name><description>Storm and sanitary sewers in 20th Ave  between 126th Street and U.S. Bulkhead Line, etc. Water main works.</description><category>Sewers</category><borough>Queens</borough><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction</current_phase><design_start>2012-07-10T00:00:00</design_start><budget_forecast>137459000.00</budget_forecast><latest_budget_changes>413000.00</latest_budget_changes><total_budget_changes>117177000.00</total_budget_changes><forecast_completion>2023-06-19T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>2180</total_schedule_changes></row><row _id="row-pp9t-6wng-tn4j" _uuid="00000000-0000-0000-B8D6-1F0DD1FF6719" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-pp9t-6wng-tn4j"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>432</pid><project_name>20th Avenue Storm and Sanitary Sewer Construction</project_name><description>Storm and sanitary sewers in 20th Ave  between 126th Street and U.S. Bulkhead Line, etc. Water main works.</description><category>Sewers</category><borough>Queens</borough><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction</current_phase><design_start>2012-07-10T00:00:00</design_start><budget_forecast>141876000.00</budget_forecast><latest_budget_changes>4417000.00</latest_budget_changes><total_budget_changes>117177000.00</total_budget_changes><forecast_completion>2023-06-19T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>2180</total_schedule_changes></row><row _id="row-sacr~5jv8_3cap" _uuid="00000000-0000-0000-0865-EAFE6E855859" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-sacr~5jv8_3cap"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>432</pid><project_name>20th Avenue Storm and Sanitary Sewer Construction</project_name><description>Storm and sanitary sewers in 20th Ave  between 126th Street and U.S. Bulkhead Line, etc. Water main works.</description><category>Sewers</category><borough>Queens</borough><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction</current_phase><design_start>2012-07-10T00:00:00</design_start><budget_forecast>141866000.00</budget_forecast><latest_budget_changes>-10000.00</latest_budget_changes><total_budget_changes>117177000.00</total_budget_changes><forecast_completion>2023-06-19T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>2180</total_schedule_changes></row><row _id="row-ku45_n4yk~etxc" _uuid="00000000-0000-0000-2628-9C609E790AC5" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ku45_n4yk~etxc"><date_reported_as_of>2016-11-01T00:00:00</date_reported_as_of><pid>443</pid><project_name>Replacement of the Esopus &amp; Route 28A Railroad Bridges</project_name><description>Replacement of the Esopus &amp; Route 28A Railroad Bridges</description><category>Bridges</category><borough>Olive</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2016-10-11T00:00:00</design_start><budget_forecast>105940085.00</budget_forecast><latest_budget_changes>3605491.41</latest_budget_changes><total_budget_changes>-50461071.35</total_budget_changes><forecast_completion>2024-12-06T00:00:00</forecast_completion><latest_schedule_changes>376</latest_schedule_changes><total_schedule_changes>714</total_schedule_changes></row><row _id="row-gehq.y6d3_kabc" _uuid="00000000-0000-0000-739F-09C0AA5BC9BB" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-gehq.y6d3_kabc"><date_reported_as_of>2017-04-01T00:00:00</date_reported_as_of><pid>443</pid><project_name>Replacement of the Esopus &amp; Route 28A Railroad Bridges</project_name><description>Replacement of the Esopus &amp; Route 28A Railroad Bridges</description><category>Bridges</category><borough>Olive</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2016-12-15T00:00:00</design_start><budget_forecast>106590694.00</budget_forecast><latest_budget_changes>650609.00</latest_budget_changes><total_budget_changes>-50461071.35</total_budget_changes><forecast_completion>2025-02-09T00:00:00</forecast_completion><latest_schedule_changes>65</latest_schedule_changes><total_schedule_changes>714</total_schedule_changes></row><row _id="row-rhhy-hgxt_c7bp" _uuid="00000000-0000-0000-6A30-0576C879362F" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-rhhy-hgxt_c7bp"><date_reported_as_of>2017-09-01T00:00:00</date_reported_as_of><pid>443</pid><project_name>Replacement of the Esopus &amp; Route 28A Railroad Bridges</project_name><description>Replacement of the Esopus &amp; Route 28A Railroad Bridges</description><category>Bridges</category><borough>Olive</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2016-10-11T00:00:00</design_start><budget_forecast>90271620.34</budget_forecast><latest_budget_changes>-16319073.66</latest_budget_changes><total_budget_changes>-50461071.35</total_budget_changes><forecast_completion>2024-12-06T00:00:00</forecast_completion><latest_schedule_changes>-65</latest_schedule_changes><total_schedule_changes>714</total_schedule_changes></row><row _id="row-drvg.e47s_amxw" _uuid="00000000-0000-0000-1678-29995E618CD0" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-drvg.e47s_amxw"><date_reported_as_of>2018-03-01T00:00:00</date_reported_as_of><pid>443</pid><project_name>Replacement of the Esopus &amp; Route 28A Railroad Bridges</project_name><description>Replacement of the Esopus Creek Bridge &amp; Route 28A Railroad Bridge</description><category>Bridges</category><borough>Olive</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2016-10-11T00:00:00</design_start><budget_forecast>91385531.00</budget_forecast><latest_budget_changes>1113910.66</latest_budget_changes><total_budget_changes>-50461071.35</total_budget_changes><forecast_completion>2024-05-20T00:00:00</forecast_completion><latest_schedule_changes>-200</latest_schedule_changes><total_schedule_changes>714</total_schedule_changes></row><row _id="row-qqx8_v4ms-7k4j" _uuid="00000000-0000-0000-ADAC-FFBE8269F757" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-qqx8_v4ms-7k4j"><date_reported_as_of>2018-08-01T00:00:00</date_reported_as_of><pid>443</pid><project_name>Replacement of the Esopus &amp; Route 28A Railroad Bridges</project_name><description>Replacement of the Esopus Creek Bridge &amp; Route 28A Railroad Bridge</description><category>Bridges</category><borough>Olive</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2016-10-11T00:00:00</design_start><budget_forecast>94621584.70</budget_forecast><latest_budget_changes>3236053.70</latest_budget_changes><total_budget_changes>-50461071.35</total_budget_changes><forecast_completion>2024-05-20T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>714</total_schedule_changes></row><row _id="row-s64j-wif5_hvtf" _uuid="00000000-0000-0000-F84A-A93C522A20F2" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-s64j-wif5_hvtf"><date_reported_as_of>2019-01-01T00:00:00</date_reported_as_of><pid>443</pid><project_name>Replacement of the Esopus &amp; Route 28A Railroad Bridges</project_name><description>Replacement of the Esopus Creek Bridge &amp; Route 28A Railroad Bridge</description><category>Bridges</category><borough>Olive</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2016-10-11T00:00:00</design_start><budget_forecast>82210276.90</budget_forecast><latest_budget_changes>-12411307.80</latest_budget_changes><total_budget_changes>-50461071.35</total_budget_changes><forecast_completion>2024-06-11T00:00:00</forecast_completion><latest_schedule_changes>22</latest_schedule_changes><total_schedule_changes>714</total_schedule_changes></row><row _id="row-a6np~kszy~7jnu" _uuid="00000000-0000-0000-227B-AD6346B5F422" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-a6np~kszy~7jnu"><date_reported_as_of>2019-05-01T00:00:00</date_reported_as_of><pid>443</pid><project_name>Replacement of the Esopus &amp; Route 28A Railroad Bridges</project_name><description>Replacement of the Esopus Creek Bridge &amp; Route 28A Railroad Bridge</description><category>Bridges</category><borough>Olive</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2016-10-11T00:00:00</design_start><budget_forecast>82210276.90</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-50461071.35</total_budget_changes><forecast_completion>2024-05-20T00:00:00</forecast_completion><latest_schedule_changes>-22</latest_schedule_changes><total_schedule_changes>714</total_schedule_changes></row><row _id="row-j3zi_x6yk-g749" _uuid="00000000-0000-0000-DF99-4411BBAC90AE" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-j3zi_x6yk-g749"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>443</pid><project_name>Replacement of the Esopus &amp; Route 28A Railroad Bridges</project_name><description>Replacement of the Esopus Creek Bridge &amp; Route 28A Railroad Bridge</description><category>Bridges</category><borough>Olive</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2016-10-11T00:00:00</design_start><budget_forecast>86375104.50</budget_forecast><latest_budget_changes>4164827.60</latest_budget_changes><total_budget_changes>-50461071.35</total_budget_changes><forecast_completion>2024-06-07T00:00:00</forecast_completion><latest_schedule_changes>18</latest_schedule_changes><total_schedule_changes>714</total_schedule_changes></row><row _id="row-wp5z.d2uh-kirm" _uuid="00000000-0000-0000-3CA9-EF98C696119E" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-wp5z.d2uh-kirm"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>443</pid><project_name>Replacement of the Esopus &amp; Route 28A Railroad Bridges</project_name><description>Replacement of the Esopus Creek Bridge &amp; Route 28A Railroad Bridge</description><category>Bridges</category><borough>Olive</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction Procurement</current_phase><design_start>2016-10-11T00:00:00</design_start><budget_forecast>86465105.00</budget_forecast><latest_budget_changes>90000.50</latest_budget_changes><total_budget_changes>-50461071.35</total_budget_changes><forecast_completion>2025-01-01T00:00:00</forecast_completion><latest_schedule_changes>208</latest_schedule_changes><total_schedule_changes>714</total_schedule_changes></row><row _id="row-x5gj~gwkf~2at9" _uuid="00000000-0000-0000-E119-0633488477B9" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-x5gj~gwkf~2at9"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>443</pid><project_name>Replacement of the Esopus &amp; Route 28A Railroad Bridges</project_name><description>Replacement of the Esopus Creek Bridge &amp; Route 28A Railroad Bridge</description><category>Bridges</category><borough>Olive</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction Procurement</current_phase><design_start>2016-10-11T00:00:00</design_start><budget_forecast>86554947.00</budget_forecast><latest_budget_changes>89842.00</latest_budget_changes><total_budget_changes>-50461071.35</total_budget_changes><forecast_completion>2025-01-01T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>714</total_schedule_changes></row><row _id="row-ktaw-wk73.mt32" _uuid="00000000-0000-0000-4D18-51CEC6935338" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ktaw-wk73.mt32"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>443</pid><project_name>Replacement of the Esopus &amp; Route 28A Railroad Bridges</project_name><description>Replacement of the Esopus Creek Bridge &amp; Route 28A Railroad Bridge</description><category>Bridges</category><borough>Olive</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction Procurement</current_phase><design_start>2016-10-11T00:00:00</design_start><budget_forecast>86554946.96</budget_forecast><latest_budget_changes>-0.04</latest_budget_changes><total_budget_changes>-50461071.35</total_budget_changes><forecast_completion>2025-06-20T00:00:00</forecast_completion><latest_schedule_changes>170</latest_schedule_changes><total_schedule_changes>714</total_schedule_changes></row><row _id="row-xfrw-saei.ngbu" _uuid="00000000-0000-0000-0595-7AD5173EBB20" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-xfrw-saei.ngbu"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>443</pid><project_name>Replacement of the Esopus &amp; Route 28A Railroad Bridges</project_name><description>Replacement of the Esopus Creek Bridge &amp; Route 28A Railroad Bridge</description><category>Bridges</category><borough>Olive</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction Procurement</current_phase><design_start>2016-10-11T00:00:00</design_start><budget_forecast>51210279.96</budget_forecast><latest_budget_changes>-35344667.00</latest_budget_changes><total_budget_changes>-50461071.35</total_budget_changes><forecast_completion>2025-06-19T00:00:00</forecast_completion><latest_schedule_changes>-1</latest_schedule_changes><total_schedule_changes>714</total_schedule_changes></row><row _id="row-u372_ntrv~8isu" _uuid="00000000-0000-0000-54A6-A028D9BBE29F" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-u372_ntrv~8isu"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>443</pid><project_name>Replacement of the Esopus &amp; Route 28A Railroad Bridges</project_name><description>Replacement of the Esopus Creek Bridge &amp; Route 28A Railroad Bridge</description><category>Bridges</category><borough>Olive</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2016-10-11T00:00:00</design_start><budget_forecast>51210279.96</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-50461071.35</total_budget_changes><forecast_completion>2025-11-09T00:00:00</forecast_completion><latest_schedule_changes>143</latest_schedule_changes><total_schedule_changes>714</total_schedule_changes></row><row _id="row-m5ug-kmgx_n8rv" _uuid="00000000-0000-0000-B61D-FD43725A92BD" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-m5ug-kmgx_n8rv"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>443</pid><project_name>Replacement of the Esopus &amp; Route 28A Railroad Bridges</project_name><description>Replacement of the Esopus &amp; Route 28A Railroad Bridges</description><category>Bridges</category><borough>Olive</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2016-10-11T00:00:00</design_start><budget_forecast>51210279.96</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-50461071.35</total_budget_changes><forecast_completion>2025-11-09T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>714</total_schedule_changes></row><row _id="row-mh5c-mzng~7hfd" _uuid="00000000-0000-0000-45DB-CFCA149386FA" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-mh5c-mzng~7hfd"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>443</pid><project_name>Replacement of the Esopus &amp; Route 28A Railroad Bridges</project_name><description>Replacement of the Esopus &amp; Route 28A Railroad Bridges</description><category>Bridges</category><borough>Olive</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2016-10-11T00:00:00</design_start><budget_forecast>51210279.96</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-50461071.35</total_budget_changes><forecast_completion>2025-11-09T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>714</total_schedule_changes></row><row _id="row-ydxi-xes4-b8wm" _uuid="00000000-0000-0000-A58B-608892CE24BD" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ydxi-xes4-b8wm"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>443</pid><project_name>Replacement of the Esopus &amp; Route 28A Railroad Bridges</project_name><description>Replacement of the Esopus &amp; Route 28A Railroad Bridges</description><category>Bridges</category><borough>Olive</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2016-10-11T00:00:00</design_start><budget_forecast>51210279.96</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-50461071.35</total_budget_changes><forecast_completion>2025-11-09T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>714</total_schedule_changes></row><row _id="row-axtp.wpfe.g8sk" _uuid="00000000-0000-0000-90B0-D6D932AD1498" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-axtp.wpfe.g8sk"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>443</pid><project_name>Replacement of the Esopus &amp; Route 28A Railroad Bridges</project_name><description>Replacement of the Esopus &amp; Route 28A Railroad Bridges</description><category>Bridges</category><borough>Olive</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2016-10-11T00:00:00</design_start><budget_forecast>51873522.24</budget_forecast><latest_budget_changes>663242.28</latest_budget_changes><total_budget_changes>-50461071.35</total_budget_changes><forecast_completion>2025-11-09T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>714</total_schedule_changes></row><row _id="row-bysb~ddbc-35wu" _uuid="00000000-0000-0000-D5E3-60C6507D5540" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-bysb~ddbc-35wu"><date_reported_as_of>2015-02-01T00:00:00</date_reported_as_of><pid>444</pid><project_name>Reconstruction of the Port Jervis Wastewater Treatment Plant</project_name><description>Reconstruction of the Port Jervis WWTP as required based on the effluent limits proposed by the Delaware River Basin Commission (DRBC)</description><category>Wastewater Treatment</category><borough>Port Jervis</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2014-06-17T00:00:00</design_start><budget_forecast>51196478.00</budget_forecast><total_budget_changes>9428438.55</total_budget_changes><forecast_completion>2020-01-24T00:00:00</forecast_completion><total_schedule_changes>2445</total_schedule_changes></row><row _id="row-uvcr.yqjb.s63n" _uuid="00000000-0000-0000-440F-A04F36CF1D8B" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-uvcr.yqjb.s63n"><date_reported_as_of>2015-08-01T00:00:00</date_reported_as_of><pid>444</pid><project_name>Reconstruction of the Port Jervis Wastewater Treatment Plant</project_name><description>Reconstruction of the Port Jervis WWTP as required based on the effluent limits proposed by the Delaware River Basin Commission (DRBC)</description><category>Wastewater Treatment</category><borough>Port Jervis</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2014-06-17T00:00:00</design_start><budget_forecast>42918306.30</budget_forecast><latest_budget_changes>-8278171.70</latest_budget_changes><total_budget_changes>9428438.55</total_budget_changes><forecast_completion>2020-01-24T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>2445</total_schedule_changes></row><row _id="row-bhmf-gauh_6g64" _uuid="00000000-0000-0000-D4AF-661C308F9AD1" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-bhmf-gauh_6g64"><date_reported_as_of>2016-01-01T00:00:00</date_reported_as_of><pid>444</pid><project_name>Reconstruction of the Port Jervis Wastewater Treatment Plant</project_name><description>Reconstruction of the Port Jervis WWTP as required based on the effluent limits proposed by the Delaware River Basin Commission (DRBC)</description><category>Wastewater Treatment</category><borough>Port Jervis</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2014-06-17T00:00:00</design_start><budget_forecast>44670495.00</budget_forecast><latest_budget_changes>1752188.70</latest_budget_changes><total_budget_changes>9428438.55</total_budget_changes><forecast_completion>2020-06-12T00:00:00</forecast_completion><latest_schedule_changes>140</latest_schedule_changes><total_schedule_changes>2445</total_schedule_changes></row><row _id="row-duwi~vvn4.ucdz" _uuid="00000000-0000-0000-C7AA-23766A72DEFC" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-duwi~vvn4.ucdz"><date_reported_as_of>2016-06-01T00:00:00</date_reported_as_of><pid>444</pid><project_name>Reconstruction of the Port Jervis Wastewater Treatment Plant</project_name><description>Reconstruction of the Port Jervis WWTP as required based on the effluent limits proposed by the Delaware River Basin Commission (DRBC)</description><category>Wastewater Treatment</category><borough>Port Jervis</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2014-06-17T00:00:00</design_start><budget_forecast>35199444.00</budget_forecast><latest_budget_changes>-9471051.00</latest_budget_changes><total_budget_changes>9428438.55</total_budget_changes><forecast_completion>2019-12-24T00:00:00</forecast_completion><latest_schedule_changes>-171</latest_schedule_changes><total_schedule_changes>2445</total_schedule_changes></row><row _id="row-9gyh_haqc~92de" _uuid="00000000-0000-0000-33D5-73D2124FF58A" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-9gyh_haqc~92de"><date_reported_as_of>2016-11-01T00:00:00</date_reported_as_of><pid>444</pid><project_name>Reconstruction of the Port Jervis Wastewater Treatment Plant</project_name><description>Reconstruction of the Port Jervis WWTP as required based on the effluent limits proposed by the Delaware River Basin Commission (DRBC)</description><category>Wastewater Treatment</category><borough>Port Jervis</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2014-06-17T00:00:00</design_start><budget_forecast>56619791.00</budget_forecast><latest_budget_changes>21420347.00</latest_budget_changes><total_budget_changes>9428438.55</total_budget_changes><forecast_completion>2020-04-09T00:00:00</forecast_completion><latest_schedule_changes>107</latest_schedule_changes><total_schedule_changes>2445</total_schedule_changes></row><row _id="row-4pti.hehi~c6dv" _uuid="00000000-0000-0000-F816-4E773C1F0F6A" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-4pti.hehi~c6dv"><date_reported_as_of>2017-04-01T00:00:00</date_reported_as_of><pid>444</pid><project_name>Reconstruction of the Port Jervis Wastewater Treatment Plant</project_name><description>Reconstruction of the Port Jervis WWTP as required based on the effluent limits proposed by the Delaware River Basin Commission (DRBC)</description><category>Wastewater Treatment</category><borough>Port Jervis</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction Procurement</current_phase><design_start>2014-06-17T00:00:00</design_start><budget_forecast>56470712.00</budget_forecast><latest_budget_changes>-149079.00</latest_budget_changes><total_budget_changes>9428438.55</total_budget_changes><forecast_completion>2021-03-26T00:00:00</forecast_completion><latest_schedule_changes>351</latest_schedule_changes><total_schedule_changes>2445</total_schedule_changes></row><row _id="row-7ivq-phwu-jwzm" _uuid="00000000-0000-0000-16DE-3B042F623C2C" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-7ivq-phwu-jwzm"><date_reported_as_of>2017-09-01T00:00:00</date_reported_as_of><pid>444</pid><project_name>Reconstruction of the Port Jervis Wastewater Treatment Plant</project_name><description>Reconstruction of the Port Jervis WWTP as required based on the effluent limits proposed by the Delaware River Basin Commission (DRBC)</description><category>Wastewater Treatment</category><borough>Port Jervis</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction Procurement</current_phase><design_start>2014-06-17T00:00:00</design_start><budget_forecast>56470712.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>9428438.55</total_budget_changes><forecast_completion>2021-11-19T00:00:00</forecast_completion><latest_schedule_changes>238</latest_schedule_changes><total_schedule_changes>2445</total_schedule_changes></row><row _id="row-25ch.iwsm-mmkt" _uuid="00000000-0000-0000-4995-3BABD65522D0" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-25ch.iwsm-mmkt"><date_reported_as_of>2018-03-01T00:00:00</date_reported_as_of><pid>444</pid><project_name>Reconstruction of the Port Jervis Wastewater Treatment Plant</project_name><description>Reconstruction of the Port Jervis WWTP as required based on the effluent limits proposed by the Delaware River Basin Commission (DRBC)</description><category>Wastewater Treatment</category><borough>Port Jervis</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction Procurement</current_phase><design_start>2014-06-17T00:00:00</design_start><budget_forecast>50502713.40</budget_forecast><latest_budget_changes>-5967998.60</latest_budget_changes><total_budget_changes>9428438.55</total_budget_changes><forecast_completion>2021-11-19T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>2445</total_schedule_changes></row><row _id="row-n72u~9pra~xaj8" _uuid="00000000-0000-0000-F65E-1D2BB7A7113D" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-n72u~9pra~xaj8"><date_reported_as_of>2018-08-01T00:00:00</date_reported_as_of><pid>444</pid><project_name>Reconstruction of the Port Jervis Wastewater Treatment Plant</project_name><description>Reconstruction of the Port Jervis WWTP as required based on the effluent limits proposed by the Delaware River Basin Commission (DRBC)</description><category>Wastewater Treatment</category><borough>Port Jervis</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction Procurement</current_phase><design_start>2014-06-17T00:00:00</design_start><budget_forecast>56765729.45</budget_forecast><latest_budget_changes>6263016.05</latest_budget_changes><total_budget_changes>9428438.55</total_budget_changes><forecast_completion>2021-11-19T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>2445</total_schedule_changes></row><row _id="row-f545~67bv-pwje" _uuid="00000000-0000-0000-D0B2-89DABA1BD89F" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-f545~67bv-pwje"><date_reported_as_of>2019-01-01T00:00:00</date_reported_as_of><pid>444</pid><project_name>Reconstruction of the Port Jervis Wastewater Treatment Plant</project_name><description>Reconstruction of the Port Jervis WWTP as required based on the effluent limits proposed by the Delaware River Basin Commission (DRBC)</description><category>Wastewater Treatment</category><borough>Port Jervis</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2014-06-17T00:00:00</design_start><budget_forecast>56490022.00</budget_forecast><latest_budget_changes>-275707.45</latest_budget_changes><total_budget_changes>9428438.55</total_budget_changes><forecast_completion>2022-07-04T00:00:00</forecast_completion><latest_schedule_changes>227</latest_schedule_changes><total_schedule_changes>2445</total_schedule_changes></row><row _id="row-dwck_rncs~w9t2" _uuid="00000000-0000-0000-5155-94610ED9C4DF" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-dwck_rncs~w9t2"><date_reported_as_of>2019-05-01T00:00:00</date_reported_as_of><pid>444</pid><project_name>Reconstruction of the Port Jervis Wastewater Treatment Plant</project_name><description>Reconstruction of the Port Jervis WWTP as required based on the effluent limits proposed by the Delaware River Basin Commission (DRBC)</description><category>Wastewater Treatment</category><borough>Port Jervis</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2014-06-17T00:00:00</design_start><budget_forecast>56490022.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>9428438.55</total_budget_changes><forecast_completion>2024-08-03T00:00:00</forecast_completion><latest_schedule_changes>761</latest_schedule_changes><total_schedule_changes>2445</total_schedule_changes></row><row _id="row-xubw.s26u.qraj" _uuid="00000000-0000-0000-66CE-81576327CDAA" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-xubw.s26u.qraj"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>444</pid><project_name>Reconstruction of the Port Jervis Wastewater Treatment Plant</project_name><description>Reconstruction of the Port Jervis WWTP as required based on the effluent limits proposed by the Delaware River Basin Commission (DRBC)</description><category>Wastewater Treatment</category><borough>Port Jervis</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2014-06-17T00:00:00</design_start><budget_forecast>56490622.00</budget_forecast><latest_budget_changes>600.00</latest_budget_changes><total_budget_changes>9428438.55</total_budget_changes><forecast_completion>2024-08-03T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>2445</total_schedule_changes></row><row _id="row-xpu7-ebw2-9bhq" _uuid="00000000-0000-0000-AFA5-089DD44ACFE1" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-xpu7-ebw2-9bhq"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>444</pid><project_name>Reconstruction of the Port Jervis Wastewater Treatment Plant</project_name><description>Reconstruction of the Port Jervis WWTP as required based on the effluent limits proposed by the Delaware River Basin Commission (DRBC)</description><category>Wastewater Treatment</category><borough>Port Jervis</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2014-06-17T00:00:00</design_start><budget_forecast>43350000.00</budget_forecast><latest_budget_changes>-13140622.00</latest_budget_changes><total_budget_changes>9428438.55</total_budget_changes><forecast_completion>2024-08-03T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>2445</total_schedule_changes></row><row _id="row-82bt-47k8~2x8k" _uuid="00000000-0000-0000-387F-09CAF0D08061" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-82bt-47k8~2x8k"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>444</pid><project_name>Reconstruction of the Port Jervis Wastewater Treatment Plant</project_name><description>Reconstruction of the Port Jervis WWTP as required based on the effluent limits proposed by the Delaware River Basin Commission (DRBC)</description><category>Wastewater Treatment</category><borough>Port Jervis</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2014-06-17T00:00:00</design_start><budget_forecast>45700000.00</budget_forecast><latest_budget_changes>2350000.00</latest_budget_changes><total_budget_changes>9428438.55</total_budget_changes><forecast_completion>2024-08-03T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>2445</total_schedule_changes></row><row _id="row-f7j7.zkcz.cp9n" _uuid="00000000-0000-0000-8A6D-492C0FC04BC4" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-f7j7.zkcz.cp9n"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>444</pid><project_name>Reconstruction of the Port Jervis Wastewater Treatment Plant</project_name><description>Reconstruction of the Port Jervis WWTP as required based on the effluent limits proposed by the Delaware River Basin Commission (DRBC)</description><category>Wastewater Treatment</category><borough>Port Jervis</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2014-06-17T00:00:00</design_start><budget_forecast>60366266.99</budget_forecast><latest_budget_changes>14666266.99</latest_budget_changes><total_budget_changes>9428438.55</total_budget_changes><forecast_completion>2025-02-01T00:00:00</forecast_completion><latest_schedule_changes>182</latest_schedule_changes><total_schedule_changes>2445</total_schedule_changes></row><row _id="row-y972.w2fp_6j9h" _uuid="00000000-0000-0000-A3E4-60C00AEE6F3F" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-y972.w2fp_6j9h"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>444</pid><project_name>Reconstruction of the Port Jervis Wastewater Treatment Plant</project_name><description>Reconstruction of the Port Jervis WWTP as required based on the effluent limits proposed by the Delaware River Basin Commission (DRBC)</description><category>Wastewater Treatment</category><borough>Port Jervis</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2014-06-17T00:00:00</design_start><budget_forecast>67654718.99</budget_forecast><latest_budget_changes>7288452.00</latest_budget_changes><total_budget_changes>9428438.55</total_budget_changes><forecast_completion>2025-06-18T00:00:00</forecast_completion><latest_schedule_changes>137</latest_schedule_changes><total_schedule_changes>2445</total_schedule_changes></row><row _id="row-kg9r~yb7a~862h" _uuid="00000000-0000-0000-D394-257FAEF96C46" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-kg9r~yb7a~862h"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>444</pid><project_name>Reconstruction of the Port Jervis Wastewater Treatment Plant</project_name><description>Reconstruction of the Port Jervis WWTP as required based on the effluent limits proposed by the Delaware River Basin Commission (DRBC)</description><category>Wastewater Treatment</category><borough>Port Jervis</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2014-06-17T00:00:00</design_start><budget_forecast>59709566.99</budget_forecast><latest_budget_changes>-7945152.00</latest_budget_changes><total_budget_changes>9428438.55</total_budget_changes><forecast_completion>2025-05-21T00:00:00</forecast_completion><latest_schedule_changes>-28</latest_schedule_changes><total_schedule_changes>2445</total_schedule_changes></row><row _id="row-qy6b~mixb-hwat" _uuid="00000000-0000-0000-1526-F853DCC6311C" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-qy6b~mixb-hwat"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>444</pid><project_name>Reconstruction of the Port Jervis Wastewater Treatment Plant</project_name><description>Reconstruction of the Port Jervis WWTP as required based on the effluent limits proposed by the Delaware River Basin Commission (DRBC)</description><category>Wastewater Treatment</category><borough>Port Jervis</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2014-06-17T00:00:00</design_start><budget_forecast>60924311.99</budget_forecast><latest_budget_changes>1214745.00</latest_budget_changes><total_budget_changes>9428438.55</total_budget_changes><forecast_completion>2026-10-04T00:00:00</forecast_completion><latest_schedule_changes>501</latest_schedule_changes><total_schedule_changes>2445</total_schedule_changes></row><row _id="row-ju2g~fxwk.9rtx" _uuid="00000000-0000-0000-0298-F843EB933716" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ju2g~fxwk.9rtx"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>444</pid><project_name>Reconstruction of the Port Jervis Wastewater Treatment Plant</project_name><description>Reconstruction of the Port Jervis WWTP as required based on the effluent limits proposed by the Delaware River Basin Commission (DRBC)</description><category>Wastewater Treatment</category><borough>Port Jervis</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2014-06-17T00:00:00</design_start><budget_forecast>60924311.99</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>9428438.55</total_budget_changes><forecast_completion>2026-10-04T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>2445</total_schedule_changes></row><row _id="row-87fa-dx9k.stj8" _uuid="00000000-0000-0000-156B-5A8C68D52095" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-87fa-dx9k.stj8"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>444</pid><project_name>Reconstruction of the Port Jervis Wastewater Treatment Plant</project_name><description>Reconstruction of the Port Jervis WWTP as required based on the effluent limits proposed by the Delaware River Basin Commission (DRBC)</description><category>Wastewater Treatment</category><borough>Port Jervis</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2014-06-17T00:00:00</design_start><budget_forecast>60624916.55</budget_forecast><latest_budget_changes>-299395.44</latest_budget_changes><total_budget_changes>9428438.55</total_budget_changes><forecast_completion>2026-10-04T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>2445</total_schedule_changes></row><row _id="row-7cwf_3ifj.f9nk" _uuid="00000000-0000-0000-07C3-048EA1D75C0C" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-7cwf_3ifj.f9nk"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>444</pid><project_name>Reconstruction of the Port Jervis Wastewater Treatment Plant</project_name><description>Reconstruction of the Port Jervis WWTP as required based on the effluent limits proposed by the Delaware River Basin Commission (DRBC)</description><category>Wastewater Treatment</category><borough>Port Jervis</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2014-06-17T00:00:00</design_start><budget_forecast>60624916.55</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>9428438.55</total_budget_changes><forecast_completion>2026-10-04T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>2445</total_schedule_changes></row><row _id="row-vndz_5qs6-b37k" _uuid="00000000-0000-0000-71B7-EFD901615167" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-vndz_5qs6-b37k"><date_reported_as_of>2016-06-01T00:00:00</date_reported_as_of><pid>448</pid><project_name>Jerome Reservoir and Aqueduct Rehabilitation</project_name><description>Improvements to: fencing, vegetation, roadway, drainage, ext. above-ground retaining walls. Including repair of dam inlet archway &amp; wingwall, re-pointing of stones &amp; reinforcement of east reservoir wall, &amp; leakage/seepage protection within OCA.</description><category>Water Supply</category><borough>Bronx</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2015-02-02T00:00:00</design_start><budget_forecast>58800000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-833277.14</total_budget_changes><forecast_completion>2021-06-22T00:00:00</forecast_completion><latest_schedule_changes>347</latest_schedule_changes><total_schedule_changes>2363</total_schedule_changes></row><row _id="row-mji8-xayg_dq5n" _uuid="00000000-0000-0000-630A-E6664A042387" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-mji8-xayg_dq5n"><date_reported_as_of>2016-11-01T00:00:00</date_reported_as_of><pid>448</pid><project_name>Jerome Reservoir and Aqueduct Rehabilitation</project_name><description>Improvements to: fencing, vegetation, roadway, drainage, ext. above-ground retaining walls. Including repair of dam inlet archway &amp; wingwall, re-pointing of stones &amp; reinforcement of east reservoir wall, &amp; leakage/seepage protection within OCA.</description><category>Water Supply</category><borough>Bronx</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2016-02-24T00:00:00</design_start><budget_forecast>61439197.00</budget_forecast><latest_budget_changes>2639197.00</latest_budget_changes><total_budget_changes>-833277.14</total_budget_changes><forecast_completion>2020-07-10T00:00:00</forecast_completion><latest_schedule_changes>-347</latest_schedule_changes><total_schedule_changes>2363</total_schedule_changes></row><row _id="row-b5zf~iszn~m7ee" _uuid="00000000-0000-0000-C906-78EB73FC3549" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-b5zf~iszn~m7ee"><date_reported_as_of>2017-04-01T00:00:00</date_reported_as_of><pid>448</pid><project_name>Jerome Reservoir and Aqueduct Rehabilitation</project_name><description>Improvements to: fencing, vegetation, roadway, drainage, ext. above-ground retaining walls. Including repair of dam inlet archway &amp; wingwall, re-pointing of stones &amp; reinforcement of east reservoir wall, &amp; leakage/seepage protection within OCA.</description><category>Water Supply</category><borough>Bronx</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2016-02-24T00:00:00</design_start><budget_forecast>34306267.00</budget_forecast><latest_budget_changes>-27132930.00</latest_budget_changes><total_budget_changes>-833277.14</total_budget_changes><forecast_completion>2020-06-19T00:00:00</forecast_completion><latest_schedule_changes>-21</latest_schedule_changes><total_schedule_changes>2363</total_schedule_changes></row><row _id="row-vbgk_sz46~35w2" _uuid="00000000-0000-0000-BE75-9E8D854D6BB7" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-vbgk_sz46~35w2"><date_reported_as_of>2017-09-01T00:00:00</date_reported_as_of><pid>448</pid><project_name>Jerome Reservoir and Aqueduct Rehabilitation</project_name><description>Improvements to: fencing, vegetation, roadway, drainage, ext. above-ground retaining walls. Including repair of dam inlet archway &amp; wingwall, re-pointing of stones &amp; reinforcement of east reservoir wall, &amp; leakage/seepage protection within OCA.</description><category>Water Supply</category><borough>Bronx</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction Procurement</current_phase><design_start>2016-02-24T00:00:00</design_start><budget_forecast>40898506.96</budget_forecast><latest_budget_changes>6592239.96</latest_budget_changes><total_budget_changes>-833277.14</total_budget_changes><forecast_completion>2021-08-01T00:00:00</forecast_completion><latest_schedule_changes>408</latest_schedule_changes><total_schedule_changes>2363</total_schedule_changes></row><row _id="row-u2gp-dsr4_k5wq" _uuid="00000000-0000-0000-36F0-A12845594B53" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-u2gp-dsr4_k5wq"><date_reported_as_of>2018-03-01T00:00:00</date_reported_as_of><pid>448</pid><project_name>Jerome Reservoir and Aqueduct Rehabilitation</project_name><description>Improvements to: fencing, vegetation, roadway, drainage, ext. above-ground retaining walls. Including repair of dam inlet archway &amp; wingwall, re-pointing of stones &amp; reinforcement of east reservoir wall, &amp; leakage/seepage protection within OCA.</description><category>Water Supply</category><borough>Bronx</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2016-02-24T00:00:00</design_start><budget_forecast>49537920.20</budget_forecast><latest_budget_changes>8639413.24</latest_budget_changes><total_budget_changes>-833277.14</total_budget_changes><forecast_completion>2021-05-14T00:00:00</forecast_completion><latest_schedule_changes>-79</latest_schedule_changes><total_schedule_changes>2363</total_schedule_changes></row><row _id="row-mp6i~ihuh~3ss6" _uuid="00000000-0000-0000-E3DB-D3E3ECDD97BA" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-mp6i~ihuh~3ss6"><date_reported_as_of>2018-08-01T00:00:00</date_reported_as_of><pid>448</pid><project_name>Jerome Reservoir and Aqueduct Rehabilitation</project_name><description>Improvements to: fencing, vegetation, roadway, drainage, ext. above-ground retaining walls. Including repair of dam inlet archway &amp; wingwall, re-pointing of stones &amp; reinforcement of east reservoir wall, &amp; leakage/seepage protection within OCA.</description><category>Water Supply</category><borough>Bronx</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2016-02-24T00:00:00</design_start><budget_forecast>52813839.20</budget_forecast><latest_budget_changes>3275919.00</latest_budget_changes><total_budget_changes>-833277.14</total_budget_changes><forecast_completion>2021-12-03T00:00:00</forecast_completion><latest_schedule_changes>203</latest_schedule_changes><total_schedule_changes>2363</total_schedule_changes></row><row _id="row-6sr7-tgzc-sxwn" _uuid="00000000-0000-0000-DE76-385CB38FA5B4" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-6sr7-tgzc-sxwn"><date_reported_as_of>2019-01-01T00:00:00</date_reported_as_of><pid>448</pid><project_name>Jerome Reservoir and Aqueduct Rehabilitation</project_name><description>Improvements to: fencing, vegetation, roadway, drainage, ext. above-ground retaining walls. Including repair of dam inlet archway &amp; wingwall, re-pointing of stones &amp; reinforcement of east reservoir wall, &amp; leakage/seepage protection within OCA.</description><category>Water Supply</category><borough>Bronx</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2016-02-24T00:00:00</design_start><budget_forecast>52813839.20</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-833277.14</total_budget_changes><forecast_completion>2022-04-14T00:00:00</forecast_completion><latest_schedule_changes>132</latest_schedule_changes><total_schedule_changes>2363</total_schedule_changes></row><row _id="row-qcjz~jut4.spqm" _uuid="00000000-0000-0000-E2A3-7FCB8EFC6DA9" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-qcjz~jut4.spqm"><date_reported_as_of>2019-05-01T00:00:00</date_reported_as_of><pid>448</pid><project_name>Jerome Reservoir and Aqueduct Rehabilitation</project_name><description>Improvements to: fencing, vegetation, roadway, drainage, ext. above-ground retaining walls. Including repair of dam inlet archway &amp; wingwall, re-pointing of stones &amp; reinforcement of east reservoir wall, &amp; leakage/seepage protection within OCA.</description><category>Water Supply</category><borough>Bronx</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2016-02-24T00:00:00</design_start><budget_forecast>52813862.20</budget_forecast><latest_budget_changes>23.00</latest_budget_changes><total_budget_changes>-833277.14</total_budget_changes><forecast_completion>2022-10-05T00:00:00</forecast_completion><latest_schedule_changes>174</latest_schedule_changes><total_schedule_changes>2363</total_schedule_changes></row><row _id="row-f76v_g6ku~nrwz" _uuid="00000000-0000-0000-592E-C05BB2E4F96B" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-f76v_g6ku~nrwz"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>448</pid><project_name>Jerome Reservoir and Aqueduct Rehabilitation</project_name><description>Improvements to: fencing, vegetation, roadway, drainage, ext. above-ground retaining walls. Including repair of dam inlet archway &amp; wingwall, re-pointing of stones &amp; reinforcement of east reservoir wall, &amp; leakage/seepage protection within OCA.</description><category>Water Supply</category><borough>Bronx</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2016-02-24T00:00:00</design_start><budget_forecast>52738042.00</budget_forecast><latest_budget_changes>-75820.20</latest_budget_changes><total_budget_changes>-833277.14</total_budget_changes><forecast_completion>2022-11-16T00:00:00</forecast_completion><latest_schedule_changes>42</latest_schedule_changes><total_schedule_changes>2363</total_schedule_changes></row><row _id="row-dbar-sntw-jadv" _uuid="00000000-0000-0000-5218-5FDC2BE7E814" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-dbar-sntw-jadv"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>448</pid><project_name>Jerome Reservoir and Aqueduct Rehabilitation</project_name><description>Improvements to: fencing, vegetation, roadway, drainage, ext. above-ground retaining walls. Including repair of dam inlet archway &amp; wingwall, re-pointing of stones &amp; reinforcement of east reservoir wall, &amp; leakage/seepage protection within OCA.</description><category>Water Supply</category><borough>Bronx</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction Procurement</current_phase><design_start>2016-02-24T00:00:00</design_start><budget_forecast>53912603.00</budget_forecast><latest_budget_changes>1174561.00</latest_budget_changes><total_budget_changes>-833277.14</total_budget_changes><forecast_completion>2023-02-11T00:00:00</forecast_completion><latest_schedule_changes>87</latest_schedule_changes><total_schedule_changes>2363</total_schedule_changes></row><row _id="row-stvv~vedx.p6cs" _uuid="00000000-0000-0000-BBFB-E66C41864A08" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-stvv~vedx.p6cs"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>448</pid><project_name>Jerome Reservoir and Aqueduct Rehabilitation</project_name><description>Improvements to: fencing, vegetation, roadway, drainage, ext. above-ground retaining walls. Including repair of dam inlet archway &amp; wingwall, re-pointing of stones &amp; reinforcement of east reservoir wall, &amp; leakage/seepage protection within OCA.</description><category>Water Supply</category><borough>Bronx</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction Procurement</current_phase><design_start>2016-02-24T00:00:00</design_start><budget_forecast>51165920.30</budget_forecast><latest_budget_changes>-2746682.70</latest_budget_changes><total_budget_changes>-833277.14</total_budget_changes><forecast_completion>2023-03-16T00:00:00</forecast_completion><latest_schedule_changes>33</latest_schedule_changes><total_schedule_changes>2363</total_schedule_changes></row><row _id="row-gxzh~q75c-r27c" _uuid="00000000-0000-0000-F7DE-BB52EA0AA793" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-gxzh~q75c-r27c"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>448</pid><project_name>Jerome Reservoir and Aqueduct Rehabilitation</project_name><description>Improvements to: fencing, vegetation, roadway, drainage, ext. above-ground retaining walls. Including repair of dam inlet archway &amp; wingwall, re-pointing of stones &amp; reinforcement of east reservoir wall, &amp; leakage/seepage protection within OCA.</description><category>Water Supply</category><borough>Bronx</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction Procurement</current_phase><design_start>2016-02-24T00:00:00</design_start><budget_forecast>64002816.83</budget_forecast><latest_budget_changes>12836896.53</latest_budget_changes><total_budget_changes>-833277.14</total_budget_changes><forecast_completion>2023-10-18T00:00:00</forecast_completion><latest_schedule_changes>216</latest_schedule_changes><total_schedule_changes>2363</total_schedule_changes></row><row _id="row-3dyy_8k3m_xex7" _uuid="00000000-0000-0000-B0B4-B410E4074347" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-3dyy_8k3m_xex7"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>448</pid><project_name>Jerome Reservoir and Aqueduct Rehabilitation</project_name><description>Improvements to: fencing, vegetation, roadway, drainage, ext. above-ground retaining walls. Including repair of dam inlet archway &amp; wingwall, re-pointing of stones &amp; reinforcement of east reservoir wall, &amp; leakage/seepage protection within OCA.</description><category>Water Supply</category><borough>Bronx</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction Procurement</current_phase><design_start>2016-02-24T00:00:00</design_start><budget_forecast>57255623.09</budget_forecast><latest_budget_changes>-6747193.74</latest_budget_changes><total_budget_changes>-833277.14</total_budget_changes><forecast_completion>2023-10-19T00:00:00</forecast_completion><latest_schedule_changes>1</latest_schedule_changes><total_schedule_changes>2363</total_schedule_changes></row><row _id="row-4fg9~4uyu-7s4p" _uuid="00000000-0000-0000-BA4C-7C1D02797364" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-4fg9~4uyu-7s4p"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>448</pid><project_name>Jerome Reservoir and Aqueduct Rehabilitation</project_name><description>Improvements to: fencing, vegetation, roadway, drainage, ext. above-ground retaining walls. Including repair of dam inlet archway &amp; wingwall, re-pointing of stones &amp; reinforcement of east reservoir wall, &amp; leakage/seepage protection within OCA.</description><category>Water Supply</category><borough>Bronx</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2016-02-24T00:00:00</design_start><budget_forecast>57255623.09</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-833277.14</total_budget_changes><forecast_completion>2026-12-29T00:00:00</forecast_completion><latest_schedule_changes>1167</latest_schedule_changes><total_schedule_changes>2363</total_schedule_changes></row><row _id="row-97d9-8knv.7j54" _uuid="00000000-0000-0000-F743-246D65EA9D32" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-97d9-8knv.7j54"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>448</pid><project_name>Jerome Reservoir and Aqueduct Rehabilitation</project_name><description>Improvements to: fencing, vegetation, roadway, drainage, ext. above-ground retaining walls. Including repair of dam inlet archway &amp; wingwall, re-pointing of stones &amp; reinforcement of east reservoir wall, &amp; leakage/seepage protection within OCA.</description><category>Water Supply</category><borough>Bronx</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2016-02-24T00:00:00</design_start><budget_forecast>57255623.09</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-833277.14</total_budget_changes><forecast_completion>2026-12-29T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>2363</total_schedule_changes></row><row _id="row-4y8d~k9ak_3wuy" _uuid="00000000-0000-0000-17D0-BCE52C07C7D6" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-4y8d~k9ak_3wuy"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>448</pid><project_name>Jerome Reservoir and Aqueduct Rehabilitation</project_name><description>Improvements to: fencing, vegetation, roadway, drainage, ext. above-ground retaining walls. Including repair of dam inlet archway &amp; wingwall, re-pointing of stones &amp; reinforcement of east reservoir wall, &amp; leakage/seepage protection within OCA.</description><category>Water Supply</category><borough>Bronx</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2016-02-24T00:00:00</design_start><budget_forecast>57255623.09</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-833277.14</total_budget_changes><forecast_completion>2026-12-29T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>2363</total_schedule_changes></row><row _id="row-c7a9_49sw.szaq" _uuid="00000000-0000-0000-19C3-FA45D56A1F94" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-c7a9_49sw.szaq"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>448</pid><project_name>Jerome Reservoir and Aqueduct Rehabilitation</project_name><description>Improvements to: fencing, vegetation, roadway, drainage, ext. above-ground retaining walls. Including repair of dam inlet archway &amp; wingwall, re-pointing of stones &amp; reinforcement of east reservoir wall, &amp; leakage/seepage protection within OCA.</description><category>Water Supply</category><borough>Bronx</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2016-02-24T00:00:00</design_start><budget_forecast>57966722.86</budget_forecast><latest_budget_changes>711099.77</latest_budget_changes><total_budget_changes>-833277.14</total_budget_changes><forecast_completion>2026-12-29T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>2363</total_schedule_changes></row><row _id="row-vb7v~jbpw.arre" _uuid="00000000-0000-0000-EA83-6AA6BBD2BEBC" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-vb7v~jbpw.arre"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>448</pid><project_name>Jerome Reservoir and Aqueduct Rehabilitation</project_name><description>Improvements to: fencing, vegetation, roadway, drainage, ext. above-ground retaining walls. Including repair of dam inlet archway &amp; wingwall, re-pointing of stones &amp; reinforcement of east reservoir wall, &amp; leakage/seepage protection within OCA.</description><category>Water Supply</category><borough>Bronx</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2016-02-24T00:00:00</design_start><budget_forecast>57966722.86</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-833277.14</total_budget_changes><forecast_completion>2026-12-29T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>2363</total_schedule_changes></row><row _id="row-pzzi_tnbc_q337" _uuid="00000000-0000-0000-37CA-F0A3E1D16749" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-pzzi_tnbc_q337"><date_reported_as_of>2016-06-01T00:00:00</date_reported_as_of><pid>449</pid><project_name>Oakwood Beach WWTP Sludge Thickening Improvements</project_name><description>Replacement of thickener pumps, controls/piping, digested sludge pumps, sludge mixing pumps, sludge recirculation pumps, spray water pumps, and seal water pumps. Installation of GBT and rehab of GTs</description><category>Wastewater Treatment</category><borough>Staten Island</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2016-02-02T00:00:00</design_start><budget_forecast>45179659.00</budget_forecast><latest_budget_changes>500000.00</latest_budget_changes><total_budget_changes>57138101.30</total_budget_changes><forecast_completion>2022-01-12T00:00:00</forecast_completion><latest_schedule_changes>624</latest_schedule_changes><total_schedule_changes>3241</total_schedule_changes></row><row _id="row-i7qn_z7ay~5gsu" _uuid="00000000-0000-0000-2E0D-D0526EF69291" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-i7qn_z7ay~5gsu"><date_reported_as_of>2016-11-01T00:00:00</date_reported_as_of><pid>449</pid><project_name>Oakwood Beach WWTP Sludge Thickening Improvements</project_name><description>Replacement of thickener pumps, controls/piping, digested sludge pumps, sludge mixing pumps, sludge recirculation pumps, spray water pumps, and seal water pumps. Installation of GBT and rehab of GTs</description><category>Wastewater Treatment</category><borough>Staten Island</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2016-02-02T00:00:00</design_start><budget_forecast>44959691.00</budget_forecast><latest_budget_changes>-219968.00</latest_budget_changes><total_budget_changes>57138101.30</total_budget_changes><forecast_completion>2023-03-26T00:00:00</forecast_completion><latest_schedule_changes>438</latest_schedule_changes><total_schedule_changes>3241</total_schedule_changes></row><row _id="row-bbp2.5pkt_cqew" _uuid="00000000-0000-0000-36B3-8AF473D456E9" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-bbp2.5pkt_cqew"><date_reported_as_of>2017-04-01T00:00:00</date_reported_as_of><pid>449</pid><project_name>Oakwood Beach WWTP Sludge Thickening Improvements</project_name><description>Replacement of thickener pumps, piping, sludge pumps, mixing pumps, recirculation pumps, spray water pumps, and heat exchangers. Install Gravity Belt Thickener, GBT pumps, polymer feed system.  Rehab of Thickeners, Sludge Box, and Distribution Box.</description><category>Wastewater Treatment</category><borough>Staten Island</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2016-02-02T00:00:00</design_start><budget_forecast>44247976.60</budget_forecast><latest_budget_changes>-711714.40</latest_budget_changes><total_budget_changes>57138101.30</total_budget_changes><forecast_completion>2023-04-08T00:00:00</forecast_completion><latest_schedule_changes>13</latest_schedule_changes><total_schedule_changes>3241</total_schedule_changes></row><row _id="row-k5uw-5pdm.xzye" _uuid="00000000-0000-0000-D8A2-317787B997C2" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-k5uw-5pdm.xzye"><date_reported_as_of>2017-09-01T00:00:00</date_reported_as_of><pid>449</pid><project_name>Oakwood Beach WWTP Sludge Thickening Improvements</project_name><description>Replacement of thickener pumps, piping, sludge pumps, mixing pumps, recirculation pumps, spray water pumps, and heat exchangers. Install Gravity Belt Thickener, GBT pumps, polymer feed system.  Rehab of Thickeners, Sludge Box, and Distribution Box.</description><category>Wastewater Treatment</category><borough>Staten Island</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2016-02-02T00:00:00</design_start><budget_forecast>44247976.60</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>57138101.30</total_budget_changes><forecast_completion>2023-05-17T00:00:00</forecast_completion><latest_schedule_changes>39</latest_schedule_changes><total_schedule_changes>3241</total_schedule_changes></row><row _id="row-2qb6.ad7g~dni7" _uuid="00000000-0000-0000-9352-6406B13ED9C1" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-2qb6.ad7g~dni7"><date_reported_as_of>2018-08-01T00:00:00</date_reported_as_of><pid>449</pid><project_name>Oakwood Beach WWTP Sludge Thickening Improvements</project_name><description>Replacement of thickener pumps, piping, sludge pumps, mixing pumps, recirculation pumps, spray water pumps, and heat exchangers. Install Gravity Belt Thickener, GBT pumps, polymer feed system.  Rehab of Thickeners, Sludge Box, and Distribution Box.</description><category>Wastewater Treatment</category><borough>Staten Island</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2016-02-02T00:00:00</design_start><budget_forecast>46441722.00</budget_forecast><latest_budget_changes>3843386.40</latest_budget_changes><total_budget_changes>57138101.30</total_budget_changes><forecast_completion>2023-11-17T00:00:00</forecast_completion><latest_schedule_changes>870</latest_schedule_changes><total_schedule_changes>3241</total_schedule_changes></row><row _id="row-ry6v_5778.nz8g" _uuid="00000000-0000-0000-FE13-92D90F1786D8" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ry6v_5778.nz8g"><date_reported_as_of>2019-01-01T00:00:00</date_reported_as_of><pid>449</pid><project_name>Oakwood Beach WWTP Sludge Thickening Improvements</project_name><description>Replacement of thickener pumps, piping, sludge pumps, mixing pumps, recirculation pumps, spray water pumps, and heat exchangers. Install Gravity Belt Thickener, GBT pumps, polymer feed system.  Rehab of Thickeners, Sludge Box, and Distribution Box.</description><category>Wastewater Treatment</category><borough>Staten Island</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2018-08-02T00:00:00</design_start><budget_forecast>43671610.00</budget_forecast><latest_budget_changes>-2770112.00</latest_budget_changes><total_budget_changes>57138101.30</total_budget_changes><forecast_completion>2023-11-17T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>3241</total_schedule_changes></row><row _id="row-9569~kd22.qvru" _uuid="00000000-0000-0000-45FA-78F437D74F7A" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-9569~kd22.qvru"><date_reported_as_of>2019-05-01T00:00:00</date_reported_as_of><pid>449</pid><project_name>Oakwood Beach WWTP Sludge Thickening Improvements</project_name><description>Replacement of thickener pumps, piping, sludge pumps, mixing pumps, recirculation pumps, spray water pumps, and heat exchangers. Install Gravity Belt Thickener, GBT pumps, polymer feed system.  Rehab of Thickeners, Sludge Box, and Distribution Box.</description><category>Wastewater Treatment</category><borough>Staten Island</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2018-08-02T00:00:00</design_start><budget_forecast>73093185.00</budget_forecast><latest_budget_changes>29421575.00</latest_budget_changes><total_budget_changes>57138101.30</total_budget_changes><forecast_completion>2024-09-06T00:00:00</forecast_completion><latest_schedule_changes>294</latest_schedule_changes><total_schedule_changes>3241</total_schedule_changes></row><row _id="row-tebr.n68t_kt2p" _uuid="00000000-0000-0000-06EF-34CF3E7EA5C0" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-tebr.n68t_kt2p"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>449</pid><project_name>Oakwood Beach WWTP Sludge Thickening Improvements</project_name><description>Replacement of thickener pumps, piping, sludge pumps, mixing pumps, recirculation pumps, spray water pumps, and heat exchangers. Install Gravity Belt Thickener, GBT pumps, polymer feed system.  Rehab of Thickeners, Sludge Box, and Distribution Box.</description><category>Wastewater Treatment</category><borough>Staten Island</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2018-08-02T00:00:00</design_start><budget_forecast>78583947.70</budget_forecast><latest_budget_changes>5490762.70</latest_budget_changes><total_budget_changes>57138101.30</total_budget_changes><forecast_completion>2024-06-19T00:00:00</forecast_completion><latest_schedule_changes>-79</latest_schedule_changes><total_schedule_changes>3241</total_schedule_changes></row><row _id="row-m3gi_fgbt~csfc" _uuid="00000000-0000-0000-EF6E-A08DB795AFFE" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-m3gi_fgbt~csfc"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>449</pid><project_name>Oakwood Beach WWTP Sludge Thickening Improvements</project_name><description>Replacement of thickener pumps, piping, sludge pumps, mixing pumps, recirculation pumps, spray water pumps, and heat exchangers. Install Gravity Belt Thickener, GBT pumps, polymer feed system.  Rehab of Thickeners, Sludge Box, and Distribution Box.</description><category>Wastewater Treatment</category><borough>Staten Island</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2018-08-02T00:00:00</design_start><budget_forecast>78856779.65</budget_forecast><latest_budget_changes>272831.95</latest_budget_changes><total_budget_changes>57138101.30</total_budget_changes><forecast_completion>2024-11-28T00:00:00</forecast_completion><latest_schedule_changes>162</latest_schedule_changes><total_schedule_changes>3241</total_schedule_changes></row><row _id="row-p94x.qeqw-nk6j" _uuid="00000000-0000-0000-718D-79C06319CA25" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-p94x.qeqw-nk6j"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>449</pid><project_name>Oakwood Beach WWTP Sludge Thickening Improvements</project_name><description>Replacement of thickener pumps, piping, sludge pumps, mixing pumps, recirculation pumps, spray water pumps, and heat exchangers. Install Gravity Belt Thickener, GBT pumps, polymer feed system.  Rehab of Thickeners, Sludge Box, and Distribution Box.</description><category>Wastewater Treatment</category><borough>Staten Island</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2018-08-02T00:00:00</design_start><budget_forecast>78425184.91</budget_forecast><latest_budget_changes>-431594.74</latest_budget_changes><total_budget_changes>57138101.30</total_budget_changes><forecast_completion>2024-11-28T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>3241</total_schedule_changes></row><row _id="row-k2g5.pcip~saf5" _uuid="00000000-0000-0000-20F5-F3F087DE51FC" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-k2g5.pcip~saf5"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>449</pid><project_name>Oakwood Beach WWTP Sludge Thickening Improvements</project_name><description>Replacement of thickener pumps, piping, sludge pumps, mixing pumps, recirculation pumps, spray water pumps, and heat exchangers. Install Gravity Belt Thickener, GBT pumps, polymer feed system.  Rehab of Thickeners, Sludge Box, and Distribution Box.</description><category>Wastewater Treatment</category><borough>Staten Island</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2018-08-02T00:00:00</design_start><budget_forecast>78425184.91</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>57138101.30</total_budget_changes><forecast_completion>2025-06-03T00:00:00</forecast_completion><latest_schedule_changes>187</latest_schedule_changes><total_schedule_changes>3241</total_schedule_changes></row><row _id="row-jf3h~9wkz~65us" _uuid="00000000-0000-0000-BBEB-3F923019B92D" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-jf3h~9wkz~65us"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>449</pid><project_name>Oakwood Beach WWTP Sludge Thickening Improvements</project_name><description>Replacement of thickener pumps, piping, sludge pumps, mixing pumps, recirculation pumps, spray water pumps, and heat exchangers. Install Gravity Belt Thickener, GBT pumps, polymer feed system.  Rehab of Thickeners, Sludge Box, and Distribution Box.</description><category>Wastewater Treatment</category><borough>Staten Island</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2018-08-02T00:00:00</design_start><budget_forecast>78425184.91</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>57138101.30</total_budget_changes><forecast_completion>2026-04-25T00:00:00</forecast_completion><latest_schedule_changes>326</latest_schedule_changes><total_schedule_changes>3241</total_schedule_changes></row><row _id="row-y8vt_i7fk-bs72" _uuid="00000000-0000-0000-19EA-8876ADE93570" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-y8vt_i7fk-bs72"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>449</pid><project_name>Oakwood Beach WWTP Sludge Thickening Improvements</project_name><description>Replacement of thickener pumps, piping, sludge pumps, mixing pumps, recirculation pumps, spray water pumps, and heat exchangers. Install Gravity Belt Thickener, GBT pumps, polymer feed system.  Rehab of Thickeners, Sludge Box, and Distribution Box.</description><category>Wastewater Treatment</category><borough>Staten Island</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2018-08-02T00:00:00</design_start><budget_forecast>78748149.21</budget_forecast><latest_budget_changes>322964.30</latest_budget_changes><total_budget_changes>57138101.30</total_budget_changes><forecast_completion>2026-07-18T00:00:00</forecast_completion><latest_schedule_changes>84</latest_schedule_changes><total_schedule_changes>3241</total_schedule_changes></row><row _id="row-6njz-k397-dr54" _uuid="00000000-0000-0000-AE31-351DB50DC9FB" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-6njz-k397-dr54"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>449</pid><project_name>Oakwood Beach WWTP Sludge Thickening Improvements</project_name><description>Replacement of thickener pumps and associated controls/piping, digested sludge pumps, sludge mixing pumps, sludge recirculation pumps, spray water pumps, and seal water pumps</description><category>Wastewater Treatment</category><borough>Staten Island</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2018-08-02T00:00:00</design_start><budget_forecast>87880194.11</budget_forecast><latest_budget_changes>9132044.90</latest_budget_changes><total_budget_changes>57138101.30</total_budget_changes><forecast_completion>2026-07-18T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>3241</total_schedule_changes></row><row _id="row-rxka_85tt-v66c" _uuid="00000000-0000-0000-DD26-90B3B6996F43" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-rxka_85tt-v66c"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>449</pid><project_name>Oakwood Beach WWTP Sludge Thickening Improvements</project_name><description>Replacement of thickener pumps and associated controls/piping, digested sludge pumps, sludge mixing pumps, sludge recirculation pumps, spray water pumps, and seal water pumps</description><category>Wastewater Treatment</category><borough>Staten Island</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2018-08-02T00:00:00</design_start><budget_forecast>87880194.11</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>57138101.30</total_budget_changes><forecast_completion>2026-10-18T00:00:00</forecast_completion><latest_schedule_changes>92</latest_schedule_changes><total_schedule_changes>3241</total_schedule_changes></row><row _id="row-97wi~tris.wgp6" _uuid="00000000-0000-0000-77D5-DF38E523BDBE" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-97wi~tris.wgp6"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>449</pid><project_name>Oakwood Beach WWTP Sludge Thickening Improvements</project_name><description>Replacement of thickener pumps and associated controls/piping, digested sludge pumps, sludge mixing pumps, sludge recirculation pumps, spray water pumps, and seal water pumps</description><category>Wastewater Treatment</category><borough>Staten Island</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction Procurement</current_phase><design_start>2018-08-02T00:00:00</design_start><budget_forecast>87880194.11</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>57138101.30</total_budget_changes><forecast_completion>2026-08-11T00:00:00</forecast_completion><latest_schedule_changes>-68</latest_schedule_changes><total_schedule_changes>3241</total_schedule_changes></row><row _id="row-9grw.qvuf-wb5d" _uuid="00000000-0000-0000-0546-BE14B857848C" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-9grw.qvuf-wb5d"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>449</pid><project_name>Oakwood Beach WWTP Sludge Thickening Improvements</project_name><description>Replacement of thickener pumps and associated controls/piping, digested sludge pumps, sludge mixing pumps, sludge recirculation pumps, spray water pumps, and seal water pumps</description><category>Wastewater Treatment</category><borough>Staten Island</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction Procurement</current_phase><design_start>2018-08-02T00:00:00</design_start><budget_forecast>100168119.30</budget_forecast><latest_budget_changes>12287925.19</latest_budget_changes><total_budget_changes>57138101.30</total_budget_changes><forecast_completion>2027-04-27T00:00:00</forecast_completion><latest_schedule_changes>259</latest_schedule_changes><total_schedule_changes>3241</total_schedule_changes></row><row _id="row-wtkt-irhw_6hq2" _uuid="00000000-0000-0000-E13D-01970ADC033D" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-wtkt-irhw_6hq2"><date_reported_as_of>2016-06-01T00:00:00</date_reported_as_of><pid>450</pid><project_name>Oakwood Beach WWTP Headworks Improvements</project_name><description>Replacement of six bar screens, grit bin vibrator, six ring flushing pumps, six main sewage pumps and assoc. piping/valves and motor control center, replacement of four exhaust fans, gas and oxygen detectors and a 15 KVA transformer</description><category>Wastewater Treatment</category><borough>Staten Island</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2015-10-20T00:00:00</design_start><budget_forecast>44206645.00</budget_forecast><latest_budget_changes>-7155355.00</latest_budget_changes><total_budget_changes>31867440.00</total_budget_changes><forecast_completion>2021-12-24T00:00:00</forecast_completion><latest_schedule_changes>178</latest_schedule_changes><total_schedule_changes>2857</total_schedule_changes></row><row _id="row-3gkc~ajer_eegv" _uuid="00000000-0000-0000-D11B-8F94C444651E" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-3gkc~ajer_eegv"><date_reported_as_of>2016-11-01T00:00:00</date_reported_as_of><pid>450</pid><project_name>Oakwood Beach WWTP Headworks Improvements</project_name><description>Replacement of six bar screens, grit bin vibrator, six ring flushing pumps, six main sewage pumps and assoc. piping/valves and motor control center, replacement of four exhaust fans, gas and oxygen detectors and a 15 KVA transformer</description><category>Wastewater Treatment</category><borough>Staten Island</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2015-10-20T00:00:00</design_start><budget_forecast>47273291.00</budget_forecast><latest_budget_changes>3066646.00</latest_budget_changes><total_budget_changes>31867440.00</total_budget_changes><forecast_completion>2021-12-24T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>2857</total_schedule_changes></row><row _id="row-snqu-hgkv-ms52" _uuid="00000000-0000-0000-9D6B-D5D1873A1646" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-snqu-hgkv-ms52"><date_reported_as_of>2017-04-01T00:00:00</date_reported_as_of><pid>450</pid><project_name>Oakwood Beach WWTP Headworks Improvements</project_name><description>Replacement of six bar screens, grit bin vibrator, six ring flushing pumps, six main sewage pumps and assoc. piping/valves and motor control center, replacement of four exhaust fans, gas and oxygen detectors and a 15 KVA transformer</description><category>Wastewater Treatment</category><borough>Staten Island</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2015-10-20T00:00:00</design_start><budget_forecast>43164076.80</budget_forecast><latest_budget_changes>-4109214.20</latest_budget_changes><total_budget_changes>31867440.00</total_budget_changes><forecast_completion>2022-05-05T00:00:00</forecast_completion><latest_schedule_changes>132</latest_schedule_changes><total_schedule_changes>2857</total_schedule_changes></row><row _id="row-ktpc-k7fj_4ivr" _uuid="00000000-0000-0000-276A-EDDC76FC9794" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ktpc-k7fj_4ivr"><date_reported_as_of>2017-09-01T00:00:00</date_reported_as_of><pid>450</pid><project_name>Oakwood Beach WWTP Headworks Improvements</project_name><description>Replacement of six bar screens, grit bin vibrator, six ring flushing pumps, six main sewage pumps and assoc. piping/valves and motor control center, replacement of four exhaust fans, gas and oxygen detectors and a 15 KVA transformer</description><category>Wastewater Treatment</category><borough>Staten Island</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2015-10-20T00:00:00</design_start><budget_forecast>54063510.00</budget_forecast><latest_budget_changes>10899433.20</latest_budget_changes><total_budget_changes>31867440.00</total_budget_changes><forecast_completion>2022-04-09T00:00:00</forecast_completion><latest_schedule_changes>-26</latest_schedule_changes><total_schedule_changes>2857</total_schedule_changes></row><row _id="row-6jre~9hb8~7npg" _uuid="00000000-0000-0000-192A-C2AF8769681D" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-6jre~9hb8~7npg"><date_reported_as_of>2018-03-01T00:00:00</date_reported_as_of><pid>450</pid><project_name>Oakwood Beach WWTP Headworks Improvements</project_name><description>Replacement of six bar screens, grit bin vibrator, six ring flushing pumps, six main sewage pumps and assoc. piping/valves and motor control center, replacement of four exhaust fans, gas and oxygen detectors and a 15 KVA transformer</description><category>Wastewater Treatment</category><borough>Staten Island</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2015-10-20T00:00:00</design_start><budget_forecast>53989497.60</budget_forecast><latest_budget_changes>-74012.40</latest_budget_changes><total_budget_changes>31867440.00</total_budget_changes><forecast_completion>2024-03-02T00:00:00</forecast_completion><latest_schedule_changes>693</latest_schedule_changes><total_schedule_changes>2857</total_schedule_changes></row><row _id="row-f3gu-ytv4.tnm3" _uuid="00000000-0000-0000-5C88-85B6F32F84B8" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-f3gu-ytv4.tnm3"><date_reported_as_of>2018-08-01T00:00:00</date_reported_as_of><pid>450</pid><project_name>Oakwood Beach WWTP Headworks Improvements</project_name><description>Replacement of six bar screens, grit bin vibrator, six ring flushing pumps, six main sewage pumps and assoc. piping/valves and motor control center, replacement of four exhaust fans, gas and oxygen detectors and a 15 KVA transformer</description><category>Wastewater Treatment</category><borough>Staten Island</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2015-10-20T00:00:00</design_start><budget_forecast>32128710.00</budget_forecast><latest_budget_changes>-21860787.60</latest_budget_changes><total_budget_changes>31867440.00</total_budget_changes><forecast_completion>2023-01-08T00:00:00</forecast_completion><latest_schedule_changes>-419</latest_schedule_changes><total_schedule_changes>2857</total_schedule_changes></row><row _id="row-3s2m-jjfx-3xmj" _uuid="00000000-0000-0000-D742-86B41264FF2E" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-3s2m-jjfx-3xmj"><date_reported_as_of>2019-01-01T00:00:00</date_reported_as_of><pid>450</pid><project_name>Oakwood Beach WWTP Headworks Improvements</project_name><description>Replacement of six bar screens, grit bin vibrator, six ring flushing pumps, six main sewage pumps and assoc. piping/valves and motor control center, replacement of four exhaust fans, gas and oxygen detectors and a 15 KVA transformer</description><category>Wastewater Treatment</category><borough>Staten Island</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2015-10-20T00:00:00</design_start><budget_forecast>47458510.00</budget_forecast><latest_budget_changes>15329800.00</latest_budget_changes><total_budget_changes>31867440.00</total_budget_changes><forecast_completion>2024-08-28T00:00:00</forecast_completion><latest_schedule_changes>598</latest_schedule_changes><total_schedule_changes>2857</total_schedule_changes></row><row _id="row-ecat.jdhg_67pa" _uuid="00000000-0000-0000-63EF-B41C6F139F5F" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ecat.jdhg_67pa"><date_reported_as_of>2019-05-01T00:00:00</date_reported_as_of><pid>450</pid><project_name>Oakwood Beach WWTP Headworks Improvements</project_name><description>Replacement of six bar screens, grit bin vibrator, six ring flushing pumps, six main sewage pumps and assoc. piping/valves and motor control center, replacement of four exhaust fans, gas and oxygen detectors and a 15 KVA transformer</description><category>Wastewater Treatment</category><borough>Staten Island</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction Procurement</current_phase><design_start>2015-12-23T00:00:00</design_start><budget_forecast>59358513.99</budget_forecast><latest_budget_changes>11900003.99</latest_budget_changes><total_budget_changes>31867440.00</total_budget_changes><forecast_completion>2024-02-10T00:00:00</forecast_completion><latest_schedule_changes>-200</latest_schedule_changes><total_schedule_changes>2857</total_schedule_changes></row><row _id="row-ueze.tc5j.94c6" _uuid="00000000-0000-0000-A768-B27073366C67" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ueze.tc5j.94c6"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>450</pid><project_name>Oakwood Beach WWTP Headworks Improvements</project_name><description>Replacement of six bar screens, grit bin vibrator, six ring flushing pumps, six main sewage pumps and assoc. piping/valves and motor control center, replacement of four exhaust fans, gas and oxygen detectors and a 15 KVA transformer</description><category>Wastewater Treatment</category><borough>Staten Island</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction Procurement</current_phase><design_start>2015-12-23T00:00:00</design_start><budget_forecast>59284497.60</budget_forecast><latest_budget_changes>-74016.39</latest_budget_changes><total_budget_changes>31867440.00</total_budget_changes><forecast_completion>2025-02-15T00:00:00</forecast_completion><latest_schedule_changes>371</latest_schedule_changes><total_schedule_changes>2857</total_schedule_changes></row><row _id="row-5fnr.ffai-z7ug" _uuid="00000000-0000-0000-7358-E8AC93447EC0" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-5fnr.ffai-z7ug"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>450</pid><project_name>Oakwood Beach WWTP Headworks Improvements</project_name><description>Replacement of six bar screens, grit bin vibrator, six ring flushing pumps, six main sewage pumps and assoc. piping/valves and motor control center, replacement of four exhaust fans, gas and oxygen detectors and a 15 KVA transformer</description><category>Wastewater Treatment</category><borough>Staten Island</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction Procurement</current_phase><design_start>2015-12-23T00:00:00</design_start><budget_forecast>59118898.00</budget_forecast><latest_budget_changes>-165599.60</latest_budget_changes><total_budget_changes>31867440.00</total_budget_changes><forecast_completion>2024-08-20T00:00:00</forecast_completion><latest_schedule_changes>-179</latest_schedule_changes><total_schedule_changes>2857</total_schedule_changes></row><row _id="row-gcwi~tnt9-yiq8" _uuid="00000000-0000-0000-EDC1-F2F2A9BDD2B2" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-gcwi~tnt9-yiq8"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>450</pid><project_name>Oakwood Beach WWTP Headworks Improvements</project_name><description>Replacement of six bar screens, grit bin vibrator, six ring flushing pumps, six main sewage pumps and assoc. piping/valves and motor control center, replacement of four exhaust fans, gas and oxygen detectors and a 15 KVA transformer</description><category>Wastewater Treatment</category><borough>Staten Island</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction Procurement</current_phase><design_start>2015-12-23T00:00:00</design_start><budget_forecast>74556528.00</budget_forecast><latest_budget_changes>15437630.00</latest_budget_changes><total_budget_changes>31867440.00</total_budget_changes><forecast_completion>2025-10-16T00:00:00</forecast_completion><latest_schedule_changes>422</latest_schedule_changes><total_schedule_changes>2857</total_schedule_changes></row><row _id="row-484v-hd5x_bnit" _uuid="00000000-0000-0000-E35E-331097A247D9" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-484v-hd5x_bnit"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>450</pid><project_name>Oakwood Beach WWTP Headworks Improvements</project_name><description>Replacement of six bar screens, grit bin vibrator, six ring flushing pumps, six main sewage pumps and assoc. piping/valves and motor control center, replacement of four exhaust fans, gas and oxygen detectors and a 15 KVA transformer</description><category>Wastewater Treatment</category><borough>Staten Island</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction Procurement</current_phase><design_start>2015-12-23T00:00:00</design_start><budget_forecast>74581530.00</budget_forecast><latest_budget_changes>25002.00</latest_budget_changes><total_budget_changes>31867440.00</total_budget_changes><forecast_completion>2025-10-17T00:00:00</forecast_completion><latest_schedule_changes>1</latest_schedule_changes><total_schedule_changes>2857</total_schedule_changes></row><row _id="row-n27p.gsym.d57s" _uuid="00000000-0000-0000-0C17-98523078D2CD" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-n27p.gsym.d57s"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>450</pid><project_name>Oakwood Beach WWTP Headworks Improvements</project_name><description>Replacement of six bar screens, grit bin vibrator, six ring flushing pumps, six main sewage pumps and assoc. piping/valves and motor control center, replacement of four exhaust fans, gas and oxygen detectors and a 15 KVA transformer</description><category>Wastewater Treatment</category><borough>Staten Island</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction Procurement</current_phase><design_start>2015-12-23T00:00:00</design_start><budget_forecast>80415120.00</budget_forecast><latest_budget_changes>5833590.00</latest_budget_changes><total_budget_changes>31867440.00</total_budget_changes><forecast_completion>2025-10-17T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>2857</total_schedule_changes></row><row _id="row-h2ui_8dfg~v7fi" _uuid="00000000-0000-0000-FDAA-EF54E0BD7A29" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-h2ui_8dfg~v7fi"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>450</pid><project_name>Oakwood Beach WWTP Headworks Improvements</project_name><description>Replacement of six bar screens, grit bin vibrator, six ring flushing pumps, six main sewage pumps and assoc. piping/valves and motor control center, replacement of four exhaust fans, gas and oxygen detectors and a 15 KVA transformer</description><category>Wastewater Treatment</category><borough>Staten Island</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction Procurement</current_phase><design_start>2015-12-23T00:00:00</design_start><budget_forecast>83229440.00</budget_forecast><latest_budget_changes>2814320.00</latest_budget_changes><total_budget_changes>31867440.00</total_budget_changes><forecast_completion>2025-10-17T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>2857</total_schedule_changes></row><row _id="row-zej2~9vq6-sxbe" _uuid="00000000-0000-0000-349F-8FE8D54F23D4" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-zej2~9vq6-sxbe"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>450</pid><project_name>Oakwood Beach WWTP Headworks Improvements</project_name><description>Replacement of six bar screens, grit bin vibrator, six ring flushing pumps, six main sewage pumps and assoc. piping/valves and motor control center, replacement of four exhaust fans, gas and oxygen detectors and a 15 KVA transformer</description><category>Wastewater Treatment</category><borough>Staten Island</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction Procurement</current_phase><design_start>2015-12-23T00:00:00</design_start><budget_forecast>83229440.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>31867440.00</total_budget_changes><forecast_completion>2026-10-17T00:00:00</forecast_completion><latest_schedule_changes>365</latest_schedule_changes><total_schedule_changes>2857</total_schedule_changes></row><row _id="row-69gw.gk3a.49ir" _uuid="00000000-0000-0000-20F5-5332BE00D989" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-69gw.gk3a.49ir"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>450</pid><project_name>Oakwood Beach WWTP Headworks Improvements</project_name><description>Replacement of six bar screens, grit bin vibrator, six ring flushing pumps, six main sewage pumps and assoc. piping/valves and motor control center, replacement of four exhaust fans, gas and oxygen detectors and a 15 KVA transformer</description><category>Wastewater Treatment</category><borough>Staten Island</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2015-12-23T00:00:00</design_start><budget_forecast>83229440.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>31867440.00</total_budget_changes><forecast_completion>2029-08-03T00:00:00</forecast_completion><latest_schedule_changes>1021</latest_schedule_changes><total_schedule_changes>2857</total_schedule_changes></row><row _id="row-bsw4-226i-cncz" _uuid="00000000-0000-0000-C122-340F1970C8FA" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-bsw4-226i-cncz"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>450</pid><project_name>Oakwood Beach WWTP Headworks Improvements</project_name><description>Replacement of six bar screens, grit bin vibrator, six ring flushing pumps, six main sewage pumps and assoc. piping/valves and motor control center, replacement of four exhaust fans, gas and oxygen detectors and a 15 KVA transformer</description><category>Wastewater Treatment</category><borough>Staten Island</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2023-02-01T00:00:00</design_start><budget_forecast>83229440.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>31867440.00</total_budget_changes><forecast_completion>2029-04-25T00:00:00</forecast_completion><latest_schedule_changes>-100</latest_schedule_changes><total_schedule_changes>2857</total_schedule_changes></row><row _id="row-9irm.cbg7~v4fy" _uuid="00000000-0000-0000-AA8E-D4B2567312E5" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-9irm.cbg7~v4fy"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>450</pid><project_name>Oakwood Beach WWTP Headworks Improvements</project_name><description>Replacement of six bar screens, grit bin vibrator, six ring flushing pumps, six main sewage pumps and assoc. piping/valves and motor control center, replacement of four exhaust fans, gas and oxygen detectors and a 15 KVA transformer</description><category>Wastewater Treatment</category><borough>Staten Island</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2023-02-01T00:00:00</design_start><budget_forecast>83229440.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>31867440.00</total_budget_changes><forecast_completion>2029-04-25T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>2857</total_schedule_changes></row><row _id="row-j5hx-7sqv-s32u" _uuid="00000000-0000-0000-70BB-F20242760E02" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-j5hx-7sqv-s32u"><date_reported_as_of>2017-04-01T00:00:00</date_reported_as_of><pid>452</pid><project_name>Primary Treatment Improvement at Wards Island WWTP</project_name><description>Replacement of internal mechanisms, concrete repairs, effluent weirs, scum troughs, grease pit collection system, electrical upgrades, HVAC upgrades, evaluation and improvement of cross collector drainage in 10 PST.</description><category>Wastewater Treatment</category><borough>Manhattan</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2017-04-18T00:00:00</design_start><budget_forecast>46456631.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>99651290.98</total_budget_changes><forecast_completion>2020-05-10T00:00:00</forecast_completion><latest_schedule_changes>-383</latest_schedule_changes><total_schedule_changes>2142</total_schedule_changes></row><row _id="row-fpqd-75rn.kz9e" _uuid="00000000-0000-0000-0A41-355BF7F2CB05" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-fpqd-75rn.kz9e"><date_reported_as_of>2017-09-01T00:00:00</date_reported_as_of><pid>452</pid><project_name>Primary Treatment Improvement at Wards Island WWTP</project_name><description>Replacement of internal mechanisms, concrete repairs, effluent weirs, scum troughs, grease pit collection system, electrical upgrades, HVAC upgrades, evaluation and improvement of cross collector drainage in 10 PST.</description><category>Wastewater Treatment</category><borough>Manhattan</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2017-06-30T00:00:00</design_start><budget_forecast>68456631.00</budget_forecast><latest_budget_changes>22000000.00</latest_budget_changes><total_budget_changes>99651290.98</total_budget_changes><forecast_completion>2020-07-22T00:00:00</forecast_completion><latest_schedule_changes>73</latest_schedule_changes><total_schedule_changes>2142</total_schedule_changes></row><row _id="row-v9ac_yd6a.qmsz" _uuid="00000000-0000-0000-CA57-25FE5AF667C8" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-v9ac_yd6a.qmsz"><date_reported_as_of>2018-03-01T00:00:00</date_reported_as_of><pid>452</pid><project_name>Primary Treatment Improvement at Wards Island WWTP</project_name><description>Replacement of internal mechanisms, concrete repairs, effluent weirs, scum troughs, grease pit collection system, electrical upgrades, HVAC upgrades, evaluation and improvement of cross collector drainage in 10 PST.</description><category>Wastewater Treatment</category><borough>Manhattan</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2017-06-30T00:00:00</design_start><budget_forecast>79500000.00</budget_forecast><latest_budget_changes>11043369.00</latest_budget_changes><total_budget_changes>99651290.98</total_budget_changes><forecast_completion>2020-10-01T00:00:00</forecast_completion><latest_schedule_changes>71</latest_schedule_changes><total_schedule_changes>2142</total_schedule_changes></row><row _id="row-83kd.5uqh~vmys" _uuid="00000000-0000-0000-A503-76B8058ABBFE" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-83kd.5uqh~vmys"><date_reported_as_of>2018-08-01T00:00:00</date_reported_as_of><pid>452</pid><project_name>Primary Treatment Improvement at Wards Island WWTP</project_name><description>Replacement of internal mechanisms, concrete repairs, effluent weirs, scum troughs, grease pit collection system, electrical upgrades, HVAC upgrades, evaluation and improvement of cross collector drainage in 10 PST.</description><category>Wastewater Treatment</category><borough>Manhattan</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2017-06-30T00:00:00</design_start><budget_forecast>46500000.00</budget_forecast><latest_budget_changes>-33000000.00</latest_budget_changes><total_budget_changes>99651290.98</total_budget_changes><forecast_completion>2021-02-26T00:00:00</forecast_completion><latest_schedule_changes>148</latest_schedule_changes><total_schedule_changes>2142</total_schedule_changes></row><row _id="row-drx3~zzhf_v6be" _uuid="00000000-0000-0000-2C1C-D294BE7DF94D" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-drx3~zzhf_v6be"><date_reported_as_of>2019-01-01T00:00:00</date_reported_as_of><pid>452</pid><project_name>Primary Treatment Improvement at Wards Island WWTP</project_name><description>Replacement of internal mechanisms, concrete repairs, effluent weirs, scum troughs, grease pit collection system, electrical upgrades, HVAC upgrades, evaluation and improvement of cross collector drainage in 10 PST.</description><category>Wastewater Treatment</category><borough>Manhattan</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2017-11-06T00:00:00</design_start><budget_forecast>75500000.00</budget_forecast><latest_budget_changes>29000000.00</latest_budget_changes><total_budget_changes>99651290.98</total_budget_changes><forecast_completion>2025-01-24T00:00:00</forecast_completion><latest_schedule_changes>1428</latest_schedule_changes><total_schedule_changes>2142</total_schedule_changes></row><row _id="row-hvi2_9wd7_tumj" _uuid="00000000-0000-0000-860F-14C99AAC1A95" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-hvi2_9wd7_tumj"><date_reported_as_of>2019-05-01T00:00:00</date_reported_as_of><pid>452</pid><project_name>Primary Treatment Improvement at Wards Island WWTP</project_name><description>Replacement of internal mechanisms, concrete repairs, effluent weirs, scum troughs, grease pit collection system, electrical upgrades, HVAC upgrades, evaluation and improvement of cross collector drainage in 10 PST.</description><category>Wastewater Treatment</category><borough>Manhattan</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2017-11-06T00:00:00</design_start><budget_forecast>75696483.35</budget_forecast><latest_budget_changes>196483.35</latest_budget_changes><total_budget_changes>99651290.98</total_budget_changes><forecast_completion>2025-01-30T00:00:00</forecast_completion><latest_schedule_changes>6</latest_schedule_changes><total_schedule_changes>2142</total_schedule_changes></row><row _id="row-jw8g-5z3t~r2ym" _uuid="00000000-0000-0000-AAEC-62FC2F8679C5" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-jw8g-5z3t~r2ym"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>452</pid><project_name>Primary Treatment Improvement at Wards Island WWTP</project_name><description>Replacement of internal mechanisms, concrete repairs, effluent weirs, scum troughs, grease pit collection system, electrical upgrades, HVAC upgrades, evaluation and improvement of cross collector drainage in 10 PST.</description><category>Wastewater Treatment</category><borough>Manhattan</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2017-11-06T00:00:00</design_start><budget_forecast>46656345.00</budget_forecast><latest_budget_changes>-29040138.35</latest_budget_changes><total_budget_changes>99651290.98</total_budget_changes><forecast_completion>2025-03-24T00:00:00</forecast_completion><latest_schedule_changes>53</latest_schedule_changes><total_schedule_changes>2142</total_schedule_changes></row><row _id="row-ie97~ezjq_jzwx" _uuid="00000000-0000-0000-A7AE-70984ED5AB47" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ie97~ezjq_jzwx"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>452</pid><project_name>Primary Treatment Improvement at Wards Island WWTP</project_name><description>Replacement of internal mechanisms, concrete repairs, effluent weirs, scum troughs, grease pit collection system, electrical upgrades, HVAC upgrades, evaluation and improvement of cross collector drainage in 10 PST.</description><category>Wastewater Treatment</category><borough>Manhattan</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2017-11-06T00:00:00</design_start><budget_forecast>95789737.35</budget_forecast><latest_budget_changes>49133392.35</latest_budget_changes><total_budget_changes>99651290.98</total_budget_changes><forecast_completion>2025-07-01T00:00:00</forecast_completion><latest_schedule_changes>99</latest_schedule_changes><total_schedule_changes>2142</total_schedule_changes></row><row _id="row-jkh9~ernm-uavy" _uuid="00000000-0000-0000-13A4-8CF0E7D20881" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-jkh9~ernm-uavy"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>452</pid><project_name>Primary Treatment Improvement at Wards Island WWTP</project_name><description>Replacement of internal mechanisms, concrete repairs, effluent weirs, scum troughs, grease pit collection system, electrical upgrades, HVAC upgrades, evaluation and improvement of cross collector drainage in 10 PST.</description><category>Wastewater Treatment</category><borough>Manhattan</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2017-11-06T00:00:00</design_start><budget_forecast>95860322.35</budget_forecast><latest_budget_changes>70585.00</latest_budget_changes><total_budget_changes>99651290.98</total_budget_changes><forecast_completion>2025-11-01T00:00:00</forecast_completion><latest_schedule_changes>123</latest_schedule_changes><total_schedule_changes>2142</total_schedule_changes></row><row _id="row-43s2_xe9k_wwfr" _uuid="00000000-0000-0000-6D6A-D7F0044E6D76" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-43s2_xe9k_wwfr"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>452</pid><project_name>Primary Treatment Improvement at Wards Island WWTP</project_name><description>Replacement of internal mechanisms, concrete repairs, effluent weirs, scum troughs, grease pit collection system, electrical upgrades, HVAC upgrades, evaluation and improvement of cross collector drainage in 10 PST.</description><category>Wastewater Treatment</category><borough>Manhattan</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2017-11-06T00:00:00</design_start><budget_forecast>95907447.35</budget_forecast><latest_budget_changes>47125.00</latest_budget_changes><total_budget_changes>99651290.98</total_budget_changes><forecast_completion>2026-02-01T00:00:00</forecast_completion><latest_schedule_changes>92</latest_schedule_changes><total_schedule_changes>2142</total_schedule_changes></row><row _id="row-hecs_zhrm_sf9v" _uuid="00000000-0000-0000-2020-7C02DA77378D" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-hecs_zhrm_sf9v"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>452</pid><project_name>Primary Treatment Improvement at Wards Island WWTP</project_name><description>Replacement of internal mechanisms, concrete repairs, effluent weirs, scum troughs, grease pit collection system, electrical upgrades, HVAC upgrades, evaluation and improvement of cross collector drainage in 10 PST.</description><category>Wastewater Treatment</category><borough>Manhattan</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2017-11-06T00:00:00</design_start><budget_forecast>105146117.35</budget_forecast><latest_budget_changes>9238670.00</latest_budget_changes><total_budget_changes>99651290.98</total_budget_changes><forecast_completion>2026-05-01T00:00:00</forecast_completion><latest_schedule_changes>89</latest_schedule_changes><total_schedule_changes>2142</total_schedule_changes></row><row _id="row-pfdk_r53u.x3ts" _uuid="00000000-0000-0000-FB69-7453FA5AC7FF" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-pfdk_r53u.x3ts"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>452</pid><project_name>Primary Treatment Improvement at Wards Island WWTP</project_name><description>Replacement of internal mechanisms, concrete repairs, effluent weirs, scum troughs, grease pit collection system, electrical upgrades, HVAC upgrades, evaluation and improvement of cross collector drainage in 10 PST.</description><category>Wastewater Treatment</category><borough>Manhattan</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction Procurement</current_phase><design_start>2017-11-06T00:00:00</design_start><budget_forecast>105193111.35</budget_forecast><latest_budget_changes>46994.00</latest_budget_changes><total_budget_changes>99651290.98</total_budget_changes><forecast_completion>2026-07-15T00:00:00</forecast_completion><latest_schedule_changes>75</latest_schedule_changes><total_schedule_changes>2142</total_schedule_changes></row><row _id="row-uhzp~rz5b-jysb" _uuid="00000000-0000-0000-51F2-A7DA0EFD90B1" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-uhzp~rz5b-jysb"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>452</pid><project_name>Primary Treatment Improvement at Wards Island WWTP</project_name><description>Replacement of collector drives, scum trough dipping weirs and dump valves for ten primary settling tanks. Also included are Influent channel mixing and seal water system for the primary sludge pumps and concrete repairs.</description><category>Wastewater Treatment</category><borough>Manhattan</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction Procurement</current_phase><design_start>2017-11-06T00:00:00</design_start><budget_forecast>105674163.25</budget_forecast><latest_budget_changes>481051.90</latest_budget_changes><total_budget_changes>99651290.98</total_budget_changes><forecast_completion>2026-06-20T00:00:00</forecast_completion><latest_schedule_changes>-25</latest_schedule_changes><total_schedule_changes>2142</total_schedule_changes></row><row _id="row-twg9_gcnj-hfvv" _uuid="00000000-0000-0000-AEFA-56D118FA80A8" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-twg9_gcnj-hfvv"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>452</pid><project_name>Primary Treatment Improvement at Wards Island WWTP</project_name><description>Replacement of collector drives, scum trough dipping weirs and dump valves for ten primary settling tanks. Also included are Influent channel mixing and seal water system for the primary sludge pumps and concrete repairs.</description><category>Wastewater Treatment</category><borough>Manhattan</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction Procurement</current_phase><design_start>2017-11-06T00:00:00</design_start><budget_forecast>106205187.75</budget_forecast><latest_budget_changes>531024.50</latest_budget_changes><total_budget_changes>99651290.98</total_budget_changes><forecast_completion>2026-09-22T00:00:00</forecast_completion><latest_schedule_changes>94</latest_schedule_changes><total_schedule_changes>2142</total_schedule_changes></row><row _id="row-ipcr_heug-vd6n" _uuid="00000000-0000-0000-FCAE-2E4C5A0A32B6" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ipcr_heug-vd6n"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>452</pid><project_name>Primary Treatment Improvement at Wards Island WWTP</project_name><description>Replacement of collector drives, scum trough dipping weirs and dump valves for ten primary settling tanks. Also included are Influent channel mixing and seal water system for the primary sludge pumps and concrete repairs.</description><category>Wastewater Treatment</category><borough>Manhattan</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2017-11-06T00:00:00</design_start><budget_forecast>143830329.36</budget_forecast><latest_budget_changes>37625141.61</latest_budget_changes><total_budget_changes>99651290.98</total_budget_changes><forecast_completion>2027-04-09T00:00:00</forecast_completion><latest_schedule_changes>199</latest_schedule_changes><total_schedule_changes>2142</total_schedule_changes></row><row _id="row-uziz~8dj2-fwhn" _uuid="00000000-0000-0000-944C-012AFF19CD6E" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-uziz~8dj2-fwhn"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>452</pid><project_name>Primary Treatment Improvement at Wards Island WWTP</project_name><description>Replacement of collector drives, scum trough dipping weirs and dump valves for ten primary settling tanks. Also included are Influent channel mixing and seal water system for the primary sludge pumps and concrete repairs.</description><category>Wastewater Treatment</category><borough>Manhattan</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2017-11-06T00:00:00</design_start><budget_forecast>146107921.98</budget_forecast><latest_budget_changes>2277592.62</latest_budget_changes><total_budget_changes>99651290.98</total_budget_changes><forecast_completion>2027-04-09T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>2142</total_schedule_changes></row><row _id="row-cd6a_dic9~6ysb" _uuid="00000000-0000-0000-C8E7-3FF74821B2F1" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-cd6a_dic9~6ysb"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>453</pid><project_name>Reconstruction of Power Distribution at Wards Island WWTP</project_name><description>Upgrades significant portions of the electrical distribution infrastructure including 5 power center installations, 23 motor control centers, 6 automatic transfer switches and 35 transformers throughout the plant, main feeders, breakers</description><category>Wastewater Treatment</category><borough>Manhattan</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2019-06-04T00:00:00</design_start><budget_forecast>117000157.30</budget_forecast><latest_budget_changes>1383749.30</latest_budget_changes><total_budget_changes>33489860.26</total_budget_changes><forecast_completion>2025-01-12T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1147</total_schedule_changes></row><row _id="row-vk6t_q37i-pjdf" _uuid="00000000-0000-0000-2A74-6EEC65880A39" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-vk6t_q37i-pjdf"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>453</pid><project_name>Reconstruction of Power Distribution at Wards Island WWTP</project_name><description>Upgrades significant portions of the electrical distribution infrastructure including 5 power center installations, 23 motor control centers, 6 automatic transfer switches and 35 transformers throughout the plant, main feeders, breakers</description><category>Wastewater Treatment</category><borough>Manhattan</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2019-06-04T00:00:00</design_start><budget_forecast>125737706.00</budget_forecast><latest_budget_changes>8737548.70</latest_budget_changes><total_budget_changes>33489860.26</total_budget_changes><forecast_completion>2025-01-12T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1147</total_schedule_changes></row><row _id="row-6vrp-ikmj.uiaa" _uuid="00000000-0000-0000-6E41-B65EAA29DF91" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-6vrp-ikmj.uiaa"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>453</pid><project_name>Reconstruction of Power Distribution at Wards Island WWTP</project_name><description>Upgrades significant portions of the electrical distribution infrastructure including 5 power center installations, 23 motor control centers, 6 automatic transfer switches and 35 transformers throughout the plant, main feeders, breakers</description><category>Wastewater Treatment</category><borough>Manhattan</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2019-06-04T00:00:00</design_start><budget_forecast>126586628.50</budget_forecast><latest_budget_changes>848922.50</latest_budget_changes><total_budget_changes>33489860.26</total_budget_changes><forecast_completion>2025-06-30T00:00:00</forecast_completion><latest_schedule_changes>169</latest_schedule_changes><total_schedule_changes>1147</total_schedule_changes></row><row _id="row-ys5u~jg4r_smjt" _uuid="00000000-0000-0000-0268-A605FF6BD9E4" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ys5u~jg4r_smjt"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>453</pid><project_name>Reconstruction of Power Distribution at Wards Island WWTP</project_name><description>Upgrades significant portions of the electrical distribution infrastructure including 5 power center installations, 23 motor control centers, 6 automatic transfer switches and 35 transformers throughout the plant, main feeders, breakers</description><category>Wastewater Treatment</category><borough>Manhattan</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2019-06-04T00:00:00</design_start><budget_forecast>126585741.22</budget_forecast><latest_budget_changes>-887.28</latest_budget_changes><total_budget_changes>33489860.26</total_budget_changes><forecast_completion>2025-11-13T00:00:00</forecast_completion><latest_schedule_changes>136</latest_schedule_changes><total_schedule_changes>1147</total_schedule_changes></row><row _id="row-4cmf_6rg5-tfds" _uuid="00000000-0000-0000-102B-0E54BBB3AF4A" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-4cmf_6rg5-tfds"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>453</pid><project_name>Reconstruction of Power Distribution at Wards Island WWTP</project_name><description>Upgrades significant portions of the electrical distribution infrastructure including 5 power center installations, 23 motor control centers, 6 automatic transfer switches and 35 transformers throughout the plant, main feeders, breakers</description><category>Wastewater Treatment</category><borough>Manhattan</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2019-06-04T00:00:00</design_start><budget_forecast>126585741.22</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>33489860.26</total_budget_changes><forecast_completion>2026-02-03T00:00:00</forecast_completion><latest_schedule_changes>82</latest_schedule_changes><total_schedule_changes>1147</total_schedule_changes></row><row _id="row-qt3w_xt5g-sfk2" _uuid="00000000-0000-0000-B180-FA7DC6838158" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-qt3w_xt5g-sfk2"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>453</pid><project_name>Reconstruction of Power Distribution at Wards Island WWTP</project_name><description>Upgrades significant portions of the electrical distribution infrastructure including 5 power center installations, 23 motor control centers, 6 automatic transfer switches and 35 transformers throughout the plant, main feeders, breakers</description><category>Wastewater Treatment</category><borough>Manhattan</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2019-06-04T00:00:00</design_start><budget_forecast>126585741.22</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>33489860.26</total_budget_changes><forecast_completion>2026-08-14T00:00:00</forecast_completion><latest_schedule_changes>192</latest_schedule_changes><total_schedule_changes>1147</total_schedule_changes></row><row _id="row-zemn~p9uk_xa68" _uuid="00000000-0000-0000-52CF-7E554F9F8F3D" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-zemn~p9uk_xa68"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>453</pid><project_name>Reconstruction of Power Distribution at Wards Island WWTP</project_name><description>Upgrades significant portions of the electrical distribution infrastructure including 3 power center installations, 15 motor control centers, 6 automatic transfer switches and 20 transformers throughout the plant</description><category>Wastewater Treatment</category><borough>Manhattan</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2019-06-04T00:00:00</design_start><budget_forecast>126585741.22</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>33489860.26</total_budget_changes><forecast_completion>2026-11-03T00:00:00</forecast_completion><latest_schedule_changes>81</latest_schedule_changes><total_schedule_changes>1147</total_schedule_changes></row><row _id="row-xwed~mddi.9ggf" _uuid="00000000-0000-0000-330B-DDB02DD639F5" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-xwed~mddi.9ggf"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>453</pid><project_name>Reconstruction of Power Distribution at Wards Island WWTP</project_name><description>Upgrades significant portions of the electrical distribution infrastructure including 3 power center installations, 15 motor control centers, 6 automatic transfer switches and 20 transformers throughout the plant</description><category>Wastewater Treatment</category><borough>Manhattan</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2019-06-04T00:00:00</design_start><budget_forecast>130373506.22</budget_forecast><latest_budget_changes>3787765.00</latest_budget_changes><total_budget_changes>33489860.26</total_budget_changes><forecast_completion>2027-09-04T00:00:00</forecast_completion><latest_schedule_changes>305</latest_schedule_changes><total_schedule_changes>1147</total_schedule_changes></row><row _id="row-sq7b_ekin_6xxs" _uuid="00000000-0000-0000-C3AB-E65932333268" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-sq7b_ekin_6xxs"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>453</pid><project_name>Reconstruction of Power Distribution at Wards Island WWTP</project_name><description>Upgrades significant portions of the electrical distribution infrastructure including 3 power center installations, 15 motor control centers, 6 automatic transfer switches and 20 transformers throughout the plant</description><category>Wastewater Treatment</category><borough>Manhattan</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2019-06-04T00:00:00</design_start><budget_forecast>149106268.26</budget_forecast><latest_budget_changes>18732762.04</latest_budget_changes><total_budget_changes>33489860.26</total_budget_changes><forecast_completion>2028-03-04T00:00:00</forecast_completion><latest_schedule_changes>182</latest_schedule_changes><total_schedule_changes>1147</total_schedule_changes></row><row _id="row-xr98~35ha-5my8" _uuid="00000000-0000-0000-0F7B-5B6CBEE38144" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-xr98~35ha-5my8"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>453</pid><project_name>Reconstruction of Power Distribution at Wards Island WWTP</project_name><description>Upgrades significant portions of the electrical distribution infrastructure including 3 power center installations, 15 motor control centers, 6 automatic transfer switches and 20 transformers throughout the plant</description><category>Wastewater Treatment</category><borough>Manhattan</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2019-06-04T00:00:00</design_start><budget_forecast>149106268.26</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>33489860.26</total_budget_changes><forecast_completion>2028-03-04T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1147</total_schedule_changes></row><row _id="row-nfsj~uucd~6xad" _uuid="00000000-0000-0000-AB06-1E062CF6D02C" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-nfsj~uucd~6xad"><date_reported_as_of>2015-08-01T00:00:00</date_reported_as_of><pid>454</pid><project_name>Bainbridge Avenue Trunk Water Main</project_name><description>Replacement Trunk Water Main in Bainbridge Ave, Bronx</description><category>Water Supply</category><borough>Bronx</borough><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction Procurement</current_phase><design_start>2014-03-17T00:00:00</design_start><budget_forecast>46802000.00</budget_forecast><total_budget_changes>25547000.00</total_budget_changes><forecast_completion>2018-11-16T00:00:00</forecast_completion><total_schedule_changes>1687</total_schedule_changes></row><row _id="row-qrpx_q2we.39vm" _uuid="00000000-0000-0000-91D7-8C3917DEB40C" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-qrpx_q2we.39vm"><date_reported_as_of>2016-01-01T00:00:00</date_reported_as_of><pid>454</pid><project_name>Bainbridge Avenue Trunk Water Main</project_name><description>Replacement Trunk Water Main in Bainbridge Ave, Bronx</description><category>Water Supply</category><borough>Bronx</borough><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction</current_phase><design_start>2014-03-17T00:00:00</design_start><budget_forecast>46802000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>25547000.00</total_budget_changes><forecast_completion>2018-09-21T00:00:00</forecast_completion><latest_schedule_changes>-56</latest_schedule_changes><total_schedule_changes>1687</total_schedule_changes></row><row _id="row-x7zv.ggcq-iidf" _uuid="00000000-0000-0000-F063-F64A7CAC4185" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-x7zv.ggcq-iidf"><date_reported_as_of>2016-06-01T00:00:00</date_reported_as_of><pid>454</pid><project_name>Bainbridge Avenue Trunk Water Main</project_name><description>Replacement Trunk Water Main in Bainbridge Ave, Bronx</description><category>Water Supply</category><borough>Bronx</borough><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction</current_phase><design_start>2014-03-17T00:00:00</design_start><budget_forecast>46982000.00</budget_forecast><latest_budget_changes>180000.00</latest_budget_changes><total_budget_changes>25547000.00</total_budget_changes><forecast_completion>2016-05-22T00:00:00</forecast_completion><latest_schedule_changes>-852</latest_schedule_changes><total_schedule_changes>1687</total_schedule_changes></row><row _id="row-grf4_m22c~q5aj" _uuid="00000000-0000-0000-AC74-26133270DA05" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-grf4_m22c~q5aj"><date_reported_as_of>2016-11-01T00:00:00</date_reported_as_of><pid>454</pid><project_name>Bainbridge Avenue Trunk Water Main</project_name><description>Replacement Trunk Water Main in Bainbridge Ave, Bronx</description><category>Water Supply</category><borough>Bronx</borough><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction</current_phase><design_start>2014-03-17T00:00:00</design_start><budget_forecast>47184462.00</budget_forecast><latest_budget_changes>202462.00</latest_budget_changes><total_budget_changes>25547000.00</total_budget_changes><forecast_completion>2018-11-18T00:00:00</forecast_completion><latest_schedule_changes>910</latest_schedule_changes><total_schedule_changes>1687</total_schedule_changes></row><row _id="row-cqe5_hyh3_x623" _uuid="00000000-0000-0000-C617-5096B46B925B" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-cqe5_hyh3_x623"><date_reported_as_of>2017-04-01T00:00:00</date_reported_as_of><pid>454</pid><project_name>Bainbridge Avenue Trunk Water Main</project_name><description>Replacement Trunk Water Main in Bainbridge Ave, Bronx</description><category>Water Supply</category><borough>Bronx</borough><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction</current_phase><design_start>2014-03-17T00:00:00</design_start><budget_forecast>47144000.00</budget_forecast><latest_budget_changes>-40462.00</latest_budget_changes><total_budget_changes>25547000.00</total_budget_changes><forecast_completion>2019-05-31T00:00:00</forecast_completion><latest_schedule_changes>194</latest_schedule_changes><total_schedule_changes>1687</total_schedule_changes></row><row _id="row-exgp.xyiq~snax" _uuid="00000000-0000-0000-4743-BE2DD98A31A2" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-exgp.xyiq~snax"><date_reported_as_of>2017-09-01T00:00:00</date_reported_as_of><pid>454</pid><project_name>Bainbridge Avenue Trunk Water Main</project_name><description>Replacement Trunk Water Main in Bainbridge Ave, Bronx</description><category>Water Supply</category><borough>Bronx</borough><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction</current_phase><design_start>2014-03-17T00:00:00</design_start><budget_forecast>47346000.00</budget_forecast><latest_budget_changes>202000.00</latest_budget_changes><total_budget_changes>25547000.00</total_budget_changes><forecast_completion>2019-06-30T00:00:00</forecast_completion><latest_schedule_changes>30</latest_schedule_changes><total_schedule_changes>1687</total_schedule_changes></row><row _id="row-7rj6-63nq.7bxn" _uuid="00000000-0000-0000-93BB-E82CE99C4278" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-7rj6-63nq.7bxn"><date_reported_as_of>2018-03-01T00:00:00</date_reported_as_of><pid>454</pid><project_name>Bainbridge Avenue Trunk Water Main</project_name><description>Replacement Trunk Water Main in Bainbridge Ave, Bronx</description><category>Water Supply</category><borough>Bronx</borough><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction</current_phase><design_start>2014-03-17T00:00:00</design_start><budget_forecast>47346000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>25547000.00</total_budget_changes><forecast_completion>2019-06-30T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1687</total_schedule_changes></row><row _id="row-aw8a.b9zs.ddbs" _uuid="00000000-0000-0000-0C16-6BD27384E201" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-aw8a.b9zs.ddbs"><date_reported_as_of>2018-08-01T00:00:00</date_reported_as_of><pid>454</pid><project_name>Bainbridge Avenue Trunk Water Main</project_name><description>Replacement Trunk Water Main in Bainbridge Ave, Bronx</description><category>Water Supply</category><borough>Bronx</borough><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction</current_phase><design_start>2014-03-17T00:00:00</design_start><budget_forecast>52137000.00</budget_forecast><latest_budget_changes>4791000.00</latest_budget_changes><total_budget_changes>25547000.00</total_budget_changes><forecast_completion>2019-06-30T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1687</total_schedule_changes></row><row _id="row-95ey.n6hq.gxqx" _uuid="00000000-0000-0000-9501-24A340BE8C20" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-95ey.n6hq.gxqx"><date_reported_as_of>2019-01-01T00:00:00</date_reported_as_of><pid>454</pid><project_name>Bainbridge Avenue Trunk Water Main</project_name><description>Replacement Trunk Water Main in Bainbridge Ave, Bronx</description><category>Water Supply</category><borough>Bronx</borough><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction</current_phase><design_start>2014-03-17T00:00:00</design_start><budget_forecast>58779000.00</budget_forecast><latest_budget_changes>6642000.00</latest_budget_changes><total_budget_changes>25547000.00</total_budget_changes><forecast_completion>2020-06-08T00:00:00</forecast_completion><latest_schedule_changes>344</latest_schedule_changes><total_schedule_changes>1687</total_schedule_changes></row><row _id="row-xywc-vjtm.u5dq" _uuid="00000000-0000-0000-7497-9B54F5F0DF71" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-xywc-vjtm.u5dq"><date_reported_as_of>2019-05-01T00:00:00</date_reported_as_of><pid>454</pid><project_name>Bainbridge Avenue Trunk Water Main</project_name><description>Replacement of Trunk Water Main in Bainbridge Avenue Between Gunhill Road and Holly Lane and in Jerome Avenue Between Holly Lane and E233th Street, etc.  Also, New 36"" WM in West Burnside Avenue &amp; Phelan Place</description><category>Water Supply</category><borough>Bronx</borough><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction</current_phase><design_start>2014-03-17T00:00:00</design_start><budget_forecast>60460000.00</budget_forecast><latest_budget_changes>1681000.00</latest_budget_changes><total_budget_changes>25547000.00</total_budget_changes><forecast_completion>2020-06-05T00:00:00</forecast_completion><latest_schedule_changes>-3</latest_schedule_changes><total_schedule_changes>1687</total_schedule_changes></row><row _id="row-pnu7-jwfh-4aa4" _uuid="00000000-0000-0000-7067-15A84D48790F" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-pnu7-jwfh-4aa4"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>454</pid><project_name>Bainbridge Avenue Trunk Water Main</project_name><description>Replacement of Trunk Water Main in Bainbridge Avenue Between Gunhill Road and Holly Lane and in Jerome Avenue Between Holly Lane and E233th Street, etc.  Also, New 36" WM in West Burnside Avenue &amp; Phelan Place</description><category>Water Supply</category><borough>Bronx</borough><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction</current_phase><design_start>2014-03-17T00:00:00</design_start><budget_forecast>60460000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>25547000.00</total_budget_changes><forecast_completion>2020-06-05T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1687</total_schedule_changes></row><row _id="row-8m66.isnr_ftnc" _uuid="00000000-0000-0000-8354-B5504A86B6F2" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-8m66.isnr_ftnc"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>454</pid><project_name>Bainbridge Avenue Trunk Water Main</project_name><category>Water Supply</category><borough>Bronx</borough><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><total_budget_changes>25547000.00</total_budget_changes><total_schedule_changes>1687</total_schedule_changes></row><row _id="row-wxqt_ycie-q8z4" _uuid="00000000-0000-0000-C088-D52069E8237F" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-wxqt_ycie-q8z4"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>454</pid><project_name>Bainbridge Avenue Trunk Water Main</project_name><category>Water Supply</category><borough>Bronx</borough><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><total_budget_changes>25547000.00</total_budget_changes><total_schedule_changes>1687</total_schedule_changes></row><row _id="row-2wvs-3pf5.aeax" _uuid="00000000-0000-0000-756B-2904E8B744C2" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-2wvs-3pf5.aeax"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>454</pid><project_name>Bainbridge Avenue Trunk Water Main</project_name><category>Water Supply</category><borough>Bronx</borough><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><total_budget_changes>25547000.00</total_budget_changes><total_schedule_changes>1687</total_schedule_changes></row><row _id="row-k7ce~xed2~s8u2" _uuid="00000000-0000-0000-C449-3D4FDFD3F298" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-k7ce~xed2~s8u2"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>454</pid><project_name>Bainbridge Avenue Trunk Water Main</project_name><category>Water Supply</category><borough>Bronx</borough><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><total_budget_changes>25547000.00</total_budget_changes><total_schedule_changes>1687</total_schedule_changes></row><row _id="row-fckt~sfd9~znpp" _uuid="00000000-0000-0000-6348-2E38B7F60289" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-fckt~sfd9~znpp"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>454</pid><project_name>Bainbridge Avenue Trunk Water Main</project_name><description>Replacement of Trunk Water Main in Bainbridge Avenue Between Gunhill Road and Holly Lane and in Jerome Avenue Between Holly Lane and E233th Street, etc.  Also, New 36" WM in West Burnside Avenue &amp; Phelan Place</description><category>Water Supply</category><borough>Bronx</borough><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction</current_phase><design_start>2014-03-17T00:00:00</design_start><budget_forecast>66046000.00</budget_forecast><latest_budget_changes>5586000.00</latest_budget_changes><total_budget_changes>25547000.00</total_budget_changes><forecast_completion>2022-07-12T00:00:00</forecast_completion><latest_schedule_changes>767</latest_schedule_changes><total_schedule_changes>1687</total_schedule_changes></row><row _id="row-b853-ufmc_hvnn" _uuid="00000000-0000-0000-5F73-4696601DDD3E" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-b853-ufmc_hvnn"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>454</pid><project_name>Bainbridge Avenue Trunk Water Main</project_name><description>Replacement of Trunk Water Main in Bainbridge Avenue Between Gunhill Road and Holly Lane and in Jerome Avenue Between Holly Lane and E233th Street, etc.  Also, New 36" WM in West Burnside Avenue &amp; Phelan Place</description><category>Water Supply</category><borough>Bronx</borough><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction</current_phase><design_start>2014-03-17T00:00:00</design_start><budget_forecast>69085000.00</budget_forecast><latest_budget_changes>3039000.00</latest_budget_changes><total_budget_changes>25547000.00</total_budget_changes><forecast_completion>2023-06-30T00:00:00</forecast_completion><latest_schedule_changes>353</latest_schedule_changes><total_schedule_changes>1687</total_schedule_changes></row><row _id="row-mami-fdpt_i4s2" _uuid="00000000-0000-0000-20C9-FCD94481265B" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-mami-fdpt_i4s2"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>454</pid><project_name>Bainbridge Avenue Trunk Water Main</project_name><description>Replacement of Trunk Water Main in Bainbridge Avenue Between Gunhill Road and Holly Lane and in Jerome Avenue Between Holly Lane and E233th Street, etc.  Also, New 36" WM in West Burnside Avenue &amp; Phelan Place</description><category>Water Supply</category><borough>Bronx</borough><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction</current_phase><design_start>2014-03-17T00:00:00</design_start><budget_forecast>69710000.00</budget_forecast><latest_budget_changes>625000.00</latest_budget_changes><total_budget_changes>25547000.00</total_budget_changes><forecast_completion>2023-06-30T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1687</total_schedule_changes></row><row _id="row-mj2x.bgcd-rm7n" _uuid="00000000-0000-0000-C267-4EB04173DFC3" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-mj2x.bgcd-rm7n"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>454</pid><project_name>Bainbridge Avenue Trunk Water Main</project_name><description>Replacement of Trunk Water Main in Bainbridge Avenue Between Gunhill Road and Holly Lane and in Jerome Avenue Between Holly Lane and E233th Street, etc.  Also, New 36" WM in West Burnside Avenue &amp; Phelan Place</description><category>Water Supply</category><borough>Bronx</borough><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction</current_phase><design_start>2014-03-17T00:00:00</design_start><budget_forecast>71949000.00</budget_forecast><latest_budget_changes>2239000.00</latest_budget_changes><total_budget_changes>25547000.00</total_budget_changes><forecast_completion>2023-06-30T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1687</total_schedule_changes></row><row _id="row-2emi~th66~j74v" _uuid="00000000-0000-0000-CCF3-6B051D7ED773" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-2emi~th66~j74v"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>454</pid><project_name>Bainbridge Avenue Trunk Water Main</project_name><description>Replacement of Trunk Water Main in Bainbridge Avenue Between Gunhill Road and Holly Lane and in Jerome Avenue Between Holly Lane and E233th Street, etc.  Also, New 36" WM in West Burnside Avenue &amp; Phelan Place</description><category>Water Supply</category><borough>Bronx</borough><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction</current_phase><design_start>2014-03-17T00:00:00</design_start><budget_forecast>72349000.00</budget_forecast><latest_budget_changes>400000.00</latest_budget_changes><total_budget_changes>25547000.00</total_budget_changes><forecast_completion>2023-06-30T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1687</total_schedule_changes></row><row _id="row-np6h_vyuw.sfef" _uuid="00000000-0000-0000-9C45-7E8B39D5A6BB" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-np6h_vyuw.sfef"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>456</pid><project_name>Gilboa Dam Reconstruction, Phase V</project_name><description>This is the final phase of the Gilboa Dam reconstruction project and includes reforestation, final site stabilization and wetlands mitigation measures.</description><category>Water Supply</category><borough>Upstate</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2020-12-30T00:00:00</design_start><budget_forecast>38329026.00</budget_forecast><latest_budget_changes>-1242700.00</latest_budget_changes><total_budget_changes>-3079490.00</total_budget_changes><forecast_completion>2024-11-29T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>503</total_schedule_changes></row><row _id="row-v6qn~iufy_ht6a" _uuid="00000000-0000-0000-04AD-5BBE72A97BCA" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-v6qn~iufy_ht6a"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>456</pid><project_name>Gilboa Dam Reconstruction, Phase V</project_name><description>This is the final phase of the Gilboa Dam reconstruction project and includes reforestation, final site stabilization and wetlands mitigation measures.</description><category>Water Supply</category><borough>Upstate</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2020-12-30T00:00:00</design_start><budget_forecast>38329026.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-3079490.00</total_budget_changes><forecast_completion>2025-06-29T00:00:00</forecast_completion><latest_schedule_changes>212</latest_schedule_changes><total_schedule_changes>503</total_schedule_changes></row><row _id="row-62bg-2pzf_ietj" _uuid="00000000-0000-0000-C775-682365AEFDE4" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-62bg-2pzf_ietj"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>456</pid><project_name>Gilboa Dam Reconstruction, Phase V</project_name><description>This is the final phase of the Gilboa Dam reconstruction project and includes reforestation, final site stabilization and wetlands mitigation measures.</description><category>Water Supply</category><borough>Upstate</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2020-12-30T00:00:00</design_start><budget_forecast>38329026.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-3079490.00</total_budget_changes><forecast_completion>2025-07-31T00:00:00</forecast_completion><latest_schedule_changes>32</latest_schedule_changes><total_schedule_changes>503</total_schedule_changes></row><row _id="row-p3xe~v4nv~yvvr" _uuid="00000000-0000-0000-96DD-593581BB0D14" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-p3xe~v4nv~yvvr"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>456</pid><project_name>Gilboa Dam Reconstruction, Phase V</project_name><description>This is the final phase of the Gilboa Dam reconstruction project and includes reforestation, final site stabilization and wetlands mitigation measures.</description><category>Water Supply</category><borough>Upstate</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2020-12-30T00:00:00</design_start><budget_forecast>31929026.00</budget_forecast><latest_budget_changes>-6400000.00</latest_budget_changes><total_budget_changes>-3079490.00</total_budget_changes><forecast_completion>2025-07-31T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>503</total_schedule_changes></row><row _id="row-4n8u~qztc_xva9" _uuid="00000000-0000-0000-AD7C-B3D54435A7E6" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-4n8u~qztc_xva9"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>456</pid><project_name>Gilboa Dam Reconstruction, Phase V</project_name><description>This is the final phase of the Gilboa Dam reconstruction project and includes reforestation, final site stabilization and wetlands mitigation measures.</description><category>Water Supply</category><borough>Upstate</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2020-12-30T00:00:00</design_start><budget_forecast>36738700.00</budget_forecast><latest_budget_changes>4809674.00</latest_budget_changes><total_budget_changes>-3079490.00</total_budget_changes><forecast_completion>2026-04-16T00:00:00</forecast_completion><latest_schedule_changes>259</latest_schedule_changes><total_schedule_changes>503</total_schedule_changes></row><row _id="row-s5tj~bfxb~sjrd" _uuid="00000000-0000-0000-DCB1-A5896A9BE968" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-s5tj~bfxb~sjrd"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>456</pid><project_name>Gilboa Dam Reconstruction, Phase V</project_name><description>This is the final phase of the Gilboa Dam reconstruction project and includes reforestation, final site stabilization and wetlands mitigation measures.</description><category>Water Supply</category><borough>Upstate</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2020-12-30T00:00:00</design_start><budget_forecast>36492236.00</budget_forecast><latest_budget_changes>-246464.00</latest_budget_changes><total_budget_changes>-3079490.00</total_budget_changes><forecast_completion>2026-04-16T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>503</total_schedule_changes></row><row _id="row-dt4k.3ixw~dm96" _uuid="00000000-0000-0000-0A63-7AAA08A1DE49" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-dt4k.3ixw~dm96"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>457</pid><project_name>Investigation and Remediation of Corrosion in Water Tunnel Facilities</project_name><category>Water Supply</category><borough>Citywide</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><total_budget_changes>0.00</total_budget_changes><total_schedule_changes>335</total_schedule_changes></row><row _id="row-qtvy-y87i.wzbt" _uuid="00000000-0000-0000-9172-ADF1F844B2E1" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-qtvy-y87i.wzbt"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>457</pid><project_name>Investigation and Remediation of Corrosion in Water Tunnel Facilities</project_name><description>Design Services for Investigation and Remediation of Corrosion in Water Tunnel Facilities</description><category>Water Supply</category><borough>Citywide</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2022-07-12T00:00:00</design_start><budget_forecast>56020208.84</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2029-05-31T00:00:00</forecast_completion><latest_schedule_changes>335</latest_schedule_changes><total_schedule_changes>335</total_schedule_changes></row><row _id="row-qvy9.3rbf-g7v8" _uuid="00000000-0000-0000-55C0-8BC32A582FE7" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-qvy9.3rbf-g7v8"><date_reported_as_of>2016-06-01T00:00:00</date_reported_as_of><pid>476</pid><project_name>Grand Concourse Reconstruction, Phase 4 (Great Streets)</project_name><description>Reconstruction of Service Roads and milling and resurfacing of the main roadways on Grand Concourse from E175 Street to E Fordham Road, including median works and ped refuges.</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2016-06-22T00:00:00</design_start><budget_forecast>63329000.00</budget_forecast><latest_budget_changes>24855000.00</latest_budget_changes><total_budget_changes>57634000.00</total_budget_changes><forecast_completion>2020-04-13T00:00:00</forecast_completion><latest_schedule_changes>292</latest_schedule_changes><total_schedule_changes>1448</total_schedule_changes></row><row _id="row-h5a7_r59v_9hwr" _uuid="00000000-0000-0000-31E7-BD6100D5A033" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-h5a7_r59v_9hwr"><date_reported_as_of>2016-11-01T00:00:00</date_reported_as_of><pid>476</pid><project_name>Grand Concourse Reconstruction, Phase 4 (Great Streets)</project_name><description>Reconstruction of Service Roads and milling and resurfacing of the main roadways on Grand Concourse from E175 Street to E Fordham Road, including median works and ped refuges.</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2016-06-22T00:00:00</design_start><budget_forecast>63254000.00</budget_forecast><latest_budget_changes>-75000.00</latest_budget_changes><total_budget_changes>57634000.00</total_budget_changes><forecast_completion>2019-10-27T00:00:00</forecast_completion><latest_schedule_changes>-169</latest_schedule_changes><total_schedule_changes>1448</total_schedule_changes></row><row _id="row-pe9u.6rz9_qi25" _uuid="00000000-0000-0000-BA55-5A5D56A080DD" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-pe9u.6rz9_qi25"><date_reported_as_of>2017-04-01T00:00:00</date_reported_as_of><pid>476</pid><project_name>Grand Concourse Reconstruction, Phase 4 (Great Streets)</project_name><description>Reconstruction of Service Roads and milling and resurfacing of the main roadways on Grand Concourse from E175 Street to E Fordham Road, including median works and ped refuges.</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2016-06-22T00:00:00</design_start><budget_forecast>63554000.00</budget_forecast><latest_budget_changes>300000.00</latest_budget_changes><total_budget_changes>57634000.00</total_budget_changes><forecast_completion>2019-06-08T00:00:00</forecast_completion><latest_schedule_changes>-141</latest_schedule_changes><total_schedule_changes>1448</total_schedule_changes></row><row _id="row-r6ku~ztqh~m6ym" _uuid="00000000-0000-0000-D6B1-6D74F6B96DAE" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-r6ku~ztqh~m6ym"><date_reported_as_of>2017-09-01T00:00:00</date_reported_as_of><pid>476</pid><project_name>Grand Concourse Reconstruction, Phase 4 (Great Streets)</project_name><description>Reconstruction of Service Roads and milling and resurfacing of the main roadways on Grand Concourse from E175 Street to E Fordham Road, including median works and ped refuges.</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2016-06-22T00:00:00</design_start><budget_forecast>64074000.00</budget_forecast><latest_budget_changes>520000.00</latest_budget_changes><total_budget_changes>57634000.00</total_budget_changes><forecast_completion>2019-11-22T00:00:00</forecast_completion><latest_schedule_changes>167</latest_schedule_changes><total_schedule_changes>1448</total_schedule_changes></row><row _id="row-4vhj.x3nb-xw9k" _uuid="00000000-0000-0000-3561-B5245A0E5F7A" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-4vhj.x3nb-xw9k"><date_reported_as_of>2018-03-01T00:00:00</date_reported_as_of><pid>476</pid><project_name>Grand Concourse Reconstruction, Phase 4 (Great Streets)</project_name><description>Reconstruction of Service Roads and milling and resurfacing of the main roadways on Grand Concourse from E175 Street to E Fordham Road, including median works and ped refuges.</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2016-07-19T00:00:00</design_start><budget_forecast>64074000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>57634000.00</total_budget_changes><forecast_completion>2023-08-14T00:00:00</forecast_completion><latest_schedule_changes>1361</latest_schedule_changes><total_schedule_changes>1448</total_schedule_changes></row><row _id="row-k24a.cg8x-pjn6" _uuid="00000000-0000-0000-732B-3181B67D8451" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-k24a.cg8x-pjn6"><date_reported_as_of>2018-08-01T00:00:00</date_reported_as_of><pid>476</pid><project_name>Grand Concourse Reconstruction, Phase 4 (Great Streets)</project_name><description>Reconstruction of Service Roads and milling and resurfacing of the main roadways on Grand Concourse from E175 Street to E Fordham Road, including median works and ped refuges.</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2016-07-19T00:00:00</design_start><budget_forecast>77596000.00</budget_forecast><latest_budget_changes>13522000.00</latest_budget_changes><total_budget_changes>57634000.00</total_budget_changes><forecast_completion>2023-11-14T00:00:00</forecast_completion><latest_schedule_changes>92</latest_schedule_changes><total_schedule_changes>1448</total_schedule_changes></row><row _id="row-tndu~iwva_82fy" _uuid="00000000-0000-0000-83D0-ED07D78A42B0" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-tndu~iwva_82fy"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>1201</pid><project_name>GATEWAY ESTATE - PHASE E/BED-805</project_name><description>Reconstruction of Gateway Estates Area (Nehemiah Creek) including sewer, watermain, street lighting and traffic signal work. Phase E</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>HPD</client_agency><current_phase>Construction</current_phase><design_start>2013-11-17T00:00:00</design_start><budget_forecast>62064000.00</budget_forecast><latest_budget_changes>26569000.00</latest_budget_changes><total_budget_changes>38077000.00</total_budget_changes><forecast_completion>2022-06-30T00:00:00</forecast_completion><latest_schedule_changes>219</latest_schedule_changes><total_schedule_changes>584</total_schedule_changes></row><row _id="row-m99j.tqw8-3wbe" _uuid="00000000-0000-0000-3FD3-E6E75F5D1B45" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-m99j.tqw8-3wbe"><date_reported_as_of>2019-01-01T00:00:00</date_reported_as_of><pid>476</pid><project_name>Grand Concourse Reconstruction, Phase 4 (Great Streets)</project_name><description>Reconstruction of Service Roads and milling and resurfacing of the main roadways on Grand Concourse from E175 Street to E Fordham Road, including median works and ped refuges.</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Construction Procurement</current_phase><design_start>2016-07-19T00:00:00</design_start><budget_forecast>79011000.00</budget_forecast><latest_budget_changes>1415000.00</latest_budget_changes><total_budget_changes>57634000.00</total_budget_changes><forecast_completion>2022-08-30T00:00:00</forecast_completion><latest_schedule_changes>-441</latest_schedule_changes><total_schedule_changes>1448</total_schedule_changes></row><row _id="row-zb5g_9nik-ecqi" _uuid="00000000-0000-0000-196C-C34471F64BFA" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-zb5g_9nik-ecqi"><date_reported_as_of>2019-05-01T00:00:00</date_reported_as_of><pid>476</pid><project_name>Grand Concourse Reconstruction, Phase 4 (Great Streets)</project_name><description>RECONSTRUCTION OF GRAND CONCOURSE FROM E 175 ST TO EAST FORDHAM RD- PHASE 4, BX</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Construction Procurement</current_phase><design_start>2016-07-19T00:00:00</design_start><budget_forecast>88592000.00</budget_forecast><latest_budget_changes>9581000.00</latest_budget_changes><total_budget_changes>57634000.00</total_budget_changes><forecast_completion>2022-08-31T00:00:00</forecast_completion><latest_schedule_changes>1</latest_schedule_changes><total_schedule_changes>1448</total_schedule_changes></row><row _id="row-zitk.itej.yx62" _uuid="00000000-0000-0000-20F3-058F57E5620B" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-zitk.itej.yx62"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>476</pid><project_name>Grand Concourse Reconstruction, Phase 4 (Great Streets)</project_name><description>RECONSTRUCTION OF GRAND CONCOURSE FROM E 175 ST TO EAST FORDHAM RD- PHASE 4, BX</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Construction</current_phase><design_start>2016-07-19T00:00:00</design_start><budget_forecast>88426000.00</budget_forecast><latest_budget_changes>-166000.00</latest_budget_changes><total_budget_changes>57634000.00</total_budget_changes><forecast_completion>2022-09-28T00:00:00</forecast_completion><latest_schedule_changes>28</latest_schedule_changes><total_schedule_changes>1448</total_schedule_changes></row><row _id="row-hfk4.nmjh-cxuf" _uuid="00000000-0000-0000-F00C-51578F90B8ED" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-hfk4.nmjh-cxuf"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>476</pid><project_name>Grand Concourse Reconstruction, Phase 4 (Great Streets)</project_name><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><total_budget_changes>57634000.00</total_budget_changes><total_schedule_changes>1448</total_schedule_changes></row><row _id="row-v44u-28cg-ux6h" _uuid="00000000-0000-0000-CC6A-73CD62919CA4" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-v44u-28cg-ux6h"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>476</pid><project_name>Grand Concourse Reconstruction, Phase 4 (Great Streets)</project_name><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><total_budget_changes>57634000.00</total_budget_changes><total_schedule_changes>1448</total_schedule_changes></row><row _id="row-rq4u~gvs4~q82f" _uuid="00000000-0000-0000-151C-E4E59B935CA2" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-rq4u~gvs4~q82f"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>476</pid><project_name>Grand Concourse Reconstruction, Phase 4 (Great Streets)</project_name><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><total_budget_changes>57634000.00</total_budget_changes><total_schedule_changes>1448</total_schedule_changes></row><row _id="row-a974-nhdf.4hnk" _uuid="00000000-0000-0000-BCEA-FD6C716A3E11" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-a974-nhdf.4hnk"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>476</pid><project_name>Grand Concourse Reconstruction, Phase 4 (Great Streets)</project_name><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><total_budget_changes>57634000.00</total_budget_changes><total_schedule_changes>1448</total_schedule_changes></row><row _id="row-9u28.5z4h_dzti" _uuid="00000000-0000-0000-D081-FEF92BBCB3D3" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-9u28.5z4h_dzti"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>476</pid><project_name>Grand Concourse Reconstruction, Phase 4 (Great Streets)</project_name><description>RECONSTRUCTION OF GRAND CONCOURSE FROM E 175 ST TO EAST FORDHAM RD- PHASE 4, BX</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Construction</current_phase><design_start>2016-07-19T00:00:00</design_start><budget_forecast>87464000.00</budget_forecast><latest_budget_changes>-962000.00</latest_budget_changes><total_budget_changes>57634000.00</total_budget_changes><forecast_completion>2023-06-13T00:00:00</forecast_completion><latest_schedule_changes>258</latest_schedule_changes><total_schedule_changes>1448</total_schedule_changes></row><row _id="row-6p9u.2u4i_36t5" _uuid="00000000-0000-0000-E086-6A337269C06D" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-6p9u.2u4i_36t5"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>476</pid><project_name>Grand Concourse Reconstruction, Phase 4 (Great Streets)</project_name><description>RECONSTRUCTION OF GRAND CONCOURSE FROM E 175 ST TO EAST FORDHAM RD- PHASE 4, BX</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Construction</current_phase><design_start>2016-07-19T00:00:00</design_start><budget_forecast>87984000.00</budget_forecast><latest_budget_changes>520000.00</latest_budget_changes><total_budget_changes>57634000.00</total_budget_changes><forecast_completion>2023-06-13T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1448</total_schedule_changes></row><row _id="row-2x7c-vbw8-w4up" _uuid="00000000-0000-0000-783B-4058613C9F34" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-2x7c-vbw8-w4up"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>476</pid><project_name>Grand Concourse Reconstruction, Phase 4 (Great Streets)</project_name><description>RECONSTRUCTION OF GRAND CONCOURSE FROM E 175 ST TO EAST FORDHAM RD- PHASE 4, BX</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Construction</current_phase><design_start>2016-07-19T00:00:00</design_start><budget_forecast>97382000.00</budget_forecast><latest_budget_changes>9398000.00</latest_budget_changes><total_budget_changes>57634000.00</total_budget_changes><forecast_completion>2023-06-13T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1448</total_schedule_changes></row><row _id="row-swr2.q49n-zbf8" _uuid="00000000-0000-0000-AC89-34E3BA75D40A" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-swr2.q49n-zbf8"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>476</pid><project_name>Grand Concourse Reconstruction, Phase 4 (Great Streets)</project_name><description>RECONSTRUCTION OF GRAND CONCOURSE FROM E 175 ST TO EAST FORDHAM RD- PHASE 4, BX</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Construction</current_phase><design_start>2016-07-19T00:00:00</design_start><budget_forecast>96108000.00</budget_forecast><latest_budget_changes>-1274000.00</latest_budget_changes><total_budget_changes>57634000.00</total_budget_changes><forecast_completion>2023-06-13T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1448</total_schedule_changes></row><row _id="row-b5ry-q7ve_x6ey" _uuid="00000000-0000-0000-3160-D30EAF6664D2" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-b5ry-q7ve_x6ey"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>476</pid><project_name>Grand Concourse Reconstruction, Phase 4 (Great Streets)</project_name><description>RECONSTRUCTION OF GRAND CONCOURSE FROM E 175 ST TO EAST FORDHAM RD- PHASE 4, BX</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Construction</current_phase><design_start>2016-07-19T00:00:00</design_start><budget_forecast>96108000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>57634000.00</total_budget_changes><forecast_completion>2023-06-13T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1448</total_schedule_changes></row><row _id="row-htqg-kcgh-4tur" _uuid="00000000-0000-0000-FB29-31B83A1E7079" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-htqg-kcgh-4tur"><date_reported_as_of>2016-01-01T00:00:00</date_reported_as_of><pid>478</pid><project_name>Catskill Aqueduct Repair and Rehabilitation</project_name><description>Project to ensure the reliability of the 74 mile upper Catskill Aqueduct, including replacement of mechanical components, leak mitigation, and biofilm removal/condition assessment.</description><category>Water Supply</category><borough>Citywide</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2015-03-23T00:00:00</design_start><budget_forecast>227874512.00</budget_forecast><total_budget_changes>9642889.68</total_budget_changes><forecast_completion>2018-10-05T00:00:00</forecast_completion><total_schedule_changes>1517</total_schedule_changes></row><row _id="row-2nhr.ggrx-mdua" _uuid="00000000-0000-0000-5D63-DCEBC1876D0F" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-2nhr.ggrx-mdua"><date_reported_as_of>2016-06-01T00:00:00</date_reported_as_of><pid>478</pid><project_name>Catskill Aqueduct Repair and Rehabilitation</project_name><description>Project to ensure the reliability of the 74 mile upper Catskill Aqueduct, including replacement of mechanical components, leak mitigation, and biofilm removal/condition assessment.</description><category>Water Supply</category><borough>Citywide</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2015-03-23T00:00:00</design_start><budget_forecast>187040468.00</budget_forecast><latest_budget_changes>-40834044.00</latest_budget_changes><total_budget_changes>9642889.68</total_budget_changes><forecast_completion>2019-02-04T00:00:00</forecast_completion><latest_schedule_changes>122</latest_schedule_changes><total_schedule_changes>1517</total_schedule_changes></row><row _id="row-ug54~bcf8~vbtq" _uuid="00000000-0000-0000-7D61-B7D77D6E2F06" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ug54~bcf8~vbtq"><date_reported_as_of>2016-11-01T00:00:00</date_reported_as_of><pid>478</pid><project_name>Catskill Aqueduct Repair and Rehabilitation</project_name><description>Project to ensure the reliability of the 74 mile upper Catskill Aqueduct, including replacement of mechanical components, leak mitigation, and biofilm removal/condition assessment.</description><category>Water Supply</category><borough>Citywide</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2015-03-23T00:00:00</design_start><budget_forecast>186745174.00</budget_forecast><latest_budget_changes>-295294.00</latest_budget_changes><total_budget_changes>9642889.68</total_budget_changes><forecast_completion>2018-03-05T00:00:00</forecast_completion><latest_schedule_changes>-336</latest_schedule_changes><total_schedule_changes>1517</total_schedule_changes></row><row _id="row-3iq5.vfwh-j2zs" _uuid="00000000-0000-0000-6AC0-5BA056AA458C" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-3iq5.vfwh-j2zs"><date_reported_as_of>2017-04-01T00:00:00</date_reported_as_of><pid>478</pid><project_name>Catskill Aqueduct Repair and Rehabilitation</project_name><description>Project to ensure the reliability of the 74 mile upper Catskill Aqueduct, including replacement of mechanical components, leak mitigation, and biofilm removal/condition assessment.</description><category>Water Supply</category><borough>Citywide</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2015-03-23T00:00:00</design_start><budget_forecast>243639057.00</budget_forecast><latest_budget_changes>56893883.00</latest_budget_changes><total_budget_changes>9642889.68</total_budget_changes><forecast_completion>2019-12-19T00:00:00</forecast_completion><latest_schedule_changes>654</latest_schedule_changes><total_schedule_changes>1517</total_schedule_changes></row><row _id="row-p5dr~ru3w_d56m" _uuid="00000000-0000-0000-5DA2-9043E6FFB8BD" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-p5dr~ru3w_d56m"><date_reported_as_of>2017-09-01T00:00:00</date_reported_as_of><pid>478</pid><project_name>Catskill Aqueduct Repair and Rehabilitation</project_name><description>Project to ensure the reliability of the 74 mile upper Catskill Aqueduct, including replacement of mechanical components, leak mitigation, and biofilm removal/condition assessment.</description><category>Water Supply</category><borough>Citywide</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction Procurement</current_phase><design_start>2015-06-19T00:00:00</design_start><budget_forecast>245306804.00</budget_forecast><latest_budget_changes>1667747.00</latest_budget_changes><total_budget_changes>9642889.68</total_budget_changes><forecast_completion>2020-02-21T00:00:00</forecast_completion><latest_schedule_changes>64</latest_schedule_changes><total_schedule_changes>1517</total_schedule_changes></row><row _id="row-7jpn~tbm2~zt7i" _uuid="00000000-0000-0000-C2F5-424AD292AD0F" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-7jpn~tbm2~zt7i"><date_reported_as_of>2018-03-01T00:00:00</date_reported_as_of><pid>478</pid><project_name>Catskill Aqueduct Repair and Rehabilitation</project_name><description>Project to ensure the reliability of the 74 mile upper Catskill Aqueduct, including replacement of mechanical components, leak mitigation, and biofilm removal/condition assessment.</description><category>Water Supply</category><borough>Citywide</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction Procurement</current_phase><design_start>2015-06-19T00:00:00</design_start><budget_forecast>244521871.00</budget_forecast><latest_budget_changes>-784933.00</latest_budget_changes><total_budget_changes>9642889.68</total_budget_changes><forecast_completion>2020-02-29T00:00:00</forecast_completion><latest_schedule_changes>8</latest_schedule_changes><total_schedule_changes>1517</total_schedule_changes></row><row _id="row-ichm~h3vm~btxr" _uuid="00000000-0000-0000-F2B2-0A61F514E89D" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ichm~h3vm~btxr"><date_reported_as_of>2018-08-01T00:00:00</date_reported_as_of><pid>478</pid><project_name>Catskill Aqueduct Repair and Rehabilitation</project_name><description>Project to ensure the reliability of the 74 mile upper Catskill Aqueduct, including replacement of mechanical components, leak mitigation, and biofilm removal/condition assessment.</description><category>Water Supply</category><borough>Citywide</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2015-06-19T00:00:00</design_start><budget_forecast>202601657.00</budget_forecast><latest_budget_changes>-41920214.00</latest_budget_changes><total_budget_changes>9642889.68</total_budget_changes><forecast_completion>2021-07-17T00:00:00</forecast_completion><latest_schedule_changes>504</latest_schedule_changes><total_schedule_changes>1517</total_schedule_changes></row><row _id="row-6eiy_mwzz_y3vj" _uuid="00000000-0000-0000-5605-0E2BB4DAD416" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-6eiy_mwzz_y3vj"><date_reported_as_of>2019-01-01T00:00:00</date_reported_as_of><pid>478</pid><project_name>Catskill Aqueduct Repair and Rehabilitation</project_name><description>Project to ensure the reliability of the 74 mile upper Catskill Aqueduct, including replacement of mechanical components, leak mitigation, and biofilm removal/condition assessment.</description><category>Water Supply</category><borough>Citywide</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2015-06-19T00:00:00</design_start><budget_forecast>203843907.00</budget_forecast><latest_budget_changes>1242250.00</latest_budget_changes><total_budget_changes>9642889.68</total_budget_changes><forecast_completion>2021-07-17T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1517</total_schedule_changes></row><row _id="row-n2xf-gs32-fyvw" _uuid="00000000-0000-0000-970B-6DD1E02505C5" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-n2xf-gs32-fyvw"><date_reported_as_of>2019-05-01T00:00:00</date_reported_as_of><pid>478</pid><project_name>Catskill Aqueduct Repair and Rehabilitation</project_name><description>Project to ensure the reliability of the 74 mile upper Catskill Aqueduct, including replacement of mechanical components, leak mitigation, and biofilm removal/condition assessment.</description><category>Water Supply</category><borough>Citywide</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2015-06-19T00:00:00</design_start><budget_forecast>218654582.20</budget_forecast><latest_budget_changes>14810675.20</latest_budget_changes><total_budget_changes>9642889.68</total_budget_changes><forecast_completion>2021-07-17T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1517</total_schedule_changes></row><row _id="row-ufvt-evty~i2vb" _uuid="00000000-0000-0000-0838-FB0116002624" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ufvt-evty~i2vb"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>478</pid><project_name>Catskill Aqueduct Repair and Rehabilitation</project_name><description>Project to ensure the reliability of the 74 mile upper Catskill Aqueduct, including replacement of mechanical components, leak mitigation, and biofilm removal/condition assessment.</description><category>Water Supply</category><borough>Citywide</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2015-06-19T00:00:00</design_start><budget_forecast>218654582.20</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>9642889.68</total_budget_changes><forecast_completion>2021-07-17T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1517</total_schedule_changes></row><row _id="row-pkw6-6hsq_bkeu" _uuid="00000000-0000-0000-513A-A3218D53EC20" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-pkw6-6hsq_bkeu"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>478</pid><project_name>Catskill Aqueduct Repair and Rehabilitation</project_name><description>Project to ensure the reliability of the 74 mile upper Catskill Aqueduct, including replacement of mechanical components, leak mitigation, and biofilm removal/condition assessment.</description><category>Water Supply</category><borough>Citywide</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2015-06-19T00:00:00</design_start><budget_forecast>213721957.00</budget_forecast><latest_budget_changes>-4932625.20</latest_budget_changes><total_budget_changes>9642889.68</total_budget_changes><forecast_completion>2021-07-17T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1517</total_schedule_changes></row><row _id="row-g8by_wcax~igy7" _uuid="00000000-0000-0000-559D-AE7C1721BB40" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-g8by_wcax~igy7"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>478</pid><project_name>Catskill Aqueduct Repair and Rehabilitation</project_name><description>Project to ensure the reliability of the 74 mile upper Catskill Aqueduct, including replacement of mechanical components, leak mitigation, and biofilm removal/condition assessment.</description><category>Water Supply</category><borough>Citywide</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2015-06-19T00:00:00</design_start><budget_forecast>233739083.00</budget_forecast><latest_budget_changes>20017126.00</latest_budget_changes><total_budget_changes>9642889.68</total_budget_changes><forecast_completion>2021-07-09T00:00:00</forecast_completion><latest_schedule_changes>-8</latest_schedule_changes><total_schedule_changes>1517</total_schedule_changes></row><row _id="row-9chb~ubx6-fp8y" _uuid="00000000-0000-0000-B6DF-F3CFB8225B42" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-9chb~ubx6-fp8y"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>478</pid><project_name>Catskill Aqueduct Repair and Rehabilitation</project_name><description>Project to ensure the reliability of the 74 mile upper Catskill Aqueduct, including replacement of mechanical components, leak mitigation, and biofilm removal/condition assessment.</description><category>Water Supply</category><borough>Citywide</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2015-06-19T00:00:00</design_start><budget_forecast>247533042.52</budget_forecast><latest_budget_changes>13793959.52</latest_budget_changes><total_budget_changes>9642889.68</total_budget_changes><forecast_completion>2022-06-01T00:00:00</forecast_completion><latest_schedule_changes>327</latest_schedule_changes><total_schedule_changes>1517</total_schedule_changes></row><row _id="row-jvpv~5b9u~57s2" _uuid="00000000-0000-0000-DE7F-0C6E47C91D9A" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-jvpv~5b9u~57s2"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>478</pid><project_name>Catskill Aqueduct Repair and Rehabilitation</project_name><description>Project to ensure the reliability of the 74 mile upper Catskill Aqueduct, including replacement of mechanical components, leak mitigation, and biofilm removal/condition assessment.</description><category>Water Supply</category><borough>Citywide</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2015-06-19T00:00:00</design_start><budget_forecast>254516352.02</budget_forecast><latest_budget_changes>6983309.50</latest_budget_changes><total_budget_changes>9642889.68</total_budget_changes><forecast_completion>2022-08-01T00:00:00</forecast_completion><latest_schedule_changes>61</latest_schedule_changes><total_schedule_changes>1517</total_schedule_changes></row><row _id="row-dy5x.k84j~k9rh" _uuid="00000000-0000-0000-7E53-5EC46344CD79" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-dy5x.k84j~k9rh"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>478</pid><project_name>Catskill Aqueduct Repair and Rehabilitation</project_name><description>Project to ensure the reliability of the 74 mile upper Catskill Aqueduct, including replacement of mechanical components, leak mitigation, and biofilm removal/condition assessment.</description><category>Water Supply</category><borough>Citywide</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2015-06-19T00:00:00</design_start><budget_forecast>267212023.00</budget_forecast><latest_budget_changes>12695670.98</latest_budget_changes><total_budget_changes>9642889.68</total_budget_changes><forecast_completion>2021-08-01T00:00:00</forecast_completion><latest_schedule_changes>-365</latest_schedule_changes><total_schedule_changes>1517</total_schedule_changes></row><row _id="row-jfen.2tt9_8u29" _uuid="00000000-0000-0000-C740-E39C82A60A81" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-jfen.2tt9_8u29"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>478</pid><project_name>Catskill Aqueduct Repair and Rehabilitation</project_name><description>Project to ensure the reliability of the 74 mile upper Catskill Aqueduct, including replacement of mechanical components, leak mitigation, and biofilm removal/condition assessment.</description><category>Water Supply</category><borough>Citywide</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2015-06-19T00:00:00</design_start><budget_forecast>267212023.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>9642889.68</total_budget_changes><forecast_completion>2022-08-01T00:00:00</forecast_completion><latest_schedule_changes>365</latest_schedule_changes><total_schedule_changes>1517</total_schedule_changes></row><row _id="row-kcqk.kpb3.7382" _uuid="00000000-0000-0000-1928-2E9358C86C06" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-kcqk.kpb3.7382"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>478</pid><project_name>Catskill Aqueduct Repair and Rehabilitation</project_name><description>Project to ensure the reliability of the 74 mile upper Catskill Aqueduct, including replacement of mechanical components, leak mitigation, and biofilm removal/condition assessment.</description><category>Water Supply</category><borough>Citywide</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2015-06-19T00:00:00</design_start><budget_forecast>244269503.18</budget_forecast><latest_budget_changes>-22942519.82</latest_budget_changes><total_budget_changes>9642889.68</total_budget_changes><forecast_completion>2022-08-01T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1517</total_schedule_changes></row><row _id="row-3y3h_p9bz.dnrw" _uuid="00000000-0000-0000-21A6-796401F0A49B" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-3y3h_p9bz.dnrw"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>478</pid><project_name>Catskill Aqueduct Repair and Rehabilitation</project_name><description>Project to ensure the reliability of the 74 mile upper Catskill Aqueduct, including replacement of mechanical components, leak mitigation, and biofilm removal/condition assessment.</description><category>Water Supply</category><borough>Citywide</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2015-06-19T00:00:00</design_start><budget_forecast>242269503.18</budget_forecast><latest_budget_changes>-2000000.00</latest_budget_changes><total_budget_changes>9642889.68</total_budget_changes><forecast_completion>2022-11-15T00:00:00</forecast_completion><latest_schedule_changes>106</latest_schedule_changes><total_schedule_changes>1517</total_schedule_changes></row><row _id="row-58rb_5ibf.bpen" _uuid="00000000-0000-0000-57D6-D74CA1B08AAB" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-58rb_5ibf.bpen"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>478</pid><project_name>Catskill Aqueduct Repair and Rehabilitation</project_name><description>Project to ensure the reliability of the 74 mile upper Catskill Aqueduct, including replacement of mechanical components, leak mitigation, and biofilm removal/condition assessment.</description><category>Water Supply</category><borough>Citywide</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2015-06-19T00:00:00</design_start><budget_forecast>237517401.68</budget_forecast><latest_budget_changes>-4752101.50</latest_budget_changes><total_budget_changes>9642889.68</total_budget_changes><forecast_completion>2022-11-30T00:00:00</forecast_completion><latest_schedule_changes>15</latest_schedule_changes><total_schedule_changes>1517</total_schedule_changes></row><row _id="row-x3g5-4nez-87vi" _uuid="00000000-0000-0000-BC20-CC18CC41DD87" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-x3g5-4nez-87vi"><date_reported_as_of>2016-01-01T00:00:00</date_reported_as_of><pid>484</pid><project_name>DBCD South Site Cultural Fit-Out</project_name><description>Interior fit-out of the south site cultural unit.</description><category>Arts and Culture</category><borough>Brooklyn</borough><managing_agency>EDC</managing_agency><client_agency>DCLA</client_agency><current_phase>Design</current_phase><design_start>2014-12-01T00:00:00</design_start><budget_forecast>34527990.70</budget_forecast><total_budget_changes>36789601.16</total_budget_changes><forecast_completion>2018-12-31T00:00:00</forecast_completion><total_schedule_changes>1706</total_schedule_changes></row><row _id="row-k4n5_rwxy~webu" _uuid="00000000-0000-0000-2A05-2896C79EE1D2" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-k4n5_rwxy~webu"><date_reported_as_of>2016-06-01T00:00:00</date_reported_as_of><pid>484</pid><project_name>DBCD South Site Cultural Fit-Out</project_name><description>Interior fit-out of the south site cultural unit.</description><category>Arts and Culture</category><borough>Brooklyn</borough><managing_agency>EDC</managing_agency><client_agency>DCLA</client_agency><current_phase>Design</current_phase><design_start>2014-12-01T00:00:00</design_start><budget_forecast>34527990.70</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>36789601.16</total_budget_changes><forecast_completion>2018-12-31T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1706</total_schedule_changes></row><row _id="row-irww_hfz7.cwhp" _uuid="00000000-0000-0000-E2B1-F861594392EB" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-irww_hfz7.cwhp"><date_reported_as_of>2016-11-01T00:00:00</date_reported_as_of><pid>484</pid><project_name>DBCD South Site Cultural Fit-Out</project_name><description>Interior fit-out of the south site cultural unit.</description><category>Arts and Culture</category><borough>Brooklyn</borough><managing_agency>EDC</managing_agency><client_agency>DCLA</client_agency><current_phase>Design</current_phase><design_start>2014-12-01T00:00:00</design_start><budget_forecast>34527720.70</budget_forecast><latest_budget_changes>-270.00</latest_budget_changes><total_budget_changes>36789601.16</total_budget_changes><forecast_completion>2018-06-29T00:00:00</forecast_completion><latest_schedule_changes>-185</latest_schedule_changes><total_schedule_changes>1706</total_schedule_changes></row><row _id="row-itsr-zpbe.kji2" _uuid="00000000-0000-0000-2A6E-4010DDB61E62" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-itsr-zpbe.kji2"><date_reported_as_of>2017-04-01T00:00:00</date_reported_as_of><pid>484</pid><project_name>DBCD South Site Cultural Fit-Out</project_name><description>Interior fit-out of the south site cultural unit.</description><category>Arts and Culture</category><borough>Brooklyn</borough><managing_agency>EDC</managing_agency><client_agency>DCLA</client_agency><current_phase>Design</current_phase><design_start>2014-12-01T00:00:00</design_start><budget_forecast>7326030.90</budget_forecast><latest_budget_changes>-27201689.80</latest_budget_changes><total_budget_changes>36789601.16</total_budget_changes><forecast_completion>2019-08-31T00:00:00</forecast_completion><latest_schedule_changes>428</latest_schedule_changes><total_schedule_changes>1706</total_schedule_changes></row><row _id="row-n7vw.x688.hhc8" _uuid="00000000-0000-0000-A492-2AE96A65F3C2" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-n7vw.x688.hhc8"><date_reported_as_of>2017-09-01T00:00:00</date_reported_as_of><pid>484</pid><project_name>DBCD South Site Cultural Fit-Out</project_name><description>Interior fit-out of the south site cultural unit.</description><category>Arts and Culture</category><borough>Brooklyn</borough><managing_agency>EDC</managing_agency><client_agency>DCLA</client_agency><current_phase>Design</current_phase><design_start>2014-12-01T00:00:00</design_start><budget_forecast>32833212.23</budget_forecast><latest_budget_changes>25507181.33</latest_budget_changes><total_budget_changes>36789601.16</total_budget_changes><forecast_completion>2019-11-30T00:00:00</forecast_completion><latest_schedule_changes>91</latest_schedule_changes><total_schedule_changes>1706</total_schedule_changes></row><row _id="row-p7hd~qinn~7utc" _uuid="00000000-0000-0000-60A3-7784E037D556" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-p7hd~qinn~7utc"><date_reported_as_of>2018-03-01T00:00:00</date_reported_as_of><pid>484</pid><project_name>DBCD South Site Cultural Fit-Out</project_name><description>Interior fit-out of the south site cultural unit.</description><category>Arts and Culture</category><borough>Brooklyn</borough><managing_agency>EDC</managing_agency><client_agency>DCLA</client_agency><current_phase>Design</current_phase><design_start>2014-12-01T00:00:00</design_start><budget_forecast>32833212.23</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>36789601.16</total_budget_changes><forecast_completion>2020-09-29T00:00:00</forecast_completion><latest_schedule_changes>304</latest_schedule_changes><total_schedule_changes>1706</total_schedule_changes></row><row _id="row-79pk.cz2v-vyt2" _uuid="00000000-0000-0000-748F-B4E1BD6F9460" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-79pk.cz2v-vyt2"><date_reported_as_of>2018-08-01T00:00:00</date_reported_as_of><pid>484</pid><project_name>DBCD South Site Cultural Fit-Out</project_name><description>Interior fit-out of the south site cultural unit.</description><category>Arts and Culture</category><borough>Brooklyn</borough><managing_agency>EDC</managing_agency><client_agency>DCLA</client_agency><current_phase>Design</current_phase><design_start>2014-12-01T00:00:00</design_start><budget_forecast>32888855.92</budget_forecast><latest_budget_changes>55643.69</latest_budget_changes><total_budget_changes>36789601.16</total_budget_changes><forecast_completion>2021-03-02T00:00:00</forecast_completion><latest_schedule_changes>154</latest_schedule_changes><total_schedule_changes>1706</total_schedule_changes></row><row _id="row-8khn_suh2-icd6" _uuid="00000000-0000-0000-E2C8-252DF862F5FC" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-8khn_suh2-icd6"><date_reported_as_of>2019-01-01T00:00:00</date_reported_as_of><pid>484</pid><project_name>DBCD South Site Cultural Fit-Out</project_name><description>Interior fit-out of the south site cultural unit.</description><category>Arts and Culture</category><borough>Brooklyn</borough><managing_agency>EDC</managing_agency><client_agency>DCLA</client_agency><current_phase>Construction Procurement</current_phase><design_start>2014-12-01T00:00:00</design_start><budget_forecast>53070000.00</budget_forecast><latest_budget_changes>20181144.08</latest_budget_changes><total_budget_changes>36789601.16</total_budget_changes><forecast_completion>2022-07-31T00:00:00</forecast_completion><latest_schedule_changes>516</latest_schedule_changes><total_schedule_changes>1706</total_schedule_changes></row><row _id="row-ve9v.eh95~9eer" _uuid="00000000-0000-0000-0830-21F3893E2D82" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ve9v.eh95~9eer"><date_reported_as_of>2019-05-01T00:00:00</date_reported_as_of><pid>484</pid><project_name>DBCD South Site Cultural Fit-Out</project_name><description>Interior fit-out of the south site cultural unit.</description><category>Arts and Culture</category><borough>Brooklyn</borough><managing_agency>EDC</managing_agency><client_agency>DCLA</client_agency><current_phase>Construction Procurement</current_phase><design_start>2014-12-01T00:00:00</design_start><budget_forecast>53070000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>36789601.16</total_budget_changes><forecast_completion>2022-07-31T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1706</total_schedule_changes></row><row _id="row-nyj3-qic7~2gat" _uuid="00000000-0000-0000-9013-92BD32D24910" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-nyj3-qic7~2gat"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>484</pid><project_name>DBCD South Site Cultural Fit-Out</project_name><description>Interior fit-out of the south site cultural unit.</description><category>Arts and Culture</category><borough>Brooklyn</borough><managing_agency>EDC</managing_agency><client_agency>DCLA</client_agency><current_phase>Construction Procurement</current_phase><design_start>2014-12-01T00:00:00</design_start><budget_forecast>51070000.00</budget_forecast><latest_budget_changes>-2000000.00</latest_budget_changes><total_budget_changes>36789601.16</total_budget_changes><forecast_completion>2022-07-31T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1706</total_schedule_changes></row><row _id="row-rmie_m9wg-kuyg" _uuid="00000000-0000-0000-8081-C18EF0398228" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-rmie_m9wg-kuyg"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>484</pid><project_name>DBCD South Site Cultural Fit-Out</project_name><description>Interior fit-out of the south site cultural unit.</description><category>Arts and Culture</category><borough>Brooklyn</borough><managing_agency>EDC</managing_agency><client_agency>DCLA</client_agency><current_phase>Construction Procurement</current_phase><design_start>2014-12-01T00:00:00</design_start><budget_forecast>51070000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>36789601.16</total_budget_changes><forecast_completion>2022-11-29T00:00:00</forecast_completion><latest_schedule_changes>121</latest_schedule_changes><total_schedule_changes>1706</total_schedule_changes></row><row _id="row-wcxx-vm67.4khh" _uuid="00000000-0000-0000-1500-1C577AAEC26D" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-wcxx-vm67.4khh"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>484</pid><project_name>DBCD South Site Cultural Fit-Out</project_name><description>Interior fit-out of the south site cultural unit.</description><category>Arts and Culture</category><borough>Brooklyn</borough><managing_agency>EDC</managing_agency><client_agency>DCLA</client_agency><current_phase>Construction Procurement</current_phase><design_start>2014-12-01T00:00:00</design_start><budget_forecast>51070000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>36789601.16</total_budget_changes><forecast_completion>2023-04-02T00:00:00</forecast_completion><latest_schedule_changes>124</latest_schedule_changes><total_schedule_changes>1706</total_schedule_changes></row><row _id="row-czvq_fsei.rezt" _uuid="00000000-0000-0000-3CC9-D2DB9BA86D85" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-czvq_fsei.rezt"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>484</pid><project_name>DBCD South Site Cultural Fit-Out</project_name><description>Interior fit-out of the south site cultural unit.</description><category>Arts and Culture</category><borough>Brooklyn</borough><managing_agency>EDC</managing_agency><client_agency>DCLA</client_agency><current_phase>Construction</current_phase><design_start>2014-12-01T00:00:00</design_start><budget_forecast>51070000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>36789601.16</total_budget_changes><forecast_completion>2022-12-31T00:00:00</forecast_completion><latest_schedule_changes>-92</latest_schedule_changes><total_schedule_changes>1706</total_schedule_changes></row><row _id="row-gxnu_2bcs_bu2h" _uuid="00000000-0000-0000-B462-E54E336540D6" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-gxnu_2bcs_bu2h"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>484</pid><project_name>DBCD South Site Cultural Fit-Out</project_name><description>Interior fit-out of the south site cultural unit.</description><category>Arts and Culture</category><borough>Brooklyn</borough><managing_agency>EDC</managing_agency><client_agency>DCLA</client_agency><current_phase>Construction</current_phase><design_start>2014-12-01T00:00:00</design_start><budget_forecast>51070000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>36789601.16</total_budget_changes><forecast_completion>2022-12-31T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1706</total_schedule_changes></row><row _id="row-v3rx_jbae.mg3r" _uuid="00000000-0000-0000-A70D-48E20BEA7B45" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-v3rx_jbae.mg3r"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>484</pid><project_name>DBCD South Site Cultural Fit-Out</project_name><description>Interior fit-out of the south site cultural unit.</description><category>Arts and Culture</category><borough>Brooklyn</borough><managing_agency>EDC</managing_agency><client_agency>DCLA</client_agency><current_phase>Construction</current_phase><design_start>2014-12-01T00:00:00</design_start><budget_forecast>51070000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>36789601.16</total_budget_changes><forecast_completion>2022-12-31T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1706</total_schedule_changes></row><row _id="row-93wh.kux7~6785" _uuid="00000000-0000-0000-5592-93FC6FD39174" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-93wh.kux7~6785"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>484</pid><project_name>DBCD South Site Cultural Fit-Out</project_name><description>Interior fit-out of the south site cultural unit.</description><category>Arts and Culture</category><borough>Brooklyn</borough><managing_agency>EDC</managing_agency><client_agency>DCLA</client_agency><current_phase>Construction</current_phase><design_start>2014-12-01T00:00:00</design_start><budget_forecast>51070000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>36789601.16</total_budget_changes><forecast_completion>2022-12-31T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1706</total_schedule_changes></row><row _id="row-jeer_kfbq_4yei" _uuid="00000000-0000-0000-3F41-0A57328DCF58" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-jeer_kfbq_4yei"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>484</pid><project_name>DBCD South Site Cultural Fit-Out</project_name><description>Interior fit-out of the south site cultural unit.</description><category>Arts and Culture</category><borough>Brooklyn</borough><managing_agency>EDC</managing_agency><client_agency>DCLA</client_agency><current_phase>Construction</current_phase><design_start>2014-12-01T00:00:00</design_start><budget_forecast>51070000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>36789601.16</total_budget_changes><forecast_completion>2022-12-31T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1706</total_schedule_changes></row><row _id="row-vyf2-qfdb.yqa3" _uuid="00000000-0000-0000-FF46-814F132DC0AC" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-vyf2-qfdb.yqa3"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>484</pid><project_name>DBCD South Site Cultural Fit-Out</project_name><description>Interior fit-out of the south site cultural unit.</description><category>Arts and Culture</category><borough>Brooklyn</borough><managing_agency>EDC</managing_agency><client_agency>DCLA</client_agency><current_phase>Construction</current_phase><design_start>2014-12-01T00:00:00</design_start><budget_forecast>70516949.86</budget_forecast><latest_budget_changes>19446949.86</latest_budget_changes><total_budget_changes>36789601.16</total_budget_changes><forecast_completion>2023-09-02T00:00:00</forecast_completion><latest_schedule_changes>245</latest_schedule_changes><total_schedule_changes>1706</total_schedule_changes></row><row _id="row-vyyu_fxs8_ep9i" _uuid="00000000-0000-0000-BE95-CDC25669BEDA" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-vyyu_fxs8_ep9i"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>484</pid><project_name>DBCD South Site Cultural Fit-Out</project_name><description>Interior fit-out of the south site cultural unit.</description><category>Arts and Culture</category><borough>Brooklyn</borough><managing_agency>EDC</managing_agency><client_agency>DCLA</client_agency><current_phase>Construction</current_phase><design_start>2014-12-01T00:00:00</design_start><budget_forecast>71317591.86</budget_forecast><latest_budget_changes>800642.00</latest_budget_changes><total_budget_changes>36789601.16</total_budget_changes><forecast_completion>2023-09-02T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1706</total_schedule_changes></row><row _id="row-fq84_89mx_ghe2" _uuid="00000000-0000-0000-0893-B2C4B4EBFE1C" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-fq84_89mx_ghe2"><date_reported_as_of>2016-11-01T00:00:00</date_reported_as_of><pid>502</pid><project_name>FDR Rehabilitation, Northbound (East 42nd to 49th Streets)</project_name><description>Repair the northbound FDR from East 42nd to 49th Streets.</description><category>Bridges</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2016-08-30T00:00:00</design_start><budget_forecast>109356670.39</budget_forecast><latest_budget_changes>11843670.39</latest_budget_changes><total_budget_changes>-2802822.00</total_budget_changes><forecast_completion>2025-04-01T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1816</total_schedule_changes></row><row _id="row-hckt-47ur~jtjq" _uuid="00000000-0000-0000-D5EB-ED1A4050316E" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-hckt-47ur~jtjq"><date_reported_as_of>2017-04-01T00:00:00</date_reported_as_of><pid>502</pid><project_name>FDR Rehabilitation, Northbound (East 42nd to 49th Streets)</project_name><description>Repair the northbound FDR from East 42nd to 49th Streets.</description><category>Bridges</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2016-08-30T00:00:00</design_start><budget_forecast>98740670.39</budget_forecast><latest_budget_changes>-10616000.00</latest_budget_changes><total_budget_changes>-2802822.00</total_budget_changes><forecast_completion>2026-08-24T00:00:00</forecast_completion><latest_schedule_changes>510</latest_schedule_changes><total_schedule_changes>1816</total_schedule_changes></row><row _id="row-ijhs_dia7_t4vb" _uuid="00000000-0000-0000-78CF-23E35DB75384" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ijhs_dia7_t4vb"><date_reported_as_of>2017-09-01T00:00:00</date_reported_as_of><pid>502</pid><project_name>FDR Rehabilitation, Northbound (East 42nd to 49th Streets)</project_name><description>Repair the northbound FDR from East 42nd to 49th Streets.</description><category>Bridges</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2016-08-30T00:00:00</design_start><budget_forecast>98115670.00</budget_forecast><latest_budget_changes>-625000.39</latest_budget_changes><total_budget_changes>-2802822.00</total_budget_changes><forecast_completion>2025-04-01T00:00:00</forecast_completion><latest_schedule_changes>-510</latest_schedule_changes><total_schedule_changes>1816</total_schedule_changes></row><row _id="row-fzrx-swu7_dyhx" _uuid="00000000-0000-0000-F93B-FD920771687B" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-fzrx-swu7_dyhx"><date_reported_as_of>2018-03-01T00:00:00</date_reported_as_of><pid>502</pid><project_name>FDR Rehabilitation, Northbound (East 42nd to 49th Streets)</project_name><description>Repair the northbound FDR from East 42nd to 49th Streets.</description><category>Bridges</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2016-08-30T00:00:00</design_start><budget_forecast>98115670.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-2802822.00</total_budget_changes><forecast_completion>2025-03-31T00:00:00</forecast_completion><latest_schedule_changes>-1</latest_schedule_changes><total_schedule_changes>1816</total_schedule_changes></row><row _id="row-6mu7~qwje-wu5h" _uuid="00000000-0000-0000-73CF-5EA29B2DFB7D" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-6mu7~qwje-wu5h"><date_reported_as_of>2018-08-01T00:00:00</date_reported_as_of><pid>502</pid><project_name>FDR Rehabilitation, Northbound (East 42nd to 49th Streets)</project_name><description>Repair the northbound FDR from East 42nd to 49th Streets.</description><category>Bridges</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2016-08-30T00:00:00</design_start><budget_forecast>98115670.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-2802822.00</total_budget_changes><forecast_completion>2027-07-12T00:00:00</forecast_completion><latest_schedule_changes>833</latest_schedule_changes><total_schedule_changes>1816</total_schedule_changes></row><row _id="row-ia96-3c27~jhpy" _uuid="00000000-0000-0000-6CC0-3D1508D15BD1" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ia96-3c27~jhpy"><date_reported_as_of>2019-01-01T00:00:00</date_reported_as_of><pid>502</pid><project_name>FDR Rehabilitation, Northbound (East 42nd to 49th Streets)</project_name><description>Repair the northbound FDR from East 42nd to 49th Streets.</description><category>Bridges</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2016-08-30T00:00:00</design_start><budget_forecast>97576162.00</budget_forecast><latest_budget_changes>-539508.00</latest_budget_changes><total_budget_changes>-2802822.00</total_budget_changes><forecast_completion>2026-07-14T00:00:00</forecast_completion><latest_schedule_changes>-363</latest_schedule_changes><total_schedule_changes>1816</total_schedule_changes></row><row _id="row-9ew7.m628.h54h" _uuid="00000000-0000-0000-12BB-29880E931CC6" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-9ew7.m628.h54h"><date_reported_as_of>2019-05-01T00:00:00</date_reported_as_of><pid>502</pid><project_name>FDR Rehabilitation, Northbound (East 42nd to 49th Streets)</project_name><description>Repair the northbound FDR from East 42nd to 49th Streets.</description><category>Bridges</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2016-08-30T00:00:00</design_start><budget_forecast>100115670.00</budget_forecast><latest_budget_changes>2539508.00</latest_budget_changes><total_budget_changes>-2802822.00</total_budget_changes><forecast_completion>2027-03-06T00:00:00</forecast_completion><latest_schedule_changes>235</latest_schedule_changes><total_schedule_changes>1816</total_schedule_changes></row><row _id="row-znms~9887~zm24" _uuid="00000000-0000-0000-0F06-59E779BD8E0D" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-znms~9887~zm24"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>502</pid><project_name>FDR Rehabilitation, Northbound (East 42nd to 49th Streets)</project_name><description>Repair the northbound FDR from East 42nd to 49th Streets.</description><category>Bridges</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2016-08-30T00:00:00</design_start><budget_forecast>99115670.00</budget_forecast><latest_budget_changes>-1000000.00</latest_budget_changes><total_budget_changes>-2802822.00</total_budget_changes><total_schedule_changes>1816</total_schedule_changes></row><row _id="row-rtuy_fjnd.jcs7" _uuid="00000000-0000-0000-768C-08ED0E7136FB" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-rtuy_fjnd.jcs7"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>502</pid><project_name>FDR Rehabilitation, Northbound (East 42nd to 49th Streets)</project_name><description>Repair the northbound FDR from East 42nd to 49th Streets.</description><category>Bridges</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2016-08-30T00:00:00</design_start><budget_forecast>99615178.00</budget_forecast><latest_budget_changes>499508.00</latest_budget_changes><total_budget_changes>-2802822.00</total_budget_changes><total_schedule_changes>1816</total_schedule_changes></row><row _id="row-7247_vc8g~x8et" _uuid="00000000-0000-0000-2789-5D49602FE664" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-7247_vc8g~x8et"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>502</pid><project_name>FDR Rehabilitation, Northbound (East 42nd to 49th Streets)</project_name><description>Repair the northbound FDR from East 42nd to 49th Streets.</description><category>Bridges</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2016-08-30T00:00:00</design_start><budget_forecast>99615178.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-2802822.00</total_budget_changes><forecast_completion>2028-01-02T00:00:00</forecast_completion><latest_schedule_changes>302</latest_schedule_changes><total_schedule_changes>1816</total_schedule_changes></row><row _id="row-gc2u.j9et_er8g" _uuid="00000000-0000-0000-FA96-5820F37A2960" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-gc2u.j9et_er8g"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>502</pid><project_name>FDR Rehabilitation, Northbound (East 42nd to 49th Streets)</project_name><description>Repair the northbound FDR from East 42nd to 49th Streets.</description><category>Bridges</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2016-08-30T00:00:00</design_start><budget_forecast>99530178.00</budget_forecast><latest_budget_changes>-85000.00</latest_budget_changes><total_budget_changes>-2802822.00</total_budget_changes><forecast_completion>2029-06-27T00:00:00</forecast_completion><latest_schedule_changes>542</latest_schedule_changes><total_schedule_changes>1816</total_schedule_changes></row><row _id="row-r9bu-h3bv_3afc" _uuid="00000000-0000-0000-74ED-F86C6E0BADC8" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-r9bu-h3bv_3afc"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>502</pid><project_name>FDR Rehabilitation, Northbound (East 42nd to 49th Streets)</project_name><category>Bridges</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><total_budget_changes>-2802822.00</total_budget_changes><total_schedule_changes>1816</total_schedule_changes></row><row _id="row-ewww~e2hq-3b54" _uuid="00000000-0000-0000-7AF1-E409A632D047" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ewww~e2hq-3b54"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>502</pid><project_name>FDR Rehabilitation, Northbound (East 42nd to 49th Streets)</project_name><description>Repair the northbound FDR from East 42nd to 49th Streets.</description><category>Bridges</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2016-08-30T00:00:00</design_start><budget_forecast>99030178.00</budget_forecast><latest_budget_changes>-500000.00</latest_budget_changes><total_budget_changes>-2802822.00</total_budget_changes><forecast_completion>2029-01-13T00:00:00</forecast_completion><latest_schedule_changes>-165</latest_schedule_changes><total_schedule_changes>1816</total_schedule_changes></row><row _id="row-r5ar.zz46~nw92" _uuid="00000000-0000-0000-428C-CBAEE139E293" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-r5ar.zz46~nw92"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>502</pid><project_name>FDR Rehabilitation, Northbound (East 42nd to 49th Streets)</project_name><description>Repair the northbound FDR from East 42nd to 49th Streets.</description><category>Bridges</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2016-08-30T00:00:00</design_start><budget_forecast>63030178.00</budget_forecast><latest_budget_changes>-36000000.00</latest_budget_changes><total_budget_changes>-2802822.00</total_budget_changes><forecast_completion>2029-02-12T00:00:00</forecast_completion><latest_schedule_changes>30</latest_schedule_changes><total_schedule_changes>1816</total_schedule_changes></row><row _id="row-edwu-r9xf.h4nx" _uuid="00000000-0000-0000-D827-3863B9BE945A" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-edwu-r9xf.h4nx"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>502</pid><project_name>FDR Rehabilitation, Northbound (East 42nd to 49th Streets)</project_name><description>Repair the northbound FDR from East 42nd to 49th Streets.</description><category>Bridges</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2016-08-30T00:00:00</design_start><budget_forecast>78660178.00</budget_forecast><latest_budget_changes>15630000.00</latest_budget_changes><total_budget_changes>-2802822.00</total_budget_changes><forecast_completion>2029-04-10T00:00:00</forecast_completion><latest_schedule_changes>57</latest_schedule_changes><total_schedule_changes>1816</total_schedule_changes></row><row _id="row-5mya_8z6a_s4cz" _uuid="00000000-0000-0000-4B7B-FCCA685DBECE" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-5mya_8z6a_s4cz"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>502</pid><project_name>FDR Rehabilitation, Northbound (East 42nd to 49th Streets)</project_name><description>Repair the northbound FDR from East 42nd to 49th Streets.</description><category>Bridges</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2016-08-30T00:00:00</design_start><budget_forecast>87080178.00</budget_forecast><latest_budget_changes>8420000.00</latest_budget_changes><total_budget_changes>-2802822.00</total_budget_changes><forecast_completion>2029-08-12T00:00:00</forecast_completion><latest_schedule_changes>124</latest_schedule_changes><total_schedule_changes>1816</total_schedule_changes></row><row _id="row-3v3c.ygar~6wxg" _uuid="00000000-0000-0000-9D55-6C352A9FCE9C" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-3v3c.ygar~6wxg"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>502</pid><project_name>FDR Rehabilitation, Northbound (East 42nd to 49th Streets)</project_name><description>Repair the northbound FDR from East 42nd to 49th Streets.</description><category>Bridges</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2016-08-30T00:00:00</design_start><budget_forecast>94710178.00</budget_forecast><latest_budget_changes>7630000.00</latest_budget_changes><total_budget_changes>-2802822.00</total_budget_changes><forecast_completion>2030-03-22T00:00:00</forecast_completion><latest_schedule_changes>222</latest_schedule_changes><total_schedule_changes>1816</total_schedule_changes></row><row _id="row-96j6~b3ax.vdij" _uuid="00000000-0000-0000-4BE3-A4415F10CD8C" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-96j6~b3ax.vdij"><date_reported_as_of>2017-09-01T00:00:00</date_reported_as_of><pid>503</pid><project_name>West Tremont Avenue over Metro North Railroad</project_name><description>Repair the West Tremont Avenue bridge over the Metro North line, located in the Bronx.</description><category>Bridges</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2017-05-30T00:00:00</design_start><budget_forecast>54138000.00</budget_forecast><latest_budget_changes>147000.00</latest_budget_changes><total_budget_changes>37794543.00</total_budget_changes><forecast_completion>2024-04-29T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1253</total_schedule_changes></row><row _id="row-zduk-xy45~imcb" _uuid="00000000-0000-0000-522A-4433498BBD8A" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-zduk-xy45~imcb"><date_reported_as_of>2018-03-01T00:00:00</date_reported_as_of><pid>503</pid><project_name>West Tremont Avenue over Metro North Railroad</project_name><description>Repair the West Tremont Avenue bridge over the Metro North line, located in the Bronx.</description><category>Bridges</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2017-05-30T00:00:00</design_start><budget_forecast>54138000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>37794543.00</total_budget_changes><forecast_completion>2025-01-07T00:00:00</forecast_completion><latest_schedule_changes>253</latest_schedule_changes><total_schedule_changes>1253</total_schedule_changes></row><row _id="row-fh7q_pmrv_y8vm" _uuid="00000000-0000-0000-3840-96FB272D62A4" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-fh7q_pmrv_y8vm"><date_reported_as_of>2018-08-01T00:00:00</date_reported_as_of><pid>503</pid><project_name>West Tremont Avenue over Metro North Railroad</project_name><description>Repair the West Tremont Avenue bridge over the Metro North line, located in the Bronx.</description><category>Bridges</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2017-05-30T00:00:00</design_start><budget_forecast>60836172.00</budget_forecast><latest_budget_changes>6698172.00</latest_budget_changes><total_budget_changes>37794543.00</total_budget_changes><forecast_completion>2025-09-17T00:00:00</forecast_completion><latest_schedule_changes>253</latest_schedule_changes><total_schedule_changes>1253</total_schedule_changes></row><row _id="row-iyw8.n84q~geqr" _uuid="00000000-0000-0000-2B3A-ADBE0C0F2628" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-iyw8.n84q~geqr"><date_reported_as_of>2019-01-01T00:00:00</date_reported_as_of><pid>503</pid><project_name>West Tremont Avenue over Metro North Railroad</project_name><description>Repair the West Tremont Avenue bridge over the Metro North line, located in the Bronx.</description><category>Bridges</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2017-05-30T00:00:00</design_start><budget_forecast>55063172.00</budget_forecast><latest_budget_changes>-5773000.00</latest_budget_changes><total_budget_changes>37794543.00</total_budget_changes><forecast_completion>2026-09-15T00:00:00</forecast_completion><latest_schedule_changes>363</latest_schedule_changes><total_schedule_changes>1253</total_schedule_changes></row><row _id="row-idw5_8kkt.f8fv" _uuid="00000000-0000-0000-6D44-7143295E33A5" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-idw5_8kkt.f8fv"><date_reported_as_of>2019-05-01T00:00:00</date_reported_as_of><pid>503</pid><project_name>West Tremont Avenue over Metro North Railroad</project_name><description>Repair the West Tremont Avenue bridge over the Metro North line, located in the Bronx.</description><category>Bridges</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2017-05-30T00:00:00</design_start><budget_forecast>57788172.00</budget_forecast><latest_budget_changes>2725000.00</latest_budget_changes><total_budget_changes>37794543.00</total_budget_changes><forecast_completion>2026-06-22T00:00:00</forecast_completion><latest_schedule_changes>-85</latest_schedule_changes><total_schedule_changes>1253</total_schedule_changes></row><row _id="row-qhi2~iysp-22sd" _uuid="00000000-0000-0000-48C0-500460A99865" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-qhi2~iysp-22sd"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>503</pid><project_name>West Tremont Avenue over Metro North Railroad</project_name><description>Repair the West Tremont Avenue bridge over the Metro North line, located in the Bronx.</description><category>Bridges</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2017-05-30T00:00:00</design_start><budget_forecast>57788172.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>37794543.00</total_budget_changes><total_schedule_changes>1253</total_schedule_changes></row><row _id="row-bf7r_mipc.j7ip" _uuid="00000000-0000-0000-0485-840B8C006FB0" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-bf7r_mipc.j7ip"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>503</pid><project_name>West Tremont Avenue over Metro North Railroad</project_name><description>Replace/Rehab the West Tremont Avenue bridge over the Metro North line, located in the Bronx.</description><category>Bridges</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2017-05-30T00:00:00</design_start><budget_forecast>58069487.00</budget_forecast><latest_budget_changes>281315.00</latest_budget_changes><total_budget_changes>37794543.00</total_budget_changes><forecast_completion>2026-11-23T00:00:00</forecast_completion><latest_schedule_changes>154</latest_schedule_changes><total_schedule_changes>1253</total_schedule_changes></row><row _id="row-e98d~7bkj~5jus" _uuid="00000000-0000-0000-90AB-D04A567830D3" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-e98d~7bkj~5jus"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>503</pid><project_name>West Tremont Avenue over Metro North Railroad</project_name><description>Replace/Rehab the West Tremont Avenue bridge over the Metro North line, located in the Bronx.</description><category>Bridges</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2017-05-30T00:00:00</design_start><budget_forecast>57644487.00</budget_forecast><latest_budget_changes>-425000.00</latest_budget_changes><total_budget_changes>37794543.00</total_budget_changes><forecast_completion>2026-11-27T00:00:00</forecast_completion><latest_schedule_changes>4</latest_schedule_changes><total_schedule_changes>1253</total_schedule_changes></row><row _id="row-rrhx_5vw4.8ep8" _uuid="00000000-0000-0000-1F13-5B3074A46499" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-rrhx_5vw4.8ep8"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>503</pid><project_name>West Tremont Avenue over Metro North Railroad</project_name><description>Replace/Rehab the West Tremont Avenue bridge over the Metro North line, located in the Bronx.</description><category>Bridges</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2017-05-30T00:00:00</design_start><budget_forecast>81930087.00</budget_forecast><latest_budget_changes>24285600.00</latest_budget_changes><total_budget_changes>37794543.00</total_budget_changes><forecast_completion>2027-07-20T00:00:00</forecast_completion><latest_schedule_changes>235</latest_schedule_changes><total_schedule_changes>1253</total_schedule_changes></row><row _id="row-x7ea-im2g~4d2g" _uuid="00000000-0000-0000-76FA-0C5F1838FDDE" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-x7ea-im2g~4d2g"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>503</pid><project_name>West Tremont Avenue over Metro North Railroad</project_name><category>Bridges</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><total_budget_changes>37794543.00</total_budget_changes><total_schedule_changes>1253</total_schedule_changes></row><row _id="row-mn6t-q52z-wunh" _uuid="00000000-0000-0000-8671-8BE94DE87B2E" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-mn6t-q52z-wunh"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>503</pid><project_name>West Tremont Avenue over Metro North Railroad</project_name><description>Replace/Rehab the West Tremont Avenue bridge over the Metro North line, located in the Bronx.</description><category>Bridges</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2018-01-16T00:00:00</design_start><budget_forecast>85116087.00</budget_forecast><latest_budget_changes>3186000.00</latest_budget_changes><total_budget_changes>37794543.00</total_budget_changes><forecast_completion>2026-06-18T00:00:00</forecast_completion><latest_schedule_changes>-397</latest_schedule_changes><total_schedule_changes>1253</total_schedule_changes></row><row _id="row-dztg-g7rq.k2rr" _uuid="00000000-0000-0000-76E9-45F8085295F0" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-dztg-g7rq.k2rr"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>503</pid><project_name>West Tremont Avenue over Metro North Railroad</project_name><description>Replace/Rehab the West Tremont Avenue bridge over the Metro North line, located in the Bronx.</description><category>Bridges</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2018-01-16T00:00:00</design_start><budget_forecast>85056088.00</budget_forecast><latest_budget_changes>-59999.00</latest_budget_changes><total_budget_changes>37794543.00</total_budget_changes><forecast_completion>2026-11-11T00:00:00</forecast_completion><latest_schedule_changes>146</latest_schedule_changes><total_schedule_changes>1253</total_schedule_changes></row><row _id="row-fs47-9a63.runb" _uuid="00000000-0000-0000-166F-5B66696669E7" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-fs47-9a63.runb"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>503</pid><project_name>West Tremont Avenue over Metro North Railroad</project_name><description>Replace/Rehab the West Tremont Avenue bridge over the Metro North line, located in the Bronx.</description><category>Bridges</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2018-01-16T00:00:00</design_start><budget_forecast>91424088.00</budget_forecast><latest_budget_changes>6368000.00</latest_budget_changes><total_budget_changes>37794543.00</total_budget_changes><forecast_completion>2027-01-06T00:00:00</forecast_completion><latest_schedule_changes>56</latest_schedule_changes><total_schedule_changes>1253</total_schedule_changes></row><row _id="row-wmib-ir4c~kgvu" _uuid="00000000-0000-0000-6358-6CC26006BE87" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-wmib-ir4c~kgvu"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>503</pid><project_name>West Tremont Avenue over Metro North Railroad</project_name><description>Replace/Rehab the West Tremont Avenue bridge over the Metro North line, located in the Bronx.</description><category>Bridges</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2018-01-16T00:00:00</design_start><budget_forecast>92349543.00</budget_forecast><latest_budget_changes>925455.00</latest_budget_changes><total_budget_changes>37794543.00</total_budget_changes><forecast_completion>2027-08-08T00:00:00</forecast_completion><latest_schedule_changes>214</latest_schedule_changes><total_schedule_changes>1253</total_schedule_changes></row><row _id="row-7539_6k7i.3j5f" _uuid="00000000-0000-0000-5FE0-3456B831FE7A" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-7539_6k7i.3j5f"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>503</pid><project_name>West Tremont Avenue over Metro North Railroad</project_name><description>Replace/Rehab the West Tremont Avenue bridge over the Metro North line, located in the Bronx.</description><category>Bridges</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2018-01-16T00:00:00</design_start><budget_forecast>91785543.00</budget_forecast><latest_budget_changes>-564000.00</latest_budget_changes><total_budget_changes>37794543.00</total_budget_changes><forecast_completion>2027-10-04T00:00:00</forecast_completion><latest_schedule_changes>57</latest_schedule_changes><total_schedule_changes>1253</total_schedule_changes></row><row _id="row-4gsx.dfwf~c9un" _uuid="00000000-0000-0000-8204-266745CC258E" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-4gsx.dfwf~c9un"><date_reported_as_of>2018-03-01T00:00:00</date_reported_as_of><pid>504</pid><project_name>5th Avenue Bridge Reconstruction over LIRR and Sea Beach, Brooklyn</project_name><description>Replace the 5th Avenue Bridge over LIRR &amp; Sea Beach, Brooklyn.</description><category>Bridges</category><borough>Brooklyn</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2017-11-30T00:00:00</design_start><budget_forecast>47279974.00</budget_forecast><latest_budget_changes>79087.00</latest_budget_changes><total_budget_changes>36577693.00</total_budget_changes><forecast_completion>2024-11-04T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>969</total_schedule_changes></row><row _id="row-ahy4-58kf-jekx" _uuid="00000000-0000-0000-0258-C7B00711534B" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ahy4-58kf-jekx"><date_reported_as_of>2018-08-01T00:00:00</date_reported_as_of><pid>504</pid><project_name>5th Avenue Bridge Reconstruction over LIRR and Sea Beach, Brooklyn</project_name><description>Replace the 5th Avenue Bridge over LIRR &amp; Sea Beach, Brooklyn.</description><category>Bridges</category><borough>Brooklyn</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2017-11-30T00:00:00</design_start><budget_forecast>49319823.00</budget_forecast><latest_budget_changes>2039849.00</latest_budget_changes><total_budget_changes>36577693.00</total_budget_changes><forecast_completion>2024-11-04T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>969</total_schedule_changes></row><row _id="row-fjsk_8hix_xb3r" _uuid="00000000-0000-0000-850C-8A9F48FB2483" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-fjsk_8hix_xb3r"><date_reported_as_of>2019-01-01T00:00:00</date_reported_as_of><pid>504</pid><project_name>5th Avenue Bridge Reconstruction over LIRR and Sea Beach, Brooklyn</project_name><description>Replace the 5th Avenue Bridge over LIRR &amp; Sea Beach, Brooklyn.</description><category>Bridges</category><borough>Brooklyn</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2017-11-30T00:00:00</design_start><budget_forecast>47269823.00</budget_forecast><latest_budget_changes>-2050000.00</latest_budget_changes><total_budget_changes>36577693.00</total_budget_changes><forecast_completion>2024-11-03T00:00:00</forecast_completion><latest_schedule_changes>-1</latest_schedule_changes><total_schedule_changes>969</total_schedule_changes></row><row _id="row-i7b8-dyns_ipi5" _uuid="00000000-0000-0000-43CC-60C1BBBE3C19" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-i7b8-dyns_ipi5"><date_reported_as_of>2019-05-01T00:00:00</date_reported_as_of><pid>504</pid><project_name>5th Avenue Bridge Reconstruction over LIRR and Sea Beach, Brooklyn</project_name><description>Replace the 5th Avenue Bridge over LIRR &amp; Sea Beach, Brooklyn.</description><category>Bridges</category><borough>Brooklyn</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2017-11-30T00:00:00</design_start><budget_forecast>46886493.00</budget_forecast><latest_budget_changes>-383330.00</latest_budget_changes><total_budget_changes>36577693.00</total_budget_changes><forecast_completion>2025-08-12T00:00:00</forecast_completion><latest_schedule_changes>282</latest_schedule_changes><total_schedule_changes>969</total_schedule_changes></row><row _id="row-uh6z~zup3_gjf8" _uuid="00000000-0000-0000-5A33-294FC538B9FC" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-uh6z~zup3_gjf8"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>504</pid><project_name>5th Avenue Bridge Reconstruction over LIRR and Sea Beach, Brooklyn</project_name><description>Replace the 5th Avenue Bridge over LIRR &amp; Sea Beach, Brooklyn.</description><category>Bridges</category><borough>Brooklyn</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2017-11-30T00:00:00</design_start><budget_forecast>50788823.00</budget_forecast><latest_budget_changes>3902330.00</latest_budget_changes><total_budget_changes>36577693.00</total_budget_changes><total_schedule_changes>969</total_schedule_changes></row><row _id="row-vkcc_2kya_575z" _uuid="00000000-0000-0000-544E-EC2B06EE180C" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-vkcc_2kya_575z"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>504</pid><project_name>5th Avenue Bridge Reconstruction over LIRR and Sea Beach, Brooklyn</project_name><description>Replace the 5th Avenue Bridge over LIRR &amp; Sea Beach, Brooklyn.</description><category>Bridges</category><borough>Brooklyn</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2017-11-30T00:00:00</design_start><budget_forecast>77869823.00</budget_forecast><latest_budget_changes>27081000.00</latest_budget_changes><total_budget_changes>36577693.00</total_budget_changes><forecast_completion>2026-01-25T00:00:00</forecast_completion><latest_schedule_changes>166</latest_schedule_changes><total_schedule_changes>969</total_schedule_changes></row><row _id="row-q2qe-jtf6.v96c" _uuid="00000000-0000-0000-A6E5-CD7897B503CB" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-q2qe-jtf6.v96c"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>504</pid><project_name>5th Avenue Bridge Reconstruction over LIRR and Sea Beach, Brooklyn</project_name><description>Replace the 5th Avenue Bridge over LIRR &amp; Sea Beach, Brooklyn.</description><category>Bridges</category><borough>Brooklyn</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2017-11-30T00:00:00</design_start><budget_forecast>77894823.00</budget_forecast><latest_budget_changes>25000.00</latest_budget_changes><total_budget_changes>36577693.00</total_budget_changes><forecast_completion>2026-10-20T00:00:00</forecast_completion><latest_schedule_changes>268</latest_schedule_changes><total_schedule_changes>969</total_schedule_changes></row><row _id="row-35j4-bzeh.ckkv" _uuid="00000000-0000-0000-63C0-6969DD0C6F0F" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-35j4-bzeh.ckkv"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>504</pid><project_name>5th Avenue Bridge Reconstruction over LIRR and Sea Beach, Brooklyn</project_name><description>Replace the 5th Avenue Bridge over LIRR &amp; Sea Beach, Brooklyn.</description><category>Bridges</category><borough>Brooklyn</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2017-11-30T00:00:00</design_start><budget_forecast>80817380.00</budget_forecast><latest_budget_changes>2922557.00</latest_budget_changes><total_budget_changes>36577693.00</total_budget_changes><forecast_completion>2027-01-16T00:00:00</forecast_completion><latest_schedule_changes>88</latest_schedule_changes><total_schedule_changes>969</total_schedule_changes></row><row _id="row-revh_cjtu_e8is" _uuid="00000000-0000-0000-C58E-E07602FEB3A9" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-revh_cjtu_e8is"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>504</pid><project_name>5th Avenue Bridge Reconstruction over LIRR and Sea Beach, Brooklyn</project_name><category>Bridges</category><borough>Brooklyn</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><total_budget_changes>36577693.00</total_budget_changes><total_schedule_changes>969</total_schedule_changes></row><row _id="row-88y5.4z8k~pmd3" _uuid="00000000-0000-0000-BDCE-D93B594B6BB4" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-88y5.4z8k~pmd3"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>504</pid><project_name>5th Avenue Bridge Reconstruction over LIRR and Sea Beach, Brooklyn</project_name><description>Replace the 5th Avenue Bridge over LIRR &amp; Sea Beach, Brooklyn.</description><category>Bridges</category><borough>Brooklyn</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2017-11-30T00:00:00</design_start><budget_forecast>74985380.00</budget_forecast><latest_budget_changes>-5832000.00</latest_budget_changes><total_budget_changes>36577693.00</total_budget_changes><forecast_completion>2027-05-06T00:00:00</forecast_completion><latest_schedule_changes>110</latest_schedule_changes><total_schedule_changes>969</total_schedule_changes></row><row _id="row-nb4c-25jm~4zn9" _uuid="00000000-0000-0000-5829-5F81929BD8C2" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-nb4c-25jm~4zn9"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>504</pid><project_name>5th Avenue Bridge Reconstruction over LIRR and Sea Beach, Brooklyn</project_name><description>Replace the 5th Avenue Bridge over LIRR &amp; Sea Beach, Brooklyn.</description><category>Bridges</category><borough>Brooklyn</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2017-11-30T00:00:00</design_start><budget_forecast>74525379.00</budget_forecast><latest_budget_changes>-460001.00</latest_budget_changes><total_budget_changes>36577693.00</total_budget_changes><forecast_completion>2027-12-03T00:00:00</forecast_completion><latest_schedule_changes>211</latest_schedule_changes><total_schedule_changes>969</total_schedule_changes></row><row _id="row-9kjg-fa4s.gg8g" _uuid="00000000-0000-0000-5E0E-E5813E32AEA0" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-9kjg-fa4s.gg8g"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>504</pid><project_name>5th Avenue Bridge Reconstruction over LIRR and Sea Beach, Brooklyn</project_name><description>Replace the 5th Avenue Bridge over LIRR &amp; Sea Beach, Brooklyn.</description><category>Bridges</category><borough>Brooklyn</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2017-11-30T00:00:00</design_start><budget_forecast>84519049.00</budget_forecast><latest_budget_changes>9993670.00</latest_budget_changes><total_budget_changes>36577693.00</total_budget_changes><forecast_completion>2027-12-03T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>969</total_schedule_changes></row><row _id="row-m4mc_w69a~s2cm" _uuid="00000000-0000-0000-24BC-2FA1E78E4032" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-m4mc_w69a~s2cm"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>504</pid><project_name>5th Avenue Bridge Reconstruction over LIRR and Sea Beach, Brooklyn</project_name><description>Replace the 5th Avenue Bridge over LIRR &amp; Sea Beach, Brooklyn.</description><category>Bridges</category><borough>Brooklyn</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2017-11-30T00:00:00</design_start><budget_forecast>86511361.00</budget_forecast><latest_budget_changes>1992312.00</latest_budget_changes><total_budget_changes>36577693.00</total_budget_changes><forecast_completion>2027-11-13T00:00:00</forecast_completion><latest_schedule_changes>-20</latest_schedule_changes><total_schedule_changes>969</total_schedule_changes></row><row _id="row-9xp4~pf3a~pry4" _uuid="00000000-0000-0000-B23A-C1371424E039" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-9xp4~pf3a~pry4"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>504</pid><project_name>5th Avenue Bridge Reconstruction over LIRR and Sea Beach, Brooklyn</project_name><description>Replace the 5th Avenue Bridge over LIRR &amp; Sea Beach, Brooklyn.</description><category>Bridges</category><borough>Brooklyn</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction Procurement</current_phase><design_start>2017-11-30T00:00:00</design_start><budget_forecast>83778580.00</budget_forecast><latest_budget_changes>-2732781.00</latest_budget_changes><total_budget_changes>36577693.00</total_budget_changes><forecast_completion>2027-07-01T00:00:00</forecast_completion><latest_schedule_changes>-135</latest_schedule_changes><total_schedule_changes>969</total_schedule_changes></row><row _id="row-gedb.tx6f~d9hm" _uuid="00000000-0000-0000-4BDC-E05A85EAFD7D" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-gedb.tx6f~d9hm"><date_reported_as_of>2017-09-01T00:00:00</date_reported_as_of><pid>506</pid><project_name>Pelham Parkway Bridge Reconstruction over Hutchinson Parkway</project_name><description>Replace the Pelham Parkway bridge over Hutchinson Parkway, Bronx.</description><category>Bridges, Streets and Roadways</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2017-05-30T00:00:00</design_start><budget_forecast>56521020.00</budget_forecast><latest_budget_changes>-274000.43</latest_budget_changes><total_budget_changes>10338071.57</total_budget_changes><forecast_completion>2024-04-29T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1934</total_schedule_changes></row><row _id="row-ity2-7zhe_fm7e" _uuid="00000000-0000-0000-E0BC-BD3D085422D2" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ity2-7zhe_fm7e"><date_reported_as_of>2018-03-01T00:00:00</date_reported_as_of><pid>506</pid><project_name>Pelham Parkway Bridge Reconstruction over Hutchinson Parkway</project_name><description>Replace the Pelham Parkway bridge over Hutchinson Parkway, Bronx.</description><category>Bridges, Streets and Roadways</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2017-05-30T00:00:00</design_start><budget_forecast>56520020.00</budget_forecast><latest_budget_changes>-1000.00</latest_budget_changes><total_budget_changes>10338071.57</total_budget_changes><forecast_completion>2025-08-26T00:00:00</forecast_completion><latest_schedule_changes>484</latest_schedule_changes><total_schedule_changes>1934</total_schedule_changes></row><row _id="row-gagj~u8mn-9cda" _uuid="00000000-0000-0000-45E8-9CAA1A57B832" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-gagj~u8mn-9cda"><date_reported_as_of>2018-08-01T00:00:00</date_reported_as_of><pid>506</pid><project_name>Pelham Parkway Bridge Reconstruction over Hutchinson Parkway</project_name><description>Replace the Pelham Parkway bridge over Hutchinson Parkway, Bronx.</description><category>Bridges, Streets and Roadways</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2017-05-30T00:00:00</design_start><budget_forecast>61798468.00</budget_forecast><latest_budget_changes>5278448.00</latest_budget_changes><total_budget_changes>10338071.57</total_budget_changes><forecast_completion>2026-03-01T00:00:00</forecast_completion><latest_schedule_changes>187</latest_schedule_changes><total_schedule_changes>1934</total_schedule_changes></row><row _id="row-5i2a~y3pd-xaf3" _uuid="00000000-0000-0000-32EA-BF8F3B0D4EC9" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-5i2a~y3pd-xaf3"><date_reported_as_of>2019-01-01T00:00:00</date_reported_as_of><pid>506</pid><project_name>Pelham Parkway Bridge Reconstruction over Hutchinson Parkway</project_name><description>Replace the Pelham Parkway bridge over Hutchinson River Parkway, Bronx.</description><category>Bridges, Streets and Roadways</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2017-05-30T00:00:00</design_start><budget_forecast>57220478.00</budget_forecast><latest_budget_changes>-4577990.00</latest_budget_changes><total_budget_changes>10338071.57</total_budget_changes><forecast_completion>2026-09-06T00:00:00</forecast_completion><latest_schedule_changes>189</latest_schedule_changes><total_schedule_changes>1934</total_schedule_changes></row><row _id="row-ag9w_8evz_zuet" _uuid="00000000-0000-0000-0CEE-3AAD078EB05A" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ag9w_8evz_zuet"><date_reported_as_of>2019-05-01T00:00:00</date_reported_as_of><pid>506</pid><project_name>Pelham Parkway Bridge Reconstruction over Hutchinson Parkway</project_name><description>Replace the Pelham Parkway bridge over Hutchinson River Parkway, Bronx.</description><category>Bridges, Streets and Roadways</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2017-05-30T00:00:00</design_start><budget_forecast>57570478.00</budget_forecast><latest_budget_changes>350000.00</latest_budget_changes><total_budget_changes>10338071.57</total_budget_changes><forecast_completion>2027-01-04T00:00:00</forecast_completion><latest_schedule_changes>120</latest_schedule_changes><total_schedule_changes>1934</total_schedule_changes></row><row _id="row-vuvg~mxcm-ygqk" _uuid="00000000-0000-0000-CB3E-139A5DE06CC2" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-vuvg~mxcm-ygqk"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>506</pid><project_name>Pelham Parkway Bridge Reconstruction over Hutchinson Parkway</project_name><description>Replace the Pelham Parkway bridge over Hutchinson River Parkway, Bronx.</description><category>Bridges, Streets and Roadways</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2017-05-30T00:00:00</design_start><budget_forecast>57220478.00</budget_forecast><latest_budget_changes>-350000.00</latest_budget_changes><total_budget_changes>10338071.57</total_budget_changes><total_schedule_changes>1934</total_schedule_changes></row><row _id="row-6ieg_kded~jtvv" _uuid="00000000-0000-0000-6001-8F893A556C1A" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-6ieg_kded~jtvv"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>506</pid><project_name>Pelham Parkway Bridge Reconstruction over Hutchinson Parkway</project_name><description>Replace/Rehab the Pelham Parkway bridge over Hutchinson River Parkway, Bronx.</description><category>Bridges, Streets and Roadways</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2017-05-30T00:00:00</design_start><budget_forecast>57348478.00</budget_forecast><latest_budget_changes>128000.00</latest_budget_changes><total_budget_changes>10338071.57</total_budget_changes><forecast_completion>2027-03-03T00:00:00</forecast_completion><latest_schedule_changes>58</latest_schedule_changes><total_schedule_changes>1934</total_schedule_changes></row><row _id="row-q96g_nk69-hqhg" _uuid="00000000-0000-0000-790C-5EDDFD896D15" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-q96g_nk69-hqhg"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>506</pid><project_name>Pelham Parkway Bridge Reconstruction over Hutchinson Parkway</project_name><description>Replace/Rehab the Pelham Parkway bridge over Hutchinson River Parkway, Bronx.</description><category>Bridges, Streets and Roadways</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2017-05-30T00:00:00</design_start><budget_forecast>56998478.00</budget_forecast><latest_budget_changes>-350000.00</latest_budget_changes><total_budget_changes>10338071.57</total_budget_changes><forecast_completion>2027-06-21T00:00:00</forecast_completion><latest_schedule_changes>110</latest_schedule_changes><total_schedule_changes>1934</total_schedule_changes></row><row _id="row-yzxd~9bn2-nc8n" _uuid="00000000-0000-0000-8489-A856A05EBB61" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-yzxd~9bn2-nc8n"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>506</pid><project_name>Pelham Parkway Bridge Reconstruction over Hutchinson Parkway</project_name><description>Replace/Rehab the Pelham Parkway bridge over Hutchinson River Parkway, Bronx.</description><category>Bridges, Streets and Roadways</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2017-05-30T00:00:00</design_start><budget_forecast>57348478.00</budget_forecast><latest_budget_changes>350000.00</latest_budget_changes><total_budget_changes>10338071.57</total_budget_changes><forecast_completion>2028-02-02T00:00:00</forecast_completion><latest_schedule_changes>226</latest_schedule_changes><total_schedule_changes>1934</total_schedule_changes></row><row _id="row-tm3e-54a4-emt6" _uuid="00000000-0000-0000-C022-9CDAD84C5A26" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-tm3e-54a4-emt6"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>506</pid><project_name>Pelham Parkway Bridge Reconstruction over Hutchinson Parkway</project_name><category>Bridges, Streets and Roadways</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><total_budget_changes>10338071.57</total_budget_changes><total_schedule_changes>1934</total_schedule_changes></row><row _id="row-xbz4~kug9~7z8i" _uuid="00000000-0000-0000-6874-50B8E7B86351" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-xbz4~kug9~7z8i"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>506</pid><project_name>Pelham Parkway Bridge Reconstruction over Hutchinson Parkway</project_name><description>Replace/Rehab the Pelham Parkway bridge over Hutchinson River Parkway, Bronx.</description><category>Bridges, Streets and Roadways</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2017-11-08T00:00:00</design_start><budget_forecast>59148478.00</budget_forecast><latest_budget_changes>1800000.00</latest_budget_changes><total_budget_changes>10338071.57</total_budget_changes><forecast_completion>2028-02-05T00:00:00</forecast_completion><latest_schedule_changes>3</latest_schedule_changes><total_schedule_changes>1934</total_schedule_changes></row><row _id="row-sniq_qp3v-zrtv" _uuid="00000000-0000-0000-814E-7EC8DB955647" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-sniq_qp3v-zrtv"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>506</pid><project_name>Pelham Parkway Bridge Reconstruction over Hutchinson Parkway</project_name><description>Replace/Rehab the Pelham Parkway bridge over Hutchinson River Parkway, Bronx.</description><category>Bridges, Streets and Roadways</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2017-11-08T00:00:00</design_start><budget_forecast>59687530.00</budget_forecast><latest_budget_changes>539052.00</latest_budget_changes><total_budget_changes>10338071.57</total_budget_changes><forecast_completion>2028-01-12T00:00:00</forecast_completion><latest_schedule_changes>-24</latest_schedule_changes><total_schedule_changes>1934</total_schedule_changes></row><row _id="row-d5bm-pvyf.2cvv" _uuid="00000000-0000-0000-5E43-A38351542F03" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-d5bm-pvyf.2cvv"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>506</pid><project_name>Pelham Parkway Bridge Reconstruction over Hutchinson Parkway</project_name><description>Replace/Rehab the Pelham Parkway bridge over Hutchinson River Parkway, Bronx.</description><category>Bridges, Streets and Roadways</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2017-11-08T00:00:00</design_start><budget_forecast>67311092.00</budget_forecast><latest_budget_changes>7623562.00</latest_budget_changes><total_budget_changes>10338071.57</total_budget_changes><forecast_completion>2028-04-23T00:00:00</forecast_completion><latest_schedule_changes>102</latest_schedule_changes><total_schedule_changes>1934</total_schedule_changes></row><row _id="row-3y4k~qqi4_6d5w" _uuid="00000000-0000-0000-C6D3-E344F0F9EB90" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-3y4k~qqi4_6d5w"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>506</pid><project_name>Pelham Parkway Bridge Reconstruction over Hutchinson Parkway</project_name><description>Replace/Rehab the Pelham Parkway bridge over Hutchinson River Parkway, Bronx.</description><category>Bridges, Streets and Roadways</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2017-11-08T00:00:00</design_start><budget_forecast>66783092.00</budget_forecast><latest_budget_changes>-528000.00</latest_budget_changes><total_budget_changes>10338071.57</total_budget_changes><forecast_completion>2029-06-16T00:00:00</forecast_completion><latest_schedule_changes>419</latest_schedule_changes><total_schedule_changes>1934</total_schedule_changes></row><row _id="row-seza-q5nn-gdkk" _uuid="00000000-0000-0000-BDFE-B642916F77FB" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-seza-q5nn-gdkk"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>506</pid><project_name>Pelham Parkway Bridge Reconstruction over Hutchinson Parkway</project_name><description>Replace/Rehab the Pelham Parkway bridge over Hutchinson River Parkway, Bronx.</description><category>Bridges, Streets and Roadways</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2017-11-08T00:00:00</design_start><budget_forecast>67133092.00</budget_forecast><latest_budget_changes>350000.00</latest_budget_changes><total_budget_changes>10338071.57</total_budget_changes><forecast_completion>2029-08-15T00:00:00</forecast_completion><latest_schedule_changes>60</latest_schedule_changes><total_schedule_changes>1934</total_schedule_changes></row><row _id="row-eirj~ki69_jvap" _uuid="00000000-0000-0000-EDB3-31E25131A1E7" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-eirj~ki69_jvap"><date_reported_as_of>2016-11-01T00:00:00</date_reported_as_of><pid>509</pid><project_name>Brooklyn Civil Court move to 210 Joralemon St</project_name><description>Relocation of Brooklyn Civil and Housing Court to 210 Joralemon St</description><category>Public Safety and Criminal Justice</category><borough>Brooklyn</borough><managing_agency>DCAS</managing_agency><client_agency>DCAS</client_agency><current_phase>Design</current_phase><design_start>2016-07-27T00:00:00</design_start><budget_forecast>80499000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>200931011.96</total_budget_changes><forecast_completion>2021-03-25T00:00:00</forecast_completion><latest_schedule_changes>145</latest_schedule_changes><total_schedule_changes>1977</total_schedule_changes></row><row _id="row-iv2p-eqes-qsh6" _uuid="00000000-0000-0000-AFE5-7EEA50E9E21C" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-iv2p-eqes-qsh6"><date_reported_as_of>2017-04-01T00:00:00</date_reported_as_of><pid>509</pid><project_name>Brooklyn Civil Court move to 210 Joralemon St</project_name><description>Relocation of Brooklyn Civil and Housing Court to 210 Joralemon St</description><category>Public Safety and Criminal Justice</category><borough>Brooklyn</borough><managing_agency>DCAS</managing_agency><client_agency>DCAS</client_agency><current_phase>Design</current_phase><design_start>2016-07-27T00:00:00</design_start><budget_forecast>126411000.00</budget_forecast><latest_budget_changes>45912000.00</latest_budget_changes><total_budget_changes>200931011.96</total_budget_changes><forecast_completion>2021-09-29T00:00:00</forecast_completion><latest_schedule_changes>188</latest_schedule_changes><total_schedule_changes>1977</total_schedule_changes></row><row _id="row-ssea-kqd4-bhz9" _uuid="00000000-0000-0000-F74A-E17A93330F01" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ssea-kqd4-bhz9"><date_reported_as_of>2017-09-01T00:00:00</date_reported_as_of><pid>509</pid><project_name>Brooklyn Civil Court move to 210 Joralemon St</project_name><description>Relocation of Brooklyn Civil and Housing Court to 210 Joralemon St</description><category>Public Safety and Criminal Justice</category><borough>Brooklyn</borough><managing_agency>DCAS</managing_agency><client_agency>DCAS</client_agency><current_phase>Design</current_phase><design_start>2016-07-27T00:00:00</design_start><budget_forecast>233584544.31</budget_forecast><latest_budget_changes>107173544.31</latest_budget_changes><total_budget_changes>200931011.96</total_budget_changes><forecast_completion>2021-09-30T00:00:00</forecast_completion><latest_schedule_changes>1</latest_schedule_changes><total_schedule_changes>1977</total_schedule_changes></row><row _id="row-35xt~tvrn-ctim" _uuid="00000000-0000-0000-5BD7-6306277F1EED" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-35xt~tvrn-ctim"><date_reported_as_of>2018-03-01T00:00:00</date_reported_as_of><pid>509</pid><project_name>Brooklyn Civil Court move to 210 Joralemon St</project_name><description>Relocation of Brooklyn Civil and Housing Court to 210 Joralemon St</description><category>Public Safety and Criminal Justice</category><borough>Brooklyn</borough><managing_agency>DCAS</managing_agency><client_agency>DCAS</client_agency><current_phase>Design</current_phase><design_start>2016-07-27T00:00:00</design_start><budget_forecast>247831621.00</budget_forecast><latest_budget_changes>14247076.69</latest_budget_changes><total_budget_changes>200931011.96</total_budget_changes><forecast_completion>2022-01-30T00:00:00</forecast_completion><latest_schedule_changes>122</latest_schedule_changes><total_schedule_changes>1977</total_schedule_changes></row><row _id="row-4e77_46bg-ykkp" _uuid="00000000-0000-0000-6C9D-D22A2FD86294" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-4e77_46bg-ykkp"><date_reported_as_of>2018-08-01T00:00:00</date_reported_as_of><pid>509</pid><project_name>Brooklyn Civil Court move to 210 Joralemon St</project_name><description>Relocation of Brooklyn Civil and Housing Court to 210 Joralemon St</description><category>Public Safety and Criminal Justice</category><borough>Brooklyn</borough><managing_agency>DCAS</managing_agency><client_agency>DCAS</client_agency><current_phase>Design</current_phase><design_start>2016-07-27T00:00:00</design_start><budget_forecast>259215516.00</budget_forecast><latest_budget_changes>11383895.00</latest_budget_changes><total_budget_changes>200931011.96</total_budget_changes><forecast_completion>2022-12-01T00:00:00</forecast_completion><latest_schedule_changes>305</latest_schedule_changes><total_schedule_changes>1977</total_schedule_changes></row><row _id="row-cejb.z2yk-kqsq" _uuid="00000000-0000-0000-3BD4-9C574A2F400A" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-cejb.z2yk-kqsq"><date_reported_as_of>2019-01-01T00:00:00</date_reported_as_of><pid>509</pid><project_name>Brooklyn Civil Court move to 210 Joralemon St</project_name><description>Relocation of Brooklyn Civil and Housing Court to 210 Joralemon St</description><category>Public Safety and Criminal Justice</category><borough>Brooklyn</borough><managing_agency>DCAS</managing_agency><client_agency>DCAS</client_agency><current_phase>Design</current_phase><design_start>2016-07-27T00:00:00</design_start><budget_forecast>259745000.00</budget_forecast><latest_budget_changes>529484.00</latest_budget_changes><total_budget_changes>200931011.96</total_budget_changes><forecast_completion>2023-03-01T00:00:00</forecast_completion><latest_schedule_changes>90</latest_schedule_changes><total_schedule_changes>1977</total_schedule_changes></row><row _id="row-tvav~bkf4~iwc8" _uuid="00000000-0000-0000-4F56-FE506BDF0BBE" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-tvav~bkf4~iwc8"><date_reported_as_of>2019-05-01T00:00:00</date_reported_as_of><pid>509</pid><project_name>Brooklyn Civil Court move to 210 Joralemon St</project_name><description>Relocation of Brooklyn Civil and Housing Court to 210 Joralemon St</description><category>Public Safety and Criminal Justice</category><borough>Brooklyn</borough><managing_agency>DCAS</managing_agency><client_agency>DCAS</client_agency><current_phase>Design</current_phase><design_start>2016-07-27T00:00:00</design_start><budget_forecast>251443000.00</budget_forecast><latest_budget_changes>-8302000.00</latest_budget_changes><total_budget_changes>200931011.96</total_budget_changes><forecast_completion>2023-03-17T00:00:00</forecast_completion><latest_schedule_changes>16</latest_schedule_changes><total_schedule_changes>1977</total_schedule_changes></row><row _id="row-8tai.d7zr.9mh9" _uuid="00000000-0000-0000-2F26-6012EC76AD15" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-8tai.d7zr.9mh9"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>509</pid><project_name>Brooklyn Civil Court move to 210 Joralemon St</project_name><description>Relocation of Brooklyn Civil and Housing Court to 210 Joralemon St</description><category>Public Safety and Criminal Justice</category><borough>Brooklyn</borough><managing_agency>DCAS</managing_agency><client_agency>DCAS</client_agency><current_phase>Design</current_phase><design_start>2016-07-27T00:00:00</design_start><budget_forecast>251443000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>200931011.96</total_budget_changes><forecast_completion>2023-06-17T00:00:00</forecast_completion><latest_schedule_changes>92</latest_schedule_changes><total_schedule_changes>1977</total_schedule_changes></row><row _id="row-zqg7~ry3f~ci8p" _uuid="00000000-0000-0000-77DF-47E83B8D87C5" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-zqg7~ry3f~ci8p"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>509</pid><project_name>Brooklyn Civil Court move to 210 Joralemon St</project_name><description>Relocation of Brooklyn Civil and Housing Court to 210 Joralemon St</description><category>Public Safety and Criminal Justice</category><borough>Brooklyn</borough><managing_agency>DCAS</managing_agency><client_agency>DCAS</client_agency><current_phase>Construction Procurement</current_phase><design_start>2016-07-27T00:00:00</design_start><budget_forecast>251443000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>200931011.96</total_budget_changes><forecast_completion>2023-09-04T00:00:00</forecast_completion><latest_schedule_changes>79</latest_schedule_changes><total_schedule_changes>1977</total_schedule_changes></row><row _id="row-6egy-9trf~njgh" _uuid="00000000-0000-0000-590D-9C7087B2B2E8" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-6egy-9trf~njgh"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>509</pid><project_name>Brooklyn Civil Court move to 210 Joralemon St</project_name><description>Relocation of Brooklyn Civil and Housing Court to 210 Joralemon St</description><category>Public Safety and Criminal Justice</category><borough>Brooklyn</borough><managing_agency>DCAS</managing_agency><client_agency>DCAS</client_agency><current_phase>Construction Procurement</current_phase><design_start>2016-07-27T00:00:00</design_start><budget_forecast>251443000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>200931011.96</total_budget_changes><forecast_completion>2024-02-02T00:00:00</forecast_completion><latest_schedule_changes>151</latest_schedule_changes><total_schedule_changes>1977</total_schedule_changes></row><row _id="row-x7zb~sctd-w954" _uuid="00000000-0000-0000-B2E2-4BD58D041C69" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-x7zb~sctd-w954"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>509</pid><project_name>Brooklyn Civil Court move to 210 Joralemon St</project_name><description>Relocation of Brooklyn Civil and Housing Court to 210 Joralemon St</description><category>Public Safety and Criminal Justice</category><borough>Brooklyn</borough><managing_agency>DCAS</managing_agency><client_agency>DCAS</client_agency><current_phase>Construction Procurement</current_phase><design_start>2016-07-27T00:00:00</design_start><budget_forecast>251443000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>200931011.96</total_budget_changes><forecast_completion>2024-08-01T00:00:00</forecast_completion><latest_schedule_changes>181</latest_schedule_changes><total_schedule_changes>1977</total_schedule_changes></row><row _id="row-7qmd~pqyi.f9x9" _uuid="00000000-0000-0000-3445-C762C0FEA782" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-7qmd~pqyi.f9x9"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>509</pid><project_name>Brooklyn Civil Court move to 210 Joralemon St</project_name><description>Relocation of Brooklyn Civil and Housing Court to 210 Joralemon St</description><category>Public Safety and Criminal Justice</category><borough>Brooklyn</borough><managing_agency>DCAS</managing_agency><client_agency>DCAS</client_agency><current_phase>Construction Procurement</current_phase><design_start>2016-07-27T00:00:00</design_start><budget_forecast>251443000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>200931011.96</total_budget_changes><forecast_completion>2024-08-01T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1977</total_schedule_changes></row><row _id="row-jcgf.bqcv~kjwm" _uuid="00000000-0000-0000-31C2-E4EA5E491154" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-jcgf.bqcv~kjwm"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>509</pid><project_name>Brooklyn Civil Court move to 210 Joralemon St</project_name><description>Relocation of Brooklyn Civil and Housing Court to 210 Joralemon St</description><category>Public Safety and Criminal Justice</category><borough>Brooklyn</borough><managing_agency>DCAS</managing_agency><client_agency>DCAS</client_agency><current_phase>Construction Procurement</current_phase><design_start>2016-07-27T00:00:00</design_start><budget_forecast>251443000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>200931011.96</total_budget_changes><forecast_completion>2025-01-31T00:00:00</forecast_completion><latest_schedule_changes>183</latest_schedule_changes><total_schedule_changes>1977</total_schedule_changes></row><row _id="row-av9v~uwin-6tdw" _uuid="00000000-0000-0000-B388-53BCAC563E77" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-av9v~uwin-6tdw"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>509</pid><project_name>Brooklyn Civil Court move to 210 Joralemon St</project_name><description>Relocation of Brooklyn Civil and Housing Court to 210 Joralemon St</description><category>Public Safety and Criminal Justice</category><borough>Brooklyn</borough><managing_agency>DCAS</managing_agency><client_agency>DCAS</client_agency><current_phase>Construction</current_phase><design_start>2016-07-27T00:00:00</design_start><budget_forecast>254101000.00</budget_forecast><latest_budget_changes>2658000.00</latest_budget_changes><total_budget_changes>200931011.96</total_budget_changes><forecast_completion>2025-01-03T00:00:00</forecast_completion><latest_schedule_changes>-28</latest_schedule_changes><total_schedule_changes>1977</total_schedule_changes></row><row _id="row-7fz8.dh7j.d9cg" _uuid="00000000-0000-0000-BFEF-AF1C2F85D30A" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-7fz8.dh7j.d9cg"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>509</pid><project_name>Brooklyn Civil Court move to 210 Joralemon St</project_name><category>Public Safety and Criminal Justice</category><borough>Brooklyn</borough><managing_agency>DCAS</managing_agency><client_agency>DCAS</client_agency><total_budget_changes>200931011.96</total_budget_changes><total_schedule_changes>1977</total_schedule_changes></row><row _id="row-qeht.78gb_mx2p" _uuid="00000000-0000-0000-E85F-8579565307C1" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-qeht.78gb_mx2p"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>509</pid><project_name>Brooklyn Civil Court move to 210 Joralemon St</project_name><description>Relocation of Brooklyn Civil and Housing Court to 210 Joralemon St</description><category>Public Safety and Criminal Justice</category><borough>Brooklyn</borough><managing_agency>DCAS</managing_agency><client_agency>DCAS</client_agency><current_phase>Construction</current_phase><design_start>2016-07-27T00:00:00</design_start><budget_forecast>281430011.96</budget_forecast><latest_budget_changes>27329011.96</latest_budget_changes><total_budget_changes>200931011.96</total_budget_changes><forecast_completion>2025-06-03T00:00:00</forecast_completion><latest_schedule_changes>151</latest_schedule_changes><total_schedule_changes>1977</total_schedule_changes></row><row _id="row-cgnz~twva_b67a" _uuid="00000000-0000-0000-1844-A5563405A92F" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-cgnz~twva_b67a"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>509</pid><project_name>Brooklyn Civil Court move to 210 Joralemon St</project_name><description>Relocation of Brooklyn Civil and Housing Court to 210 Joralemon St</description><category>Public Safety and Criminal Justice</category><borough>Brooklyn</borough><managing_agency>DCAS</managing_agency><client_agency>DCAS</client_agency><current_phase>Construction</current_phase><design_start>2016-07-27T00:00:00</design_start><budget_forecast>281430011.96</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>200931011.96</total_budget_changes><forecast_completion>2026-03-31T00:00:00</forecast_completion><latest_schedule_changes>301</latest_schedule_changes><total_schedule_changes>1977</total_schedule_changes></row><row _id="row-a239.4pwe_e4ty" _uuid="00000000-0000-0000-A918-079F27846047" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-a239.4pwe_e4ty"><date_reported_as_of>2017-04-01T00:00:00</date_reported_as_of><pid>510</pid><project_name>Brooklyn Supreme Court Fire Alarm System Upgrade</project_name><description>New Fire Alarm and Sprinkler System at 360 Adams Street Kings County Supreme Courhouse</description><category>Public Safety and Criminal Justice</category><borough>Brooklyn</borough><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><current_phase>Design</current_phase><design_start>2017-03-31T00:00:00</design_start><budget_forecast>47040232.00</budget_forecast><latest_budget_changes>3730232.00</latest_budget_changes><total_budget_changes>47003000.00</total_budget_changes><forecast_completion>2022-11-01T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1533</total_schedule_changes></row><row _id="row-m375_m8hi.kjnu" _uuid="00000000-0000-0000-2805-19317B6A2952" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-m375_m8hi.kjnu"><date_reported_as_of>2017-09-01T00:00:00</date_reported_as_of><pid>510</pid><project_name>Brooklyn Supreme Court Fire Alarm System Upgrade</project_name><description>New Fire Alarm and Sprinkler System at 360 Adams Street Kings County Supreme Courhouse</description><category>Public Safety and Criminal Justice</category><borough>Brooklyn</borough><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><current_phase>Design</current_phase><design_start>2017-03-31T00:00:00</design_start><budget_forecast>39623232.00</budget_forecast><latest_budget_changes>-7417000.00</latest_budget_changes><total_budget_changes>47003000.00</total_budget_changes><forecast_completion>2022-12-30T00:00:00</forecast_completion><latest_schedule_changes>59</latest_schedule_changes><total_schedule_changes>1533</total_schedule_changes></row><row _id="row-g7p9.xbgy~msbn" _uuid="00000000-0000-0000-8469-6469F62773D9" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-g7p9.xbgy~msbn"><date_reported_as_of>2018-03-01T00:00:00</date_reported_as_of><pid>510</pid><project_name>Brooklyn Supreme Court Fire Alarm System Upgrade</project_name><description>New Fire Alarm and Sprinkler System at 360 Adams Street Kings County Supreme Courhouse</description><category>Public Safety and Criminal Justice</category><borough>Brooklyn</borough><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><current_phase>Design</current_phase><design_start>2017-03-31T00:00:00</design_start><budget_forecast>57503747.00</budget_forecast><latest_budget_changes>17880515.00</latest_budget_changes><total_budget_changes>47003000.00</total_budget_changes><forecast_completion>2022-04-12T00:00:00</forecast_completion><latest_schedule_changes>-262</latest_schedule_changes><total_schedule_changes>1533</total_schedule_changes></row><row _id="row-ijax-57vd~2i2c" _uuid="00000000-0000-0000-266E-90AD58DB4924" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ijax-57vd~2i2c"><date_reported_as_of>2018-08-01T00:00:00</date_reported_as_of><pid>510</pid><project_name>Brooklyn Supreme Court Fire Alarm System Upgrade</project_name><description>New Fire Alarm and Sprinkler System at 360 Adams Street Kings County Supreme Courhouse</description><category>Public Safety and Criminal Justice</category><borough>Brooklyn</borough><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><current_phase>Design</current_phase><design_start>2017-03-31T00:00:00</design_start><budget_forecast>57702000.00</budget_forecast><latest_budget_changes>198253.00</latest_budget_changes><total_budget_changes>47003000.00</total_budget_changes><forecast_completion>2022-11-01T00:00:00</forecast_completion><latest_schedule_changes>203</latest_schedule_changes><total_schedule_changes>1533</total_schedule_changes></row><row _id="row-ktwu.yfvq.ym5r" _uuid="00000000-0000-0000-6121-8ABEAB19A9F0" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ktwu.yfvq.ym5r"><date_reported_as_of>2019-01-01T00:00:00</date_reported_as_of><pid>510</pid><project_name>Brooklyn Supreme Court Fire Alarm System Upgrade</project_name><description>New Fire Alarm and Sprinkler System at 360 Adams Street Kings County Supreme Courhouse</description><category>Public Safety and Criminal Justice</category><borough>Brooklyn</borough><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><current_phase>Design</current_phase><design_start>2017-03-31T00:00:00</design_start><budget_forecast>57961818.00</budget_forecast><latest_budget_changes>259818.00</latest_budget_changes><total_budget_changes>47003000.00</total_budget_changes><forecast_completion>2023-07-23T00:00:00</forecast_completion><latest_schedule_changes>264</latest_schedule_changes><total_schedule_changes>1533</total_schedule_changes></row><row _id="row-3247-x986-uqcq" _uuid="00000000-0000-0000-3C5B-9D429302435F" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-3247-x986-uqcq"><date_reported_as_of>2019-05-01T00:00:00</date_reported_as_of><pid>510</pid><project_name>Brooklyn Supreme Court Fire Alarm System Upgrade</project_name><description>Brooklyn Supreme Court, Fire Alarm, Sprinkler, 360 Adams Street - New addressable fire detection and alarm system and new sprinkler system.</description><category>Public Safety and Criminal Justice</category><borough>Brooklyn</borough><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><current_phase>Design</current_phase><design_start>2017-03-31T00:00:00</design_start><budget_forecast>58062000.00</budget_forecast><latest_budget_changes>100182.00</latest_budget_changes><total_budget_changes>47003000.00</total_budget_changes><forecast_completion>2023-12-01T00:00:00</forecast_completion><latest_schedule_changes>131</latest_schedule_changes><total_schedule_changes>1533</total_schedule_changes></row><row _id="row-cdhj~37jy~ccyi" _uuid="00000000-0000-0000-0FF6-50999AA26022" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-cdhj~37jy~ccyi"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>510</pid><project_name>Brooklyn Supreme Court Fire Alarm System Upgrade</project_name><description>Brooklyn Supreme Court, Fire Alarm, Sprinkler, 360 Adams Street - New addressable fire detection and alarm system and new sprinkler system.</description><category>Public Safety and Criminal Justice</category><borough>Brooklyn</borough><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><current_phase>Design</current_phase><design_start>2017-03-31T00:00:00</design_start><budget_forecast>63107000.00</budget_forecast><latest_budget_changes>5045000.00</latest_budget_changes><total_budget_changes>47003000.00</total_budget_changes><forecast_completion>2023-12-01T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1533</total_schedule_changes></row><row _id="row-y8fq-fqa7-jukx" _uuid="00000000-0000-0000-1B3B-FAE888EA53A3" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-y8fq-fqa7-jukx"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>510</pid><project_name>Brooklyn Supreme Court Fire Alarm System Upgrade</project_name><category>Public Safety and Criminal Justice</category><borough>Brooklyn</borough><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><total_budget_changes>47003000.00</total_budget_changes><total_schedule_changes>1533</total_schedule_changes></row><row _id="row-iihz~z8xb~3bbi" _uuid="00000000-0000-0000-C5CC-627E8D20E0C9" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-iihz~z8xb~3bbi"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>510</pid><project_name>Brooklyn Supreme Court Fire Alarm System Upgrade</project_name><category>Public Safety and Criminal Justice</category><borough>Brooklyn</borough><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><total_budget_changes>47003000.00</total_budget_changes><total_schedule_changes>1533</total_schedule_changes></row><row _id="row-tywx_buay~np24" _uuid="00000000-0000-0000-5A58-E973C98848F8" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-tywx_buay~np24"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>510</pid><project_name>Brooklyn Supreme Court Fire Alarm System Upgrade</project_name><category>Public Safety and Criminal Justice</category><borough>Brooklyn</borough><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><total_budget_changes>47003000.00</total_budget_changes><total_schedule_changes>1533</total_schedule_changes></row><row _id="row-2gz7_m9fd-zf4q" _uuid="00000000-0000-0000-E37D-8E366F858E91" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-2gz7_m9fd-zf4q"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>510</pid><project_name>Brooklyn Supreme Court Fire Alarm System Upgrade</project_name><category>Public Safety and Criminal Justice</category><borough>Brooklyn</borough><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><total_budget_changes>47003000.00</total_budget_changes><total_schedule_changes>1533</total_schedule_changes></row><row _id="row-6jq4_p62j~y6ux" _uuid="00000000-0000-0000-F58E-26B4ADDB0C80" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-6jq4_p62j~y6ux"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>510</pid><project_name>Brooklyn Supreme Court Fire Alarm System Upgrade</project_name><description>Brooklyn Supreme Court, Fire Alarm, Sprinkler, 360 Adams Street - New addressable fire detection and alarm system and new sprinkler system.</description><category>Public Safety and Criminal Justice</category><borough>Brooklyn</borough><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><current_phase>Design</current_phase><design_start>2017-03-31T00:00:00</design_start><budget_forecast>90161000.00</budget_forecast><latest_budget_changes>27054000.00</latest_budget_changes><total_budget_changes>47003000.00</total_budget_changes><forecast_completion>2025-11-26T00:00:00</forecast_completion><latest_schedule_changes>726</latest_schedule_changes><total_schedule_changes>1533</total_schedule_changes></row><row _id="row-9tu3~54s8-m7kk" _uuid="00000000-0000-0000-B68F-0AFEC060F621" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-9tu3~54s8-m7kk"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>510</pid><project_name>Brooklyn Supreme Court Fire Alarm System Upgrade</project_name><description>Brooklyn Supreme Court, Fire Alarm, Sprinkler, 360 Adams Street - New addressable fire detection and alarm system and new sprinkler system.</description><category>Public Safety and Criminal Justice</category><borough>Brooklyn</borough><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><current_phase>Design</current_phase><design_start>2017-03-31T00:00:00</design_start><budget_forecast>90161000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>47003000.00</total_budget_changes><forecast_completion>2026-03-30T00:00:00</forecast_completion><latest_schedule_changes>124</latest_schedule_changes><total_schedule_changes>1533</total_schedule_changes></row><row _id="row-paqa.ptby.ymmc" _uuid="00000000-0000-0000-9F26-A1A4DBAC2FEE" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-paqa.ptby.ymmc"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>510</pid><project_name>Brooklyn Supreme Court Fire Alarm System Upgrade</project_name><description>Brooklyn Supreme Court, Fire Alarm, Sprinkler, 360 Adams Street - New addressable fire detection and alarm system and new sprinkler system.</description><category>Public Safety and Criminal Justice</category><borough>Brooklyn</borough><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><current_phase>Design</current_phase><design_start>2017-03-31T00:00:00</design_start><budget_forecast>90193000.00</budget_forecast><latest_budget_changes>32000.00</latest_budget_changes><total_budget_changes>47003000.00</total_budget_changes><forecast_completion>2026-06-30T00:00:00</forecast_completion><latest_schedule_changes>92</latest_schedule_changes><total_schedule_changes>1533</total_schedule_changes></row><row _id="row-4nsw_u7hj-5vqg" _uuid="00000000-0000-0000-1D29-2F9DCC81F252" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-4nsw_u7hj-5vqg"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>510</pid><project_name>Brooklyn Supreme Court Fire Alarm System Upgrade</project_name><description>Brooklyn Supreme Court, Fire Alarm, Sprinkler, 360 Adams Street - New addressable fire detection and alarm system and new sprinkler system.</description><category>Public Safety and Criminal Justice</category><borough>Brooklyn</borough><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><current_phase>Design</current_phase><design_start>2017-03-31T00:00:00</design_start><budget_forecast>90313000.00</budget_forecast><latest_budget_changes>120000.00</latest_budget_changes><total_budget_changes>47003000.00</total_budget_changes><forecast_completion>2026-09-29T00:00:00</forecast_completion><latest_schedule_changes>91</latest_schedule_changes><total_schedule_changes>1533</total_schedule_changes></row><row _id="row-nn25.itpy-6z6r" _uuid="00000000-0000-0000-24F3-B73D6420B767" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-nn25.itpy-6z6r"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>510</pid><project_name>Brooklyn Supreme Court Fire Alarm System Upgrade</project_name><description>Brooklyn Supreme Court, Fire Alarm, Sprinkler, 360 Adams Street - New addressable fire detection and alarm system and new sprinkler system.</description><category>Public Safety and Criminal Justice</category><borough>Brooklyn</borough><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><current_phase>Design</current_phase><design_start>2017-03-31T00:00:00</design_start><budget_forecast>90313000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>47003000.00</total_budget_changes><forecast_completion>2027-01-12T00:00:00</forecast_completion><latest_schedule_changes>105</latest_schedule_changes><total_schedule_changes>1533</total_schedule_changes></row><row _id="row-h9g2~2tmv-jsy4" _uuid="00000000-0000-0000-2437-2FD260205474" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-h9g2~2tmv-jsy4"><date_reported_as_of>2016-06-01T00:00:00</date_reported_as_of><pid>516</pid><project_name>Coney Island Area, Phase 3A</project_name><description>Reconstruction of Storm and Sanitary sewers, Trunk and Distribution Water Main in Coney Island Area -Phase 3A, Borough of Brooklyn.</description><category>Industrial Development</category><borough>Brooklyn</borough><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Design</current_phase><design_start>2014-03-17T00:00:00</design_start><budget_forecast>38153000.00</budget_forecast><total_budget_changes>25273000.00</total_budget_changes><forecast_completion>2020-07-30T00:00:00</forecast_completion><total_schedule_changes>1215</total_schedule_changes></row><row _id="row-d3fd-dycp_wbs2" _uuid="00000000-0000-0000-B1D2-0A2D02B62AAE" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-d3fd-dycp_wbs2"><date_reported_as_of>2016-11-01T00:00:00</date_reported_as_of><pid>516</pid><project_name>Coney Island Area, Phase 3A</project_name><description>Reconstruction of Storm and Sanitary sewers, Trunk and Distribution Water Main in Coney Island Area -Phase 3A, Borough of Brooklyn.</description><category>Industrial Development</category><borough>Brooklyn</borough><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Design</current_phase><design_start>2014-03-17T00:00:00</design_start><budget_forecast>39427000.00</budget_forecast><latest_budget_changes>1274000.00</latest_budget_changes><total_budget_changes>25273000.00</total_budget_changes><forecast_completion>2021-07-08T00:00:00</forecast_completion><latest_schedule_changes>343</latest_schedule_changes><total_schedule_changes>1215</total_schedule_changes></row><row _id="row-3ah6.3v3i~5h7b" _uuid="00000000-0000-0000-9C26-AE0B5C035241" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-3ah6.3v3i~5h7b"><date_reported_as_of>2017-04-01T00:00:00</date_reported_as_of><pid>516</pid><project_name>Coney Island Area, Phase 3A</project_name><description>Reconstruction of Storm and Sanitary sewers, Trunk and Distribution Water Main in Coney Island Area -Phase 3A, Borough of Brooklyn.</description><category>Industrial Development</category><borough>Brooklyn</borough><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Design</current_phase><design_start>2014-03-17T00:00:00</design_start><budget_forecast>39427000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>25273000.00</total_budget_changes><forecast_completion>2021-07-08T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1215</total_schedule_changes></row><row _id="row-7nuk-5x3k.wj2a" _uuid="00000000-0000-0000-05AC-7F9E41B36888" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-7nuk-5x3k.wj2a"><date_reported_as_of>2017-09-01T00:00:00</date_reported_as_of><pid>516</pid><project_name>Coney Island Area, Phase 3A</project_name><description>Reconstruction of Storm and Sanitary sewers, Trunk and Distribution Water Main in Coney Island Area -Phase 3A, Borough of Brooklyn.</description><category>Industrial Development</category><borough>Brooklyn</borough><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Design</current_phase><design_start>2014-03-17T00:00:00</design_start><budget_forecast>39427000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>25273000.00</total_budget_changes><forecast_completion>2021-09-06T00:00:00</forecast_completion><latest_schedule_changes>60</latest_schedule_changes><total_schedule_changes>1215</total_schedule_changes></row><row _id="row-7ab2_ithy_exvz" _uuid="00000000-0000-0000-822D-4C13995676EC" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-7ab2_ithy_exvz"><date_reported_as_of>2018-03-01T00:00:00</date_reported_as_of><pid>516</pid><project_name>Coney Island Area, Phase 3A</project_name><description>Reconstruction of Storm and Sanitary sewers, Trunk and Distribution Water Main in Coney Island Area -Phase 3A, Borough of Brooklyn.</description><category>Industrial Development</category><borough>Brooklyn</borough><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction Procurement</current_phase><design_start>2014-03-17T00:00:00</design_start><budget_forecast>39427000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>25273000.00</total_budget_changes><forecast_completion>2021-08-15T00:00:00</forecast_completion><latest_schedule_changes>-22</latest_schedule_changes><total_schedule_changes>1215</total_schedule_changes></row><row _id="row-6ncw_8s7n-zes5" _uuid="00000000-0000-0000-946D-8B7B2F1C41B6" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-6ncw_8s7n-zes5"><date_reported_as_of>2018-08-01T00:00:00</date_reported_as_of><pid>516</pid><project_name>Coney Island Area, Phase 3A</project_name><description>Reconstruction of Storm and Sanitary sewers, Trunk and Distribution Water Main in Coney Island Area -Phase 3A, Borough of Brooklyn.</description><category>Industrial Development</category><borough>Brooklyn</borough><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction Procurement</current_phase><design_start>2014-03-17T00:00:00</design_start><budget_forecast>61315000.00</budget_forecast><latest_budget_changes>21888000.00</latest_budget_changes><total_budget_changes>25273000.00</total_budget_changes><forecast_completion>2022-11-27T00:00:00</forecast_completion><latest_schedule_changes>469</latest_schedule_changes><total_schedule_changes>1215</total_schedule_changes></row><row _id="row-cqrw.hds7.cxpa" _uuid="00000000-0000-0000-8918-947B81C26490" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-cqrw.hds7.cxpa"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>1201</pid><project_name>GATEWAY ESTATE - PHASE E/BED-805</project_name><description>Reconstruction of Gateway Estates Area (Nehemiah Creek) including sewer, watermain, street lighting and traffic signal work. Phase E</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>HPD</client_agency><current_phase>Construction</current_phase><design_start>2013-11-17T00:00:00</design_start><budget_forecast>82755000.00</budget_forecast><latest_budget_changes>20691000.00</latest_budget_changes><total_budget_changes>38077000.00</total_budget_changes><forecast_completion>2023-09-30T00:00:00</forecast_completion><latest_schedule_changes>457</latest_schedule_changes><total_schedule_changes>584</total_schedule_changes></row><row _id="row-msxg_tn3p~zq29" _uuid="00000000-0000-0000-1000-8CA8907C8FEC" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-msxg_tn3p~zq29"><date_reported_as_of>2019-01-01T00:00:00</date_reported_as_of><pid>516</pid><project_name>Coney Island Area, Phase 3A</project_name><description>Reconstruction of Storm and Sanitary sewers, Trunk and Distribution Water Main in Coney Island Area -Phase 3A, Borough of Brooklyn.</description><category>Industrial Development</category><borough>Brooklyn</borough><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction Procurement</current_phase><design_start>2014-03-17T00:00:00</design_start><budget_forecast>61616000.00</budget_forecast><latest_budget_changes>301000.00</latest_budget_changes><total_budget_changes>25273000.00</total_budget_changes><forecast_completion>2022-11-27T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1215</total_schedule_changes></row><row _id="row-z4ts_ttdm_sgn8" _uuid="00000000-0000-0000-8207-E78E08321394" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-z4ts_ttdm_sgn8"><date_reported_as_of>2019-05-01T00:00:00</date_reported_as_of><pid>516</pid><project_name>Coney Island Area, Phase 3A</project_name><description>Reconstruction of Storm and Sanitary sewer, Trunk and distribution water main in Coney Island area - Phase 3A, Borough of Brooklyn</description><category>Industrial Development</category><borough>Brooklyn</borough><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction Procurement</current_phase><design_start>2014-03-17T00:00:00</design_start><budget_forecast>61696000.00</budget_forecast><latest_budget_changes>80000.00</latest_budget_changes><total_budget_changes>25273000.00</total_budget_changes><forecast_completion>2023-10-27T00:00:00</forecast_completion><latest_schedule_changes>334</latest_schedule_changes><total_schedule_changes>1215</total_schedule_changes></row><row _id="row-ckdw~zpbs_gn8m" _uuid="00000000-0000-0000-C893-1EFC5B636986" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ckdw~zpbs_gn8m"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>516</pid><project_name>Coney Island Area, Phase 3A</project_name><description>Reconstruction of Storm and Sanitary sewer, Trunk and distribution water main in Coney Island area - Phase 3A, Borough of Brooklyn</description><category>Industrial Development</category><borough>Brooklyn</borough><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction Procurement</current_phase><design_start>2014-03-17T00:00:00</design_start><budget_forecast>61546000.00</budget_forecast><latest_budget_changes>-150000.00</latest_budget_changes><total_budget_changes>25273000.00</total_budget_changes><forecast_completion>2023-10-27T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1215</total_schedule_changes></row><row _id="row-qzek~bi4x~9x3t" _uuid="00000000-0000-0000-710E-01A9259EDA05" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-qzek~bi4x~9x3t"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>516</pid><project_name>Coney Island Area, Phase 3A</project_name><category>Industrial Development</category><borough>Brooklyn</borough><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><total_budget_changes>25273000.00</total_budget_changes><total_schedule_changes>1215</total_schedule_changes></row><row _id="row-n8xq.8jqh_vqvn" _uuid="00000000-0000-0000-D4DE-D870A1313A39" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-n8xq.8jqh_vqvn"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>516</pid><project_name>Coney Island Area, Phase 3A</project_name><category>Industrial Development</category><borough>Brooklyn</borough><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><total_budget_changes>25273000.00</total_budget_changes><total_schedule_changes>1215</total_schedule_changes></row><row _id="row-jamw-avg7-th9d" _uuid="00000000-0000-0000-A6A5-511FE34DEAC0" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-jamw-avg7-th9d"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>516</pid><project_name>Coney Island Area, Phase 3A</project_name><category>Industrial Development</category><borough>Brooklyn</borough><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><total_budget_changes>25273000.00</total_budget_changes><total_schedule_changes>1215</total_schedule_changes></row><row _id="row-6qhg~p283.6n8q" _uuid="00000000-0000-0000-4DCA-D6D750BA6366" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-6qhg~p283.6n8q"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>516</pid><project_name>Coney Island Area, Phase 3A</project_name><category>Industrial Development</category><borough>Brooklyn</borough><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><total_budget_changes>25273000.00</total_budget_changes><total_schedule_changes>1215</total_schedule_changes></row><row _id="row-wb65~cxe6_ih46" _uuid="00000000-0000-0000-D308-260ABC4C6CF7" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-wb65~cxe6_ih46"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>516</pid><project_name>Coney Island Area, Phase 3A</project_name><description>Reconstruction of Storm and Sanitary sewer, Trunk and distribution water main in Coney Island area - Phase 3A, Borough of Brooklyn</description><category>Industrial Development</category><borough>Brooklyn</borough><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction</current_phase><design_start>2014-03-17T00:00:00</design_start><budget_forecast>62922000.00</budget_forecast><latest_budget_changes>1376000.00</latest_budget_changes><total_budget_changes>25273000.00</total_budget_changes><forecast_completion>2023-11-27T00:00:00</forecast_completion><latest_schedule_changes>31</latest_schedule_changes><total_schedule_changes>1215</total_schedule_changes></row><row _id="row-yd47~4pdf.2pd2" _uuid="00000000-0000-0000-6A78-6B71F61725CB" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-yd47~4pdf.2pd2"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>516</pid><project_name>Coney Island Area, Phase 3A</project_name><description>Reconstruction of Storm and Sanitary sewer, Trunk and distribution water main in Coney Island area - Phase 3A, Borough of Brooklyn</description><category>Industrial Development</category><borough>Brooklyn</borough><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction</current_phase><design_start>2014-03-17T00:00:00</design_start><budget_forecast>63020000.00</budget_forecast><latest_budget_changes>98000.00</latest_budget_changes><total_budget_changes>25273000.00</total_budget_changes><forecast_completion>2023-11-27T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1215</total_schedule_changes></row><row _id="row-2pax~nr2b_wjz8" _uuid="00000000-0000-0000-BD2E-FFBBA3D1964E" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-2pax~nr2b_wjz8"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>516</pid><project_name>Coney Island Area, Phase 3A</project_name><description>Reconstruction of Storm and Sanitary sewer, Trunk and distribution water main in Coney Island area - Phase 3A, Borough of Brooklyn</description><category>Industrial Development</category><borough>Brooklyn</borough><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction</current_phase><design_start>2014-03-17T00:00:00</design_start><budget_forecast>63020000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>25273000.00</total_budget_changes><forecast_completion>2023-11-27T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1215</total_schedule_changes></row><row _id="row-u587~egph~idpv" _uuid="00000000-0000-0000-5D6D-B543DB523EF9" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-u587~egph~idpv"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>516</pid><project_name>Coney Island Area, Phase 3A</project_name><description>Reconstruction of Storm and Sanitary sewer, Trunk and distribution water main in Coney Island area - Phase 3A, Borough of Brooklyn</description><category>Industrial Development</category><borough>Brooklyn</borough><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction</current_phase><design_start>2014-03-17T00:00:00</design_start><budget_forecast>63426000.00</budget_forecast><latest_budget_changes>406000.00</latest_budget_changes><total_budget_changes>25273000.00</total_budget_changes><forecast_completion>2023-11-27T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1215</total_schedule_changes></row><row _id="row-q2rn.hq67~e5pa" _uuid="00000000-0000-0000-BBA7-F2EFAAC2C0D1" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-q2rn.hq67~e5pa"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>516</pid><project_name>Coney Island Area, Phase 3A</project_name><description>Reconstruction of Storm and Sanitary sewer, Trunk and distribution water main in Coney Island area - Phase 3A, Borough of Brooklyn</description><category>Industrial Development</category><borough>Brooklyn</borough><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction</current_phase><design_start>2014-03-17T00:00:00</design_start><budget_forecast>63426000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>25273000.00</total_budget_changes><forecast_completion>2023-11-27T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1215</total_schedule_changes></row><row _id="row-ijpv.kfu8~wegg" _uuid="00000000-0000-0000-B7EE-82E1AB4E1312" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ijpv.kfu8~wegg"><date_reported_as_of>2016-11-01T00:00:00</date_reported_as_of><pid>519</pid><project_name>Ped Safety Upgrades on Atlantic Avenue, Phase 2</project_name><description>Safety Improvements on Atlantic Ave from Conduit Avenue to Rockaway Blvd, Phase 2, Brooklyn</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2016-08-04T00:00:00</design_start><budget_forecast>30359852.00</budget_forecast><latest_budget_changes>484348.00</latest_budget_changes><total_budget_changes>10136496.00</total_budget_changes><forecast_completion>2020-07-30T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1400</total_schedule_changes></row><row _id="row-gara_7gy4.pv9d" _uuid="00000000-0000-0000-42A1-34502B18497A" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-gara_7gy4.pv9d"><date_reported_as_of>2017-04-01T00:00:00</date_reported_as_of><pid>519</pid><project_name>Ped Safety Upgrades on Atlantic Avenue, Phase 2</project_name><description>Safety Improvements on Atlantic Ave from Conduit Avenue to Rockaway Blvd, Phase 2, Brooklyn</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2016-08-04T00:00:00</design_start><budget_forecast>37375000.00</budget_forecast><latest_budget_changes>7015148.00</latest_budget_changes><total_budget_changes>10136496.00</total_budget_changes><forecast_completion>2021-02-27T00:00:00</forecast_completion><latest_schedule_changes>212</latest_schedule_changes><total_schedule_changes>1400</total_schedule_changes></row><row _id="row-yy8u-ajfr-r7rf" _uuid="00000000-0000-0000-0C44-CB52C746490A" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-yy8u-ajfr-r7rf"><date_reported_as_of>2017-09-01T00:00:00</date_reported_as_of><pid>519</pid><project_name>Ped Safety Upgrades on Atlantic Avenue, Phase 2</project_name><description>Safety Improvements on Atlantic Ave from Conduit Avenue to Rockaway Blvd, Phase 2, Brooklyn</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2016-08-04T00:00:00</design_start><budget_forecast>39140000.00</budget_forecast><latest_budget_changes>1765000.00</latest_budget_changes><total_budget_changes>10136496.00</total_budget_changes><forecast_completion>2021-02-27T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1400</total_schedule_changes></row><row _id="row-bgn8-bw9u-pz2t" _uuid="00000000-0000-0000-296A-D2F8BA77B942" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-bgn8-bw9u-pz2t"><date_reported_as_of>2018-03-01T00:00:00</date_reported_as_of><pid>519</pid><project_name>Ped Safety Upgrades on Atlantic Avenue, Phase 2</project_name><description>Safety Improvements on Atlantic Ave from Conduit Avenue to Rockaway Blvd, Phase 2, Brooklyn</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2016-08-04T00:00:00</design_start><budget_forecast>39140000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>10136496.00</total_budget_changes><forecast_completion>2021-12-21T00:00:00</forecast_completion><latest_schedule_changes>297</latest_schedule_changes><total_schedule_changes>1400</total_schedule_changes></row><row _id="row-4ic7.yvsv.ganm" _uuid="00000000-0000-0000-43C8-DEC18542EB9C" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-4ic7.yvsv.ganm"><date_reported_as_of>2018-08-01T00:00:00</date_reported_as_of><pid>519</pid><project_name>Ped Safety Upgrades on Atlantic Avenue, Phase 2</project_name><description>Safety Improvements on Atlantic Ave from Conduit Avenue to Rockaway Blvd, Phase 2, Brooklyn</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2016-08-04T00:00:00</design_start><budget_forecast>39473000.00</budget_forecast><latest_budget_changes>333000.00</latest_budget_changes><total_budget_changes>10136496.00</total_budget_changes><forecast_completion>2021-12-21T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1400</total_schedule_changes></row><row _id="row-rddh-ty3u~mh9s" _uuid="00000000-0000-0000-F528-D80CFA5D1BD1" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-rddh-ty3u~mh9s"><date_reported_as_of>2019-01-01T00:00:00</date_reported_as_of><pid>519</pid><project_name>Ped Safety Upgrades on Atlantic Avenue, Phase 2</project_name><description>Safety Improvements on Atlantic Ave from Conduit Avenue to Rockaway Blvd, Phase 2, Brooklyn</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2016-08-04T00:00:00</design_start><budget_forecast>44269000.00</budget_forecast><latest_budget_changes>4796000.00</latest_budget_changes><total_budget_changes>10136496.00</total_budget_changes><forecast_completion>2022-06-17T00:00:00</forecast_completion><latest_schedule_changes>178</latest_schedule_changes><total_schedule_changes>1400</total_schedule_changes></row><row _id="row-nqyd-4hfh_5j8v" _uuid="00000000-0000-0000-4204-E30BEB0C6B67" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-nqyd-4hfh_5j8v"><date_reported_as_of>2019-05-01T00:00:00</date_reported_as_of><pid>519</pid><project_name>Ped Safety Upgrades on Atlantic Avenue, Phase 2</project_name><description>PED. SAFETY UPGRADES ON ATLANTIC AVE - PH 2, BROOKLYN</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2016-08-04T00:00:00</design_start><budget_forecast>39983000.00</budget_forecast><latest_budget_changes>-4286000.00</latest_budget_changes><total_budget_changes>10136496.00</total_budget_changes><forecast_completion>2022-11-19T00:00:00</forecast_completion><latest_schedule_changes>155</latest_schedule_changes><total_schedule_changes>1400</total_schedule_changes></row><row _id="row-9s3s_frxt~d9na" _uuid="00000000-0000-0000-65B4-8B1186F76DC6" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-9s3s_frxt~d9na"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>519</pid><project_name>Ped Safety Upgrades on Atlantic Avenue, Phase 2</project_name><description>PED. SAFETY UPGRADES ON ATLANTIC AVE - PH 2, BROOKLYN</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2016-08-04T00:00:00</design_start><budget_forecast>39964000.00</budget_forecast><latest_budget_changes>-19000.00</latest_budget_changes><total_budget_changes>10136496.00</total_budget_changes><forecast_completion>2023-02-01T00:00:00</forecast_completion><latest_schedule_changes>74</latest_schedule_changes><total_schedule_changes>1400</total_schedule_changes></row><row _id="row-qcff.crvu-qpui" _uuid="00000000-0000-0000-53E1-96A6A3220B87" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-qcff.crvu-qpui"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>519</pid><project_name>Ped Safety Upgrades on Atlantic Avenue, Phase 2</project_name><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><total_budget_changes>10136496.00</total_budget_changes><total_schedule_changes>1400</total_schedule_changes></row><row _id="row-uzw3_dfkh.27m6" _uuid="00000000-0000-0000-7D81-C390D37A0ED1" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-uzw3_dfkh.27m6"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>519</pid><project_name>Ped Safety Upgrades on Atlantic Avenue, Phase 2</project_name><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><total_budget_changes>10136496.00</total_budget_changes><total_schedule_changes>1400</total_schedule_changes></row><row _id="row-tyj9-5msq.q7n6" _uuid="00000000-0000-0000-48F4-DAFC25131B76" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-tyj9-5msq.q7n6"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>519</pid><project_name>Ped Safety Upgrades on Atlantic Avenue, Phase 2</project_name><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><total_budget_changes>10136496.00</total_budget_changes><total_schedule_changes>1400</total_schedule_changes></row><row _id="row-jjeq-atur-mga5" _uuid="00000000-0000-0000-0DE2-3C6873282B74" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-jjeq-atur-mga5"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>519</pid><project_name>Ped Safety Upgrades on Atlantic Avenue, Phase 2</project_name><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><total_budget_changes>10136496.00</total_budget_changes><total_schedule_changes>1400</total_schedule_changes></row><row _id="row-nxsj_e2jj_uky9" _uuid="00000000-0000-0000-0D84-208123EF9B33" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-nxsj_e2jj_uky9"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>519</pid><project_name>Ped Safety Upgrades on Atlantic Avenue, Phase 2</project_name><description>PED. SAFETY UPGRADES ON ATLANTIC AVE - PH 2, BROOKLYN</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Construction</current_phase><design_start>2016-08-04T00:00:00</design_start><budget_forecast>40140000.00</budget_forecast><latest_budget_changes>176000.00</latest_budget_changes><total_budget_changes>10136496.00</total_budget_changes><forecast_completion>2024-05-30T00:00:00</forecast_completion><latest_schedule_changes>484</latest_schedule_changes><total_schedule_changes>1400</total_schedule_changes></row><row _id="row-wfyx~hq64_6p72" _uuid="00000000-0000-0000-C0C2-178B91876AE9" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-wfyx~hq64_6p72"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>519</pid><project_name>Ped Safety Upgrades on Atlantic Avenue, Phase 2</project_name><description>PED. SAFETY UPGRADES ON ATLANTIC AVE - PH 2, BROOKLYN</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Construction</current_phase><design_start>2016-08-04T00:00:00</design_start><budget_forecast>39544000.00</budget_forecast><latest_budget_changes>-596000.00</latest_budget_changes><total_budget_changes>10136496.00</total_budget_changes><forecast_completion>2024-05-30T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1400</total_schedule_changes></row><row _id="row-f4jp-apbm~3va9" _uuid="00000000-0000-0000-28EA-CCCB82574154" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-f4jp-apbm~3va9"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>519</pid><project_name>Ped Safety Upgrades on Atlantic Avenue, Phase 2</project_name><description>PED. SAFETY UPGRADES ON ATLANTIC AVE - PH 2, BROOKLYN</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Construction</current_phase><design_start>2016-08-04T00:00:00</design_start><budget_forecast>40013000.00</budget_forecast><latest_budget_changes>469000.00</latest_budget_changes><total_budget_changes>10136496.00</total_budget_changes><forecast_completion>2024-05-30T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1400</total_schedule_changes></row><row _id="row-yush.4sx9_c7rz" _uuid="00000000-0000-0000-15FF-BE24699F7856" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-yush.4sx9_c7rz"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>519</pid><project_name>Ped Safety Upgrades on Atlantic Avenue, Phase 2</project_name><description>PED. SAFETY UPGRADES ON ATLANTIC AVE - PH 2, BROOKLYN</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Construction</current_phase><design_start>2016-08-04T00:00:00</design_start><budget_forecast>40012000.00</budget_forecast><latest_budget_changes>-1000.00</latest_budget_changes><total_budget_changes>10136496.00</total_budget_changes><forecast_completion>2024-05-30T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1400</total_schedule_changes></row><row _id="row-2u6b_v84u_fkwa" _uuid="00000000-0000-0000-DC87-0869E291BBD8" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-2u6b_v84u_fkwa"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>519</pid><project_name>Ped Safety Upgrades on Atlantic Avenue, Phase 2</project_name><description>PED. SAFETY UPGRADES ON ATLANTIC AVE - PH 2, BROOKLYN</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Construction</current_phase><design_start>2016-08-04T00:00:00</design_start><budget_forecast>40012000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>10136496.00</total_budget_changes><forecast_completion>2024-05-30T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1400</total_schedule_changes></row><row _id="row-dsnk.rcda.a9p5" _uuid="00000000-0000-0000-91B5-E8D6D9A87F10" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-dsnk.rcda.a9p5"><date_reported_as_of>2016-06-01T00:00:00</date_reported_as_of><pid>522</pid><project_name>Power Distribution at Bowery Bay WWTP</project_name><description>Power Distribution at Bowery Bay WWTP.</description><category>Wastewater Treatment</category><borough>Queens</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2015-11-13T00:00:00</design_start><budget_forecast>45499538.00</budget_forecast><total_budget_changes>24235381.01</total_budget_changes><forecast_completion>2020-12-11T00:00:00</forecast_completion><total_schedule_changes>1684</total_schedule_changes></row><row _id="row-rcef-cyhu.mgcd" _uuid="00000000-0000-0000-836D-1318724C6684" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-rcef-cyhu.mgcd"><date_reported_as_of>2016-11-01T00:00:00</date_reported_as_of><pid>522</pid><project_name>Power Distribution at Bowery Bay WWTP</project_name><description>Power Distribution at Bowery Bay WWTP.</description><category>Wastewater Treatment</category><borough>Queens</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction Procurement</current_phase><design_start>2015-11-13T00:00:00</design_start><budget_forecast>46208326.00</budget_forecast><latest_budget_changes>708788.00</latest_budget_changes><total_budget_changes>24235381.01</total_budget_changes><forecast_completion>2021-02-03T00:00:00</forecast_completion><latest_schedule_changes>54</latest_schedule_changes><total_schedule_changes>1684</total_schedule_changes></row><row _id="row-hded-zpvg_pg3p" _uuid="00000000-0000-0000-73DC-0EB654A99188" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-hded-zpvg_pg3p"><date_reported_as_of>2017-04-01T00:00:00</date_reported_as_of><pid>522</pid><project_name>Power Distribution at Bowery Bay WWTP</project_name><description>Power Distribution at Bowery Bay WWTP.</description><category>Wastewater Treatment</category><borough>Queens</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction Procurement</current_phase><design_start>2015-11-13T00:00:00</design_start><budget_forecast>41557728.20</budget_forecast><latest_budget_changes>-4650597.80</latest_budget_changes><total_budget_changes>24235381.01</total_budget_changes><forecast_completion>2021-04-23T00:00:00</forecast_completion><latest_schedule_changes>79</latest_schedule_changes><total_schedule_changes>1684</total_schedule_changes></row><row _id="row-qkdu~82r4_vci4" _uuid="00000000-0000-0000-6B6E-D47CF0E22F2C" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-qkdu~82r4_vci4"><date_reported_as_of>2017-09-01T00:00:00</date_reported_as_of><pid>522</pid><project_name>Power Distribution at Bowery Bay WWTP</project_name><description>Power Distribution at Bowery Bay WWTP.</description><category>Wastewater Treatment</category><borough>Queens</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction Procurement</current_phase><design_start>2015-11-13T00:00:00</design_start><budget_forecast>47108394.46</budget_forecast><latest_budget_changes>5550666.26</latest_budget_changes><total_budget_changes>24235381.01</total_budget_changes><forecast_completion>2021-06-21T00:00:00</forecast_completion><latest_schedule_changes>59</latest_schedule_changes><total_schedule_changes>1684</total_schedule_changes></row><row _id="row-7ktq-c7i9-fdvj" _uuid="00000000-0000-0000-EEE7-899025DC8D7A" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-7ktq-c7i9-fdvj"><date_reported_as_of>2018-03-01T00:00:00</date_reported_as_of><pid>522</pid><project_name>Power Distribution at Bowery Bay WWTP</project_name><description>Power Distribution at Bowery Bay WWTP.</description><category>Wastewater Treatment</category><borough>Queens</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction Procurement</current_phase><design_start>2015-11-13T00:00:00</design_start><budget_forecast>41108688.20</budget_forecast><latest_budget_changes>-5999706.26</latest_budget_changes><total_budget_changes>24235381.01</total_budget_changes><forecast_completion>2021-08-07T00:00:00</forecast_completion><latest_schedule_changes>47</latest_schedule_changes><total_schedule_changes>1684</total_schedule_changes></row><row _id="row-smad-4ay5~6gsr" _uuid="00000000-0000-0000-10D1-E9CD8825A8FE" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-smad-4ay5~6gsr"><date_reported_as_of>2018-08-01T00:00:00</date_reported_as_of><pid>522</pid><project_name>Power Distribution at Bowery Bay WWTP</project_name><description>Power Distribution at Bowery Bay WWTP.</description><category>Wastewater Treatment</category><borough>Queens</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction Procurement</current_phase><design_start>2015-11-13T00:00:00</design_start><budget_forecast>49802124.00</budget_forecast><latest_budget_changes>8693435.80</latest_budget_changes><total_budget_changes>24235381.01</total_budget_changes><forecast_completion>2022-03-14T00:00:00</forecast_completion><latest_schedule_changes>219</latest_schedule_changes><total_schedule_changes>1684</total_schedule_changes></row><row _id="row-qpsv~bdnb-y7md" _uuid="00000000-0000-0000-6C17-BB6F488F7A08" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-qpsv~bdnb-y7md"><date_reported_as_of>2019-01-01T00:00:00</date_reported_as_of><pid>522</pid><project_name>Power Distribution at Bowery Bay WWTP</project_name><description>Power Distribution at Bowery Bay WWTP.</description><category>Wastewater Treatment</category><borough>Queens</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction Procurement</current_phase><design_start>2015-11-13T00:00:00</design_start><budget_forecast>47786259.20</budget_forecast><latest_budget_changes>-2015864.80</latest_budget_changes><total_budget_changes>24235381.01</total_budget_changes><forecast_completion>2022-06-29T00:00:00</forecast_completion><latest_schedule_changes>107</latest_schedule_changes><total_schedule_changes>1684</total_schedule_changes></row><row _id="row-ybq7.spuw~xgmq" _uuid="00000000-0000-0000-EA1C-3B4FCD475986" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ybq7.spuw~xgmq"><date_reported_as_of>2019-05-01T00:00:00</date_reported_as_of><pid>522</pid><project_name>Power Distribution at Bowery Bay WWTP</project_name><description>Power Distribution at Bowery Bay WWTP.</description><category>Wastewater Treatment</category><borough>Queens</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction Procurement</current_phase><design_start>2015-11-13T00:00:00</design_start><budget_forecast>67305899.00</budget_forecast><latest_budget_changes>19519639.80</latest_budget_changes><total_budget_changes>24235381.01</total_budget_changes><forecast_completion>2022-09-19T00:00:00</forecast_completion><latest_schedule_changes>82</latest_schedule_changes><total_schedule_changes>1684</total_schedule_changes></row><row _id="row-bqrt.qndm.n7nq" _uuid="00000000-0000-0000-EB96-F09C285EBE8E" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-bqrt.qndm.n7nq"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>522</pid><project_name>Power Distribution at Bowery Bay WWTP</project_name><description>Power Distribution at Bowery Bay WWTP.</description><category>Wastewater Treatment</category><borough>Queens</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction Procurement</current_phase><design_start>2015-11-13T00:00:00</design_start><budget_forecast>69367895.20</budget_forecast><latest_budget_changes>2061996.20</latest_budget_changes><total_budget_changes>24235381.01</total_budget_changes><forecast_completion>2022-10-31T00:00:00</forecast_completion><latest_schedule_changes>42</latest_schedule_changes><total_schedule_changes>1684</total_schedule_changes></row><row _id="row-t8b4-3y46_6jqj" _uuid="00000000-0000-0000-7772-E08AEB74BB2A" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-t8b4-3y46_6jqj"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>522</pid><project_name>Power Distribution at Bowery Bay WWTP</project_name><description>Power Distribution at Bowery Bay WWTP.</description><category>Wastewater Treatment</category><borough>Queens</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2015-11-13T00:00:00</design_start><budget_forecast>68873447.66</budget_forecast><latest_budget_changes>-494447.54</latest_budget_changes><total_budget_changes>24235381.01</total_budget_changes><forecast_completion>2023-01-27T00:00:00</forecast_completion><latest_schedule_changes>88</latest_schedule_changes><total_schedule_changes>1684</total_schedule_changes></row><row _id="row-ckre~fbc8~zxkx" _uuid="00000000-0000-0000-80A6-59447125BEC7" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ckre~fbc8~zxkx"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>522</pid><project_name>Power Distribution at Bowery Bay WWTP</project_name><description>Power Distribution at Bowery Bay WWTP.</description><category>Wastewater Treatment</category><borough>Queens</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2015-11-13T00:00:00</design_start><budget_forecast>68873764.13</budget_forecast><latest_budget_changes>316.47</latest_budget_changes><total_budget_changes>24235381.01</total_budget_changes><forecast_completion>2023-01-27T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1684</total_schedule_changes></row><row _id="row-f8bn~ta8g_36cs" _uuid="00000000-0000-0000-3B4C-663990C47D64" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-f8bn~ta8g_36cs"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>522</pid><project_name>Power Distribution at Bowery Bay WWTP</project_name><description>Power Distribution at Bowery Bay WWTP.</description><category>Wastewater Treatment</category><borough>Queens</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2015-11-13T00:00:00</design_start><budget_forecast>68873764.13</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>24235381.01</total_budget_changes><forecast_completion>2023-01-27T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1684</total_schedule_changes></row><row _id="row-kx3k~remm_yzar" _uuid="00000000-0000-0000-534B-F9C0BD157C1D" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-kx3k~remm_yzar"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>522</pid><project_name>Power Distribution at Bowery Bay WWTP</project_name><description>Power Distribution at Bowery Bay WWTP.</description><category>Wastewater Treatment</category><borough>Queens</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2015-11-13T00:00:00</design_start><budget_forecast>68873764.13</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>24235381.01</total_budget_changes><forecast_completion>2023-01-27T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1684</total_schedule_changes></row><row _id="row-mucq_fx56_y83j" _uuid="00000000-0000-0000-A6E2-CBFF330C84F7" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-mucq_fx56_y83j"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>522</pid><project_name>Power Distribution at Bowery Bay WWTP</project_name><description>Power Distribution at Bowery Bay WWTP.</description><category>Wastewater Treatment</category><borough>Queens</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2015-11-13T00:00:00</design_start><budget_forecast>68873764.13</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>24235381.01</total_budget_changes><forecast_completion>2023-01-27T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1684</total_schedule_changes></row><row _id="row-dhxx_pxvg-dfj6" _uuid="00000000-0000-0000-173A-1F7C1AF6624F" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-dhxx_pxvg-dfj6"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>522</pid><project_name>Power Distribution at Bowery Bay WWTP</project_name><description>Power Distribution at Bowery Bay WWTP.</description><category>Wastewater Treatment</category><borough>Queens</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2015-11-13T00:00:00</design_start><budget_forecast>68873764.13</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>24235381.01</total_budget_changes><forecast_completion>2023-01-27T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1684</total_schedule_changes></row><row _id="row-q2he-62br~hxqv" _uuid="00000000-0000-0000-049E-8F1CE2648D1A" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-q2he-62br~hxqv"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>522</pid><project_name>Power Distribution at Bowery Bay WWTP</project_name><description>Power Distribution at Bowery Bay WWTP.</description><category>Wastewater Treatment</category><borough>Queens</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2015-11-13T00:00:00</design_start><budget_forecast>68873764.13</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>24235381.01</total_budget_changes><forecast_completion>2024-03-29T00:00:00</forecast_completion><latest_schedule_changes>427</latest_schedule_changes><total_schedule_changes>1684</total_schedule_changes></row><row _id="row-y773-7bu9.y4sn" _uuid="00000000-0000-0000-3D18-4D7A143500CE" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-y773-7bu9.y4sn"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>522</pid><project_name>Power Distribution at Bowery Bay WWTP</project_name><description>Power Distribution at Bowery Bay WWTP.</description><category>Wastewater Treatment</category><borough>Queens</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2015-11-13T00:00:00</design_start><budget_forecast>68873764.13</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>24235381.01</total_budget_changes><forecast_completion>2024-12-24T00:00:00</forecast_completion><latest_schedule_changes>270</latest_schedule_changes><total_schedule_changes>1684</total_schedule_changes></row><row _id="row-unhg_v8h2-7dkr" _uuid="00000000-0000-0000-6CE1-1DB68F199F58" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-unhg_v8h2-7dkr"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>522</pid><project_name>Power Distribution at Bowery Bay WWTP</project_name><description>Power Distribution at Bowery Bay WWTP.</description><category>Wastewater Treatment</category><borough>Queens</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2015-11-13T00:00:00</design_start><budget_forecast>69734919.01</budget_forecast><latest_budget_changes>861154.88</latest_budget_changes><total_budget_changes>24235381.01</total_budget_changes><forecast_completion>2025-07-22T00:00:00</forecast_completion><latest_schedule_changes>210</latest_schedule_changes><total_schedule_changes>1684</total_schedule_changes></row><row _id="row-vira-mk7v~4qjc" _uuid="00000000-0000-0000-A4F0-41E662B8F8CA" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-vira-mk7v~4qjc"><date_reported_as_of>2019-05-01T00:00:00</date_reported_as_of><pid>534</pid><project_name>Grand Street Bridge over Newtown Creek</project_name><description>Replace the existing structure (swing-type bridge) with a new bridge; located between Gardner Avenue in Brooklyn and 47th Street in Queens.</description><category>Bridges, Streets and Roadways</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2019-06-17T00:00:00</design_start><budget_forecast>144618744.00</budget_forecast><latest_budget_changes>5862744.00</latest_budget_changes><total_budget_changes>160682490.00</total_budget_changes><forecast_completion>2026-12-01T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1645</total_schedule_changes></row><row _id="row-zxpt~nm3r-ezi6" _uuid="00000000-0000-0000-B4FB-7F7714DACAF4" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-zxpt~nm3r-ezi6"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>534</pid><project_name>Grand Street Bridge over Newtown Creek</project_name><description>Replace the existing structure (swing-type bridge) with a new bridge; located between Gardner Avenue in Brooklyn and 47th Street in Queens.</description><category>Bridges, Streets and Roadways</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2019-06-17T00:00:00</design_start><budget_forecast>140803000.00</budget_forecast><latest_budget_changes>-3815744.00</latest_budget_changes><total_budget_changes>160682490.00</total_budget_changes><total_schedule_changes>1645</total_schedule_changes></row><row _id="row-c3ah_f466-psrf" _uuid="00000000-0000-0000-1ED7-6BA8826EDB3F" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-c3ah_f466-psrf"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>534</pid><project_name>Grand Street Bridge over Newtown Creek</project_name><description>Replace the existing structure (swing-type bridge) with a new bridge; located between Gardner Avenue in Brooklyn and 47th Street in Queens.</description><category>Bridges, Streets and Roadways</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2019-06-17T00:00:00</design_start><budget_forecast>140802744.00</budget_forecast><latest_budget_changes>-256.00</latest_budget_changes><total_budget_changes>160682490.00</total_budget_changes><total_schedule_changes>1645</total_schedule_changes></row><row _id="row-q968-w6ni~3etf" _uuid="00000000-0000-0000-21D0-2DFC0AD0A313" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-q968-w6ni~3etf"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>534</pid><project_name>Grand Street Bridge over Newtown Creek</project_name><description>Replace the existing structure (swing-type bridge) with a new bridge; located between Gardner Avenue in Brooklyn and 47th Street in Queens.</description><category>Bridges, Streets and Roadways</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2019-06-17T00:00:00</design_start><budget_forecast>141102744.00</budget_forecast><latest_budget_changes>300000.00</latest_budget_changes><total_budget_changes>160682490.00</total_budget_changes><forecast_completion>2030-06-03T00:00:00</forecast_completion><latest_schedule_changes>1280</latest_schedule_changes><total_schedule_changes>1645</total_schedule_changes></row><row _id="row-xmmu-g7tf~kvc9" _uuid="00000000-0000-0000-9FCF-8706E664F3CB" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-xmmu-g7tf~kvc9"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>534</pid><project_name>Grand Street Bridge over Newtown Creek</project_name><description>Replace the existing structure (swing-type bridge) with a new bridge; located between Gardner Avenue in Brooklyn and 47th Street in Queens.</description><category>Bridges, Streets and Roadways</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2019-06-17T00:00:00</design_start><budget_forecast>141102744.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>160682490.00</total_budget_changes><forecast_completion>2029-08-24T00:00:00</forecast_completion><latest_schedule_changes>-283</latest_schedule_changes><total_schedule_changes>1645</total_schedule_changes></row><row _id="row-ernv~qmwf~9kh7" _uuid="00000000-0000-0000-837A-B9909BE38881" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ernv~qmwf~9kh7"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>534</pid><project_name>Grand Street Bridge over Newtown Creek</project_name><category>Bridges, Streets and Roadways</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><total_budget_changes>160682490.00</total_budget_changes><total_schedule_changes>1645</total_schedule_changes></row><row _id="row-dt2a.8ar3-f5bs" _uuid="00000000-0000-0000-04FA-2EBC02B85D2C" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-dt2a.8ar3-f5bs"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>534</pid><project_name>Grand Street Bridge over Newtown Creek</project_name><description>Replace the existing structure (swing-type bridge) with a new bridge; located between Gardner Avenue in Brooklyn and 47th Street in Queens.</description><category>Bridges, Streets and Roadways</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2019-06-17T00:00:00</design_start><budget_forecast>140136744.00</budget_forecast><latest_budget_changes>-966000.00</latest_budget_changes><total_budget_changes>160682490.00</total_budget_changes><forecast_completion>2029-08-22T00:00:00</forecast_completion><latest_schedule_changes>-2</latest_schedule_changes><total_schedule_changes>1645</total_schedule_changes></row><row _id="row-bjyv-6fx6~hgaz" _uuid="00000000-0000-0000-3333-7F4A7476E672" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-bjyv-6fx6~hgaz"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>534</pid><project_name>Grand Street Bridge over Newtown Creek</project_name><description>Replace the existing structure (swing-type bridge) with a new bridge; located between Gardner Avenue in Brooklyn and 47th Street in Queens.</description><category>Bridges, Streets and Roadways</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2019-06-17T00:00:00</design_start><budget_forecast>141216490.00</budget_forecast><latest_budget_changes>1079746.00</latest_budget_changes><total_budget_changes>160682490.00</total_budget_changes><forecast_completion>2029-10-07T00:00:00</forecast_completion><latest_schedule_changes>46</latest_schedule_changes><total_schedule_changes>1645</total_schedule_changes></row><row _id="row-jjhi~fbty.jciq" _uuid="00000000-0000-0000-B578-335544942C1D" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-jjhi~fbty.jciq"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>534</pid><project_name>Grand Street Bridge over Newtown Creek</project_name><description>Replace the existing structure (swing-type bridge) with a new bridge; located between Gardner Avenue in Brooklyn and 47th Street in Queens.</description><category>Bridges, Streets and Roadways</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2019-06-17T00:00:00</design_start><budget_forecast>279622490.00</budget_forecast><latest_budget_changes>138406000.00</latest_budget_changes><total_budget_changes>160682490.00</total_budget_changes><forecast_completion>2030-01-16T00:00:00</forecast_completion><latest_schedule_changes>101</latest_schedule_changes><total_schedule_changes>1645</total_schedule_changes></row><row _id="row-y2zc~hxgs_uqte" _uuid="00000000-0000-0000-6FDC-4A0D32E6AB56" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-y2zc~hxgs_uqte"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>534</pid><project_name>Grand Street Bridge over Newtown Creek</project_name><description>Replace the existing structure (swing-type bridge) with a new bridge; located between Gardner Avenue in Brooklyn and 47th Street in Queens.</description><category>Bridges, Streets and Roadways</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2019-06-17T00:00:00</design_start><budget_forecast>282342490.00</budget_forecast><latest_budget_changes>2720000.00</latest_budget_changes><total_budget_changes>160682490.00</total_budget_changes><forecast_completion>2031-07-28T00:00:00</forecast_completion><latest_schedule_changes>558</latest_schedule_changes><total_schedule_changes>1645</total_schedule_changes></row><row _id="row-v8sg_3vgt~2su5" _uuid="00000000-0000-0000-F252-2E9855895EE9" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-v8sg_3vgt~2su5"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>534</pid><project_name>Grand Street Bridge over Newtown Creek</project_name><description>Replace the existing structure (swing-type bridge) with a new bridge; located between Gardner Avenue in Brooklyn and 47th Street in Queens.</description><category>Bridges, Streets and Roadways</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2019-06-17T00:00:00</design_start><budget_forecast>299438490.00</budget_forecast><latest_budget_changes>17096000.00</latest_budget_changes><total_budget_changes>160682490.00</total_budget_changes><forecast_completion>2031-06-03T00:00:00</forecast_completion><latest_schedule_changes>-55</latest_schedule_changes><total_schedule_changes>1645</total_schedule_changes></row><row _id="row-msh8_h4we~g6t7" _uuid="00000000-0000-0000-6EAB-1691DEF5BA32" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-msh8_h4we~g6t7"><date_reported_as_of>2016-06-01T00:00:00</date_reported_as_of><pid>536</pid><project_name>Park Avenue Tunnel (Murray Hill)</project_name><description>Reconstruction of Park Avenue Tunnel</description><category>Bridges</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><design_start>2006-08-01T00:00:00</design_start><budget_forecast>63839661.61</budget_forecast><total_budget_changes>-17773389.61</total_budget_changes><forecast_completion>2019-01-15T00:00:00</forecast_completion><total_schedule_changes>1568</total_schedule_changes></row><row _id="row-kkdc.6mk9-yr4u" _uuid="00000000-0000-0000-B1FE-DBB2CB3F084B" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-kkdc.6mk9-yr4u"><date_reported_as_of>2016-11-01T00:00:00</date_reported_as_of><pid>536</pid><project_name>Park Avenue Tunnel (Murray Hill)</project_name><description>Reconstruction of Park Avenue Tunnel</description><category>Bridges</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><design_start>2006-08-01T00:00:00</design_start><budget_forecast>63407661.61</budget_forecast><latest_budget_changes>-432000.00</latest_budget_changes><total_budget_changes>-17773389.61</total_budget_changes><forecast_completion>2019-01-15T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1568</total_schedule_changes></row><row _id="row-j5sc-q7ev.6yf3" _uuid="00000000-0000-0000-7E46-F92B92DBCF1F" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-j5sc-q7ev.6yf3"><date_reported_as_of>2017-04-01T00:00:00</date_reported_as_of><pid>536</pid><project_name>Park Avenue Tunnel (Murray Hill)</project_name><description>Repair Park Avenue tunnel, located in Midtown, Manhattan.</description><category>Bridges</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><design_start>2006-08-01T00:00:00</design_start><budget_forecast>40372464.48</budget_forecast><latest_budget_changes>-23035197.13</latest_budget_changes><total_budget_changes>-17773389.61</total_budget_changes><forecast_completion>2019-01-15T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1568</total_schedule_changes></row><row _id="row-tbpu-zfnm-kqgf" _uuid="00000000-0000-0000-70DA-C497975EA80B" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-tbpu-zfnm-kqgf"><date_reported_as_of>2017-09-01T00:00:00</date_reported_as_of><pid>536</pid><project_name>Park Avenue Tunnel (Murray Hill)</project_name><description>Repair Park Avenue tunnel, located in Midtown, Manhattan.</description><category>Bridges</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><design_start>2006-08-01T00:00:00</design_start><budget_forecast>40672495.00</budget_forecast><latest_budget_changes>300030.52</latest_budget_changes><total_budget_changes>-17773389.61</total_budget_changes><forecast_completion>2019-01-25T00:00:00</forecast_completion><latest_schedule_changes>10</latest_schedule_changes><total_schedule_changes>1568</total_schedule_changes></row><row _id="row-psfn-uss7-cxd8" _uuid="00000000-0000-0000-5741-C304A5E6B21D" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-psfn-uss7-cxd8"><date_reported_as_of>2018-03-01T00:00:00</date_reported_as_of><pid>536</pid><project_name>Park Avenue Tunnel (Murray Hill)</project_name><description>Repair Park Avenue tunnel, located in Midtown, Manhattan.</description><category>Bridges</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><design_start>2006-08-01T00:00:00</design_start><budget_forecast>40287911.00</budget_forecast><latest_budget_changes>-384584.00</latest_budget_changes><total_budget_changes>-17773389.61</total_budget_changes><forecast_completion>2019-01-25T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1568</total_schedule_changes></row><row _id="row-hnmz-xpph_4jzg" _uuid="00000000-0000-0000-D2FE-01F1E3815E9C" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-hnmz-xpph_4jzg"><date_reported_as_of>2018-08-01T00:00:00</date_reported_as_of><pid>536</pid><project_name>Park Avenue Tunnel (Murray Hill)</project_name><description>Repair Park Avenue tunnel, located in Midtown, Manhattan.</description><category>Bridges</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><design_start>2006-08-01T00:00:00</design_start><budget_forecast>41260059.00</budget_forecast><latest_budget_changes>972148.00</latest_budget_changes><total_budget_changes>-17773389.61</total_budget_changes><forecast_completion>2019-01-25T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1568</total_schedule_changes></row><row _id="row-94ww-ey4r-2qba" _uuid="00000000-0000-0000-14FD-186E04C24FEB" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-94ww-ey4r-2qba"><date_reported_as_of>2019-01-01T00:00:00</date_reported_as_of><pid>536</pid><project_name>Park Avenue Tunnel (Murray Hill)</project_name><description>Repair Park Avenue tunnel, located in Midtown, Manhattan.</description><category>Bridges</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><design_start>2006-08-01T00:00:00</design_start><budget_forecast>40883060.00</budget_forecast><latest_budget_changes>-376999.00</latest_budget_changes><total_budget_changes>-17773389.61</total_budget_changes><forecast_completion>2020-04-03T00:00:00</forecast_completion><latest_schedule_changes>434</latest_schedule_changes><total_schedule_changes>1568</total_schedule_changes></row><row _id="row-sm3u_gih4_tpve" _uuid="00000000-0000-0000-DBDF-3713E7CCD6D6" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-sm3u_gih4_tpve"><date_reported_as_of>2019-05-01T00:00:00</date_reported_as_of><pid>536</pid><project_name>Park Avenue Tunnel (Murray Hill)</project_name><description>Repair Park Avenue tunnel, located in Midtown, Manhattan.</description><category>Bridges</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><design_start>2006-08-01T00:00:00</design_start><budget_forecast>41333057.00</budget_forecast><latest_budget_changes>449997.00</latest_budget_changes><total_budget_changes>-17773389.61</total_budget_changes><forecast_completion>2020-07-10T00:00:00</forecast_completion><latest_schedule_changes>98</latest_schedule_changes><total_schedule_changes>1568</total_schedule_changes></row><row _id="row-m5it.sur6.4edc" _uuid="00000000-0000-0000-D226-1B74E350546C" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-m5it.sur6.4edc"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>536</pid><project_name>Park Avenue Tunnel (Murray Hill)</project_name><description>Repair Park Avenue tunnel, located in Midtown, Manhattan.</description><category>Bridges</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><design_start>2006-08-01T00:00:00</design_start><budget_forecast>45753059.00</budget_forecast><latest_budget_changes>4420002.00</latest_budget_changes><total_budget_changes>-17773389.61</total_budget_changes><total_schedule_changes>1568</total_schedule_changes></row><row _id="row-cc4v-y3v4_x4e3" _uuid="00000000-0000-0000-6C4B-9A9AEFF79E0A" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-cc4v-y3v4_x4e3"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>536</pid><project_name>Park Avenue Tunnel (Murray Hill)</project_name><description>Repair Park Avenue tunnel, located in Midtown, Manhattan.</description><category>Bridges</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><design_start>2006-08-01T00:00:00</design_start><budget_forecast>45653074.00</budget_forecast><latest_budget_changes>-99985.00</latest_budget_changes><total_budget_changes>-17773389.61</total_budget_changes><total_schedule_changes>1568</total_schedule_changes></row><row _id="row-g42g.b25e_dm4e" _uuid="00000000-0000-0000-3822-C2C260EC82B4" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-g42g.b25e_dm4e"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>536</pid><project_name>Park Avenue Tunnel (Murray Hill)</project_name><description>Repair Park Avenue tunnel, located in Midtown, Manhattan.</description><category>Bridges</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><design_start>2006-08-01T00:00:00</design_start><budget_forecast>46553074.00</budget_forecast><latest_budget_changes>900000.00</latest_budget_changes><total_budget_changes>-17773389.61</total_budget_changes><total_schedule_changes>1568</total_schedule_changes></row><row _id="row-tcvd_9cxb-k8ez" _uuid="00000000-0000-0000-CF11-2308B7B9214C" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-tcvd_9cxb-k8ez"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>536</pid><project_name>Park Avenue Tunnel (Murray Hill)</project_name><description>Repair Park Avenue tunnel, located in Midtown, Manhattan.</description><category>Bridges</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><design_start>2006-08-01T00:00:00</design_start><budget_forecast>48530028.00</budget_forecast><latest_budget_changes>1976954.00</latest_budget_changes><total_budget_changes>-17773389.61</total_budget_changes><forecast_completion>2021-06-08T00:00:00</forecast_completion><latest_schedule_changes>333</latest_schedule_changes><total_schedule_changes>1568</total_schedule_changes></row><row _id="row-e2ew.xjdu_jdxw" _uuid="00000000-0000-0000-E6DB-48393DD55629" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-e2ew.xjdu_jdxw"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>536</pid><project_name>Park Avenue Tunnel (Murray Hill)</project_name><category>Bridges</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><total_budget_changes>-17773389.61</total_budget_changes><total_schedule_changes>1568</total_schedule_changes></row><row _id="row-rstd_wvtu_7n23" _uuid="00000000-0000-0000-A3ED-40693993A540" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-rstd_wvtu_7n23"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>536</pid><project_name>Park Avenue Tunnel (Murray Hill)</project_name><description>Repair Park Avenue tunnel, located in Midtown, Manhattan.</description><category>Bridges</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><design_start>2006-08-01T00:00:00</design_start><budget_forecast>48301028.00</budget_forecast><latest_budget_changes>-229000.00</latest_budget_changes><total_budget_changes>-17773389.61</total_budget_changes><forecast_completion>2022-08-03T00:00:00</forecast_completion><latest_schedule_changes>421</latest_schedule_changes><total_schedule_changes>1568</total_schedule_changes></row><row _id="row-avgx_x86v-pyfs" _uuid="00000000-0000-0000-2FB0-7464FBEF2CFE" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-avgx_x86v-pyfs"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>536</pid><project_name>Park Avenue Tunnel (Murray Hill)</project_name><description>Repair Park Avenue tunnel, located in Midtown, Manhattan.</description><category>Bridges</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><design_start>2006-08-01T00:00:00</design_start><budget_forecast>52836967.00</budget_forecast><latest_budget_changes>4535939.00</latest_budget_changes><total_budget_changes>-17773389.61</total_budget_changes><forecast_completion>2022-08-03T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1568</total_schedule_changes></row><row _id="row-zy5y.4cmc.y9ed" _uuid="00000000-0000-0000-662F-773807CAB6EC" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-zy5y.4cmc.y9ed"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>536</pid><project_name>Park Avenue Tunnel (Murray Hill)</project_name><description>Repair Park Avenue tunnel, located in Midtown, Manhattan.</description><category>Bridges</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><design_start>2006-08-01T00:00:00</design_start><budget_forecast>46396271.00</budget_forecast><latest_budget_changes>-6440696.00</latest_budget_changes><total_budget_changes>-17773389.61</total_budget_changes><forecast_completion>2022-08-03T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1568</total_schedule_changes></row><row _id="row-hjuz.zaws.s562" _uuid="00000000-0000-0000-938D-E4EFA0DDDF0F" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-hjuz.zaws.s562"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>536</pid><project_name>Park Avenue Tunnel (Murray Hill)</project_name><description>Repair Park Avenue tunnel, located in Midtown, Manhattan.</description><category>Bridges</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><design_start>2006-08-01T00:00:00</design_start><budget_forecast>43024414.00</budget_forecast><latest_budget_changes>-3371857.00</latest_budget_changes><total_budget_changes>-17773389.61</total_budget_changes><forecast_completion>2023-05-02T00:00:00</forecast_completion><latest_schedule_changes>272</latest_schedule_changes><total_schedule_changes>1568</total_schedule_changes></row><row _id="row-pb5p~hvbr_dgeb" _uuid="00000000-0000-0000-434A-5C4BE8C02A1C" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-pb5p~hvbr_dgeb"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>536</pid><project_name>Park Avenue Tunnel (Murray Hill)</project_name><description>Repair Park Avenue tunnel, located in Midtown, Manhattan.</description><category>Bridges</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><design_start>2006-08-01T00:00:00</design_start><budget_forecast>46066272.00</budget_forecast><latest_budget_changes>3041858.00</latest_budget_changes><total_budget_changes>-17773389.61</total_budget_changes><forecast_completion>2023-05-02T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1568</total_schedule_changes></row><row _id="row-2g85.z5tf-4que" _uuid="00000000-0000-0000-B20E-D512E38E19AE" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-2g85.z5tf-4que"><date_reported_as_of>2017-09-01T00:00:00</date_reported_as_of><pid>537</pid><project_name>Carl Schurz Park Promenade over FDR (East 81st to 90th Streets)</project_name><description>Replace the Promenade over FDR between East 81st to 90th Streets in Manhattan.</description><category>Bridges</category><borough>Manhattan</borough><managing_agency>DOT</managing_agency><client_agency>DOT, DPR</client_agency><current_phase>Design</current_phase><design_start>2017-05-30T00:00:00</design_start><budget_forecast>312992000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-197139579.00</total_budget_changes><forecast_completion>2025-10-31T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1571</total_schedule_changes></row><row _id="row-mue8-a5hf.ttqy" _uuid="00000000-0000-0000-C77C-73D9B03C5CDF" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-mue8-a5hf.ttqy"><date_reported_as_of>2018-03-01T00:00:00</date_reported_as_of><pid>537</pid><project_name>Carl Schurz Park Promenade over FDR (East 81st to 90th Streets)</project_name><description>Replace the Promenade over FDR between East 81st to 90th Streets in Manhattan.</description><category>Bridges</category><borough>Manhattan</borough><managing_agency>DOT</managing_agency><client_agency>DOT, DPR</client_agency><current_phase>Design</current_phase><design_start>2017-05-30T00:00:00</design_start><budget_forecast>348404421.00</budget_forecast><latest_budget_changes>35412421.00</latest_budget_changes><total_budget_changes>-197139579.00</total_budget_changes><forecast_completion>2025-10-31T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1571</total_schedule_changes></row><row _id="row-vm76.262v-ubxu" _uuid="00000000-0000-0000-E919-98A74533749A" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-vm76.262v-ubxu"><date_reported_as_of>2018-08-01T00:00:00</date_reported_as_of><pid>537</pid><project_name>Carl Schurz Park Promenade over FDR (East 81st to 90th Streets)</project_name><description>Replace the Promenade over FDR between East 81st to 90th Streets in Manhattan.</description><category>Bridges</category><borough>Manhattan</borough><managing_agency>DOT</managing_agency><client_agency>DOT, DPR</client_agency><current_phase>Design</current_phase><design_start>2017-05-30T00:00:00</design_start><budget_forecast>348754421.00</budget_forecast><latest_budget_changes>350000.00</latest_budget_changes><total_budget_changes>-197139579.00</total_budget_changes><forecast_completion>2025-10-31T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1571</total_schedule_changes></row><row _id="row-vw23~8h5n~97gb" _uuid="00000000-0000-0000-D534-6F5FD9285E6C" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-vw23~8h5n~97gb"><date_reported_as_of>2019-01-01T00:00:00</date_reported_as_of><pid>537</pid><project_name>Carl Schurz Park Promenade over FDR (East 81st to 90th Streets)</project_name><description>Replace the Promenade over FDR between East 81st to 90th Streets in Manhattan.</description><category>Bridges</category><borough>Manhattan</borough><managing_agency>DOT</managing_agency><client_agency>DOT, DPR</client_agency><current_phase>Design</current_phase><design_start>2017-05-30T00:00:00</design_start><budget_forecast>35762421.00</budget_forecast><latest_budget_changes>-312992000.00</latest_budget_changes><total_budget_changes>-197139579.00</total_budget_changes><forecast_completion>2025-10-31T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1571</total_schedule_changes></row><row _id="row-vjvh_rt83_b266" _uuid="00000000-0000-0000-5FC7-42908A163A53" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-vjvh_rt83_b266"><date_reported_as_of>2019-05-01T00:00:00</date_reported_as_of><pid>537</pid><project_name>Carl Schurz Park Promenade over FDR (East 81st to 90th Streets)</project_name><description>Replace the Promenade over FDR between East 81st to 90th Streets in Manhattan.</description><category>Bridges</category><borough>Manhattan</borough><managing_agency>DOT</managing_agency><client_agency>DOT, DPR</client_agency><current_phase>Design</current_phase><design_start>2017-05-30T00:00:00</design_start><budget_forecast>36112421.00</budget_forecast><latest_budget_changes>350000.00</latest_budget_changes><total_budget_changes>-197139579.00</total_budget_changes><forecast_completion>2025-10-31T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1571</total_schedule_changes></row><row _id="row-3ij7_kwew_x65x" _uuid="00000000-0000-0000-3117-A23C74821981" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-3ij7_kwew_x65x"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>537</pid><project_name>Carl Schurz Park Promenade over FDR (East 81st to 90th Streets)</project_name><description>Replace the Promenade over FDR between East 81st to 90th Streets in Manhattan.</description><category>Bridges</category><borough>Manhattan</borough><managing_agency>DOT</managing_agency><client_agency>DOT, DPR</client_agency><current_phase>Design</current_phase><design_start>2017-05-30T00:00:00</design_start><budget_forecast>313742421.00</budget_forecast><latest_budget_changes>277630000.00</latest_budget_changes><total_budget_changes>-197139579.00</total_budget_changes><total_schedule_changes>1571</total_schedule_changes></row><row _id="row-fuy4~7tua-yf98" _uuid="00000000-0000-0000-6B99-4B6234C347CA" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-fuy4~7tua-yf98"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>537</pid><project_name>Carl Schurz Park Promenade over FDR (East 81st to 90th Streets)</project_name><description>Replace the Promenade over FDR Drive between East 81st to 90th Streets in Manhattan.</description><category>Bridges</category><borough>Manhattan</borough><managing_agency>DOT</managing_agency><client_agency>DOT, DPR</client_agency><current_phase>Design</current_phase><design_start>2017-05-30T00:00:00</design_start><budget_forecast>313552421.00</budget_forecast><latest_budget_changes>-190000.00</latest_budget_changes><total_budget_changes>-197139579.00</total_budget_changes><total_schedule_changes>1571</total_schedule_changes></row><row _id="row-jrju-vrqb.j4r2" _uuid="00000000-0000-0000-B2FE-41D4DF2A0AE8" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-jrju-vrqb.j4r2"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>537</pid><project_name>Carl Schurz Park Promenade over FDR (East 81st to 90th Streets)</project_name><description>Replace the Promenade over FDR Drive between East 81st to 90th Streets in Manhattan.</description><category>Bridges</category><borough>Manhattan</borough><managing_agency>DOT</managing_agency><client_agency>DOT, DPR</client_agency><current_phase>Design</current_phase><design_start>2017-05-30T00:00:00</design_start><budget_forecast>313202421.00</budget_forecast><latest_budget_changes>-350000.00</latest_budget_changes><total_budget_changes>-197139579.00</total_budget_changes><forecast_completion>2028-02-18T00:00:00</forecast_completion><latest_schedule_changes>840</latest_schedule_changes><total_schedule_changes>1571</total_schedule_changes></row><row _id="row-k74e-bqpi-xu4g" _uuid="00000000-0000-0000-030C-4452C78F1204" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-k74e-bqpi-xu4g"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>537</pid><project_name>Carl Schurz Park Promenade over FDR (East 81st to 90th Streets)</project_name><description>Replace the Promenade over FDR Drive between East 81st to 90th Streets in Manhattan.</description><category>Bridges</category><borough>Manhattan</borough><managing_agency>DOT</managing_agency><client_agency>DOT, DPR</client_agency><current_phase>Design</current_phase><design_start>2017-05-30T00:00:00</design_start><budget_forecast>313902421.00</budget_forecast><latest_budget_changes>700000.00</latest_budget_changes><total_budget_changes>-197139579.00</total_budget_changes><forecast_completion>2028-10-28T00:00:00</forecast_completion><latest_schedule_changes>253</latest_schedule_changes><total_schedule_changes>1571</total_schedule_changes></row><row _id="row-v5qm_ud82.44y5" _uuid="00000000-0000-0000-0E81-2D2AFD8D4258" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-v5qm_ud82.44y5"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>537</pid><project_name>Carl Schurz Park Promenade over FDR (East 81st to 90th Streets)</project_name><category>Bridges</category><borough>Manhattan</borough><managing_agency>DOT</managing_agency><client_agency>DOT, DPR</client_agency><total_budget_changes>-197139579.00</total_budget_changes><total_schedule_changes>1571</total_schedule_changes></row><row _id="row-dgd5-g2y4.apc3" _uuid="00000000-0000-0000-4BF3-D1EE26B4C65F" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-dgd5-g2y4.apc3"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>537</pid><project_name>Carl Schurz Park Promenade over FDR (East 81st to 90th Streets)</project_name><description>Replace the Promenade over FDR Drive between East 81st to 90th Streets in Manhattan.</description><category>Bridges</category><borough>Manhattan</borough><managing_agency>DOT</managing_agency><client_agency>DOT, DPR</client_agency><current_phase>Design</current_phase><design_start>2017-05-30T00:00:00</design_start><budget_forecast>116552421.00</budget_forecast><latest_budget_changes>-197350000.00</latest_budget_changes><total_budget_changes>-197139579.00</total_budget_changes><forecast_completion>2028-12-16T00:00:00</forecast_completion><latest_schedule_changes>49</latest_schedule_changes><total_schedule_changes>1571</total_schedule_changes></row><row _id="row-7sf3~usie.8iy5" _uuid="00000000-0000-0000-54E4-DDF6A51F5636" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-7sf3~usie.8iy5"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>537</pid><project_name>Carl Schurz Park Promenade over FDR (East 81st to 90th Streets)</project_name><description>Replace the Promenade over FDR Drive between East 81st to 90th Streets in Manhattan.</description><category>Bridges</category><borough>Manhattan</borough><managing_agency>DOT</managing_agency><client_agency>DOT, DPR</client_agency><current_phase>Design</current_phase><design_start>2017-05-30T00:00:00</design_start><budget_forecast>116602421.00</budget_forecast><latest_budget_changes>50000.00</latest_budget_changes><total_budget_changes>-197139579.00</total_budget_changes><forecast_completion>2029-01-13T00:00:00</forecast_completion><latest_schedule_changes>28</latest_schedule_changes><total_schedule_changes>1571</total_schedule_changes></row><row _id="row-k36v~8uqb.xtbs" _uuid="00000000-0000-0000-CBA9-0BDDBD4C3A73" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-k36v~8uqb.xtbs"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>537</pid><project_name>Carl Schurz Park Promenade over FDR (East 81st to 90th Streets)</project_name><description>Replace the Promenade over FDR Drive between East 81st to 90th Streets in Manhattan.</description><category>Bridges</category><borough>Manhattan</borough><managing_agency>DOT</managing_agency><client_agency>DOT, DPR</client_agency><current_phase>Design</current_phase><design_start>2017-05-30T00:00:00</design_start><budget_forecast>0.00</budget_forecast><latest_budget_changes>-116602421.00</latest_budget_changes><total_budget_changes>-197139579.00</total_budget_changes><forecast_completion>2029-02-20T00:00:00</forecast_completion><latest_schedule_changes>38</latest_schedule_changes><total_schedule_changes>1571</total_schedule_changes></row><row _id="row-dvax-q57r.kuzk" _uuid="00000000-0000-0000-A3E5-01FB9587467C" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-dvax-q57r.kuzk"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>537</pid><project_name>Carl Schurz Park Promenade over FDR (East 81st to 90th Streets)</project_name><description>Replace the Promenade over FDR Drive between East 81st to 90th Streets in Manhattan.</description><category>Bridges</category><borough>Manhattan</borough><managing_agency>DOT</managing_agency><client_agency>DOT, DPR</client_agency><current_phase>Design</current_phase><design_start>2017-05-30T00:00:00</design_start><budget_forecast>0.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-197139579.00</total_budget_changes><forecast_completion>2029-09-30T00:00:00</forecast_completion><latest_schedule_changes>222</latest_schedule_changes><total_schedule_changes>1571</total_schedule_changes></row><row _id="row-3a2h_dwq9_fyp4" _uuid="00000000-0000-0000-D12E-A9EFD7BBC640" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-3a2h_dwq9_fyp4"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>537</pid><project_name>Carl Schurz Park Promenade over FDR (East 81st to 90th Streets)</project_name><description>Replace the Promenade over FDR Drive between East 81st to 90th Streets in Manhattan.</description><category>Bridges</category><borough>Manhattan</borough><managing_agency>DOT</managing_agency><client_agency>DOT, DPR</client_agency><current_phase>Design</current_phase><design_start>2017-05-30T00:00:00</design_start><budget_forecast>115852421.00</budget_forecast><latest_budget_changes>115852421.00</latest_budget_changes><total_budget_changes>-197139579.00</total_budget_changes><forecast_completion>2030-02-18T00:00:00</forecast_completion><latest_schedule_changes>141</latest_schedule_changes><total_schedule_changes>1571</total_schedule_changes></row><row _id="row-d6jf~nh73-ewy7" _uuid="00000000-0000-0000-CFFB-E2F3A9990552" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-d6jf~nh73-ewy7"><date_reported_as_of>2018-03-01T00:00:00</date_reported_as_of><pid>539</pid><project_name>Boston Road Bridge Over Hutchinson River Rehabilitation</project_name><description>Rehabilitation of Boston Road Bridge over Hutchinson River, located in the Bornx.</description><category>Bridges, Streets and Roadways</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2018-04-16T00:00:00</design_start><budget_forecast>39299321.00</budget_forecast><latest_budget_changes>249321.00</latest_budget_changes><total_budget_changes>49309814.00</total_budget_changes><forecast_completion>2024-03-04T00:00:00</forecast_completion><latest_schedule_changes>-10</latest_schedule_changes><total_schedule_changes>803</total_schedule_changes></row><row _id="row-xd6f.8dqm.9uw9" _uuid="00000000-0000-0000-454D-B3BAB97098C7" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-xd6f.8dqm.9uw9"><date_reported_as_of>2018-08-01T00:00:00</date_reported_as_of><pid>539</pid><project_name>Boston Road Bridge Over Hutchinson River Rehabilitation</project_name><description>Rehabilitation of Boston Road Bridge over Hutchinson River, located in the Bornx.</description><category>Bridges, Streets and Roadways</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2018-04-16T00:00:00</design_start><budget_forecast>39522092.00</budget_forecast><latest_budget_changes>222771.00</latest_budget_changes><total_budget_changes>49309814.00</total_budget_changes><forecast_completion>2024-05-15T00:00:00</forecast_completion><latest_schedule_changes>72</latest_schedule_changes><total_schedule_changes>803</total_schedule_changes></row><row _id="row-x32m~7up6_6q7z" _uuid="00000000-0000-0000-9522-285B0C0B9F30" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-x32m~7up6_6q7z"><date_reported_as_of>2019-01-01T00:00:00</date_reported_as_of><pid>539</pid><project_name>Boston Road Bridge Over Hutchinson River Rehabilitation</project_name><description>Rehabilitation of Boston Road Bridge over Hutchinson River, located in the Bornx.</description><category>Bridges, Streets and Roadways</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2018-04-16T00:00:00</design_start><budget_forecast>41928092.00</budget_forecast><latest_budget_changes>2406000.00</latest_budget_changes><total_budget_changes>49309814.00</total_budget_changes><forecast_completion>2024-03-04T00:00:00</forecast_completion><latest_schedule_changes>-72</latest_schedule_changes><total_schedule_changes>803</total_schedule_changes></row><row _id="row-68w2.83t7_ff2f" _uuid="00000000-0000-0000-0461-DA6F3A2CBA4F" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-68w2.83t7_ff2f"><date_reported_as_of>2019-05-01T00:00:00</date_reported_as_of><pid>539</pid><project_name>Boston Road Bridge Over Hutchinson River Rehabilitation</project_name><description>Rehabilitation of Boston Road Bridge over Hutchinson River, located in the Bornx.</description><category>Bridges, Streets and Roadways</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2018-04-16T00:00:00</design_start><budget_forecast>43372092.00</budget_forecast><latest_budget_changes>1444000.00</latest_budget_changes><total_budget_changes>49309814.00</total_budget_changes><forecast_completion>2024-05-14T00:00:00</forecast_completion><latest_schedule_changes>71</latest_schedule_changes><total_schedule_changes>803</total_schedule_changes></row><row _id="row-ww3y_b7gp~c5mp" _uuid="00000000-0000-0000-B591-2E2377D89CFE" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ww3y_b7gp~c5mp"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>539</pid><project_name>Boston Road Bridge Over Hutchinson River Rehabilitation</project_name><description>Rehabilitation of Boston Road Bridge over Hutchinson River, located in the Bornx.</description><category>Bridges, Streets and Roadways</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2018-04-16T00:00:00</design_start><budget_forecast>62523092.00</budget_forecast><latest_budget_changes>19151000.00</latest_budget_changes><total_budget_changes>49309814.00</total_budget_changes><forecast_completion>2024-05-14T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>803</total_schedule_changes></row><row _id="row-yg2b~im5p~3euq" _uuid="00000000-0000-0000-CE56-ADE6B69E551D" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-yg2b~im5p~3euq"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>539</pid><project_name>Boston Road Bridge Over Hutchinson River Rehabilitation</project_name><description>Rehabilitation of Boston Road Bridge over Hutchinson River, located in the Bornx.</description><category>Bridges, Streets and Roadways</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2018-04-16T00:00:00</design_start><budget_forecast>77682092.00</budget_forecast><latest_budget_changes>15159000.00</latest_budget_changes><total_budget_changes>49309814.00</total_budget_changes><forecast_completion>2024-05-14T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>803</total_schedule_changes></row><row _id="row-2cxc_j4uc.r8f7" _uuid="00000000-0000-0000-2723-D8BC096E44C9" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-2cxc_j4uc.r8f7"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>539</pid><project_name>Boston Road Bridge Over Hutchinson River Rehabilitation</project_name><description>Rehabilitation of Boston Road Bridge over Hutchinson River, located in the Bornx.</description><category>Bridges, Streets and Roadways</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2018-04-16T00:00:00</design_start><budget_forecast>81002092.00</budget_forecast><latest_budget_changes>3320000.00</latest_budget_changes><total_budget_changes>49309814.00</total_budget_changes><forecast_completion>2024-06-25T00:00:00</forecast_completion><latest_schedule_changes>42</latest_schedule_changes><total_schedule_changes>803</total_schedule_changes></row><row _id="row-k46x~i8k6-qt57" _uuid="00000000-0000-0000-E235-0FDBDE87320D" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-k46x~i8k6-qt57"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>539</pid><project_name>Boston Road Bridge Over Hutchinson River Rehabilitation</project_name><description>Rehabilitation of Boston Road Bridge over Hutchinson River, located in the Bornx.</description><category>Bridges, Streets and Roadways</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2018-04-16T00:00:00</design_start><budget_forecast>81199814.00</budget_forecast><latest_budget_changes>197722.00</latest_budget_changes><total_budget_changes>49309814.00</total_budget_changes><forecast_completion>2025-01-24T00:00:00</forecast_completion><latest_schedule_changes>213</latest_schedule_changes><total_schedule_changes>803</total_schedule_changes></row><row _id="row-9na6_qszy_gnkh" _uuid="00000000-0000-0000-9F4B-2407AFA6F81F" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-9na6_qszy_gnkh"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>539</pid><project_name>Boston Road Bridge Over Hutchinson River Rehabilitation</project_name><category>Bridges, Streets and Roadways</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><total_budget_changes>49309814.00</total_budget_changes><total_schedule_changes>803</total_schedule_changes></row><row _id="row-6zki~u9qs-5jea" _uuid="00000000-0000-0000-F294-3BC72B83E22F" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-6zki~u9qs-5jea"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>539</pid><project_name>Boston Road Bridge Over Hutchinson River Rehabilitation</project_name><description>Rehabilitation of Boston Road Bridge over Hutchinson River, located in the Bornx.</description><category>Bridges, Streets and Roadways</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2018-04-16T00:00:00</design_start><budget_forecast>82501814.00</budget_forecast><latest_budget_changes>1302000.00</latest_budget_changes><total_budget_changes>49309814.00</total_budget_changes><forecast_completion>2025-02-18T00:00:00</forecast_completion><latest_schedule_changes>25</latest_schedule_changes><total_schedule_changes>803</total_schedule_changes></row><row _id="row-tzv6.u9un.qww6" _uuid="00000000-0000-0000-2C91-9991FF150C6A" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-tzv6.u9un.qww6"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>539</pid><project_name>Boston Road Bridge Over Hutchinson River Rehabilitation</project_name><description>Rehabilitation of Boston Road Bridge over Hutchinson River, located in the Bornx.</description><category>Bridges, Streets and Roadways</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction Procurement</current_phase><design_start>2018-04-16T00:00:00</design_start><budget_forecast>84001814.00</budget_forecast><latest_budget_changes>1500000.00</latest_budget_changes><total_budget_changes>49309814.00</total_budget_changes><forecast_completion>2025-11-02T00:00:00</forecast_completion><latest_schedule_changes>257</latest_schedule_changes><total_schedule_changes>803</total_schedule_changes></row><row _id="row-yj56_xpi5~bu3z" _uuid="00000000-0000-0000-2770-79AF7D523117" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-yj56_xpi5~bu3z"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>539</pid><project_name>Boston Road Bridge Over Hutchinson River Rehabilitation</project_name><description>Rehabilitation of Boston Road Bridge over Hutchinson River, located in the Bornx.</description><category>Bridges, Streets and Roadways</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction Procurement</current_phase><design_start>2018-04-16T00:00:00</design_start><budget_forecast>87656814.00</budget_forecast><latest_budget_changes>3655000.00</latest_budget_changes><total_budget_changes>49309814.00</total_budget_changes><forecast_completion>2025-11-22T00:00:00</forecast_completion><latest_schedule_changes>20</latest_schedule_changes><total_schedule_changes>803</total_schedule_changes></row><row _id="row-qxpx~h9ys~5mse" _uuid="00000000-0000-0000-0E1F-7C7F4A078596" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-qxpx~h9ys~5mse"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>539</pid><project_name>Boston Road Bridge Over Hutchinson River Rehabilitation</project_name><description>Rehabilitation of Boston Road Bridge over Hutchinson River, located in the Bornx.</description><category>Bridges, Streets and Roadways</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction Procurement</current_phase><design_start>2018-04-16T00:00:00</design_start><budget_forecast>77479008.00</budget_forecast><latest_budget_changes>-10177806.00</latest_budget_changes><total_budget_changes>49309814.00</total_budget_changes><forecast_completion>2026-02-05T00:00:00</forecast_completion><latest_schedule_changes>75</latest_schedule_changes><total_schedule_changes>803</total_schedule_changes></row><row _id="row-jf4e_z8kg~2haq" _uuid="00000000-0000-0000-01E0-851304E8B1F9" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-jf4e_z8kg~2haq"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>539</pid><project_name>Boston Road Bridge Over Hutchinson River Rehabilitation</project_name><description>Rehabilitation of Boston Road Bridge over Hutchinson River, located in the Bornx.</description><category>Bridges, Streets and Roadways</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction Procurement</current_phase><design_start>2018-04-16T00:00:00</design_start><budget_forecast>88359814.00</budget_forecast><latest_budget_changes>10880806.00</latest_budget_changes><total_budget_changes>49309814.00</total_budget_changes><forecast_completion>2026-05-26T00:00:00</forecast_completion><latest_schedule_changes>110</latest_schedule_changes><total_schedule_changes>803</total_schedule_changes></row><row _id="row-2yvv~y6x8_a4rz" _uuid="00000000-0000-0000-198A-17CC84D7CF02" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-2yvv~y6x8_a4rz"><date_reported_as_of>2018-08-01T00:00:00</date_reported_as_of><pid>540</pid><project_name>Battery Park Underpass Emergency Relief Betterments</project_name><description>Resiliency betterments for Battery Park and West Street underpasses.</description><category>Bridges</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2018-04-01T00:00:00</design_start><budget_forecast>18850000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>47923308.00</total_budget_changes><forecast_completion>2022-03-30T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1197</total_schedule_changes></row><row _id="row-u6ej~avx7_dhcn" _uuid="00000000-0000-0000-4EBE-8FD3739A0C7F" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-u6ej~avx7_dhcn"><date_reported_as_of>2019-01-01T00:00:00</date_reported_as_of><pid>540</pid><project_name>Battery Park Underpass Emergency Relief Betterments</project_name><description>Resiliency betterments for Battery Park and West Street underpasses.</description><category>Bridges</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2018-04-01T00:00:00</design_start><budget_forecast>19810000.00</budget_forecast><latest_budget_changes>960000.00</latest_budget_changes><total_budget_changes>47923308.00</total_budget_changes><forecast_completion>2022-03-30T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1197</total_schedule_changes></row><row _id="row-6nr6-pndq.hkvx" _uuid="00000000-0000-0000-A5B4-C19CB81B93A9" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-6nr6-pndq.hkvx"><date_reported_as_of>2019-05-01T00:00:00</date_reported_as_of><pid>540</pid><project_name>Battery Park Underpass Emergency Relief Betterments</project_name><description>Resiliency betterments for Battery Park and West Street underpasses.</description><category>Bridges</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2018-04-01T00:00:00</design_start><budget_forecast>19805000.00</budget_forecast><latest_budget_changes>-5000.00</latest_budget_changes><total_budget_changes>47923308.00</total_budget_changes><forecast_completion>2022-03-30T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1197</total_schedule_changes></row><row _id="row-7333.wn4n~ddj2" _uuid="00000000-0000-0000-8D77-F6B5EF3DD7A4" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-7333.wn4n~ddj2"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>540</pid><project_name>Battery Park Underpass Emergency Relief Betterments</project_name><description>Resiliency betterments for Battery Park and West Street underpasses.</description><category>Bridges</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2018-04-01T00:00:00</design_start><budget_forecast>19810000.00</budget_forecast><latest_budget_changes>5000.00</latest_budget_changes><total_budget_changes>47923308.00</total_budget_changes><total_schedule_changes>1197</total_schedule_changes></row><row _id="row-crdu~bq4j.457u" _uuid="00000000-0000-0000-D85B-B3DD9A83D2FC" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-crdu~bq4j.457u"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>540</pid><project_name>Battery Park Underpass Emergency Relief Betterments</project_name><description>Resiliency betterments for Battery Park and West Street underpasses.</description><category>Bridges</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2018-04-01T00:00:00</design_start><budget_forecast>19745529.00</budget_forecast><latest_budget_changes>-64471.00</latest_budget_changes><total_budget_changes>47923308.00</total_budget_changes><total_schedule_changes>1197</total_schedule_changes></row><row _id="row-ah7g~45iv.kweh" _uuid="00000000-0000-0000-644E-8C7A55DAB526" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ah7g~45iv.kweh"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>540</pid><project_name>Battery Park Underpass Emergency Relief Betterments</project_name><description>Resiliency betterments for Battery Park and West Street underpasses.</description><category>Bridges</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2018-04-01T00:00:00</design_start><budget_forecast>20120529.00</budget_forecast><latest_budget_changes>375000.00</latest_budget_changes><total_budget_changes>47923308.00</total_budget_changes><total_schedule_changes>1197</total_schedule_changes></row><row _id="row-77eb_h2hm.2gmc" _uuid="00000000-0000-0000-B2A1-5D54AD85C175" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-77eb_h2hm.2gmc"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>540</pid><project_name>Battery Park Underpass Emergency Relief Betterments</project_name><description>Resiliency betterments for Battery Park and West Street underpasses.</description><category>Bridges</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2018-04-01T00:00:00</design_start><budget_forecast>20120529.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>47923308.00</total_budget_changes><total_schedule_changes>1197</total_schedule_changes></row><row _id="row-ajdr-gvb9~3sen" _uuid="00000000-0000-0000-7C10-9B65F8A12BB9" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ajdr-gvb9~3sen"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>540</pid><project_name>Battery Park Underpass Emergency Relief Betterments</project_name><category>Bridges</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><total_budget_changes>47923308.00</total_budget_changes><total_schedule_changes>1197</total_schedule_changes></row><row _id="row-ndpd-j89x-xe73" _uuid="00000000-0000-0000-DF04-6CB706F0D69A" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ndpd-j89x-xe73"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>540</pid><project_name>Battery Park Underpass Emergency Relief Betterments</project_name><description>Resiliency betterments for Battery Park and West Street underpasses.</description><category>Bridges</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2018-04-01T00:00:00</design_start><budget_forecast>66713670.00</budget_forecast><latest_budget_changes>46593141.00</latest_budget_changes><total_budget_changes>47923308.00</total_budget_changes><forecast_completion>2024-04-29T00:00:00</forecast_completion><latest_schedule_changes>761</latest_schedule_changes><total_schedule_changes>1197</total_schedule_changes></row><row _id="row-wr2d.biv7_cbai" _uuid="00000000-0000-0000-6047-0486309B435D" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-wr2d.biv7_cbai"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>540</pid><project_name>Battery Park Underpass Emergency Relief Betterments</project_name><description>Resiliency betterments for Battery Park and West Street underpasses.</description><category>Bridges</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2018-04-01T00:00:00</design_start><budget_forecast>55043529.00</budget_forecast><latest_budget_changes>-11670141.00</latest_budget_changes><total_budget_changes>47923308.00</total_budget_changes><forecast_completion>2024-10-28T00:00:00</forecast_completion><latest_schedule_changes>182</latest_schedule_changes><total_schedule_changes>1197</total_schedule_changes></row><row _id="row-wydu.bf2r.kgyc" _uuid="00000000-0000-0000-DDA9-FFB17463C370" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-wydu.bf2r.kgyc"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>540</pid><project_name>Battery Park Underpass Emergency Relief Betterments</project_name><description>Resiliency betterments for Battery Park and West Street underpasses.</description><category>Bridges</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2018-04-01T00:00:00</design_start><budget_forecast>56984167.00</budget_forecast><latest_budget_changes>1940638.00</latest_budget_changes><total_budget_changes>47923308.00</total_budget_changes><forecast_completion>2024-11-27T00:00:00</forecast_completion><latest_schedule_changes>30</latest_schedule_changes><total_schedule_changes>1197</total_schedule_changes></row><row _id="row-8pjp-z88w~8pac" _uuid="00000000-0000-0000-FCBA-2816979717C8" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-8pjp-z88w~8pac"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>540</pid><project_name>Battery Park Underpass Emergency Relief Betterments</project_name><description>Resiliency betterments for Battery Park and West Street underpasses.</description><category>Bridges</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2018-04-01T00:00:00</design_start><budget_forecast>69171308.00</budget_forecast><latest_budget_changes>12187141.00</latest_budget_changes><total_budget_changes>47923308.00</total_budget_changes><forecast_completion>2025-01-19T00:00:00</forecast_completion><latest_schedule_changes>53</latest_schedule_changes><total_schedule_changes>1197</total_schedule_changes></row><row _id="row-dv4h.6eqa.jyy3" _uuid="00000000-0000-0000-CF76-BC35F95A0214" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-dv4h.6eqa.jyy3"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>540</pid><project_name>Battery Park Underpass Emergency Relief Betterments</project_name><description>Resiliency betterments for Battery Park and West Street underpasses.</description><category>Bridges</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2018-04-01T00:00:00</design_start><budget_forecast>66773308.00</budget_forecast><latest_budget_changes>-2398000.00</latest_budget_changes><total_budget_changes>47923308.00</total_budget_changes><forecast_completion>2025-07-09T00:00:00</forecast_completion><latest_schedule_changes>171</latest_schedule_changes><total_schedule_changes>1197</total_schedule_changes></row><row _id="row-an33.mzwq-3uxa" _uuid="00000000-0000-0000-97BA-65267CD9A4B4" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-an33.mzwq-3uxa"><date_reported_as_of>2017-09-01T00:00:00</date_reported_as_of><pid>541</pid><project_name>Shore Road Bridge over Hutchinson River</project_name><description>Replace the Shore Road Bridge over the Hutchinson River with a new bridge.</description><category>Bridges, Streets and Roadways</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2017-06-30T00:00:00</design_start><budget_forecast>358691000.00</budget_forecast><latest_budget_changes>0.16</latest_budget_changes><total_budget_changes>-19049921.84</total_budget_changes><forecast_completion>2025-12-17T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1477</total_schedule_changes></row><row _id="row-vmwn-7c7e.87rq" _uuid="00000000-0000-0000-9869-4B3E9437A697" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-vmwn-7c7e.87rq"><date_reported_as_of>2018-03-01T00:00:00</date_reported_as_of><pid>541</pid><project_name>Shore Road Bridge over Hutchinson River</project_name><description>Replace the Shore Road Bridge over the Hutchinson River with a new bridge.</description><category>Bridges, Streets and Roadways</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2017-06-30T00:00:00</design_start><budget_forecast>357738743.00</budget_forecast><latest_budget_changes>-952257.00</latest_budget_changes><total_budget_changes>-19049921.84</total_budget_changes><forecast_completion>2025-12-17T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1477</total_schedule_changes></row><row _id="row-ciab_hqnk_gtzz" _uuid="00000000-0000-0000-27DA-6AC690A8032A" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ciab_hqnk_gtzz"><date_reported_as_of>2018-08-01T00:00:00</date_reported_as_of><pid>541</pid><project_name>Shore Road Bridge over Hutchinson River</project_name><description>Replace the Shore Road Bridge over the Hutchinson River with a new bridge.</description><category>Bridges, Streets and Roadways</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2017-06-30T00:00:00</design_start><budget_forecast>357738743.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-19049921.84</total_budget_changes><forecast_completion>2025-12-17T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1477</total_schedule_changes></row><row _id="row-bvaj.2w79-dhrt" _uuid="00000000-0000-0000-A3B1-A1AD9BDF1914" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-bvaj.2w79-dhrt"><date_reported_as_of>2019-01-01T00:00:00</date_reported_as_of><pid>541</pid><project_name>Shore Road Bridge over Hutchinson River</project_name><description>Replace the Shore Road Bridge over the Hutchinson River with a new bridge.</description><category>Bridges, Streets and Roadways</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2017-06-30T00:00:00</design_start><budget_forecast>321166743.00</budget_forecast><latest_budget_changes>-36572000.00</latest_budget_changes><total_budget_changes>-19049921.84</total_budget_changes><forecast_completion>2025-12-17T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1477</total_schedule_changes></row><row _id="row-6rmr.s6k5_ztjr" _uuid="00000000-0000-0000-712A-4D14A3FCA1A2" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-6rmr.s6k5_ztjr"><date_reported_as_of>2019-05-01T00:00:00</date_reported_as_of><pid>541</pid><project_name>Shore Road Bridge over Hutchinson River</project_name><description>Replace the Shore Road Bridge over the Hutchinson River with a new bridge.</description><category>Bridges, Streets and Roadways</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2017-06-30T00:00:00</design_start><budget_forecast>315738743.00</budget_forecast><latest_budget_changes>-5428000.00</latest_budget_changes><total_budget_changes>-19049921.84</total_budget_changes><forecast_completion>2025-12-17T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1477</total_schedule_changes></row><row _id="row-v86p~kdj2_3v3h" _uuid="00000000-0000-0000-066C-FD77E60AD916" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-v86p~kdj2_3v3h"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>541</pid><project_name>Shore Road Bridge over Hutchinson River</project_name><description>Replace the Shore Road Bridge over the Hutchinson River with a new bridge.</description><category>Bridges, Streets and Roadways</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2017-06-30T00:00:00</design_start><budget_forecast>317488743.00</budget_forecast><latest_budget_changes>1750000.00</latest_budget_changes><total_budget_changes>-19049921.84</total_budget_changes><total_schedule_changes>1477</total_schedule_changes></row><row _id="row-5nq8_hufa.95ne" _uuid="00000000-0000-0000-9180-01172BCA5EC6" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-5nq8_hufa.95ne"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>541</pid><project_name>Shore Road Bridge over Hutchinson River</project_name><description>Replace the Shore Road Bridge over the Hutchinson River with a new bridge.</description><category>Bridges, Streets and Roadways</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2017-06-30T00:00:00</design_start><budget_forecast>318488743.00</budget_forecast><latest_budget_changes>1000000.00</latest_budget_changes><total_budget_changes>-19049921.84</total_budget_changes><total_schedule_changes>1477</total_schedule_changes></row><row _id="row-emzs_t5d8-8ume" _uuid="00000000-0000-0000-1F6C-BC47AF35A0AE" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-emzs_t5d8-8ume"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>541</pid><project_name>Shore Road Bridge over Hutchinson River</project_name><description>Replace the Shore Road Bridge over the Hutchinson River with a new bridge.</description><category>Bridges, Streets and Roadways</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2017-06-30T00:00:00</design_start><budget_forecast>319394743.00</budget_forecast><latest_budget_changes>906000.00</latest_budget_changes><total_budget_changes>-19049921.84</total_budget_changes><forecast_completion>2029-04-05T00:00:00</forecast_completion><latest_schedule_changes>1205</latest_schedule_changes><total_schedule_changes>1477</total_schedule_changes></row><row _id="row-i8aa~pvv5-g95e" _uuid="00000000-0000-0000-5B54-7D8FCA0AE918" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-i8aa~pvv5-g95e"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>541</pid><project_name>Shore Road Bridge over Hutchinson River</project_name><description>Replace the Shore Road Bridge over the Hutchinson River with a new bridge.</description><category>Bridges, Streets and Roadways</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2017-06-30T00:00:00</design_start><budget_forecast>324125743.00</budget_forecast><latest_budget_changes>4731000.00</latest_budget_changes><total_budget_changes>-19049921.84</total_budget_changes><forecast_completion>2029-07-15T00:00:00</forecast_completion><latest_schedule_changes>101</latest_schedule_changes><total_schedule_changes>1477</total_schedule_changes></row><row _id="row-y59t.6qzj-358v" _uuid="00000000-0000-0000-D813-14C993E87ACB" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-y59t.6qzj-358v"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>541</pid><project_name>Shore Road Bridge over Hutchinson River</project_name><category>Bridges, Streets and Roadways</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><total_budget_changes>-19049921.84</total_budget_changes><total_schedule_changes>1477</total_schedule_changes></row><row _id="row-dx7k.54na_8c4n" _uuid="00000000-0000-0000-2DDE-1EE8B7CD6E26" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-dx7k.54na_8c4n"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>541</pid><project_name>Shore Road Bridge over Hutchinson River</project_name><description>Replace the Shore Road Bridge over the Hutchinson River with a new bridge.</description><category>Bridges, Streets and Roadways</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2017-06-30T00:00:00</design_start><budget_forecast>323375743.00</budget_forecast><latest_budget_changes>-750000.00</latest_budget_changes><total_budget_changes>-19049921.84</total_budget_changes><forecast_completion>2029-03-31T00:00:00</forecast_completion><latest_schedule_changes>-106</latest_schedule_changes><total_schedule_changes>1477</total_schedule_changes></row><row _id="row-8vsh.x7x4~8f8a" _uuid="00000000-0000-0000-A076-B7598E06A8AC" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-8vsh.x7x4~8f8a"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>541</pid><project_name>Shore Road Bridge over Hutchinson River</project_name><description>Replace the Shore Road Bridge over the Hutchinson River with a new bridge.</description><category>Bridges, Streets and Roadways</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2017-06-30T00:00:00</design_start><budget_forecast>332185852.00</budget_forecast><latest_budget_changes>8810109.00</latest_budget_changes><total_budget_changes>-19049921.84</total_budget_changes><forecast_completion>2029-03-31T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1477</total_schedule_changes></row><row _id="row-xirr~5e49~kphm" _uuid="00000000-0000-0000-46E0-DC020163047A" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-xirr~5e49~kphm"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>541</pid><project_name>Shore Road Bridge over Hutchinson River</project_name><description>Replace the Shore Road Bridge over the Hutchinson River with a new bridge.</description><category>Bridges, Streets and Roadways</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2017-06-30T00:00:00</design_start><budget_forecast>337466228.00</budget_forecast><latest_budget_changes>5280376.00</latest_budget_changes><total_budget_changes>-19049921.84</total_budget_changes><forecast_completion>2029-03-31T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1477</total_schedule_changes></row><row _id="row-2rdz~sizd.jt5z" _uuid="00000000-0000-0000-1BF1-329F8B1D1919" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-2rdz~sizd.jt5z"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>541</pid><project_name>Shore Road Bridge over Hutchinson River</project_name><description>Replace the Shore Road Bridge over the Hutchinson River with a new bridge.</description><category>Bridges, Streets and Roadways</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2017-06-30T00:00:00</design_start><budget_forecast>340732843.00</budget_forecast><latest_budget_changes>3266615.00</latest_budget_changes><total_budget_changes>-19049921.84</total_budget_changes><forecast_completion>2029-07-24T00:00:00</forecast_completion><latest_schedule_changes>115</latest_schedule_changes><total_schedule_changes>1477</total_schedule_changes></row><row _id="row-td9k.rgte_57t2" _uuid="00000000-0000-0000-6473-B013ABC50304" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-td9k.rgte_57t2"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>541</pid><project_name>Shore Road Bridge over Hutchinson River</project_name><description>Replace the Shore Road Bridge over the Hutchinson River with a new bridge.</description><category>Bridges, Streets and Roadways</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2017-06-30T00:00:00</design_start><budget_forecast>339641078.00</budget_forecast><latest_budget_changes>-1091765.00</latest_budget_changes><total_budget_changes>-19049921.84</total_budget_changes><forecast_completion>2030-01-02T00:00:00</forecast_completion><latest_schedule_changes>162</latest_schedule_changes><total_schedule_changes>1477</total_schedule_changes></row><row _id="row-j6jt~yf8a.ke9y" _uuid="00000000-0000-0000-A848-C5D2AB2ED68E" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-j6jt~yf8a.ke9y"><date_reported_as_of>2016-06-01T00:00:00</date_reported_as_of><pid>544</pid><project_name>Coler Specialty Hospital Priority Mitigation Projects</project_name><description>The priority mitigation projects at Coler include key critical mitigation projects to improve the resiliency of the campus.</description><category>Health and Hospitals</category><borough>Manhattan</borough><managing_agency>EDC</managing_agency><client_agency>H+H</client_agency><current_phase>Construction Procurement</current_phase><design_start>2014-09-01T00:00:00</design_start><budget_forecast>26776342.00</budget_forecast><total_budget_changes>0.00</total_budget_changes><forecast_completion>2017-12-01T00:00:00</forecast_completion><total_schedule_changes>2085</total_schedule_changes></row><row _id="row-x7zg~btph~hmau" _uuid="00000000-0000-0000-4D75-80F208E9BFBF" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-x7zg~btph~hmau"><date_reported_as_of>2016-11-01T00:00:00</date_reported_as_of><pid>544</pid><project_name>Coler Specialty Hospital Priority Mitigation Projects</project_name><description>The priority mitigation projects at Coler include key critical mitigation projects to improve the resiliency of the campus.</description><category>Health and Hospitals</category><borough>Manhattan</borough><managing_agency>EDC</managing_agency><client_agency>H+H</client_agency><current_phase>Construction Procurement</current_phase><design_start>2014-09-01T00:00:00</design_start><budget_forecast>26824487.00</budget_forecast><latest_budget_changes>48145.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2018-11-15T00:00:00</forecast_completion><latest_schedule_changes>349</latest_schedule_changes><total_schedule_changes>2085</total_schedule_changes></row><row _id="row-t3dw_aqaw-27rg" _uuid="00000000-0000-0000-C894-85082C5A30BB" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-t3dw_aqaw-27rg"><date_reported_as_of>2017-04-01T00:00:00</date_reported_as_of><pid>544</pid><project_name>Coler Specialty Hospital Priority Mitigation Projects</project_name><description>The priority mitigation projects at Coler include key critical mitigation projects to improve the resiliency of the campus.</description><category>Health and Hospitals</category><borough>Manhattan</borough><managing_agency>EDC</managing_agency><client_agency>H+H</client_agency><current_phase>Construction</current_phase><design_start>2014-09-01T00:00:00</design_start><budget_forecast>21312417.00</budget_forecast><latest_budget_changes>-5512070.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2018-06-30T00:00:00</forecast_completion><latest_schedule_changes>-138</latest_schedule_changes><total_schedule_changes>2085</total_schedule_changes></row><row _id="row-xdcw_7jn9~cpx6" _uuid="00000000-0000-0000-E67A-B14A3F594A0E" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-xdcw_7jn9~cpx6"><date_reported_as_of>2017-09-01T00:00:00</date_reported_as_of><pid>544</pid><project_name>Coler Specialty Hospital Priority Mitigation Projects</project_name><description>The priority mitigation projects at Coler include key critical mitigation projects to improve the resiliency of the campus.</description><category>Health and Hospitals</category><borough>Manhattan</borough><managing_agency>EDC</managing_agency><client_agency>H+H</client_agency><current_phase>Construction</current_phase><design_start>2014-09-01T00:00:00</design_start><budget_forecast>21023561.26</budget_forecast><latest_budget_changes>-288855.74</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2018-12-31T00:00:00</forecast_completion><latest_schedule_changes>184</latest_schedule_changes><total_schedule_changes>2085</total_schedule_changes></row><row _id="row-22qx-ujw3_qv6x" _uuid="00000000-0000-0000-8D79-B7D2FF7E6567" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-22qx-ujw3_qv6x"><date_reported_as_of>2018-03-01T00:00:00</date_reported_as_of><pid>544</pid><project_name>Coler Specialty Hospital Priority Mitigation Projects</project_name><description>The priority mitigation projects at Coler include key critical mitigation projects to improve the resiliency of the campus.</description><category>Health and Hospitals</category><borough>Manhattan</borough><managing_agency>EDC</managing_agency><client_agency>H+H</client_agency><current_phase>Construction</current_phase><design_start>2014-09-01T00:00:00</design_start><budget_forecast>21980342.26</budget_forecast><latest_budget_changes>956781.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2018-12-31T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>2085</total_schedule_changes></row><row _id="row-9vnw~24s4_snef" _uuid="00000000-0000-0000-D3A0-8E29B71BD249" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-9vnw~24s4_snef"><date_reported_as_of>2018-08-01T00:00:00</date_reported_as_of><pid>544</pid><project_name>Coler Specialty Hospital Priority Mitigation Projects</project_name><description>The priority mitigation projects at Coler include key critical mitigation projects to improve the resiliency of the campus.</description><category>Health and Hospitals</category><borough>Manhattan</borough><managing_agency>EDC</managing_agency><client_agency>H+H</client_agency><current_phase>Construction</current_phase><design_start>2014-09-01T00:00:00</design_start><budget_forecast>23156983.99</budget_forecast><latest_budget_changes>1176641.73</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2019-10-31T00:00:00</forecast_completion><latest_schedule_changes>304</latest_schedule_changes><total_schedule_changes>2085</total_schedule_changes></row><row _id="row-8e7q_fmnj~m2fv" _uuid="00000000-0000-0000-2826-5CF5ACA035A8" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-8e7q_fmnj~m2fv"><date_reported_as_of>2019-01-01T00:00:00</date_reported_as_of><pid>544</pid><project_name>Coler Specialty Hospital Priority Mitigation Projects</project_name><description>The priority mitigation projects at Coler include key critical mitigation projects to improve the resiliency of the campus.</description><category>Health and Hospitals</category><borough>Manhattan</borough><managing_agency>EDC</managing_agency><client_agency>H+H</client_agency><current_phase>Construction</current_phase><design_start>2014-09-01T00:00:00</design_start><budget_forecast>23156983.99</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2020-10-31T00:00:00</forecast_completion><latest_schedule_changes>366</latest_schedule_changes><total_schedule_changes>2085</total_schedule_changes></row><row _id="row-dmv2.ri5v.ji6m" _uuid="00000000-0000-0000-19C7-E47AF203B90A" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-dmv2.ri5v.ji6m"><date_reported_as_of>2019-05-01T00:00:00</date_reported_as_of><pid>544</pid><project_name>Coler Specialty Hospital Priority Mitigation Projects</project_name><description>The priority mitigation projects at Coler include key critical mitigation projects to improve the resiliency of the campus.</description><category>Health and Hospitals</category><borough>Manhattan</borough><managing_agency>EDC</managing_agency><client_agency>H+H</client_agency><current_phase>Construction</current_phase><design_start>2014-09-01T00:00:00</design_start><budget_forecast>23156983.99</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2020-10-31T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>2085</total_schedule_changes></row><row _id="row-w2v6.aif3-xfnv" _uuid="00000000-0000-0000-D5D4-78E4B62BC52C" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-w2v6.aif3-xfnv"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>544</pid><project_name>Coler Specialty Hospital Priority Mitigation Projects</project_name><description>The priority mitigation projects at Coler include key critical mitigation projects to improve the resiliency of the campus.</description><category>Health and Hospitals</category><borough>Manhattan</borough><managing_agency>EDC</managing_agency><client_agency>H+H</client_agency><current_phase>Construction</current_phase><design_start>2014-09-01T00:00:00</design_start><budget_forecast>23156983.99</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2020-10-31T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>2085</total_schedule_changes></row><row _id="row-8vy5-9sm5_w852" _uuid="00000000-0000-0000-27A5-DAC607FC1139" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-8vy5-9sm5_w852"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>544</pid><project_name>Coler Specialty Hospital Priority Mitigation Projects</project_name><description>The priority mitigation projects at Coler include key critical mitigation projects to improve the resiliency of the campus.</description><category>Health and Hospitals</category><borough>Manhattan</borough><managing_agency>EDC</managing_agency><client_agency>H+H</client_agency><current_phase>Construction</current_phase><design_start>2014-09-01T00:00:00</design_start><budget_forecast>12073687.00</budget_forecast><latest_budget_changes>-11083296.99</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2020-10-31T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>2085</total_schedule_changes></row><row _id="row-r84c-2hy7_qgy7" _uuid="00000000-0000-0000-1D49-6C60BA3A502A" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-r84c-2hy7_qgy7"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>544</pid><project_name>Coler Specialty Hospital Priority Mitigation Projects</project_name><description>The priority mitigation projects at Coler include key critical mitigation projects to improve the resiliency of the campus.</description><category>Health and Hospitals</category><borough>Manhattan</borough><managing_agency>EDC</managing_agency><client_agency>H+H</client_agency><current_phase>Construction</current_phase><design_start>2014-09-01T00:00:00</design_start><budget_forecast>12073687.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2020-10-31T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>2085</total_schedule_changes></row><row _id="row-kieb.i8zh.6esq" _uuid="00000000-0000-0000-ADD1-EEE4AAA4E1AE" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-kieb.i8zh.6esq"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>544</pid><project_name>Coler Specialty Hospital Priority Mitigation Projects</project_name><description>The priority mitigation projects at Coler include key critical mitigation projects to improve the resiliency of the campus.</description><category>Health and Hospitals</category><borough>Manhattan</borough><managing_agency>EDC</managing_agency><client_agency>H+H</client_agency><current_phase>Construction</current_phase><design_start>2014-09-01T00:00:00</design_start><budget_forecast>12073687.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2020-10-31T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>2085</total_schedule_changes></row><row _id="row-y2hd~86x4.im7u" _uuid="00000000-0000-0000-A491-DDEF9701AC7F" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-y2hd~86x4.im7u"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>544</pid><project_name>Coler Specialty Hospital Priority Mitigation Projects</project_name><description>The priority mitigation projects at Coler include key critical mitigation projects to improve the resiliency of the campus.</description><category>Health and Hospitals</category><borough>Manhattan</borough><managing_agency>EDC</managing_agency><client_agency>H+H</client_agency><current_phase>Construction</current_phase><design_start>2014-09-01T00:00:00</design_start><budget_forecast>21529654.00</budget_forecast><latest_budget_changes>9455967.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2022-12-31T00:00:00</forecast_completion><latest_schedule_changes>791</latest_schedule_changes><total_schedule_changes>2085</total_schedule_changes></row><row _id="row-yiua-jzrb.rzse" _uuid="00000000-0000-0000-74D9-84D4EC489E44" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-yiua-jzrb.rzse"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>544</pid><project_name>Coler Specialty Hospital Priority Mitigation Projects</project_name><description>The priority mitigation projects at Coler include key critical mitigation projects to improve the resiliency of the campus.</description><category>Health and Hospitals</category><borough>Manhattan</borough><managing_agency>EDC</managing_agency><client_agency>H+H</client_agency><current_phase>Construction</current_phase><design_start>2014-09-01T00:00:00</design_start><budget_forecast>21529654.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2022-12-31T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>2085</total_schedule_changes></row><row _id="row-y4ri_gagf.iku2" _uuid="00000000-0000-0000-105C-0882EF8EB68B" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-y4ri_gagf.iku2"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>544</pid><project_name>Coler Specialty Hospital Priority Mitigation Projects</project_name><description>The priority mitigation projects at Coler include key critical mitigation projects to improve the resiliency of the campus.</description><category>Health and Hospitals</category><borough>Manhattan</borough><managing_agency>EDC</managing_agency><client_agency>H+H</client_agency><current_phase>Construction</current_phase><design_start>2014-09-01T00:00:00</design_start><budget_forecast>24246640.00</budget_forecast><latest_budget_changes>2716986.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2023-03-01T00:00:00</forecast_completion><latest_schedule_changes>60</latest_schedule_changes><total_schedule_changes>2085</total_schedule_changes></row><row _id="row-zjpa~hgv2.6jty" _uuid="00000000-0000-0000-0688-71B8F6A0E5BB" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-zjpa~hgv2.6jty"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>544</pid><project_name>Coler Specialty Hospital Priority Mitigation Projects</project_name><description>The priority mitigation projects at Coler include key critical mitigation projects to improve the resiliency of the campus.</description><category>Health and Hospitals</category><borough>Manhattan</borough><managing_agency>EDC</managing_agency><client_agency>H+H</client_agency><current_phase>Construction</current_phase><design_start>2014-09-01T00:00:00</design_start><budget_forecast>24107117.00</budget_forecast><latest_budget_changes>-139523.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2023-05-31T00:00:00</forecast_completion><latest_schedule_changes>91</latest_schedule_changes><total_schedule_changes>2085</total_schedule_changes></row><row _id="row-yihr~8v3c-mqfw" _uuid="00000000-0000-0000-752B-DE7468A92E94" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-yihr~8v3c-mqfw"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>544</pid><project_name>Coler Specialty Hospital Priority Mitigation Projects</project_name><description>The priority mitigation projects at Coler include key critical mitigation projects to improve the resiliency of the campus.</description><category>Health and Hospitals</category><borough>Manhattan</borough><managing_agency>EDC</managing_agency><client_agency>H+H</client_agency><current_phase>Construction</current_phase><design_start>2014-09-01T00:00:00</design_start><budget_forecast>26776342.00</budget_forecast><latest_budget_changes>2669225.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2023-07-31T00:00:00</forecast_completion><latest_schedule_changes>61</latest_schedule_changes><total_schedule_changes>2085</total_schedule_changes></row><row _id="row-f9fh.pe4a.3jx8" _uuid="00000000-0000-0000-61CA-19A7E77523DB" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-f9fh.pe4a.3jx8"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>544</pid><project_name>Coler Specialty Hospital Priority Mitigation Projects</project_name><description>The priority mitigation projects at Coler include key critical mitigation projects to improve the resiliency of the campus.</description><category>Health and Hospitals</category><borough>Manhattan</borough><managing_agency>EDC</managing_agency><client_agency>H+H</client_agency><current_phase>Construction</current_phase><design_start>2014-09-01T00:00:00</design_start><budget_forecast>26776342.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2023-08-17T00:00:00</forecast_completion><latest_schedule_changes>17</latest_schedule_changes><total_schedule_changes>2085</total_schedule_changes></row><row _id="row-ksxi_n49n_f7zu" _uuid="00000000-0000-0000-172B-CA6B7DCEC6D4" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ksxi_n49n_f7zu"><date_reported_as_of>2016-06-01T00:00:00</date_reported_as_of><pid>545</pid><project_name>Bellevue Medical Center Priority Mitigation Projects</project_name><description>Priority mitigation projects for the repair/restoration and hazard mitigation for Bellevue Hospital, damaged during Superstorm Sandy</description><category>Health and Hospitals</category><borough>Manhattan</borough><managing_agency>EDC</managing_agency><client_agency>H+H</client_agency><current_phase>Design</current_phase><design_start>2014-01-01T00:00:00</design_start><budget_forecast>50941375.00</budget_forecast><total_budget_changes>0.00</total_budget_changes><forecast_completion>2018-03-31T00:00:00</forecast_completion><total_schedule_changes>1854</total_schedule_changes></row><row _id="row-rn6z.8857~zvuc" _uuid="00000000-0000-0000-E356-EF777D9E6029" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-rn6z.8857~zvuc"><date_reported_as_of>2016-11-01T00:00:00</date_reported_as_of><pid>545</pid><project_name>Bellevue Medical Center Priority Mitigation Projects</project_name><description>Priority mitigation projects for the repair/restoration and hazard mitigation for Bellevue Hospital, damaged during Superstorm Sandy</description><category>Health and Hospitals</category><borough>Manhattan</borough><managing_agency>EDC</managing_agency><client_agency>H+H</client_agency><current_phase>Design</current_phase><design_start>2014-01-01T00:00:00</design_start><budget_forecast>42407946.00</budget_forecast><latest_budget_changes>-8533429.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2018-03-31T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1854</total_schedule_changes></row><row _id="row-g8ge~dksz_pzx5" _uuid="00000000-0000-0000-DF0D-1D1759492914" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-g8ge~dksz_pzx5"><date_reported_as_of>2017-04-01T00:00:00</date_reported_as_of><pid>545</pid><project_name>Bellevue Medical Center Priority Mitigation Projects</project_name><description>Priority mitigation projects for the repair/restoration and hazard mitigation for Bellevue Hospital, damaged during Superstorm Sandy</description><category>Health and Hospitals</category><borough>Manhattan</borough><managing_agency>EDC</managing_agency><client_agency>H+H</client_agency><current_phase>Design</current_phase><design_start>2014-01-01T00:00:00</design_start><budget_forecast>51038881.00</budget_forecast><latest_budget_changes>8630935.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2018-06-30T00:00:00</forecast_completion><latest_schedule_changes>91</latest_schedule_changes><total_schedule_changes>1854</total_schedule_changes></row><row _id="row-tpxh~rskd~npcm" _uuid="00000000-0000-0000-E395-C0CF3EF47CDD" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-tpxh~rskd~npcm"><date_reported_as_of>2017-09-01T00:00:00</date_reported_as_of><pid>545</pid><project_name>Bellevue Medical Center Priority Mitigation Projects</project_name><description>Priority mitigation projects for the repair/restoration and hazard mitigation for Bellevue Hospital, damaged during Superstorm Sandy</description><category>Health and Hospitals</category><borough>Manhattan</borough><managing_agency>EDC</managing_agency><client_agency>H+H</client_agency><current_phase>Construction</current_phase><design_start>2014-01-01T00:00:00</design_start><budget_forecast>50941375.00</budget_forecast><latest_budget_changes>-97506.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2020-06-30T00:00:00</forecast_completion><latest_schedule_changes>731</latest_schedule_changes><total_schedule_changes>1854</total_schedule_changes></row><row _id="row-tcpt_8rfe~rq8y" _uuid="00000000-0000-0000-4E62-5CCDA636AC3E" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-tcpt_8rfe~rq8y"><date_reported_as_of>2018-03-01T00:00:00</date_reported_as_of><pid>545</pid><project_name>Bellevue Medical Center Priority Mitigation Projects</project_name><description>Priority mitigation projects for the repair/restoration and hazard mitigation for Bellevue Hospital, damaged during Superstorm Sandy</description><category>Health and Hospitals</category><borough>Manhattan</borough><managing_agency>EDC</managing_agency><client_agency>H+H</client_agency><current_phase>Construction</current_phase><design_start>2014-01-01T00:00:00</design_start><budget_forecast>51680421.00</budget_forecast><latest_budget_changes>739046.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2020-06-30T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1854</total_schedule_changes></row><row _id="row-4nma~gptn_f3am" _uuid="00000000-0000-0000-0DDC-861350A5CB0D" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-4nma~gptn_f3am"><date_reported_as_of>2018-08-01T00:00:00</date_reported_as_of><pid>545</pid><project_name>Bellevue Medical Center Priority Mitigation Projects</project_name><description>Priority mitigation projects for the repair/restoration and hazard mitigation for Bellevue Hospital, damaged during Superstorm Sandy</description><category>Health and Hospitals</category><borough>Manhattan</borough><managing_agency>EDC</managing_agency><client_agency>H+H</client_agency><current_phase>Construction</current_phase><design_start>2014-01-01T00:00:00</design_start><budget_forecast>53184355.00</budget_forecast><latest_budget_changes>1503934.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2020-06-30T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1854</total_schedule_changes></row><row _id="row-r3cw.upgm_kab2" _uuid="00000000-0000-0000-C3FE-98D99AB932BA" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-r3cw.upgm_kab2"><date_reported_as_of>2019-01-01T00:00:00</date_reported_as_of><pid>545</pid><project_name>Bellevue Medical Center Priority Mitigation Projects</project_name><description>Priority mitigation projects for the repair/restoration and hazard mitigation for Bellevue Hospital, damaged during Superstorm Sandy</description><category>Health and Hospitals</category><borough>Manhattan</borough><managing_agency>EDC</managing_agency><client_agency>H+H</client_agency><current_phase>Construction</current_phase><design_start>2014-01-01T00:00:00</design_start><budget_forecast>53184355.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2020-06-30T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1854</total_schedule_changes></row><row _id="row-jv9t~9fgr.5sgk" _uuid="00000000-0000-0000-A064-0C1C2B97B905" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-jv9t~9fgr.5sgk"><date_reported_as_of>2019-05-01T00:00:00</date_reported_as_of><pid>545</pid><project_name>Bellevue Medical Center Priority Mitigation Projects</project_name><description>Priority mitigation projects for the repair/restoration and hazard mitigation for Bellevue Hospital, damaged during Superstorm Sandy</description><category>Health and Hospitals</category><borough>Manhattan</borough><managing_agency>EDC</managing_agency><client_agency>H+H</client_agency><current_phase>Construction</current_phase><design_start>2014-01-01T00:00:00</design_start><budget_forecast>53184355.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2020-06-30T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1854</total_schedule_changes></row><row _id="row-ttfu_theu-rjq8" _uuid="00000000-0000-0000-A23A-6DF5D2BECAF2" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ttfu_theu-rjq8"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>545</pid><project_name>Bellevue Medical Center Priority Mitigation Projects</project_name><description>Priority mitigation projects for the repair/restoration and hazard mitigation for Bellevue Hospital, damaged during Superstorm Sandy</description><category>Health and Hospitals</category><borough>Manhattan</borough><managing_agency>EDC</managing_agency><client_agency>H+H</client_agency><current_phase>Construction</current_phase><design_start>2014-01-01T00:00:00</design_start><budget_forecast>53184355.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2020-06-30T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1854</total_schedule_changes></row><row _id="row-binj~nxn9_twt4" _uuid="00000000-0000-0000-70A2-2691F710D4D6" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-binj~nxn9_twt4"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>545</pid><project_name>Bellevue Medical Center Priority Mitigation Projects</project_name><description>Priority mitigation projects for the repair/restoration and hazard mitigation for Bellevue Hospital, damaged during Superstorm Sandy</description><category>Health and Hospitals</category><borough>Manhattan</borough><managing_agency>EDC</managing_agency><client_agency>H+H</client_agency><current_phase>Construction</current_phase><design_start>2014-01-01T00:00:00</design_start><budget_forecast>45171439.00</budget_forecast><latest_budget_changes>-8012916.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2022-01-28T00:00:00</forecast_completion><latest_schedule_changes>577</latest_schedule_changes><total_schedule_changes>1854</total_schedule_changes></row><row _id="row-vmw7~iwwh_myir" _uuid="00000000-0000-0000-2EAC-390C4D4EDDDB" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-vmw7~iwwh_myir"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>545</pid><project_name>Bellevue Medical Center Priority Mitigation Projects</project_name><description>Priority mitigation projects for the repair/restoration and hazard mitigation for Bellevue Hospital, damaged during Superstorm Sandy</description><category>Health and Hospitals</category><borough>Manhattan</borough><managing_agency>EDC</managing_agency><client_agency>H+H</client_agency><current_phase>Construction</current_phase><design_start>2014-01-01T00:00:00</design_start><budget_forecast>45171439.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2022-04-30T00:00:00</forecast_completion><latest_schedule_changes>92</latest_schedule_changes><total_schedule_changes>1854</total_schedule_changes></row><row _id="row-jbsd-ypnv_y7s5" _uuid="00000000-0000-0000-14FB-68D9388C017C" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-jbsd-ypnv_y7s5"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>545</pid><project_name>Bellevue Medical Center Priority Mitigation Projects</project_name><description>Priority mitigation projects for the repair/restoration and hazard mitigation for Bellevue Hospital, damaged during Superstorm Sandy</description><category>Health and Hospitals</category><borough>Manhattan</borough><managing_agency>EDC</managing_agency><client_agency>H+H</client_agency><current_phase>Construction</current_phase><design_start>2014-01-01T00:00:00</design_start><budget_forecast>45171439.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2022-04-30T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1854</total_schedule_changes></row><row _id="row-e3np_eu3c_uw38" _uuid="00000000-0000-0000-EC69-E8D31805DB83" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-e3np_eu3c_uw38"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>545</pid><project_name>Bellevue Medical Center Priority Mitigation Projects</project_name><description>Priority mitigation projects for the repair/restoration and hazard mitigation for Bellevue Hospital, damaged during Superstorm Sandy</description><category>Health and Hospitals</category><borough>Manhattan</borough><managing_agency>EDC</managing_agency><client_agency>H+H</client_agency><current_phase>Construction</current_phase><design_start>2014-01-01T00:00:00</design_start><budget_forecast>46807309.00</budget_forecast><latest_budget_changes>1635870.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2022-04-30T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1854</total_schedule_changes></row><row _id="row-umpx~3w99~ukfj" _uuid="00000000-0000-0000-3089-D062340060C6" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-umpx~3w99~ukfj"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>545</pid><project_name>Bellevue Medical Center Priority Mitigation Projects</project_name><description>Priority mitigation projects for the repair/restoration and hazard mitigation for Bellevue Hospital, damaged during Superstorm Sandy</description><category>Health and Hospitals</category><borough>Manhattan</borough><managing_agency>EDC</managing_agency><client_agency>H+H</client_agency><current_phase>Construction</current_phase><design_start>2014-01-01T00:00:00</design_start><budget_forecast>46807309.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2022-04-30T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1854</total_schedule_changes></row><row _id="row-c9mp~tdmu-s4yj" _uuid="00000000-0000-0000-F471-1A2BEFFE3666" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-c9mp~tdmu-s4yj"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>545</pid><project_name>Bellevue Medical Center Priority Mitigation Projects</project_name><description>Priority mitigation projects for the repair/restoration and hazard mitigation for Bellevue Hospital, damaged during Superstorm Sandy</description><category>Health and Hospitals</category><borough>Manhattan</borough><managing_agency>EDC</managing_agency><client_agency>H+H</client_agency><current_phase>Construction</current_phase><design_start>2014-01-01T00:00:00</design_start><budget_forecast>45581225.00</budget_forecast><latest_budget_changes>-1226084.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2022-06-14T00:00:00</forecast_completion><latest_schedule_changes>45</latest_schedule_changes><total_schedule_changes>1854</total_schedule_changes></row><row _id="row-awjw_45r4.p2ys" _uuid="00000000-0000-0000-3862-61AB946C087F" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-awjw_45r4.p2ys"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>545</pid><project_name>Bellevue Medical Center Priority Mitigation Projects</project_name><description>Priority mitigation projects for the repair/restoration and hazard mitigation for Bellevue Hospital, damaged during Superstorm Sandy</description><category>Health and Hospitals</category><borough>Manhattan</borough><managing_agency>EDC</managing_agency><client_agency>H+H</client_agency><current_phase>Construction</current_phase><design_start>2014-01-01T00:00:00</design_start><budget_forecast>45792288.00</budget_forecast><latest_budget_changes>211063.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2023-06-30T00:00:00</forecast_completion><latest_schedule_changes>381</latest_schedule_changes><total_schedule_changes>1854</total_schedule_changes></row><row _id="row-6b5q_583p.65nb" _uuid="00000000-0000-0000-FBB7-2FF2BB253D29" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-6b5q_583p.65nb"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>545</pid><project_name>Bellevue Medical Center Priority Mitigation Projects</project_name><description>Priority mitigation projects for the repair/restoration and hazard mitigation for Bellevue Hospital, damaged during Superstorm Sandy</description><category>Health and Hospitals</category><borough>Manhattan</borough><managing_agency>EDC</managing_agency><client_agency>H+H</client_agency><current_phase>Construction</current_phase><design_start>2014-01-01T00:00:00</design_start><budget_forecast>50941375.00</budget_forecast><latest_budget_changes>5149087.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2023-09-18T00:00:00</forecast_completion><latest_schedule_changes>80</latest_schedule_changes><total_schedule_changes>1854</total_schedule_changes></row><row _id="row-u3c3_errj-7it7" _uuid="00000000-0000-0000-ED40-C5044EC0C650" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-u3c3_errj-7it7"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>545</pid><project_name>Bellevue Medical Center Priority Mitigation Projects</project_name><description>Priority mitigation projects for the repair/restoration and hazard mitigation for Bellevue Hospital, damaged during Superstorm Sandy</description><category>Health and Hospitals</category><borough>Manhattan</borough><managing_agency>EDC</managing_agency><client_agency>H+H</client_agency><current_phase>Construction</current_phase><design_start>2014-01-01T00:00:00</design_start><budget_forecast>50941375.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2023-04-28T00:00:00</forecast_completion><latest_schedule_changes>-143</latest_schedule_changes><total_schedule_changes>1854</total_schedule_changes></row><row _id="row-k7z7-cjui_ztqe" _uuid="00000000-0000-0000-C4BA-F1775F0EA8E1" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-k7z7-cjui_ztqe"><date_reported_as_of>2019-01-01T00:00:00</date_reported_as_of><pid>550</pid><project_name>Construction of Gowanus CSO retention FAC Superfund Site</project_name><description>CSO Facilities, bulkheads, pilots and other requirements to comply with Gowanus Canal Superfund Adminstrative Orders</description><category>Industrial Development</category><borough>Brooklyn</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2017-11-22T00:00:00</design_start><budget_forecast>1350400000.00</budget_forecast><latest_budget_changes>236095114.00</latest_budget_changes><total_budget_changes>432995114.00</total_budget_changes><forecast_completion>2031-07-07T00:00:00</forecast_completion><latest_schedule_changes>945</latest_schedule_changes><total_schedule_changes>1086</total_schedule_changes></row><row _id="row-63gq.m3mr.fi7j" _uuid="00000000-0000-0000-E7F3-086BD8B6BE61" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-63gq.m3mr.fi7j"><date_reported_as_of>2019-05-01T00:00:00</date_reported_as_of><pid>550</pid><project_name>Construction of Gowanus CSO retention FAC Superfund Site</project_name><description>CSO Facilities, bulkheads, pilots and other requirements to comply with Gowanus Canal Superfund Adminstrative Orders</description><category>Industrial Development</category><borough>Brooklyn</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2017-11-22T00:00:00</design_start><budget_forecast>1350400000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>432995114.00</total_budget_changes><forecast_completion>2031-07-07T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1086</total_schedule_changes></row><row _id="row-pymq~t3yx-i632" _uuid="00000000-0000-0000-7A52-15D325D3E837" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-pymq~t3yx-i632"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>550</pid><project_name>Construction of Gowanus CSO retention FAC Superfund Site</project_name><description>CSO Facilities, bulkheads, pilots and other requirements to comply with Gowanus Canal Superfund Adminstrative Orders</description><category>Industrial Development</category><borough>Brooklyn</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2017-11-22T00:00:00</design_start><budget_forecast>1427400000.00</budget_forecast><latest_budget_changes>77000000.00</latest_budget_changes><total_budget_changes>432995114.00</total_budget_changes><forecast_completion>2031-07-07T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1086</total_schedule_changes></row><row _id="row-8qfp~ran9_ggbv" _uuid="00000000-0000-0000-4D22-D546F17FE756" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-8qfp~ran9_ggbv"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>550</pid><project_name>Construction of Gowanus CSO retention FAC Superfund Site</project_name><description>CSO Facilities, bulkheads, pilots and other requirements to comply with Gowanus Canal Superfund Adminstrative Orders</description><category>Industrial Development</category><borough>Brooklyn</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2017-11-22T00:00:00</design_start><budget_forecast>1446700000.00</budget_forecast><latest_budget_changes>19300000.00</latest_budget_changes><total_budget_changes>432995114.00</total_budget_changes><forecast_completion>2031-07-07T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1086</total_schedule_changes></row><row _id="row-njve.52d3~8xxa" _uuid="00000000-0000-0000-9FC1-913DD1CE553A" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-njve.52d3~8xxa"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>550</pid><project_name>Construction of Gowanus CSO retention FAC Superfund Site</project_name><description>CSO Facilities, bulkheads, pilots and other requirements to comply with Gowanus Canal Superfund Adminstrative Orders</description><category>Industrial Development</category><borough>Brooklyn</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2017-11-22T00:00:00</design_start><budget_forecast>1446700000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>432995114.00</total_budget_changes><forecast_completion>2031-07-07T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1086</total_schedule_changes></row><row _id="row-xsxz.vac6_ytdz" _uuid="00000000-0000-0000-BDEA-1A7CCE008F78" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-xsxz.vac6_ytdz"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>550</pid><project_name>Construction of Gowanus CSO retention FAC Superfund Site</project_name><description>CSO Facilities, bulkheads, pilots and other requirements to comply with Gowanus Canal Superfund Adminstrative Orders</description><category>Industrial Development</category><borough>Brooklyn</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2017-11-22T00:00:00</design_start><budget_forecast>1534300000.00</budget_forecast><latest_budget_changes>87600000.00</latest_budget_changes><total_budget_changes>432995114.00</total_budget_changes><forecast_completion>2031-07-07T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1086</total_schedule_changes></row><row _id="row-rkcm-v4vf.xckq" _uuid="00000000-0000-0000-0B3C-7C227B8DFEAF" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-rkcm-v4vf.xckq"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>550</pid><project_name>Construction of Gowanus CSO retention FAC Superfund Site</project_name><description>CSO Facilities, bulkheads, pilots and other requirements to comply with Gowanus Canal Superfund Adminstrative Orders</description><category>Industrial Development</category><borough>Brooklyn</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2017-11-22T00:00:00</design_start><budget_forecast>1558300000.00</budget_forecast><latest_budget_changes>24000000.00</latest_budget_changes><total_budget_changes>432995114.00</total_budget_changes><forecast_completion>2031-07-07T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1086</total_schedule_changes></row><row _id="row-ifu2.jggz-pu74" _uuid="00000000-0000-0000-9961-2D5995D38837" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ifu2.jggz-pu74"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>550</pid><project_name>Construction of Gowanus CSO retention FAC Superfund Site</project_name><description>CSO Facilities, bulkheads, pilots and other requirements to comply with Gowanus Canal Superfund Adminstrative Orders</description><category>Industrial Development</category><borough>Brooklyn</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction Procurement</current_phase><design_start>2017-11-22T00:00:00</design_start><budget_forecast>1547300000.00</budget_forecast><latest_budget_changes>-11000000.00</latest_budget_changes><total_budget_changes>432995114.00</total_budget_changes><forecast_completion>2031-11-25T00:00:00</forecast_completion><latest_schedule_changes>141</latest_schedule_changes><total_schedule_changes>1086</total_schedule_changes></row><row _id="row-b8k3-aub3~uftd" _uuid="00000000-0000-0000-091E-E84F3DE1CC43" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-b8k3-aub3~uftd"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>550</pid><project_name>Construction of Gowanus CSO retention FAC Superfund Site</project_name><category>Industrial Development</category><borough>Brooklyn</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><total_budget_changes>432995114.00</total_budget_changes><total_schedule_changes>1086</total_schedule_changes></row><row _id="row-hw88-fxci-r4fx" _uuid="00000000-0000-0000-C4BF-60392A979F18" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-hw88-fxci-r4fx"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>550</pid><project_name>Construction of Gowanus CSO retention FAC Superfund Site</project_name><description>CSO Facilities, bulkheads, pilots and other requirements to comply with Gowanus Canal Superfund Adminstrative Orders</description><category>Industrial Development</category><borough>Brooklyn</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction Procurement</current_phase><design_start>2017-11-22T00:00:00</design_start><budget_forecast>1547300000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>432995114.00</total_budget_changes><forecast_completion>2031-11-25T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1086</total_schedule_changes></row><row _id="row-s8de_qu6i_wmav" _uuid="00000000-0000-0000-1073-F701F884866F" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-s8de_qu6i_wmav"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>550</pid><project_name>Construction of Gowanus CSO retention FAC Superfund Site</project_name><description>CSO Facilities, bulkheads, pilots and other requirements to comply with Gowanus Canal Superfund Adminstrative Orders</description><category>Industrial Development</category><borough>Brooklyn</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction Procurement</current_phase><design_start>2017-11-22T00:00:00</design_start><budget_forecast>1547300000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>432995114.00</total_budget_changes><forecast_completion>2031-11-25T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1086</total_schedule_changes></row><row _id="row-srnq_xrtu~jmna" _uuid="00000000-0000-0000-79DB-E2FCEACE8CDB" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-srnq_xrtu~jmna"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>550</pid><project_name>Construction of Gowanus CSO retention FAC Superfund Site</project_name><description>CSO Facilities, bulkheads, pilots and other requirements to comply with Gowanus Canal Superfund Adminstrative Orders</description><category>Industrial Development</category><borough>Brooklyn</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction Procurement</current_phase><design_start>2017-11-22T00:00:00</design_start><budget_forecast>1547300000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>432995114.00</total_budget_changes><forecast_completion>2031-11-25T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1086</total_schedule_changes></row><row _id="row-y673.qdbj~6igk" _uuid="00000000-0000-0000-4983-60C2D778CC38" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-y673.qdbj~6igk"><date_reported_as_of>2017-09-01T00:00:00</date_reported_as_of><pid>554</pid><project_name>Kensico Eastview Connection Tunnel Construction</project_name><description>The redundant connection between Kensico and Hillview Reservoirs provides resiliency against planned or unplanned tunnel outages to deliver water.</description><category>Water Supply</category><borough>Valhalla</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2017-06-02T00:00:00</design_start><budget_forecast>1245612532.00</budget_forecast><latest_budget_changes>68947854.00</latest_budget_changes><total_budget_changes>881770648.00</total_budget_changes><forecast_completion>2024-10-11T00:00:00</forecast_completion><latest_schedule_changes>-210</latest_schedule_changes><total_schedule_changes>3132</total_schedule_changes></row><row _id="row-rinw_8r85.2968" _uuid="00000000-0000-0000-A270-1A1DA224FE9C" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-rinw_8r85.2968"><date_reported_as_of>2018-03-01T00:00:00</date_reported_as_of><pid>554</pid><project_name>Kensico Eastview Connection Tunnel Construction</project_name><description>The redundant connection between Kensico and Hillview Reservoirs provides resiliency against planned or unplanned tunnel outages to deliver water.</description><category>Water Supply</category><borough>Valhalla</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2017-06-02T00:00:00</design_start><budget_forecast>1454467714.80</budget_forecast><latest_budget_changes>208855182.80</latest_budget_changes><total_budget_changes>881770648.00</total_budget_changes><forecast_completion>2027-10-28T00:00:00</forecast_completion><latest_schedule_changes>1112</latest_schedule_changes><total_schedule_changes>3132</total_schedule_changes></row><row _id="row-wkht_jpmq.vb68" _uuid="00000000-0000-0000-8034-80819BDC5124" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-wkht_jpmq.vb68"><date_reported_as_of>2018-08-01T00:00:00</date_reported_as_of><pid>554</pid><project_name>Kensico Eastview Connection Tunnel Construction</project_name><description>The redundant connection between Kensico and Hillview Reservoirs provides resiliency against planned or unplanned tunnel outages to deliver water.</description><category>Water Supply</category><borough>Valhalla</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2017-08-01T00:00:00</design_start><budget_forecast>1468061956.80</budget_forecast><latest_budget_changes>13594242.00</latest_budget_changes><total_budget_changes>881770648.00</total_budget_changes><forecast_completion>2028-05-05T00:00:00</forecast_completion><latest_schedule_changes>190</latest_schedule_changes><total_schedule_changes>3132</total_schedule_changes></row><row _id="row-fupy.nccf.jiqa" _uuid="00000000-0000-0000-645F-B13A1AC743FC" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-fupy.nccf.jiqa"><date_reported_as_of>2019-01-01T00:00:00</date_reported_as_of><pid>554</pid><project_name>Kensico Eastview Connection Tunnel Construction</project_name><description>The redundant connection between Kensico and Hillview Reservoirs provides resiliency against planned or unplanned tunnel outages to deliver water.</description><category>Water Supply</category><borough>Valhalla</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2017-08-01T00:00:00</design_start><budget_forecast>1463327823.80</budget_forecast><latest_budget_changes>-4734133.00</latest_budget_changes><total_budget_changes>881770648.00</total_budget_changes><forecast_completion>2030-08-26T00:00:00</forecast_completion><latest_schedule_changes>843</latest_schedule_changes><total_schedule_changes>3132</total_schedule_changes></row><row _id="row-phav_9myc.q7qm" _uuid="00000000-0000-0000-0228-D7EF87E341C4" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-phav_9myc.q7qm"><date_reported_as_of>2019-05-01T00:00:00</date_reported_as_of><pid>554</pid><project_name>Kensico Eastview Connection Tunnel Construction</project_name><description>A new 2+ mile, 27-ft internal diamter tunnel between Kensico and Cat-Del UV Facility (Eastview).  The tunnel will include a new screen chamber and will provide ciritcal redundancy to the Delaware Aqueduct in this area.</description><category>Water Supply</category><borough>Valhalla</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2017-08-01T00:00:00</design_start><budget_forecast>1452196604.80</budget_forecast><latest_budget_changes>-11131219.00</latest_budget_changes><total_budget_changes>881770648.00</total_budget_changes><forecast_completion>2031-05-27T00:00:00</forecast_completion><latest_schedule_changes>274</latest_schedule_changes><total_schedule_changes>3132</total_schedule_changes></row><row _id="row-st8f_i7ae~q8jj" _uuid="00000000-0000-0000-17E5-7CC4269D4BDC" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-st8f_i7ae~q8jj"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>554</pid><project_name>Kensico Eastview Connection Tunnel Construction</project_name><description>A new 2+ mile, 27-ft internal diameter tunnel between Kensico and the Cat-Del UV Facility.  The tunnel will include a new screen chamber and rehab of existing intake, and will provide critical redundancy to the Delaware Aqueduct in this area.</description><category>Water Supply</category><borough>Valhalla</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2017-08-01T00:00:00</design_start><budget_forecast>1984467323.00</budget_forecast><latest_budget_changes>532270718.20</latest_budget_changes><total_budget_changes>881770648.00</total_budget_changes><forecast_completion>2031-05-27T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>3132</total_schedule_changes></row><row _id="row-v73e~uqci_5sja" _uuid="00000000-0000-0000-FD89-C7DB76CB2BD1" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-v73e~uqci_5sja"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>554</pid><project_name>Kensico Eastview Connection Tunnel Construction</project_name><description>A new 2+ mile, 27-ft internal diameter tunnel between Kensico and the Cat-Del UV Facility.  The tunnel will include a new screen chamber and rehab of existing intake, and will provide critical redundancy to the Delaware Aqueduct in this area.</description><category>Water Supply</category><borough>Valhalla</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2017-08-01T00:00:00</design_start><budget_forecast>1984467323.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>881770648.00</total_budget_changes><forecast_completion>2031-05-17T00:00:00</forecast_completion><latest_schedule_changes>-10</latest_schedule_changes><total_schedule_changes>3132</total_schedule_changes></row><row _id="row-tvyr~4tfg.jpcz" _uuid="00000000-0000-0000-8F84-DC0FD98A7F9B" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-tvyr~4tfg.jpcz"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>554</pid><project_name>Kensico Eastview Connection Tunnel Construction</project_name><description>A new 2+ mile, 27-ft internal diameter tunnel between Kensico and the Cat-Del UV Facility.  The tunnel will include a new screen chamber and rehab of existing intake, and will provide critical redundancy to the Delaware Aqueduct in this area.</description><category>Water Supply</category><borough>Valhalla</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2017-08-01T00:00:00</design_start><budget_forecast>1909623969.00</budget_forecast><latest_budget_changes>-74843354.00</latest_budget_changes><total_budget_changes>881770648.00</total_budget_changes><forecast_completion>2031-05-17T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>3132</total_schedule_changes></row><row _id="row-thug.764i.ctmk" _uuid="00000000-0000-0000-23C5-EF1E72E0C732" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-thug.764i.ctmk"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>554</pid><project_name>Kensico Eastview Connection Tunnel Construction</project_name><description>A new 2+ mile, 27-ft internal diameter tunnel between Kensico and the Cat-Del UV Facility.  The tunnel will include a new screen chamber and rehab of existing intake, and will provide critical redundancy to the Delaware Aqueduct in this area.</description><category>Water Supply</category><borough>Valhalla</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2017-08-01T00:00:00</design_start><budget_forecast>1902139633.60</budget_forecast><latest_budget_changes>-7484335.40</latest_budget_changes><total_budget_changes>881770648.00</total_budget_changes><forecast_completion>2031-05-17T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>3132</total_schedule_changes></row><row _id="row-4n5i_89gi-xdu8" _uuid="00000000-0000-0000-6690-4620D4F57997" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-4n5i_89gi-xdu8"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>554</pid><project_name>Kensico Eastview Connection Tunnel Construction</project_name><description>A new 2+ mile, 27-ft internal diameter tunnel between Kensico and the Cat-Del UV Facility.  The tunnel will include a new screen chamber and rehab of existing intake, and will provide critical redundancy to the Delaware Aqueduct in this area.</description><category>Water Supply</category><borough>Valhalla</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2017-08-01T00:00:00</design_start><budget_forecast>1902139633.60</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>881770648.00</total_budget_changes><forecast_completion>2031-05-17T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>3132</total_schedule_changes></row><row _id="row-fwqc.hruu-buir" _uuid="00000000-0000-0000-9231-B6ECD1F7259C" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-fwqc.hruu-buir"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>554</pid><project_name>Kensico Eastview Connection Tunnel Construction</project_name><description>A new 2+ mile, 27-ft internal diameter tunnel between Kensico and the Cat-Del UV Facility.  The tunnel will include a new screen chamber and rehab of existing intake, and will provide critical redundancy to the Delaware Aqueduct in this area.</description><category>Water Supply</category><borough>Valhalla</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2017-08-01T00:00:00</design_start><budget_forecast>1902139633.60</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>881770648.00</total_budget_changes><forecast_completion>2031-05-17T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>3132</total_schedule_changes></row><row _id="row-gncc_jjes~bxf4" _uuid="00000000-0000-0000-3263-C3489C91CDDD" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-gncc_jjes~bxf4"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>554</pid><project_name>Kensico Eastview Connection Tunnel Construction</project_name><description>The redundant connection between Kensico and Hillview Reservoirs provides resiliency against planned or unplanned tunnel outages to deliver water.</description><category>Water Supply</category><borough>Valhalla</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2017-08-01T00:00:00</design_start><budget_forecast>1894196436.60</budget_forecast><latest_budget_changes>-7943197.00</latest_budget_changes><total_budget_changes>881770648.00</total_budget_changes><forecast_completion>2031-05-17T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>3132</total_schedule_changes></row><row _id="row-hc2u.9wsh~nbga" _uuid="00000000-0000-0000-836F-E029A67274F4" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-hc2u.9wsh~nbga"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>554</pid><project_name>Kensico Eastview Connection Tunnel Construction</project_name><description>The redundant connection between Kensico and Hillview Reservoirs provides resiliency against planned or unplanned tunnel outages to deliver water.</description><category>Water Supply</category><borough>Valhalla</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2017-08-01T00:00:00</design_start><budget_forecast>1957196436.60</budget_forecast><latest_budget_changes>63000000.00</latest_budget_changes><total_budget_changes>881770648.00</total_budget_changes><forecast_completion>2033-12-05T00:00:00</forecast_completion><latest_schedule_changes>933</latest_schedule_changes><total_schedule_changes>3132</total_schedule_changes></row><row _id="row-h5mp.xanf_kgby" _uuid="00000000-0000-0000-EBDA-283F3FF3889E" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-h5mp.xanf_kgby"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>554</pid><project_name>Kensico Eastview Connection Tunnel Construction</project_name><description>The redundant connection between Kensico and Hillview Reservoirs provides resiliency against planned or unplanned tunnel outages to deliver water.</description><category>Water Supply</category><borough>Valhalla</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2017-08-01T00:00:00</design_start><budget_forecast>2058435326.00</budget_forecast><latest_budget_changes>101238889.40</latest_budget_changes><total_budget_changes>881770648.00</total_budget_changes><forecast_completion>2033-12-05T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>3132</total_schedule_changes></row><row _id="row-cvtk~54vb_i7cj" _uuid="00000000-0000-0000-F5B3-EFAF755A8847" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-cvtk~54vb_i7cj"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>554</pid><project_name>Kensico Eastview Connection Tunnel Construction</project_name><description>The redundant connection between Kensico and Hillview Reservoirs provides resiliency against planned or unplanned tunnel outages to deliver water.</description><category>Water Supply</category><borough>Valhalla</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2017-08-01T00:00:00</design_start><budget_forecast>2058435326.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>881770648.00</total_budget_changes><forecast_completion>2033-12-05T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>3132</total_schedule_changes></row><row _id="row-q9v4_cp82.hada" _uuid="00000000-0000-0000-CF77-98F59275CCCD" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-q9v4_cp82.hada"><date_reported_as_of>2017-09-01T00:00:00</date_reported_as_of><pid>556</pid><project_name>Metropolitan Avenue Bridge over CSX Transport</project_name><description>Replace the Metropolitan Avenue bridge over CSX Transport, Queens.</description><category>Bridges, Streets and Roadways</category><borough>Queens</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2017-09-28T00:00:00</design_start><budget_forecast>67602000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>4699394.00</total_budget_changes><forecast_completion>2024-09-02T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>2027</total_schedule_changes></row><row _id="row-hkkt.64sq~k8uk" _uuid="00000000-0000-0000-35FA-4FD91542C2B0" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-hkkt.64sq~k8uk"><date_reported_as_of>2018-03-01T00:00:00</date_reported_as_of><pid>556</pid><project_name>Metropolitan Avenue Bridge over CSX Transport</project_name><description>Replace the Metropolitan Avenue bridge over CSX Transport, Queens.</description><category>Bridges, Streets and Roadways</category><borough>Queens</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2017-09-28T00:00:00</design_start><budget_forecast>74843394.00</budget_forecast><latest_budget_changes>7241394.00</latest_budget_changes><total_budget_changes>4699394.00</total_budget_changes><forecast_completion>2024-09-02T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>2027</total_schedule_changes></row><row _id="row-qyaa~hqg2_c5qs" _uuid="00000000-0000-0000-7FD1-B43CAFB38F7A" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-qyaa~hqg2_c5qs"><date_reported_as_of>2018-08-01T00:00:00</date_reported_as_of><pid>556</pid><project_name>Metropolitan Avenue Bridge over CSX Transport</project_name><description>Replace the Metropolitan Avenue bridge over CSX Transport, Queens.</description><category>Bridges, Streets and Roadways</category><borough>Queens</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2017-09-28T00:00:00</design_start><budget_forecast>75268394.00</budget_forecast><latest_budget_changes>425000.00</latest_budget_changes><total_budget_changes>4699394.00</total_budget_changes><forecast_completion>2026-09-16T00:00:00</forecast_completion><latest_schedule_changes>744</latest_schedule_changes><total_schedule_changes>2027</total_schedule_changes></row><row _id="row-2fd8_zgj9.sf62" _uuid="00000000-0000-0000-8FF8-1E938EE772E7" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-2fd8_zgj9.sf62"><date_reported_as_of>2019-01-01T00:00:00</date_reported_as_of><pid>556</pid><project_name>Metropolitan Avenue Bridge over CSX Transport</project_name><description>Replace the Metropolitan Avenue bridge over CSX Transport, Queens.</description><category>Bridges, Streets and Roadways</category><borough>Queens</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2017-09-28T00:00:00</design_start><budget_forecast>-4102606.00</budget_forecast><latest_budget_changes>-79371000.00</latest_budget_changes><total_budget_changes>4699394.00</total_budget_changes><forecast_completion>2027-03-15T00:00:00</forecast_completion><latest_schedule_changes>180</latest_schedule_changes><total_schedule_changes>2027</total_schedule_changes></row><row _id="row-mtc8_jnh8-zmkj" _uuid="00000000-0000-0000-11E5-AC6C5A6FFC04" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-mtc8_jnh8-zmkj"><date_reported_as_of>2019-05-01T00:00:00</date_reported_as_of><pid>556</pid><project_name>Metropolitan Avenue Bridge over CSX Transport</project_name><description>Replace the Metropolitan Avenue bridge over CSX Transport, Queens.</description><category>Bridges, Streets and Roadways</category><borough>Queens</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2017-09-28T00:00:00</design_start><budget_forecast>68452394.00</budget_forecast><latest_budget_changes>72555000.00</latest_budget_changes><total_budget_changes>4699394.00</total_budget_changes><forecast_completion>2027-02-19T00:00:00</forecast_completion><latest_schedule_changes>-24</latest_schedule_changes><total_schedule_changes>2027</total_schedule_changes></row><row _id="row-fx9u.nqsr_rd49" _uuid="00000000-0000-0000-0DCE-BAC2A47594F6" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-fx9u.nqsr_rd49"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>556</pid><project_name>Metropolitan Avenue Bridge over CSX Transport</project_name><description>Replace the Metropolitan Avenue bridge over CSX Transport, Queens.</description><category>Bridges, Streets and Roadways</category><borough>Queens</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2017-09-28T00:00:00</design_start><budget_forecast>72926394.00</budget_forecast><latest_budget_changes>4474000.00</latest_budget_changes><total_budget_changes>4699394.00</total_budget_changes><total_schedule_changes>2027</total_schedule_changes></row><row _id="row-avv9_sjtx~z6a8" _uuid="00000000-0000-0000-1B14-BDE468D80962" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-avv9_sjtx~z6a8"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>556</pid><project_name>Metropolitan Avenue Bridge over CSX Transport</project_name><description>Replace/Rehab the Metropolitan Avenue bridge over CSX Transport, Queens.</description><category>Bridges, Streets and Roadways</category><borough>Queens</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2017-09-28T00:00:00</design_start><budget_forecast>73226394.00</budget_forecast><latest_budget_changes>300000.00</latest_budget_changes><total_budget_changes>4699394.00</total_budget_changes><forecast_completion>2027-12-14T00:00:00</forecast_completion><latest_schedule_changes>298</latest_schedule_changes><total_schedule_changes>2027</total_schedule_changes></row><row _id="row-pywd.xiun-vrp3" _uuid="00000000-0000-0000-16EF-BB7CC78F2AF5" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-pywd.xiun-vrp3"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>556</pid><project_name>Metropolitan Avenue Bridge over CSX Transport</project_name><description>Replace/Rehab the Metropolitan Avenue bridge over CSX Transport, Queens.</description><category>Bridges, Streets and Roadways</category><borough>Queens</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2017-09-28T00:00:00</design_start><budget_forecast>72801394.00</budget_forecast><latest_budget_changes>-425000.00</latest_budget_changes><total_budget_changes>4699394.00</total_budget_changes><forecast_completion>2028-02-22T00:00:00</forecast_completion><latest_schedule_changes>70</latest_schedule_changes><total_schedule_changes>2027</total_schedule_changes></row><row _id="row-vvku~438z.23sp" _uuid="00000000-0000-0000-EF89-28196FEE6CA0" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-vvku~438z.23sp"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>556</pid><project_name>Metropolitan Avenue Bridge over CSX Transport</project_name><description>Replace/Rehab the Metropolitan Avenue bridge over CSX Transport, Queens.</description><category>Bridges, Streets and Roadways</category><borough>Queens</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2017-09-28T00:00:00</design_start><budget_forecast>72801394.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>4699394.00</total_budget_changes><forecast_completion>2029-10-24T00:00:00</forecast_completion><latest_schedule_changes>610</latest_schedule_changes><total_schedule_changes>2027</total_schedule_changes></row><row _id="row-qkrw~qy28_8xqx" _uuid="00000000-0000-0000-8616-F07DD6D69C24" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-qkrw~qy28_8xqx"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>556</pid><project_name>Metropolitan Avenue Bridge over CSX Transport</project_name><category>Bridges, Streets and Roadways</category><borough>Queens</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><total_budget_changes>4699394.00</total_budget_changes><total_schedule_changes>2027</total_schedule_changes></row><row _id="row-j94c_txzf_gf3z" _uuid="00000000-0000-0000-AA2B-0D9CCF7F02E3" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-j94c_txzf_gf3z"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>556</pid><project_name>Metropolitan Avenue Bridge over CSX Transport</project_name><description>Replace/Rehab the Metropolitan Avenue bridge over CSX Transport, Queens.</description><category>Bridges, Streets and Roadways</category><borough>Queens</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2018-04-16T00:00:00</design_start><budget_forecast>72301394.00</budget_forecast><latest_budget_changes>-500000.00</latest_budget_changes><total_budget_changes>4699394.00</total_budget_changes><forecast_completion>2028-12-29T00:00:00</forecast_completion><latest_schedule_changes>-299</latest_schedule_changes><total_schedule_changes>2027</total_schedule_changes></row><row _id="row-h468~wrwr-w3p7" _uuid="00000000-0000-0000-5AA1-6686927E0F78" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-h468~wrwr-w3p7"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>556</pid><project_name>Metropolitan Avenue Bridge over CSX Transport</project_name><description>Replace/Rehab the Metropolitan Avenue bridge over CSX Transport, Queens.</description><category>Bridges, Streets and Roadways</category><borough>Queens</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2018-04-16T00:00:00</design_start><budget_forecast>72301394.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>4699394.00</total_budget_changes><forecast_completion>2028-12-29T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>2027</total_schedule_changes></row><row _id="row-ukrb_uqcd_z76a" _uuid="00000000-0000-0000-8D06-6B3CD63DEB81" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ukrb_uqcd_z76a"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>556</pid><project_name>Metropolitan Avenue Bridge over CSX Transport</project_name><description>Replace/Rehab the Metropolitan Avenue bridge over CSX Transport, Queens.</description><category>Bridges, Streets and Roadways</category><borough>Queens</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2018-04-16T00:00:00</design_start><budget_forecast>71376394.00</budget_forecast><latest_budget_changes>-925000.00</latest_budget_changes><total_budget_changes>4699394.00</total_budget_changes><forecast_completion>2029-07-16T00:00:00</forecast_completion><latest_schedule_changes>199</latest_schedule_changes><total_schedule_changes>2027</total_schedule_changes></row><row _id="row-ujkc.b6vv.zbzb" _uuid="00000000-0000-0000-07F1-FD94B53333CB" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ujkc.b6vv.zbzb"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>556</pid><project_name>Metropolitan Avenue Bridge over CSX Transport</project_name><description>Replace/Rehab the Metropolitan Avenue bridge over CSX Transport, Queens.</description><category>Bridges, Streets and Roadways</category><borough>Queens</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2018-04-16T00:00:00</design_start><budget_forecast>71376394.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>4699394.00</total_budget_changes><forecast_completion>2030-01-05T00:00:00</forecast_completion><latest_schedule_changes>173</latest_schedule_changes><total_schedule_changes>2027</total_schedule_changes></row><row _id="row-52q9_fby5.x7rm" _uuid="00000000-0000-0000-0718-E7853FB5ADCE" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-52q9_fby5.x7rm"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>556</pid><project_name>Metropolitan Avenue Bridge over CSX Transport</project_name><description>Replace/Rehab the Metropolitan Avenue bridge over CSX Transport, Queens.</description><category>Bridges, Streets and Roadways</category><borough>Queens</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2018-04-16T00:00:00</design_start><budget_forecast>72301394.00</budget_forecast><latest_budget_changes>925000.00</latest_budget_changes><total_budget_changes>4699394.00</total_budget_changes><forecast_completion>2030-03-22T00:00:00</forecast_completion><latest_schedule_changes>76</latest_schedule_changes><total_schedule_changes>2027</total_schedule_changes></row><row _id="row-5zvg_wkec.z39a" _uuid="00000000-0000-0000-A509-40C3AE5E4FB8" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-5zvg_wkec.z39a"><date_reported_as_of>2017-09-01T00:00:00</date_reported_as_of><pid>558</pid><project_name>Belt System - Cross Island over 115th Avenue/Dutch Broadway</project_name><description>Repair the Cross Island bridge over 115th Avenue/Dutch Broadway, Queens.</description><category>Bridges</category><borough>Queens</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2017-10-03T00:00:00</design_start><budget_forecast>24984000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>17528706.00</total_budget_changes><forecast_completion>2023-09-08T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1845</total_schedule_changes></row><row _id="row-ysn7~xgks.ec98" _uuid="00000000-0000-0000-3830-74D5AD738C9C" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ysn7~xgks.ec98"><date_reported_as_of>2018-03-01T00:00:00</date_reported_as_of><pid>558</pid><project_name>Belt System - Cross Island over 115th Avenue/Dutch Broadway</project_name><description>Repair the Cross Island bridge over 115th Avenue/Dutch Broadway, Queens.</description><category>Bridges</category><borough>Queens</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2017-10-03T00:00:00</design_start><budget_forecast>24984000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>17528706.00</total_budget_changes><forecast_completion>2023-09-08T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1845</total_schedule_changes></row><row _id="row-vsbs_qgcj-44uu" _uuid="00000000-0000-0000-130A-B1C4E6315694" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-vsbs_qgcj-44uu"><date_reported_as_of>2018-08-01T00:00:00</date_reported_as_of><pid>558</pid><project_name>Belt System - Cross Island over 115th Avenue/Dutch Broadway</project_name><description>Repair the Cross Island bridge over 115th Avenue/Dutch Broadway, Queens.</description><category>Bridges</category><borough>Queens</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2017-10-03T00:00:00</design_start><budget_forecast>25664171.00</budget_forecast><latest_budget_changes>680171.00</latest_budget_changes><total_budget_changes>17528706.00</total_budget_changes><forecast_completion>2023-09-08T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1845</total_schedule_changes></row><row _id="row-aw9y.5n4m.ei74" _uuid="00000000-0000-0000-01D5-8777EDD18746" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-aw9y.5n4m.ei74"><date_reported_as_of>2019-01-01T00:00:00</date_reported_as_of><pid>558</pid><project_name>Belt System - Cross Island over 115th Avenue/Dutch Broadway</project_name><description>Repair the Cross Island bridge over 115th Avenue/Dutch Broadway, Queens.</description><category>Bridges</category><borough>Queens</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2017-10-03T00:00:00</design_start><budget_forecast>25668171.00</budget_forecast><latest_budget_changes>4000.00</latest_budget_changes><total_budget_changes>17528706.00</total_budget_changes><forecast_completion>2023-09-08T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1845</total_schedule_changes></row><row _id="row-9pym_qs9r_s6v6" _uuid="00000000-0000-0000-CECB-E6A501DBC5A9" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-9pym_qs9r_s6v6"><date_reported_as_of>2019-05-01T00:00:00</date_reported_as_of><pid>558</pid><project_name>Belt System - Cross Island over 115th Avenue/Dutch Broadway</project_name><description>Repair the Cross Island bridge over 115th Avenue/Dutch Broadway, Queens.</description><category>Bridges</category><borough>Queens</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2017-10-03T00:00:00</design_start><budget_forecast>25838171.00</budget_forecast><latest_budget_changes>170000.00</latest_budget_changes><total_budget_changes>17528706.00</total_budget_changes><forecast_completion>2025-11-14T00:00:00</forecast_completion><latest_schedule_changes>798</latest_schedule_changes><total_schedule_changes>1845</total_schedule_changes></row><row _id="row-79pd~33up-iuu3" _uuid="00000000-0000-0000-1449-1A5E12755A1C" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-79pd~33up-iuu3"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>558</pid><project_name>Belt System - Cross Island over 115th Avenue/Dutch Broadway</project_name><description>Repair the Cross Island bridge over 115th Avenue/Dutch Broadway, Queens.</description><category>Bridges</category><borough>Queens</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2017-10-03T00:00:00</design_start><budget_forecast>25753171.00</budget_forecast><latest_budget_changes>-85000.00</latest_budget_changes><total_budget_changes>17528706.00</total_budget_changes><total_schedule_changes>1845</total_schedule_changes></row><row _id="row-nwpb~m8mf.9q4h" _uuid="00000000-0000-0000-F175-506B6EBA03B1" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-nwpb~m8mf.9q4h"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>558</pid><project_name>Belt System - Cross Island over 115th Avenue/Dutch Broadway</project_name><description>Repair the Cross Island bridge over 115th Avenue/Dutch Broadway, Queens.</description><category>Bridges</category><borough>Queens</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2017-10-03T00:00:00</design_start><budget_forecast>25753171.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>17528706.00</total_budget_changes><total_schedule_changes>1845</total_schedule_changes></row><row _id="row-ibfd~u47e~8xt3" _uuid="00000000-0000-0000-866C-988FCE239AB8" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ibfd~u47e~8xt3"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>558</pid><project_name>Belt System - Cross Island over 115th Avenue/Dutch Broadway</project_name><description>Repair the Cross Island bridge over 115th Avenue/Dutch Broadway, Queens.</description><category>Bridges</category><borough>Queens</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2017-10-03T00:00:00</design_start><budget_forecast>19496625.00</budget_forecast><latest_budget_changes>-6256546.00</latest_budget_changes><total_budget_changes>17528706.00</total_budget_changes><total_schedule_changes>1845</total_schedule_changes></row><row _id="row-yv2h-2v62_j5q6" _uuid="00000000-0000-0000-D855-EDAA457383BA" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-yv2h-2v62_j5q6"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>558</pid><project_name>Belt System - Cross Island over 115th Avenue/Dutch Broadway</project_name><description>Repair the Cross Island bridge over 115th Avenue/Dutch Broadway, Queens.</description><category>Bridges</category><borough>Queens</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2017-10-03T00:00:00</design_start><budget_forecast>25843171.00</budget_forecast><latest_budget_changes>6346546.00</latest_budget_changes><total_budget_changes>17528706.00</total_budget_changes><total_schedule_changes>1845</total_schedule_changes></row><row _id="row-eiq6-bnym~a2vi" _uuid="00000000-0000-0000-04A4-40D9AC5D760A" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-eiq6-bnym~a2vi"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>558</pid><project_name>Belt System - Cross Island over 115th Avenue/Dutch Broadway</project_name><category>Bridges</category><borough>Queens</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><total_budget_changes>17528706.00</total_budget_changes><total_schedule_changes>1845</total_schedule_changes></row><row _id="row-wx3z~vs56.9uh4" _uuid="00000000-0000-0000-79C4-FD73259762FA" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-wx3z~vs56.9uh4"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>558</pid><project_name>Belt System - Cross Island over 115th Avenue/Dutch Broadway</project_name><description>Repair the Cross Island bridge over 115th Avenue/Dutch Broadway, Queens.</description><category>Bridges</category><borough>Queens</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2017-10-03T00:00:00</design_start><budget_forecast>25882171.00</budget_forecast><latest_budget_changes>39000.00</latest_budget_changes><total_budget_changes>17528706.00</total_budget_changes><forecast_completion>2025-11-18T00:00:00</forecast_completion><latest_schedule_changes>4</latest_schedule_changes><total_schedule_changes>1845</total_schedule_changes></row><row _id="row-pnhd-qa5p~4z45" _uuid="00000000-0000-0000-4E4D-843522933CEB" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-pnhd-qa5p~4z45"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>558</pid><project_name>Belt System - Cross Island over 115th Avenue/Dutch Broadway</project_name><description>Repair the Cross Island bridge over 115th Avenue/Dutch Broadway, Queens.</description><category>Bridges</category><borough>Queens</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2017-10-03T00:00:00</design_start><budget_forecast>34241171.00</budget_forecast><latest_budget_changes>8359000.00</latest_budget_changes><total_budget_changes>17528706.00</total_budget_changes><forecast_completion>2027-02-13T00:00:00</forecast_completion><latest_schedule_changes>452</latest_schedule_changes><total_schedule_changes>1845</total_schedule_changes></row><row _id="row-aucz-hi3p.4yuu" _uuid="00000000-0000-0000-7E08-8EF6EDD491E6" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-aucz-hi3p.4yuu"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>558</pid><project_name>Belt System - Cross Island over 115th Avenue/Dutch Broadway</project_name><description>Repair the Cross Island bridge over 115th Avenue/Dutch Broadway, Queens.</description><category>Bridges</category><borough>Queens</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2017-10-03T00:00:00</design_start><budget_forecast>40260171.00</budget_forecast><latest_budget_changes>6019000.00</latest_budget_changes><total_budget_changes>17528706.00</total_budget_changes><forecast_completion>2027-01-31T00:00:00</forecast_completion><latest_schedule_changes>-13</latest_schedule_changes><total_schedule_changes>1845</total_schedule_changes></row><row _id="row-9f2d~ndpf~duhs" _uuid="00000000-0000-0000-1F92-E70106C9AF70" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-9f2d~ndpf~duhs"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>558</pid><project_name>Belt System - Cross Island over 115th Avenue/Dutch Broadway</project_name><description>Repair the Cross Island bridge over 115th Avenue/Dutch Broadway, Queens.</description><category>Bridges</category><borough>Queens</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2017-10-03T00:00:00</design_start><budget_forecast>41673367.00</budget_forecast><latest_budget_changes>1413196.00</latest_budget_changes><total_budget_changes>17528706.00</total_budget_changes><forecast_completion>2028-07-18T00:00:00</forecast_completion><latest_schedule_changes>534</latest_schedule_changes><total_schedule_changes>1845</total_schedule_changes></row><row _id="row-nt4d~vypc-mzej" _uuid="00000000-0000-0000-70B2-868826EB13F6" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-nt4d~vypc-mzej"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>558</pid><project_name>Belt System - Cross Island over 115th Avenue/Dutch Broadway</project_name><description>Repair the Cross Island bridge over 115th Avenue/Dutch Broadway, Queens.</description><category>Bridges</category><borough>Queens</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2017-10-03T00:00:00</design_start><budget_forecast>42512706.00</budget_forecast><latest_budget_changes>839339.00</latest_budget_changes><total_budget_changes>17528706.00</total_budget_changes><forecast_completion>2028-09-26T00:00:00</forecast_completion><latest_schedule_changes>70</latest_schedule_changes><total_schedule_changes>1845</total_schedule_changes></row><row _id="row-papk.yrm5-376y" _uuid="00000000-0000-0000-EC34-A594AE6AB2A8" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-papk.yrm5-376y"><date_reported_as_of>2016-11-01T00:00:00</date_reported_as_of><pid>560</pid><project_name>Brooklyn Sanitation Garage Construction: Community District 3</project_name><description>Construction of new Sanitation garage facility for services to Brooklyn Community District 3 to be located at Warsoff Place in Brooklyn</description><category>Sanitation</category><borough>Brooklyn</borough><managing_agency>DSNY</managing_agency><client_agency>DSNY</client_agency><current_phase>Design</current_phase><design_start>2005-07-25T00:00:00</design_start><budget_forecast>178760628.00</budget_forecast><total_budget_changes>25603365.00</total_budget_changes><forecast_completion>2022-12-31T00:00:00</forecast_completion><total_schedule_changes>790</total_schedule_changes></row><row _id="row-x3u7_idpb-snyx" _uuid="00000000-0000-0000-1564-D535FD6B7F1A" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-x3u7_idpb-snyx"><date_reported_as_of>2017-04-01T00:00:00</date_reported_as_of><pid>560</pid><project_name>Brooklyn Sanitation Garage Construction: Community District 3</project_name><description>Construction of new Sanitation garage facility for services to Brooklyn Community District 3 to be located at Warsoff Place in Brooklyn</description><category>Sanitation</category><borough>Brooklyn</borough><managing_agency>DSNY</managing_agency><client_agency>DSNY</client_agency><current_phase>Design</current_phase><design_start>2005-07-25T00:00:00</design_start><budget_forecast>178760628.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>25603365.00</total_budget_changes><forecast_completion>2022-12-31T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>790</total_schedule_changes></row><row _id="row-vtzu_mfh4-ru93" _uuid="00000000-0000-0000-9FBE-4FC41CD3C7E5" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-vtzu_mfh4-ru93"><date_reported_as_of>2017-09-01T00:00:00</date_reported_as_of><pid>560</pid><project_name>Brooklyn Sanitation Garage Construction: Community District 3</project_name><description>Construction of new Sanitation garage facility for services to Brooklyn Community District 3 to be located at Warsoff Place in Brooklyn</description><category>Sanitation</category><borough>Brooklyn</borough><managing_agency>DSNY</managing_agency><client_agency>DSNY</client_agency><current_phase>Design</current_phase><design_start>2005-07-25T00:00:00</design_start><budget_forecast>178760628.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>25603365.00</total_budget_changes><forecast_completion>2022-12-31T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>790</total_schedule_changes></row><row _id="row-qxj2-e3ii.ih54" _uuid="00000000-0000-0000-B2D1-2827AFB4DF61" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-qxj2-e3ii.ih54"><date_reported_as_of>2018-03-01T00:00:00</date_reported_as_of><pid>560</pid><project_name>Brooklyn Sanitation Garage Construction: Community District 3</project_name><description>Construction of new Sanitation garage facility for services to Brooklyn Community District 3 to be located at Warsoff Place in Brooklyn</description><category>Sanitation</category><borough>Brooklyn</borough><managing_agency>DSNY</managing_agency><client_agency>DSNY</client_agency><current_phase>Design</current_phase><design_start>2005-07-25T00:00:00</design_start><budget_forecast>220172543.00</budget_forecast><latest_budget_changes>41411915.00</latest_budget_changes><total_budget_changes>25603365.00</total_budget_changes><forecast_completion>2022-12-31T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>790</total_schedule_changes></row><row _id="row-jfnr~2x23~xahd" _uuid="00000000-0000-0000-5809-425042D2A304" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-jfnr~2x23~xahd"><date_reported_as_of>2018-08-01T00:00:00</date_reported_as_of><pid>560</pid><project_name>Brooklyn Sanitation Garage Construction: Community District 3</project_name><description>Construction of new Sanitation garage facility for services to Brooklyn Community District 3 to be located at Warsoff Place in Brooklyn</description><category>Sanitation</category><borough>Brooklyn</borough><managing_agency>DSNY</managing_agency><client_agency>DSNY</client_agency><current_phase>Design</current_phase><design_start>2005-07-25T00:00:00</design_start><budget_forecast>220295969.00</budget_forecast><latest_budget_changes>123426.00</latest_budget_changes><total_budget_changes>25603365.00</total_budget_changes><forecast_completion>2022-10-17T00:00:00</forecast_completion><latest_schedule_changes>-75</latest_schedule_changes><total_schedule_changes>790</total_schedule_changes></row><row _id="row-ducx~qrfb-pgvp" _uuid="00000000-0000-0000-204D-F16FA7EFCE28" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ducx~qrfb-pgvp"><date_reported_as_of>2019-01-01T00:00:00</date_reported_as_of><pid>560</pid><project_name>Brooklyn Sanitation Garage Construction: Community District 3</project_name><description>Construction of new Sanitation garage facility for services to Brooklyn Community District 3 to be located at Warsoff Place in Brooklyn</description><category>Sanitation</category><borough>Brooklyn</borough><managing_agency>DSNY</managing_agency><client_agency>DSNY</client_agency><current_phase>Construction Procurement</current_phase><design_start>2005-07-25T00:00:00</design_start><budget_forecast>204337986.93</budget_forecast><latest_budget_changes>-15957982.07</latest_budget_changes><total_budget_changes>25603365.00</total_budget_changes><forecast_completion>2022-12-31T00:00:00</forecast_completion><latest_schedule_changes>75</latest_schedule_changes><total_schedule_changes>790</total_schedule_changes></row><row _id="row-g5gu~nmz2_8vg2" _uuid="00000000-0000-0000-A230-0CB66855D931" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-g5gu~nmz2_8vg2"><date_reported_as_of>2019-05-01T00:00:00</date_reported_as_of><pid>560</pid><project_name>Brooklyn Sanitation Garage Construction: Community District 3</project_name><description>Construction of new Sanitation garage facility for services to Brooklyn Community District 3 to be located at Warsoff Place in Brooklyn</description><category>Sanitation</category><borough>Brooklyn</borough><managing_agency>DSNY</managing_agency><client_agency>DSNY</client_agency><current_phase>Construction Procurement</current_phase><design_start>2005-07-25T00:00:00</design_start><budget_forecast>204347986.93</budget_forecast><latest_budget_changes>10000.00</latest_budget_changes><total_budget_changes>25603365.00</total_budget_changes><forecast_completion>2023-01-31T00:00:00</forecast_completion><latest_schedule_changes>31</latest_schedule_changes><total_schedule_changes>790</total_schedule_changes></row><row _id="row-nrrj~v3mi.sd42" _uuid="00000000-0000-0000-E311-D25FCE82F290" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-nrrj~v3mi.sd42"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>560</pid><project_name>Brooklyn Sanitation Garage Construction: Community District 3</project_name><description>Construction of new Sanitation garage facility for services to Brooklyn Community District 3 to be located at Warsoff Place in Brooklyn</description><category>Sanitation</category><borough>Brooklyn</borough><managing_agency>DSNY</managing_agency><client_agency>DSNY</client_agency><current_phase>Construction</current_phase><design_start>2005-07-25T00:00:00</design_start><budget_forecast>204347976.93</budget_forecast><latest_budget_changes>-10.00</latest_budget_changes><total_budget_changes>25603365.00</total_budget_changes><forecast_completion>2022-12-31T00:00:00</forecast_completion><latest_schedule_changes>-31</latest_schedule_changes><total_schedule_changes>790</total_schedule_changes></row><row _id="row-i29c.5umy~ztec" _uuid="00000000-0000-0000-1B06-91EBDFB6F3E0" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-i29c.5umy~ztec"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>560</pid><project_name>Brooklyn Sanitation Garage Construction: Community District 3</project_name><description>Construction of new Sanitation garage facility for services to Brooklyn Community District 3 to be located at Warsoff Place in Brooklyn</description><category>Sanitation</category><borough>Brooklyn</borough><managing_agency>DSNY</managing_agency><client_agency>DSNY</client_agency><current_phase>Construction</current_phase><design_start>2005-07-25T00:00:00</design_start><budget_forecast>204347986.93</budget_forecast><latest_budget_changes>10.00</latest_budget_changes><total_budget_changes>25603365.00</total_budget_changes><forecast_completion>2022-12-31T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>790</total_schedule_changes></row><row _id="row-bf4e-dahg-j9x6" _uuid="00000000-0000-0000-F101-D5D440A99E3C" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-bf4e-dahg-j9x6"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>560</pid><project_name>Brooklyn Sanitation Garage Construction: Community District 3</project_name><description>Construction of new Sanitation garage facility for services to Brooklyn Community District 3 to be located at Warsoff Place in Brooklyn</description><category>Sanitation</category><borough>Brooklyn</borough><managing_agency>DSNY</managing_agency><client_agency>DSNY</client_agency><current_phase>Construction</current_phase><design_start>2005-07-25T00:00:00</design_start><budget_forecast>204347986.93</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>25603365.00</total_budget_changes><forecast_completion>2022-12-31T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>790</total_schedule_changes></row><row _id="row-hq9p.6spn_m3hc" _uuid="00000000-0000-0000-CB27-68FF77B70FE2" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-hq9p.6spn_m3hc"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>560</pid><project_name>Brooklyn Sanitation Garage Construction: Community District 3</project_name><description>Construction of new Sanitation garage facility for services to Brooklyn Community District 3 to be located at Warsoff Place in Brooklyn</description><category>Sanitation</category><borough>Brooklyn</borough><managing_agency>DSNY</managing_agency><client_agency>DSNY</client_agency><current_phase>Construction</current_phase><design_start>2005-07-25T00:00:00</design_start><budget_forecast>204347986.93</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>25603365.00</total_budget_changes><forecast_completion>2022-12-31T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>790</total_schedule_changes></row><row _id="row-c84r_rd7s.t2x9" _uuid="00000000-0000-0000-BB4E-513A62CDE2A1" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-c84r_rd7s.t2x9"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>560</pid><project_name>Brooklyn Sanitation Garage Construction: Community District 3</project_name><description>Construction of new Sanitation garage facility for services to Brooklyn Community District 3 to be located at Warsoff Place in Brooklyn</description><category>Sanitation</category><borough>Brooklyn</borough><managing_agency>DSNY</managing_agency><client_agency>DSNY</client_agency><current_phase>Construction</current_phase><design_start>2005-07-25T00:00:00</design_start><budget_forecast>204347986.93</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>25603365.00</total_budget_changes><forecast_completion>2022-12-31T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>790</total_schedule_changes></row><row _id="row-faqg.pwhx-kgdq" _uuid="00000000-0000-0000-465B-9A4F42789F0F" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-faqg.pwhx-kgdq"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>560</pid><project_name>Brooklyn Sanitation Garage Construction: Community District 3</project_name><description>Construction of new Sanitation garage facility for services to Brooklyn Community District 3 to be located at Warsoff Place in Brooklyn</description><category>Sanitation</category><borough>Brooklyn</borough><managing_agency>DSNY</managing_agency><client_agency>DSNY</client_agency><current_phase>Construction</current_phase><design_start>2005-07-25T00:00:00</design_start><budget_forecast>204347986.93</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>25603365.00</total_budget_changes><forecast_completion>2022-12-31T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>790</total_schedule_changes></row><row _id="row-bzw7-brj6-kwp8" _uuid="00000000-0000-0000-4E8C-B796B65B8EDE" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-bzw7-brj6-kwp8"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>560</pid><project_name>Brooklyn Sanitation Garage Construction: Community District 3</project_name><description>Construction of new Sanitation garage facility for services to Brooklyn Community District 3 to be located at Warsoff Place in Brooklyn</description><category>Sanitation</category><borough>Brooklyn</borough><managing_agency>DSNY</managing_agency><client_agency>DSNY</client_agency><current_phase>Construction</current_phase><design_start>2005-07-25T00:00:00</design_start><budget_forecast>204363993.07</budget_forecast><latest_budget_changes>16006.14</latest_budget_changes><total_budget_changes>25603365.00</total_budget_changes><forecast_completion>2024-12-31T00:00:00</forecast_completion><latest_schedule_changes>731</latest_schedule_changes><total_schedule_changes>790</total_schedule_changes></row><row _id="row-sxe4_dd5e_ktji" _uuid="00000000-0000-0000-DEA9-4DBB2C1BB653" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-sxe4_dd5e_ktji"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>560</pid><project_name>Brooklyn Sanitation Garage Construction: Community District 3</project_name><description>Construction of new Sanitation garage facility for services to Brooklyn Community District 3 to be located at Warsoff Place in Brooklyn</description><category>Sanitation</category><borough>Brooklyn</borough><managing_agency>DSNY</managing_agency><client_agency>DSNY</client_agency><current_phase>Construction</current_phase><design_start>2005-07-25T00:00:00</design_start><budget_forecast>204363993.00</budget_forecast><latest_budget_changes>-0.07</latest_budget_changes><total_budget_changes>25603365.00</total_budget_changes><forecast_completion>2024-12-31T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>790</total_schedule_changes></row><row _id="row-yjwn~h84a~pcfj" _uuid="00000000-0000-0000-5086-672877D289D4" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-yjwn~h84a~pcfj"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>560</pid><project_name>Brooklyn Sanitation Garage Construction: Community District 3</project_name><description>Construction of new Sanitation garage facility for services to Brooklyn Community District 3 to be located at Warsoff Place in Brooklyn</description><category>Sanitation</category><borough>Brooklyn</borough><managing_agency>DSNY</managing_agency><client_agency>DSNY</client_agency><current_phase>Construction</current_phase><design_start>2005-07-25T00:00:00</design_start><budget_forecast>204363993.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>25603365.00</total_budget_changes><forecast_completion>2024-12-31T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>790</total_schedule_changes></row><row _id="row-hm9t_qm6y~jqj3" _uuid="00000000-0000-0000-7343-59D35C279934" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-hm9t_qm6y~jqj3"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>560</pid><project_name>Brooklyn Sanitation Garage Construction: Community District 3</project_name><description>Construction of new Sanitation garage facility for services to Brooklyn Community District 3 to be located at Warsoff Place in Brooklyn</description><category>Sanitation</category><borough>Brooklyn</borough><managing_agency>DSNY</managing_agency><client_agency>DSNY</client_agency><current_phase>Construction</current_phase><design_start>2005-07-25T00:00:00</design_start><budget_forecast>204363993.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>25603365.00</total_budget_changes><forecast_completion>2025-02-28T00:00:00</forecast_completion><latest_schedule_changes>59</latest_schedule_changes><total_schedule_changes>790</total_schedule_changes></row><row _id="row-jy2x.am98~cb58" _uuid="00000000-0000-0000-2204-F82C301E8822" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-jy2x.am98~cb58"><date_reported_as_of>2016-11-01T00:00:00</date_reported_as_of><pid>561</pid><project_name>Coney Island Hospital CSS Building and Perimeter Flood Protection</project_name><description>Renovation of CIH to advance the City’s resiliency plan, repair damages,  and protect the hospital from future disasters.</description><category>Health and Hospitals</category><borough>Brooklyn</borough><managing_agency>EDC</managing_agency><client_agency>H+H</client_agency><current_phase>Design</current_phase><design_start>2016-02-01T00:00:00</design_start><budget_forecast>665168171.00</budget_forecast><total_budget_changes>30635879.93</total_budget_changes><forecast_completion>2021-02-06T00:00:00</forecast_completion><total_schedule_changes>1243</total_schedule_changes></row><row _id="row-czcc.4cw5.n42h" _uuid="00000000-0000-0000-A1F8-8FE9F1C8310E" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-czcc.4cw5.n42h"><date_reported_as_of>2017-04-01T00:00:00</date_reported_as_of><pid>561</pid><project_name>Coney Island Hospital CSS Building and Perimeter Flood Protection</project_name><description>Renovation of CIH to advance the City’s resiliency plan, repair damages,  and protect the hospital from future disasters.</description><category>Health and Hospitals</category><borough>Brooklyn</borough><managing_agency>EDC</managing_agency><client_agency>H+H</client_agency><current_phase>Design</current_phase><design_start>2016-02-01T00:00:00</design_start><budget_forecast>665168171.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>30635879.93</total_budget_changes><forecast_completion>2022-08-08T00:00:00</forecast_completion><latest_schedule_changes>548</latest_schedule_changes><total_schedule_changes>1243</total_schedule_changes></row><row _id="row-rsus.nmwy.c2j4" _uuid="00000000-0000-0000-3258-2A614537AFF8" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-rsus.nmwy.c2j4"><date_reported_as_of>2017-09-01T00:00:00</date_reported_as_of><pid>561</pid><project_name>Coney Island Hospital CSS Building and Perimeter Flood Protection</project_name><description>Renovation of CIH to advance the City’s resiliency plan, repair damages,  and protect the hospital from future disasters.</description><category>Health and Hospitals</category><borough>Brooklyn</borough><managing_agency>EDC</managing_agency><client_agency>H+H</client_agency><current_phase>Design</current_phase><design_start>2016-02-01T00:00:00</design_start><budget_forecast>665168171.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>30635879.93</total_budget_changes><forecast_completion>2022-08-08T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1243</total_schedule_changes></row><row _id="row-ppky_zati.d6wn" _uuid="00000000-0000-0000-FC9F-C6F8F5D4659A" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ppky_zati.d6wn"><date_reported_as_of>2018-03-01T00:00:00</date_reported_as_of><pid>561</pid><project_name>Coney Island Hospital CSS Building and Perimeter Flood Protection</project_name><description>Renovation of CIH to advance the City’s resiliency plan, repair damages,  and protect the hospital from future disasters.</description><category>Health and Hospitals</category><borough>Brooklyn</borough><managing_agency>EDC</managing_agency><client_agency>H+H</client_agency><current_phase>Construction</current_phase><design_start>2016-02-01T00:00:00</design_start><budget_forecast>665754400.00</budget_forecast><latest_budget_changes>586229.00</latest_budget_changes><total_budget_changes>30635879.93</total_budget_changes><forecast_completion>2023-03-31T00:00:00</forecast_completion><latest_schedule_changes>235</latest_schedule_changes><total_schedule_changes>1243</total_schedule_changes></row><row _id="row-j7v2_har9.iq66" _uuid="00000000-0000-0000-4CC4-98C15BFF32A6" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-j7v2_har9.iq66"><date_reported_as_of>2018-08-01T00:00:00</date_reported_as_of><pid>561</pid><project_name>Coney Island Hospital CSS Building and Perimeter Flood Protection</project_name><description>Renovation of CIH to advance the City’s resiliency plan, repair damages,  and protect the hospital from future disasters.</description><category>Health and Hospitals</category><borough>Brooklyn</borough><managing_agency>EDC</managing_agency><client_agency>H+H</client_agency><current_phase>Construction</current_phase><design_start>2016-02-01T00:00:00</design_start><budget_forecast>678812311.00</budget_forecast><latest_budget_changes>13057911.00</latest_budget_changes><total_budget_changes>30635879.93</total_budget_changes><forecast_completion>2023-03-31T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1243</total_schedule_changes></row><row _id="row-4dsr-2d3e~inmh" _uuid="00000000-0000-0000-1DB9-9BEFCD04F43C" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-4dsr-2d3e~inmh"><date_reported_as_of>2019-01-01T00:00:00</date_reported_as_of><pid>561</pid><project_name>Coney Island Hospital CSS Building and Perimeter Flood Protection</project_name><description>Renovation of CIH to advance the City’s resiliency plan, repair damages,  and protect the hospital from future disasters.</description><category>Health and Hospitals</category><borough>Brooklyn</borough><managing_agency>EDC</managing_agency><client_agency>H+H</client_agency><current_phase>Construction</current_phase><design_start>2016-02-01T00:00:00</design_start><budget_forecast>678812311.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>30635879.93</total_budget_changes><forecast_completion>2023-03-31T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1243</total_schedule_changes></row><row _id="row-nefx_2fr8_8fca" _uuid="00000000-0000-0000-1530-098FF545B9EB" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-nefx_2fr8_8fca"><date_reported_as_of>2019-05-01T00:00:00</date_reported_as_of><pid>561</pid><project_name>Coney Island Hospital CSS Building and Perimeter Flood Protection</project_name><description>Renovation of CIH to advance the City’s resiliency plan, repair damages,  and protect the hospital from future disasters.</description><category>Health and Hospitals</category><borough>Brooklyn</borough><managing_agency>EDC</managing_agency><client_agency>H+H</client_agency><current_phase>Construction</current_phase><design_start>2016-02-01T00:00:00</design_start><budget_forecast>678812311.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>30635879.93</total_budget_changes><forecast_completion>2023-03-31T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1243</total_schedule_changes></row><row _id="row-tfdd~yykn-g5zd" _uuid="00000000-0000-0000-23A7-A4A40E3BEBF1" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-tfdd~yykn-g5zd"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>561</pid><project_name>Coney Island Hospital CSS Building and Perimeter Flood Protection</project_name><description>Renovation of CIH to advance the City’s resiliency plan, repair damages,  and protect the hospital from future disasters.</description><category>Health and Hospitals</category><borough>Brooklyn</borough><managing_agency>EDC</managing_agency><client_agency>H+H</client_agency><current_phase>Construction</current_phase><design_start>2016-02-01T00:00:00</design_start><budget_forecast>678812311.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>30635879.93</total_budget_changes><forecast_completion>2023-03-31T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1243</total_schedule_changes></row><row _id="row-ysvs-kfnr_upr3" _uuid="00000000-0000-0000-2B90-EEE194BBB861" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ysvs-kfnr_upr3"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>561</pid><project_name>Coney Island Hospital CSS Building and Perimeter Flood Protection</project_name><description>Renovation of CIH to advance the City’s resiliency plan, repair damages,  and protect the hospital from future disasters.</description><category>Health and Hospitals</category><borough>Brooklyn</borough><managing_agency>EDC</managing_agency><client_agency>H+H</client_agency><current_phase>Construction</current_phase><design_start>2016-02-01T00:00:00</design_start><budget_forecast>683220954.00</budget_forecast><latest_budget_changes>4408643.00</latest_budget_changes><total_budget_changes>30635879.93</total_budget_changes><forecast_completion>2023-03-31T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1243</total_schedule_changes></row><row _id="row-hhug_axs2_a25j" _uuid="00000000-0000-0000-2A72-7E0C17544262" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-hhug_axs2_a25j"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>561</pid><project_name>Coney Island Hospital CSS Building and Perimeter Flood Protection</project_name><description>Renovation of CIH to advance the City’s resiliency plan, repair damages,  and protect the hospital from future disasters.</description><category>Health and Hospitals</category><borough>Brooklyn</borough><managing_agency>EDC</managing_agency><client_agency>H+H</client_agency><current_phase>Construction</current_phase><design_start>2016-02-01T00:00:00</design_start><budget_forecast>683220954.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>30635879.93</total_budget_changes><forecast_completion>2023-07-31T00:00:00</forecast_completion><latest_schedule_changes>122</latest_schedule_changes><total_schedule_changes>1243</total_schedule_changes></row><row _id="row-rkmg-crgf~cg2r" _uuid="00000000-0000-0000-2C45-CDC9D235DE3F" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-rkmg-crgf~cg2r"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>561</pid><project_name>Coney Island Hospital CSS Building and Perimeter Flood Protection</project_name><description>Renovation of CIH to advance the City’s resiliency plan, repair damages,  and protect the hospital from future disasters.</description><category>Health and Hospitals</category><borough>Brooklyn</borough><managing_agency>EDC</managing_agency><client_agency>H+H</client_agency><current_phase>Construction</current_phase><design_start>2016-02-01T00:00:00</design_start><budget_forecast>683220954.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>30635879.93</total_budget_changes><forecast_completion>2023-07-31T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1243</total_schedule_changes></row><row _id="row-2k7d_q745-rt3e" _uuid="00000000-0000-0000-83F3-7135F546C3B9" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-2k7d_q745-rt3e"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>561</pid><project_name>Coney Island Hospital CSS Building and Perimeter Flood Protection</project_name><description>Renovation of CIH to advance the City’s resiliency plan, repair damages,  and protect the hospital from future disasters.</description><category>Health and Hospitals</category><borough>Brooklyn</borough><managing_agency>EDC</managing_agency><client_agency>H+H</client_agency><current_phase>Construction</current_phase><design_start>2016-02-01T00:00:00</design_start><budget_forecast>689052010.00</budget_forecast><latest_budget_changes>5831056.00</latest_budget_changes><total_budget_changes>30635879.93</total_budget_changes><forecast_completion>2023-08-21T00:00:00</forecast_completion><latest_schedule_changes>21</latest_schedule_changes><total_schedule_changes>1243</total_schedule_changes></row><row _id="row-ffyf~jvza-zv2u" _uuid="00000000-0000-0000-8334-7BB00F4A8403" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ffyf~jvza-zv2u"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>561</pid><project_name>Coney Island Hospital CSS Building and Perimeter Flood Protection</project_name><description>Renovation of CIH to advance the City’s resiliency plan, repair damages,  and protect the hospital from future disasters.</description><category>Health and Hospitals</category><borough>Brooklyn</borough><managing_agency>EDC</managing_agency><client_agency>H+H</client_agency><current_phase>Construction</current_phase><design_start>2016-02-01T00:00:00</design_start><budget_forecast>689052010.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>30635879.93</total_budget_changes><forecast_completion>2023-08-21T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1243</total_schedule_changes></row><row _id="row-x3h4-sgs9_vyp2" _uuid="00000000-0000-0000-7492-6CB119B18BA3" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-x3h4-sgs9_vyp2"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>561</pid><project_name>Coney Island Hospital CSS Building and Perimeter Flood Protection</project_name><description>Renovation of CIH to advance the City’s resiliency plan, repair damages,  and protect the hospital from future disasters.</description><category>Health and Hospitals</category><borough>Brooklyn</borough><managing_agency>EDC</managing_agency><client_agency>H+H</client_agency><current_phase>Construction</current_phase><design_start>2016-02-01T00:00:00</design_start><budget_forecast>685851869.00</budget_forecast><latest_budget_changes>-3200141.00</latest_budget_changes><total_budget_changes>30635879.93</total_budget_changes><forecast_completion>2023-08-14T00:00:00</forecast_completion><latest_schedule_changes>-7</latest_schedule_changes><total_schedule_changes>1243</total_schedule_changes></row><row _id="row-z73g-f5kk_idus" _uuid="00000000-0000-0000-320C-EC0772C9D0A9" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-z73g-f5kk_idus"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>561</pid><project_name>Coney Island Hospital CSS Building and Perimeter Flood Protection</project_name><description>Renovation of CIH to advance the City’s resiliency plan, repair damages,  and protect the hospital from future disasters.</description><category>Health and Hospitals</category><borough>Brooklyn</borough><managing_agency>EDC</managing_agency><client_agency>H+H</client_agency><current_phase>Construction</current_phase><design_start>2016-02-01T00:00:00</design_start><budget_forecast>695449514.00</budget_forecast><latest_budget_changes>9597645.00</latest_budget_changes><total_budget_changes>30635879.93</total_budget_changes><forecast_completion>2023-12-31T00:00:00</forecast_completion><latest_schedule_changes>139</latest_schedule_changes><total_schedule_changes>1243</total_schedule_changes></row><row _id="row-z6ka-tvxj.uh4t" _uuid="00000000-0000-0000-B549-BB180B08B9CF" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-z6ka-tvxj.uh4t"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>561</pid><project_name>Coney Island Hospital CSS Building and Perimeter Flood Protection</project_name><description>Renovation of CIH to advance the City’s resiliency plan, repair damages,  and protect the hospital from future disasters.</description><category>Health and Hospitals</category><borough>Brooklyn</borough><managing_agency>EDC</managing_agency><client_agency>H+H</client_agency><current_phase>Construction</current_phase><design_start>2016-02-01T00:00:00</design_start><budget_forecast>695804050.93</budget_forecast><latest_budget_changes>354536.93</latest_budget_changes><total_budget_changes>30635879.93</total_budget_changes><forecast_completion>2024-04-22T00:00:00</forecast_completion><latest_schedule_changes>113</latest_schedule_changes><total_schedule_changes>1243</total_schedule_changes></row><row _id="row-xr3j_2ruy~vr4z" _uuid="00000000-0000-0000-8922-2E22C3ACB622" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-xr3j_2ruy~vr4z"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>561</pid><project_name>Coney Island Hospital CSS Building and Perimeter Flood Protection</project_name><description>Renovation of CIH to advance the City’s resiliency plan, repair damages,  and protect the hospital from future disasters.</description><category>Health and Hospitals</category><borough>Brooklyn</borough><managing_agency>EDC</managing_agency><client_agency>H+H</client_agency><current_phase>Construction</current_phase><design_start>2016-02-01T00:00:00</design_start><budget_forecast>695804050.93</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>30635879.93</total_budget_changes><forecast_completion>2024-07-03T00:00:00</forecast_completion><latest_schedule_changes>72</latest_schedule_changes><total_schedule_changes>1243</total_schedule_changes></row><row _id="row-rr9q~hsra.yei7" _uuid="00000000-0000-0000-A229-5844740CAD18" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-rr9q~hsra.yei7"><date_reported_as_of>2016-11-01T00:00:00</date_reported_as_of><pid>562</pid><project_name>Metropolitan Hospital Perimeter Flood Protection</project_name><description>Flood mitigation system to protect Metropolitan's campus from future flooding due and sea level rise</description><category>Industrial Development</category><borough>Manhattan</borough><managing_agency>EDC</managing_agency><client_agency>H+H</client_agency><current_phase>Design</current_phase><design_start>2016-12-01T00:00:00</design_start><budget_forecast>81159381.00</budget_forecast><total_budget_changes>27046705.00</total_budget_changes><forecast_completion>2020-11-30T00:00:00</forecast_completion><total_schedule_changes>1452</total_schedule_changes></row><row _id="row-2jb6~gs43_vqjy" _uuid="00000000-0000-0000-30D7-C4A81BB5F912" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-2jb6~gs43_vqjy"><date_reported_as_of>2017-04-01T00:00:00</date_reported_as_of><pid>562</pid><project_name>Metropolitan Hospital Perimeter Flood Protection</project_name><description>Flood mitigation system to protect Metropolitan's campus from future flooding due and sea level rise</description><category>Industrial Development</category><borough>Manhattan</borough><managing_agency>EDC</managing_agency><client_agency>H+H</client_agency><current_phase>Design</current_phase><design_start>2016-12-01T00:00:00</design_start><budget_forecast>81159381.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>27046705.00</total_budget_changes><forecast_completion>2020-11-30T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1452</total_schedule_changes></row><row _id="row-6eqm-nr55_cwyz" _uuid="00000000-0000-0000-9169-6B29D759CC4D" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-6eqm-nr55_cwyz"><date_reported_as_of>2017-09-01T00:00:00</date_reported_as_of><pid>562</pid><project_name>Metropolitan Hospital Perimeter Flood Protection</project_name><description>Flood mitigation system to protect Metropolitan's campus from future flooding due and sea level rise</description><category>Industrial Development</category><borough>Manhattan</borough><managing_agency>EDC</managing_agency><client_agency>H+H</client_agency><current_phase>Design</current_phase><design_start>2016-12-01T00:00:00</design_start><budget_forecast>81159381.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>27046705.00</total_budget_changes><forecast_completion>2020-11-30T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1452</total_schedule_changes></row><row _id="row-p39u-aree.vga4" _uuid="00000000-0000-0000-8577-166B6EA6C6B5" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-p39u-aree.vga4"><date_reported_as_of>2018-03-01T00:00:00</date_reported_as_of><pid>562</pid><project_name>Metropolitan Hospital Perimeter Flood Protection</project_name><description>Flood mitigation system to protect Metropolitan's campus from future flooding due and sea level rise</description><category>Industrial Development</category><borough>Manhattan</borough><managing_agency>EDC</managing_agency><client_agency>H+H</client_agency><current_phase>Design</current_phase><design_start>2016-12-01T00:00:00</design_start><budget_forecast>82232241.00</budget_forecast><latest_budget_changes>1072860.00</latest_budget_changes><total_budget_changes>27046705.00</total_budget_changes><forecast_completion>2021-10-30T00:00:00</forecast_completion><latest_schedule_changes>334</latest_schedule_changes><total_schedule_changes>1452</total_schedule_changes></row><row _id="row-6sfk-cpmd-v2z9" _uuid="00000000-0000-0000-EF7F-EC9BDA0E1EB9" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-6sfk-cpmd-v2z9"><date_reported_as_of>2018-08-01T00:00:00</date_reported_as_of><pid>562</pid><project_name>Metropolitan Hospital Perimeter Flood Protection</project_name><category>Industrial Development</category><borough>Manhattan</borough><managing_agency>EDC</managing_agency><client_agency>H+H</client_agency><total_budget_changes>27046705.00</total_budget_changes><total_schedule_changes>1452</total_schedule_changes></row><row _id="row-z6gh_nvtr-he2p" _uuid="00000000-0000-0000-C995-2D91F7EAD54D" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-z6gh_nvtr-he2p"><date_reported_as_of>2019-01-01T00:00:00</date_reported_as_of><pid>562</pid><project_name>Metropolitan Hospital Perimeter Flood Protection</project_name><category>Industrial Development</category><borough>Manhattan</borough><managing_agency>EDC</managing_agency><client_agency>H+H</client_agency><total_budget_changes>27046705.00</total_budget_changes><total_schedule_changes>1452</total_schedule_changes></row><row _id="row-358q~g5m4_iqkj" _uuid="00000000-0000-0000-BBD9-E0176D5507AD" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-358q~g5m4_iqkj"><date_reported_as_of>2019-05-01T00:00:00</date_reported_as_of><pid>562</pid><project_name>Metropolitan Hospital Perimeter Flood Protection</project_name><category>Industrial Development</category><borough>Manhattan</borough><managing_agency>EDC</managing_agency><client_agency>H+H</client_agency><total_budget_changes>27046705.00</total_budget_changes><total_schedule_changes>1452</total_schedule_changes></row><row _id="row-k778~55b4.nreu" _uuid="00000000-0000-0000-CF05-8974D426A318" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-k778~55b4.nreu"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>562</pid><project_name>Metropolitan Hospital Perimeter Flood Protection</project_name><category>Industrial Development</category><borough>Manhattan</borough><managing_agency>EDC</managing_agency><client_agency>H+H</client_agency><total_budget_changes>27046705.00</total_budget_changes><total_schedule_changes>1452</total_schedule_changes></row><row _id="row-uiz9-ygmr-46uh" _uuid="00000000-0000-0000-F840-B8E7947880A1" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-uiz9-ygmr-46uh"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>562</pid><project_name>Metropolitan Hospital Perimeter Flood Protection</project_name><category>Industrial Development</category><borough>Manhattan</borough><managing_agency>EDC</managing_agency><client_agency>H+H</client_agency><total_budget_changes>27046705.00</total_budget_changes><total_schedule_changes>1452</total_schedule_changes></row><row _id="row-s8p2_hzps_943j" _uuid="00000000-0000-0000-ACC6-CD734A745824" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-s8p2_hzps_943j"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>562</pid><project_name>Metropolitan Hospital Perimeter Flood Protection</project_name><category>Industrial Development</category><borough>Manhattan</borough><managing_agency>EDC</managing_agency><client_agency>H+H</client_agency><total_budget_changes>27046705.00</total_budget_changes><total_schedule_changes>1452</total_schedule_changes></row><row _id="row-6cj8-vwgt_2ub5" _uuid="00000000-0000-0000-DBB2-2F927C72B7A2" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-6cj8-vwgt_2ub5"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>562</pid><project_name>Metropolitan Hospital Perimeter Flood Protection</project_name><category>Industrial Development</category><borough>Manhattan</borough><managing_agency>EDC</managing_agency><client_agency>H+H</client_agency><total_budget_changes>27046705.00</total_budget_changes><total_schedule_changes>1452</total_schedule_changes></row><row _id="row-gbdd_nt58_hmqi" _uuid="00000000-0000-0000-8F7E-611DBF15FF12" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-gbdd_nt58_hmqi"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>562</pid><project_name>Metropolitan Hospital Perimeter Flood Protection</project_name><description>Flood mitigation system to protect Metropolitan's campus from future flooding due and sea level rise</description><category>Industrial Development</category><borough>Manhattan</borough><managing_agency>EDC</managing_agency><client_agency>H+H</client_agency><current_phase>Design</current_phase><design_start>2016-12-01T00:00:00</design_start><budget_forecast>101831859.00</budget_forecast><latest_budget_changes>19599618.00</latest_budget_changes><total_budget_changes>27046705.00</total_budget_changes><forecast_completion>2027-08-07T00:00:00</forecast_completion><latest_schedule_changes>2107</latest_schedule_changes><total_schedule_changes>1452</total_schedule_changes></row><row _id="row-jjxy.fvv7_2ckg" _uuid="00000000-0000-0000-8DC0-85BD2EF4E693" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-jjxy.fvv7_2ckg"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>562</pid><project_name>Metropolitan Hospital Perimeter Flood Protection</project_name><description>Flood mitigation system to protect Metropolitan's campus from future flooding due and sea level rise</description><category>Industrial Development</category><borough>Manhattan</borough><managing_agency>EDC</managing_agency><client_agency>H+H</client_agency><current_phase>Design</current_phase><design_start>2016-12-01T00:00:00</design_start><budget_forecast>101831859.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>27046705.00</total_budget_changes><forecast_completion>2027-08-07T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1452</total_schedule_changes></row><row _id="row-g9hc.y7ya~82wq" _uuid="00000000-0000-0000-B6D3-41472D495C27" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-g9hc.y7ya~82wq"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>562</pid><project_name>Metropolitan Hospital Perimeter Flood Protection</project_name><description>Flood mitigation system to protect Metropolitan's campus from future flooding due and sea level rise</description><category>Industrial Development</category><borough>Manhattan</borough><managing_agency>EDC</managing_agency><client_agency>H+H</client_agency><current_phase>Construction Procurement</current_phase><design_start>2016-12-01T00:00:00</design_start><budget_forecast>111118294.00</budget_forecast><latest_budget_changes>9286435.00</latest_budget_changes><total_budget_changes>27046705.00</total_budget_changes><forecast_completion>2027-04-02T00:00:00</forecast_completion><latest_schedule_changes>-127</latest_schedule_changes><total_schedule_changes>1452</total_schedule_changes></row><row _id="row-snhd~p74n~x8mr" _uuid="00000000-0000-0000-12D6-6B494783B116" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-snhd~p74n~x8mr"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>562</pid><project_name>Metropolitan Hospital Perimeter Flood Protection</project_name><description>Flood mitigation system to protect Metropolitan's campus from future flooding due and sea level rise</description><category>Industrial Development</category><borough>Manhattan</borough><managing_agency>EDC</managing_agency><client_agency>H+H</client_agency><current_phase>Construction Procurement</current_phase><design_start>2016-12-01T00:00:00</design_start><budget_forecast>109632350.00</budget_forecast><latest_budget_changes>-1485944.00</latest_budget_changes><total_budget_changes>27046705.00</total_budget_changes><forecast_completion>2027-04-02T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1452</total_schedule_changes></row><row _id="row-pt67_sq8j-7qkd" _uuid="00000000-0000-0000-25E6-35BC773FB90D" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-pt67_sq8j-7qkd"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>562</pid><project_name>Metropolitan Hospital Perimeter Flood Protection</project_name><description>Flood mitigation system to protect Metropolitan's campus from future flooding due and sea level rise</description><category>Industrial Development</category><borough>Manhattan</borough><managing_agency>EDC</managing_agency><client_agency>H+H</client_agency><current_phase>Construction</current_phase><design_start>2016-12-01T00:00:00</design_start><budget_forecast>108206086.00</budget_forecast><latest_budget_changes>-1426264.00</latest_budget_changes><total_budget_changes>27046705.00</total_budget_changes><forecast_completion>2024-11-21T00:00:00</forecast_completion><latest_schedule_changes>-862</latest_schedule_changes><total_schedule_changes>1452</total_schedule_changes></row><row _id="row-rav6~m5m3-5g4f" _uuid="00000000-0000-0000-5A00-DA565FFC3043" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-rav6~m5m3-5g4f"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>562</pid><project_name>Metropolitan Hospital Perimeter Flood Protection</project_name><description>Flood mitigation system to protect Metropolitan's campus from future flooding due and sea level rise</description><category>Industrial Development</category><borough>Manhattan</borough><managing_agency>EDC</managing_agency><client_agency>H+H</client_agency><current_phase>Construction</current_phase><design_start>2016-12-01T00:00:00</design_start><budget_forecast>108206086.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>27046705.00</total_budget_changes><forecast_completion>2024-11-21T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1452</total_schedule_changes></row><row _id="row-zp34_8rfm_jtih" _uuid="00000000-0000-0000-F9DD-F213F8DE4AD0" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-zp34_8rfm_jtih"><date_reported_as_of>2017-09-01T00:00:00</date_reported_as_of><pid>573</pid><project_name>Bronx Sanitation Garage Construction: Community District 9, 10, 11</project_name><description>Construction of new Sanitation garage facility to serve Bronx community districts 9, 10, and 11 to be located at Zerega Avenue in the Bronx</description><category>Sanitation</category><borough>Bronx</borough><managing_agency>DSNY</managing_agency><client_agency>DSNY</client_agency><current_phase>Design</current_phase><design_start>2017-08-01T00:00:00</design_start><budget_forecast>291383225.00</budget_forecast><latest_budget_changes>-1066575.00</latest_budget_changes><total_budget_changes>268983862.56</total_budget_changes><forecast_completion>2026-06-30T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1919</total_schedule_changes></row><row _id="row-frdi_gi2s.pchk" _uuid="00000000-0000-0000-0A99-0FDF8A951573" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-frdi_gi2s.pchk"><date_reported_as_of>2018-03-01T00:00:00</date_reported_as_of><pid>573</pid><project_name>Bronx Sanitation Garage Construction: Community District 9, 10, 11</project_name><description>Construction of new Sanitation garage facility to serve Bronx community districts 9, 10, and 11 to be located at Zerega Avenue in the Bronx</description><category>Sanitation</category><borough>Bronx</borough><managing_agency>DSNY</managing_agency><client_agency>DSNY</client_agency><current_phase>Design</current_phase><design_start>2017-08-01T00:00:00</design_start><budget_forecast>291383225.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>268983862.56</total_budget_changes><forecast_completion>2026-06-30T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1919</total_schedule_changes></row><row _id="row-q9as~35kf-ju22" _uuid="00000000-0000-0000-6C1E-288E70D1B0C7" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-q9as~35kf-ju22"><date_reported_as_of>2018-08-01T00:00:00</date_reported_as_of><pid>573</pid><project_name>Bronx Sanitation Garage Construction: Community District 9, 10, 11</project_name><description>Construction of new Sanitation garage facility to serve Bronx community districts 9, 10, and 11 to be located at Zerega Avenue in the Bronx</description><category>Sanitation</category><borough>Bronx</borough><managing_agency>DSNY</managing_agency><client_agency>DSNY</client_agency><current_phase>Design</current_phase><design_start>2017-08-01T00:00:00</design_start><budget_forecast>291383225.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>268983862.56</total_budget_changes><forecast_completion>2026-06-30T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1919</total_schedule_changes></row><row _id="row-d9ka-c2wf~w2dt" _uuid="00000000-0000-0000-701E-09A492726A4B" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-d9ka-c2wf~w2dt"><date_reported_as_of>2019-01-01T00:00:00</date_reported_as_of><pid>573</pid><project_name>Bronx Sanitation Garage Construction: Community District 9, 10, 11</project_name><description>Construction of new Sanitation garage facility to serve Bronx community districts 9, 10, and 11 to be located at Zerega Avenue in the Bronx</description><category>Sanitation</category><borough>Bronx</borough><managing_agency>DSNY</managing_agency><client_agency>DSNY</client_agency><current_phase>Design</current_phase><design_start>2017-08-01T00:00:00</design_start><budget_forecast>304238643.20</budget_forecast><latest_budget_changes>12855418.20</latest_budget_changes><total_budget_changes>268983862.56</total_budget_changes><forecast_completion>2026-06-30T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1919</total_schedule_changes></row><row _id="row-9kp4_3pn4~3ck5" _uuid="00000000-0000-0000-0AAE-6FE73924F6D8" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-9kp4_3pn4~3ck5"><date_reported_as_of>2019-05-01T00:00:00</date_reported_as_of><pid>573</pid><project_name>Bronx Sanitation Garage Construction: Community District 9, 10, 11</project_name><description>Construction of new Sanitation garage facility to serve Bronx community districts 9, 10, and 11 to be located at Zerega Avenue in the Bronx</description><category>Sanitation</category><borough>Bronx</borough><managing_agency>DSNY</managing_agency><client_agency>DSNY</client_agency><current_phase>Design</current_phase><design_start>2017-08-01T00:00:00</design_start><budget_forecast>300856407.20</budget_forecast><latest_budget_changes>-3382236.00</latest_budget_changes><total_budget_changes>268983862.56</total_budget_changes><forecast_completion>2026-12-31T00:00:00</forecast_completion><latest_schedule_changes>184</latest_schedule_changes><total_schedule_changes>1919</total_schedule_changes></row><row _id="row-ceb3.b2ra-sudm" _uuid="00000000-0000-0000-0E37-3A1510A3DE5D" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ceb3.b2ra-sudm"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>573</pid><project_name>Bronx Sanitation Garage Construction: Community District 9, 10, 11</project_name><description>Construction of new Sanitation garage facility to serve Bronx community districts 9, 10, and 11 to be located at Zerega Avenue in the Bronx</description><category>Sanitation</category><borough>Bronx</borough><managing_agency>DSNY</managing_agency><client_agency>DSNY</client_agency><current_phase>Design</current_phase><design_start>2017-08-01T00:00:00</design_start><budget_forecast>300864537.00</budget_forecast><latest_budget_changes>8129.80</latest_budget_changes><total_budget_changes>268983862.56</total_budget_changes><forecast_completion>2027-07-01T00:00:00</forecast_completion><latest_schedule_changes>182</latest_schedule_changes><total_schedule_changes>1919</total_schedule_changes></row><row _id="row-annq.nxic~dcfy" _uuid="00000000-0000-0000-A1A3-32EB6BEF93B2" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-annq.nxic~dcfy"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>573</pid><project_name>Bronx Sanitation Garage Construction: Community District 9, 10, 11</project_name><description>Construction of new Sanitation garage facility to serve Bronx community districts 9, 10, and 11 to be located at Zerega Avenue in the Bronx</description><category>Sanitation</category><borough>Bronx</borough><managing_agency>DSNY</managing_agency><client_agency>DSNY</client_agency><current_phase>Design</current_phase><design_start>2017-08-01T00:00:00</design_start><budget_forecast>309572342.66</budget_forecast><latest_budget_changes>8707805.66</latest_budget_changes><total_budget_changes>268983862.56</total_budget_changes><forecast_completion>2027-12-31T00:00:00</forecast_completion><latest_schedule_changes>183</latest_schedule_changes><total_schedule_changes>1919</total_schedule_changes></row><row _id="row-yht3-x9jm~hjvf" _uuid="00000000-0000-0000-47DC-74BD1B0934AF" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-yht3-x9jm~hjvf"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>573</pid><project_name>Bronx Sanitation Garage Construction: Community District 9, 10, 11</project_name><description>Construction of new Sanitation garage facility to serve Bronx community districts 9, 10, and 11 to be located at Zerega Avenue in the Bronx</description><category>Sanitation</category><borough>Bronx</borough><managing_agency>DSNY</managing_agency><client_agency>DSNY</client_agency><current_phase>Design</current_phase><design_start>2017-08-01T00:00:00</design_start><budget_forecast>309572342.66</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>268983862.56</total_budget_changes><forecast_completion>2028-01-01T00:00:00</forecast_completion><latest_schedule_changes>1</latest_schedule_changes><total_schedule_changes>1919</total_schedule_changes></row><row _id="row-eiiq_q8k4~shju" _uuid="00000000-0000-0000-7EEA-807AE4F9684A" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-eiiq_q8k4~shju"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>573</pid><project_name>Bronx Sanitation Garage Construction: Community District 9, 10, 11</project_name><description>Construction of new Sanitation garage facility to serve Bronx community districts 9, 10, and 11 to be located at Zerega Avenue in the Bronx</description><category>Sanitation</category><borough>Bronx</borough><managing_agency>DSNY</managing_agency><client_agency>DSNY</client_agency><current_phase>Design</current_phase><design_start>2017-08-01T00:00:00</design_start><budget_forecast>337050342.66</budget_forecast><latest_budget_changes>27478000.00</latest_budget_changes><total_budget_changes>268983862.56</total_budget_changes><forecast_completion>2028-09-30T00:00:00</forecast_completion><latest_schedule_changes>273</latest_schedule_changes><total_schedule_changes>1919</total_schedule_changes></row><row _id="row-zct5~k5gr_32qr" _uuid="00000000-0000-0000-2D15-342784356406" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-zct5~k5gr_32qr"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>573</pid><project_name>Bronx Sanitation Garage Construction: Community District 9, 10, 11</project_name><description>Construction of new Sanitation garage facility to serve Bronx community districts 9, 10, and 11 to be located at Zerega Avenue in the Bronx</description><category>Sanitation</category><borough>Bronx</borough><managing_agency>DSNY</managing_agency><client_agency>DSNY</client_agency><current_phase>Design</current_phase><design_start>2017-08-01T00:00:00</design_start><budget_forecast>337050342.66</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>268983862.56</total_budget_changes><forecast_completion>2029-09-30T00:00:00</forecast_completion><latest_schedule_changes>365</latest_schedule_changes><total_schedule_changes>1919</total_schedule_changes></row><row _id="row-86g4-ned3_gu49" _uuid="00000000-0000-0000-D791-F54101E1D1DB" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-86g4-ned3_gu49"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>573</pid><project_name>Bronx Sanitation Garage Construction: Community District 9, 10, 11</project_name><description>Construction of new Sanitation garage facility to serve Bronx community districts 9, 10, and 11 to be located at Zerega Avenue in the Bronx</description><category>Sanitation</category><borough>Bronx</borough><managing_agency>DSNY</managing_agency><client_agency>DSNY</client_agency><current_phase>Design</current_phase><design_start>2017-08-01T00:00:00</design_start><budget_forecast>337050342.66</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>268983862.56</total_budget_changes><forecast_completion>2029-09-30T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1919</total_schedule_changes></row><row _id="row-qr73.28dt-r86m" _uuid="00000000-0000-0000-84E4-EEE71DBA8323" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-qr73.28dt-r86m"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>573</pid><project_name>Bronx Sanitation Garage Construction: Community District 9, 10, 11</project_name><description>Construction of new Sanitation garage facility to serve Bronx community districts 9, 10, and 11 to be located at Zerega Avenue in the Bronx</description><category>Sanitation</category><borough>Bronx</borough><managing_agency>DSNY</managing_agency><client_agency>DSNY</client_agency><current_phase>Design</current_phase><design_start>2017-08-01T00:00:00</design_start><budget_forecast>337050342.66</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>268983862.56</total_budget_changes><forecast_completion>2029-12-31T00:00:00</forecast_completion><latest_schedule_changes>92</latest_schedule_changes><total_schedule_changes>1919</total_schedule_changes></row><row _id="row-4u4a-gc6e-kzr2" _uuid="00000000-0000-0000-4797-E88F44892D75" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-4u4a-gc6e-kzr2"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>573</pid><project_name>Bronx Sanitation Garage Construction: Community District 9, 10, 11</project_name><description>Construction of new Sanitation garage facility to serve Bronx community districts 9, 10, and 11 to be located at Zerega Avenue in the Bronx</description><category>Sanitation</category><borough>Bronx</borough><managing_agency>DSNY</managing_agency><client_agency>DSNY</client_agency><current_phase>Design</current_phase><design_start>2017-08-01T00:00:00</design_start><budget_forecast>341795000.00</budget_forecast><latest_budget_changes>4744657.34</latest_budget_changes><total_budget_changes>268983862.56</total_budget_changes><forecast_completion>2030-06-30T00:00:00</forecast_completion><latest_schedule_changes>181</latest_schedule_changes><total_schedule_changes>1919</total_schedule_changes></row><row _id="row-wrbw-n56c-t2c5" _uuid="00000000-0000-0000-5D5F-B16F5192ADE3" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-wrbw-n56c-t2c5"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>573</pid><project_name>Bronx Sanitation Garage Construction: Community District 9, 10, 11</project_name><description>Construction of new Sanitation garage facility to serve Bronx community districts 9, 10, and 11 to be located at Zerega Avenue in the Bronx</description><category>Sanitation</category><borough>Bronx</borough><managing_agency>DSNY</managing_agency><client_agency>DSNY</client_agency><current_phase>Design</current_phase><design_start>2017-08-01T00:00:00</design_start><budget_forecast>341795000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>268983862.56</total_budget_changes><forecast_completion>2030-06-30T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1919</total_schedule_changes></row><row _id="row-e3hd_xmj2-j8jv" _uuid="00000000-0000-0000-E880-41B2CD1BC3A3" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-e3hd_xmj2-j8jv"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>573</pid><project_name>Bronx Sanitation Garage Construction: Community District 9, 10, 11</project_name><description>Construction of new Sanitation garage facility to serve Bronx community districts 9, 10, and 11 to be located at Zerega Avenue in the Bronx</description><category>Sanitation</category><borough>Bronx</borough><managing_agency>DSNY</managing_agency><client_agency>DSNY</client_agency><current_phase>Design</current_phase><design_start>2017-08-01T00:00:00</design_start><budget_forecast>561433662.56</budget_forecast><latest_budget_changes>219638662.56</latest_budget_changes><total_budget_changes>268983862.56</total_budget_changes><forecast_completion>2031-10-01T00:00:00</forecast_completion><latest_schedule_changes>458</latest_schedule_changes><total_schedule_changes>1919</total_schedule_changes></row><row _id="row-sw2k.5my6.pg48" _uuid="00000000-0000-0000-A65A-4EE3839DDAD5" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-sw2k.5my6.pg48"><date_reported_as_of>2017-04-01T00:00:00</date_reported_as_of><pid>574</pid><project_name>Sunset Park Infrastructure</project_name><description>This project is construction of infrastructure and streetscape improvements in Sunset Park from 37th to 43rd Streets, between the Gowanus Expressway and the waterfront - to activate the waterfront and promote future development.</description><category>Industrial Development</category><borough>Brooklyn</borough><managing_agency>EDC</managing_agency><client_agency>Mayor's Office</client_agency><current_phase>Design</current_phase><design_start>2016-06-08T00:00:00</design_start><budget_forecast>5866058.31</budget_forecast><total_budget_changes>31633941.69</total_budget_changes><forecast_completion>2020-10-18T00:00:00</forecast_completion><total_schedule_changes>1290</total_schedule_changes></row><row _id="row-8ve3~mzi7.tnfv" _uuid="00000000-0000-0000-387B-A7654BFD5C8C" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-8ve3~mzi7.tnfv"><date_reported_as_of>2017-09-01T00:00:00</date_reported_as_of><pid>574</pid><project_name>Sunset Park Infrastructure</project_name><description>This project is construction of infrastructure and streetscape improvements in Sunset Park from 37th to 43rd Streets, between the Gowanus Expressway and the waterfront - to activate the waterfront and promote future development.</description><category>Industrial Development</category><borough>Brooklyn</borough><managing_agency>EDC</managing_agency><client_agency>Mayor's Office</client_agency><current_phase>Design</current_phase><design_start>2016-06-08T00:00:00</design_start><budget_forecast>37500000.00</budget_forecast><latest_budget_changes>31633941.69</latest_budget_changes><total_budget_changes>31633941.69</total_budget_changes><forecast_completion>2020-12-25T00:00:00</forecast_completion><latest_schedule_changes>68</latest_schedule_changes><total_schedule_changes>1290</total_schedule_changes></row><row _id="row-e8qx-pweh_h9sy" _uuid="00000000-0000-0000-0D8C-E336180BDF9F" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-e8qx-pweh_h9sy"><date_reported_as_of>2018-03-01T00:00:00</date_reported_as_of><pid>574</pid><project_name>Sunset Park Infrastructure</project_name><description>This project is construction of infrastructure and streetscape improvements in Sunset Park from 37th to 43rd Streets, between the Gowanus Expressway and the waterfront - to activate the waterfront and promote future development.</description><category>Industrial Development</category><borough>Brooklyn</borough><managing_agency>EDC</managing_agency><client_agency>Mayor's Office</client_agency><current_phase>Design</current_phase><design_start>2016-06-08T00:00:00</design_start><budget_forecast>37500000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>31633941.69</total_budget_changes><forecast_completion>2021-05-30T00:00:00</forecast_completion><latest_schedule_changes>156</latest_schedule_changes><total_schedule_changes>1290</total_schedule_changes></row><row _id="row-ku8n_aucp.2zd9" _uuid="00000000-0000-0000-F0D3-2EAA5045584D" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ku8n_aucp.2zd9"><date_reported_as_of>2018-08-01T00:00:00</date_reported_as_of><pid>574</pid><project_name>Sunset Park Infrastructure</project_name><description>This project is construction of infrastructure and streetscape improvements in Sunset Park from 37th to 43rd Streets, between the Gowanus Expressway and the waterfront - to activate the waterfront and promote future development.</description><category>Industrial Development</category><borough>Brooklyn</borough><managing_agency>EDC</managing_agency><client_agency>Mayor's Office</client_agency><current_phase>Design</current_phase><design_start>2016-06-08T00:00:00</design_start><budget_forecast>37500000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>31633941.69</total_budget_changes><forecast_completion>2021-11-28T00:00:00</forecast_completion><latest_schedule_changes>182</latest_schedule_changes><total_schedule_changes>1290</total_schedule_changes></row><row _id="row-bes8~uyvi.rf9w" _uuid="00000000-0000-0000-BFC2-97F3231F0651" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-bes8~uyvi.rf9w"><date_reported_as_of>2019-01-01T00:00:00</date_reported_as_of><pid>574</pid><project_name>Sunset Park Infrastructure</project_name><description>This project is construction of infrastructure and streetscape improvements in Sunset Park from 37th to 43rd Streets, between the Gowanus Expressway and the waterfront - to activate the waterfront and promote future development.</description><category>Industrial Development</category><borough>Brooklyn</borough><managing_agency>EDC</managing_agency><client_agency>Mayor's Office</client_agency><current_phase>Design</current_phase><design_start>2016-06-08T00:00:00</design_start><budget_forecast>37500000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>31633941.69</total_budget_changes><forecast_completion>2022-03-28T00:00:00</forecast_completion><latest_schedule_changes>120</latest_schedule_changes><total_schedule_changes>1290</total_schedule_changes></row><row _id="row-6qp3.euf3.z325" _uuid="00000000-0000-0000-868E-AEF4335C3200" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-6qp3.euf3.z325"><date_reported_as_of>2019-05-01T00:00:00</date_reported_as_of><pid>574</pid><project_name>Sunset Park Infrastructure</project_name><description>This project is construction of infrastructure and streetscape improvements in Sunset Park from 37th to 43rd Streets, between the Gowanus Expressway and the waterfront - to activate the waterfront and promote future development.</description><category>Industrial Development</category><borough>Brooklyn</borough><managing_agency>EDC</managing_agency><client_agency>Mayor's Office</client_agency><current_phase>Design</current_phase><design_start>2016-06-08T00:00:00</design_start><budget_forecast>37500000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>31633941.69</total_budget_changes><forecast_completion>2022-06-28T00:00:00</forecast_completion><latest_schedule_changes>92</latest_schedule_changes><total_schedule_changes>1290</total_schedule_changes></row><row _id="row-vmgh.w392.tkqc" _uuid="00000000-0000-0000-83C2-4E93473BC865" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-vmgh.w392.tkqc"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>574</pid><project_name>Sunset Park Infrastructure</project_name><description>This project is construction of infrastructure and streetscape improvements in Sunset Park from 37th to 43rd Streets, between the Gowanus Expressway and the waterfront - to activate the waterfront and promote future development.</description><category>Industrial Development</category><borough>Brooklyn</borough><managing_agency>EDC</managing_agency><client_agency>Mayor's Office</client_agency><current_phase>Construction Procurement</current_phase><design_start>2016-06-08T00:00:00</design_start><budget_forecast>37500000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>31633941.69</total_budget_changes><forecast_completion>2022-06-15T00:00:00</forecast_completion><latest_schedule_changes>-13</latest_schedule_changes><total_schedule_changes>1290</total_schedule_changes></row><row _id="row-c33p~hkxu_gdca" _uuid="00000000-0000-0000-8E6D-DDD4C774CC32" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-c33p~hkxu_gdca"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>574</pid><project_name>Sunset Park Infrastructure</project_name><description>This project is construction of infrastructure and streetscape improvements in Sunset Park from 37th to 43rd Streets, between the Gowanus Expressway and the waterfront - to activate the waterfront and promote future development.</description><category>Industrial Development</category><borough>Brooklyn</borough><managing_agency>EDC</managing_agency><client_agency>Mayor's Office</client_agency><current_phase>Construction Procurement</current_phase><design_start>2016-06-08T00:00:00</design_start><budget_forecast>37500000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>31633941.69</total_budget_changes><forecast_completion>2022-08-29T00:00:00</forecast_completion><latest_schedule_changes>75</latest_schedule_changes><total_schedule_changes>1290</total_schedule_changes></row><row _id="row-ruha~g5t6_xstb" _uuid="00000000-0000-0000-6699-A904F526ABEE" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ruha~g5t6_xstb"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>574</pid><project_name>Sunset Park Infrastructure</project_name><description>This project is construction of infrastructure and streetscape improvements in Sunset Park from 37th to 43rd Streets, between the Gowanus Expressway and the waterfront - to activate the waterfront and promote future development.</description><category>Industrial Development</category><borough>Brooklyn</borough><managing_agency>EDC</managing_agency><client_agency>Mayor's Office</client_agency><current_phase>Construction Procurement</current_phase><design_start>2016-06-08T00:00:00</design_start><budget_forecast>37500000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>31633941.69</total_budget_changes><forecast_completion>2023-03-01T00:00:00</forecast_completion><latest_schedule_changes>184</latest_schedule_changes><total_schedule_changes>1290</total_schedule_changes></row><row _id="row-dikn.2r4q_pkbh" _uuid="00000000-0000-0000-C65D-537E1249985E" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-dikn.2r4q_pkbh"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>574</pid><project_name>Sunset Park Infrastructure</project_name><description>This project is construction of infrastructure and streetscape improvements in Sunset Park from 37th to 43rd Streets, between the Gowanus Expressway and the waterfront - to activate the waterfront and promote future development.</description><category>Industrial Development</category><borough>Brooklyn</borough><managing_agency>EDC</managing_agency><client_agency>Mayor's Office</client_agency><current_phase>Construction Procurement</current_phase><design_start>2016-06-08T00:00:00</design_start><budget_forecast>37500000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>31633941.69</total_budget_changes><forecast_completion>2023-03-01T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1290</total_schedule_changes></row><row _id="row-x6vj.8gdb~3xmr" _uuid="00000000-0000-0000-2FE7-C019C7A7D06E" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-x6vj.8gdb~3xmr"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>574</pid><project_name>Sunset Park Infrastructure</project_name><description>This project is construction of infrastructure and streetscape improvements in Sunset Park from 37th to 43rd Streets, between the Gowanus Expressway and the waterfront - to activate the waterfront and promote future development.</description><category>Industrial Development</category><borough>Brooklyn</borough><managing_agency>EDC</managing_agency><client_agency>Mayor's Office</client_agency><current_phase>Construction Procurement</current_phase><design_start>2016-06-08T00:00:00</design_start><budget_forecast>43000000.00</budget_forecast><latest_budget_changes>5500000.00</latest_budget_changes><total_budget_changes>31633941.69</total_budget_changes><forecast_completion>2024-02-29T00:00:00</forecast_completion><latest_schedule_changes>365</latest_schedule_changes><total_schedule_changes>1290</total_schedule_changes></row><row _id="row-yagq~r3st.ge78" _uuid="00000000-0000-0000-634C-6C2CAE9F6481" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-yagq~r3st.ge78"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>574</pid><project_name>Sunset Park Infrastructure</project_name><description>This project is construction of infrastructure and streetscape improvements in Sunset Park from 37th to 43rd Streets, between the Gowanus Expressway and the waterfront - to activate the waterfront and promote future development.</description><category>Industrial Development</category><borough>Brooklyn</borough><managing_agency>EDC</managing_agency><client_agency>Mayor's Office</client_agency><current_phase>Construction Procurement</current_phase><design_start>2016-06-08T00:00:00</design_start><budget_forecast>43000000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>31633941.69</total_budget_changes><forecast_completion>2024-02-29T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1290</total_schedule_changes></row><row _id="row-2b9w-hj44-ytmb" _uuid="00000000-0000-0000-D9C5-1FF25C6D46E7" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-2b9w-hj44-ytmb"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>574</pid><project_name>Sunset Park Infrastructure</project_name><description>This project is construction of infrastructure and streetscape improvements in Sunset Park from 37th to 43rd Streets, between the Gowanus Expressway and the waterfront - to activate the waterfront and promote future development.</description><category>Industrial Development</category><borough>Brooklyn</borough><managing_agency>EDC</managing_agency><client_agency>Mayor's Office</client_agency><current_phase>Construction</current_phase><design_start>2016-06-08T00:00:00</design_start><budget_forecast>37500000.00</budget_forecast><latest_budget_changes>-5500000.00</latest_budget_changes><total_budget_changes>31633941.69</total_budget_changes><forecast_completion>2023-11-01T00:00:00</forecast_completion><latest_schedule_changes>-120</latest_schedule_changes><total_schedule_changes>1290</total_schedule_changes></row><row _id="row-gfsf_u6x2_phm3" _uuid="00000000-0000-0000-3400-5F87BC1CF1A8" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-gfsf_u6x2_phm3"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>574</pid><project_name>Sunset Park Infrastructure</project_name><description>This project is construction of infrastructure and streetscape improvements in Sunset Park from 37th to 43rd Streets, between the Gowanus Expressway and the waterfront - to activate the waterfront and promote future development.</description><category>Industrial Development</category><borough>Brooklyn</borough><managing_agency>EDC</managing_agency><client_agency>Mayor's Office</client_agency><current_phase>Construction</current_phase><design_start>2016-06-08T00:00:00</design_start><budget_forecast>37500000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>31633941.69</total_budget_changes><forecast_completion>2024-04-30T00:00:00</forecast_completion><latest_schedule_changes>181</latest_schedule_changes><total_schedule_changes>1290</total_schedule_changes></row><row _id="row-qjxs~p45q-kht8" _uuid="00000000-0000-0000-5563-EECF9A298CDA" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-qjxs~p45q-kht8"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>574</pid><project_name>Sunset Park Infrastructure</project_name><description>This project is construction of infrastructure and streetscape improvements in Sunset Park from 37th to 43rd Streets, between the Gowanus Expressway and the waterfront - to activate the waterfront and promote future development.</description><category>Industrial Development</category><borough>Brooklyn</borough><managing_agency>EDC</managing_agency><client_agency>Mayor's Office</client_agency><current_phase>Construction</current_phase><design_start>2016-06-08T00:00:00</design_start><budget_forecast>37500000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>31633941.69</total_budget_changes><forecast_completion>2024-04-30T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1290</total_schedule_changes></row><row _id="row-gacn-i8hf-efjk" _uuid="00000000-0000-0000-2B67-835C9276ECA1" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-gacn-i8hf-efjk"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1201</pid><project_name>GATEWAY ESTATE - PHASE E/BED-805</project_name><description>Reconstruction of Gateway Estates Area (Nehemiah Creek) including sewer, watermain, street lighting and traffic signal work. Phase E</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>HPD</client_agency><current_phase>Construction</current_phase><design_start>2013-11-17T00:00:00</design_start><budget_forecast>82751000.00</budget_forecast><latest_budget_changes>-4000.00</latest_budget_changes><total_budget_changes>38077000.00</total_budget_changes><forecast_completion>2022-12-31T00:00:00</forecast_completion><latest_schedule_changes>-273</latest_schedule_changes><total_schedule_changes>584</total_schedule_changes></row><row _id="row-ijdb_ipiq-4p2z" _uuid="00000000-0000-0000-DBCA-04EECC46605E" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ijdb_ipiq-4p2z"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>574</pid><project_name>Sunset Park Infrastructure</project_name><description>This project is construction of infrastructure and streetscape improvements in Sunset Park from 37th to 43rd Streets, between the Gowanus Expressway and the waterfront - to activate the waterfront and promote future development.</description><category>Industrial Development</category><borough>Brooklyn</borough><managing_agency>EDC</managing_agency><client_agency>Mayor's Office</client_agency><current_phase>Construction</current_phase><design_start>2016-06-08T00:00:00</design_start><budget_forecast>37500000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>31633941.69</total_budget_changes><forecast_completion>2024-04-30T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1290</total_schedule_changes></row><row _id="row-2cja-dwkv.7nwm" _uuid="00000000-0000-0000-E270-58799A98A010" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-2cja-dwkv.7nwm"><date_reported_as_of>2017-04-01T00:00:00</date_reported_as_of><pid>575</pid><project_name>Lower Concourse Initiative</project_name><description>The Project will improve the roadways and pedestrian facilities. The Project will consist of roadway reconstruction within Exterior Street between East 138th Street and East 150th Street.</description><category>Industrial Development</category><borough>Bronx</borough><managing_agency>EDC</managing_agency><client_agency>EDC</client_agency><current_phase>Design</current_phase><design_start>2017-04-01T00:00:00</design_start><budget_forecast>84520367.00</budget_forecast><total_budget_changes>-5100000.00</total_budget_changes><forecast_completion>2021-09-01T00:00:00</forecast_completion><total_schedule_changes>730</total_schedule_changes></row><row _id="row-f7kt-zp9d.nvrb" _uuid="00000000-0000-0000-E620-D16DA907CE3A" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-f7kt-zp9d.nvrb"><date_reported_as_of>2017-09-01T00:00:00</date_reported_as_of><pid>575</pid><project_name>Lower Concourse Initiative</project_name><description>The Project will improve the roadways and pedestrian facilities. The Project will consist of roadway reconstruction within Exterior Street between East 138th Street and East 150th Street.</description><category>Industrial Development</category><borough>Bronx</borough><managing_agency>EDC</managing_agency><client_agency>EDC</client_agency><current_phase>Design</current_phase><design_start>2017-04-01T00:00:00</design_start><budget_forecast>84520367.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-5100000.00</total_budget_changes><forecast_completion>2021-09-01T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>730</total_schedule_changes></row><row _id="row-p6di_v39t-my7i" _uuid="00000000-0000-0000-8F90-D41DBF4E1FD7" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-p6di_v39t-my7i"><date_reported_as_of>2018-03-01T00:00:00</date_reported_as_of><pid>575</pid><project_name>Lower Concourse Initiative</project_name><description>The Project will improve the roadways and pedestrian facilities. The Project will consist of roadway reconstruction within Exterior Street between East 138th Street and East 150th Street.</description><category>Industrial Development</category><borough>Bronx</borough><managing_agency>EDC</managing_agency><client_agency>EDC</client_agency><current_phase>Design</current_phase><design_start>2017-04-01T00:00:00</design_start><budget_forecast>84520367.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-5100000.00</total_budget_changes><forecast_completion>2021-09-01T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>730</total_schedule_changes></row><row _id="row-pqhm_myce.evq7" _uuid="00000000-0000-0000-A2DD-591E8FD5A81B" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-pqhm_myce.evq7"><date_reported_as_of>2018-08-01T00:00:00</date_reported_as_of><pid>575</pid><project_name>Lower Concourse Initiative</project_name><description>The Project will improve the roadways and pedestrian facilities. The Project will consist of roadway reconstruction within Exterior Street between East 138th Street and East 150th Street.</description><category>Industrial Development</category><borough>Bronx</borough><managing_agency>EDC</managing_agency><client_agency>EDC</client_agency><current_phase>Design</current_phase><design_start>2017-04-01T00:00:00</design_start><budget_forecast>84520367.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-5100000.00</total_budget_changes><forecast_completion>2022-04-01T00:00:00</forecast_completion><latest_schedule_changes>212</latest_schedule_changes><total_schedule_changes>730</total_schedule_changes></row><row _id="row-6g5b.xfbk-ucsa" _uuid="00000000-0000-0000-7349-561CE282A97A" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-6g5b.xfbk-ucsa"><date_reported_as_of>2019-01-01T00:00:00</date_reported_as_of><pid>575</pid><project_name>Lower Concourse Initiative</project_name><description>The Project will improve the roadways and pedestrian facilities. The Project will consist of roadway reconstruction within Exterior Street between East 138th Street and East 150th Street.</description><category>Industrial Development</category><borough>Bronx</borough><managing_agency>EDC</managing_agency><client_agency>EDC</client_agency><current_phase>Design</current_phase><design_start>2017-04-01T00:00:00</design_start><budget_forecast>84520367.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-5100000.00</total_budget_changes><forecast_completion>2022-04-02T00:00:00</forecast_completion><latest_schedule_changes>1</latest_schedule_changes><total_schedule_changes>730</total_schedule_changes></row><row _id="row-f32r-9emn-qvqi" _uuid="00000000-0000-0000-32BF-6377D18F616C" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-f32r-9emn-qvqi"><date_reported_as_of>2019-05-01T00:00:00</date_reported_as_of><pid>575</pid><project_name>Lower Concourse Initiative</project_name><description>The Project will improve the roadways and pedestrian facilities. The Project will consist of roadway reconstruction within Exterior Street between East 138th Street and East 150th Street.</description><category>Industrial Development</category><borough>Bronx</borough><managing_agency>EDC</managing_agency><client_agency>EDC</client_agency><current_phase>Design</current_phase><design_start>2017-04-01T00:00:00</design_start><budget_forecast>84520367.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-5100000.00</total_budget_changes><forecast_completion>2022-05-03T00:00:00</forecast_completion><latest_schedule_changes>31</latest_schedule_changes><total_schedule_changes>730</total_schedule_changes></row><row _id="row-8q4a_kyym~95bg" _uuid="00000000-0000-0000-5C66-2339D9ED0E34" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-8q4a_kyym~95bg"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>575</pid><project_name>Lower Concourse Initiative</project_name><description>The Project will improve the roadways and pedestrian facilities. The Project will consist of roadway reconstruction within Exterior Street between East 138th Street and East 150th Street.</description><category>Industrial Development</category><borough>Bronx</borough><managing_agency>EDC</managing_agency><client_agency>EDC</client_agency><current_phase>Construction Procurement</current_phase><design_start>2017-04-01T00:00:00</design_start><budget_forecast>84520367.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-5100000.00</total_budget_changes><forecast_completion>2022-10-01T00:00:00</forecast_completion><latest_schedule_changes>151</latest_schedule_changes><total_schedule_changes>730</total_schedule_changes></row><row _id="row-udgr_ejq7-hjpe" _uuid="00000000-0000-0000-3A23-41828A377D4E" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-udgr_ejq7-hjpe"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>575</pid><project_name>Lower Concourse Initiative</project_name><description>The Project will improve the roadways and pedestrian facilities. The Project will consist of roadway reconstruction within Exterior Street between East 138th Street and East 150th Street.</description><category>Industrial Development</category><borough>Bronx</borough><managing_agency>EDC</managing_agency><client_agency>EDC</client_agency><current_phase>Construction Procurement</current_phase><design_start>2017-04-01T00:00:00</design_start><budget_forecast>84520367.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-5100000.00</total_budget_changes><forecast_completion>2022-10-31T00:00:00</forecast_completion><latest_schedule_changes>30</latest_schedule_changes><total_schedule_changes>730</total_schedule_changes></row><row _id="row-5ejn.cktw.wi7e" _uuid="00000000-0000-0000-2BF4-65FC0B726637" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-5ejn.cktw.wi7e"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>575</pid><project_name>Lower Concourse Initiative</project_name><description>The Project will improve the roadways and pedestrian facilities. The Project will consist of roadway reconstruction within Exterior Street between East 138th Street and East 150th Street.</description><category>Industrial Development</category><borough>Bronx</borough><managing_agency>EDC</managing_agency><client_agency>EDC</client_agency><current_phase>Construction Procurement</current_phase><design_start>2017-04-01T00:00:00</design_start><budget_forecast>84520367.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-5100000.00</total_budget_changes><forecast_completion>2023-01-30T00:00:00</forecast_completion><latest_schedule_changes>91</latest_schedule_changes><total_schedule_changes>730</total_schedule_changes></row><row _id="row-rewp~g6kw~nrz2" _uuid="00000000-0000-0000-B89B-690CD2682E07" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-rewp~g6kw~nrz2"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>575</pid><project_name>Lower Concourse Initiative</project_name><description>The Project will improve the roadways and pedestrian facilities. The Project will consist of roadway reconstruction within Exterior Street between East 138th Street and East 150th Street.</description><category>Industrial Development</category><borough>Bronx</borough><managing_agency>EDC</managing_agency><client_agency>EDC</client_agency><current_phase>Construction Procurement</current_phase><design_start>2017-04-01T00:00:00</design_start><budget_forecast>84520367.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-5100000.00</total_budget_changes><forecast_completion>2023-10-31T00:00:00</forecast_completion><latest_schedule_changes>274</latest_schedule_changes><total_schedule_changes>730</total_schedule_changes></row><row _id="row-g2d9-768z-xzfv" _uuid="00000000-0000-0000-62F8-3930D96C7F7F" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-g2d9-768z-xzfv"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>575</pid><project_name>Lower Concourse Initiative</project_name><description>The Project will improve the roadways and pedestrian facilities. The Project will consist of roadway reconstruction within Exterior Street between East 138th Street and East 150th Street.</description><category>Industrial Development</category><borough>Bronx</borough><managing_agency>EDC</managing_agency><client_agency>EDC</client_agency><current_phase>Construction</current_phase><design_start>2017-04-01T00:00:00</design_start><budget_forecast>84520367.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-5100000.00</total_budget_changes><forecast_completion>2023-05-01T00:00:00</forecast_completion><latest_schedule_changes>-183</latest_schedule_changes><total_schedule_changes>730</total_schedule_changes></row><row _id="row-n9yd.8zyb~3igy" _uuid="00000000-0000-0000-B690-C2E78D9F51FE" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-n9yd.8zyb~3igy"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>575</pid><project_name>Lower Concourse Initiative</project_name><description>The Project will improve the roadways and pedestrian facilities. The Project will consist of roadway reconstruction within Exterior Street between East 138th Street and East 150th Street.</description><category>Industrial Development</category><borough>Bronx</borough><managing_agency>EDC</managing_agency><client_agency>EDC</client_agency><current_phase>Construction</current_phase><design_start>2017-04-01T00:00:00</design_start><budget_forecast>84520367.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-5100000.00</total_budget_changes><forecast_completion>2023-05-01T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>730</total_schedule_changes></row><row _id="row-dq8t_h3wr_cyq9" _uuid="00000000-0000-0000-1746-F38F6DF82203" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-dq8t_h3wr_cyq9"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>575</pid><project_name>Lower Concourse Initiative</project_name><description>The Project will improve the roadways and pedestrian facilities. The Project will consist of roadway reconstruction within Exterior Street between East 138th Street and East 150th Street.</description><category>Industrial Development</category><borough>Bronx</borough><managing_agency>EDC</managing_agency><client_agency>EDC</client_agency><current_phase>Construction</current_phase><design_start>2017-04-01T00:00:00</design_start><budget_forecast>84520367.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-5100000.00</total_budget_changes><forecast_completion>2023-06-30T00:00:00</forecast_completion><latest_schedule_changes>60</latest_schedule_changes><total_schedule_changes>730</total_schedule_changes></row><row _id="row-xpsq-htuh_gav9" _uuid="00000000-0000-0000-169B-419732513D6D" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-xpsq-htuh_gav9"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>575</pid><project_name>Lower Concourse Initiative</project_name><description>The Project will improve the roadways and pedestrian facilities. The Project will consist of roadway reconstruction within Exterior Street between East 138th Street and East 150th Street.</description><category>Industrial Development</category><borough>Bronx</borough><managing_agency>EDC</managing_agency><client_agency>EDC</client_agency><current_phase>Construction</current_phase><design_start>2017-04-01T00:00:00</design_start><budget_forecast>84520367.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-5100000.00</total_budget_changes><forecast_completion>2023-06-30T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>730</total_schedule_changes></row><row _id="row-2i6m-g737-6ayd" _uuid="00000000-0000-0000-213A-699108A33456" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-2i6m-g737-6ayd"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>575</pid><project_name>Lower Concourse Initiative</project_name><description>The Project will improve the roadways and pedestrian facilities. The Project will consist of roadway reconstruction within Exterior Street between East 138th Street and East 150th Street.</description><category>Industrial Development</category><borough>Bronx</borough><managing_agency>EDC</managing_agency><client_agency>EDC</client_agency><current_phase>Construction</current_phase><design_start>2017-04-01T00:00:00</design_start><budget_forecast>84520367.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-5100000.00</total_budget_changes><forecast_completion>2023-09-01T00:00:00</forecast_completion><latest_schedule_changes>63</latest_schedule_changes><total_schedule_changes>730</total_schedule_changes></row><row _id="row-nwy3-dx2u_hbuk" _uuid="00000000-0000-0000-FCDA-4F56D4FD67E5" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-nwy3-dx2u_hbuk"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>575</pid><project_name>Lower Concourse Initiative</project_name><description>The Project will improve the roadways and pedestrian facilities. The Project will consist of roadway reconstruction within Exterior Street between East 138th Street and East 150th Street.</description><category>Industrial Development</category><borough>Bronx</borough><managing_agency>EDC</managing_agency><client_agency>EDC</client_agency><current_phase>Construction</current_phase><design_start>2017-04-01T00:00:00</design_start><budget_forecast>79420367.00</budget_forecast><latest_budget_changes>-5100000.00</latest_budget_changes><total_budget_changes>-5100000.00</total_budget_changes><forecast_completion>2023-09-01T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>730</total_schedule_changes></row><row _id="row-8vnt_qaxj_zc74" _uuid="00000000-0000-0000-18EA-30FAAF974A99" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-8vnt_qaxj_zc74"><date_reported_as_of>2017-09-01T00:00:00</date_reported_as_of><pid>580</pid><project_name>Replacement of The Digester at The Hunts Point WWTP</project_name><description>Construction of New Anaerobic Digesters</description><category>Wastewater Treatment</category><borough>Bronx</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2017-09-21T00:00:00</design_start><budget_forecast>320921000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>72852004.14</total_budget_changes><forecast_completion>2023-10-27T00:00:00</forecast_completion><latest_schedule_changes>465</latest_schedule_changes><total_schedule_changes>1355</total_schedule_changes></row><row _id="row-7ih8.ncpq-gbkn" _uuid="00000000-0000-0000-556E-3B2FA1F6D51F" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-7ih8.ncpq-gbkn"><date_reported_as_of>2018-03-01T00:00:00</date_reported_as_of><pid>580</pid><project_name>Replacement of The Digester at The Hunts Point WWTP</project_name><description>Construction of New Anaerobic Digesters</description><category>Wastewater Treatment</category><borough>Bronx</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2017-09-21T00:00:00</design_start><budget_forecast>435531400.00</budget_forecast><latest_budget_changes>114610400.00</latest_budget_changes><total_budget_changes>72852004.14</total_budget_changes><forecast_completion>2023-10-17T00:00:00</forecast_completion><latest_schedule_changes>-10</latest_schedule_changes><total_schedule_changes>1355</total_schedule_changes></row><row _id="row-bhek~t2um-w32b" _uuid="00000000-0000-0000-7BE3-4B28F4C6657F" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-bhek~t2um-w32b"><date_reported_as_of>2018-08-01T00:00:00</date_reported_as_of><pid>580</pid><project_name>Replacement of The Digester at The Hunts Point WWTP</project_name><description>Construction of New Anaerobic Digesters</description><category>Wastewater Treatment</category><borough>Bronx</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2017-09-21T00:00:00</design_start><budget_forecast>321651100.00</budget_forecast><latest_budget_changes>-113880300.00</latest_budget_changes><total_budget_changes>72852004.14</total_budget_changes><forecast_completion>2023-07-31T00:00:00</forecast_completion><latest_schedule_changes>-78</latest_schedule_changes><total_schedule_changes>1355</total_schedule_changes></row><row _id="row-hp3k-ex7q_sawy" _uuid="00000000-0000-0000-B9ED-6AB9E4B13B92" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-hp3k-ex7q_sawy"><date_reported_as_of>2019-01-01T00:00:00</date_reported_as_of><pid>580</pid><project_name>Replacement of The Digester at The Hunts Point WWTP</project_name><description>Construction of New Anaerobic Digesters</description><category>Wastewater Treatment</category><borough>Bronx</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2017-10-22T00:00:00</design_start><budget_forecast>435651100.00</budget_forecast><latest_budget_changes>114000000.00</latest_budget_changes><total_budget_changes>72852004.14</total_budget_changes><forecast_completion>2023-09-18T00:00:00</forecast_completion><latest_schedule_changes>49</latest_schedule_changes><total_schedule_changes>1355</total_schedule_changes></row><row _id="row-3mvf_5udk_6gty" _uuid="00000000-0000-0000-7CC2-44E38C7ED5F0" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-3mvf_5udk_6gty"><date_reported_as_of>2019-05-01T00:00:00</date_reported_as_of><pid>580</pid><project_name>Replacement of The Digester at The Hunts Point WWTP</project_name><description>Construction of New Anaerobic Digesters</description><category>Wastewater Treatment</category><borough>Bronx</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2017-10-22T00:00:00</design_start><budget_forecast>428531400.00</budget_forecast><latest_budget_changes>-7119700.00</latest_budget_changes><total_budget_changes>72852004.14</total_budget_changes><forecast_completion>2024-10-22T00:00:00</forecast_completion><latest_schedule_changes>400</latest_schedule_changes><total_schedule_changes>1355</total_schedule_changes></row><row _id="row-avem-gya4~cfdj" _uuid="00000000-0000-0000-0CD5-6285B2E17278" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-avem-gya4~cfdj"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>580</pid><project_name>Replacement of The Digester at The Hunts Point WWTP</project_name><description>Construction of New Anaerobic Digesters</description><category>Wastewater Treatment</category><borough>Bronx</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction Procurement</current_phase><design_start>2017-10-22T00:00:00</design_start><budget_forecast>444656320.00</budget_forecast><latest_budget_changes>16124920.00</latest_budget_changes><total_budget_changes>72852004.14</total_budget_changes><forecast_completion>2024-09-22T00:00:00</forecast_completion><latest_schedule_changes>-30</latest_schedule_changes><total_schedule_changes>1355</total_schedule_changes></row><row _id="row-ppp2~sfgn_iqai" _uuid="00000000-0000-0000-D09E-82CAD80654A0" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ppp2~sfgn_iqai"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>580</pid><project_name>Replacement of The Digester at The Hunts Point WWTP</project_name><description>Construction of New Anaerobic Digesters</description><category>Wastewater Treatment</category><borough>Bronx</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction Procurement</current_phase><design_start>2017-10-22T00:00:00</design_start><budget_forecast>422347923.00</budget_forecast><latest_budget_changes>-22308397.00</latest_budget_changes><total_budget_changes>72852004.14</total_budget_changes><forecast_completion>2025-02-16T00:00:00</forecast_completion><latest_schedule_changes>147</latest_schedule_changes><total_schedule_changes>1355</total_schedule_changes></row><row _id="row-uqr4.sgmq-24hm" _uuid="00000000-0000-0000-118E-5CA7AC7B3B26" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-uqr4.sgmq-24hm"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>580</pid><project_name>Replacement of The Digester at The Hunts Point WWTP</project_name><description>Construction of New Anaerobic Digesters</description><category>Wastewater Treatment</category><borough>Bronx</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2017-10-22T00:00:00</design_start><budget_forecast>422341923.00</budget_forecast><latest_budget_changes>-6000.00</latest_budget_changes><total_budget_changes>72852004.14</total_budget_changes><forecast_completion>2024-12-29T00:00:00</forecast_completion><latest_schedule_changes>-49</latest_schedule_changes><total_schedule_changes>1355</total_schedule_changes></row><row _id="row-qm2d_axgq_smkj" _uuid="00000000-0000-0000-E03B-F3DFF89A4F61" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-qm2d_axgq_smkj"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>580</pid><project_name>Replacement of The Digester at The Hunts Point WWTP</project_name><description>Construction of New Anaerobic Digesters</description><category>Wastewater Treatment</category><borough>Bronx</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction Procurement</current_phase><design_start>2017-10-22T00:00:00</design_start><budget_forecast>452311923.00</budget_forecast><latest_budget_changes>29970000.00</latest_budget_changes><total_budget_changes>72852004.14</total_budget_changes><forecast_completion>2025-01-16T00:00:00</forecast_completion><latest_schedule_changes>18</latest_schedule_changes><total_schedule_changes>1355</total_schedule_changes></row><row _id="row-jjmm-g7x9_gtgh" _uuid="00000000-0000-0000-7300-BCDC06E39A03" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-jjmm-g7x9_gtgh"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>580</pid><project_name>Replacement of The Digester at The Hunts Point WWTP</project_name><description>Construction of New Anaerobic Digesters</description><category>Wastewater Treatment</category><borough>Bronx</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction Procurement</current_phase><design_start>2017-10-22T00:00:00</design_start><budget_forecast>458653902.00</budget_forecast><latest_budget_changes>6341979.00</latest_budget_changes><total_budget_changes>72852004.14</total_budget_changes><forecast_completion>2026-01-07T00:00:00</forecast_completion><latest_schedule_changes>356</latest_schedule_changes><total_schedule_changes>1355</total_schedule_changes></row><row _id="row-tefd.yzq8-p9z5" _uuid="00000000-0000-0000-9265-298D6D3DACD5" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-tefd.yzq8-p9z5"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>580</pid><project_name>Replacement of The Digester at The Hunts Point WWTP</project_name><description>Construction of New Anaerobic Digesters</description><category>Wastewater Treatment</category><borough>Bronx</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction Procurement</current_phase><design_start>2017-10-22T00:00:00</design_start><budget_forecast>458653902.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>72852004.14</total_budget_changes><forecast_completion>2026-01-07T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1355</total_schedule_changes></row><row _id="row-rmmw.x7i5~c4f2" _uuid="00000000-0000-0000-4B83-C7E7BFDA3CD7" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-rmmw.x7i5~c4f2"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>580</pid><project_name>Replacement of The Digester at The Hunts Point WWTP</project_name><description>Construction of New Anaerobic Digesters</description><category>Wastewater Treatment</category><borough>Bronx</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction Procurement</current_phase><design_start>2017-10-22T00:00:00</design_start><budget_forecast>458653902.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>72852004.14</total_budget_changes><forecast_completion>2026-01-07T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1355</total_schedule_changes></row><row _id="row-da7b_jk4f~cjjg" _uuid="00000000-0000-0000-0CE2-A8887E83F035" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-da7b_jk4f~cjjg"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>580</pid><project_name>Replacement of The Digester at The Hunts Point WWTP</project_name><description>Construction of New Anaerobic Digesters</description><category>Wastewater Treatment</category><borough>Bronx</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2017-10-22T00:00:00</design_start><budget_forecast>393773004.14</budget_forecast><latest_budget_changes>-64880897.86</latest_budget_changes><total_budget_changes>72852004.14</total_budget_changes><forecast_completion>2026-04-04T00:00:00</forecast_completion><latest_schedule_changes>87</latest_schedule_changes><total_schedule_changes>1355</total_schedule_changes></row><row _id="row-iv8u-w4rr-63ki" _uuid="00000000-0000-0000-3A82-BF89271B53B8" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-iv8u-w4rr-63ki"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>580</pid><project_name>Replacement of The Digester at The Hunts Point WWTP</project_name><description>Construction of New Anaerobic Digesters</description><category>Wastewater Treatment</category><borough>Bronx</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2017-10-22T00:00:00</design_start><budget_forecast>393773004.14</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>72852004.14</total_budget_changes><forecast_completion>2026-04-04T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1355</total_schedule_changes></row><row _id="row-m8sk-dhy9-uht6" _uuid="00000000-0000-0000-911D-3AEC426FFA33" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-m8sk-dhy9-uht6"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>580</pid><project_name>Replacement of The Digester at The Hunts Point WWTP</project_name><description>Construction of New Anaerobic Digesters</description><category>Wastewater Treatment</category><borough>Bronx</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2017-10-22T00:00:00</design_start><budget_forecast>393773004.14</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>72852004.14</total_budget_changes><forecast_completion>2026-04-04T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1355</total_schedule_changes></row><row _id="row-6xq7.by25~yjvh" _uuid="00000000-0000-0000-5E28-43C836DC77B5" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-6xq7.by25~yjvh"><date_reported_as_of>2017-04-01T00:00:00</date_reported_as_of><pid>584</pid><project_name>Brooklyn Bridge - Approach Arches Rehabilitation</project_name><description>Repair approach arches, towers, and ramp substructures of Brooklyn Bridge.</description><category>Bridges</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2016-04-13T00:00:00</design_start><budget_forecast>300246941.90</budget_forecast><total_budget_changes>33135732.10</total_budget_changes><forecast_completion>2018-11-30T00:00:00</forecast_completion><total_schedule_changes>1908</total_schedule_changes></row><row _id="row-evqp~kcqx_ifkc" _uuid="00000000-0000-0000-0F70-89EC43CE430D" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-evqp~kcqx_ifkc"><date_reported_as_of>2017-09-01T00:00:00</date_reported_as_of><pid>584</pid><project_name>Brooklyn Bridge - Approach Arches Rehabilitation</project_name><description>Repair approach arches, towers, and ramp substructures of Brooklyn Bridge.</description><category>Bridges</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2016-04-13T00:00:00</design_start><budget_forecast>300871942.00</budget_forecast><latest_budget_changes>625000.10</latest_budget_changes><total_budget_changes>33135732.10</total_budget_changes><forecast_completion>2020-09-24T00:00:00</forecast_completion><latest_schedule_changes>664</latest_schedule_changes><total_schedule_changes>1908</total_schedule_changes></row><row _id="row-x4xn~v5vq~xsie" _uuid="00000000-0000-0000-9E19-D4EEFF4F6F6E" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-x4xn~v5vq~xsie"><date_reported_as_of>2018-03-01T00:00:00</date_reported_as_of><pid>584</pid><project_name>Brooklyn Bridge - Approach Arches Rehabilitation</project_name><description>Repair approach arches, towers, and ramp substructures of Brooklyn Bridge.</description><category>Bridges</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2016-04-13T00:00:00</design_start><budget_forecast>334315942.00</budget_forecast><latest_budget_changes>33444000.00</latest_budget_changes><total_budget_changes>33135732.10</total_budget_changes><forecast_completion>2022-05-29T00:00:00</forecast_completion><latest_schedule_changes>612</latest_schedule_changes><total_schedule_changes>1908</total_schedule_changes></row><row _id="row-aste~i692.8eht" _uuid="00000000-0000-0000-B699-447B855848E4" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-aste~i692.8eht"><date_reported_as_of>2018-08-01T00:00:00</date_reported_as_of><pid>584</pid><project_name>Brooklyn Bridge - Approach Arches Rehabilitation</project_name><description>Repair approach arches, towers, and ramp substructures of Brooklyn Bridge.</description><category>Bridges</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2016-04-13T00:00:00</design_start><budget_forecast>325240000.00</budget_forecast><latest_budget_changes>-9075942.00</latest_budget_changes><total_budget_changes>33135732.10</total_budget_changes><forecast_completion>2020-08-30T00:00:00</forecast_completion><latest_schedule_changes>-637</latest_schedule_changes><total_schedule_changes>1908</total_schedule_changes></row><row _id="row-4bkx-szb7-68c6" _uuid="00000000-0000-0000-6227-424389DE7890" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-4bkx-szb7-68c6"><date_reported_as_of>2019-01-01T00:00:00</date_reported_as_of><pid>584</pid><project_name>Brooklyn Bridge - Approach Arches Rehabilitation</project_name><description>Rehabilitate approach arches and towers of Brooklyn Bridge.  Including masonry cleaning, masonry repairs, repointing, rehabilition of transverse walls, new infill walls of the approach arch blocks.  Clean and repoint the tower masonry, reinforce the gothic arches of the towers, and rehabilitate the tower tops.</description><category>Bridges</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2016-04-13T00:00:00</design_start><budget_forecast>343692647.00</budget_forecast><latest_budget_changes>18452647.00</latest_budget_changes><total_budget_changes>33135732.10</total_budget_changes><forecast_completion>2022-06-01T00:00:00</forecast_completion><latest_schedule_changes>640</latest_schedule_changes><total_schedule_changes>1908</total_schedule_changes></row><row _id="row-3u4x.mxg8_9asp" _uuid="00000000-0000-0000-E747-3E20935B065B" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-3u4x.mxg8_9asp"><date_reported_as_of>2019-05-01T00:00:00</date_reported_as_of><pid>584</pid><project_name>Brooklyn Bridge - Approach Arches Rehabilitation</project_name><description>Rehabilitate approach arches and towers of Brooklyn Bridge.  Including masonry cleaning, masonry repairs, repointing, rehabilition of transverse walls, new infill walls of the approach arch blocks.  Clean and repoint the tower masonry, reinforce the gothic arches of the towers, and rehabilitate the tower tops.</description><category>Bridges</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2016-04-13T00:00:00</design_start><budget_forecast>365264863.00</budget_forecast><latest_budget_changes>21572216.00</latest_budget_changes><total_budget_changes>33135732.10</total_budget_changes><forecast_completion>2022-06-01T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1908</total_schedule_changes></row><row _id="row-q2jp_fg9z~8i5k" _uuid="00000000-0000-0000-C615-4324EA925DB1" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-q2jp_fg9z~8i5k"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>584</pid><project_name>Brooklyn Bridge - Approach Arches Rehabilitation</project_name><description>Rehabilitate approach arches and towers of Brooklyn Bridge.  Including masonry cleaning, masonry repairs, repointing, rehabilition of transverse walls, new infill walls of the approach arch blocks.  Clean and repoint the tower masonry, reinforce the gothic arches of the towers, and rehabilitate the tower tops.</description><category>Bridges</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2016-04-13T00:00:00</design_start><budget_forecast>340206082.00</budget_forecast><latest_budget_changes>-25058781.00</latest_budget_changes><total_budget_changes>33135732.10</total_budget_changes><total_schedule_changes>1908</total_schedule_changes></row><row _id="row-c4yu_recs~wrsj" _uuid="00000000-0000-0000-771A-328EE0C0D474" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-c4yu_recs~wrsj"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>584</pid><project_name>Brooklyn Bridge - Approach Arches Rehabilitation</project_name><description>Rehabilitate approach arches and towers of Brooklyn Bridge.  Including masonry cleaning, masonry repairs, repointing, rehabilition of transverse walls, new infill walls of the approach arch blocks.  Clean and repoint the tower masonry, reinforce the gothic arches of the towers, and rehabilitate the tower tops.</description><category>Bridges</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2016-04-13T00:00:00</design_start><budget_forecast>335887414.00</budget_forecast><latest_budget_changes>-4318668.00</latest_budget_changes><total_budget_changes>33135732.10</total_budget_changes><total_schedule_changes>1908</total_schedule_changes></row><row _id="row-7ein.9bh8.ee8p" _uuid="00000000-0000-0000-9BE7-526107F9AC0A" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-7ein.9bh8.ee8p"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>584</pid><project_name>Brooklyn Bridge - Approach Arches Rehabilitation</project_name><description>Rehabilitate approach arches and towers of Brooklyn Bridge.  Including masonry cleaning, masonry repairs, repointing, rehabilition of transverse walls, new infill walls of the approach arch blocks.  Clean and repoint the tower masonry, reinforce the gothic arches of the towers, and rehabilitate the tower tops.</description><category>Bridges</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><design_start>2016-04-13T00:00:00</design_start><budget_forecast>334587414.00</budget_forecast><latest_budget_changes>-1300000.00</latest_budget_changes><total_budget_changes>33135732.10</total_budget_changes><forecast_completion>2023-02-19T00:00:00</forecast_completion><latest_schedule_changes>263</latest_schedule_changes><total_schedule_changes>1908</total_schedule_changes></row><row _id="row-v749-3drz.aefb" _uuid="00000000-0000-0000-4746-85623ECFA94D" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-v749-3drz.aefb"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>584</pid><project_name>Brooklyn Bridge - Approach Arches Rehabilitation</project_name><description>Rehabilitate approach arches and towers of Brooklyn Bridge.  Including masonry cleaning, masonry repairs, repointing, rehabilition of transverse walls, new infill walls of the approach arch blocks.  Clean and repoint the tower masonry, reinforce the gothic arches of the towers, and rehabilitate the tower tops.</description><category>Bridges</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><design_start>2016-04-13T00:00:00</design_start><budget_forecast>322359174.00</budget_forecast><latest_budget_changes>-12228240.00</latest_budget_changes><total_budget_changes>33135732.10</total_budget_changes><forecast_completion>2024-02-19T00:00:00</forecast_completion><latest_schedule_changes>365</latest_schedule_changes><total_schedule_changes>1908</total_schedule_changes></row><row _id="row-gktv.y868.5y3r" _uuid="00000000-0000-0000-1285-B9D5B54FDA0B" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-gktv.y868.5y3r"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>584</pid><project_name>Brooklyn Bridge - Approach Arches Rehabilitation</project_name><category>Bridges</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><total_budget_changes>33135732.10</total_budget_changes><total_schedule_changes>1908</total_schedule_changes></row><row _id="row-gg9k.4ed5_jn9m" _uuid="00000000-0000-0000-3758-DD7A4676A4A1" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-gg9k.4ed5_jn9m"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1201</pid><project_name>GATEWAY ESTATE - PHASE E/BED-805</project_name><description>Reconstruction of Gateway Estates Area (Nehemiah Creek) including sewer, watermain, street lighting and traffic signal work. Phase E</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>HPD</client_agency><current_phase>Construction</current_phase><design_start>2013-11-17T00:00:00</design_start><budget_forecast>73572000.00</budget_forecast><latest_budget_changes>-9179000.00</latest_budget_changes><total_budget_changes>38077000.00</total_budget_changes><forecast_completion>2023-06-30T00:00:00</forecast_completion><latest_schedule_changes>181</latest_schedule_changes><total_schedule_changes>584</total_schedule_changes></row><row _id="row-9v86.gz47_75e2" _uuid="00000000-0000-0000-9DBD-BE3AB32402EB" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-9v86.gz47_75e2"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>584</pid><project_name>Brooklyn Bridge - Approach Arches Rehabilitation</project_name><description>Rehabilitate approach arches and towers of Brooklyn Bridge.  Including masonry cleaning, masonry repairs, repointing, rehabilition of transverse walls, new infill walls of the approach arch blocks.  Clean and repoint the tower masonry, reinforce the gothic arches of the towers, and rehabilitate the tower tops.</description><category>Bridges</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><design_start>2016-04-13T00:00:00</design_start><budget_forecast>431344048.00</budget_forecast><latest_budget_changes>108984874.00</latest_budget_changes><total_budget_changes>33135732.10</total_budget_changes><forecast_completion>2024-05-23T00:00:00</forecast_completion><latest_schedule_changes>94</latest_schedule_changes><total_schedule_changes>1908</total_schedule_changes></row><row _id="row-bdry.ww4e~dkh3" _uuid="00000000-0000-0000-7DBF-B6A9CDB98FFB" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-bdry.ww4e~dkh3"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>584</pid><project_name>Brooklyn Bridge - Approach Arches Rehabilitation</project_name><description>Rehabilitate approach arches and towers of Brooklyn Bridge.  Including masonry cleaning, masonry repairs, repointing, rehabilition of transverse walls, new infill walls of the approach arch blocks.  Clean and repoint the tower masonry, reinforce the gothic arches of the towers, and rehabilitate the tower tops.</description><category>Bridges</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><design_start>2016-04-13T00:00:00</design_start><budget_forecast>219909300.00</budget_forecast><latest_budget_changes>-211434748.00</latest_budget_changes><total_budget_changes>33135732.10</total_budget_changes><forecast_completion>2024-02-20T00:00:00</forecast_completion><latest_schedule_changes>-93</latest_schedule_changes><total_schedule_changes>1908</total_schedule_changes></row><row _id="row-r6q8-u39q~var2" _uuid="00000000-0000-0000-CC3A-8EC2A2B7E3F0" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-r6q8-u39q~var2"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>584</pid><project_name>Brooklyn Bridge - Approach Arches Rehabilitation</project_name><description>Rehabilitate approach arches and towers of Brooklyn Bridge.  Including masonry cleaning, masonry repairs, repointing, rehabilition of transverse walls, new infill walls of the approach arch blocks.  Clean and repoint the tower masonry, reinforce the gothic arches of the towers, and rehabilitate the tower tops.</description><category>Bridges</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><design_start>2016-04-13T00:00:00</design_start><budget_forecast>347633300.00</budget_forecast><latest_budget_changes>127724000.00</latest_budget_changes><total_budget_changes>33135732.10</total_budget_changes><forecast_completion>2024-02-20T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1908</total_schedule_changes></row><row _id="row-qi6f.5rqc~qt7i" _uuid="00000000-0000-0000-A031-446C9A566CB8" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-qi6f.5rqc~qt7i"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>584</pid><project_name>Brooklyn Bridge - Approach Arches Rehabilitation</project_name><description>Rehabilitate approach arches and towers of Brooklyn Bridge.  Including masonry cleaning, masonry repairs, repointing, rehabilition of transverse walls, new infill walls of the approach arch blocks.  Clean and repoint the tower masonry, reinforce the gothic arches of the towers, and rehabilitate the tower tops.</description><category>Bridges</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><design_start>2016-04-13T00:00:00</design_start><budget_forecast>436629674.00</budget_forecast><latest_budget_changes>88996374.00</latest_budget_changes><total_budget_changes>33135732.10</total_budget_changes><forecast_completion>2024-02-20T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1908</total_schedule_changes></row><row _id="row-4r3m_sxry_cwav" _uuid="00000000-0000-0000-2DA9-E8FAF396E6A2" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-4r3m_sxry_cwav"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>584</pid><project_name>Brooklyn Bridge - Approach Arches Rehabilitation</project_name><description>Rehabilitate approach arches and towers of Brooklyn Bridge.  Including masonry cleaning, masonry repairs, repointing, rehabilition of transverse walls, new infill walls of the approach arch blocks.  Clean and repoint the tower masonry, reinforce the gothic arches of the towers, and rehabilitate the tower tops.</description><category>Bridges</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><design_start>2016-04-13T00:00:00</design_start><budget_forecast>333382674.00</budget_forecast><latest_budget_changes>-103247000.00</latest_budget_changes><total_budget_changes>33135732.10</total_budget_changes><forecast_completion>2024-02-20T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1908</total_schedule_changes></row><row _id="row-6hi3-jgss.ekxv" _uuid="00000000-0000-0000-77DD-89C35710C41F" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-6hi3-jgss.ekxv"><date_reported_as_of>2017-04-01T00:00:00</date_reported_as_of><pid>586</pid><project_name>Central Park Light Infrastructure</project_name><description>Install, remove, and furnish equipment for electrical work associated with traffic signals, lighting, and distribution systems in Central Park, Manhattan.</description><category>Parks, Streets and Roadways</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction Procurement</current_phase><design_start>2016-04-29T00:00:00</design_start><budget_forecast>42379125.60</budget_forecast><total_budget_changes>-3323649.60</total_budget_changes><forecast_completion>2019-06-18T00:00:00</forecast_completion><total_schedule_changes>1535</total_schedule_changes></row><row _id="row-2f78-ty6i-c9ka" _uuid="00000000-0000-0000-5D7C-BBF186B31F3D" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-2f78-ty6i-c9ka"><date_reported_as_of>2017-09-01T00:00:00</date_reported_as_of><pid>586</pid><project_name>Central Park Light Infrastructure</project_name><description>Install, remove, and furnish equipment for electrical work associated with traffic signals, lighting, and distribution systems in Central Park, Manhattan.</description><category>Parks, Streets and Roadways</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><design_start>2016-04-29T00:00:00</design_start><budget_forecast>42329126.00</budget_forecast><latest_budget_changes>-49999.60</latest_budget_changes><total_budget_changes>-3323649.60</total_budget_changes><forecast_completion>2019-06-18T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1535</total_schedule_changes></row><row _id="row-eybs.xkpw.6ytx" _uuid="00000000-0000-0000-6241-727587417F69" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-eybs.xkpw.6ytx"><date_reported_as_of>2018-03-01T00:00:00</date_reported_as_of><pid>586</pid><project_name>Central Park Light Infrastructure</project_name><description>Install, remove, and furnish equipment for electrical work associated with traffic signals, lighting, and distribution systems in Central Park, Manhattan.</description><category>Parks, Streets and Roadways</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><design_start>2016-04-29T00:00:00</design_start><budget_forecast>42453656.00</budget_forecast><latest_budget_changes>124530.00</latest_budget_changes><total_budget_changes>-3323649.60</total_budget_changes><forecast_completion>2019-08-23T00:00:00</forecast_completion><latest_schedule_changes>66</latest_schedule_changes><total_schedule_changes>1535</total_schedule_changes></row><row _id="row-87u9-f5k9~5kwz" _uuid="00000000-0000-0000-9A3B-EF564891FAA4" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-87u9-f5k9~5kwz"><date_reported_as_of>2018-08-01T00:00:00</date_reported_as_of><pid>586</pid><project_name>Central Park Light Infrastructure</project_name><description>Install, remove, and furnish equipment for electrical work associated with traffic signals, lighting, and distribution systems in Central Park, Manhattan.</description><category>Parks, Streets and Roadways</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><design_start>2016-04-29T00:00:00</design_start><budget_forecast>42453656.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-3323649.60</total_budget_changes><forecast_completion>2019-06-18T00:00:00</forecast_completion><latest_schedule_changes>-66</latest_schedule_changes><total_schedule_changes>1535</total_schedule_changes></row><row _id="row-shsi~dbbi~u2gs" _uuid="00000000-0000-0000-D464-1B58D8F93CA3" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-shsi~dbbi~u2gs"><date_reported_as_of>2019-01-01T00:00:00</date_reported_as_of><pid>586</pid><project_name>Central Park Light Infrastructure</project_name><description>Install, remove, and furnish equipment for electrical work associated with traffic signals, lighting, and distribution systems in Central Park, Manhattan.</description><category>Parks, Streets and Roadways</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><design_start>2016-04-29T00:00:00</design_start><budget_forecast>42728656.00</budget_forecast><latest_budget_changes>275000.00</latest_budget_changes><total_budget_changes>-3323649.60</total_budget_changes><forecast_completion>2019-06-18T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1535</total_schedule_changes></row><row _id="row-dukm_3rr7~95we" _uuid="00000000-0000-0000-A576-11B381712A79" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-dukm_3rr7~95we"><date_reported_as_of>2019-05-01T00:00:00</date_reported_as_of><pid>586</pid><project_name>Central Park Light Infrastructure</project_name><description>Install, remove, and furnish equipment for electrical work associated with traffic signals, lighting, and distribution systems in Central Park, Manhattan.</description><category>Parks, Streets and Roadways</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><design_start>2016-04-29T00:00:00</design_start><budget_forecast>42528656.00</budget_forecast><latest_budget_changes>-200000.00</latest_budget_changes><total_budget_changes>-3323649.60</total_budget_changes><total_schedule_changes>1535</total_schedule_changes></row><row _id="row-hg2z-ycns_8tz8" _uuid="00000000-0000-0000-246A-9EA3536CB951" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-hg2z-ycns_8tz8"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>586</pid><project_name>Central Park Light Infrastructure</project_name><description>Install, remove, and furnish equipment for electrical work associated with traffic signals, lighting, and distribution systems in Central Park, Manhattan.</description><category>Parks, Streets and Roadways</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><design_start>2016-04-29T00:00:00</design_start><budget_forecast>43253656.00</budget_forecast><latest_budget_changes>725000.00</latest_budget_changes><total_budget_changes>-3323649.60</total_budget_changes><total_schedule_changes>1535</total_schedule_changes></row><row _id="row-uw37_9ht4_9aa5" _uuid="00000000-0000-0000-F6FF-1E19DD150FB4" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-uw37_9ht4_9aa5"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>586</pid><project_name>Central Park Light Infrastructure</project_name><description>Install, remove, and furnish equipment for electrical work associated with traffic signals, lighting, and distribution systems in Central Park, Manhattan.</description><category>Parks, Streets and Roadways</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><design_start>2016-04-29T00:00:00</design_start><budget_forecast>43303656.00</budget_forecast><latest_budget_changes>50000.00</latest_budget_changes><total_budget_changes>-3323649.60</total_budget_changes><total_schedule_changes>1535</total_schedule_changes></row><row _id="row-yv2u-da4k-5wqn" _uuid="00000000-0000-0000-FC88-2E23F89DE5DD" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-yv2u-da4k-5wqn"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>586</pid><project_name>Central Park Light Infrastructure</project_name><description>Install, remove, and furnish equipment for electrical work associated with traffic signals, lighting, and distribution systems in Central Park, Manhattan.</description><category>Parks, Streets and Roadways</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><design_start>2016-04-29T00:00:00</design_start><budget_forecast>43173656.00</budget_forecast><latest_budget_changes>-130000.00</latest_budget_changes><total_budget_changes>-3323649.60</total_budget_changes><total_schedule_changes>1535</total_schedule_changes></row><row _id="row-8tkq_abz8-hka5" _uuid="00000000-0000-0000-4F1D-04D410BD3623" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-8tkq_abz8-hka5"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>586</pid><project_name>Central Park Light Infrastructure</project_name><description>Install, remove, and furnish equipment for electrical work associated with traffic signals, lighting, and distribution systems in Central Park, Manhattan.</description><category>Parks, Streets and Roadways</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2016-04-29T00:00:00</design_start><budget_forecast>53914476.00</budget_forecast><latest_budget_changes>10740820.00</latest_budget_changes><total_budget_changes>-3323649.60</total_budget_changes><total_schedule_changes>1535</total_schedule_changes></row><row _id="row-feuf_pkbx_64pf" _uuid="00000000-0000-0000-35FC-D7D4FB69E1BD" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-feuf_pkbx_64pf"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>586</pid><project_name>Central Park Light Infrastructure</project_name><category>Parks, Streets and Roadways</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><total_budget_changes>-3323649.60</total_budget_changes><total_schedule_changes>1535</total_schedule_changes></row><row _id="row-sd8w_ku39_u2ui" _uuid="00000000-0000-0000-C9B0-2B7E7865EAB7" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-sd8w_ku39_u2ui"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>586</pid><project_name>Central Park Light Infrastructure</project_name><description>Install, remove, and furnish equipment for electrical work associated with traffic signals, lighting, and distribution systems in Central Park, Manhattan.</description><category>Parks, Streets and Roadways</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2016-04-29T00:00:00</design_start><budget_forecast>40065476.00</budget_forecast><latest_budget_changes>-13849000.00</latest_budget_changes><total_budget_changes>-3323649.60</total_budget_changes><total_schedule_changes>1535</total_schedule_changes></row><row _id="row-2fmt.qpbc_hyuj" _uuid="00000000-0000-0000-C6C3-DE5EA63B9053" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-2fmt.qpbc_hyuj"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>586</pid><project_name>Central Park Light Infrastructure</project_name><description>Install, remove, and furnish equipment for electrical work associated with traffic signals, lighting, and distribution systems in Central Park, Manhattan.</description><category>Parks, Streets and Roadways</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><design_start>2016-04-29T00:00:00</design_start><budget_forecast>40815476.00</budget_forecast><latest_budget_changes>750000.00</latest_budget_changes><total_budget_changes>-3323649.60</total_budget_changes><forecast_completion>2022-06-20T00:00:00</forecast_completion><latest_schedule_changes>1098</latest_schedule_changes><total_schedule_changes>1535</total_schedule_changes></row><row _id="row-bb5u-j2un-6sdn" _uuid="00000000-0000-0000-FACC-1E0E7AACE79A" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-bb5u-j2un-6sdn"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>586</pid><project_name>Central Park Light Infrastructure</project_name><description>Install, remove, and furnish equipment for electrical work associated with traffic signals, lighting, and distribution systems in Central Park, Manhattan.</description><category>Parks, Streets and Roadways</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><design_start>2016-04-29T00:00:00</design_start><budget_forecast>39435476.00</budget_forecast><latest_budget_changes>-1380000.00</latest_budget_changes><total_budget_changes>-3323649.60</total_budget_changes><forecast_completion>2023-06-30T00:00:00</forecast_completion><latest_schedule_changes>375</latest_schedule_changes><total_schedule_changes>1535</total_schedule_changes></row><row _id="row-f5mk_mkt8_drxb" _uuid="00000000-0000-0000-40BE-2711D29584F0" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-f5mk_mkt8_drxb"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>1202</pid><project_name>150th Street Spine: Phase II - DOT Van Wyck Expressway - Trunk Combined Sewer</project_name><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Design</current_phase><design_start>2021-03-04T00:00:00</design_start><budget_forecast>139368000.00</budget_forecast><total_budget_changes>-676000.00</total_budget_changes><forecast_completion>2025-10-25T00:00:00</forecast_completion><total_schedule_changes>-194</total_schedule_changes></row><row _id="row-y6tx~tu8m_2thu" _uuid="00000000-0000-0000-E1FE-5C26CBF8D51D" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-y6tx~tu8m_2thu"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>586</pid><project_name>Central Park Light Infrastructure</project_name><description>Install, remove, and furnish equipment for electrical work associated with traffic signals, lighting, and distribution systems in Central Park, Manhattan.</description><category>Parks, Streets and Roadways</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><design_start>2016-04-29T00:00:00</design_start><budget_forecast>39771188.00</budget_forecast><latest_budget_changes>335712.00</latest_budget_changes><total_budget_changes>-3323649.60</total_budget_changes><forecast_completion>2023-06-30T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1535</total_schedule_changes></row><row _id="row-yume.aibq.d9er" _uuid="00000000-0000-0000-ACDC-82E09016F537" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-yume.aibq.d9er"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>586</pid><project_name>Central Park Light Infrastructure</project_name><description>Install, remove, and furnish equipment for electrical work associated with traffic signals, lighting, and distribution systems in Central Park, Manhattan.</description><category>Parks, Streets and Roadways</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><design_start>2016-04-29T00:00:00</design_start><budget_forecast>39055476.00</budget_forecast><latest_budget_changes>-715712.00</latest_budget_changes><total_budget_changes>-3323649.60</total_budget_changes><forecast_completion>2023-08-31T00:00:00</forecast_completion><latest_schedule_changes>62</latest_schedule_changes><total_schedule_changes>1535</total_schedule_changes></row><row _id="row-a4aq.n54h_4njm" _uuid="00000000-0000-0000-3EE8-06A3FFE54CD6" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-a4aq.n54h_4njm"><date_reported_as_of>2017-09-01T00:00:00</date_reported_as_of><pid>587</pid><project_name>Concourse Village Avenue over Metro North</project_name><description>Replace the Concourse Village Avenue bridge over Metro North, Bronx</description><category>Bridges</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2017-09-19T00:00:00</design_start><budget_forecast>50084283.00</budget_forecast><latest_budget_changes>0.63</latest_budget_changes><total_budget_changes>-186092.37</total_budget_changes><forecast_completion>2024-08-20T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1865</total_schedule_changes></row><row _id="row-3dtt~z27b-zwtd" _uuid="00000000-0000-0000-F300-8DA47AB0146F" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-3dtt~z27b-zwtd"><date_reported_as_of>2018-03-01T00:00:00</date_reported_as_of><pid>587</pid><project_name>Concourse Village Avenue over Metro North</project_name><description>Replace the Concourse Village Avenue bridge over Metro North, Bronx</description><category>Bridges</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2017-09-19T00:00:00</design_start><budget_forecast>50068796.00</budget_forecast><latest_budget_changes>-15487.00</latest_budget_changes><total_budget_changes>-186092.37</total_budget_changes><forecast_completion>2024-08-20T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1865</total_schedule_changes></row><row _id="row-seu6-rea7_292i" _uuid="00000000-0000-0000-1153-6EE9AA6232E5" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-seu6-rea7_292i"><date_reported_as_of>2018-08-01T00:00:00</date_reported_as_of><pid>587</pid><project_name>Concourse Village Avenue over Metro North</project_name><description>Replace the Concourse Village Avenue bridge over Metro North, Bronx</description><category>Bridges</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2017-09-19T00:00:00</design_start><budget_forecast>50068796.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-186092.37</total_budget_changes><forecast_completion>2024-08-20T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1865</total_schedule_changes></row><row _id="row-5ytn_z76m-f7ex" _uuid="00000000-0000-0000-82B0-49873E403020" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-5ytn_z76m-f7ex"><date_reported_as_of>2019-01-01T00:00:00</date_reported_as_of><pid>587</pid><project_name>Concourse Village Avenue over Metro North</project_name><description>Replace the Concourse Village Avenue bridge over Metro North, Bronx</description><category>Bridges</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2017-09-19T00:00:00</design_start><budget_forecast>50068795.00</budget_forecast><latest_budget_changes>-1.00</latest_budget_changes><total_budget_changes>-186092.37</total_budget_changes><forecast_completion>2024-08-20T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1865</total_schedule_changes></row><row _id="row-7qkf_2e87.8aqc" _uuid="00000000-0000-0000-05DD-795209B455D9" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-7qkf_2e87.8aqc"><date_reported_as_of>2019-05-01T00:00:00</date_reported_as_of><pid>587</pid><project_name>Concourse Village Avenue over Metro North</project_name><description>Replace the Concourse Village Avenue bridge over Metro North, Bronx</description><category>Bridges</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2017-09-19T00:00:00</design_start><budget_forecast>51068795.00</budget_forecast><latest_budget_changes>1000000.00</latest_budget_changes><total_budget_changes>-186092.37</total_budget_changes><forecast_completion>2027-10-17T00:00:00</forecast_completion><latest_schedule_changes>1153</latest_schedule_changes><total_schedule_changes>1865</total_schedule_changes></row><row _id="row-5i83.hvyd-efyb" _uuid="00000000-0000-0000-023E-BA80358B406E" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-5i83.hvyd-efyb"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>587</pid><project_name>Concourse Village Avenue over Metro North</project_name><description>Replace the Concourse Village Avenue bridge over Metro North, Bronx</description><category>Bridges</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2017-09-19T00:00:00</design_start><budget_forecast>51068795.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-186092.37</total_budget_changes><total_schedule_changes>1865</total_schedule_changes></row><row _id="row-gbgh_jhg5~9uun" _uuid="00000000-0000-0000-379D-259E1AC4540A" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-gbgh_jhg5~9uun"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>587</pid><project_name>Concourse Village Avenue over Metro North</project_name><description>Replace the Concourse Village Avenue bridge over Metro North, Bronx</description><category>Bridges</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2017-09-19T00:00:00</design_start><budget_forecast>51069190.00</budget_forecast><latest_budget_changes>395.00</latest_budget_changes><total_budget_changes>-186092.37</total_budget_changes><forecast_completion>2028-07-25T00:00:00</forecast_completion><latest_schedule_changes>282</latest_schedule_changes><total_schedule_changes>1865</total_schedule_changes></row><row _id="row-y7ed.t3zc_w8u8" _uuid="00000000-0000-0000-8649-48E35E3ECC32" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-y7ed.t3zc_w8u8"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>587</pid><project_name>Concourse Village Avenue over Metro North</project_name><description>Replace the Concourse Village Avenue bridge over Metro North, Bronx</description><category>Bridges</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2017-09-19T00:00:00</design_start><budget_forecast>51069190.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-186092.37</total_budget_changes><forecast_completion>2028-07-25T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1865</total_schedule_changes></row><row _id="row-sj5m~4umr.h2q9" _uuid="00000000-0000-0000-B5FE-10E65CE0BF81" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-sj5m~4umr.h2q9"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>587</pid><project_name>Concourse Village Avenue over Metro North</project_name><description>Replace the Concourse Village Avenue bridge over Metro North, Bronx</description><category>Bridges</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2017-09-19T00:00:00</design_start><budget_forecast>51069190.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-186092.37</total_budget_changes><forecast_completion>2029-01-21T00:00:00</forecast_completion><latest_schedule_changes>180</latest_schedule_changes><total_schedule_changes>1865</total_schedule_changes></row><row _id="row-bujc_j3e9_y6at" _uuid="00000000-0000-0000-9682-92FF4268F79D" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-bujc_j3e9_y6at"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>587</pid><project_name>Concourse Village Avenue over Metro North</project_name><category>Bridges</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><total_budget_changes>-186092.37</total_budget_changes><total_schedule_changes>1865</total_schedule_changes></row><row _id="row-znqn~k29z_ycdn" _uuid="00000000-0000-0000-3EE7-98E3F0D55E95" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-znqn~k29z_ycdn"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>587</pid><project_name>Concourse Village Avenue over Metro North</project_name><description>Replace the Concourse Village Avenue bridge over Metro North, Bronx</description><category>Bridges</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2019-01-25T00:00:00</design_start><budget_forecast>50569190.00</budget_forecast><latest_budget_changes>-500000.00</latest_budget_changes><total_budget_changes>-186092.37</total_budget_changes><forecast_completion>2027-09-09T00:00:00</forecast_completion><latest_schedule_changes>-500</latest_schedule_changes><total_schedule_changes>1865</total_schedule_changes></row><row _id="row-ag63.difw-n9wu" _uuid="00000000-0000-0000-316B-F999CD8A90CA" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ag63.difw-n9wu"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>587</pid><project_name>Concourse Village Avenue over Metro North</project_name><description>Replace the Concourse Village Avenue bridge over Metro North, Bronx</description><category>Bridges</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2019-01-25T00:00:00</design_start><budget_forecast>50569190.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-186092.37</total_budget_changes><forecast_completion>2029-04-23T00:00:00</forecast_completion><latest_schedule_changes>592</latest_schedule_changes><total_schedule_changes>1865</total_schedule_changes></row><row _id="row-a8m8~9j8r_8wir" _uuid="00000000-0000-0000-8D4B-15E1044E76FC" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-a8m8~9j8r_8wir"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>587</pid><project_name>Concourse Village Avenue over Metro North</project_name><description>Replace the Concourse Village Avenue bridge over Metro North, Bronx</description><category>Bridges</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2019-01-25T00:00:00</design_start><budget_forecast>49809580.00</budget_forecast><latest_budget_changes>-759610.00</latest_budget_changes><total_budget_changes>-186092.37</total_budget_changes><forecast_completion>2029-08-22T00:00:00</forecast_completion><latest_schedule_changes>121</latest_schedule_changes><total_schedule_changes>1865</total_schedule_changes></row><row _id="row-57aa~djzn~pjnd" _uuid="00000000-0000-0000-A9E6-B6BFC5BD5A71" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-57aa~djzn~pjnd"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>587</pid><project_name>Concourse Village Avenue over Metro North</project_name><description>Replace the Concourse Village Avenue bridge over Metro North, Bronx</description><category>Bridges</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2019-01-25T00:00:00</design_start><budget_forecast>50137437.00</budget_forecast><latest_budget_changes>327857.00</latest_budget_changes><total_budget_changes>-186092.37</total_budget_changes><forecast_completion>2029-03-02T00:00:00</forecast_completion><latest_schedule_changes>-173</latest_schedule_changes><total_schedule_changes>1865</total_schedule_changes></row><row _id="row-7n6q~v28u.3nsi" _uuid="00000000-0000-0000-698D-85F03EFDF616" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-7n6q~v28u.3nsi"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>587</pid><project_name>Concourse Village Avenue over Metro North</project_name><description>Replace the Concourse Village Avenue bridge over Metro North, Bronx</description><category>Bridges</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2019-01-25T00:00:00</design_start><budget_forecast>49898190.00</budget_forecast><latest_budget_changes>-239247.00</latest_budget_changes><total_budget_changes>-186092.37</total_budget_changes><forecast_completion>2029-09-28T00:00:00</forecast_completion><latest_schedule_changes>210</latest_schedule_changes><total_schedule_changes>1865</total_schedule_changes></row><row _id="row-n8kw_bfuq_t9j8" _uuid="00000000-0000-0000-C887-02F238AD0AE6" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-n8kw_bfuq_t9j8"><date_reported_as_of>2017-09-01T00:00:00</date_reported_as_of><pid>588</pid><project_name>East 156th Street Bridge over Access to Housing</project_name><description>Replace the East 156th Street bridge over Access to Housing, Bronx.</description><category>Bridges, Streets and Roadways</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2017-10-05T00:00:00</design_start><budget_forecast>65500000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-363846.00</total_budget_changes><forecast_completion>2024-09-05T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1720</total_schedule_changes></row><row _id="row-9m96~63mb_grii" _uuid="00000000-0000-0000-EB97-8D463CCC57E6" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-9m96~63mb_grii"><date_reported_as_of>2018-03-01T00:00:00</date_reported_as_of><pid>588</pid><project_name>East 156th Street Bridge over Access to Housing</project_name><description>Replace the East 156th Street bridge over Access to Housing, Bronx.</description><category>Bridges, Streets and Roadways</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2017-10-05T00:00:00</design_start><budget_forecast>65500000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-363846.00</total_budget_changes><forecast_completion>2024-09-05T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1720</total_schedule_changes></row><row _id="row-94av_xtcm~w6rd" _uuid="00000000-0000-0000-5E55-F92B2E71B34C" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-94av_xtcm~w6rd"><date_reported_as_of>2018-08-01T00:00:00</date_reported_as_of><pid>588</pid><project_name>East 156th Street Bridge over Access to Housing</project_name><description>Replace the East 156th Street bridge over Access to Housing, Bronx.</description><category>Bridges, Streets and Roadways</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2017-10-05T00:00:00</design_start><budget_forecast>65500000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-363846.00</total_budget_changes><forecast_completion>2024-09-05T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1720</total_schedule_changes></row><row _id="row-94dx.4xjv.xxjw" _uuid="00000000-0000-0000-BBC9-161E1AD7101D" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-94dx.4xjv.xxjw"><date_reported_as_of>2019-01-01T00:00:00</date_reported_as_of><pid>588</pid><project_name>East 156th Street Bridge over Access to Housing</project_name><description>Replace the East 156th Street bridge over Access to Housing, Bronx.</description><category>Bridges, Streets and Roadways</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2017-10-05T00:00:00</design_start><budget_forecast>65500000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-363846.00</total_budget_changes><forecast_completion>2027-10-09T00:00:00</forecast_completion><latest_schedule_changes>1129</latest_schedule_changes><total_schedule_changes>1720</total_schedule_changes></row><row _id="row-3swj_b8eu-ssc5" _uuid="00000000-0000-0000-C9F3-E25202C68EE8" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-3swj_b8eu-ssc5"><date_reported_as_of>2019-05-01T00:00:00</date_reported_as_of><pid>588</pid><project_name>East 156th Street Bridge over Access to Housing</project_name><description>Replace the East 156th Street bridge over Access to Housing, Bronx.</description><category>Bridges, Streets and Roadways</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2017-10-05T00:00:00</design_start><budget_forecast>66500000.00</budget_forecast><latest_budget_changes>1000000.00</latest_budget_changes><total_budget_changes>-363846.00</total_budget_changes><forecast_completion>2027-10-18T00:00:00</forecast_completion><latest_schedule_changes>9</latest_schedule_changes><total_schedule_changes>1720</total_schedule_changes></row><row _id="row-63gq-z98h_pk3r" _uuid="00000000-0000-0000-0964-7867CDFB2CC8" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-63gq-z98h_pk3r"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>588</pid><project_name>East 156th Street Bridge over Access to Housing</project_name><description>Replace the East 156th Street bridge over Access to Housing, Bronx.</description><category>Bridges, Streets and Roadways</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2017-10-05T00:00:00</design_start><budget_forecast>66000000.00</budget_forecast><latest_budget_changes>-500000.00</latest_budget_changes><total_budget_changes>-363846.00</total_budget_changes><total_schedule_changes>1720</total_schedule_changes></row><row _id="row-kdha~v6gr_mrin" _uuid="00000000-0000-0000-0885-6E0FB08AEA6E" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-kdha~v6gr_mrin"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>588</pid><project_name>East 156th Street Bridge over Access to Housing</project_name><description>Replace the East 156th Street bridge over Access to Housing, Bronx.</description><category>Bridges, Streets and Roadways</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2017-10-05T00:00:00</design_start><budget_forecast>66000331.00</budget_forecast><latest_budget_changes>331.00</latest_budget_changes><total_budget_changes>-363846.00</total_budget_changes><forecast_completion>2028-05-03T00:00:00</forecast_completion><latest_schedule_changes>198</latest_schedule_changes><total_schedule_changes>1720</total_schedule_changes></row><row _id="row-yhjn-mcu2.z3ce" _uuid="00000000-0000-0000-7BF6-AAA920F2A7B1" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-yhjn-mcu2.z3ce"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>588</pid><project_name>East 156th Street Bridge over Access to Housing</project_name><description>Replace the East 156th Street bridge over Access to Housing, Bronx.</description><category>Bridges, Streets and Roadways</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2017-10-05T00:00:00</design_start><budget_forecast>66500331.00</budget_forecast><latest_budget_changes>500000.00</latest_budget_changes><total_budget_changes>-363846.00</total_budget_changes><forecast_completion>2028-08-01T00:00:00</forecast_completion><latest_schedule_changes>90</latest_schedule_changes><total_schedule_changes>1720</total_schedule_changes></row><row _id="row-piwi~qqtg_fdxm" _uuid="00000000-0000-0000-DBBB-48889578E1D1" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-piwi~qqtg_fdxm"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>588</pid><project_name>East 156th Street Bridge over Access to Housing</project_name><description>Replace the East 156th Street bridge over Access to Housing, Bronx.</description><category>Bridges, Streets and Roadways</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2017-10-05T00:00:00</design_start><budget_forecast>66500331.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-363846.00</total_budget_changes><forecast_completion>2029-04-30T00:00:00</forecast_completion><latest_schedule_changes>272</latest_schedule_changes><total_schedule_changes>1720</total_schedule_changes></row><row _id="row-c5w8.3zuw.r6jm" _uuid="00000000-0000-0000-4E7F-63B76F497D5D" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-c5w8.3zuw.r6jm"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>588</pid><project_name>East 156th Street Bridge over Access to Housing</project_name><category>Bridges, Streets and Roadways</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><total_budget_changes>-363846.00</total_budget_changes><total_schedule_changes>1720</total_schedule_changes></row><row _id="row-za85.y5r4_ym5x" _uuid="00000000-0000-0000-AD1A-0553B335D8B4" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-za85.y5r4_ym5x"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>588</pid><project_name>East 156th Street Bridge over Access to Housing</project_name><description>Replace the East 156th Street bridge over Access to Housing, Bronx.</description><category>Bridges, Streets and Roadways</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2019-01-25T00:00:00</design_start><budget_forecast>66000331.00</budget_forecast><latest_budget_changes>-500000.00</latest_budget_changes><total_budget_changes>-363846.00</total_budget_changes><forecast_completion>2027-09-07T00:00:00</forecast_completion><latest_schedule_changes>-601</latest_schedule_changes><total_schedule_changes>1720</total_schedule_changes></row><row _id="row-9v6i_m8f2.kv6i" _uuid="00000000-0000-0000-A17E-EFC88000CD58" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-9v6i_m8f2.kv6i"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>588</pid><project_name>East 156th Street Bridge over Access to Housing</project_name><description>Replace the East 156th Street bridge over Access to Housing, Bronx.</description><category>Bridges, Streets and Roadways</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2019-01-25T00:00:00</design_start><budget_forecast>66000331.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-363846.00</total_budget_changes><forecast_completion>2029-02-19T00:00:00</forecast_completion><latest_schedule_changes>531</latest_schedule_changes><total_schedule_changes>1720</total_schedule_changes></row><row _id="row-3trt.hayi.na3x" _uuid="00000000-0000-0000-C932-F31156C18D23" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-3trt.hayi.na3x"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>588</pid><project_name>East 156th Street Bridge over Access to Housing</project_name><description>Replace the East 156th Street bridge over Access to Housing, Bronx.</description><category>Bridges, Streets and Roadways</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2019-01-25T00:00:00</design_start><budget_forecast>65500331.00</budget_forecast><latest_budget_changes>-500000.00</latest_budget_changes><total_budget_changes>-363846.00</total_budget_changes><forecast_completion>2029-02-19T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1720</total_schedule_changes></row><row _id="row-4e2k-5xq7_9ija" _uuid="00000000-0000-0000-8F31-8376AEED26E3" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-4e2k-5xq7_9ija"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>588</pid><project_name>East 156th Street Bridge over Access to Housing</project_name><description>Replace the East 156th Street bridge over Access to Housing, Bronx.</description><category>Bridges, Streets and Roadways</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2019-01-25T00:00:00</design_start><budget_forecast>62222494.00</budget_forecast><latest_budget_changes>-3277837.00</latest_budget_changes><total_budget_changes>-363846.00</total_budget_changes><forecast_completion>2029-02-21T00:00:00</forecast_completion><latest_schedule_changes>2</latest_schedule_changes><total_schedule_changes>1720</total_schedule_changes></row><row _id="row-4pe7~b9sw-kv9f" _uuid="00000000-0000-0000-D997-14AAF2382F5C" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-4pe7~b9sw-kv9f"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>588</pid><project_name>East 156th Street Bridge over Access to Housing</project_name><description>Replace the East 156th Street bridge over Access to Housing, Bronx.</description><category>Bridges, Streets and Roadways</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2019-01-25T00:00:00</design_start><budget_forecast>65136154.00</budget_forecast><latest_budget_changes>2913660.00</latest_budget_changes><total_budget_changes>-363846.00</total_budget_changes><forecast_completion>2029-05-22T00:00:00</forecast_completion><latest_schedule_changes>90</latest_schedule_changes><total_schedule_changes>1720</total_schedule_changes></row><row _id="row-ttxi~vnzq-b4ep" _uuid="00000000-0000-0000-964F-FB19AC331FF4" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ttxi~vnzq-b4ep"><date_reported_as_of>2019-01-01T00:00:00</date_reported_as_of><pid>592</pid><project_name>Henry Hudson Parkway over Amtrak (Northbound)</project_name><description>Replace the Ramp to northbound Henry Hudson Parkway over Amtrak in Manhattan.</description><category>Bridges</category><borough>Manhattan</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2018-05-10T00:00:00</design_start><budget_forecast>53551000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>500625.00</total_budget_changes><forecast_completion>2025-04-08T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1693</total_schedule_changes></row><row _id="row-96si-ag3w-riya" _uuid="00000000-0000-0000-5903-A5DE25444650" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-96si-ag3w-riya"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>592</pid><project_name>Henry Hudson Parkway over Amtrak (Northbound)</project_name><description>Replace the Ramp to northbound Henry Hudson Parkway over Amtrak in Manhattan.</description><category>Bridges</category><borough>Manhattan</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2020-01-02T00:00:00</design_start><budget_forecast>53551000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>500625.00</total_budget_changes><forecast_completion>2029-07-08T00:00:00</forecast_completion><latest_schedule_changes>1552</latest_schedule_changes><total_schedule_changes>1693</total_schedule_changes></row><row _id="row-5xek_2266.6x84" _uuid="00000000-0000-0000-4B02-665BCA616F23" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-5xek_2266.6x84"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>592</pid><project_name>Henry Hudson Parkway over Amtrak (Northbound)</project_name><description>Replace the Ramp to northbound Henry Hudson Parkway over Amtrak in Manhattan.</description><category>Bridges</category><borough>Manhattan</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2020-01-02T00:00:00</design_start><budget_forecast>54051000.00</budget_forecast><latest_budget_changes>500000.00</latest_budget_changes><total_budget_changes>500625.00</total_budget_changes><forecast_completion>2030-02-25T00:00:00</forecast_completion><latest_schedule_changes>232</latest_schedule_changes><total_schedule_changes>1693</total_schedule_changes></row><row _id="row-3z9g-a9zx_tx6x" _uuid="00000000-0000-0000-3AC7-136C2888130A" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-3z9g-a9zx_tx6x"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>592</pid><project_name>Henry Hudson Parkway over Amtrak (Northbound)</project_name><description>Replace the Ramp to northbound Henry Hudson Parkway over Amtrak in Manhattan.</description><category>Bridges</category><borough>Manhattan</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2020-01-02T00:00:00</design_start><budget_forecast>55689625.00</budget_forecast><latest_budget_changes>1638625.00</latest_budget_changes><total_budget_changes>500625.00</total_budget_changes><forecast_completion>2030-08-27T00:00:00</forecast_completion><latest_schedule_changes>183</latest_schedule_changes><total_schedule_changes>1693</total_schedule_changes></row><row _id="row-jfhz-dtzd_sqzu" _uuid="00000000-0000-0000-AD52-04DE0E11293E" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-jfhz-dtzd_sqzu"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>592</pid><project_name>Henry Hudson Parkway over Amtrak (Northbound)</project_name><category>Bridges</category><borough>Manhattan</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><total_budget_changes>500625.00</total_budget_changes><total_schedule_changes>1693</total_schedule_changes></row><row _id="row-ahey_m2s4.gens" _uuid="00000000-0000-0000-1808-C2F11D5D0904" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ahey_m2s4.gens"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>592</pid><project_name>Henry Hudson Parkway over Amtrak (Northbound)</project_name><description>Replace the Ramp to northbound Henry Hudson Parkway over Amtrak in Manhattan.</description><category>Bridges</category><borough>Manhattan</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2020-01-02T00:00:00</design_start><budget_forecast>54051625.00</budget_forecast><latest_budget_changes>-1638000.00</latest_budget_changes><total_budget_changes>500625.00</total_budget_changes><forecast_completion>2029-11-27T00:00:00</forecast_completion><latest_schedule_changes>-273</latest_schedule_changes><total_schedule_changes>1693</total_schedule_changes></row><row _id="row-66uk.dtm9~6bgn" _uuid="00000000-0000-0000-B588-430507042B55" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-66uk.dtm9~6bgn"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>592</pid><project_name>Henry Hudson Parkway over Amtrak (Northbound)</project_name><description>Replace the Ramp to northbound Henry Hudson Parkway over Amtrak in Manhattan.</description><category>Bridges</category><borough>Manhattan</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2020-01-02T00:00:00</design_start><budget_forecast>54051625.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>500625.00</total_budget_changes><forecast_completion>2029-05-17T00:00:00</forecast_completion><latest_schedule_changes>-194</latest_schedule_changes><total_schedule_changes>1693</total_schedule_changes></row><row _id="row-twa8-pzsu_hqpv" _uuid="00000000-0000-0000-B23B-58C2EC74E832" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-twa8-pzsu_hqpv"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>592</pid><project_name>Henry Hudson Parkway over Amtrak (Northbound)</project_name><description>Replace the Ramp to northbound Henry Hudson Parkway over Amtrak in Manhattan.</description><category>Bridges</category><borough>Manhattan</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2020-01-02T00:00:00</design_start><budget_forecast>53551625.00</budget_forecast><latest_budget_changes>-500000.00</latest_budget_changes><total_budget_changes>500625.00</total_budget_changes><forecast_completion>2029-07-01T00:00:00</forecast_completion><latest_schedule_changes>45</latest_schedule_changes><total_schedule_changes>1693</total_schedule_changes></row><row _id="row-hsgv-rfuz~m2ht" _uuid="00000000-0000-0000-B909-7991EC494A98" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-hsgv-rfuz~m2ht"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>592</pid><project_name>Henry Hudson Parkway over Amtrak (Northbound)</project_name><description>Replace the Ramp to northbound Henry Hudson Parkway over Amtrak in Manhattan.</description><category>Bridges</category><borough>Manhattan</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2020-01-02T00:00:00</design_start><budget_forecast>53551625.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>500625.00</total_budget_changes><forecast_completion>2029-07-01T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1693</total_schedule_changes></row><row _id="row-tm24.2rwk_igvd" _uuid="00000000-0000-0000-A920-E2730AEFAF53" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-tm24.2rwk_igvd"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>592</pid><project_name>Henry Hudson Parkway over Amtrak (Northbound)</project_name><description>Replace the Ramp to northbound Henry Hudson Parkway over Amtrak in Manhattan.</description><category>Bridges</category><borough>Manhattan</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2020-01-02T00:00:00</design_start><budget_forecast>54051625.00</budget_forecast><latest_budget_changes>500000.00</latest_budget_changes><total_budget_changes>500625.00</total_budget_changes><forecast_completion>2029-11-26T00:00:00</forecast_completion><latest_schedule_changes>148</latest_schedule_changes><total_schedule_changes>1693</total_schedule_changes></row><row _id="row-t6s4.i2e9.fm8m" _uuid="00000000-0000-0000-A98B-D49E675A5A8C" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-t6s4.i2e9.fm8m"><date_reported_as_of>2017-04-01T00:00:00</date_reported_as_of><pid>594</pid><project_name>Queensboro Bridge Roadway Replacement over East River</project_name><description>This project includes the replacement of the upper roadway's deck on the main bridge along with steel repairs, fire standpipes, and lighting upgrades.</description><category>Bridges, Streets and Roadways</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2015-04-09T00:00:00</design_start><budget_forecast>361933233.33</budget_forecast><total_budget_changes>8567339.67</total_budget_changes><forecast_completion>2019-05-08T00:00:00</forecast_completion><total_schedule_changes>1970</total_schedule_changes></row><row _id="row-5qkg~88qd.rw5q" _uuid="00000000-0000-0000-FDA6-B30B11A4A986" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-5qkg~88qd.rw5q"><date_reported_as_of>2017-09-01T00:00:00</date_reported_as_of><pid>594</pid><project_name>Queensboro Bridge Roadway Replacement over East River</project_name><description>This project includes the replacement of the upper roadway's deck on the main bridge along with steel repairs, fire standpipes, and lighting upgrades.</description><category>Bridges, Streets and Roadways</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2015-04-09T00:00:00</design_start><budget_forecast>373837381.00</budget_forecast><latest_budget_changes>11904147.67</latest_budget_changes><total_budget_changes>8567339.67</total_budget_changes><forecast_completion>2019-04-08T00:00:00</forecast_completion><latest_schedule_changes>-30</latest_schedule_changes><total_schedule_changes>1970</total_schedule_changes></row><row _id="row-gs3v_b6xa.5ubz" _uuid="00000000-0000-0000-41D1-4D93977F171B" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-gs3v_b6xa.5ubz"><date_reported_as_of>2018-03-01T00:00:00</date_reported_as_of><pid>594</pid><project_name>Queensboro Bridge Roadway Replacement over East River</project_name><description>This project includes the replacement of the upper roadway's deck on the main bridge along with steel repairs, fire standpipes, and lighting upgrades.</description><category>Bridges, Streets and Roadways</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2015-04-09T00:00:00</design_start><budget_forecast>388146233.00</budget_forecast><latest_budget_changes>14308852.00</latest_budget_changes><total_budget_changes>8567339.67</total_budget_changes><forecast_completion>2019-10-21T00:00:00</forecast_completion><latest_schedule_changes>196</latest_schedule_changes><total_schedule_changes>1970</total_schedule_changes></row><row _id="row-7jde.ekmg-k58t" _uuid="00000000-0000-0000-089F-AAAC35637EF5" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-7jde.ekmg-k58t"><date_reported_as_of>2018-08-01T00:00:00</date_reported_as_of><pid>594</pid><project_name>Queensboro Bridge Roadway Replacement over East River</project_name><description>This project includes the replacement of the upper roadway's deck on the main bridge along with steel repairs, fire standpipes, and lighting upgrades.</description><category>Bridges, Streets and Roadways</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><design_start>2015-04-09T00:00:00</design_start><budget_forecast>386618233.00</budget_forecast><latest_budget_changes>-1528000.00</latest_budget_changes><total_budget_changes>8567339.67</total_budget_changes><forecast_completion>2022-11-04T00:00:00</forecast_completion><latest_schedule_changes>1110</latest_schedule_changes><total_schedule_changes>1970</total_schedule_changes></row><row _id="row-ajpg.x6wq_mj2a" _uuid="00000000-0000-0000-3F07-A7D679466569" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ajpg.x6wq_mj2a"><date_reported_as_of>2019-01-01T00:00:00</date_reported_as_of><pid>594</pid><project_name>Queensboro Bridge Roadway Replacement over East River</project_name><description>This project includes the replacement of the upper roadway's deck on the main bridge along with steel repairs, fire standpipes, and lighting upgrades.</description><category>Bridges, Streets and Roadways</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><design_start>2015-04-09T00:00:00</design_start><budget_forecast>336460221.26</budget_forecast><latest_budget_changes>-50158011.74</latest_budget_changes><total_budget_changes>8567339.67</total_budget_changes><forecast_completion>2022-10-28T00:00:00</forecast_completion><latest_schedule_changes>-7</latest_schedule_changes><total_schedule_changes>1970</total_schedule_changes></row><row _id="row-6a8c.6p92.vssh" _uuid="00000000-0000-0000-4F41-A39CA47DBF9B" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-6a8c.6p92.vssh"><date_reported_as_of>2019-05-01T00:00:00</date_reported_as_of><pid>594</pid><project_name>Queensboro Bridge Roadway Replacement over East River</project_name><description>This project includes the replacement of the upper roadway's deck on the main bridge along with steel repairs, fire standpipes, and lighting upgrades.</description><category>Bridges, Streets and Roadways</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><design_start>2015-04-09T00:00:00</design_start><budget_forecast>70033000.00</budget_forecast><latest_budget_changes>-266427221.26</latest_budget_changes><total_budget_changes>8567339.67</total_budget_changes><forecast_completion>2022-10-28T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1970</total_schedule_changes></row><row _id="row-w97x_bej8_ijfi" _uuid="00000000-0000-0000-66FD-41001B34F1DA" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-w97x_bej8_ijfi"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>594</pid><project_name>Queensboro Bridge Roadway Replacement over East River</project_name><description>This project includes the replacement of the upper roadway's deck on the main bridge along with steel repairs, fire standpipes, and lighting upgrades.</description><category>Bridges, Streets and Roadways</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><design_start>2015-04-09T00:00:00</design_start><budget_forecast>393248176.00</budget_forecast><latest_budget_changes>323215176.00</latest_budget_changes><total_budget_changes>8567339.67</total_budget_changes><forecast_completion>2022-11-04T00:00:00</forecast_completion><latest_schedule_changes>7</latest_schedule_changes><total_schedule_changes>1970</total_schedule_changes></row><row _id="row-fdj2~3e3x~kp25" _uuid="00000000-0000-0000-CF96-6C61234D43B0" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-fdj2~3e3x~kp25"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>594</pid><project_name>Queensboro Bridge Roadway Replacement over East River</project_name><description>This project includes the replacement of the upper roadway's deck on the main bridge along with steel repairs, fire standpipes, and lighting upgrades.</description><category>Bridges, Streets and Roadways</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><design_start>2015-04-09T00:00:00</design_start><budget_forecast>394997777.00</budget_forecast><latest_budget_changes>1749601.00</latest_budget_changes><total_budget_changes>8567339.67</total_budget_changes><forecast_completion>2023-06-29T00:00:00</forecast_completion><latest_schedule_changes>237</latest_schedule_changes><total_schedule_changes>1970</total_schedule_changes></row><row _id="row-33ph-zsab_cv5j" _uuid="00000000-0000-0000-1535-F5F9E1259DD6" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-33ph-zsab_cv5j"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>594</pid><project_name>Queensboro Bridge Roadway Replacement over East River</project_name><description>This project includes the replacement of the upper roadway's deck on the main bridge along with steel repairs, fire standpipes, and lighting upgrades.</description><category>Bridges, Streets and Roadways</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><design_start>2015-04-09T00:00:00</design_start><budget_forecast>394447777.00</budget_forecast><latest_budget_changes>-550000.00</latest_budget_changes><total_budget_changes>8567339.67</total_budget_changes><forecast_completion>2022-10-28T00:00:00</forecast_completion><latest_schedule_changes>-244</latest_schedule_changes><total_schedule_changes>1970</total_schedule_changes></row><row _id="row-epx9_8fsi-u2cs" _uuid="00000000-0000-0000-4164-2932DF62A79D" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-epx9_8fsi-u2cs"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>1202</pid><project_name>150th Street Spine: Phase II - DOT Van Wyck Expressway - Trunk Combined Sewer</project_name><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Design</current_phase><design_start>2020-03-02T00:00:00</design_start><budget_forecast>139368000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-676000.00</total_budget_changes><total_schedule_changes>-194</total_schedule_changes></row><row _id="row-j4ep_55eg-74av" _uuid="00000000-0000-0000-8139-652C43F4097D" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-j4ep_55eg-74av"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>594</pid><project_name>Queensboro Bridge Roadway Replacement over East River</project_name><description>This project includes the replacement of the upper roadway's deck on the main bridge along with steel repairs, fire standpipes, and lighting upgrades.</description><category>Bridges, Streets and Roadways</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><design_start>2015-04-09T00:00:00</design_start><budget_forecast>351710966.00</budget_forecast><latest_budget_changes>-42736811.00</latest_budget_changes><total_budget_changes>8567339.67</total_budget_changes><forecast_completion>2023-12-01T00:00:00</forecast_completion><latest_schedule_changes>399</latest_schedule_changes><total_schedule_changes>1970</total_schedule_changes></row><row _id="row-uftz_ki63~aut5" _uuid="00000000-0000-0000-CEF5-7B14D5BE42CB" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-uftz_ki63~aut5"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>594</pid><project_name>Queensboro Bridge Roadway Replacement over East River</project_name><category>Bridges, Streets and Roadways</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><total_budget_changes>8567339.67</total_budget_changes><total_schedule_changes>1970</total_schedule_changes></row><row _id="row-d3zu~idx9-7dry" _uuid="00000000-0000-0000-8529-91A0D891C035" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-d3zu~idx9-7dry"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>594</pid><project_name>Queensboro Bridge Roadway Replacement over East River</project_name><description>This project includes the replacement of the upper roadway's deck on the main bridge along with steel repairs, fire standpipes, and lighting upgrades.</description><category>Bridges, Streets and Roadways</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><design_start>2015-04-09T00:00:00</design_start><budget_forecast>359006966.00</budget_forecast><latest_budget_changes>7296000.00</latest_budget_changes><total_budget_changes>8567339.67</total_budget_changes><forecast_completion>2023-12-15T00:00:00</forecast_completion><latest_schedule_changes>14</latest_schedule_changes><total_schedule_changes>1970</total_schedule_changes></row><row _id="row-9qzc-giu5~8whw" _uuid="00000000-0000-0000-B47C-A57B4C0CE4AE" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-9qzc-giu5~8whw"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>594</pid><project_name>Queensboro Bridge Roadway Replacement over East River</project_name><description>This project includes the replacement of the upper roadway's deck on the main bridge along with steel repairs, fire standpipes, and lighting upgrades.</description><category>Bridges, Streets and Roadways</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><design_start>2015-04-09T00:00:00</design_start><budget_forecast>383033014.00</budget_forecast><latest_budget_changes>24026048.00</latest_budget_changes><total_budget_changes>8567339.67</total_budget_changes><forecast_completion>2024-03-13T00:00:00</forecast_completion><latest_schedule_changes>89</latest_schedule_changes><total_schedule_changes>1970</total_schedule_changes></row><row _id="row-2ukc_tqgr~2skj" _uuid="00000000-0000-0000-7B3F-B4EFC0611C80" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-2ukc_tqgr~2skj"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>594</pid><project_name>Queensboro Bridge Roadway Replacement over East River</project_name><description>This project includes the replacement of the upper roadway's deck on the main bridge along with steel repairs, fire standpipes, and lighting upgrades.</description><category>Bridges, Streets and Roadways</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><design_start>2015-04-09T00:00:00</design_start><budget_forecast>364535769.00</budget_forecast><latest_budget_changes>-18497245.00</latest_budget_changes><total_budget_changes>8567339.67</total_budget_changes><forecast_completion>2024-03-13T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1970</total_schedule_changes></row><row _id="row-4kp2_kndk-mamf" _uuid="00000000-0000-0000-08DB-7B789D33FD3E" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-4kp2_kndk-mamf"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>594</pid><project_name>Queensboro Bridge Roadway Replacement over East River</project_name><description>This project includes the replacement of the upper roadway's deck on the main bridge along with steel repairs, fire standpipes, and lighting upgrades.</description><category>Bridges, Streets and Roadways</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><design_start>2015-04-09T00:00:00</design_start><budget_forecast>358195118.00</budget_forecast><latest_budget_changes>-6340651.00</latest_budget_changes><total_budget_changes>8567339.67</total_budget_changes><forecast_completion>2014-01-31T00:00:00</forecast_completion><latest_schedule_changes>-3694</latest_schedule_changes><total_schedule_changes>1970</total_schedule_changes></row><row _id="row-huy7.6pa4_69kb" _uuid="00000000-0000-0000-66F5-3B1823217EB7" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-huy7.6pa4_69kb"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>594</pid><project_name>Queensboro Bridge Roadway Replacement over East River</project_name><description>This project includes the replacement of the upper roadway's deck on the main bridge along with steel repairs, fire standpipes, and lighting upgrades.</description><category>Bridges, Streets and Roadways</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><design_start>2015-04-09T00:00:00</design_start><budget_forecast>370500573.00</budget_forecast><latest_budget_changes>12305455.00</latest_budget_changes><total_budget_changes>8567339.67</total_budget_changes><forecast_completion>2024-09-28T00:00:00</forecast_completion><latest_schedule_changes>3893</latest_schedule_changes><total_schedule_changes>1970</total_schedule_changes></row><row _id="row-xdm6_yhkf.vqfm" _uuid="00000000-0000-0000-87D8-7D108F8D7288" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-xdm6_yhkf.vqfm"><date_reported_as_of>2018-08-01T00:00:00</date_reported_as_of><pid>599</pid><project_name>Williamsburg Bridge Miscellaneous Repairs and Painting</project_name><description>Scope includes paint the south side of the bridge, repair flags and structural steel, evaluate PP20 Bearings, evaluate tension rods at mid-span of the bridge, repair bridge cables and suspenders, replace modular joint, investigate the feasibility of additional clearance at towers, and resurface bridge decks with new waterproofing membrane.</description><category>Bridges</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2018-08-15T00:00:00</design_start><budget_forecast>307501000.00</budget_forecast><latest_budget_changes>1501000.00</latest_budget_changes><total_budget_changes>52784947.00</total_budget_changes><forecast_completion>2024-03-09T00:00:00</forecast_completion><latest_schedule_changes>-272</latest_schedule_changes><total_schedule_changes>362</total_schedule_changes></row><row _id="row-6pqg.2g43~wqcx" _uuid="00000000-0000-0000-EC57-2CC3FFC61CEB" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-6pqg.2g43~wqcx"><date_reported_as_of>2019-01-01T00:00:00</date_reported_as_of><pid>599</pid><project_name>Williamsburg Bridge Miscellaneous Repairs and Painting</project_name><description>Scope includes paint the south side of the bridge, repair flags and structural steel, evaluate PP20 Bearings, evaluate tension rods at mid-span of the bridge, repair bridge cables and suspenders, replace modular joint, investigate the feasibility of additional clearance at towers, and resurface bridge decks with new waterproofing membrane.</description><category>Bridges</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2018-08-15T00:00:00</design_start><budget_forecast>316565000.00</budget_forecast><latest_budget_changes>9064000.00</latest_budget_changes><total_budget_changes>52784947.00</total_budget_changes><forecast_completion>2024-12-06T00:00:00</forecast_completion><latest_schedule_changes>272</latest_schedule_changes><total_schedule_changes>362</total_schedule_changes></row><row _id="row-isry_cpei_cemv" _uuid="00000000-0000-0000-7878-8B9265CB2F17" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-isry_cpei_cemv"><date_reported_as_of>2019-05-01T00:00:00</date_reported_as_of><pid>599</pid><project_name>Williamsburg Bridge Miscellaneous Repairs and Painting</project_name><description>Scope includes paint the south side of the bridge, repair flags and structural steel, evaluate PP20 Bearings, evaluate tension rods at mid-span of the bridge, repair bridge cables and suspenders, replace modular joint, investigate the feasibility of additional clearance at towers, and resurface bridge decks with new waterproofing membrane.</description><category>Bridges</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2018-08-15T00:00:00</design_start><budget_forecast>308186521.00</budget_forecast><latest_budget_changes>-8378479.00</latest_budget_changes><total_budget_changes>52784947.00</total_budget_changes><forecast_completion>2024-12-06T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>362</total_schedule_changes></row><row _id="row-j547~i3wp.c36i" _uuid="00000000-0000-0000-92B7-C325A61654C1" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-j547~i3wp.c36i"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>599</pid><project_name>Williamsburg Bridge Miscellaneous Repairs and Painting</project_name><description>Scope includes paint the south side of the bridge, repair flags and structural steel, evaluate PP20 Bearings, evaluate tension rods at mid-span of the bridge, repair bridge cables and suspenders, replace modular joint, investigate the feasibility of additional clearance at towers, and resurface bridge decks with new waterproofing membrane.</description><category>Bridges</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><design_start>2018-08-15T00:00:00</design_start><budget_forecast>308294521.00</budget_forecast><latest_budget_changes>108000.00</latest_budget_changes><total_budget_changes>52784947.00</total_budget_changes><total_schedule_changes>362</total_schedule_changes></row><row _id="row-q4va-fk4m-ihax" _uuid="00000000-0000-0000-E181-3C1064D2018C" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-q4va-fk4m-ihax"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>599</pid><project_name>Williamsburg Bridge Miscellaneous Repairs and Painting</project_name><description>Scope includes paint the south side of the bridge, repair flags and structural steel, evaluate PP20 Bearings, evaluate tension rods at mid-span of the bridge, repair bridge cables and suspenders, replace modular joint, investigate the feasibility of additional clearance at towers, and resurface bridge decks with new waterproofing membrane.</description><category>Bridges</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2018-08-15T00:00:00</design_start><budget_forecast>173205250.00</budget_forecast><latest_budget_changes>928729.00</latest_budget_changes><total_budget_changes>52784947.00</total_budget_changes><forecast_completion>2025-05-08T00:00:00</forecast_completion><latest_schedule_changes>153</latest_schedule_changes><total_schedule_changes>362</total_schedule_changes></row><row _id="row-a243-hj28-6awm" _uuid="00000000-0000-0000-6FD9-30D2F26BCE15" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-a243-hj28-6awm"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>599</pid><project_name>Williamsburg Bridge Miscellaneous Repairs and Painting</project_name><category>Bridges</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><total_budget_changes>52784947.00</total_budget_changes><total_schedule_changes>362</total_schedule_changes></row><row _id="row-gsfd.77ct_m6gb" _uuid="00000000-0000-0000-9D5E-F3C1CCDADFCA" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-gsfd.77ct_m6gb"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>599</pid><project_name>Williamsburg Bridge Miscellaneous Repairs and Painting</project_name><description>Scope includes paint the south side of the bridge, repair flags and structural steel, evaluate PP20 Bearings, evaluate tension rods at mid-span of the bridge, repair bridge cables and suspenders, replace modular joint, investigate the feasibility of additional clearance at towers, and resurface bridge decks with new waterproofing membrane.</description><category>Bridges</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2018-08-15T00:00:00</design_start><budget_forecast>170791250.00</budget_forecast><latest_budget_changes>-2414000.00</latest_budget_changes><total_budget_changes>52784947.00</total_budget_changes><forecast_completion>2025-05-07T00:00:00</forecast_completion><latest_schedule_changes>-1</latest_schedule_changes><total_schedule_changes>362</total_schedule_changes></row><row _id="row-6jbj.5eam-nkkb" _uuid="00000000-0000-0000-5C4B-C43F4F1DCAFF" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-6jbj.5eam-nkkb"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>599</pid><project_name>Williamsburg Bridge Miscellaneous Repairs and Painting</project_name><description>Scope includes paint the south side of the bridge, repair flags and structural steel, evaluate PP20 Bearings, evaluate tension rods at mid-span of the bridge, repair bridge cables and suspenders, replace modular joint, investigate the feasibility of additional clearance at towers, and resurface bridge decks with new waterproofing membrane.</description><category>Bridges</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction Procurement</current_phase><design_start>2018-08-15T00:00:00</design_start><budget_forecast>214214567.00</budget_forecast><latest_budget_changes>43423317.00</latest_budget_changes><total_budget_changes>52784947.00</total_budget_changes><forecast_completion>2026-03-25T00:00:00</forecast_completion><latest_schedule_changes>322</latest_schedule_changes><total_schedule_changes>362</total_schedule_changes></row><row _id="row-byba~uzih_f7q8" _uuid="00000000-0000-0000-87E4-C7CC75372242" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-byba~uzih_f7q8"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>599</pid><project_name>Williamsburg Bridge Miscellaneous Repairs and Painting</project_name><description>Scope includes paint the south side of the bridge, repair flags and structural steel, evaluate PP20 Bearings, evaluate tension rods at mid-span of the bridge, repair bridge cables and suspenders, replace modular joint, investigate the feasibility of additional clearance at towers, and resurface bridge decks with new waterproofing membrane.</description><category>Bridges</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction Procurement</current_phase><design_start>2018-08-15T00:00:00</design_start><budget_forecast>207382567.00</budget_forecast><latest_budget_changes>-6832000.00</latest_budget_changes><total_budget_changes>52784947.00</total_budget_changes><forecast_completion>2026-04-21T00:00:00</forecast_completion><latest_schedule_changes>27</latest_schedule_changes><total_schedule_changes>362</total_schedule_changes></row><row _id="row-md34_7b2u-d6vk" _uuid="00000000-0000-0000-4231-1D65CAA6D08C" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-md34_7b2u-d6vk"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>599</pid><project_name>Williamsburg Bridge Miscellaneous Repairs and Painting</project_name><description>Scope includes paint the south side of the bridge, repair flags and structural steel, evaluate PP20 Bearings, evaluate tension rods at mid-span of the bridge, repair bridge cables and suspenders, replace modular joint, investigate the feasibility of additional clearance at towers, and resurface bridge decks with new waterproofing membrane.</description><category>Bridges</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction Procurement</current_phase><design_start>2018-08-15T00:00:00</design_start><budget_forecast>228073406.00</budget_forecast><latest_budget_changes>20690839.00</latest_budget_changes><total_budget_changes>52784947.00</total_budget_changes><forecast_completion>2026-06-18T00:00:00</forecast_completion><latest_schedule_changes>58</latest_schedule_changes><total_schedule_changes>362</total_schedule_changes></row><row _id="row-99pt_qtjx_35v9" _uuid="00000000-0000-0000-F20C-31A26CFC41CE" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-99pt_qtjx_35v9"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>599</pid><project_name>Williamsburg Bridge Miscellaneous Repairs and Painting</project_name><description>Scope includes paint the south side of the bridge, repair flags and structural steel, evaluate PP20 Bearings, evaluate tension rods at mid-span of the bridge, repair bridge cables and suspenders, replace modular joint, investigate the feasibility of additional clearance at towers, and resurface bridge decks with new waterproofing membrane.</description><category>Bridges</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><design_start>2018-08-15T00:00:00</design_start><budget_forecast>222766947.00</budget_forecast><latest_budget_changes>-5306459.00</latest_budget_changes><total_budget_changes>52784947.00</total_budget_changes><forecast_completion>2025-12-03T00:00:00</forecast_completion><latest_schedule_changes>-197</latest_schedule_changes><total_schedule_changes>362</total_schedule_changes></row><row _id="row-ka8t-4a6g.fu3e" _uuid="00000000-0000-0000-7BE9-34FF88F7E1A7" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ka8t-4a6g.fu3e"><date_reported_as_of>2017-09-01T00:00:00</date_reported_as_of><pid>617</pid><project_name>BROAD CHANNEL BULKHEADS - PH II</project_name><description>Reconstruction of West 14, 15, 16, 17, 18 and 19th Streets from Crossbay Blvd to to Dead End</description><category>Industrial Development</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2015-06-01T00:00:00</design_start><budget_forecast>30933000.00</budget_forecast><total_budget_changes>61781000.00</total_budget_changes><forecast_completion>2024-08-27T00:00:00</forecast_completion><total_schedule_changes>-74</total_schedule_changes></row><row _id="row-b7mc.u8qy_f4v4" _uuid="00000000-0000-0000-18D0-34C6719F8D20" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-b7mc.u8qy_f4v4"><date_reported_as_of>2018-03-01T00:00:00</date_reported_as_of><pid>617</pid><project_name>BROAD CHANNEL BULKHEADS - PH II</project_name><description>Reconstruction of West 14, 15, 16, 17, 18 and 19th Streets from Crossbay Blvd to to Dead End</description><category>Industrial Development</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2015-06-01T00:00:00</design_start><budget_forecast>30933000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>61781000.00</total_budget_changes><forecast_completion>2024-08-27T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>-74</total_schedule_changes></row><row _id="row-xpmy_ecpi_kkta" _uuid="00000000-0000-0000-31AA-5F6035158075" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-xpmy_ecpi_kkta"><date_reported_as_of>2018-08-01T00:00:00</date_reported_as_of><pid>617</pid><project_name>BROAD CHANNEL BULKHEADS - PH II</project_name><description>Reconstruction of West 14, 15, 16, 17, 18 and 19th Streets from Crossbay Blvd to to Dead End</description><category>Industrial Development</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2015-06-01T00:00:00</design_start><budget_forecast>34291000.00</budget_forecast><latest_budget_changes>3358000.00</latest_budget_changes><total_budget_changes>61781000.00</total_budget_changes><forecast_completion>2024-11-12T00:00:00</forecast_completion><latest_schedule_changes>77</latest_schedule_changes><total_schedule_changes>-74</total_schedule_changes></row><row _id="row-q898~mpjc_xq94" _uuid="00000000-0000-0000-5F4D-BC9DD96FBEB0" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-q898~mpjc_xq94"><date_reported_as_of>2019-01-01T00:00:00</date_reported_as_of><pid>617</pid><project_name>BROAD CHANNEL BULKHEADS - PH II</project_name><description>Reconstruction of West 14, 15, 16, 17, 18 and 19th Streets from Crossbay Blvd to to Dead End</description><category>Industrial Development</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2015-06-01T00:00:00</design_start><budget_forecast>43870000.00</budget_forecast><latest_budget_changes>9579000.00</latest_budget_changes><total_budget_changes>61781000.00</total_budget_changes><forecast_completion>2025-01-10T00:00:00</forecast_completion><latest_schedule_changes>59</latest_schedule_changes><total_schedule_changes>-74</total_schedule_changes></row><row _id="row-47mw-5gha.7qsm" _uuid="00000000-0000-0000-CDE3-A4378A4C3882" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-47mw-5gha.7qsm"><date_reported_as_of>2019-05-01T00:00:00</date_reported_as_of><pid>617</pid><project_name>BROAD CHANNEL BULKHEADS - PH II</project_name><description>West 14th Rd. from Cross Bay Blvd. to Dead end (water side)  West 15th Rd. from Cross Bay Blvd. to Dead end (water side)  West 16th Rd. from Cross Bay Blvd. to Dead end (water side)  West 17th Rd. from Cross Bay Blvd. to Dead end (water side)  West 18th Rd. from Cross Bay Blvd. to Dead end (water side)  West 19th Rd. from Cross Bay Blvd. to Dead end (water side)</description><category>Industrial Development</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Construction Procurement</current_phase><design_start>2015-06-01T00:00:00</design_start><budget_forecast>39742000.00</budget_forecast><latest_budget_changes>-4128000.00</latest_budget_changes><total_budget_changes>61781000.00</total_budget_changes><forecast_completion>2023-05-25T00:00:00</forecast_completion><latest_schedule_changes>-596</latest_schedule_changes><total_schedule_changes>-74</total_schedule_changes></row><row _id="row-baqv~2pd5~qwiv" _uuid="00000000-0000-0000-9030-CF1E6EA5FB19" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-baqv~2pd5~qwiv"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>617</pid><project_name>BROAD CHANNEL BULKHEADS - PH II</project_name><description>West 14th Rd. from Cross Bay Blvd. to Dead end (water side) West 15th Rd. from Cross Bay Blvd. to Dead end (water side) West 16th Rd. from Cross Bay Blvd. to Dead end (water side) West 17th Rd. from Cross Bay Blvd. to Dead end (water side)</description><category>Industrial Development</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Construction Procurement</current_phase><design_start>2015-06-01T00:00:00</design_start><budget_forecast>100110000.00</budget_forecast><latest_budget_changes>60368000.00</latest_budget_changes><total_budget_changes>61781000.00</total_budget_changes><forecast_completion>2023-05-25T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>-74</total_schedule_changes></row><row _id="row-arcc_cwnh~mg8n" _uuid="00000000-0000-0000-1877-736EA6A82701" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-arcc_cwnh~mg8n"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>617</pid><project_name>BROAD CHANNEL BULKHEADS - PH II</project_name><category>Industrial Development</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><total_budget_changes>61781000.00</total_budget_changes><total_schedule_changes>-74</total_schedule_changes></row><row _id="row-b7mb.g9xa-shht" _uuid="00000000-0000-0000-F51B-A333F28B60E7" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-b7mb.g9xa-shht"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>617</pid><project_name>BROAD CHANNEL BULKHEADS - PH II</project_name><category>Industrial Development</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><total_budget_changes>61781000.00</total_budget_changes><total_schedule_changes>-74</total_schedule_changes></row><row _id="row-i8hd.wq2i~y2uw" _uuid="00000000-0000-0000-B16D-9A27F6EE8EAC" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-i8hd.wq2i~y2uw"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>617</pid><project_name>BROAD CHANNEL BULKHEADS - PH II</project_name><category>Industrial Development</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><total_budget_changes>61781000.00</total_budget_changes><total_schedule_changes>-74</total_schedule_changes></row><row _id="row-6fi7_3qux_m664" _uuid="00000000-0000-0000-48C7-5B21725E1FE2" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-6fi7_3qux_m664"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>617</pid><project_name>BROAD CHANNEL BULKHEADS - PH II</project_name><category>Industrial Development</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><total_budget_changes>61781000.00</total_budget_changes><total_schedule_changes>-74</total_schedule_changes></row><row _id="row-enma.rr5f.tgbb" _uuid="00000000-0000-0000-AE6B-DA96B80CADB0" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-enma.rr5f.tgbb"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>617</pid><project_name>BROAD CHANNEL BULKHEADS - PH II</project_name><description>West 14th Rd. from Cross Bay Blvd. to Dead end (water side) West 15th Rd. from Cross Bay Blvd. to Dead end (water side) West 16th Rd. from Cross Bay Blvd. to Dead end (water side) West 17th Rd. from Cross Bay Blvd. to Dead end (water side)</description><category>Industrial Development</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Construction</current_phase><design_start>2015-06-01T00:00:00</design_start><budget_forecast>86464000.00</budget_forecast><latest_budget_changes>-13646000.00</latest_budget_changes><total_budget_changes>61781000.00</total_budget_changes><forecast_completion>2024-06-14T00:00:00</forecast_completion><latest_schedule_changes>386</latest_schedule_changes><total_schedule_changes>-74</total_schedule_changes></row><row _id="row-e64p.sdg4.msad" _uuid="00000000-0000-0000-8767-FC5B040C71E4" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-e64p.sdg4.msad"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>617</pid><project_name>BROAD CHANNEL BULKHEADS - PH II</project_name><description>West 14th Rd. from Cross Bay Blvd. to Dead end (water side) West 15th Rd. from Cross Bay Blvd. to Dead end (water side) West 16th Rd. from Cross Bay Blvd. to Dead end (water side) West 17th Rd. from Cross Bay Blvd. to Dead end (water side)</description><category>Industrial Development</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Construction</current_phase><design_start>2015-06-01T00:00:00</design_start><budget_forecast>86814000.00</budget_forecast><latest_budget_changes>350000.00</latest_budget_changes><total_budget_changes>61781000.00</total_budget_changes><forecast_completion>2024-06-14T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>-74</total_schedule_changes></row><row _id="row-b3wn.mf2d.8ymk" _uuid="00000000-0000-0000-07C9-1769B14E983D" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-b3wn.mf2d.8ymk"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>617</pid><project_name>BROAD CHANNEL BULKHEADS - PH II</project_name><description>West 14th Rd. from Cross Bay Blvd. to Dead end (water side) West 15th Rd. from Cross Bay Blvd. to Dead end (water side) West 16th Rd. from Cross Bay Blvd. to Dead end (water side) West 17th Rd. from Cross Bay Blvd. to Dead end (water side)</description><category>Industrial Development</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Construction</current_phase><design_start>2015-06-01T00:00:00</design_start><budget_forecast>92714000.00</budget_forecast><latest_budget_changes>5900000.00</latest_budget_changes><total_budget_changes>61781000.00</total_budget_changes><forecast_completion>2024-06-14T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>-74</total_schedule_changes></row><row _id="row-tfun.uy8g_m5ae" _uuid="00000000-0000-0000-FC50-C76E8EAC6B91" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-tfun.uy8g_m5ae"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>617</pid><project_name>BROAD CHANNEL BULKHEADS - PH II</project_name><description>West 14th Rd. from Cross Bay Blvd. to Dead end (water side) West 15th Rd. from Cross Bay Blvd. to Dead end (water side) West 16th Rd. from Cross Bay Blvd. to Dead end (water side) West 17th Rd. from Cross Bay Blvd. to Dead end (water side)</description><category>Industrial Development</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Construction</current_phase><design_start>2015-06-01T00:00:00</design_start><budget_forecast>92714000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>61781000.00</total_budget_changes><forecast_completion>2024-06-14T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>-74</total_schedule_changes></row><row _id="row-j6sv.2f9j-3x3v" _uuid="00000000-0000-0000-ECE2-74986451F5FE" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-j6sv.2f9j-3x3v"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>617</pid><project_name>BROAD CHANNEL BULKHEADS - PH II</project_name><description>West 14th Rd. from Cross Bay Blvd. to Dead end (water side) West 15th Rd. from Cross Bay Blvd. to Dead end (water side) West 16th Rd. from Cross Bay Blvd. to Dead end (water side) West 17th Rd. from Cross Bay Blvd. to Dead end (water side)</description><category>Industrial Development</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Construction</current_phase><design_start>2015-06-01T00:00:00</design_start><budget_forecast>92714000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>61781000.00</total_budget_changes><forecast_completion>2024-06-14T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>-74</total_schedule_changes></row><row _id="row-pnz6_ej7f~phtx" _uuid="00000000-0000-0000-0F21-373E0311D70E" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-pnz6_ej7f~phtx"><date_reported_as_of>2017-09-01T00:00:00</date_reported_as_of><pid>618</pid><project_name>RECONSTRUCTION OF QUEENS BLVD - PHASE 1</project_name><description>Reconstruction of Queens Blvd between Roosevelt Ave and 73rd St. (Segment 1) Great Streets Vision Zero.</description><category>Industrial Development</category><borough>Queens</borough><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2016-08-11T00:00:00</design_start><budget_forecast>75466000.00</budget_forecast><total_budget_changes>176245000.00</total_budget_changes><forecast_completion>2023-11-14T00:00:00</forecast_completion><total_schedule_changes>1906</total_schedule_changes></row><row _id="row-e7mq.xnp6.bnev" _uuid="00000000-0000-0000-42F0-FC41E13105C0" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-e7mq.xnp6.bnev"><date_reported_as_of>2018-03-01T00:00:00</date_reported_as_of><pid>618</pid><project_name>RECONSTRUCTION OF QUEENS BLVD - PHASE 1</project_name><description>Reconstruction of Queens Blvd between Roosevelt Ave and 73rd St. (Segment 1) Great Streets Vision Zero.</description><category>Industrial Development</category><borough>Queens</borough><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2016-08-11T00:00:00</design_start><budget_forecast>75466000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>176245000.00</total_budget_changes><forecast_completion>2023-11-14T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1906</total_schedule_changes></row><row _id="row-6edf-2a27.tjic" _uuid="00000000-0000-0000-A1EF-C19CE53C706E" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-6edf-2a27.tjic"><date_reported_as_of>2018-08-01T00:00:00</date_reported_as_of><pid>618</pid><project_name>RECONSTRUCTION OF QUEENS BLVD - PHASE 1</project_name><description>Reconstruction of Queens Blvd between Roosevelt Ave and 73rd St. (Segment 1) Great Streets Vision Zero.</description><category>Industrial Development</category><borough>Queens</borough><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2016-08-11T00:00:00</design_start><budget_forecast>75866000.00</budget_forecast><latest_budget_changes>400000.00</latest_budget_changes><total_budget_changes>176245000.00</total_budget_changes><forecast_completion>2024-01-27T00:00:00</forecast_completion><latest_schedule_changes>74</latest_schedule_changes><total_schedule_changes>1906</total_schedule_changes></row><row _id="row-edvf~raiy_wzc9" _uuid="00000000-0000-0000-EC6E-4EE62A34D340" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-edvf~raiy_wzc9"><date_reported_as_of>2019-01-01T00:00:00</date_reported_as_of><pid>618</pid><project_name>RECONSTRUCTION OF QUEENS BLVD - PHASE 1</project_name><description>Reconstruction of Queens Blvd between Roosevelt Ave and 73rd St. (Segment 1) Great Streets Vision Zero.</description><category>Industrial Development</category><borough>Queens</borough><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2016-08-11T00:00:00</design_start><budget_forecast>121613000.00</budget_forecast><latest_budget_changes>45747000.00</latest_budget_changes><total_budget_changes>176245000.00</total_budget_changes><forecast_completion>2024-11-28T00:00:00</forecast_completion><latest_schedule_changes>306</latest_schedule_changes><total_schedule_changes>1906</total_schedule_changes></row><row _id="row-snyd~ee7b~7rbh" _uuid="00000000-0000-0000-29E5-035F83621538" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-snyd~ee7b~7rbh"><date_reported_as_of>2019-05-01T00:00:00</date_reported_as_of><pid>618</pid><project_name>RECONSTRUCTION OF QUEENS BLVD - PHASE 1</project_name><description>Vision Zero - Queens Boulevard - Segment 1: Roosevelt Avenue to 73rd Street. Variety of safety and streetscape improvements including partial street reconstruction and resurfacing to address roadway conditions</description><category>Industrial Development</category><borough>Queens</borough><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2016-08-11T00:00:00</design_start><budget_forecast>76802000.00</budget_forecast><latest_budget_changes>-44811000.00</latest_budget_changes><total_budget_changes>176245000.00</total_budget_changes><forecast_completion>2025-06-03T00:00:00</forecast_completion><latest_schedule_changes>187</latest_schedule_changes><total_schedule_changes>1906</total_schedule_changes></row><row _id="row-mkrk-57id_v2st" _uuid="00000000-0000-0000-AE51-AA1E3864A18B" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-mkrk-57id_v2st"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>618</pid><project_name>RECONSTRUCTION OF QUEENS BLVD - PHASE 1</project_name><description>Vision Zero - Queens Boulevard - Segment 1: Roosevelt Avenue to 73rd Street. Variety of safety and streetscape improvements including partial street reconstruction and resurfacing to address roadway conditions</description><category>Industrial Development</category><borough>Queens</borough><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2016-08-11T00:00:00</design_start><budget_forecast>76802000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>176245000.00</total_budget_changes><forecast_completion>2026-05-01T00:00:00</forecast_completion><latest_schedule_changes>332</latest_schedule_changes><total_schedule_changes>1906</total_schedule_changes></row><row _id="row-g7a4_524c-2qk8" _uuid="00000000-0000-0000-3624-EDCB2EA89A66" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-g7a4_524c-2qk8"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>618</pid><project_name>RECONSTRUCTION OF QUEENS BLVD - PHASE 1</project_name><category>Industrial Development</category><borough>Queens</borough><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><total_budget_changes>176245000.00</total_budget_changes><total_schedule_changes>1906</total_schedule_changes></row><row _id="row-6i49~ikfr-avjw" _uuid="00000000-0000-0000-1A3F-52223C6E4DBD" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-6i49~ikfr-avjw"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>618</pid><project_name>RECONSTRUCTION OF QUEENS BLVD - PHASE 1</project_name><category>Industrial Development</category><borough>Queens</borough><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><total_budget_changes>176245000.00</total_budget_changes><total_schedule_changes>1906</total_schedule_changes></row><row _id="row-z4ts-sfpd~znm6" _uuid="00000000-0000-0000-A96F-BE571A6F4B50" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-z4ts-sfpd~znm6"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>618</pid><project_name>RECONSTRUCTION OF QUEENS BLVD - PHASE 1</project_name><category>Industrial Development</category><borough>Queens</borough><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><total_budget_changes>176245000.00</total_budget_changes><total_schedule_changes>1906</total_schedule_changes></row><row _id="row-xvb5-4mya-aesj" _uuid="00000000-0000-0000-1F75-C718302FA1BC" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-xvb5-4mya-aesj"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>618</pid><project_name>RECONSTRUCTION OF QUEENS BLVD - PHASE 1</project_name><category>Industrial Development</category><borough>Queens</borough><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><total_budget_changes>176245000.00</total_budget_changes><total_schedule_changes>1906</total_schedule_changes></row><row _id="row-wt4p~2dik.neay" _uuid="00000000-0000-0000-C125-147491798641" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-wt4p~2dik.neay"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>618</pid><project_name>RECONSTRUCTION OF QUEENS BLVD - PHASE 1</project_name><description>Vision Zero - Queens Boulevard - Segment 1: Roosevelt Avenue to 73rd Street. Variety of safety and streetscape improvements including partial street reconstruction and resurfacing to address roadway conditions</description><category>Industrial Development</category><borough>Queens</borough><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2016-08-11T00:00:00</design_start><budget_forecast>180741000.00</budget_forecast><latest_budget_changes>103939000.00</latest_budget_changes><total_budget_changes>176245000.00</total_budget_changes><forecast_completion>2028-03-04T00:00:00</forecast_completion><latest_schedule_changes>673</latest_schedule_changes><total_schedule_changes>1906</total_schedule_changes></row><row _id="row-2qsz~7m5h-bty8" _uuid="00000000-0000-0000-3BE8-551870CE54C7" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-2qsz~7m5h-bty8"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>618</pid><project_name>RECONSTRUCTION OF QUEENS BLVD - PHASE 1</project_name><description>Vision Zero - Queens Boulevard - Segment 1: Roosevelt Avenue to 73rd Street. Variety of safety and streetscape improvements including partial street reconstruction and resurfacing to address roadway conditions</description><category>Industrial Development</category><borough>Queens</borough><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2016-08-11T00:00:00</design_start><budget_forecast>180751000.00</budget_forecast><latest_budget_changes>10000.00</latest_budget_changes><total_budget_changes>176245000.00</total_budget_changes><forecast_completion>2029-03-04T00:00:00</forecast_completion><latest_schedule_changes>365</latest_schedule_changes><total_schedule_changes>1906</total_schedule_changes></row><row _id="row-m3a4_n4mv_3k5k" _uuid="00000000-0000-0000-CEAC-D68C110F22F8" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-m3a4_n4mv_3k5k"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>618</pid><project_name>RECONSTRUCTION OF QUEENS BLVD - PHASE 1</project_name><description>Vision Zero - Queens Boulevard - Segment 1: Roosevelt Avenue to 73rd Street. Variety of safety and streetscape improvements including partial street reconstruction and resurfacing to address roadway conditions</description><category>Industrial Development</category><borough>Queens</borough><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2016-08-11T00:00:00</design_start><budget_forecast>250961000.00</budget_forecast><latest_budget_changes>70210000.00</latest_budget_changes><total_budget_changes>176245000.00</total_budget_changes><forecast_completion>2028-08-01T00:00:00</forecast_completion><latest_schedule_changes>-215</latest_schedule_changes><total_schedule_changes>1906</total_schedule_changes></row><row _id="row-y83j_wscp.eznc" _uuid="00000000-0000-0000-1C4F-EC1FF2401EE5" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-y83j_wscp.eznc"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>618</pid><project_name>RECONSTRUCTION OF QUEENS BLVD - PHASE 1</project_name><description>Vision Zero - Queens Boulevard - Segment 1: Roosevelt Avenue to 73rd Street. Variety of safety and streetscape improvements including partial street reconstruction and resurfacing to address roadway conditions</description><category>Industrial Development</category><borough>Queens</borough><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2016-08-11T00:00:00</design_start><budget_forecast>251711000.00</budget_forecast><latest_budget_changes>750000.00</latest_budget_changes><total_budget_changes>176245000.00</total_budget_changes><forecast_completion>2029-02-01T00:00:00</forecast_completion><latest_schedule_changes>184</latest_schedule_changes><total_schedule_changes>1906</total_schedule_changes></row><row _id="row-uv88-26p5_cvfk" _uuid="00000000-0000-0000-A3F9-8AFFCB060D5C" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-uv88-26p5_cvfk"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>618</pid><project_name>RECONSTRUCTION OF QUEENS BLVD - PHASE 1</project_name><description>Vision Zero - Queens Boulevard - Segment 1: Roosevelt Avenue to 73rd Street. Variety of safety and streetscape improvements including partial street reconstruction and resurfacing to address roadway conditions</description><category>Industrial Development</category><borough>Queens</borough><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2016-08-11T00:00:00</design_start><budget_forecast>251711000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>176245000.00</total_budget_changes><forecast_completion>2029-02-01T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1906</total_schedule_changes></row><row _id="row-9cm5~r5hr_ht7y" _uuid="00000000-0000-0000-FF8E-04F7595DFF7D" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-9cm5~r5hr_ht7y"><date_reported_as_of>2017-09-01T00:00:00</date_reported_as_of><pid>619</pid><project_name>RECONSTRUCTION OF QUEENS BLVD - PHASE 2</project_name><description>Reconstruction of Queens Blvd  between 73rd St and Eliot Avenue (Segment 2). Great Streets Vision Zero</description><category>Industrial Development</category><borough>Queens</borough><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2016-10-20T00:00:00</design_start><budget_forecast>71842000.00</budget_forecast><total_budget_changes>14201000.00</total_budget_changes><forecast_completion>2023-04-12T00:00:00</forecast_completion><total_schedule_changes>2315</total_schedule_changes></row><row _id="row-6ybp-d783.uv4i" _uuid="00000000-0000-0000-66B3-A7B57582D556" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-6ybp-d783.uv4i"><date_reported_as_of>2018-03-01T00:00:00</date_reported_as_of><pid>619</pid><project_name>RECONSTRUCTION OF QUEENS BLVD - PHASE 2</project_name><description>Reconstruction of Queens Blvd  between 73rd St and Eliot Avenue (Segment 2). Great Streets Vision Zero</description><category>Industrial Development</category><borough>Queens</borough><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2016-10-20T00:00:00</design_start><budget_forecast>71842000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>14201000.00</total_budget_changes><forecast_completion>2023-04-12T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>2315</total_schedule_changes></row><row _id="row-vigb_665x.4s25" _uuid="00000000-0000-0000-B911-BA192FDD4584" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-vigb_665x.4s25"><date_reported_as_of>2018-08-01T00:00:00</date_reported_as_of><pid>619</pid><project_name>RECONSTRUCTION OF QUEENS BLVD - PHASE 2</project_name><description>Reconstruction of Queens Blvd  between 73rd St and Eliot Avenue (Segment 2). Great Streets Vision Zero</description><category>Industrial Development</category><borough>Queens</borough><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2016-10-20T00:00:00</design_start><budget_forecast>71842000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>14201000.00</total_budget_changes><forecast_completion>2023-04-12T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>2315</total_schedule_changes></row><row _id="row-8a25~qci8.b739" _uuid="00000000-0000-0000-95F4-C82456805D82" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-8a25~qci8.b739"><date_reported_as_of>2019-01-01T00:00:00</date_reported_as_of><pid>619</pid><project_name>RECONSTRUCTION OF QUEENS BLVD - PHASE 2</project_name><description>Reconstruction of Queens Blvd  between 73rd St and Eliot Avenue (Segment 2). Great Streets Vision Zero</description><category>Industrial Development</category><borough>Queens</borough><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2016-10-20T00:00:00</design_start><budget_forecast>80263000.00</budget_forecast><latest_budget_changes>8421000.00</latest_budget_changes><total_budget_changes>14201000.00</total_budget_changes><forecast_completion>2024-08-27T00:00:00</forecast_completion><latest_schedule_changes>503</latest_schedule_changes><total_schedule_changes>2315</total_schedule_changes></row><row _id="row-c4u8-mvq8~6hkk" _uuid="00000000-0000-0000-E232-AAFC46DCC68C" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-c4u8-mvq8~6hkk"><date_reported_as_of>2019-05-01T00:00:00</date_reported_as_of><pid>619</pid><project_name>RECONSTRUCTION OF QUEENS BLVD - PHASE 2</project_name><description>Vision Zero - Queens Boulevard - Segment 2: 73rd Street to Eliot Avenue. Variety of safety and streetscape improvements including partial street reconstruction and resurfacing to address roadway conditions</description><category>Industrial Development</category><borough>Queens</borough><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2016-10-26T00:00:00</design_start><budget_forecast>71692000.00</budget_forecast><latest_budget_changes>-8571000.00</latest_budget_changes><total_budget_changes>14201000.00</total_budget_changes><forecast_completion>2025-09-13T00:00:00</forecast_completion><latest_schedule_changes>382</latest_schedule_changes><total_schedule_changes>2315</total_schedule_changes></row><row _id="row-8sah_krde~si6c" _uuid="00000000-0000-0000-0E13-4C45B8626C12" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-8sah_krde~si6c"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>619</pid><project_name>RECONSTRUCTION OF QUEENS BLVD - PHASE 2</project_name><description>Vision Zero - Queens Boulevard - Segment 2: 73rd Street to Eliot Avenue. Variety of safety and streetscape improvements including partial street reconstruction and resurfacing to address roadway conditions</description><category>Industrial Development</category><borough>Queens</borough><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2016-10-26T00:00:00</design_start><budget_forecast>71692000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>14201000.00</total_budget_changes><forecast_completion>2026-05-14T00:00:00</forecast_completion><latest_schedule_changes>243</latest_schedule_changes><total_schedule_changes>2315</total_schedule_changes></row><row _id="row-zsci-64et~n9cu" _uuid="00000000-0000-0000-0A8F-3C07B9A54932" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-zsci-64et~n9cu"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>619</pid><project_name>RECONSTRUCTION OF QUEENS BLVD - PHASE 2</project_name><category>Industrial Development</category><borough>Queens</borough><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><total_budget_changes>14201000.00</total_budget_changes><total_schedule_changes>2315</total_schedule_changes></row><row _id="row-b6ic~9shk.mxkm" _uuid="00000000-0000-0000-CD64-2F9CA92EBD08" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-b6ic~9shk.mxkm"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>619</pid><project_name>RECONSTRUCTION OF QUEENS BLVD - PHASE 2</project_name><category>Industrial Development</category><borough>Queens</borough><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><total_budget_changes>14201000.00</total_budget_changes><total_schedule_changes>2315</total_schedule_changes></row><row _id="row-7hc6.py8a.kcxm" _uuid="00000000-0000-0000-FE33-CEF204DE3D71" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-7hc6.py8a.kcxm"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>619</pid><project_name>RECONSTRUCTION OF QUEENS BLVD - PHASE 2</project_name><category>Industrial Development</category><borough>Queens</borough><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><total_budget_changes>14201000.00</total_budget_changes><total_schedule_changes>2315</total_schedule_changes></row><row _id="row-2xp4~98f2_3nc9" _uuid="00000000-0000-0000-EB48-35EA004B0E20" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-2xp4~98f2_3nc9"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>619</pid><project_name>RECONSTRUCTION OF QUEENS BLVD - PHASE 2</project_name><category>Industrial Development</category><borough>Queens</borough><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><total_budget_changes>14201000.00</total_budget_changes><total_schedule_changes>2315</total_schedule_changes></row><row _id="row-zq7b_kbuu-mixz" _uuid="00000000-0000-0000-CC54-EBB8373C10E8" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-zq7b_kbuu-mixz"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>619</pid><project_name>RECONSTRUCTION OF QUEENS BLVD - PHASE 2</project_name><description>Vision Zero - Queens Boulevard - Segment 2: 73rd Street to Eliot Avenue. Variety of safety and streetscape improvements including partial street reconstruction and resurfacing to address roadway conditions</description><category>Industrial Development</category><borough>Queens</borough><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2016-10-26T00:00:00</design_start><budget_forecast>84238000.00</budget_forecast><latest_budget_changes>12546000.00</latest_budget_changes><total_budget_changes>14201000.00</total_budget_changes><forecast_completion>2028-09-12T00:00:00</forecast_completion><latest_schedule_changes>852</latest_schedule_changes><total_schedule_changes>2315</total_schedule_changes></row><row _id="row-5g97_by5k_drur" _uuid="00000000-0000-0000-A644-6E832ED82ED2" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-5g97_by5k_drur"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>619</pid><project_name>RECONSTRUCTION OF QUEENS BLVD - PHASE 2</project_name><description>Vision Zero - Queens Boulevard - Segment 2: 73rd Street to Eliot Avenue. Variety of safety and streetscape improvements including partial street reconstruction and resurfacing to address roadway conditions</description><category>Industrial Development</category><borough>Queens</borough><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2016-10-26T00:00:00</design_start><budget_forecast>84243000.00</budget_forecast><latest_budget_changes>5000.00</latest_budget_changes><total_budget_changes>14201000.00</total_budget_changes><forecast_completion>2029-09-13T00:00:00</forecast_completion><latest_schedule_changes>366</latest_schedule_changes><total_schedule_changes>2315</total_schedule_changes></row><row _id="row-x8rr-yc4j_b3ag" _uuid="00000000-0000-0000-57ED-A615D7CC0CD0" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-x8rr-yc4j_b3ag"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>619</pid><project_name>RECONSTRUCTION OF QUEENS BLVD - PHASE 2</project_name><description>Vision Zero - Queens Boulevard - Segment 2: 73rd Street to Eliot Avenue. Variety of safety and streetscape improvements including partial street reconstruction and resurfacing to address roadway conditions</description><category>Industrial Development</category><borough>Queens</borough><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2016-10-26T00:00:00</design_start><budget_forecast>85043000.00</budget_forecast><latest_budget_changes>800000.00</latest_budget_changes><total_budget_changes>14201000.00</total_budget_changes><forecast_completion>2029-08-13T00:00:00</forecast_completion><latest_schedule_changes>-31</latest_schedule_changes><total_schedule_changes>2315</total_schedule_changes></row><row _id="row-vqvv_vqmf_iuqh" _uuid="00000000-0000-0000-A718-6B9D870F2625" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-vqvv_vqmf_iuqh"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>619</pid><project_name>RECONSTRUCTION OF QUEENS BLVD - PHASE 2</project_name><description>Vision Zero - Queens Boulevard - Segment 2: 73rd Street to Eliot Avenue. Variety of safety and streetscape improvements including partial street reconstruction and resurfacing to address roadway conditions</description><category>Industrial Development</category><borough>Queens</borough><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2016-10-26T00:00:00</design_start><budget_forecast>86043000.00</budget_forecast><latest_budget_changes>1000000.00</latest_budget_changes><total_budget_changes>14201000.00</total_budget_changes><forecast_completion>2029-08-13T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>2315</total_schedule_changes></row><row _id="row-3ais_iku8~4mwp" _uuid="00000000-0000-0000-E403-1C7F78914BA0" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-3ais_iku8~4mwp"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>1202</pid><project_name>150th Street Spine: Phase II - DOT Van Wyck Expressway - Trunk Combined Sewer</project_name><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Design</current_phase><design_start>2020-03-02T00:00:00</design_start><budget_forecast>139368000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-676000.00</total_budget_changes><forecast_completion>2026-05-01T00:00:00</forecast_completion><latest_schedule_changes>188</latest_schedule_changes><total_schedule_changes>-194</total_schedule_changes></row><row _id="row-65hr_hf92.nhhf" _uuid="00000000-0000-0000-CE24-D8C6C7F0A082" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-65hr_hf92.nhhf"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>619</pid><project_name>RECONSTRUCTION OF QUEENS BLVD - PHASE 2</project_name><description>Vision Zero - Queens Boulevard - Segment 2: 73rd Street to Eliot Avenue. Variety of safety and streetscape improvements including partial street reconstruction and resurfacing to address roadway conditions</description><category>Industrial Development</category><borough>Queens</borough><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2016-10-26T00:00:00</design_start><budget_forecast>86043000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>14201000.00</total_budget_changes><forecast_completion>2029-08-13T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>2315</total_schedule_changes></row><row _id="row-akfy.4aww-xzkz" _uuid="00000000-0000-0000-964C-7DDC3815DEBB" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-akfy.4aww-xzkz"><date_reported_as_of>2017-09-01T00:00:00</date_reported_as_of><pid>623</pid><project_name>RECONSTRUCTION OF E 177 STREET/DEVOE AVENUE</project_name><description>Reconstruction of E 177th Street /Devoe Ave etc., Bronx</description><category>Industrial Development, Streets and Roadways</category><borough>Bronx</borough><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2009-09-03T00:00:00</design_start><budget_forecast>25482000.00</budget_forecast><total_budget_changes>25050000.00</total_budget_changes><forecast_completion>2021-08-14T00:00:00</forecast_completion><total_schedule_changes>1839</total_schedule_changes></row><row _id="row-7jxn.5esx~vg7t" _uuid="00000000-0000-0000-2408-DBB91883F5BD" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-7jxn.5esx~vg7t"><date_reported_as_of>2018-03-01T00:00:00</date_reported_as_of><pid>623</pid><project_name>RECONSTRUCTION OF E 177 STREET/DEVOE AVENUE</project_name><description>Reconstruction of E 177th Street /Devoe Ave etc., Bronx</description><category>Industrial Development, Streets and Roadways</category><borough>Bronx</borough><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2009-09-03T00:00:00</design_start><budget_forecast>25482000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>25050000.00</total_budget_changes><forecast_completion>2021-08-14T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1839</total_schedule_changes></row><row _id="row-2tbn.tt4i.7tcu" _uuid="00000000-0000-0000-76A4-2343B561FF05" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-2tbn.tt4i.7tcu"><date_reported_as_of>2018-08-01T00:00:00</date_reported_as_of><pid>623</pid><project_name>RECONSTRUCTION OF E 177 STREET/DEVOE AVENUE</project_name><description>Reconstruction of E 177th Street /Devoe Ave etc., Bronx</description><category>Industrial Development, Streets and Roadways</category><borough>Bronx</borough><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2009-09-03T00:00:00</design_start><budget_forecast>25526000.00</budget_forecast><latest_budget_changes>44000.00</latest_budget_changes><total_budget_changes>25050000.00</total_budget_changes><forecast_completion>2022-08-14T00:00:00</forecast_completion><latest_schedule_changes>365</latest_schedule_changes><total_schedule_changes>1839</total_schedule_changes></row><row _id="row-cnv2.gk4r_xvf4" _uuid="00000000-0000-0000-051B-04B5535BE654" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-cnv2.gk4r_xvf4"><date_reported_as_of>2019-01-01T00:00:00</date_reported_as_of><pid>623</pid><project_name>RECONSTRUCTION OF E 177 STREET/DEVOE AVENUE</project_name><description>Reconstruction of E 177th Street /Devoe Ave etc., Bronx</description><category>Industrial Development, Streets and Roadways</category><borough>Bronx</borough><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2009-09-03T00:00:00</design_start><budget_forecast>25776000.00</budget_forecast><latest_budget_changes>250000.00</latest_budget_changes><total_budget_changes>25050000.00</total_budget_changes><forecast_completion>2022-08-14T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1839</total_schedule_changes></row><row _id="row-59d4_8btq~86iz" _uuid="00000000-0000-0000-E4F8-73C5CC6119E3" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-59d4_8btq~86iz"><date_reported_as_of>2019-05-01T00:00:00</date_reported_as_of><pid>623</pid><project_name>RECONSTRUCTION OF E 177 STREET/DEVOE AVENUE</project_name><description>Road Reconstruction, Water Main and Combined Sewer Work    E 177th Street from Devoe Ave to Bronx Park Ave     East Tremont Ave from Bronx Park Ave to Boston Rd    Devoe Ave from E 177th Street to East Tremont Ave</description><category>Industrial Development, Streets and Roadways</category><borough>Bronx</borough><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2009-09-03T00:00:00</design_start><budget_forecast>25776000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>25050000.00</total_budget_changes><forecast_completion>2022-11-15T00:00:00</forecast_completion><latest_schedule_changes>93</latest_schedule_changes><total_schedule_changes>1839</total_schedule_changes></row><row _id="row-9njx~w4pt_itdw" _uuid="00000000-0000-0000-D839-7B0E2027AB3A" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-9njx~w4pt_itdw"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>623</pid><project_name>RECONSTRUCTION OF E 177 STREET/DEVOE AVENUE</project_name><description>Road Reconstruction, Water Main and Combined Sewer Work    E 177th Street from Devoe Ave to Bronx Park Ave     East Tremont Ave from Bronx Park Ave to Boston Rd    Devoe Ave from E 177th Street to East Tremont Ave</description><category>Industrial Development, Streets and Roadways</category><borough>Bronx</borough><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2009-09-03T00:00:00</design_start><budget_forecast>27026000.00</budget_forecast><latest_budget_changes>1250000.00</latest_budget_changes><total_budget_changes>25050000.00</total_budget_changes><forecast_completion>2022-11-15T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1839</total_schedule_changes></row><row _id="row-usxe-je9e.tpe3" _uuid="00000000-0000-0000-E5CE-5C3E09584F12" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-usxe-je9e.tpe3"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>623</pid><project_name>RECONSTRUCTION OF E 177 STREET/DEVOE AVENUE</project_name><category>Industrial Development, Streets and Roadways</category><borough>Bronx</borough><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><total_budget_changes>25050000.00</total_budget_changes><total_schedule_changes>1839</total_schedule_changes></row><row _id="row-yyru_6rnd-iqby" _uuid="00000000-0000-0000-D51A-1A829009A787" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-yyru_6rnd-iqby"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>623</pid><project_name>RECONSTRUCTION OF E 177 STREET/DEVOE AVENUE</project_name><category>Industrial Development, Streets and Roadways</category><borough>Bronx</borough><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><total_budget_changes>25050000.00</total_budget_changes><total_schedule_changes>1839</total_schedule_changes></row><row _id="row-xin4~8ram.24y6" _uuid="00000000-0000-0000-89DF-EE141C41F413" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-xin4~8ram.24y6"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>623</pid><project_name>RECONSTRUCTION OF E 177 STREET/DEVOE AVENUE</project_name><category>Industrial Development, Streets and Roadways</category><borough>Bronx</borough><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><total_budget_changes>25050000.00</total_budget_changes><total_schedule_changes>1839</total_schedule_changes></row><row _id="row-nj4q.e623_5c7x" _uuid="00000000-0000-0000-B5CB-2ED0E3588B3C" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-nj4q.e623_5c7x"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>623</pid><project_name>RECONSTRUCTION OF E 177 STREET/DEVOE AVENUE</project_name><category>Industrial Development, Streets and Roadways</category><borough>Bronx</borough><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><total_budget_changes>25050000.00</total_budget_changes><total_schedule_changes>1839</total_schedule_changes></row><row _id="row-qy6k-mymc.admn" _uuid="00000000-0000-0000-F96B-1A3082FA4D6E" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-qy6k-mymc.admn"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>623</pid><project_name>RECONSTRUCTION OF E 177 STREET/DEVOE AVENUE</project_name><description>Road Reconstruction, Water Main and Combined Sewer Work    E 177th Street from Devoe Ave to Bronx Park Ave     East Tremont Ave from Bronx Park Ave to Boston Rd    Devoe Ave from E 177th Street to East Tremont Ave</description><category>Industrial Development, Streets and Roadways</category><borough>Bronx</borough><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2009-09-03T00:00:00</design_start><budget_forecast>26948000.00</budget_forecast><latest_budget_changes>-78000.00</latest_budget_changes><total_budget_changes>25050000.00</total_budget_changes><forecast_completion>2024-09-27T00:00:00</forecast_completion><latest_schedule_changes>682</latest_schedule_changes><total_schedule_changes>1839</total_schedule_changes></row><row _id="row-5cb9-i9bg-6zr8" _uuid="00000000-0000-0000-D213-0C4EF74464A6" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-5cb9-i9bg-6zr8"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>623</pid><project_name>RECONSTRUCTION OF E 177 STREET/DEVOE AVENUE</project_name><description>Road Reconstruction, Water Main and Combined Sewer Work    E 177th Street from Devoe Ave to Bronx Park Ave     East Tremont Ave from Bronx Park Ave to Boston Rd    Devoe Ave from E 177th Street to East Tremont Ave</description><category>Industrial Development, Streets and Roadways</category><borough>Bronx</borough><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2009-09-03T00:00:00</design_start><budget_forecast>26948000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>25050000.00</total_budget_changes><forecast_completion>2025-09-26T00:00:00</forecast_completion><latest_schedule_changes>364</latest_schedule_changes><total_schedule_changes>1839</total_schedule_changes></row><row _id="row-b36m.d2sg_qicb" _uuid="00000000-0000-0000-5F20-55F2584B4C63" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-b36m.d2sg_qicb"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>623</pid><project_name>RECONSTRUCTION OF E 177 STREET/DEVOE AVENUE</project_name><description>Road Reconstruction, Water Main and Combined Sewer Work    E 177th Street from Devoe Ave to Bronx Park Ave     East Tremont Ave from Bronx Park Ave to Boston Rd    Devoe Ave from E 177th Street to East Tremont Ave</description><category>Industrial Development, Streets and Roadways</category><borough>Bronx</borough><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2009-09-03T00:00:00</design_start><budget_forecast>49935000.00</budget_forecast><latest_budget_changes>22987000.00</latest_budget_changes><total_budget_changes>25050000.00</total_budget_changes><forecast_completion>2025-09-26T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1839</total_schedule_changes></row><row _id="row-5j6z-abx2~r7z9" _uuid="00000000-0000-0000-A829-A290618F2D54" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-5j6z-abx2~r7z9"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>623</pid><project_name>RECONSTRUCTION OF E 177 STREET/DEVOE AVENUE</project_name><description>Road Reconstruction, Water Main and Combined Sewer Work    E 177th Street from Devoe Ave to Bronx Park Ave     East Tremont Ave from Bronx Park Ave to Boston Rd    Devoe Ave from E 177th Street to East Tremont Ave</description><category>Industrial Development, Streets and Roadways</category><borough>Bronx</borough><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2009-09-03T00:00:00</design_start><budget_forecast>50532000.00</budget_forecast><latest_budget_changes>597000.00</latest_budget_changes><total_budget_changes>25050000.00</total_budget_changes><forecast_completion>2026-08-27T00:00:00</forecast_completion><latest_schedule_changes>335</latest_schedule_changes><total_schedule_changes>1839</total_schedule_changes></row><row _id="row-fkv2~kiin_ph3p" _uuid="00000000-0000-0000-501D-6325DD54E0F9" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-fkv2~kiin_ph3p"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>623</pid><project_name>RECONSTRUCTION OF E 177 STREET/DEVOE AVENUE</project_name><description>Road Reconstruction, Water Main and Combined Sewer Work    E 177th Street from Devoe Ave to Bronx Park Ave     East Tremont Ave from Bronx Park Ave to Boston Rd    Devoe Ave from E 177th Street to East Tremont Ave</description><category>Industrial Development, Streets and Roadways</category><borough>Bronx</borough><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2009-09-03T00:00:00</design_start><budget_forecast>50532000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>25050000.00</total_budget_changes><forecast_completion>2026-08-27T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1839</total_schedule_changes></row><row _id="row-5uan.5rde-vi3h" _uuid="00000000-0000-0000-07C8-4F445CAB1BF7" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-5uan.5rde-vi3h"><date_reported_as_of>2017-09-01T00:00:00</date_reported_as_of><pid>631</pid><project_name>CONSTRUCTION OF BMPs NC 6 AND 15 - SI</project_name><description>Storm and Santary Sewers Installation and Water Main replacement in Bedford Avenue between Mason Avenue and Nugent Street.  Project includes Bluebelt Best Management Practice storm sewer outlet.</description><category>Industrial Development</category><borough>Staten Island</borough><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Design</current_phase><design_start>2017-08-14T00:00:00</design_start><budget_forecast>31529000.00</budget_forecast><total_budget_changes>1921000.00</total_budget_changes><forecast_completion>2021-11-27T00:00:00</forecast_completion><total_schedule_changes>925</total_schedule_changes></row><row _id="row-nfjr-rfab_9pfy" _uuid="00000000-0000-0000-6B5D-08B95F4C1F78" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-nfjr-rfab_9pfy"><date_reported_as_of>2018-03-01T00:00:00</date_reported_as_of><pid>631</pid><project_name>CONSTRUCTION OF BMPs NC 6 AND 15 - SI</project_name><description>Storm and Santary Sewers Installation and Water Main replacement in Bedford Avenue between Mason Avenue and Nugent Street.  Project includes Bluebelt Best Management Practice storm sewer outlet.</description><category>Industrial Development</category><borough>Staten Island</borough><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Design</current_phase><design_start>2017-08-14T00:00:00</design_start><budget_forecast>34680000.00</budget_forecast><latest_budget_changes>3151000.00</latest_budget_changes><total_budget_changes>1921000.00</total_budget_changes><forecast_completion>2021-11-27T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>925</total_schedule_changes></row><row _id="row-gc6z~kqek.x6xk" _uuid="00000000-0000-0000-C691-ECDF34B0BF96" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-gc6z~kqek.x6xk"><date_reported_as_of>2018-08-01T00:00:00</date_reported_as_of><pid>631</pid><project_name>CONSTRUCTION OF BMPs NC 6 AND 15 - SI</project_name><description>Storm and Santary Sewers Installation and Water Main replacement in Bedford Avenue between Mason Avenue and Nugent Street.  Project includes Bluebelt Best Management Practice storm sewer outlet.</description><category>Industrial Development</category><borough>Staten Island</borough><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Design</current_phase><design_start>2017-08-14T00:00:00</design_start><budget_forecast>31979000.00</budget_forecast><latest_budget_changes>-2701000.00</latest_budget_changes><total_budget_changes>1921000.00</total_budget_changes><forecast_completion>2021-11-27T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>925</total_schedule_changes></row><row _id="row-h9wu_s9f5.yk8z" _uuid="00000000-0000-0000-935B-19DB5A846CAD" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-h9wu_s9f5.yk8z"><date_reported_as_of>2019-01-01T00:00:00</date_reported_as_of><pid>631</pid><project_name>CONSTRUCTION OF BMPs NC 6 AND 15 - SI</project_name><description>Storm and Santary Sewers Installation and Water Main replacement in Bedford Avenue between Mason Avenue and Nugent Street.  Project includes Bluebelt Best Management Practice storm sewer outlet.</description><category>Industrial Development</category><borough>Staten Island</borough><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Design</current_phase><design_start>2017-08-14T00:00:00</design_start><budget_forecast>33036000.00</budget_forecast><latest_budget_changes>1057000.00</latest_budget_changes><total_budget_changes>1921000.00</total_budget_changes><forecast_completion>2022-11-26T00:00:00</forecast_completion><latest_schedule_changes>364</latest_schedule_changes><total_schedule_changes>925</total_schedule_changes></row><row _id="row-pi85.exza-9sn5" _uuid="00000000-0000-0000-A069-CA8084AAE4D2" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-pi85.exza-9sn5"><date_reported_as_of>2019-05-01T00:00:00</date_reported_as_of><pid>631</pid><project_name>CONSTRUCTION OF BMPs NC 6 AND 15 - SI</project_name><description>CONSTRUCTION OF BMP�s NC 6 AND 15, STORM AND SANITARY SEWERS INSTALLATION, SI</description><category>Industrial Development</category><borough>Staten Island</borough><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Design</current_phase><design_start>2017-08-14T00:00:00</design_start><budget_forecast>32279000.00</budget_forecast><latest_budget_changes>-757000.00</latest_budget_changes><total_budget_changes>1921000.00</total_budget_changes><forecast_completion>2022-12-01T00:00:00</forecast_completion><latest_schedule_changes>5</latest_schedule_changes><total_schedule_changes>925</total_schedule_changes></row><row _id="row-2we9~9mc2~4pzz" _uuid="00000000-0000-0000-70C9-68C43228A896" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-2we9~9mc2~4pzz"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>631</pid><project_name>CONSTRUCTION OF BMPs NC 6 AND 15 - SI</project_name><category>Industrial Development</category><borough>Staten Island</borough><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><total_budget_changes>1921000.00</total_budget_changes><total_schedule_changes>925</total_schedule_changes></row><row _id="row-tqnw_mtdg.tek6" _uuid="00000000-0000-0000-262E-E48176CC7D86" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-tqnw_mtdg.tek6"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>631</pid><project_name>CONSTRUCTION OF BMPs NC 6 AND 15 - SI</project_name><category>Industrial Development</category><borough>Staten Island</borough><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><total_budget_changes>1921000.00</total_budget_changes><total_schedule_changes>925</total_schedule_changes></row><row _id="row-wpj9~fmyg_f3y7" _uuid="00000000-0000-0000-21DB-77F0CF90D5DC" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-wpj9~fmyg_f3y7"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>631</pid><project_name>CONSTRUCTION OF BMPs NC 6 AND 15 - SI</project_name><category>Industrial Development</category><borough>Staten Island</borough><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><total_budget_changes>1921000.00</total_budget_changes><total_schedule_changes>925</total_schedule_changes></row><row _id="row-tg4t_5nxf~d7kz" _uuid="00000000-0000-0000-AE0F-781C7B4C1987" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-tg4t_5nxf~d7kz"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>631</pid><project_name>CONSTRUCTION OF BMPs NC 6 AND 15 - SI</project_name><category>Industrial Development</category><borough>Staten Island</borough><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><total_budget_changes>1921000.00</total_budget_changes><total_schedule_changes>925</total_schedule_changes></row><row _id="row-nfcp~kxni-n82y" _uuid="00000000-0000-0000-65F0-DCF4F32C2200" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-nfcp~kxni-n82y"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>631</pid><project_name>CONSTRUCTION OF BMPs NC 6 AND 15 - SI</project_name><category>Industrial Development</category><borough>Staten Island</borough><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><total_budget_changes>1921000.00</total_budget_changes><total_schedule_changes>925</total_schedule_changes></row><row _id="row-xc8i-6nh5-xdij" _uuid="00000000-0000-0000-A634-0B3D982DA034" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-xc8i-6nh5-xdij"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>631</pid><project_name>CONSTRUCTION OF BMPs NC 6 AND 15 - SI</project_name><category>Industrial Development</category><borough>Staten Island</borough><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><total_budget_changes>1921000.00</total_budget_changes><total_schedule_changes>925</total_schedule_changes></row><row _id="row-6r8k~nfc3-p7z4" _uuid="00000000-0000-0000-C829-F641E6395DC0" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-6r8k~nfc3-p7z4"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>631</pid><project_name>CONSTRUCTION OF BMPs NC 6 AND 15 - SI</project_name><category>Industrial Development</category><borough>Staten Island</borough><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><total_budget_changes>1921000.00</total_budget_changes><total_schedule_changes>925</total_schedule_changes></row><row _id="row-gbha_nrqd~kg4b" _uuid="00000000-0000-0000-3BEC-EF99C3B88DB0" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-gbha_nrqd~kg4b"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>631</pid><project_name>CONSTRUCTION OF BMPs NC 6 AND 15 - SI</project_name><category>Industrial Development</category><borough>Staten Island</borough><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><total_budget_changes>1921000.00</total_budget_changes><total_schedule_changes>925</total_schedule_changes></row><row _id="row-kzrg-83mg.qv7a" _uuid="00000000-0000-0000-C599-6E3447A003CB" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-kzrg-83mg.qv7a"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>631</pid><project_name>CONSTRUCTION OF BMPs NC 6 AND 15 - SI</project_name><description>CONSTRUCTION OF BMP’s NC 6 AND 15, STORM AND SANITARY SEWERS INSTALLATION, SI</description><category>Industrial Development</category><borough>Staten Island</borough><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction</current_phase><design_start>2017-08-14T00:00:00</design_start><budget_forecast>33450000.00</budget_forecast><latest_budget_changes>1171000.00</latest_budget_changes><total_budget_changes>1921000.00</total_budget_changes><forecast_completion>2024-06-09T00:00:00</forecast_completion><latest_schedule_changes>556</latest_schedule_changes><total_schedule_changes>925</total_schedule_changes></row><row _id="row-gxhb.9kkk_p2kx" _uuid="00000000-0000-0000-B395-41C61D94AA14" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-gxhb.9kkk_p2kx"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>631</pid><project_name>CONSTRUCTION OF BMPs NC 6 AND 15 - SI</project_name><description>CONSTRUCTION OF BMP’s NC 6 AND 15, STORM AND SANITARY SEWERS INSTALLATION, SI</description><category>Industrial Development</category><borough>Staten Island</borough><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction</current_phase><design_start>2017-08-14T00:00:00</design_start><budget_forecast>33450000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>1921000.00</total_budget_changes><forecast_completion>2024-06-09T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>925</total_schedule_changes></row><row _id="row-2y3p~v4bk~uui7" _uuid="00000000-0000-0000-E9BF-193E9FD860BA" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-2y3p~v4bk~uui7"><date_reported_as_of>2017-09-01T00:00:00</date_reported_as_of><pid>634</pid><project_name>New 40th Precinct</project_name><description>New 40th Precinct at 567 E 149 Street, Bronx, NY 10455.  Design and build of a 43,000 SF on an existing City-owned property.</description><category>Public Safety and Criminal Justice</category><borough>Bronx</borough><managing_agency>DDC</managing_agency><client_agency>Police</client_agency><current_phase>Construction Procurement</current_phase><design_start>2014-09-30T00:00:00</design_start><budget_forecast>71000000.00</budget_forecast><total_budget_changes>26020000.00</total_budget_changes><forecast_completion>2021-06-25T00:00:00</forecast_completion><total_schedule_changes>711</total_schedule_changes></row><row _id="row-wvib_s7vs-cuj6" _uuid="00000000-0000-0000-D2D7-79DFB40E6CB9" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-wvib_s7vs-cuj6"><date_reported_as_of>2018-03-01T00:00:00</date_reported_as_of><pid>634</pid><project_name>New 40th Precinct</project_name><description>New 40th Precinct at 567 E 149 Street, Bronx, NY 10455.  Design and build of a 43,000 SF on an existing City-owned property.</description><category>Public Safety and Criminal Justice</category><borough>Bronx</borough><managing_agency>DDC</managing_agency><client_agency>Police</client_agency><current_phase>Construction Procurement</current_phase><design_start>2014-09-30T00:00:00</design_start><budget_forecast>75845699.75</budget_forecast><latest_budget_changes>4845699.75</latest_budget_changes><total_budget_changes>26020000.00</total_budget_changes><forecast_completion>2021-06-12T00:00:00</forecast_completion><latest_schedule_changes>-13</latest_schedule_changes><total_schedule_changes>711</total_schedule_changes></row><row _id="row-upqe_nyax.7jh4" _uuid="00000000-0000-0000-B2EB-1AFBE6F53093" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-upqe_nyax.7jh4"><date_reported_as_of>2018-08-01T00:00:00</date_reported_as_of><pid>634</pid><project_name>New 40th Precinct</project_name><description>New 40th Precinct at 567 E 149 Street, Bronx, NY 10455.  Design and build of a 45,000 SF on an existing City-owned property.</description><category>Public Safety and Criminal Justice</category><borough>Bronx</borough><managing_agency>DDC</managing_agency><client_agency>Police</client_agency><current_phase>Construction</current_phase><design_start>2014-09-30T00:00:00</design_start><budget_forecast>76950000.00</budget_forecast><latest_budget_changes>1104300.25</latest_budget_changes><total_budget_changes>26020000.00</total_budget_changes><forecast_completion>2021-06-21T00:00:00</forecast_completion><latest_schedule_changes>9</latest_schedule_changes><total_schedule_changes>711</total_schedule_changes></row><row _id="row-vppy-bxj9~i82s" _uuid="00000000-0000-0000-EF77-316926BA2E9A" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-vppy-bxj9~i82s"><date_reported_as_of>2019-01-01T00:00:00</date_reported_as_of><pid>634</pid><project_name>New 40th Precinct</project_name><description>New 40th Precinct at 567 E 149 Street, Bronx, NY 10455.  Design and build of a 45,000 SF on an existing City-owned property.</description><category>Public Safety and Criminal Justice</category><borough>Bronx</borough><managing_agency>DDC</managing_agency><client_agency>Police</client_agency><current_phase>Construction</current_phase><design_start>2014-09-30T00:00:00</design_start><budget_forecast>76451187.93</budget_forecast><latest_budget_changes>-498812.07</latest_budget_changes><total_budget_changes>26020000.00</total_budget_changes><forecast_completion>2021-06-25T00:00:00</forecast_completion><latest_schedule_changes>4</latest_schedule_changes><total_schedule_changes>711</total_schedule_changes></row><row _id="row-hbfq-2egn.u5bk" _uuid="00000000-0000-0000-1A29-2BE6B5FA6529" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-hbfq-2egn.u5bk"><date_reported_as_of>2019-05-01T00:00:00</date_reported_as_of><pid>634</pid><project_name>New 40th Precinct</project_name><description>Design and build a new Police Precinct with full basement totaling 43,000 sq. ft. on an existing City owned property in the Bronx.</description><category>Public Safety and Criminal Justice</category><borough>Bronx</borough><managing_agency>DDC</managing_agency><client_agency>Police</client_agency><current_phase>Construction</current_phase><design_start>2014-09-30T00:00:00</design_start><budget_forecast>77300000.00</budget_forecast><latest_budget_changes>848812.07</latest_budget_changes><total_budget_changes>26020000.00</total_budget_changes><forecast_completion>2021-06-25T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>711</total_schedule_changes></row><row _id="row-y7yv_2jp4_t897" _uuid="00000000-0000-0000-FC9F-78855D5F6666" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-y7yv_2jp4_t897"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>634</pid><project_name>New 40th Precinct</project_name><description>Design and build a new Police Precinct with full basement totaling 43,000 sq. ft. on an existing City owned property in the Bronx.</description><category>Public Safety and Criminal Justice</category><borough>Bronx</borough><managing_agency>DDC</managing_agency><client_agency>Police</client_agency><current_phase>Construction</current_phase><design_start>2014-09-30T00:00:00</design_start><budget_forecast>77300000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>26020000.00</total_budget_changes><forecast_completion>2021-06-25T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>711</total_schedule_changes></row><row _id="row-quy4_bet3.xheq" _uuid="00000000-0000-0000-8871-18BC5DF26C53" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-quy4_bet3.xheq"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>634</pid><project_name>New 40th Precinct</project_name><category>Public Safety and Criminal Justice</category><borough>Bronx</borough><managing_agency>DDC</managing_agency><client_agency>Police</client_agency><total_budget_changes>26020000.00</total_budget_changes><total_schedule_changes>711</total_schedule_changes></row><row _id="row-26mw_jrsf.2far" _uuid="00000000-0000-0000-0F58-47DD8D8205ED" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-26mw_jrsf.2far"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>634</pid><project_name>New 40th Precinct</project_name><category>Public Safety and Criminal Justice</category><borough>Bronx</borough><managing_agency>DDC</managing_agency><client_agency>Police</client_agency><total_budget_changes>26020000.00</total_budget_changes><total_schedule_changes>711</total_schedule_changes></row><row _id="row-x8mm_8i8a.wtzc" _uuid="00000000-0000-0000-CD28-445025944975" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-x8mm_8i8a.wtzc"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>634</pid><project_name>New 40th Precinct</project_name><category>Public Safety and Criminal Justice</category><borough>Bronx</borough><managing_agency>DDC</managing_agency><client_agency>Police</client_agency><total_budget_changes>26020000.00</total_budget_changes><total_schedule_changes>711</total_schedule_changes></row><row _id="row-i4my.q3q3-p4g5" _uuid="00000000-0000-0000-D817-D4DB9B339A07" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-i4my.q3q3-p4g5"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>634</pid><project_name>New 40th Precinct</project_name><category>Public Safety and Criminal Justice</category><borough>Bronx</borough><managing_agency>DDC</managing_agency><client_agency>Police</client_agency><total_budget_changes>26020000.00</total_budget_changes><total_schedule_changes>711</total_schedule_changes></row><row _id="row-yh2n~bce9-qjvi" _uuid="00000000-0000-0000-3B96-ACE832DE6705" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-yh2n~bce9-qjvi"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>634</pid><project_name>New 40th Precinct</project_name><description>Design and build a new Police Precinct with full basement totaling 43,000 sq. ft. on an existing City owned property in the Bronx.</description><category>Public Safety and Criminal Justice</category><borough>Bronx</borough><managing_agency>DDC</managing_agency><client_agency>Police</client_agency><current_phase>Construction</current_phase><design_start>2014-09-30T00:00:00</design_start><budget_forecast>80753000.00</budget_forecast><latest_budget_changes>3453000.00</latest_budget_changes><total_budget_changes>26020000.00</total_budget_changes><forecast_completion>2022-10-13T00:00:00</forecast_completion><latest_schedule_changes>475</latest_schedule_changes><total_schedule_changes>711</total_schedule_changes></row><row _id="row-cw9i-xris~n7y9" _uuid="00000000-0000-0000-C2C0-2AB21D891688" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-cw9i-xris~n7y9"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>634</pid><project_name>New 40th Precinct</project_name><description>Design and build a new Police Precinct with full basement totaling 43,000 sq. ft. on an existing City owned property in the Bronx.</description><category>Public Safety and Criminal Justice</category><borough>Bronx</borough><managing_agency>DDC</managing_agency><client_agency>Police</client_agency><current_phase>Construction</current_phase><design_start>2014-09-30T00:00:00</design_start><budget_forecast>80953000.00</budget_forecast><latest_budget_changes>200000.00</latest_budget_changes><total_budget_changes>26020000.00</total_budget_changes><forecast_completion>2022-10-26T00:00:00</forecast_completion><latest_schedule_changes>13</latest_schedule_changes><total_schedule_changes>711</total_schedule_changes></row><row _id="row-ezf5.4u22~49hz" _uuid="00000000-0000-0000-71AC-85DFCEE04D35" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ezf5.4u22~49hz"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>634</pid><project_name>New 40th Precinct</project_name><description>Design and build a new Police Precinct with full basement totaling 43,000 sq. ft. on an existing City owned property in the Bronx.</description><category>Public Safety and Criminal Justice</category><borough>Bronx</borough><managing_agency>DDC</managing_agency><client_agency>Police</client_agency><current_phase>Construction</current_phase><design_start>2014-09-30T00:00:00</design_start><budget_forecast>91274000.00</budget_forecast><latest_budget_changes>10321000.00</latest_budget_changes><total_budget_changes>26020000.00</total_budget_changes><forecast_completion>2022-11-09T00:00:00</forecast_completion><latest_schedule_changes>14</latest_schedule_changes><total_schedule_changes>711</total_schedule_changes></row><row _id="row-r783~5xey_avyz" _uuid="00000000-0000-0000-DB3A-1A5F33362C15" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-r783~5xey_avyz"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>634</pid><project_name>New 40th Precinct</project_name><description>Design and build a new Police Precinct with full basement totaling 43,000 sq. ft. on an existing City owned property in the Bronx.</description><category>Public Safety and Criminal Justice</category><borough>Bronx</borough><managing_agency>DDC</managing_agency><client_agency>Police</client_agency><design_start>2014-09-30T00:00:00</design_start><budget_forecast>98816000.00</budget_forecast><latest_budget_changes>7542000.00</latest_budget_changes><total_budget_changes>26020000.00</total_budget_changes><forecast_completion>2023-06-06T00:00:00</forecast_completion><latest_schedule_changes>209</latest_schedule_changes><total_schedule_changes>711</total_schedule_changes></row><row _id="row-uveh.se2k~s7jb" _uuid="00000000-0000-0000-1F40-624988063756" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-uveh.se2k~s7jb"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>634</pid><project_name>New 40th Precinct</project_name><description>Design and build a new Police Precinct with full basement totaling 43,000 sq. ft. on an existing City owned property in the Bronx.</description><category>Public Safety and Criminal Justice</category><borough>Bronx</borough><managing_agency>DDC</managing_agency><client_agency>Police</client_agency><design_start>2014-09-30T00:00:00</design_start><budget_forecast>97020000.00</budget_forecast><latest_budget_changes>-1796000.00</latest_budget_changes><total_budget_changes>26020000.00</total_budget_changes><total_schedule_changes>711</total_schedule_changes></row><row _id="row-encq-zt86_j43v" _uuid="00000000-0000-0000-2FEC-E2EFB8F9613D" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-encq-zt86_j43v"><date_reported_as_of>2017-09-01T00:00:00</date_reported_as_of><pid>639</pid><project_name>253 Broadway Landmark's Space Renovations</project_name><description>Renovation of 3 floors for new office space for the Landmarks Commission, as well as new public hearing room.</description><category>Other Government Facilities</category><borough>Manhattan</borough><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><current_phase>Construction</current_phase><design_start>2013-01-23T00:00:00</design_start><budget_forecast>31529000.00</budget_forecast><total_budget_changes>35010000.00</total_budget_changes><forecast_completion>2018-10-08T00:00:00</forecast_completion><total_schedule_changes>1696</total_schedule_changes></row><row _id="row-zqhy-wagc_mnbq" _uuid="00000000-0000-0000-07E5-0BFE3E548F93" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-zqhy-wagc_mnbq"><date_reported_as_of>2018-03-01T00:00:00</date_reported_as_of><pid>639</pid><project_name>253 Broadway Landmark's Space Renovations</project_name><description>Renovation of 3 floors for new office space for the Landmarks Commission, as well as new public hearing room.</description><category>Other Government Facilities</category><borough>Manhattan</borough><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><current_phase>Construction</current_phase><design_start>2013-01-23T00:00:00</design_start><budget_forecast>31529000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>35010000.00</total_budget_changes><forecast_completion>2019-04-19T00:00:00</forecast_completion><latest_schedule_changes>193</latest_schedule_changes><total_schedule_changes>1696</total_schedule_changes></row><row _id="row-r77i-z9k2-ecmc" _uuid="00000000-0000-0000-ED84-C1E112847509" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-r77i-z9k2-ecmc"><date_reported_as_of>2018-08-01T00:00:00</date_reported_as_of><pid>639</pid><project_name>253 Broadway Landmark's Space Renovations</project_name><description>Renovation of 3 floors for new office space for the Landmarks Commission, as well as new public hearing room.</description><category>Other Government Facilities</category><borough>Manhattan</borough><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><current_phase>Construction</current_phase><design_start>2013-01-23T00:00:00</design_start><budget_forecast>31049000.00</budget_forecast><latest_budget_changes>-480000.00</latest_budget_changes><total_budget_changes>35010000.00</total_budget_changes><forecast_completion>2019-12-31T00:00:00</forecast_completion><latest_schedule_changes>256</latest_schedule_changes><total_schedule_changes>1696</total_schedule_changes></row><row _id="row-2dqz.c4b4~g8qi" _uuid="00000000-0000-0000-CF2D-B7E346EBDB7F" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-2dqz.c4b4~g8qi"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1202</pid><project_name>150th Street Spine: Phase II - DOT Van Wyck Expressway - Trunk Combined Sewer</project_name><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction</current_phase><design_start>2020-03-02T00:00:00</design_start><budget_forecast>138692000.00</budget_forecast><latest_budget_changes>-676000.00</latest_budget_changes><total_budget_changes>-676000.00</total_budget_changes><forecast_completion>2025-04-14T00:00:00</forecast_completion><latest_schedule_changes>-382</latest_schedule_changes><total_schedule_changes>-194</total_schedule_changes></row><row _id="row-ei8g.hiaq.iqtx" _uuid="00000000-0000-0000-5520-EA675AC2F569" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ei8g.hiaq.iqtx"><date_reported_as_of>2019-01-01T00:00:00</date_reported_as_of><pid>639</pid><project_name>253 Broadway Landmark's Space Renovations</project_name><description>Renovation of 3 floors for new office space for the Landmarks Commission, as well as new public hearing room.</description><category>Other Government Facilities</category><borough>Manhattan</borough><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><current_phase>Construction</current_phase><design_start>2013-01-23T00:00:00</design_start><budget_forecast>46473775.99</budget_forecast><latest_budget_changes>15424775.99</latest_budget_changes><total_budget_changes>35010000.00</total_budget_changes><forecast_completion>2020-06-01T00:00:00</forecast_completion><latest_schedule_changes>153</latest_schedule_changes><total_schedule_changes>1696</total_schedule_changes></row><row _id="row-j4fv~kkwj-zxzb" _uuid="00000000-0000-0000-8AA3-AEA596BDCD42" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-j4fv~kkwj-zxzb"><date_reported_as_of>2019-05-01T00:00:00</date_reported_as_of><pid>639</pid><project_name>253 Broadway Landmark's Space Renovations</project_name><description>Renovate 4 floors of the building to create new office space for the Landmarks Preservation Commission, including new hearing room.</description><category>Other Government Facilities</category><borough>Manhattan</borough><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><current_phase>Construction</current_phase><design_start>2013-01-23T00:00:00</design_start><budget_forecast>73828000.00</budget_forecast><latest_budget_changes>27354224.01</latest_budget_changes><total_budget_changes>35010000.00</total_budget_changes><forecast_completion>2020-06-30T00:00:00</forecast_completion><latest_schedule_changes>29</latest_schedule_changes><total_schedule_changes>1696</total_schedule_changes></row><row _id="row-sq67_sica~svgu" _uuid="00000000-0000-0000-191C-020850B8AFDD" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-sq67_sica~svgu"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>639</pid><project_name>253 Broadway Landmark's Space Renovations</project_name><description>Renovate 4 floors of the building to create new office space for the Landmarks Preservation Commission, including new hearing room.</description><category>Other Government Facilities</category><borough>Manhattan</borough><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><current_phase>Construction</current_phase><design_start>2013-01-23T00:00:00</design_start><budget_forecast>73932000.00</budget_forecast><latest_budget_changes>104000.00</latest_budget_changes><total_budget_changes>35010000.00</total_budget_changes><forecast_completion>2021-02-26T00:00:00</forecast_completion><latest_schedule_changes>241</latest_schedule_changes><total_schedule_changes>1696</total_schedule_changes></row><row _id="row-tebt~5zdt.8kti" _uuid="00000000-0000-0000-8C69-ED02D4B35E71" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-tebt~5zdt.8kti"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>639</pid><project_name>253 Broadway Landmark's Space Renovations</project_name><category>Other Government Facilities</category><borough>Manhattan</borough><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><total_budget_changes>35010000.00</total_budget_changes><total_schedule_changes>1696</total_schedule_changes></row><row _id="row-n273~grp2-gffh" _uuid="00000000-0000-0000-F86D-82B9B73A7D54" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-n273~grp2-gffh"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>639</pid><project_name>253 Broadway Landmark's Space Renovations</project_name><category>Other Government Facilities</category><borough>Manhattan</borough><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><total_budget_changes>35010000.00</total_budget_changes><total_schedule_changes>1696</total_schedule_changes></row><row _id="row-8j7k~eijx.jtxj" _uuid="00000000-0000-0000-EBF2-74E938AFF2B4" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-8j7k~eijx.jtxj"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>639</pid><project_name>253 Broadway Landmark's Space Renovations</project_name><category>Other Government Facilities</category><borough>Manhattan</borough><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><total_budget_changes>35010000.00</total_budget_changes><total_schedule_changes>1696</total_schedule_changes></row><row _id="row-nynm~4tk2_by5p" _uuid="00000000-0000-0000-3FCC-C08985316307" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-nynm~4tk2_by5p"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>639</pid><project_name>253 Broadway Landmark's Space Renovations</project_name><category>Other Government Facilities</category><borough>Manhattan</borough><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><total_budget_changes>35010000.00</total_budget_changes><total_schedule_changes>1696</total_schedule_changes></row><row _id="row-m4uz_i25k_ta3z" _uuid="00000000-0000-0000-F0DD-266575D64130" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-m4uz_i25k_ta3z"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>639</pid><project_name>253 Broadway Landmark's Space Renovations</project_name><description>Renovate 4 floors of the building to create new office space for the Landmarks Preservation Commission, including new hearing room.</description><category>Other Government Facilities</category><borough>Manhattan</borough><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><current_phase>Construction</current_phase><design_start>2013-01-23T00:00:00</design_start><budget_forecast>66994000.00</budget_forecast><latest_budget_changes>-6938000.00</latest_budget_changes><total_budget_changes>35010000.00</total_budget_changes><forecast_completion>2022-08-31T00:00:00</forecast_completion><latest_schedule_changes>551</latest_schedule_changes><total_schedule_changes>1696</total_schedule_changes></row><row _id="row-hgx5_9rk8_x8am" _uuid="00000000-0000-0000-AA0B-2E51164ECA1A" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-hgx5_9rk8_x8am"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>639</pid><project_name>253 Broadway Landmark's Space Renovations</project_name><description>Renovate 4 floors of the building to create new office space for the Landmarks Preservation Commission, including new hearing room.</description><category>Other Government Facilities</category><borough>Manhattan</borough><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><current_phase>Construction</current_phase><design_start>2013-01-23T00:00:00</design_start><budget_forecast>69740000.00</budget_forecast><latest_budget_changes>2746000.00</latest_budget_changes><total_budget_changes>35010000.00</total_budget_changes><forecast_completion>2022-08-31T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1696</total_schedule_changes></row><row _id="row-7rhf_grr2~cpun" _uuid="00000000-0000-0000-C8BB-D60BCD80B90A" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-7rhf_grr2~cpun"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>639</pid><project_name>253 Broadway Landmark's Space Renovations</project_name><description>Renovate 4 floors of the building to create new office space for the Landmarks Preservation Commission, including new hearing room.</description><category>Other Government Facilities</category><borough>Manhattan</borough><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><current_phase>Construction</current_phase><design_start>2013-01-23T00:00:00</design_start><budget_forecast>69056000.00</budget_forecast><latest_budget_changes>-684000.00</latest_budget_changes><total_budget_changes>35010000.00</total_budget_changes><forecast_completion>2022-12-31T00:00:00</forecast_completion><latest_schedule_changes>122</latest_schedule_changes><total_schedule_changes>1696</total_schedule_changes></row><row _id="row-wknj-xy73-5abu" _uuid="00000000-0000-0000-E7A9-6EACDFD016ED" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-wknj-xy73-5abu"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>639</pid><project_name>253 Broadway Landmark's Space Renovations</project_name><description>Renovate 4 floors of the building to create new office space for the Landmarks Preservation Commission, including new hearing room.</description><category>Other Government Facilities</category><borough>Manhattan</borough><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><current_phase>Construction</current_phase><design_start>2013-01-23T00:00:00</design_start><budget_forecast>64108000.00</budget_forecast><latest_budget_changes>-4948000.00</latest_budget_changes><total_budget_changes>35010000.00</total_budget_changes><forecast_completion>2022-12-31T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1696</total_schedule_changes></row><row _id="row-83i2.jsr7_iidr" _uuid="00000000-0000-0000-B46F-EA5E98BAB0A5" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-83i2.jsr7_iidr"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>639</pid><project_name>253 Broadway Landmark's Space Renovations</project_name><description>Renovate 4 floors of the building to create new office space for the Landmarks Preservation Commission, including new hearing room.</description><category>Other Government Facilities</category><borough>Manhattan</borough><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><current_phase>Construction</current_phase><design_start>2013-01-23T00:00:00</design_start><budget_forecast>66539000.00</budget_forecast><latest_budget_changes>2431000.00</latest_budget_changes><total_budget_changes>35010000.00</total_budget_changes><forecast_completion>2023-05-31T00:00:00</forecast_completion><latest_schedule_changes>151</latest_schedule_changes><total_schedule_changes>1696</total_schedule_changes></row><row _id="row-2ue5_qrge_mvx9" _uuid="00000000-0000-0000-5F91-4173CE869AA3" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-2ue5_qrge_mvx9"><date_reported_as_of>2017-09-01T00:00:00</date_reported_as_of><pid>651</pid><project_name>STM &amp; SAN SWR, WILLET PT BLVD WHITESTONE AREA, PH2</project_name><description>Whitestone Area, Willets Point Blvd, Queens</description><category>Sewers</category><borough>Queens</borough><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Design</current_phase><design_start>2013-03-15T00:00:00</design_start><budget_forecast>69282000.00</budget_forecast><total_budget_changes>41243000.00</total_budget_changes><forecast_completion>2021-08-27T00:00:00</forecast_completion><total_schedule_changes>642</total_schedule_changes></row><row _id="row-u75y-9unh_j4sp" _uuid="00000000-0000-0000-5BA9-D87B6C46E368" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-u75y-9unh_j4sp"><date_reported_as_of>2018-03-01T00:00:00</date_reported_as_of><pid>651</pid><project_name>STM &amp; SAN SWR, WILLET PT BLVD WHITESTONE AREA, PH2</project_name><description>Whitestone Area, Willets Point Blvd, Queens</description><category>Sewers</category><borough>Queens</borough><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction Procurement</current_phase><design_start>2013-03-15T00:00:00</design_start><budget_forecast>69282000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>41243000.00</total_budget_changes><forecast_completion>2021-08-27T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>642</total_schedule_changes></row><row _id="row-3mbd_qhb6~xg58" _uuid="00000000-0000-0000-A2CA-625ED4190ACB" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-3mbd_qhb6~xg58"><date_reported_as_of>2018-08-01T00:00:00</date_reported_as_of><pid>651</pid><project_name>STM &amp; SAN SWR, WILLET PT BLVD WHITESTONE AREA, PH2</project_name><description>Whitestone Area, Willets Point Blvd, Queens</description><category>Sewers</category><borough>Queens</borough><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction Procurement</current_phase><design_start>2013-03-15T00:00:00</design_start><budget_forecast>94262000.00</budget_forecast><latest_budget_changes>24980000.00</latest_budget_changes><total_budget_changes>41243000.00</total_budget_changes><forecast_completion>2021-09-15T00:00:00</forecast_completion><latest_schedule_changes>19</latest_schedule_changes><total_schedule_changes>642</total_schedule_changes></row><row _id="row-6r63.wx2r~an6d" _uuid="00000000-0000-0000-4AC2-FE0056231CF7" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-6r63.wx2r~an6d"><date_reported_as_of>2019-01-01T00:00:00</date_reported_as_of><pid>651</pid><project_name>STM &amp; SAN SWR, WILLET PT BLVD WHITESTONE AREA, PH2</project_name><description>Whitestone Area, Willets Point Blvd, Queens</description><category>Sewers</category><borough>Queens</borough><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction</current_phase><design_start>2013-03-15T00:00:00</design_start><budget_forecast>95233000.00</budget_forecast><latest_budget_changes>971000.00</latest_budget_changes><total_budget_changes>41243000.00</total_budget_changes><forecast_completion>2022-09-15T00:00:00</forecast_completion><latest_schedule_changes>365</latest_schedule_changes><total_schedule_changes>642</total_schedule_changes></row><row _id="row-x63g.r82a.zgxk" _uuid="00000000-0000-0000-2C9E-1C9E6C7C59A8" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-x63g.r82a.zgxk"><date_reported_as_of>2019-05-01T00:00:00</date_reported_as_of><pid>651</pid><project_name>STM &amp; SAN SWR, WILLET PT BLVD WHITESTONE AREA, PH2</project_name><description>Installation of Storm sewers, Sanitary sewers, &amp; Water mains in Whitestone Area.</description><category>Sewers</category><borough>Queens</borough><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction</current_phase><design_start>2013-03-15T00:00:00</design_start><budget_forecast>95997000.00</budget_forecast><latest_budget_changes>764000.00</latest_budget_changes><total_budget_changes>41243000.00</total_budget_changes><forecast_completion>2022-09-15T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>642</total_schedule_changes></row><row _id="row-sh8x-judx_xi5y" _uuid="00000000-0000-0000-4A21-02980E711EBC" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-sh8x-judx_xi5y"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>651</pid><project_name>STM &amp; SAN SWR, WILLET PT BLVD WHITESTONE AREA, PH2</project_name><description>Installation of Storm sewers, Sanitary sewers, &amp; Water mains in Whitestone Area.</description><category>Sewers</category><borough>Queens</borough><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction</current_phase><design_start>2013-03-15T00:00:00</design_start><budget_forecast>99690000.00</budget_forecast><latest_budget_changes>3693000.00</latest_budget_changes><total_budget_changes>41243000.00</total_budget_changes><forecast_completion>2022-09-15T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>642</total_schedule_changes></row><row _id="row-an2s.j883_ueai" _uuid="00000000-0000-0000-8FB5-EE9FFC0D302D" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-an2s.j883_ueai"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>651</pid><project_name>STM &amp; SAN SWR, WILLET PT BLVD WHITESTONE AREA, PH2</project_name><category>Sewers</category><borough>Queens</borough><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><total_budget_changes>41243000.00</total_budget_changes><total_schedule_changes>642</total_schedule_changes></row><row _id="row-94yw.2ehv~g5zp" _uuid="00000000-0000-0000-EF38-AE33C9746C1F" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-94yw.2ehv~g5zp"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>651</pid><project_name>STM &amp; SAN SWR, WILLET PT BLVD WHITESTONE AREA, PH2</project_name><category>Sewers</category><borough>Queens</borough><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><total_budget_changes>41243000.00</total_budget_changes><total_schedule_changes>642</total_schedule_changes></row><row _id="row-z2g7~dzug~wibz" _uuid="00000000-0000-0000-B03A-68EEC0AF6282" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-z2g7~dzug~wibz"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>651</pid><project_name>STM &amp; SAN SWR, WILLET PT BLVD WHITESTONE AREA, PH2</project_name><category>Sewers</category><borough>Queens</borough><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><total_budget_changes>41243000.00</total_budget_changes><total_schedule_changes>642</total_schedule_changes></row><row _id="row-gnmm~k58a-p7a5" _uuid="00000000-0000-0000-B365-73A32924488D" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-gnmm~k58a-p7a5"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>651</pid><project_name>STM &amp; SAN SWR, WILLET PT BLVD WHITESTONE AREA, PH2</project_name><category>Sewers</category><borough>Queens</borough><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><total_budget_changes>41243000.00</total_budget_changes><total_schedule_changes>642</total_schedule_changes></row><row _id="row-5mue.3gp6.usbm" _uuid="00000000-0000-0000-DD9F-E2844A8B5E2E" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-5mue.3gp6.usbm"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>651</pid><project_name>STM &amp; SAN SWR, WILLET PT BLVD WHITESTONE AREA, PH2</project_name><description>Installation of Storm sewers, Sanitary sewers, &amp; Water mains in Whitestone Area.</description><category>Sewers</category><borough>Queens</borough><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction</current_phase><design_start>2013-03-15T00:00:00</design_start><budget_forecast>108079000.00</budget_forecast><latest_budget_changes>8389000.00</latest_budget_changes><total_budget_changes>41243000.00</total_budget_changes><forecast_completion>2022-09-15T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>642</total_schedule_changes></row><row _id="row-ccti-rddj~nueq" _uuid="00000000-0000-0000-8CF1-010B336E0E6A" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ccti-rddj~nueq"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>651</pid><project_name>STM &amp; SAN SWR, WILLET PT BLVD WHITESTONE AREA, PH2</project_name><description>Installation of Storm sewers, Sanitary sewers, &amp; Water mains in Whitestone Area.</description><category>Sewers</category><borough>Queens</borough><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction</current_phase><design_start>2013-03-15T00:00:00</design_start><budget_forecast>109091000.00</budget_forecast><latest_budget_changes>1012000.00</latest_budget_changes><total_budget_changes>41243000.00</total_budget_changes><forecast_completion>2022-09-15T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>642</total_schedule_changes></row><row _id="row-beme.5kca-mnq7" _uuid="00000000-0000-0000-566D-538C64C20162" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-beme.5kca-mnq7"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>651</pid><project_name>STM &amp; SAN SWR, WILLET PT BLVD WHITESTONE AREA, PH2</project_name><description>Installation of Storm sewers, Sanitary sewers, &amp; Water mains in Whitestone Area.</description><category>Sewers</category><borough>Queens</borough><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction</current_phase><design_start>2013-03-15T00:00:00</design_start><budget_forecast>109091000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>41243000.00</total_budget_changes><forecast_completion>2022-09-15T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>642</total_schedule_changes></row><row _id="row-vspr~xsj5.g7ra" _uuid="00000000-0000-0000-21C6-772CC6C69168" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-vspr~xsj5.g7ra"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>651</pid><project_name>STM &amp; SAN SWR, WILLET PT BLVD WHITESTONE AREA, PH2</project_name><description>Installation of Storm sewers, Sanitary sewers, &amp; Water mains in Whitestone Area.</description><category>Sewers</category><borough>Queens</borough><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction</current_phase><design_start>2013-03-15T00:00:00</design_start><budget_forecast>110525000.00</budget_forecast><latest_budget_changes>1434000.00</latest_budget_changes><total_budget_changes>41243000.00</total_budget_changes><forecast_completion>2023-05-31T00:00:00</forecast_completion><latest_schedule_changes>258</latest_schedule_changes><total_schedule_changes>642</total_schedule_changes></row><row _id="row-yb5s_nft3.zpde" _uuid="00000000-0000-0000-42A9-945BDEFECB8A" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-yb5s_nft3.zpde"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>651</pid><project_name>STM &amp; SAN SWR, WILLET PT BLVD WHITESTONE AREA, PH2</project_name><description>Installation of Storm sewers, Sanitary sewers, &amp; Water mains in Whitestone Area.</description><category>Sewers</category><borough>Queens</borough><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction</current_phase><design_start>2013-03-15T00:00:00</design_start><budget_forecast>110525000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>41243000.00</total_budget_changes><forecast_completion>2023-05-31T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>642</total_schedule_changes></row><row _id="row-3sfz.hunx-gcyt" _uuid="00000000-0000-0000-67F6-E7D2B8939A7E" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-3sfz.hunx-gcyt"><date_reported_as_of>2017-09-01T00:00:00</date_reported_as_of><pid>652</pid><project_name>STM &amp; SAN SWR, N.B. WHITESTONE EXPWY SERV RD, PH 3</project_name><description>Whitestone Area Storm and Sanitary Sewers Phase 3</description><category>Sewers</category><borough>Queens</borough><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Design</current_phase><design_start>2016-07-15T00:00:00</design_start><budget_forecast>59922000.00</budget_forecast><total_budget_changes>15468000.00</total_budget_changes><forecast_completion>2022-10-07T00:00:00</forecast_completion><total_schedule_changes>684</total_schedule_changes></row><row _id="row-getm.z9a2.4kzw" _uuid="00000000-0000-0000-5F72-B718EDBE576D" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-getm.z9a2.4kzw"><date_reported_as_of>2018-03-01T00:00:00</date_reported_as_of><pid>652</pid><project_name>STM &amp; SAN SWR, N.B. WHITESTONE EXPWY SERV RD, PH 3</project_name><description>Whitestone Area Storm and Sanitary Sewers Phase 3</description><category>Sewers</category><borough>Queens</borough><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Design</current_phase><design_start>2016-07-15T00:00:00</design_start><budget_forecast>59922000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>15468000.00</total_budget_changes><forecast_completion>2022-10-07T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>684</total_schedule_changes></row><row _id="row-zxcr.4e7i_nme2" _uuid="00000000-0000-0000-C8D3-1D45C375B1BF" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-zxcr.4e7i_nme2"><date_reported_as_of>2018-08-01T00:00:00</date_reported_as_of><pid>652</pid><project_name>STM &amp; SAN SWR, N.B. WHITESTONE EXPWY SERV RD, PH 3</project_name><description>Whitestone Area Storm and Sanitary Sewers Phase 3</description><category>Sewers</category><borough>Queens</borough><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Design</current_phase><design_start>2016-07-15T00:00:00</design_start><budget_forecast>60113000.00</budget_forecast><latest_budget_changes>191000.00</latest_budget_changes><total_budget_changes>15468000.00</total_budget_changes><forecast_completion>2022-10-07T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>684</total_schedule_changes></row><row _id="row-mdea.4avf-66uc" _uuid="00000000-0000-0000-3D4C-FE260F145E1F" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-mdea.4avf-66uc"><date_reported_as_of>2019-01-01T00:00:00</date_reported_as_of><pid>652</pid><project_name>STM &amp; SAN SWR, N.B. WHITESTONE EXPWY SERV RD, PH 3</project_name><description>Whitestone Area Storm and Sanitary Sewers Phase 3</description><category>Sewers</category><borough>Queens</borough><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Design</current_phase><design_start>2016-07-15T00:00:00</design_start><budget_forecast>60230000.00</budget_forecast><latest_budget_changes>117000.00</latest_budget_changes><total_budget_changes>15468000.00</total_budget_changes><forecast_completion>2022-10-07T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>684</total_schedule_changes></row><row _id="row-vewy_p2v4-a7t9" _uuid="00000000-0000-0000-3ABB-79E7C1458CEA" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-vewy_p2v4-a7t9"><date_reported_as_of>2019-05-01T00:00:00</date_reported_as_of><pid>652</pid><project_name>STM &amp; SAN SWR, N.B. WHITESTONE EXPWY SERV RD, PH 3</project_name><description>Installation of  Storm sewers, Sanitary sewers, &amp; Water mains in Whitestone Area-Phase 3</description><category>Sewers</category><borough>Queens</borough><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Design</current_phase><design_start>2016-07-15T00:00:00</design_start><budget_forecast>60763000.00</budget_forecast><latest_budget_changes>533000.00</latest_budget_changes><total_budget_changes>15468000.00</total_budget_changes><forecast_completion>2023-08-16T00:00:00</forecast_completion><latest_schedule_changes>313</latest_schedule_changes><total_schedule_changes>684</total_schedule_changes></row><row _id="row-ybvu_37uf_9b28" _uuid="00000000-0000-0000-0FC9-ADD1CC6054F8" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ybvu_37uf_9b28"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>652</pid><project_name>STM &amp; SAN SWR, N.B. WHITESTONE EXPWY SERV RD, PH 3</project_name><description>Installation of  Storm sewers, Sanitary sewers, &amp; Water mains in Whitestone Area-Phase 3</description><category>Sewers</category><borough>Queens</borough><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Design</current_phase><design_start>2016-07-15T00:00:00</design_start><budget_forecast>60763000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>15468000.00</total_budget_changes><forecast_completion>2023-08-16T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>684</total_schedule_changes></row><row _id="row-wg2x.udwq_kz4d" _uuid="00000000-0000-0000-8F44-480FD0DF473A" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-wg2x.udwq_kz4d"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>652</pid><project_name>STM &amp; SAN SWR, N.B. WHITESTONE EXPWY SERV RD, PH 3</project_name><category>Sewers</category><borough>Queens</borough><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><total_budget_changes>15468000.00</total_budget_changes><total_schedule_changes>684</total_schedule_changes></row><row _id="row-bckt_yxvg-7czr" _uuid="00000000-0000-0000-4724-A868E134C58A" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-bckt_yxvg-7czr"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>652</pid><project_name>STM &amp; SAN SWR, N.B. WHITESTONE EXPWY SERV RD, PH 3</project_name><category>Sewers</category><borough>Queens</borough><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><total_budget_changes>15468000.00</total_budget_changes><total_schedule_changes>684</total_schedule_changes></row><row _id="row-nszb.dvwy.kywa" _uuid="00000000-0000-0000-F681-73DF486C0D4B" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-nszb.dvwy.kywa"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>652</pid><project_name>STM &amp; SAN SWR, N.B. WHITESTONE EXPWY SERV RD, PH 3</project_name><category>Sewers</category><borough>Queens</borough><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><total_budget_changes>15468000.00</total_budget_changes><total_schedule_changes>684</total_schedule_changes></row><row _id="row-abep~dwky-vs6a" _uuid="00000000-0000-0000-0E52-315DBBD96080" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-abep~dwky-vs6a"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>652</pid><project_name>STM &amp; SAN SWR, N.B. WHITESTONE EXPWY SERV RD, PH 3</project_name><category>Sewers</category><borough>Queens</borough><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><total_budget_changes>15468000.00</total_budget_changes><total_schedule_changes>684</total_schedule_changes></row><row _id="row-kdg6_ewry.qbqm" _uuid="00000000-0000-0000-F840-FAA175B4D289" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-kdg6_ewry.qbqm"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>652</pid><project_name>STM &amp; SAN SWR, N.B. WHITESTONE EXPWY SERV RD, PH 3</project_name><description>Installation of  Storm sewers, Sanitary sewers, &amp; Water mains in Whitestone Area-Phase 3</description><category>Sewers</category><borough>Queens</borough><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction</current_phase><design_start>2016-07-15T00:00:00</design_start><budget_forecast>76897000.00</budget_forecast><latest_budget_changes>16134000.00</latest_budget_changes><total_budget_changes>15468000.00</total_budget_changes><forecast_completion>2024-08-21T00:00:00</forecast_completion><latest_schedule_changes>371</latest_schedule_changes><total_schedule_changes>684</total_schedule_changes></row><row _id="row-9pzi.qwht-fajj" _uuid="00000000-0000-0000-6E46-75ABBEF4EAF6" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-9pzi.qwht-fajj"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>652</pid><project_name>STM &amp; SAN SWR, N.B. WHITESTONE EXPWY SERV RD, PH 3</project_name><description>Installation of  Storm sewers, Sanitary sewers, &amp; Water mains in Whitestone Area-Phase 3</description><category>Sewers</category><borough>Queens</borough><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction</current_phase><design_start>2016-07-15T00:00:00</design_start><budget_forecast>76591000.00</budget_forecast><latest_budget_changes>-306000.00</latest_budget_changes><total_budget_changes>15468000.00</total_budget_changes><forecast_completion>2024-08-21T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>684</total_schedule_changes></row><row _id="row-je4r_92d8-85kg" _uuid="00000000-0000-0000-FE1F-C9E6FDB8F269" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-je4r_92d8-85kg"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>652</pid><project_name>STM &amp; SAN SWR, N.B. WHITESTONE EXPWY SERV RD, PH 3</project_name><description>Installation of  Storm sewers, Sanitary sewers, &amp; Water mains in Whitestone Area-Phase 3</description><category>Sewers</category><borough>Queens</borough><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction</current_phase><design_start>2016-07-15T00:00:00</design_start><budget_forecast>76746000.00</budget_forecast><latest_budget_changes>155000.00</latest_budget_changes><total_budget_changes>15468000.00</total_budget_changes><forecast_completion>2024-08-21T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>684</total_schedule_changes></row><row _id="row-ygnp_gazx~r8vm" _uuid="00000000-0000-0000-FD37-DB7BF211AE57" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ygnp_gazx~r8vm"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>652</pid><project_name>STM &amp; SAN SWR, N.B. WHITESTONE EXPWY SERV RD, PH 3</project_name><description>Installation of  Storm sewers, Sanitary sewers, &amp; Water mains in Whitestone Area-Phase 3</description><category>Sewers</category><borough>Queens</borough><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction</current_phase><design_start>2016-07-15T00:00:00</design_start><budget_forecast>75390000.00</budget_forecast><latest_budget_changes>-1356000.00</latest_budget_changes><total_budget_changes>15468000.00</total_budget_changes><forecast_completion>2024-08-21T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>684</total_schedule_changes></row><row _id="row-ib2x~2fsb~nvci" _uuid="00000000-0000-0000-58EC-3D4E2463FD0E" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ib2x~2fsb~nvci"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>652</pid><project_name>STM &amp; SAN SWR, N.B. WHITESTONE EXPWY SERV RD, PH 3</project_name><description>Installation of  Storm sewers, Sanitary sewers, &amp; Water mains in Whitestone Area-Phase 3</description><category>Sewers</category><borough>Queens</borough><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction</current_phase><design_start>2016-07-15T00:00:00</design_start><budget_forecast>75390000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>15468000.00</total_budget_changes><forecast_completion>2024-08-21T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>684</total_schedule_changes></row><row _id="row-wjxp_8xsn-gedi" _uuid="00000000-0000-0000-108C-116431B9ECB7" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-wjxp_8xsn-gedi"><date_reported_as_of>2017-09-01T00:00:00</date_reported_as_of><pid>665</pid><project_name>TLC - NEW OFFICE FACILITY - 24-55 BQE WEST</project_name><description>Design and construction of new adminstration wing to replace existing administration wing, new parking, provide new inspection lane within the inspection facility.</description><category>Other Government Facilities</category><borough>Queens</borough><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><current_phase>Design</current_phase><design_start>2015-09-15T00:00:00</design_start><budget_forecast>77176000.00</budget_forecast><total_budget_changes>75370000.00</total_budget_changes><forecast_completion>2022-11-30T00:00:00</forecast_completion><total_schedule_changes>1248</total_schedule_changes></row><row _id="row-pzvd.kss9_zm7i" _uuid="00000000-0000-0000-1CCF-86ED89A2D1D1" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-pzvd.kss9_zm7i"><date_reported_as_of>2018-03-01T00:00:00</date_reported_as_of><pid>665</pid><project_name>TLC - NEW OFFICE FACILITY - 24-55 BQE WEST</project_name><description>Design and construction of new adminstration wing to replace existing administration wing, new parking, provide new inspection lane within the inspection facility.</description><category>Other Government Facilities</category><borough>Queens</borough><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><current_phase>Design</current_phase><design_start>2015-09-15T00:00:00</design_start><budget_forecast>91110000.00</budget_forecast><latest_budget_changes>13934000.00</latest_budget_changes><total_budget_changes>75370000.00</total_budget_changes><forecast_completion>2022-11-30T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1248</total_schedule_changes></row><row _id="row-zdja_rxap-7ieb" _uuid="00000000-0000-0000-94A5-DC45958ADCE2" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-zdja_rxap-7ieb"><date_reported_as_of>2018-08-01T00:00:00</date_reported_as_of><pid>665</pid><project_name>TLC - NEW OFFICE FACILITY - 24-55 BQE WEST</project_name><description>Design and construction of new adminstration wing to replace existing administration wing, new parking, provide new inspection lane within the inspection facility.</description><category>Other Government Facilities</category><borough>Queens</borough><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><current_phase>Design</current_phase><design_start>2015-09-15T00:00:00</design_start><budget_forecast>91942584.00</budget_forecast><latest_budget_changes>832584.00</latest_budget_changes><total_budget_changes>75370000.00</total_budget_changes><forecast_completion>2023-07-02T00:00:00</forecast_completion><latest_schedule_changes>214</latest_schedule_changes><total_schedule_changes>1248</total_schedule_changes></row><row _id="row-grbu.6tp8_647f" _uuid="00000000-0000-0000-69B9-FAF071602090" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-grbu.6tp8_647f"><date_reported_as_of>2019-01-01T00:00:00</date_reported_as_of><pid>665</pid><project_name>TLC - NEW OFFICE FACILITY - 24-55 BQE WEST</project_name><description>Design and construction of new adminstration wing to replace existing administration wing, new parking, provide new inspection lane within the inspection facility.</description><category>Other Government Facilities</category><borough>Queens</borough><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><current_phase>Design</current_phase><design_start>2015-09-15T00:00:00</design_start><budget_forecast>87154000.00</budget_forecast><latest_budget_changes>-4788584.00</latest_budget_changes><total_budget_changes>75370000.00</total_budget_changes><forecast_completion>2023-10-15T00:00:00</forecast_completion><latest_schedule_changes>105</latest_schedule_changes><total_schedule_changes>1248</total_schedule_changes></row><row _id="row-qa6h.bxix_7nq2" _uuid="00000000-0000-0000-6213-4177CC40488A" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-qa6h.bxix_7nq2"><date_reported_as_of>2019-05-01T00:00:00</date_reported_as_of><pid>665</pid><project_name>TLC - NEW OFFICE FACILITY - 24-55 BQE WEST</project_name><description>Replace existing administration wing; provide new parking and new inspection lane within the facility.</description><category>Other Government Facilities</category><borough>Queens</borough><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><current_phase>Design</current_phase><design_start>2015-09-15T00:00:00</design_start><budget_forecast>79981000.00</budget_forecast><latest_budget_changes>-7173000.00</latest_budget_changes><total_budget_changes>75370000.00</total_budget_changes><forecast_completion>2024-01-28T00:00:00</forecast_completion><latest_schedule_changes>105</latest_schedule_changes><total_schedule_changes>1248</total_schedule_changes></row><row _id="row-fyus_sysu-w9ir" _uuid="00000000-0000-0000-2DB3-55F21756185E" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-fyus_sysu-w9ir"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>665</pid><project_name>TLC - NEW OFFICE FACILITY - 24-55 BQE WEST</project_name><description>Replace existing administration wing; provide new parking and new inspection lane within the facility.</description><category>Other Government Facilities</category><borough>Queens</borough><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><current_phase>Construction Procurement</current_phase><design_start>2015-09-15T00:00:00</design_start><budget_forecast>79981000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>75370000.00</total_budget_changes><forecast_completion>2024-02-18T00:00:00</forecast_completion><latest_schedule_changes>21</latest_schedule_changes><total_schedule_changes>1248</total_schedule_changes></row><row _id="row-wd2m_p3dx-nmt3" _uuid="00000000-0000-0000-D518-254611DEEF90" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-wd2m_p3dx-nmt3"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>665</pid><project_name>TLC - NEW OFFICE FACILITY - 24-55 BQE WEST</project_name><category>Other Government Facilities</category><borough>Queens</borough><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><total_budget_changes>75370000.00</total_budget_changes><total_schedule_changes>1248</total_schedule_changes></row><row _id="row-nd5s.49bk_w93d" _uuid="00000000-0000-0000-D943-3AD4255E59FA" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-nd5s.49bk_w93d"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>665</pid><project_name>TLC - NEW OFFICE FACILITY - 24-55 BQE WEST</project_name><category>Other Government Facilities</category><borough>Queens</borough><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><total_budget_changes>75370000.00</total_budget_changes><total_schedule_changes>1248</total_schedule_changes></row><row _id="row-3ttc-pmsn~d9yc" _uuid="00000000-0000-0000-69C7-ADF50072310B" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-3ttc-pmsn~d9yc"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>665</pid><project_name>TLC - NEW OFFICE FACILITY - 24-55 BQE WEST</project_name><category>Other Government Facilities</category><borough>Queens</borough><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><total_budget_changes>75370000.00</total_budget_changes><total_schedule_changes>1248</total_schedule_changes></row><row _id="row-8zqq~rqmm-zkze" _uuid="00000000-0000-0000-CD84-9C360DFCCC89" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-8zqq~rqmm-zkze"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>665</pid><project_name>TLC - NEW OFFICE FACILITY - 24-55 BQE WEST</project_name><category>Other Government Facilities</category><borough>Queens</borough><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><total_budget_changes>75370000.00</total_budget_changes><total_schedule_changes>1248</total_schedule_changes></row><row _id="row-wxa7-ujej_ddjm" _uuid="00000000-0000-0000-AE10-0945EF5A035A" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-wxa7-ujej_ddjm"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>665</pid><project_name>TLC - NEW OFFICE FACILITY - 24-55 BQE WEST</project_name><description>Replace existing administration wing; provide new parking and new inspection lane within the facility.</description><category>Other Government Facilities</category><borough>Queens</borough><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><current_phase>Construction</current_phase><design_start>2015-09-15T00:00:00</design_start><budget_forecast>152358000.00</budget_forecast><latest_budget_changes>72377000.00</latest_budget_changes><total_budget_changes>75370000.00</total_budget_changes><forecast_completion>2025-03-24T00:00:00</forecast_completion><latest_schedule_changes>400</latest_schedule_changes><total_schedule_changes>1248</total_schedule_changes></row><row _id="row-uweu.jq5a_fij9" _uuid="00000000-0000-0000-9175-409438388336" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-uweu.jq5a_fij9"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>665</pid><project_name>TLC - NEW OFFICE FACILITY - 24-55 BQE WEST</project_name><description>Replace existing administration wing; provide new parking and new inspection lane within the facility.</description><category>Other Government Facilities</category><borough>Queens</borough><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><current_phase>Construction</current_phase><design_start>2015-09-15T00:00:00</design_start><budget_forecast>152356000.00</budget_forecast><latest_budget_changes>-2000.00</latest_budget_changes><total_budget_changes>75370000.00</total_budget_changes><forecast_completion>2025-03-24T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1248</total_schedule_changes></row><row _id="row-sie9_z5hq~iuxq" _uuid="00000000-0000-0000-EF5F-71ADBBE63CCC" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-sie9_z5hq~iuxq"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1202</pid><project_name>150th Street Spine: Phase II - DOT Van Wyck Expressway - Trunk Combined Sewer</project_name><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction</current_phase><design_start>2020-03-02T00:00:00</design_start><budget_forecast>138692000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-676000.00</total_budget_changes><forecast_completion>2025-04-14T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>-194</total_schedule_changes></row><row _id="row-r4jv~veep~kg45" _uuid="00000000-0000-0000-A111-3EFA1985A0E2" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-r4jv~veep~kg45"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>665</pid><project_name>TLC - NEW OFFICE FACILITY - 24-55 BQE WEST</project_name><description>Replace existing administration wing; provide new parking and new inspection lane within the facility.</description><category>Other Government Facilities</category><borough>Queens</borough><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><current_phase>Construction</current_phase><design_start>2015-09-15T00:00:00</design_start><budget_forecast>152356000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>75370000.00</total_budget_changes><forecast_completion>2025-03-24T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1248</total_schedule_changes></row><row _id="row-sy7u_svk2.2zct" _uuid="00000000-0000-0000-DD70-0760D77C9D24" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-sy7u_svk2.2zct"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>665</pid><project_name>TLC - NEW OFFICE FACILITY - 24-55 BQE WEST</project_name><description>Replace existing administration wing; provide new parking and new inspection lane within the facility.</description><category>Other Government Facilities</category><borough>Queens</borough><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><current_phase>Construction</current_phase><design_start>2015-09-15T00:00:00</design_start><budget_forecast>152476000.00</budget_forecast><latest_budget_changes>120000.00</latest_budget_changes><total_budget_changes>75370000.00</total_budget_changes><forecast_completion>2026-05-01T00:00:00</forecast_completion><latest_schedule_changes>403</latest_schedule_changes><total_schedule_changes>1248</total_schedule_changes></row><row _id="row-hgd8~gz9h~9zkm" _uuid="00000000-0000-0000-8184-208140DC9F82" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-hgd8~gz9h~9zkm"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>665</pid><project_name>TLC - NEW OFFICE FACILITY - 24-55 BQE WEST</project_name><description>Replace existing administration wing; provide new parking and new inspection lane within the facility.</description><category>Other Government Facilities</category><borough>Queens</borough><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><current_phase>Construction</current_phase><design_start>2015-09-15T00:00:00</design_start><budget_forecast>152546000.00</budget_forecast><latest_budget_changes>70000.00</latest_budget_changes><total_budget_changes>75370000.00</total_budget_changes><forecast_completion>2026-05-01T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1248</total_schedule_changes></row><row _id="row-imtn-b78q_pw8u" _uuid="00000000-0000-0000-7D94-95DC451B3D3B" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-imtn-b78q_pw8u"><date_reported_as_of>2019-05-01T00:00:00</date_reported_as_of><pid>667</pid><project_name>The Reconstruction of The Lower Catskill Aqueduct</project_name><description>Reconstruction of Aqueduct structures; Replacement of mechanical equipment; cleaning the aqueduct interior &amp; rehabilitation &amp; repair of cracks &amp; leaks. All relevent assessments, investigations, piloting, plans and reports.</description><category>Water Supply</category><borough>Citywide</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2019-04-15T00:00:00</design_start><budget_forecast>331260845.00</budget_forecast><latest_budget_changes>16000000.00</latest_budget_changes><total_budget_changes>-65760729.00</total_budget_changes><forecast_completion>2025-06-01T00:00:00</forecast_completion><latest_schedule_changes>274</latest_schedule_changes><total_schedule_changes>1421</total_schedule_changes></row><row _id="row-hwhb~zb9e~uzgi" _uuid="00000000-0000-0000-EF53-E19973AD8863" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-hwhb~zb9e~uzgi"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>667</pid><project_name>The Reconstruction of The Lower Catskill Aqueduct</project_name><description>Reconstruction of Aqueduct structures; Replacement of mechanical equipment; cleaning the aqueduct interior &amp; rehabilitation &amp; repair of cracks &amp; leaks. All relevent assessments, investigations, piloting, plans and reports.</description><category>Water Supply</category><borough>Citywide</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2019-04-15T00:00:00</design_start><budget_forecast>315260845.00</budget_forecast><latest_budget_changes>-16000000.00</latest_budget_changes><total_budget_changes>-65760729.00</total_budget_changes><forecast_completion>2025-06-01T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1421</total_schedule_changes></row><row _id="row-k5v5~brtm_h33s" _uuid="00000000-0000-0000-D6C3-7D85EBC70CCD" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-k5v5~brtm_h33s"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>667</pid><project_name>The Reconstruction of The Lower Catskill Aqueduct</project_name><description>Reconstruction of Aqueduct structures; Replacement of mechanical equipment; cleaning the aqueduct interior &amp; rehabilitation &amp; repair of cracks &amp; leaks. All relevent assessments, investigations, piloting, plans and reports.</description><category>Water Supply</category><borough>Citywide</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2019-04-15T00:00:00</design_start><budget_forecast>292760845.00</budget_forecast><latest_budget_changes>-22500000.00</latest_budget_changes><total_budget_changes>-65760729.00</total_budget_changes><forecast_completion>2025-06-01T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1421</total_schedule_changes></row><row _id="row-5nqc~rrbf_gww7" _uuid="00000000-0000-0000-5DD1-22998E347314" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-5nqc~rrbf_gww7"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>667</pid><project_name>The Reconstruction of The Lower Catskill Aqueduct</project_name><description>Reconstruction of Aqueduct structures; Replacement of mechanical equipment; cleaning the aqueduct interior &amp; rehabilitation &amp; repair of cracks &amp; leaks. All relevent assessments, investigations, piloting, plans and reports.</description><category>Water Supply</category><borough>Citywide</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2019-04-15T00:00:00</design_start><budget_forecast>292760845.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-65760729.00</total_budget_changes><forecast_completion>2025-06-01T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1421</total_schedule_changes></row><row _id="row-uiz8_ef3w-mpzw" _uuid="00000000-0000-0000-C90D-E2C60E6E930D" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-uiz8_ef3w-mpzw"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>667</pid><project_name>The Reconstruction of The Lower Catskill Aqueduct</project_name><description>Reconstruction of Aqueduct structures; Replacement of mechanical equipment; cleaning the aqueduct interior &amp; rehabilitation &amp; repair of cracks &amp; leaks. All relevent assessments, investigations, piloting, plans and reports.</description><category>Water Supply</category><borough>Citywide</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2019-04-15T00:00:00</design_start><budget_forecast>170260845.00</budget_forecast><latest_budget_changes>-122500000.00</latest_budget_changes><total_budget_changes>-65760729.00</total_budget_changes><forecast_completion>2027-03-29T00:00:00</forecast_completion><latest_schedule_changes>666</latest_schedule_changes><total_schedule_changes>1421</total_schedule_changes></row><row _id="row-dd2t.agcv-3qpu" _uuid="00000000-0000-0000-882F-C7B0178FF310" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-dd2t.agcv-3qpu"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>667</pid><project_name>The Reconstruction of The Lower Catskill Aqueduct</project_name><description>Reconstruction of Aqueduct structures; Replacement of mechanical equipment; cleaning the aqueduct interior &amp; rehabilitation &amp; repair of cracks &amp; leaks. All relevent assessments, investigations, piloting, plans and reports.</description><category>Water Supply</category><borough>Citywide</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2019-04-15T00:00:00</design_start><budget_forecast>165260845.00</budget_forecast><latest_budget_changes>-5000000.00</latest_budget_changes><total_budget_changes>-65760729.00</total_budget_changes><forecast_completion>2027-03-29T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1421</total_schedule_changes></row><row _id="row-ccaz~5tg9-bdnj" _uuid="00000000-0000-0000-5D4A-7427AD20CBA9" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ccaz~5tg9-bdnj"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>667</pid><project_name>The Reconstruction of The Lower Catskill Aqueduct</project_name><description>Reconstruction of Aqueduct structures; Replacement of mechanical equipment; cleaning the aqueduct interior &amp; rehabilitation &amp; repair of cracks &amp; leaks. All relevent assessments, investigations, piloting, plans and reports.</description><category>Water Supply</category><borough>Citywide</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2019-04-15T00:00:00</design_start><budget_forecast>165260845.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-65760729.00</total_budget_changes><forecast_completion>2027-03-29T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1421</total_schedule_changes></row><row _id="row-rue6~q353_c3p5" _uuid="00000000-0000-0000-010C-BA033F1332B8" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-rue6~q353_c3p5"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>667</pid><project_name>The Reconstruction of The Lower Catskill Aqueduct</project_name><description>Reconstruction of Aqueduct structures; Replacement of mechanical equipment; cleaning the aqueduct interior &amp; rehabilitation &amp; repair of cracks &amp; leaks. All relevent assessments, investigations, piloting, plans and reports.</description><category>Water Supply</category><borough>Citywide</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2019-04-15T00:00:00</design_start><budget_forecast>244460845.00</budget_forecast><latest_budget_changes>79200000.00</latest_budget_changes><total_budget_changes>-65760729.00</total_budget_changes><forecast_completion>2027-11-27T00:00:00</forecast_completion><latest_schedule_changes>243</latest_schedule_changes><total_schedule_changes>1421</total_schedule_changes></row><row _id="row-b2hp_db6e-gw6k" _uuid="00000000-0000-0000-D34A-7A2791F129B6" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-b2hp_db6e-gw6k"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>667</pid><project_name>The Reconstruction of The Lower Catskill Aqueduct</project_name><description>Reconstruction of Aqueduct structures; Replacement of mechanical equipment; cleaning the aqueduct interior &amp; rehabilitation &amp; repair of cracks &amp; leaks. All relevent assessments, investigations, piloting, plans and reports.</description><category>Water Supply</category><borough>Citywide</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2019-04-15T00:00:00</design_start><budget_forecast>249460845.00</budget_forecast><latest_budget_changes>5000000.00</latest_budget_changes><total_budget_changes>-65760729.00</total_budget_changes><forecast_completion>2027-11-27T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1421</total_schedule_changes></row><row _id="row-bfta~z4fc~ceg7" _uuid="00000000-0000-0000-6B0F-BFC86A4E7E76" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-bfta~z4fc~ceg7"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>667</pid><project_name>The Reconstruction of The Lower Catskill Aqueduct</project_name><description>Reconstruction of Aqueduct structures; Replacement of mechanical equipment; cleaning the aqueduct interior &amp; rehabilitation &amp; repair of cracks &amp; leaks. All relevent assessments, investigations, piloting, plans and reports.</description><category>Water Supply</category><borough>Citywide</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2019-04-15T00:00:00</design_start><budget_forecast>249500116.00</budget_forecast><latest_budget_changes>39271.00</latest_budget_changes><total_budget_changes>-65760729.00</total_budget_changes><forecast_completion>2027-11-27T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1421</total_schedule_changes></row><row _id="row-5uuj~p9hj.guqu" _uuid="00000000-0000-0000-1782-D6462A0D5869" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-5uuj~p9hj.guqu"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>667</pid><project_name>The Reconstruction of The Lower Catskill Aqueduct</project_name><description>Reconstruction of Aqueduct structures; Replacement of mechanical equipment; cleaning the aqueduct interior &amp; rehabilitation &amp; repair of cracks &amp; leaks. All relevent assessments, investigations, piloting, plans and reports.</description><category>Water Supply</category><borough>Citywide</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2019-04-15T00:00:00</design_start><budget_forecast>249500116.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-65760729.00</total_budget_changes><forecast_completion>2028-07-22T00:00:00</forecast_completion><latest_schedule_changes>238</latest_schedule_changes><total_schedule_changes>1421</total_schedule_changes></row><row _id="row-qsh5_59vj~difx" _uuid="00000000-0000-0000-AB8A-9929B8728F1C" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-qsh5_59vj~difx"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>669</pid><project_name>Hillview Reservoir Chemical Addition Facilities</project_name><description>This project provides new chemical addition and support facilities at Hillview Reservoir.</description><category>Water Supply</category><borough>City of Yonkers</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2020-03-17T00:00:00</design_start><budget_forecast>412815000.00</budget_forecast><latest_budget_changes>15290000.00</latest_budget_changes><total_budget_changes>159902202.01</total_budget_changes><forecast_completion>2029-01-23T00:00:00</forecast_completion><latest_schedule_changes>64</latest_schedule_changes><total_schedule_changes>82</total_schedule_changes></row><row _id="row-pqwn-mmxu-bnfx" _uuid="00000000-0000-0000-5254-CF8B04AD4FDB" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-pqwn-mmxu-bnfx"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>669</pid><project_name>Hillview Reservoir Chemical Addition Facilities</project_name><description>This project provides new chemical addition and support facilities at Hillview Reservoir.</description><category>Water Supply</category><borough>City of Yonkers</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2020-03-17T00:00:00</design_start><budget_forecast>398408000.00</budget_forecast><latest_budget_changes>-14407000.00</latest_budget_changes><total_budget_changes>159902202.01</total_budget_changes><forecast_completion>2029-03-28T00:00:00</forecast_completion><latest_schedule_changes>64</latest_schedule_changes><total_schedule_changes>82</total_schedule_changes></row><row _id="row-xmyh-53j6~mbsx" _uuid="00000000-0000-0000-89B2-3574A0852832" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-xmyh-53j6~mbsx"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>669</pid><project_name>Hillview Reservoir Chemical Addition Facilities</project_name><description>This project provides new chemical addition and support facilities at Hillview Reservoir.</description><category>Water Supply</category><borough>City of Yonkers</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2020-03-17T00:00:00</design_start><budget_forecast>411608000.00</budget_forecast><latest_budget_changes>13200000.00</latest_budget_changes><total_budget_changes>159902202.01</total_budget_changes><forecast_completion>2029-03-28T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>82</total_schedule_changes></row><row _id="row-dj8q-w9e2.5pz6" _uuid="00000000-0000-0000-5291-95F7914A68E8" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-dj8q-w9e2.5pz6"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>669</pid><project_name>Hillview Reservoir Chemical Addition Facilities</project_name><description>This project provides new chemical addition and support facilities at Hillview Reservoir.</description><category>Water Supply</category><borough>City of Yonkers</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2020-03-17T00:00:00</design_start><budget_forecast>411608000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>159902202.01</total_budget_changes><forecast_completion>2029-03-28T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>82</total_schedule_changes></row><row _id="row-kqr2_bkbk-3xbw" _uuid="00000000-0000-0000-65A8-329E19C4F8A2" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-kqr2_bkbk-3xbw"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>669</pid><project_name>Hillview Reservoir Chemical Addition Facilities</project_name><description>This project provides new chemical addition and support facilities at Hillview Reservoir.</description><category>Water Supply</category><borough>City of Yonkers</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2020-03-17T00:00:00</design_start><budget_forecast>411608000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>159902202.01</total_budget_changes><forecast_completion>2029-03-28T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>82</total_schedule_changes></row><row _id="row-emea_pbvt_bmvh" _uuid="00000000-0000-0000-B2ED-F272F15B7D2C" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-emea_pbvt_bmvh"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>669</pid><project_name>Hillview Reservoir Chemical Addition Facilities</project_name><description>This project provides new chemical addition and support facilities at Hillview Reservoir.</description><category>Water Supply</category><borough>City of Yonkers</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2020-03-17T00:00:00</design_start><budget_forecast>483705300.00</budget_forecast><latest_budget_changes>72097300.00</latest_budget_changes><total_budget_changes>159902202.01</total_budget_changes><forecast_completion>2029-03-28T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>82</total_schedule_changes></row><row _id="row-sxjk_8tsj.38ru" _uuid="00000000-0000-0000-D185-55C6DBD65082" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-sxjk_8tsj.38ru"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>669</pid><project_name>Hillview Reservoir Chemical Addition Facilities</project_name><description>This project provides new chemical addition and support facilities at Hillview Reservoir.</description><category>Water Supply</category><borough>City of Yonkers</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2020-03-17T00:00:00</design_start><budget_forecast>540271602.01</budget_forecast><latest_budget_changes>56566302.01</latest_budget_changes><total_budget_changes>159902202.01</total_budget_changes><forecast_completion>2029-03-28T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>82</total_schedule_changes></row><row _id="row-xamb.2rpi_hck9" _uuid="00000000-0000-0000-5434-6DAC10508304" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-xamb.2rpi_hck9"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>669</pid><project_name>Hillview Reservoir Chemical Addition Facilities</project_name><description>This project provides new chemical addition and support facilities at Hillview Reservoir.</description><category>Water Supply</category><borough>City of Yonkers</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction Procurement</current_phase><design_start>2020-03-17T00:00:00</design_start><budget_forecast>557427202.01</budget_forecast><latest_budget_changes>17155600.00</latest_budget_changes><total_budget_changes>159902202.01</total_budget_changes><forecast_completion>2029-02-10T00:00:00</forecast_completion><latest_schedule_changes>-46</latest_schedule_changes><total_schedule_changes>82</total_schedule_changes></row><row _id="row-vkhe~n678-89tv" _uuid="00000000-0000-0000-242F-72F3083382B5" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-vkhe~n678-89tv"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>670</pid><project_name>Hillview Reservoir Flow Control Improvements</project_name><description>This project provides improvements to the existing structures and mechanical flow control systems at Hillview Reservoir.</description><category>Water Supply</category><borough>City of Yonkers</borough><managing_agency>DEP</managing_agency><client_agency>BWS</client_agency><current_phase>Design</current_phase><design_start>2020-04-13T00:00:00</design_start><budget_forecast>351840000.00</budget_forecast><latest_budget_changes>25075000.00</latest_budget_changes><total_budget_changes>-11397050.18</total_budget_changes><forecast_completion>2032-06-05T00:00:00</forecast_completion><latest_schedule_changes>43</latest_schedule_changes><total_schedule_changes>254</total_schedule_changes></row><row _id="row-5ikp.z3ag~aphg" _uuid="00000000-0000-0000-5D5A-642ABD970160" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-5ikp.z3ag~aphg"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>670</pid><project_name>Hillview Reservoir Flow Control Improvements</project_name><description>This project provides improvements to the existing structures and mechanical flow control systems at Hillview Reservoir.</description><category>Water Supply</category><borough>City of Yonkers</borough><managing_agency>DEP</managing_agency><client_agency>BWS</client_agency><current_phase>Design</current_phase><design_start>2020-04-13T00:00:00</design_start><budget_forecast>274908000.00</budget_forecast><latest_budget_changes>-76932000.00</latest_budget_changes><total_budget_changes>-11397050.18</total_budget_changes><forecast_completion>2032-06-28T00:00:00</forecast_completion><latest_schedule_changes>23</latest_schedule_changes><total_schedule_changes>254</total_schedule_changes></row><row _id="row-m8fc_i8xv_jzta" _uuid="00000000-0000-0000-76DE-2EB8CE9C3A05" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-m8fc_i8xv_jzta"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>670</pid><project_name>Hillview Reservoir Flow Control Improvements</project_name><description>This project provides improvements to the existing structures and mechanical flow control systems at Hillview Reservoir.</description><category>Water Supply</category><borough>City of Yonkers</borough><managing_agency>DEP</managing_agency><client_agency>BWS</client_agency><current_phase>Design</current_phase><design_start>2020-04-13T00:00:00</design_start><budget_forecast>275124803.36</budget_forecast><latest_budget_changes>216803.36</latest_budget_changes><total_budget_changes>-11397050.18</total_budget_changes><forecast_completion>2032-01-03T00:00:00</forecast_completion><latest_schedule_changes>-177</latest_schedule_changes><total_schedule_changes>254</total_schedule_changes></row><row _id="row-2dq2~qtp7.2jnk" _uuid="00000000-0000-0000-0E06-A06900FD03E8" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-2dq2~qtp7.2jnk"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>670</pid><project_name>Hillview Reservoir Flow Control Improvements</project_name><description>This project provides improvements to the existing structures and mechanical flow control systems at Hillview Reservoir.</description><category>Water Supply</category><borough>City of Yonkers</borough><managing_agency>DEP</managing_agency><client_agency>BWS</client_agency><current_phase>Design</current_phase><design_start>2020-04-13T00:00:00</design_start><budget_forecast>318720000.00</budget_forecast><latest_budget_changes>43595196.64</latest_budget_changes><total_budget_changes>-11397050.18</total_budget_changes><forecast_completion>2032-01-03T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>254</total_schedule_changes></row><row _id="row-nusg~pg2c~x9vf" _uuid="00000000-0000-0000-0B35-698990AE232F" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-nusg~pg2c~x9vf"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>670</pid><project_name>Hillview Reservoir Flow Control Improvements</project_name><description>This project provides improvements to the existing structures and mechanical flow control systems at Hillview Reservoir.</description><category>Water Supply</category><borough>City of Yonkers</borough><managing_agency>DEP</managing_agency><client_agency>BWS</client_agency><current_phase>Design</current_phase><design_start>2020-04-13T00:00:00</design_start><budget_forecast>318671149.82</budget_forecast><latest_budget_changes>-48850.18</latest_budget_changes><total_budget_changes>-11397050.18</total_budget_changes><forecast_completion>2032-06-05T00:00:00</forecast_completion><latest_schedule_changes>154</latest_schedule_changes><total_schedule_changes>254</total_schedule_changes></row><row _id="row-hqup_s8ms-mai5" _uuid="00000000-0000-0000-1123-2ACEF60557AF" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-hqup_s8ms-mai5"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>670</pid><project_name>Hillview Reservoir Flow Control Improvements</project_name><description>This project provides improvements to the existing structures and mechanical flow control systems at Hillview Reservoir.</description><category>Water Supply</category><borough>City of Yonkers</borough><managing_agency>DEP</managing_agency><client_agency>BWS</client_agency><current_phase>Design</current_phase><design_start>2020-04-13T00:00:00</design_start><budget_forecast>318659349.82</budget_forecast><latest_budget_changes>-11800.00</latest_budget_changes><total_budget_changes>-11397050.18</total_budget_changes><forecast_completion>2033-01-02T00:00:00</forecast_completion><latest_schedule_changes>211</latest_schedule_changes><total_schedule_changes>254</total_schedule_changes></row><row _id="row-4gag~82nm_e7ts" _uuid="00000000-0000-0000-A9BE-1F0ECC78126E" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-4gag~82nm_e7ts"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>670</pid><project_name>Hillview Reservoir Flow Control Improvements</project_name><description>This project provides improvements to the existing structures and mechanical flow control systems at Hillview Reservoir.</description><category>Water Supply</category><borough>City of Yonkers</borough><managing_agency>DEP</managing_agency><client_agency>BWS</client_agency><current_phase>Design</current_phase><design_start>2020-04-13T00:00:00</design_start><budget_forecast>318620649.82</budget_forecast><latest_budget_changes>-38700.00</latest_budget_changes><total_budget_changes>-11397050.18</total_budget_changes><forecast_completion>2033-01-02T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>254</total_schedule_changes></row><row _id="row-7c8r_xudy~8j8y" _uuid="00000000-0000-0000-CECE-0B70F933B3C9" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-7c8r_xudy~8j8y"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>670</pid><project_name>Hillview Reservoir Flow Control Improvements</project_name><description>This project provides improvements to the existing structures and mechanical flow control systems at Hillview Reservoir.</description><category>Water Supply</category><borough>City of Yonkers</borough><managing_agency>DEP</managing_agency><client_agency>BWS</client_agency><current_phase>Design</current_phase><design_start>2020-04-13T00:00:00</design_start><budget_forecast>315367949.82</budget_forecast><latest_budget_changes>-3252700.00</latest_budget_changes><total_budget_changes>-11397050.18</total_budget_changes><forecast_completion>2033-01-02T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>254</total_schedule_changes></row><row _id="row-5icf~g6pd_25x3" _uuid="00000000-0000-0000-0D8B-418192421CD9" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-5icf~g6pd_25x3"><date_reported_as_of>2018-08-01T00:00:00</date_reported_as_of><pid>671</pid><project_name>Storm Mitigation Loan Program at Bowery Bay</project_name><description>SMLP portion for Bowery Bay WWTP as part of the New York City Wastewater Resiliency Program.</description><category>Wastewater Treatment</category><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2018-03-29T00:00:00</design_start><budget_forecast>37570670.04</budget_forecast><latest_budget_changes>-20364788.78</latest_budget_changes><total_budget_changes>-19623216.41</total_budget_changes><forecast_completion>2021-03-08T00:00:00</forecast_completion><latest_schedule_changes>109</latest_schedule_changes><total_schedule_changes>1026</total_schedule_changes></row><row _id="row-e8rw~tr96~widf" _uuid="00000000-0000-0000-C92D-1C667786AF66" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-e8rw~tr96~widf"><date_reported_as_of>2019-01-01T00:00:00</date_reported_as_of><pid>671</pid><project_name>Storm Mitigation Loan Program at Bowery Bay</project_name><description>SMLP portion for Bowery Bay WRRF as part of the New York City Wastewater Resiliency Program.</description><category>Wastewater Treatment</category><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2018-04-30T00:00:00</design_start><budget_forecast>35686871.60</budget_forecast><latest_budget_changes>-1883798.44</latest_budget_changes><total_budget_changes>-19623216.41</total_budget_changes><forecast_completion>2023-04-08T00:00:00</forecast_completion><latest_schedule_changes>761</latest_schedule_changes><total_schedule_changes>1026</total_schedule_changes></row><row _id="row-b8xz~n6zg.4y2d" _uuid="00000000-0000-0000-AF9E-141A9344CF80" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-b8xz~n6zg.4y2d"><date_reported_as_of>2019-05-01T00:00:00</date_reported_as_of><pid>671</pid><project_name>Storm Mitigation Loan Program at Bowery Bay</project_name><description>SMLP portion for Bowery Bay WRRF as part of the New York City Wastewater Resiliency Program.</description><category>Wastewater Treatment</category><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2018-04-30T00:00:00</design_start><budget_forecast>29413673.79</budget_forecast><latest_budget_changes>-6273197.81</latest_budget_changes><total_budget_changes>-19623216.41</total_budget_changes><forecast_completion>2021-10-12T00:00:00</forecast_completion><latest_schedule_changes>-543</latest_schedule_changes><total_schedule_changes>1026</total_schedule_changes></row><row _id="row-ibyj~nftd~6a37" _uuid="00000000-0000-0000-6391-182FFDA4E448" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ibyj~nftd~6a37"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>671</pid><project_name>Storm Mitigation Loan Program at Bowery Bay</project_name><description>SMLP portion for Bowery Bay WRRF as part of the New York City Wastewater Resiliency Program.</description><category>Wastewater Treatment</category><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2018-04-30T00:00:00</design_start><budget_forecast>31053956.85</budget_forecast><latest_budget_changes>1640283.06</latest_budget_changes><total_budget_changes>-19623216.41</total_budget_changes><forecast_completion>2021-11-16T00:00:00</forecast_completion><latest_schedule_changes>35</latest_schedule_changes><total_schedule_changes>1026</total_schedule_changes></row><row _id="row-eth9~p9rr-gq73" _uuid="00000000-0000-0000-2FAB-18151B176A2B" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-eth9~p9rr-gq73"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>671</pid><project_name>Storm Mitigation Loan Program at Bowery Bay</project_name><description>SMLP portion for Bowery Bay WRRF as part of the New York City Wastewater Resiliency Program.</description><category>Wastewater Treatment</category><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2018-04-30T00:00:00</design_start><budget_forecast>33467836.53</budget_forecast><latest_budget_changes>2413879.68</latest_budget_changes><total_budget_changes>-19623216.41</total_budget_changes><forecast_completion>2022-03-04T00:00:00</forecast_completion><latest_schedule_changes>108</latest_schedule_changes><total_schedule_changes>1026</total_schedule_changes></row><row _id="row-r2en~ya3d.kic6" _uuid="00000000-0000-0000-2A72-11AB6553FFBC" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-r2en~ya3d.kic6"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>671</pid><project_name>Storm Mitigation Loan Program at Bowery Bay</project_name><description>SMLP portion for Bowery Bay WRRF as part of the New York City Wastewater Resiliency Program.</description><category>Wastewater Treatment</category><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction Procurement</current_phase><design_start>2018-04-30T00:00:00</design_start><budget_forecast>33467836.53</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-19623216.41</total_budget_changes><forecast_completion>2022-08-26T00:00:00</forecast_completion><latest_schedule_changes>175</latest_schedule_changes><total_schedule_changes>1026</total_schedule_changes></row><row _id="row-q8gk~s6ch_5ks3" _uuid="00000000-0000-0000-A7C0-A2A0BB416AB2" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-q8gk~s6ch_5ks3"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>671</pid><project_name>Storm Mitigation Loan Program at Bowery Bay</project_name><description>SMLP portion for Bowery Bay WRRF as part of the New York City Wastewater Resiliency Program.</description><category>Wastewater Treatment</category><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction Procurement</current_phase><design_start>2018-04-30T00:00:00</design_start><budget_forecast>33362182.71</budget_forecast><latest_budget_changes>-105653.82</latest_budget_changes><total_budget_changes>-19623216.41</total_budget_changes><forecast_completion>2023-01-13T00:00:00</forecast_completion><latest_schedule_changes>140</latest_schedule_changes><total_schedule_changes>1026</total_schedule_changes></row><row _id="row-655x.z22j.dpf4" _uuid="00000000-0000-0000-5311-A90ACA855700" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-655x.z22j.dpf4"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>671</pid><project_name>Storm Mitigation Loan Program at Bowery Bay</project_name><description>SMLP portion for Bowery Bay WRRF as part of the New York City Wastewater Resiliency Program.</description><category>Wastewater Treatment</category><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2018-04-30T00:00:00</design_start><budget_forecast>35179043.91</budget_forecast><latest_budget_changes>1816861.20</latest_budget_changes><total_budget_changes>-19623216.41</total_budget_changes><forecast_completion>2022-09-01T00:00:00</forecast_completion><latest_schedule_changes>-134</latest_schedule_changes><total_schedule_changes>1026</total_schedule_changes></row><row _id="row-gnhe.n2is_afud" _uuid="00000000-0000-0000-DD71-2B7A653A1D54" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-gnhe.n2is_afud"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>671</pid><project_name>Storm Mitigation Loan Program at Bowery Bay</project_name><description>SMLP portion for Bowery Bay WRRF as part of the New York City Wastewater Resiliency Program.</description><category>Wastewater Treatment</category><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2018-04-30T00:00:00</design_start><budget_forecast>35600950.13</budget_forecast><latest_budget_changes>421906.22</latest_budget_changes><total_budget_changes>-19623216.41</total_budget_changes><forecast_completion>2022-09-01T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1026</total_schedule_changes></row><row _id="row-aytm~h646-2cf9" _uuid="00000000-0000-0000-1DA4-D401A1458F4B" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-aytm~h646-2cf9"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>671</pid><project_name>Storm Mitigation Loan Program at Bowery Bay</project_name><description>SMLP portion for Bowery Bay WWTP as part of the New York City Wastewater Resiliency Program.</description><category>Wastewater Treatment</category><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2018-04-30T00:00:00</design_start><budget_forecast>37890196.95</budget_forecast><latest_budget_changes>2289246.82</latest_budget_changes><total_budget_changes>-19623216.41</total_budget_changes><forecast_completion>2022-09-01T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1026</total_schedule_changes></row><row _id="row-w5fk_vxzb~8wy3" _uuid="00000000-0000-0000-A34C-94B3C08F9159" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-w5fk_vxzb~8wy3"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>671</pid><project_name>Storm Mitigation Loan Program at Bowery Bay</project_name><description>SMLP portion for Bowery Bay WWTP as part of the New York City Wastewater Resiliency Program.</description><category>Wastewater Treatment</category><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2018-04-30T00:00:00</design_start><budget_forecast>37775009.87</budget_forecast><latest_budget_changes>-115187.08</latest_budget_changes><total_budget_changes>-19623216.41</total_budget_changes><forecast_completion>2022-09-01T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1026</total_schedule_changes></row><row _id="row-yyuv-gnc7~twym" _uuid="00000000-0000-0000-D3C7-0B7D3CC0D9CC" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-yyuv-gnc7~twym"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>671</pid><project_name>Storm Mitigation Loan Program at Bowery Bay</project_name><description>SMLP portion for Bowery Bay WWTP as part of the New York City Wastewater Resiliency Program.</description><category>Wastewater Treatment</category><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2018-04-30T00:00:00</design_start><budget_forecast>38312242.41</budget_forecast><latest_budget_changes>537232.54</latest_budget_changes><total_budget_changes>-19623216.41</total_budget_changes><forecast_completion>2023-09-11T00:00:00</forecast_completion><latest_schedule_changes>375</latest_schedule_changes><total_schedule_changes>1026</total_schedule_changes></row><row _id="row-bcpw-phqa-d6g2" _uuid="00000000-0000-0000-AC6B-FB7E012A064B" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-bcpw-phqa-d6g2"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>671</pid><project_name>Storm Mitigation Loan Program at Bowery Bay</project_name><description>SMLP portion for Bowery Bay WWTP as part of the New York City Wastewater Resiliency Program.</description><category>Wastewater Treatment</category><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2018-04-30T00:00:00</design_start><budget_forecast>38312242.41</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-19623216.41</total_budget_changes><forecast_completion>2023-09-11T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1026</total_schedule_changes></row><row _id="row-izjz-4tri.k4za" _uuid="00000000-0000-0000-8BD1-B4F30859A58D" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-izjz-4tri.k4za"><date_reported_as_of>2018-08-01T00:00:00</date_reported_as_of><pid>672</pid><project_name>Storm Mitigation Loan Program at Hunts Point</project_name><description>SMLP portion for Hunts Point WWTP as part of the New York City Wastewater Resiliency Program.</description><category>Wastewater Treatment</category><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2018-04-16T00:00:00</design_start><budget_forecast>36635629.33</budget_forecast><latest_budget_changes>-5037051.90</latest_budget_changes><total_budget_changes>20080597.79</total_budget_changes><forecast_completion>2020-09-09T00:00:00</forecast_completion><latest_schedule_changes>-73</latest_schedule_changes><total_schedule_changes>1091</total_schedule_changes></row><row _id="row-c98s.jmay_xfd8" _uuid="00000000-0000-0000-30E6-FC217FB9FA2E" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-c98s.jmay_xfd8"><date_reported_as_of>2019-01-01T00:00:00</date_reported_as_of><pid>672</pid><project_name>Storm Mitigation Loan Program at Hunts Point</project_name><description>SMLP portion for Hunts Point WRRF as part of the New York City Wastewater Resiliency Program.</description><category>Wastewater Treatment</category><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2018-04-16T00:00:00</design_start><budget_forecast>38284773.39</budget_forecast><latest_budget_changes>1649144.06</latest_budget_changes><total_budget_changes>20080597.79</total_budget_changes><forecast_completion>2021-06-08T00:00:00</forecast_completion><latest_schedule_changes>272</latest_schedule_changes><total_schedule_changes>1091</total_schedule_changes></row><row _id="row-7ad3.pwmz_cer5" _uuid="00000000-0000-0000-D389-09459D702A88" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-7ad3.pwmz_cer5"><date_reported_as_of>2019-05-01T00:00:00</date_reported_as_of><pid>672</pid><project_name>Storm Mitigation Loan Program at Hunts Point</project_name><description>SMLP portion for Hunts Point WRRF as part of the New York City Wastewater Resiliency Program.</description><category>Wastewater Treatment</category><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2018-04-16T00:00:00</design_start><budget_forecast>40053442.93</budget_forecast><latest_budget_changes>1768669.54</latest_budget_changes><total_budget_changes>20080597.79</total_budget_changes><forecast_completion>2021-05-26T00:00:00</forecast_completion><latest_schedule_changes>-13</latest_schedule_changes><total_schedule_changes>1091</total_schedule_changes></row><row _id="row-imk2.hi9j-ruwn" _uuid="00000000-0000-0000-C16C-D0D811DCD69E" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-imk2.hi9j-ruwn"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>672</pid><project_name>Storm Mitigation Loan Program at Hunts Point</project_name><description>SMLP portion for Hunts Point WRRF as part of the New York City Wastewater Resiliency Program.</description><category>Wastewater Treatment</category><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2018-04-16T00:00:00</design_start><budget_forecast>40053442.93</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>20080597.79</total_budget_changes><forecast_completion>2021-08-16T00:00:00</forecast_completion><latest_schedule_changes>82</latest_schedule_changes><total_schedule_changes>1091</total_schedule_changes></row><row _id="row-d5pf~gmmv-i4ze" _uuid="00000000-0000-0000-9D26-F6C88F03E58D" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-d5pf~gmmv-i4ze"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>672</pid><project_name>Storm Mitigation Loan Program at Hunts Point</project_name><description>SMLP portion for Hunts Point WRRF as part of the New York City Wastewater Resiliency Program.</description><category>Wastewater Treatment</category><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2018-04-16T00:00:00</design_start><budget_forecast>39936042.68</budget_forecast><latest_budget_changes>-117400.25</latest_budget_changes><total_budget_changes>20080597.79</total_budget_changes><forecast_completion>2022-01-05T00:00:00</forecast_completion><latest_schedule_changes>142</latest_schedule_changes><total_schedule_changes>1091</total_schedule_changes></row><row _id="row-ybq7_xwaf~gn9b" _uuid="00000000-0000-0000-32B3-00618ED5C38A" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ybq7_xwaf~gn9b"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>672</pid><project_name>Storm Mitigation Loan Program at Hunts Point</project_name><description>SMLP portion for Hunts Point WRRF as part of the New York City Wastewater Resiliency Program.</description><category>Wastewater Treatment</category><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2018-04-16T00:00:00</design_start><budget_forecast>35957095.79</budget_forecast><latest_budget_changes>-3978946.89</latest_budget_changes><total_budget_changes>20080597.79</total_budget_changes><forecast_completion>2022-04-25T00:00:00</forecast_completion><latest_schedule_changes>110</latest_schedule_changes><total_schedule_changes>1091</total_schedule_changes></row><row _id="row-iaic.5f92.mr92" _uuid="00000000-0000-0000-694B-B41020B293F0" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-iaic.5f92.mr92"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>672</pid><project_name>Storm Mitigation Loan Program at Hunts Point</project_name><description>SMLP portion for Hunts Point WRRF as part of the New York City Wastewater Resiliency Program.</description><category>Wastewater Treatment</category><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction Procurement</current_phase><design_start>2018-04-16T00:00:00</design_start><budget_forecast>35957095.79</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>20080597.79</total_budget_changes><forecast_completion>2022-11-15T00:00:00</forecast_completion><latest_schedule_changes>204</latest_schedule_changes><total_schedule_changes>1091</total_schedule_changes></row><row _id="row-q2dn.ivqn~n98b" _uuid="00000000-0000-0000-C35F-B9E2A74F91D9" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-q2dn.ivqn~n98b"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>672</pid><project_name>Storm Mitigation Loan Program at Hunts Point</project_name><description>SMLP portion for Hunts Point WRRF as part of the New York City Wastewater Resiliency Program.</description><category>Wastewater Treatment</category><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2018-04-16T00:00:00</design_start><budget_forecast>52506558.19</budget_forecast><latest_budget_changes>16549462.40</latest_budget_changes><total_budget_changes>20080597.79</total_budget_changes><forecast_completion>2023-02-17T00:00:00</forecast_completion><latest_schedule_changes>94</latest_schedule_changes><total_schedule_changes>1091</total_schedule_changes></row><row _id="row-rk5v-r8b7_r36q" _uuid="00000000-0000-0000-40A8-AC1A2AA47D60" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-rk5v-r8b7_r36q"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>672</pid><project_name>Storm Mitigation Loan Program at Hunts Point</project_name><description>SMLP portion for Hunts Point WRRF as part of the New York City Wastewater Resiliency Program.</description><category>Wastewater Treatment</category><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2018-04-16T00:00:00</design_start><budget_forecast>52506558.19</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>20080597.79</total_budget_changes><forecast_completion>2023-02-17T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1091</total_schedule_changes></row><row _id="row-6qhd_dbeq_dicy" _uuid="00000000-0000-0000-98E0-6C4D833EA673" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-6qhd_dbeq_dicy"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>672</pid><project_name>Storm Mitigation Loan Program at Hunts Point</project_name><description>SMLP portion for Hunts Point WWTP as part of the New York City Wastewater Resiliency Program.</description><category>Wastewater Treatment</category><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2018-04-16T00:00:00</design_start><budget_forecast>60882161.37</budget_forecast><latest_budget_changes>8375603.18</latest_budget_changes><total_budget_changes>20080597.79</total_budget_changes><forecast_completion>2023-02-17T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1091</total_schedule_changes></row><row _id="row-pw74.yu5e.zs2w" _uuid="00000000-0000-0000-D7B8-39642D3E629A" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-pw74.yu5e.zs2w"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>672</pid><project_name>Storm Mitigation Loan Program at Hunts Point</project_name><description>SMLP portion for Hunts Point WWTP as part of the New York City Wastewater Resiliency Program.</description><category>Wastewater Treatment</category><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2018-04-16T00:00:00</design_start><budget_forecast>70261761.84</budget_forecast><latest_budget_changes>9379600.47</latest_budget_changes><total_budget_changes>20080597.79</total_budget_changes><forecast_completion>2023-02-17T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1091</total_schedule_changes></row><row _id="row-grmg_8uu7.2hpp" _uuid="00000000-0000-0000-43BD-EF0D09E07B91" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-grmg_8uu7.2hpp"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>672</pid><project_name>Storm Mitigation Loan Program at Hunts Point</project_name><description>SMLP portion for Hunts Point WWTP as part of the New York City Wastewater Resiliency Program.</description><category>Wastewater Treatment</category><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2018-04-16T00:00:00</design_start><budget_forecast>61753279.02</budget_forecast><latest_budget_changes>-8508482.82</latest_budget_changes><total_budget_changes>20080597.79</total_budget_changes><forecast_completion>2023-11-17T00:00:00</forecast_completion><latest_schedule_changes>273</latest_schedule_changes><total_schedule_changes>1091</total_schedule_changes></row><row _id="row-332d_jyrc.83kn" _uuid="00000000-0000-0000-93C4-50B4A52A539E" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-332d_jyrc.83kn"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>672</pid><project_name>Storm Mitigation Loan Program at Hunts Point</project_name><description>SMLP portion for Hunts Point WWTP as part of the New York City Wastewater Resiliency Program.</description><category>Wastewater Treatment</category><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2018-04-16T00:00:00</design_start><budget_forecast>61753279.02</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>20080597.79</total_budget_changes><forecast_completion>2023-11-17T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1091</total_schedule_changes></row><row _id="row-p2h8-ydb4_xifh" _uuid="00000000-0000-0000-A613-27747E4A92F6" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-p2h8-ydb4_xifh"><date_reported_as_of>2017-09-01T00:00:00</date_reported_as_of><pid>689</pid><project_name>Raise Shorelines Citywide</project_name><description>The design and construction of shoreline reconstruction projects necessary to provide Citywide protection from future flooding caused by elevated seal elvels.</description><category>Industrial Development</category><borough>Citywide</borough><managing_agency>EDC</managing_agency><client_agency>ORR</client_agency><current_phase>Design</current_phase><design_start>2017-08-01T00:00:00</design_start><budget_forecast>60422401.00</budget_forecast><total_budget_changes>0.00</total_budget_changes><forecast_completion>2022-12-31T00:00:00</forecast_completion><total_schedule_changes>639</total_schedule_changes></row><row _id="row-gaig.wea6_t9u5" _uuid="00000000-0000-0000-DC33-6B8286440984" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-gaig.wea6_t9u5"><date_reported_as_of>2018-03-01T00:00:00</date_reported_as_of><pid>689</pid><project_name>Raise Shorelines Citywide</project_name><description>The design and construction of shoreline reconstruction projects necessary to provide Citywide protection from future flooding caused by elevated seal elvels.</description><category>Industrial Development</category><borough>Citywide</borough><managing_agency>EDC</managing_agency><client_agency>ORR</client_agency><current_phase>Design</current_phase><design_start>2017-08-01T00:00:00</design_start><budget_forecast>60422401.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2022-12-31T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>639</total_schedule_changes></row><row _id="row-e2br-j6mm_v4n4" _uuid="00000000-0000-0000-5C1F-3662EDBC1098" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-e2br-j6mm_v4n4"><date_reported_as_of>2018-08-01T00:00:00</date_reported_as_of><pid>689</pid><project_name>Raise Shorelines Citywide</project_name><description>The design and construction of shoreline reconstruction projects necessary to provide Citywide protection from future flooding caused by elevated seal elvels.</description><category>Industrial Development</category><borough>Citywide</borough><managing_agency>EDC</managing_agency><client_agency>ORR</client_agency><current_phase>Design</current_phase><design_start>2017-08-01T00:00:00</design_start><budget_forecast>60422401.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2022-12-31T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>639</total_schedule_changes></row><row _id="row-z2ee-dhqp_z27t" _uuid="00000000-0000-0000-398B-F4561DDEFFB8" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-z2ee-dhqp_z27t"><date_reported_as_of>2019-01-01T00:00:00</date_reported_as_of><pid>689</pid><project_name>Raise Shorelines Citywide</project_name><description>The design and construction of shoreline reconstruction projects necessary to provide Citywide protection from future flooding caused by elevated seal elvels.</description><category>Industrial Development</category><borough>Citywide</borough><managing_agency>EDC</managing_agency><client_agency>ORR</client_agency><current_phase>Design</current_phase><design_start>2017-08-01T00:00:00</design_start><budget_forecast>60422401.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2022-12-31T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>639</total_schedule_changes></row><row _id="row-73aa_icnj.8j2m" _uuid="00000000-0000-0000-FEDB-64080B862A84" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-73aa_icnj.8j2m"><date_reported_as_of>2019-05-01T00:00:00</date_reported_as_of><pid>689</pid><project_name>Raise Shorelines Citywide</project_name><description>The design and construction of shoreline reconstruction projects necessary to provide Citywide protection from future flooding caused by elevated seal elvels.</description><category>Industrial Development</category><borough>Citywide</borough><managing_agency>EDC</managing_agency><client_agency>ORR</client_agency><current_phase>Design</current_phase><design_start>2017-08-01T00:00:00</design_start><budget_forecast>60422401.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2022-12-31T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>639</total_schedule_changes></row><row _id="row-92qk~aban_pdw3" _uuid="00000000-0000-0000-BD8A-B4A3D5306319" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-92qk~aban_pdw3"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>689</pid><project_name>Raise Shorelines Citywide</project_name><description>The design and construction of shoreline reconstruction projects necessary to provide Citywide protection from future flooding caused by elevated seal elvels.</description><category>Industrial Development</category><borough>Citywide</borough><managing_agency>EDC</managing_agency><client_agency>ORR</client_agency><current_phase>Design</current_phase><design_start>2017-08-01T00:00:00</design_start><budget_forecast>89152926.86</budget_forecast><latest_budget_changes>28730525.86</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2022-12-31T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>639</total_schedule_changes></row><row _id="row-gp4h_5kxw_cqfh" _uuid="00000000-0000-0000-8448-65D476A30C24" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-gp4h_5kxw_cqfh"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>689</pid><project_name>Raise Shorelines Citywide</project_name><description>The design and construction of shoreline reconstruction projects necessary to provide Citywide protection from future flooding caused by elevated seal elvels.</description><category>Industrial Development</category><borough>Citywide</borough><managing_agency>EDC</managing_agency><client_agency>ORR</client_agency><current_phase>Design</current_phase><design_start>2017-08-01T00:00:00</design_start><budget_forecast>89152926.86</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2022-12-31T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>639</total_schedule_changes></row><row _id="row-pg8k-prd9-tijc" _uuid="00000000-0000-0000-F8F4-6F1841FEC4C3" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-pg8k-prd9-tijc"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>689</pid><project_name>Raise Shorelines Citywide</project_name><description>The design and construction of shoreline reconstruction projects necessary to provide Citywide protection from future flooding caused by elevated seal elvels.</description><category>Industrial Development</category><borough>Citywide</borough><managing_agency>EDC</managing_agency><client_agency>ORR</client_agency><current_phase>Design</current_phase><design_start>2017-08-01T00:00:00</design_start><budget_forecast>89152926.86</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2022-12-31T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>639</total_schedule_changes></row><row _id="row-g3bh.5ih3~gww9" _uuid="00000000-0000-0000-18ED-C50CB3231F45" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-g3bh.5ih3~gww9"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>689</pid><project_name>Raise Shorelines Citywide</project_name><description>The design and construction of shoreline reconstruction projects necessary to provide Citywide protection from future flooding caused by elevated seal elvels.</description><category>Industrial Development</category><borough>Citywide</borough><managing_agency>EDC</managing_agency><client_agency>ORR</client_agency><current_phase>Design</current_phase><design_start>2017-08-01T00:00:00</design_start><budget_forecast>89152926.86</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2022-12-31T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>639</total_schedule_changes></row><row _id="row-mhr6_77wy_yy7t" _uuid="00000000-0000-0000-DEE0-D78B9E4C634A" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-mhr6_77wy_yy7t"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>689</pid><project_name>Raise Shorelines Citywide</project_name><description>The design and construction of shoreline reconstruction projects necessary to provide Citywide protection from future flooding caused by elevated seal elvels.</description><category>Industrial Development</category><borough>Citywide</borough><managing_agency>EDC</managing_agency><client_agency>ORR</client_agency><current_phase>Design</current_phase><design_start>2017-08-01T00:00:00</design_start><budget_forecast>89152926.86</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2022-12-31T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>639</total_schedule_changes></row><row _id="row-jei3-8d2r_w7ht" _uuid="00000000-0000-0000-1101-2660B0678BC3" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-jei3-8d2r_w7ht"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>689</pid><project_name>Raise Shorelines Citywide</project_name><description>The design and construction of shoreline reconstruction projects necessary to provide Citywide protection from future flooding caused by elevated seal elvels.</description><category>Industrial Development</category><borough>Citywide</borough><managing_agency>EDC</managing_agency><client_agency>ORR</client_agency><current_phase>Design</current_phase><design_start>2017-08-01T00:00:00</design_start><budget_forecast>89152926.86</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2022-12-31T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>639</total_schedule_changes></row><row _id="row-zrt6_t5jz~3bme" _uuid="00000000-0000-0000-7E53-53AA5A394E2A" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-zrt6_t5jz~3bme"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>689</pid><project_name>Raise Shorelines Citywide</project_name><description>The design and construction of shoreline reconstruction projects necessary to provide Citywide protection from future flooding caused by elevated seal elvels.</description><category>Industrial Development</category><borough>Citywide</borough><managing_agency>EDC</managing_agency><client_agency>ORR</client_agency><current_phase>Design</current_phase><design_start>2017-08-01T00:00:00</design_start><budget_forecast>60422410.00</budget_forecast><latest_budget_changes>-28730516.86</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2023-06-30T00:00:00</forecast_completion><latest_schedule_changes>181</latest_schedule_changes><total_schedule_changes>639</total_schedule_changes></row><row _id="row-kh7q~tnh4_7use" _uuid="00000000-0000-0000-E486-5461AC230F81" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-kh7q~tnh4_7use"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>689</pid><project_name>Raise Shorelines Citywide</project_name><description>The design and construction of shoreline reconstruction projects necessary to provide Citywide protection from future flooding caused by elevated seal elvels.</description><category>Industrial Development</category><borough>Citywide</borough><managing_agency>EDC</managing_agency><client_agency>ORR</client_agency><current_phase>Design</current_phase><design_start>2017-08-01T00:00:00</design_start><budget_forecast>60422401.00</budget_forecast><latest_budget_changes>-9.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2023-12-31T00:00:00</forecast_completion><latest_schedule_changes>184</latest_schedule_changes><total_schedule_changes>639</total_schedule_changes></row><row _id="row-6pg9~u9u8~krhq" _uuid="00000000-0000-0000-2BD1-EB50D362A071" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-6pg9~u9u8~krhq"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>689</pid><project_name>Raise Shorelines Citywide</project_name><description>The design and construction of shoreline reconstruction projects necessary to provide Citywide protection from future flooding caused by elevated seal elvels.</description><category>Industrial Development</category><borough>Citywide</borough><managing_agency>EDC</managing_agency><client_agency>ORR</client_agency><current_phase>Design</current_phase><design_start>2017-08-01T00:00:00</design_start><budget_forecast>60422401.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2024-09-30T00:00:00</forecast_completion><latest_schedule_changes>274</latest_schedule_changes><total_schedule_changes>639</total_schedule_changes></row><row _id="row-kgm8~v68d~p6qj" _uuid="00000000-0000-0000-B1A2-595D38E46329" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-kgm8~v68d~p6qj"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>689</pid><project_name>Raise Shorelines Citywide</project_name><description>The design and construction of shoreline reconstruction projects necessary to provide Citywide protection from future flooding caused by elevated seal elvels.</description><category>Industrial Development</category><borough>Citywide</borough><managing_agency>EDC</managing_agency><client_agency>ORR</client_agency><current_phase>Design</current_phase><design_start>2017-08-01T00:00:00</design_start><budget_forecast>60422401.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2024-09-30T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>639</total_schedule_changes></row><row _id="row-fbh7.r5n8-figx" _uuid="00000000-0000-0000-3846-B166E8B42CBB" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-fbh7.r5n8-figx"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>696</pid><project_name>West 35th Street over Amtrak</project_name><description>Repair the West 35th Street bridge over Amtrak, Manhattan</description><category>Bridges</category><borough>Manhattan</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2018-11-21T00:00:00</design_start><budget_forecast>33671034.00</budget_forecast><latest_budget_changes>-121966.00</latest_budget_changes><total_budget_changes>-621966.00</total_budget_changes><forecast_completion>2027-04-15T00:00:00</forecast_completion><latest_schedule_changes>1060</latest_schedule_changes><total_schedule_changes>2846</total_schedule_changes></row><row _id="row-tdps_cg6g_8a4d" _uuid="00000000-0000-0000-1467-0F4FF8863C50" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-tdps_cg6g_8a4d"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>696</pid><project_name>West 35th Street over Amtrak</project_name><description>Repair the West 35th Street bridge over Amtrak, Manhattan</description><category>Bridges</category><borough>Manhattan</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2018-11-21T00:00:00</design_start><budget_forecast>33171034.00</budget_forecast><latest_budget_changes>-500000.00</latest_budget_changes><total_budget_changes>-621966.00</total_budget_changes><total_schedule_changes>2846</total_schedule_changes></row><row _id="row-xh77.hu68_nq6e" _uuid="00000000-0000-0000-20B5-BC387D883746" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-xh77.hu68_nq6e"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>696</pid><project_name>West 35th Street over Amtrak</project_name><description>Repair the West 35th Street bridge over Amtrak, Manhattan</description><category>Bridges</category><borough>Manhattan</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2018-11-21T00:00:00</design_start><budget_forecast>33792943.00</budget_forecast><latest_budget_changes>621909.00</latest_budget_changes><total_budget_changes>-621966.00</total_budget_changes><forecast_completion>2027-07-09T00:00:00</forecast_completion><latest_schedule_changes>85</latest_schedule_changes><total_schedule_changes>2846</total_schedule_changes></row><row _id="row-29qk_h5sb-nwzx" _uuid="00000000-0000-0000-41B8-4FB628ACFCEF" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-29qk_h5sb-nwzx"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>696</pid><project_name>West 35th Street over Amtrak</project_name><category>Bridges</category><borough>Manhattan</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><total_budget_changes>-621966.00</total_budget_changes><total_schedule_changes>2846</total_schedule_changes></row><row _id="row-hn2w-2q95-gwwt" _uuid="00000000-0000-0000-0EC0-3EBCFB3D66B7" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-hn2w-2q95-gwwt"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>696</pid><project_name>West 35th Street over Amtrak</project_name><description>Repair the West 35th Street bridge over Amtrak, Manhattan</description><category>Bridges</category><borough>Manhattan</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2018-11-21T00:00:00</design_start><budget_forecast>33171034.00</budget_forecast><latest_budget_changes>-621909.00</latest_budget_changes><total_budget_changes>-621966.00</total_budget_changes><forecast_completion>2028-05-05T00:00:00</forecast_completion><latest_schedule_changes>301</latest_schedule_changes><total_schedule_changes>2846</total_schedule_changes></row><row _id="row-qwa8.x6mf.axh8" _uuid="00000000-0000-0000-6035-8C55D99B8C2D" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-qwa8.x6mf.axh8"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>696</pid><project_name>West 35th Street over Amtrak</project_name><description>Repair the West 35th Street bridge over Amtrak, Manhattan</description><category>Bridges</category><borough>Manhattan</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2018-11-21T00:00:00</design_start><budget_forecast>33171034.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-621966.00</total_budget_changes><forecast_completion>2028-03-27T00:00:00</forecast_completion><latest_schedule_changes>-39</latest_schedule_changes><total_schedule_changes>2846</total_schedule_changes></row><row _id="row-9esg~k9df-3qij" _uuid="00000000-0000-0000-5E28-6F4333F69B06" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-9esg~k9df-3qij"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>696</pid><project_name>West 35th Street over Amtrak</project_name><description>Repair the West 35th Street bridge over Amtrak, Manhattan</description><category>Bridges</category><borough>Manhattan</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2018-11-21T00:00:00</design_start><budget_forecast>32671034.00</budget_forecast><latest_budget_changes>-500000.00</latest_budget_changes><total_budget_changes>-621966.00</total_budget_changes><forecast_completion>2030-12-10T00:00:00</forecast_completion><latest_schedule_changes>988</latest_schedule_changes><total_schedule_changes>2846</total_schedule_changes></row><row _id="row-w799_8q59.swn8" _uuid="00000000-0000-0000-2E37-0A43C3218F1B" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-w799_8q59.swn8"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>696</pid><project_name>West 35th Street over Amtrak</project_name><description>Repair the West 35th Street bridge over Amtrak, Manhattan</description><category>Bridges</category><borough>Manhattan</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2018-11-21T00:00:00</design_start><budget_forecast>32671034.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-621966.00</total_budget_changes><forecast_completion>2032-03-05T00:00:00</forecast_completion><latest_schedule_changes>451</latest_schedule_changes><total_schedule_changes>2846</total_schedule_changes></row><row _id="row-ysxn_b7k7_vtui" _uuid="00000000-0000-0000-C156-7EDE207CA586" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ysxn_b7k7_vtui"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>696</pid><project_name>West 35th Street over Amtrak</project_name><description>Repair the West 35th Street bridge over Amtrak, Manhattan</description><category>Bridges</category><borough>Manhattan</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2018-11-21T00:00:00</design_start><budget_forecast>33171034.00</budget_forecast><latest_budget_changes>500000.00</latest_budget_changes><total_budget_changes>-621966.00</total_budget_changes><forecast_completion>2032-03-05T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>2846</total_schedule_changes></row><row _id="row-3rzz_apwe-5dd9" _uuid="00000000-0000-0000-2E6C-C87C7527EE48" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-3rzz_apwe-5dd9"><date_reported_as_of>2018-08-01T00:00:00</date_reported_as_of><pid>701</pid><project_name>East 174th Street over Sheridan Expressway - Amtrak</project_name><description>Repair the East 174th Street bridge over Sheridan Expressway/ AMTRAK, the Bronx</description><category>Bridges</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2018-08-16T00:00:00</design_start><budget_forecast>140940000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>5146882.00</total_budget_changes><forecast_completion>2026-01-16T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1431</total_schedule_changes></row><row _id="row-kyg8-espq~xufv" _uuid="00000000-0000-0000-AFC8-BF8A163700D9" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-kyg8-espq~xufv"><date_reported_as_of>2019-01-01T00:00:00</date_reported_as_of><pid>701</pid><project_name>East 174th Street over Sheridan Expressway - Amtrak</project_name><description>Repair the East 174th Street bridge over Sheridan Expressway/ AMTRAK, the Bronx</description><category>Bridges</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2018-08-16T00:00:00</design_start><budget_forecast>140940000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>5146882.00</total_budget_changes><forecast_completion>2026-01-16T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1431</total_schedule_changes></row><row _id="row-a2f2-ckqz~nh2p" _uuid="00000000-0000-0000-BE8F-4385E042070F" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-a2f2-ckqz~nh2p"><date_reported_as_of>2019-05-01T00:00:00</date_reported_as_of><pid>701</pid><project_name>East 174th Street over Sheridan Expressway - Amtrak</project_name><description>Repair the East 174th Street bridge over Sheridan Expressway/ AMTRAK, the Bronx</description><category>Bridges</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2018-08-16T00:00:00</design_start><budget_forecast>140940000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>5146882.00</total_budget_changes><forecast_completion>2026-11-09T00:00:00</forecast_completion><latest_schedule_changes>297</latest_schedule_changes><total_schedule_changes>1431</total_schedule_changes></row><row _id="row-3v9e_3d5w_kess" _uuid="00000000-0000-0000-6D23-F169B54DD1CD" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-3v9e_3d5w_kess"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>701</pid><project_name>East 174th Street over Sheridan Expressway - Amtrak</project_name><description>Repair the East 174th Street bridge over Sheridan Expressway/ AMTRAK, the Bronx</description><category>Bridges</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2018-08-16T00:00:00</design_start><budget_forecast>141940200.00</budget_forecast><latest_budget_changes>1000200.00</latest_budget_changes><total_budget_changes>5146882.00</total_budget_changes><total_schedule_changes>1431</total_schedule_changes></row><row _id="row-xkae_wfvs~4di5" _uuid="00000000-0000-0000-E297-64594EFAE501" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-xkae_wfvs~4di5"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>701</pid><project_name>East 174th Street over Sheridan Expressway - Amtrak</project_name><description>Repair the East 174th Street bridge over Sheridan Expressway/ AMTRAK, the Bronx</description><category>Bridges</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2018-08-16T00:00:00</design_start><budget_forecast>141954882.00</budget_forecast><latest_budget_changes>14682.00</latest_budget_changes><total_budget_changes>5146882.00</total_budget_changes><forecast_completion>2028-04-21T00:00:00</forecast_completion><latest_schedule_changes>529</latest_schedule_changes><total_schedule_changes>1431</total_schedule_changes></row><row _id="row-7z85-ez8c.2wvq" _uuid="00000000-0000-0000-5628-5493254352BD" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-7z85-ez8c.2wvq"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>701</pid><project_name>East 174th Street over Sheridan Expressway - Amtrak</project_name><description>Repair the East 174th Street bridge over Sheridan Expressway/ AMTRAK, the Bronx</description><category>Bridges</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2018-08-16T00:00:00</design_start><budget_forecast>141954882.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>5146882.00</total_budget_changes><forecast_completion>2028-06-02T00:00:00</forecast_completion><latest_schedule_changes>42</latest_schedule_changes><total_schedule_changes>1431</total_schedule_changes></row><row _id="row-mwum.bsfv~v49n" _uuid="00000000-0000-0000-EF5B-F3792117E0D7" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-mwum.bsfv~v49n"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>701</pid><project_name>East 174th Street over Sheridan Expressway - Amtrak</project_name><description>Repair the East 174th Street bridge over Sheridan Expressway/ AMTRAK, the Bronx</description><category>Bridges</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2018-08-16T00:00:00</design_start><budget_forecast>141954882.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>5146882.00</total_budget_changes><forecast_completion>2029-03-02T00:00:00</forecast_completion><latest_schedule_changes>273</latest_schedule_changes><total_schedule_changes>1431</total_schedule_changes></row><row _id="row-7pnx_hddz-zwyq" _uuid="00000000-0000-0000-4900-455B77B72629" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-7pnx_hddz-zwyq"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>701</pid><project_name>East 174th Street over Sheridan Expressway - Amtrak</project_name><category>Bridges</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><total_budget_changes>5146882.00</total_budget_changes><total_schedule_changes>1431</total_schedule_changes></row><row _id="row-siin~6zpw-uwqu" _uuid="00000000-0000-0000-A3B3-7F6945585E87" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-siin~6zpw-uwqu"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>701</pid><project_name>East 174th Street over Sheridan Expressway - Amtrak</project_name><description>Repair the East 174th Street bridge over Sheridan Expressway/ AMTRAK, the Bronx</description><category>Bridges</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2018-08-16T00:00:00</design_start><budget_forecast>141454882.00</budget_forecast><latest_budget_changes>-500000.00</latest_budget_changes><total_budget_changes>5146882.00</total_budget_changes><forecast_completion>2029-11-01T00:00:00</forecast_completion><latest_schedule_changes>244</latest_schedule_changes><total_schedule_changes>1431</total_schedule_changes></row><row _id="row-asms.pa9v_cxtn" _uuid="00000000-0000-0000-0831-5C8705E48362" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-asms.pa9v_cxtn"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>701</pid><project_name>East 174th Street over Sheridan Expressway - Amtrak</project_name><description>Repair the East 174th Street bridge over Sheridan Expressway/ AMTRAK, the Bronx</description><category>Bridges</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2018-08-16T00:00:00</design_start><budget_forecast>141454882.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>5146882.00</total_budget_changes><forecast_completion>2030-04-04T00:00:00</forecast_completion><latest_schedule_changes>154</latest_schedule_changes><total_schedule_changes>1431</total_schedule_changes></row><row _id="row-ty9s-jsjw~33cm" _uuid="00000000-0000-0000-C270-35DC389479EC" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ty9s-jsjw~33cm"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>701</pid><project_name>East 174th Street over Sheridan Expressway - Amtrak</project_name><description>Repair the East 174th Street bridge over Sheridan Expressway/ AMTRAK, the Bronx</description><category>Bridges</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2018-08-16T00:00:00</design_start><budget_forecast>140939882.00</budget_forecast><latest_budget_changes>-515000.00</latest_budget_changes><total_budget_changes>5146882.00</total_budget_changes><forecast_completion>2029-12-13T00:00:00</forecast_completion><latest_schedule_changes>-112</latest_schedule_changes><total_schedule_changes>1431</total_schedule_changes></row><row _id="row-uuas_79gm-2yhm" _uuid="00000000-0000-0000-E8FB-F28639D78E9E" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-uuas_79gm-2yhm"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>701</pid><project_name>East 174th Street over Sheridan Expressway - Amtrak</project_name><description>Repair the East 174th Street bridge over Sheridan Expressway/ AMTRAK, the Bronx</description><category>Bridges</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2018-08-16T00:00:00</design_start><budget_forecast>140939882.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>5146882.00</total_budget_changes><forecast_completion>2029-10-11T00:00:00</forecast_completion><latest_schedule_changes>-63</latest_schedule_changes><total_schedule_changes>1431</total_schedule_changes></row><row _id="row-4r4a_n85a~6a9g" _uuid="00000000-0000-0000-923F-8232C5B83DD1" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-4r4a_n85a~6a9g"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>701</pid><project_name>East 174th Street over Sheridan Expressway - Amtrak</project_name><description>Repair the East 174th Street bridge over Sheridan Expressway/ AMTRAK, the Bronx</description><category>Bridges</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2018-08-16T00:00:00</design_start><budget_forecast>146086882.00</budget_forecast><latest_budget_changes>5147000.00</latest_budget_changes><total_budget_changes>5146882.00</total_budget_changes><forecast_completion>2029-12-17T00:00:00</forecast_completion><latest_schedule_changes>67</latest_schedule_changes><total_schedule_changes>1431</total_schedule_changes></row><row _id="row-6xyt-jrt2_dykj" _uuid="00000000-0000-0000-D7B8-0779658067EA" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-6xyt-jrt2_dykj"><date_reported_as_of>2019-01-01T00:00:00</date_reported_as_of><pid>703</pid><project_name>Pelham Bay Equestrian Park over Amtrak</project_name><description>Repair the Pelham Bay Equestrian Park bridge over Amtrak, the Bronx</description><category>Bridges</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DPR</client_agency><current_phase>Design</current_phase><design_start>2019-01-30T00:00:00</design_start><budget_forecast>1208997.00</budget_forecast><latest_budget_changes>-40120003.00</latest_budget_changes><total_budget_changes>137997.00</total_budget_changes><forecast_completion>2026-10-21T00:00:00</forecast_completion><latest_schedule_changes>803</latest_schedule_changes><total_schedule_changes>1029</total_schedule_changes></row><row _id="row-ntxb.h637_sk3y" _uuid="00000000-0000-0000-BA93-2066FA3F857E" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ntxb.h637_sk3y"><date_reported_as_of>2019-05-01T00:00:00</date_reported_as_of><pid>703</pid><project_name>Pelham Bay Equestrian Park over Amtrak</project_name><description>Repair the Pelham Bay Equestrian Park bridge over Amtrak, the Bronx</description><category>Bridges</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DPR</client_agency><current_phase>Design</current_phase><design_start>2019-01-30T00:00:00</design_start><budget_forecast>2208997.00</budget_forecast><latest_budget_changes>1000000.00</latest_budget_changes><total_budget_changes>137997.00</total_budget_changes><forecast_completion>2026-07-01T00:00:00</forecast_completion><latest_schedule_changes>-112</latest_schedule_changes><total_schedule_changes>1029</total_schedule_changes></row><row _id="row-4eyn-stmi_va38" _uuid="00000000-0000-0000-360F-E5D22A9FAE06" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-4eyn-stmi_va38"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>703</pid><project_name>Pelham Bay Equestrian Park over Amtrak</project_name><description>Repair the Pelham Bay Equestrian Park bridge over Amtrak, the Bronx</description><category>Bridges</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DPR</client_agency><current_phase>Design</current_phase><design_start>2019-01-30T00:00:00</design_start><budget_forecast>43537997.00</budget_forecast><latest_budget_changes>41329000.00</latest_budget_changes><total_budget_changes>137997.00</total_budget_changes><total_schedule_changes>1029</total_schedule_changes></row><row _id="row-7jpx-du3t_kuqv" _uuid="00000000-0000-0000-D505-186DA5B97100" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-7jpx-du3t_kuqv"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>703</pid><project_name>Pelham Bay Equestrian Park over Amtrak</project_name><description>Replace/Rehab the Pelham Bay Equestrian Park bridge over Amtrak, the Bronx</description><category>Bridges</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DPR</client_agency><current_phase>Design</current_phase><design_start>2019-01-30T00:00:00</design_start><budget_forecast>42328997.00</budget_forecast><latest_budget_changes>-1209000.00</latest_budget_changes><total_budget_changes>137997.00</total_budget_changes><forecast_completion>2027-01-11T00:00:00</forecast_completion><latest_schedule_changes>194</latest_schedule_changes><total_schedule_changes>1029</total_schedule_changes></row><row _id="row-v7d4_7ewz-wj2p" _uuid="00000000-0000-0000-B442-A2BCA5C7D1B7" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-v7d4_7ewz-wj2p"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>703</pid><project_name>Pelham Bay Equestrian Park over Amtrak</project_name><description>Replace/Rehab the Pelham Bay Equestrian Park bridge over Amtrak, the Bronx</description><category>Bridges</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DPR</client_agency><current_phase>Design</current_phase><design_start>2019-01-30T00:00:00</design_start><budget_forecast>42328997.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>137997.00</total_budget_changes><forecast_completion>2027-07-11T00:00:00</forecast_completion><latest_schedule_changes>181</latest_schedule_changes><total_schedule_changes>1029</total_schedule_changes></row><row _id="row-7avb-8prf-cv8b" _uuid="00000000-0000-0000-8E07-E7BE5C0D8BE9" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-7avb-8prf-cv8b"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>703</pid><project_name>Pelham Bay Equestrian Park over Amtrak</project_name><description>Replace/Rehab the Pelham Bay Equestrian Park bridge over Amtrak, the Bronx</description><category>Bridges</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DPR</client_agency><current_phase>Design</current_phase><design_start>2019-01-30T00:00:00</design_start><budget_forecast>42328997.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>137997.00</total_budget_changes><forecast_completion>2028-04-03T00:00:00</forecast_completion><latest_schedule_changes>267</latest_schedule_changes><total_schedule_changes>1029</total_schedule_changes></row><row _id="row-2guc_452z_kpex" _uuid="00000000-0000-0000-03B2-A2413E2E7D58" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-2guc_452z_kpex"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>703</pid><project_name>Pelham Bay Equestrian Park over Amtrak</project_name><category>Bridges</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DPR</client_agency><total_budget_changes>137997.00</total_budget_changes><total_schedule_changes>1029</total_schedule_changes></row><row _id="row-mpcs.9k97-npee" _uuid="00000000-0000-0000-15AF-909D35162688" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-mpcs.9k97-npee"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>703</pid><project_name>Pelham Bay Equestrian Park over Amtrak</project_name><description>Replace/Rehab the Pelham Bay Equestrian Park bridge over Amtrak, the Bronx</description><category>Bridges</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DPR</client_agency><current_phase>Design</current_phase><design_start>2019-01-30T00:00:00</design_start><budget_forecast>41828997.00</budget_forecast><latest_budget_changes>-500000.00</latest_budget_changes><total_budget_changes>137997.00</total_budget_changes><forecast_completion>2026-05-17T00:00:00</forecast_completion><latest_schedule_changes>-687</latest_schedule_changes><total_schedule_changes>1029</total_schedule_changes></row><row _id="row-yb9s-3hyb-wxuj" _uuid="00000000-0000-0000-0E1D-4572EA5CA0FF" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-yb9s-3hyb-wxuj"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>703</pid><project_name>Pelham Bay Equestrian Park over Amtrak</project_name><description>Replace/Rehab the Pelham Bay Equestrian Park bridge over Amtrak, the Bronx</description><category>Bridges</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DPR</client_agency><current_phase>Design</current_phase><design_start>2019-01-30T00:00:00</design_start><budget_forecast>41466997.00</budget_forecast><latest_budget_changes>-362000.00</latest_budget_changes><total_budget_changes>137997.00</total_budget_changes><forecast_completion>2026-08-24T00:00:00</forecast_completion><latest_schedule_changes>99</latest_schedule_changes><total_schedule_changes>1029</total_schedule_changes></row><row _id="row-vf3m.brm7~c73i" _uuid="00000000-0000-0000-50CE-18D8CCB7D19C" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-vf3m.brm7~c73i"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>703</pid><project_name>Pelham Bay Equestrian Park over Amtrak</project_name><description>Replace/Rehab the Pelham Bay Equestrian Park bridge over Amtrak, the Bronx</description><category>Bridges</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DPR</client_agency><current_phase>Design</current_phase><design_start>2019-01-30T00:00:00</design_start><budget_forecast>40966997.00</budget_forecast><latest_budget_changes>-500000.00</latest_budget_changes><total_budget_changes>137997.00</total_budget_changes><forecast_completion>2026-07-18T00:00:00</forecast_completion><latest_schedule_changes>-37</latest_schedule_changes><total_schedule_changes>1029</total_schedule_changes></row><row _id="row-xdfa_yfy3-uy4s" _uuid="00000000-0000-0000-AEE3-13BDF3AD133D" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-xdfa_yfy3-uy4s"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>703</pid><project_name>Pelham Bay Equestrian Park over Amtrak</project_name><description>Replace/Rehab the Pelham Bay Equestrian Park bridge over Amtrak, the Bronx</description><category>Bridges</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DPR</client_agency><current_phase>Design</current_phase><design_start>2019-01-30T00:00:00</design_start><budget_forecast>0.00</budget_forecast><latest_budget_changes>-40966997.00</latest_budget_changes><total_budget_changes>137997.00</total_budget_changes><forecast_completion>2027-06-04T00:00:00</forecast_completion><latest_schedule_changes>321</latest_schedule_changes><total_schedule_changes>1029</total_schedule_changes></row><row _id="row-mrzr-2pmd~435e" _uuid="00000000-0000-0000-ED39-3431768EDD19" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-mrzr-2pmd~435e"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>703</pid><project_name>Pelham Bay Equestrian Park over Amtrak</project_name><description>Replace/Rehab the Pelham Bay Equestrian Park bridge over Amtrak, the Bronx</description><category>Bridges</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DPR</client_agency><current_phase>Design</current_phase><design_start>2019-01-30T00:00:00</design_start><budget_forecast>41466997.00</budget_forecast><latest_budget_changes>41466997.00</latest_budget_changes><total_budget_changes>137997.00</total_budget_changes><forecast_completion>2027-06-04T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1029</total_schedule_changes></row><row _id="row-hmgp~sfbh_dyqy" _uuid="00000000-0000-0000-AFB6-15EAB6A450B4" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-hmgp~sfbh_dyqy"><date_reported_as_of>2019-01-01T00:00:00</date_reported_as_of><pid>708</pid><project_name>Harlem River Drive Ramp Reconstruction (George Washington Bridge)</project_name><description>Repair the Harlem River Drive Ramp to George Washington Bridge over Harlem River Drive Southbound (Trans-Manhattan Expressway), Manhattan</description><category>Bridges, Streets and Roadways</category><borough>Manhattan</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2019-02-07T00:00:00</design_start><budget_forecast>429583000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-3711870.00</total_budget_changes><forecast_completion>2028-04-14T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>2697</total_schedule_changes></row><row _id="row-z33m~6ier-x69a" _uuid="00000000-0000-0000-C80B-9F5A4D53659E" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-z33m~6ier-x69a"><date_reported_as_of>2019-05-01T00:00:00</date_reported_as_of><pid>708</pid><project_name>Harlem River Drive Ramp Reconstruction (George Washington Bridge)</project_name><description>Repair the Harlem River Drive Ramp to George Washington Bridge over Harlem River Drive Southbound (Trans-Manhattan Expressway), Manhattan</description><category>Bridges, Streets and Roadways</category><borough>Manhattan</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2019-02-07T00:00:00</design_start><budget_forecast>430583000.00</budget_forecast><latest_budget_changes>1000000.00</latest_budget_changes><total_budget_changes>-3711870.00</total_budget_changes><forecast_completion>2028-04-14T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>2697</total_schedule_changes></row><row _id="row-vc87_xnmh-5wvp" _uuid="00000000-0000-0000-51F2-75DB724926DB" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-vc87_xnmh-5wvp"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>708</pid><project_name>Harlem River Drive Ramp Reconstruction (George Washington Bridge)</project_name><description>Repair the Harlem River Drive Ramp to George Washington Bridge over Harlem River Drive Southbound (Trans-Manhattan Expressway), Manhattan</description><category>Bridges, Streets and Roadways</category><borough>Manhattan</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2019-02-07T00:00:00</design_start><budget_forecast>430583000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-3711870.00</total_budget_changes><total_schedule_changes>2697</total_schedule_changes></row><row _id="row-yee6_hqyr-ci26" _uuid="00000000-0000-0000-F208-AFC54B87B64F" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-yee6_hqyr-ci26"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>708</pid><project_name>Harlem River Drive Ramp Reconstruction (George Washington Bridge)</project_name><description>Repair the Harlem River Drive Ramp to George Washington Bridge over Harlem River Drive Southbound (Trans-Manhattan Expressway), Manhattan</description><category>Bridges, Streets and Roadways</category><borough>Manhattan</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2019-02-07T00:00:00</design_start><budget_forecast>430582546.00</budget_forecast><latest_budget_changes>-454.00</latest_budget_changes><total_budget_changes>-3711870.00</total_budget_changes><forecast_completion>2028-04-14T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>2697</total_schedule_changes></row><row _id="row-fe6j~vkzn.a2sm" _uuid="00000000-0000-0000-BC5E-DD6C209E2F7D" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-fe6j~vkzn.a2sm"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>708</pid><project_name>Harlem River Drive Ramp Reconstruction (George Washington Bridge)</project_name><description>Repair the Harlem River Drive Ramp to George Washington Bridge over Harlem River Drive Southbound (Trans-Manhattan Expressway), Manhattan</description><category>Bridges, Streets and Roadways</category><borough>Manhattan</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2019-02-07T00:00:00</design_start><budget_forecast>430582546.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-3711870.00</total_budget_changes><forecast_completion>2028-04-18T00:00:00</forecast_completion><latest_schedule_changes>4</latest_schedule_changes><total_schedule_changes>2697</total_schedule_changes></row><row _id="row-zree.d5yq-v8s5" _uuid="00000000-0000-0000-73A2-E83568EB3066" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-zree.d5yq-v8s5"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>708</pid><project_name>Harlem River Drive Ramp Reconstruction (George Washington Bridge)</project_name><description>Repair the Harlem River Drive Ramp to George Washington Bridge over Harlem River Drive Southbound (Trans-Manhattan Expressway), Manhattan</description><category>Bridges, Streets and Roadways</category><borough>Manhattan</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2019-02-07T00:00:00</design_start><budget_forecast>430582546.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-3711870.00</total_budget_changes><forecast_completion>2029-02-05T00:00:00</forecast_completion><latest_schedule_changes>293</latest_schedule_changes><total_schedule_changes>2697</total_schedule_changes></row><row _id="row-wamy-r8xr-tzxc" _uuid="00000000-0000-0000-EA90-625EEFFB0143" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-wamy-r8xr-tzxc"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>708</pid><project_name>Harlem River Drive Ramp Reconstruction (George Washington Bridge)</project_name><category>Bridges, Streets and Roadways</category><borough>Manhattan</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><total_budget_changes>-3711870.00</total_budget_changes><total_schedule_changes>2697</total_schedule_changes></row><row _id="row-4s48-zr9q~hkkb" _uuid="00000000-0000-0000-6FD4-29CE6BAFEB0E" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-4s48-zr9q~hkkb"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>708</pid><project_name>Harlem River Drive Ramp Reconstruction (George Washington Bridge)</project_name><description>Repair the Harlem River Drive Ramp to George Washington Bridge over Harlem River Drive Southbound (Trans-Manhattan Expressway), Manhattan</description><category>Bridges, Streets and Roadways</category><borough>Manhattan</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2019-02-07T00:00:00</design_start><budget_forecast>430082546.00</budget_forecast><latest_budget_changes>-500000.00</latest_budget_changes><total_budget_changes>-3711870.00</total_budget_changes><forecast_completion>2033-07-08T00:00:00</forecast_completion><latest_schedule_changes>1614</latest_schedule_changes><total_schedule_changes>2697</total_schedule_changes></row><row _id="row-yhpi_wpsf.72f4" _uuid="00000000-0000-0000-3473-2E5FD6A3B8CA" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-yhpi_wpsf.72f4"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>708</pid><project_name>Harlem River Drive Ramp Reconstruction (George Washington Bridge)</project_name><description>Repair the Harlem River Drive Ramp to George Washington Bridge over Harlem River Drive Southbound (Trans-Manhattan Expressway), Manhattan</description><category>Bridges, Streets and Roadways</category><borough>Manhattan</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2019-02-07T00:00:00</design_start><budget_forecast>430082546.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-3711870.00</total_budget_changes><forecast_completion>2034-07-09T00:00:00</forecast_completion><latest_schedule_changes>366</latest_schedule_changes><total_schedule_changes>2697</total_schedule_changes></row><row _id="row-yi46~sair-d9xc" _uuid="00000000-0000-0000-C8A1-41914CF0E658" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-yi46~sair-d9xc"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>708</pid><project_name>Harlem River Drive Ramp Reconstruction (George Washington Bridge)</project_name><description>Repair the Harlem River Drive Ramp to George Washington Bridge over Harlem River Drive Southbound (Trans-Manhattan Expressway), Manhattan</description><category>Bridges, Streets and Roadways</category><borough>Manhattan</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2019-02-07T00:00:00</design_start><budget_forecast>429792546.00</budget_forecast><latest_budget_changes>-290000.00</latest_budget_changes><total_budget_changes>-3711870.00</total_budget_changes><forecast_completion>2034-08-03T00:00:00</forecast_completion><latest_schedule_changes>25</latest_schedule_changes><total_schedule_changes>2697</total_schedule_changes></row><row _id="row-dd46.82gr.87fj" _uuid="00000000-0000-0000-C355-FDF054DA681E" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-dd46.82gr.87fj"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>708</pid><project_name>Harlem River Drive Ramp Reconstruction (George Washington Bridge)</project_name><description>Repair the Harlem River Drive Ramp to George Washington Bridge over Harlem River Drive Southbound (Trans-Manhattan Expressway), Manhattan</description><category>Bridges, Streets and Roadways</category><borough>Manhattan</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2019-02-07T00:00:00</design_start><budget_forecast>427587546.00</budget_forecast><latest_budget_changes>-2205000.00</latest_budget_changes><total_budget_changes>-3711870.00</total_budget_changes><forecast_completion>2035-04-15T00:00:00</forecast_completion><latest_schedule_changes>255</latest_schedule_changes><total_schedule_changes>2697</total_schedule_changes></row><row _id="row-8kp4~rwbr.yrxy" _uuid="00000000-0000-0000-4BB6-581F9AD65F69" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-8kp4~rwbr.yrxy"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>708</pid><project_name>Harlem River Drive Ramp Reconstruction (George Washington Bridge)</project_name><description>Repair the Harlem River Drive Ramp to George Washington Bridge over Harlem River Drive Southbound (Trans-Manhattan Expressway), Manhattan</description><category>Bridges, Streets and Roadways</category><borough>Manhattan</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2019-02-07T00:00:00</design_start><budget_forecast>425871130.00</budget_forecast><latest_budget_changes>-1716416.00</latest_budget_changes><total_budget_changes>-3711870.00</total_budget_changes><forecast_completion>2035-09-02T00:00:00</forecast_completion><latest_schedule_changes>140</latest_schedule_changes><total_schedule_changes>2697</total_schedule_changes></row><row _id="row-pbpd.4h3c_6d9s" _uuid="00000000-0000-0000-C681-E80D3D215848" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-pbpd.4h3c_6d9s"><date_reported_as_of>2019-01-01T00:00:00</date_reported_as_of><pid>709</pid><project_name>Beverly Road over Brighton Subway Line</project_name><description>Repair the Beverly Road bridge over BMT Subway Brighton,  Brooklyn</description><category>Bridges</category><borough>Brooklyn</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2018-09-19T00:00:00</design_start><budget_forecast>47702000.00</budget_forecast><latest_budget_changes>500000.00</latest_budget_changes><total_budget_changes>1279646.00</total_budget_changes><forecast_completion>2025-08-19T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1864</total_schedule_changes></row><row _id="row-v9mc_ce9s-dxnr" _uuid="00000000-0000-0000-4981-1384E5F27580" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-v9mc_ce9s-dxnr"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>709</pid><project_name>Beverly Road over Brighton Subway Line</project_name><description>Repair the Beverly Road bridge over BMT Subway Brighton,  Brooklyn</description><category>Bridges</category><borough>Brooklyn</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2020-01-06T00:00:00</design_start><budget_forecast>47702000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>1279646.00</total_budget_changes><total_schedule_changes>1864</total_schedule_changes></row><row _id="row-sbqt~y2vw.wjb9" _uuid="00000000-0000-0000-60C5-4CAE91C26B48" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-sbqt~y2vw.wjb9"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>709</pid><project_name>Beverly Road over Brighton Subway Line</project_name><description>Repair the Beverly Road bridge over BMT Subway Brighton,  Brooklyn</description><category>Bridges</category><borough>Brooklyn</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2020-01-06T00:00:00</design_start><budget_forecast>48202000.00</budget_forecast><latest_budget_changes>500000.00</latest_budget_changes><total_budget_changes>1279646.00</total_budget_changes><forecast_completion>2028-07-11T00:00:00</forecast_completion><latest_schedule_changes>1057</latest_schedule_changes><total_schedule_changes>1864</total_schedule_changes></row><row _id="row-xzcx.nj5e~aus5" _uuid="00000000-0000-0000-BB5E-8B4978ECF632" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-xzcx.nj5e~aus5"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>709</pid><project_name>Beverly Road over Brighton Subway Line</project_name><description>Repair the Beverly Road bridge over BMT Subway Brighton,  Brooklyn</description><category>Bridges</category><borough>Brooklyn</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2020-01-06T00:00:00</design_start><budget_forecast>49417235.00</budget_forecast><latest_budget_changes>1215235.00</latest_budget_changes><total_budget_changes>1279646.00</total_budget_changes><forecast_completion>2030-01-22T00:00:00</forecast_completion><latest_schedule_changes>560</latest_schedule_changes><total_schedule_changes>1864</total_schedule_changes></row><row _id="row-mi6t-4d5j~puw4" _uuid="00000000-0000-0000-2AFC-2AD056252EFD" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-mi6t-4d5j~puw4"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>709</pid><project_name>Beverly Road over Brighton Subway Line</project_name><category>Bridges</category><borough>Brooklyn</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><total_budget_changes>1279646.00</total_budget_changes><total_schedule_changes>1864</total_schedule_changes></row><row _id="row-mpx8~6u9x.c268" _uuid="00000000-0000-0000-D2F9-E114DFBB18A3" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-mpx8~6u9x.c268"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>709</pid><project_name>Beverly Road over Brighton Subway Line</project_name><description>Repair the Beverly Road bridge over BMT Subway Brighton,  Brooklyn</description><category>Bridges</category><borough>Brooklyn</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2020-01-06T00:00:00</design_start><budget_forecast>48202235.00</budget_forecast><latest_budget_changes>-1215000.00</latest_budget_changes><total_budget_changes>1279646.00</total_budget_changes><forecast_completion>2029-10-04T00:00:00</forecast_completion><latest_schedule_changes>-110</latest_schedule_changes><total_schedule_changes>1864</total_schedule_changes></row><row _id="row-35vq_2faf_5msz" _uuid="00000000-0000-0000-6198-9BB6C34FF10F" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-35vq_2faf_5msz"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>709</pid><project_name>Beverly Road over Brighton Subway Line</project_name><description>Repair the Beverly Road bridge over BMT Subway Brighton,  Brooklyn</description><category>Bridges</category><borough>Brooklyn</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2020-01-06T00:00:00</design_start><budget_forecast>48481235.00</budget_forecast><latest_budget_changes>279000.00</latest_budget_changes><total_budget_changes>1279646.00</total_budget_changes><forecast_completion>2029-11-30T00:00:00</forecast_completion><latest_schedule_changes>57</latest_schedule_changes><total_schedule_changes>1864</total_schedule_changes></row><row _id="row-56ma~u328-5ejw" _uuid="00000000-0000-0000-5DE5-71AC1E4322C9" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-56ma~u328-5ejw"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>709</pid><project_name>Beverly Road over Brighton Subway Line</project_name><description>Repair the Beverly Road bridge over BMT Subway Brighton,  Brooklyn</description><category>Bridges</category><borough>Brooklyn</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2020-01-06T00:00:00</design_start><budget_forecast>47981235.00</budget_forecast><latest_budget_changes>-500000.00</latest_budget_changes><total_budget_changes>1279646.00</total_budget_changes><forecast_completion>2030-02-28T00:00:00</forecast_completion><latest_schedule_changes>90</latest_schedule_changes><total_schedule_changes>1864</total_schedule_changes></row><row _id="row-piyx~e8mg-hggc" _uuid="00000000-0000-0000-F4A0-65D17D27781C" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-piyx~e8mg-hggc"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>709</pid><project_name>Beverly Road over Brighton Subway Line</project_name><description>Repair the Beverly Road bridge over BMT Subway Brighton,  Brooklyn</description><category>Bridges</category><borough>Brooklyn</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2020-01-06T00:00:00</design_start><budget_forecast>48248646.00</budget_forecast><latest_budget_changes>267411.00</latest_budget_changes><total_budget_changes>1279646.00</total_budget_changes><forecast_completion>2030-05-29T00:00:00</forecast_completion><latest_schedule_changes>90</latest_schedule_changes><total_schedule_changes>1864</total_schedule_changes></row><row _id="row-xydj_3s83_xuip" _uuid="00000000-0000-0000-8AB2-89664D584A6A" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-xydj_3s83_xuip"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>709</pid><project_name>Beverly Road over Brighton Subway Line</project_name><description>Repair the Beverly Road bridge over BMT Subway Brighton,  Brooklyn</description><category>Bridges</category><borough>Brooklyn</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2020-01-06T00:00:00</design_start><budget_forecast>48481646.00</budget_forecast><latest_budget_changes>233000.00</latest_budget_changes><total_budget_changes>1279646.00</total_budget_changes><forecast_completion>2030-09-26T00:00:00</forecast_completion><latest_schedule_changes>120</latest_schedule_changes><total_schedule_changes>1864</total_schedule_changes></row><row _id="row-chex_ee4b.nhsm" _uuid="00000000-0000-0000-3124-F9883AD1BA3C" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-chex_ee4b.nhsm"><date_reported_as_of>2018-03-01T00:00:00</date_reported_as_of><pid>720</pid><project_name>Reconstruction of the West and North Docks at the OH WWTP</project_name><description>RECONSTRUCTION OF SEA WALL AND DOCK AT OWLS HEAD WWTP</description><category>Wastewater Treatment</category><borough>Brooklyn</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2017-02-13T00:00:00</design_start><budget_forecast>61612778.00</budget_forecast><total_budget_changes>10985726.80</total_budget_changes><forecast_completion>2020-05-12T00:00:00</forecast_completion><total_schedule_changes>1389</total_schedule_changes></row><row _id="row-fbwk~5273-wnjn" _uuid="00000000-0000-0000-5D22-53DB2AA4088B" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-fbwk~5273-wnjn"><date_reported_as_of>2018-08-01T00:00:00</date_reported_as_of><pid>720</pid><project_name>Reconstruction of the West and North Docks at the OH WWTP</project_name><description>RECONSTRUCTION OF SEA WALL AND DOCK AT OWLS HEAD WWTP</description><category>Wastewater Treatment</category><borough>Brooklyn</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2017-08-18T00:00:00</design_start><budget_forecast>56198668.00</budget_forecast><latest_budget_changes>-5414110.00</latest_budget_changes><total_budget_changes>10985726.80</total_budget_changes><forecast_completion>2021-04-17T00:00:00</forecast_completion><latest_schedule_changes>340</latest_schedule_changes><total_schedule_changes>1389</total_schedule_changes></row><row _id="row-cai5-4xqh_fw6i" _uuid="00000000-0000-0000-C04F-E0EA8D753671" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-cai5-4xqh_fw6i"><date_reported_as_of>2019-01-01T00:00:00</date_reported_as_of><pid>720</pid><project_name>Reconstruction of the West and North Docks at the OH WWTP</project_name><description>RECONSTRUCTION OF SEA WALL AND DOCK AT OWLS HEAD WWTP</description><category>Wastewater Treatment</category><borough>Brooklyn</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2017-08-18T00:00:00</design_start><budget_forecast>59871570.00</budget_forecast><latest_budget_changes>3672902.00</latest_budget_changes><total_budget_changes>10985726.80</total_budget_changes><forecast_completion>2021-08-16T00:00:00</forecast_completion><latest_schedule_changes>121</latest_schedule_changes><total_schedule_changes>1389</total_schedule_changes></row><row _id="row-4n99.6srw.hqu8" _uuid="00000000-0000-0000-7BDE-19F34BBE8BDB" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-4n99.6srw.hqu8"><date_reported_as_of>2019-05-01T00:00:00</date_reported_as_of><pid>720</pid><project_name>Reconstruction of the West and North Docks at the OH WWTP</project_name><description>RECONSTRUCTION OF SEA WALL AND DOCK AT OWLS HEAD WWTP</description><category>Wastewater Treatment</category><borough>Brooklyn</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2017-08-18T00:00:00</design_start><budget_forecast>63323000.00</budget_forecast><latest_budget_changes>3451430.00</latest_budget_changes><total_budget_changes>10985726.80</total_budget_changes><forecast_completion>2021-11-08T00:00:00</forecast_completion><latest_schedule_changes>84</latest_schedule_changes><total_schedule_changes>1389</total_schedule_changes></row><row _id="row-e8br_6jxn-pn7s" _uuid="00000000-0000-0000-4BC1-55773AB7A34E" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-e8br_6jxn-pn7s"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>720</pid><project_name>Reconstruction of the West and North Docks at the OH WWTP</project_name><description>RECONSTRUCTION OF SEA WALL AND DOCK AT OWLS HEAD WWTP</description><category>Wastewater Treatment</category><borough>Brooklyn</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2017-08-18T00:00:00</design_start><budget_forecast>63323000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>10985726.80</total_budget_changes><forecast_completion>2022-02-11T00:00:00</forecast_completion><latest_schedule_changes>95</latest_schedule_changes><total_schedule_changes>1389</total_schedule_changes></row><row _id="row-hyic.5qhy_3w4k" _uuid="00000000-0000-0000-3BDF-740CDEAB110D" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-hyic.5qhy_3w4k"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>720</pid><project_name>Reconstruction of the West and North Docks at the OH WWTP</project_name><description>RECONSTRUCTION OF SEA WALL AND DOCK AT OWLS HEAD WWTP</description><category>Wastewater Treatment</category><borough>Brooklyn</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2017-08-18T00:00:00</design_start><budget_forecast>63726414.00</budget_forecast><latest_budget_changes>403414.00</latest_budget_changes><total_budget_changes>10985726.80</total_budget_changes><forecast_completion>2023-02-22T00:00:00</forecast_completion><latest_schedule_changes>376</latest_schedule_changes><total_schedule_changes>1389</total_schedule_changes></row><row _id="row-dv3k-umii_u2dg" _uuid="00000000-0000-0000-C410-57D3ACE445FB" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-dv3k-umii_u2dg"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>720</pid><project_name>Reconstruction of the West and North Docks at the OH WWTP</project_name><description>RECONSTRUCTION OF SEA WALL AND DOCK AT OWLS HEAD WWTP</description><category>Wastewater Treatment</category><borough>Brooklyn</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2017-08-18T00:00:00</design_start><budget_forecast>62530068.25</budget_forecast><latest_budget_changes>-1196345.75</latest_budget_changes><total_budget_changes>10985726.80</total_budget_changes><forecast_completion>2023-02-22T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1389</total_schedule_changes></row><row _id="row-jnha.tya4~wdgx" _uuid="00000000-0000-0000-5488-98B3AB630856" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-jnha.tya4~wdgx"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>720</pid><project_name>Reconstruction of the West and North Docks at the OH WWTP</project_name><description>RECONSTRUCTION OF SEA WALL AND DOCK AT OWLS HEAD WWTP</description><category>Wastewater Treatment</category><borough>Brooklyn</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2017-08-18T00:00:00</design_start><budget_forecast>62599208.17</budget_forecast><latest_budget_changes>69139.92</latest_budget_changes><total_budget_changes>10985726.80</total_budget_changes><forecast_completion>2023-02-22T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1389</total_schedule_changes></row><row _id="row-q8sn-2d6n~xtd7" _uuid="00000000-0000-0000-6683-73EB83504FE8" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-q8sn-2d6n~xtd7"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>720</pid><project_name>Reconstruction of the West and North Docks at the OH WWTP</project_name><description>RECONSTRUCTION OF SEA WALL AND DOCK AT OWLS HEAD WWTP</description><category>Wastewater Treatment</category><borough>Brooklyn</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2017-08-18T00:00:00</design_start><budget_forecast>63402555.40</budget_forecast><latest_budget_changes>803347.23</latest_budget_changes><total_budget_changes>10985726.80</total_budget_changes><forecast_completion>2023-02-22T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1389</total_schedule_changes></row><row _id="row-eyxp~ceg9-xzzf" _uuid="00000000-0000-0000-5C90-7DA2361938A8" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-eyxp~ceg9-xzzf"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>720</pid><project_name>Reconstruction of the West and North Docks at the OH WWTP</project_name><description>RECONSTRUCTION OF SEA WALL AND DOCK AT OWLS HEAD WWTP</description><category>Wastewater Treatment</category><borough>Brooklyn</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2017-08-18T00:00:00</design_start><budget_forecast>65618513.00</budget_forecast><latest_budget_changes>2215957.60</latest_budget_changes><total_budget_changes>10985726.80</total_budget_changes><forecast_completion>2023-10-11T00:00:00</forecast_completion><latest_schedule_changes>231</latest_schedule_changes><total_schedule_changes>1389</total_schedule_changes></row><row _id="row-uwdz-5g5e~8fd7" _uuid="00000000-0000-0000-BA5E-9FC07B42585F" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-uwdz-5g5e~8fd7"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>720</pid><project_name>Reconstruction of the West and North Docks at the OH WWTP</project_name><description>RECONSTRUCTION OF SEA WALL AND DOCK AT OWLS HEAD WWTP</description><category>Wastewater Treatment</category><borough>Brooklyn</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2017-08-18T00:00:00</design_start><budget_forecast>74531450.00</budget_forecast><latest_budget_changes>8912937.00</latest_budget_changes><total_budget_changes>10985726.80</total_budget_changes><forecast_completion>2024-04-29T00:00:00</forecast_completion><latest_schedule_changes>201</latest_schedule_changes><total_schedule_changes>1389</total_schedule_changes></row><row _id="row-fvex_pvec.mx7r" _uuid="00000000-0000-0000-DB52-3AE057C54F7A" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-fvex_pvec.mx7r"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>720</pid><project_name>Reconstruction of the West and North Docks at the OH WWTP</project_name><description>RECONSTRUCTION OF SEA WALL AND DOCK AT OWLS HEAD WWTP</description><category>Wastewater Treatment</category><borough>Brooklyn</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2017-08-18T00:00:00</design_start><budget_forecast>74531450.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>10985726.80</total_budget_changes><forecast_completion>2024-05-09T00:00:00</forecast_completion><latest_schedule_changes>10</latest_schedule_changes><total_schedule_changes>1389</total_schedule_changes></row><row _id="row-zx7w~fmux_i3kq" _uuid="00000000-0000-0000-F619-A5FCC3E36C60" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-zx7w~fmux_i3kq"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>720</pid><project_name>Reconstruction of the West and North Docks at the OH WWTP</project_name><description>RECONSTRUCTION OF SEA WALL AND DOCK AT OWLS HEAD WWTP</description><category>Wastewater Treatment</category><borough>Brooklyn</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2017-08-18T00:00:00</design_start><budget_forecast>72598504.80</budget_forecast><latest_budget_changes>-1932945.20</latest_budget_changes><total_budget_changes>10985726.80</total_budget_changes><forecast_completion>2024-05-09T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1389</total_schedule_changes></row><row _id="row-5yca~3dim_hhs7" _uuid="00000000-0000-0000-213A-8F5B23F2052F" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-5yca~3dim_hhs7"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>720</pid><project_name>Reconstruction of the West and North Docks at the OH WWTP</project_name><description>RECONSTRUCTION OF SEA WALL AND DOCK AT OWLS HEAD WWTP</description><category>Wastewater Treatment</category><borough>Brooklyn</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2017-08-18T00:00:00</design_start><budget_forecast>72598504.80</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>10985726.80</total_budget_changes><forecast_completion>2024-03-01T00:00:00</forecast_completion><latest_schedule_changes>-69</latest_schedule_changes><total_schedule_changes>1389</total_schedule_changes></row><row _id="row-ew7b~8ej6-win3" _uuid="00000000-0000-0000-A102-A274C1BFC480" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ew7b~8ej6-win3"><date_reported_as_of>2018-08-01T00:00:00</date_reported_as_of><pid>721</pid><project_name>Storm Mitigation Loan Program at Red Hook</project_name><description>SMLP portion for Red Hook WWTP as part of the New York City Wastewater Resiliency Program.</description><category>Wastewater Treatment</category><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2018-05-30T00:00:00</design_start><budget_forecast>34444531.97</budget_forecast><latest_budget_changes>4205214.08</latest_budget_changes><total_budget_changes>13549422.97</total_budget_changes><forecast_completion>2021-01-20T00:00:00</forecast_completion><latest_schedule_changes>-1</latest_schedule_changes><total_schedule_changes>921</total_schedule_changes></row><row _id="row-scyj.jeh5_xe2c" _uuid="00000000-0000-0000-A0B4-AC28AF5E97AF" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-scyj.jeh5_xe2c"><date_reported_as_of>2019-01-01T00:00:00</date_reported_as_of><pid>721</pid><project_name>Storm Mitigation Loan Program at Red Hook</project_name><description>SMLP portion for Red Hook WRRF as part of the New York City Wastewater Resiliency Program.</description><category>Wastewater Treatment</category><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2018-11-01T00:00:00</design_start><budget_forecast>34621097.86</budget_forecast><latest_budget_changes>176565.89</latest_budget_changes><total_budget_changes>13549422.97</total_budget_changes><forecast_completion>2021-06-23T00:00:00</forecast_completion><latest_schedule_changes>154</latest_schedule_changes><total_schedule_changes>921</total_schedule_changes></row><row _id="row-uxa2.bfke.n475" _uuid="00000000-0000-0000-0A6B-3F832544FA48" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-uxa2.bfke.n475"><date_reported_as_of>2019-05-01T00:00:00</date_reported_as_of><pid>721</pid><project_name>Storm Mitigation Loan Program at Red Hook</project_name><description>SMLP portion for Red Hook WRRF as part of the New York City Wastewater Resiliency Program.</description><category>Wastewater Treatment</category><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2018-11-01T00:00:00</design_start><budget_forecast>38110604.77</budget_forecast><latest_budget_changes>3489506.91</latest_budget_changes><total_budget_changes>13549422.97</total_budget_changes><forecast_completion>2021-11-03T00:00:00</forecast_completion><latest_schedule_changes>133</latest_schedule_changes><total_schedule_changes>921</total_schedule_changes></row><row _id="row-as38~c9fh~rex2" _uuid="00000000-0000-0000-6577-F4FDBE118AB1" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-as38~c9fh~rex2"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>721</pid><project_name>Storm Mitigation Loan Program at Red Hook</project_name><description>SMLP portion for Red Hook WRRF as part of the New York City Wastewater Resiliency Program.</description><category>Wastewater Treatment</category><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2018-11-01T00:00:00</design_start><budget_forecast>23924743.23</budget_forecast><latest_budget_changes>-14185861.54</latest_budget_changes><total_budget_changes>13549422.97</total_budget_changes><forecast_completion>2021-12-06T00:00:00</forecast_completion><latest_schedule_changes>33</latest_schedule_changes><total_schedule_changes>921</total_schedule_changes></row><row _id="row-uz8f_yreg_482y" _uuid="00000000-0000-0000-BE99-20B82D284DF8" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-uz8f_yreg_482y"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>721</pid><project_name>Storm Mitigation Loan Program at Red Hook</project_name><description>SMLP portion for Red Hook WRRF as part of the New York City Wastewater Resiliency Program.</description><category>Wastewater Treatment</category><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2018-11-01T00:00:00</design_start><budget_forecast>23969267.17</budget_forecast><latest_budget_changes>44523.94</latest_budget_changes><total_budget_changes>13549422.97</total_budget_changes><forecast_completion>2022-05-09T00:00:00</forecast_completion><latest_schedule_changes>154</latest_schedule_changes><total_schedule_changes>921</total_schedule_changes></row><row _id="row-jir3-jh6d-27b5" _uuid="00000000-0000-0000-1475-5EE32E28E001" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-jir3-jh6d-27b5"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>721</pid><project_name>Storm Mitigation Loan Program at Red Hook</project_name><description>SMLP portion for Red Hook WRRF as part of the New York City Wastewater Resiliency Program.</description><category>Wastewater Treatment</category><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction Procurement</current_phase><design_start>2018-11-01T00:00:00</design_start><budget_forecast>24483914.27</budget_forecast><latest_budget_changes>514647.10</latest_budget_changes><total_budget_changes>13549422.97</total_budget_changes><forecast_completion>2022-07-05T00:00:00</forecast_completion><latest_schedule_changes>57</latest_schedule_changes><total_schedule_changes>921</total_schedule_changes></row><row _id="row-gwia.68n4~sejs" _uuid="00000000-0000-0000-6669-BEE77FF0F1EB" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-gwia.68n4~sejs"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>721</pid><project_name>Storm Mitigation Loan Program at Red Hook</project_name><description>SMLP portion for Red Hook WRRF as part of the New York City Wastewater Resiliency Program.</description><category>Wastewater Treatment</category><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction Procurement</current_phase><design_start>2018-11-01T00:00:00</design_start><budget_forecast>26273116.75</budget_forecast><latest_budget_changes>1789202.48</latest_budget_changes><total_budget_changes>13549422.97</total_budget_changes><forecast_completion>2023-01-13T00:00:00</forecast_completion><latest_schedule_changes>192</latest_schedule_changes><total_schedule_changes>921</total_schedule_changes></row><row _id="row-qq57-ua9g~c58i" _uuid="00000000-0000-0000-42B1-57884F61143D" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-qq57-ua9g~c58i"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>721</pid><project_name>Storm Mitigation Loan Program at Red Hook</project_name><description>SMLP portion for Red Hook WRRF as part of the New York City Wastewater Resiliency Program.</description><category>Wastewater Treatment</category><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2018-11-01T00:00:00</design_start><budget_forecast>18905305.33</budget_forecast><latest_budget_changes>-7367811.42</latest_budget_changes><total_budget_changes>13549422.97</total_budget_changes><forecast_completion>2022-09-01T00:00:00</forecast_completion><latest_schedule_changes>-134</latest_schedule_changes><total_schedule_changes>921</total_schedule_changes></row><row _id="row-uw2h.j3kg~p5yu" _uuid="00000000-0000-0000-41F0-95B421D234CD" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-uw2h.j3kg~p5yu"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>721</pid><project_name>Storm Mitigation Loan Program at Red Hook</project_name><description>SMLP portion for Red Hook WRRF as part of the New York City Wastewater Resiliency Program.</description><category>Wastewater Treatment</category><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2018-11-01T00:00:00</design_start><budget_forecast>35565620.12</budget_forecast><latest_budget_changes>16660314.79</latest_budget_changes><total_budget_changes>13549422.97</total_budget_changes><forecast_completion>2022-09-01T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>921</total_schedule_changes></row><row _id="row-9pgg.83ts~ycm7" _uuid="00000000-0000-0000-8994-21D38C8525B7" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-9pgg.83ts~ycm7"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>721</pid><project_name>Storm Mitigation Loan Program at Red Hook</project_name><description>SMLP portion for Red Hook WWTP as part of the New York City Wastewater Resiliency Program.</description><category>Wastewater Treatment</category><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2018-11-01T00:00:00</design_start><budget_forecast>39124845.02</budget_forecast><latest_budget_changes>3559224.90</latest_budget_changes><total_budget_changes>13549422.97</total_budget_changes><forecast_completion>2022-09-01T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>921</total_schedule_changes></row><row _id="row-fru9-75ca~zgyv" _uuid="00000000-0000-0000-0627-75F0790EE0A7" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-fru9-75ca~zgyv"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>721</pid><project_name>Storm Mitigation Loan Program at Red Hook</project_name><description>SMLP portion for Red Hook WWTP as part of the New York City Wastewater Resiliency Program.</description><category>Wastewater Treatment</category><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2018-11-01T00:00:00</design_start><budget_forecast>39078898.98</budget_forecast><latest_budget_changes>-45946.04</latest_budget_changes><total_budget_changes>13549422.97</total_budget_changes><forecast_completion>2022-09-01T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>921</total_schedule_changes></row><row _id="row-9m22~wi55.899u" _uuid="00000000-0000-0000-77A5-555EE340F573" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-9m22~wi55.899u"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>721</pid><project_name>Storm Mitigation Loan Program at Red Hook</project_name><description>SMLP portion for Red Hook WWTP as part of the New York City Wastewater Resiliency Program.</description><category>Wastewater Treatment</category><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2018-11-01T00:00:00</design_start><budget_forecast>43033453.47</budget_forecast><latest_budget_changes>3954554.49</latest_budget_changes><total_budget_changes>13549422.97</total_budget_changes><forecast_completion>2023-07-31T00:00:00</forecast_completion><latest_schedule_changes>333</latest_schedule_changes><total_schedule_changes>921</total_schedule_changes></row><row _id="row-eu6i~bqap-rd3u" _uuid="00000000-0000-0000-DA96-0D3583975B55" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-eu6i~bqap-rd3u"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>721</pid><project_name>Storm Mitigation Loan Program at Red Hook</project_name><description>SMLP portion for Red Hook WWTP as part of the New York City Wastewater Resiliency Program.</description><category>Wastewater Treatment</category><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2018-11-01T00:00:00</design_start><budget_forecast>43788740.86</budget_forecast><latest_budget_changes>755287.39</latest_budget_changes><total_budget_changes>13549422.97</total_budget_changes><forecast_completion>2023-07-31T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>921</total_schedule_changes></row><row _id="row-dhx3_kev7-ys77" _uuid="00000000-0000-0000-1DA9-807293044D4D" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-dhx3_kev7-ys77"><date_reported_as_of>2018-03-01T00:00:00</date_reported_as_of><pid>722</pid><project_name>Throgs Neck Pumping Station Rehabilitation and Improvements</project_name><description>Throgs Neck Pumping Station Rehabilitation and Improvements</description><category>Wastewater Treatment</category><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2018-06-11T00:00:00</design_start><budget_forecast>41689486.00</budget_forecast><total_budget_changes>25708336.86</total_budget_changes><forecast_completion>2023-03-04T00:00:00</forecast_completion><total_schedule_changes>1306</total_schedule_changes></row><row _id="row-cxvh.p6yb~mmx2" _uuid="00000000-0000-0000-6472-50AC7EBAEB39" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-cxvh.p6yb~mmx2"><date_reported_as_of>2018-08-01T00:00:00</date_reported_as_of><pid>722</pid><project_name>Throgs Neck Pumping Station Rehabilitation and Improvements</project_name><description>Throgs Neck Pumping Station Rehabilitation and Improvements</description><category>Wastewater Treatment</category><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2018-06-11T00:00:00</design_start><budget_forecast>46015605.00</budget_forecast><latest_budget_changes>4326119.00</latest_budget_changes><total_budget_changes>25708336.86</total_budget_changes><forecast_completion>2022-11-22T00:00:00</forecast_completion><latest_schedule_changes>-102</latest_schedule_changes><total_schedule_changes>1306</total_schedule_changes></row><row _id="row-iy8d.drzz.b2r5" _uuid="00000000-0000-0000-81F6-84A6DF6F64AB" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-iy8d.drzz.b2r5"><date_reported_as_of>2019-01-01T00:00:00</date_reported_as_of><pid>722</pid><project_name>Throgs Neck Pumping Station Rehabilitation and Improvements</project_name><description>Throgs Neck Pumping Station Rehabilitation and Improvements</description><category>Wastewater Treatment</category><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2018-06-11T00:00:00</design_start><budget_forecast>42156642.00</budget_forecast><latest_budget_changes>-3858963.00</latest_budget_changes><total_budget_changes>25708336.86</total_budget_changes><forecast_completion>2022-12-20T00:00:00</forecast_completion><latest_schedule_changes>28</latest_schedule_changes><total_schedule_changes>1306</total_schedule_changes></row><row _id="row-2hyv_fem7-ajai" _uuid="00000000-0000-0000-7300-2B078DDB9745" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-2hyv_fem7-ajai"><date_reported_as_of>2019-05-01T00:00:00</date_reported_as_of><pid>722</pid><project_name>Throgs Neck Pumping Station Rehabilitation and Improvements</project_name><description>Throgs Neck Pumping Station Rehabilitation and Improvements</description><category>Wastewater Treatment</category><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2018-06-11T00:00:00</design_start><budget_forecast>48006911.00</budget_forecast><latest_budget_changes>5850269.00</latest_budget_changes><total_budget_changes>25708336.86</total_budget_changes><forecast_completion>2023-03-10T00:00:00</forecast_completion><latest_schedule_changes>80</latest_schedule_changes><total_schedule_changes>1306</total_schedule_changes></row><row _id="row-bf77-vy93_pf7t" _uuid="00000000-0000-0000-F914-FCA15981A3D9" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-bf77-vy93_pf7t"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>722</pid><project_name>Throgs Neck Pumping Station Rehabilitation and Improvements</project_name><description>Throgs Neck Pumping Station Rehabilitation and Improvements</description><category>Wastewater Treatment</category><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2018-06-11T00:00:00</design_start><budget_forecast>48108647.00</budget_forecast><latest_budget_changes>101736.00</latest_budget_changes><total_budget_changes>25708336.86</total_budget_changes><forecast_completion>2023-04-26T00:00:00</forecast_completion><latest_schedule_changes>47</latest_schedule_changes><total_schedule_changes>1306</total_schedule_changes></row><row _id="row-gycz.isa7.8nzz" _uuid="00000000-0000-0000-6801-B89FE2A94999" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-gycz.isa7.8nzz"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>722</pid><project_name>Throgs Neck Pumping Station Rehabilitation and Improvements</project_name><description>Throgs Neck Pumping Station Rehabilitation and Improvements</description><category>Wastewater Treatment</category><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2018-06-11T00:00:00</design_start><budget_forecast>48108647.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>25708336.86</total_budget_changes><forecast_completion>2023-11-24T00:00:00</forecast_completion><latest_schedule_changes>212</latest_schedule_changes><total_schedule_changes>1306</total_schedule_changes></row><row _id="row-kb9g-rgrd-99ad" _uuid="00000000-0000-0000-B09C-BB703BD73341" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-kb9g-rgrd-99ad"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>722</pid><project_name>Throgs Neck Pumping Station Rehabilitation and Improvements</project_name><description>Throgs Neck Pumping Station Rehabilitation and Improvements</description><category>Wastewater Treatment</category><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2018-06-11T00:00:00</design_start><budget_forecast>48188239.69</budget_forecast><latest_budget_changes>79592.69</latest_budget_changes><total_budget_changes>25708336.86</total_budget_changes><forecast_completion>2024-01-11T00:00:00</forecast_completion><latest_schedule_changes>48</latest_schedule_changes><total_schedule_changes>1306</total_schedule_changes></row><row _id="row-gnhg~ah3b_awpi" _uuid="00000000-0000-0000-32CA-49CB32610392" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-gnhg~ah3b_awpi"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>722</pid><project_name>Throgs Neck Pumping Station Rehabilitation and Improvements</project_name><description>Throgs Neck Pumping Station Rehabilitation and Improvements</description><category>Wastewater Treatment</category><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2018-06-11T00:00:00</design_start><budget_forecast>56696738.50</budget_forecast><latest_budget_changes>8508498.81</latest_budget_changes><total_budget_changes>25708336.86</total_budget_changes><forecast_completion>2024-06-09T00:00:00</forecast_completion><latest_schedule_changes>150</latest_schedule_changes><total_schedule_changes>1306</total_schedule_changes></row><row _id="row-ugb5~54wk.tr7k" _uuid="00000000-0000-0000-1352-383A7CF60BFB" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ugb5~54wk.tr7k"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>722</pid><project_name>Throgs Neck Pumping Station Rehabilitation and Improvements</project_name><description>Throgs Neck Pumping Station Rehabilitation and Improvements</description><category>Wastewater Treatment</category><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction Procurement</current_phase><design_start>2018-06-11T00:00:00</design_start><budget_forecast>56696739.69</budget_forecast><latest_budget_changes>1.19</latest_budget_changes><total_budget_changes>25708336.86</total_budget_changes><forecast_completion>2024-05-29T00:00:00</forecast_completion><latest_schedule_changes>-11</latest_schedule_changes><total_schedule_changes>1306</total_schedule_changes></row><row _id="row-4wjq-rdya-dxfw" _uuid="00000000-0000-0000-92D7-F8EF35272BE3" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-4wjq-rdya-dxfw"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>722</pid><project_name>Throgs Neck Pumping Station Rehabilitation and Improvements</project_name><description>Throgs Neck Pumping Station Rehabilitation and Improvements</description><category>Wastewater Treatment</category><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction Procurement</current_phase><design_start>2018-06-11T00:00:00</design_start><budget_forecast>65875108.19</budget_forecast><latest_budget_changes>9178368.50</latest_budget_changes><total_budget_changes>25708336.86</total_budget_changes><forecast_completion>2024-05-23T00:00:00</forecast_completion><latest_schedule_changes>-6</latest_schedule_changes><total_schedule_changes>1306</total_schedule_changes></row><row _id="row-iezu.vfby_rpxc" _uuid="00000000-0000-0000-9292-CD10D7469F84" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-iezu.vfby_rpxc"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>722</pid><project_name>Throgs Neck Pumping Station Rehabilitation and Improvements</project_name><description>Throgs Neck Pumping Station Rehabilitation and Improvements</description><category>Wastewater Treatment</category><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction Procurement</current_phase><design_start>2018-06-30T00:00:00</design_start><budget_forecast>67399887.19</budget_forecast><latest_budget_changes>1524779.00</latest_budget_changes><total_budget_changes>25708336.86</total_budget_changes><forecast_completion>2024-07-25T00:00:00</forecast_completion><latest_schedule_changes>63</latest_schedule_changes><total_schedule_changes>1306</total_schedule_changes></row><row _id="row-v6h7_xvbp-bdrq" _uuid="00000000-0000-0000-F17A-0E89DB590079" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-v6h7_xvbp-bdrq"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>722</pid><project_name>Throgs Neck Pumping Station Rehabilitation and Improvements</project_name><description>Throgs Neck Pumping Station Rehabilitation and Improvements</description><category>Wastewater Treatment</category><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2018-06-30T00:00:00</design_start><budget_forecast>67400071.25</budget_forecast><latest_budget_changes>184.06</latest_budget_changes><total_budget_changes>25708336.86</total_budget_changes><forecast_completion>2025-12-16T00:00:00</forecast_completion><latest_schedule_changes>509</latest_schedule_changes><total_schedule_changes>1306</total_schedule_changes></row><row _id="row-bjdb_yt4u~b586" _uuid="00000000-0000-0000-7971-28455F436B3F" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-bjdb_yt4u~b586"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>722</pid><project_name>Throgs Neck Pumping Station Rehabilitation and Improvements</project_name><description>Throgs Neck Pumping Station Rehabilitation and Improvements</description><category>Wastewater Treatment</category><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2018-06-30T00:00:00</design_start><budget_forecast>67397822.86</budget_forecast><latest_budget_changes>-2248.39</latest_budget_changes><total_budget_changes>25708336.86</total_budget_changes><forecast_completion>2025-12-16T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1306</total_schedule_changes></row><row _id="row-dr3h.szd2_42uj" _uuid="00000000-0000-0000-5AC4-64EF5D798856" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-dr3h.szd2_42uj"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>722</pid><project_name>Throgs Neck Pumping Station Rehabilitation and Improvements</project_name><description>Throgs Neck Pumping Station Rehabilitation and Improvements</description><category>Wastewater Treatment</category><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2018-06-30T00:00:00</design_start><budget_forecast>67397822.86</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>25708336.86</total_budget_changes><forecast_completion>2026-09-30T00:00:00</forecast_completion><latest_schedule_changes>288</latest_schedule_changes><total_schedule_changes>1306</total_schedule_changes></row><row _id="row-7xep-t5up-cqqw" _uuid="00000000-0000-0000-56C7-C77B94625672" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-7xep-t5up-cqqw"><date_reported_as_of>2018-03-01T00:00:00</date_reported_as_of><pid>723</pid><project_name>Revenue Cycle Implementation</project_name><description>The Epic Revenue Cycle system will be  enterprise-wide and help increase revenue (by proper billing of services provided) in addition to ensuring patient safety and improved patient care, a top priority in workflows.</description><category>Health and Hospitals, IT</category><borough>Citywide</borough><managing_agency>HHC</managing_agency><client_agency>H+H</client_agency><current_phase>IT</current_phase><budget_forecast>289117990.00</budget_forecast><total_budget_changes>0.00</total_budget_changes><forecast_completion>2020-06-30T00:00:00</forecast_completion><total_schedule_changes>1279</total_schedule_changes></row><row _id="row-e4ps.vray_7ebt" _uuid="00000000-0000-0000-3EBC-3E280213AA9C" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-e4ps.vray_7ebt"><date_reported_as_of>2018-08-01T00:00:00</date_reported_as_of><pid>723</pid><project_name>Revenue Cycle Implementation</project_name><description>The Epic Revenue Cycle system will be  enterprise-wide and help increase revenue (by proper billing of services provided) in addition to ensuring patient safety and improved patient care, a top priority in workflows.</description><category>Health and Hospitals, IT</category><borough>Citywide</borough><managing_agency>HHC</managing_agency><client_agency>H+H</client_agency><current_phase>IT</current_phase><budget_forecast>289117990.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2018-10-20T00:00:00</forecast_completion><latest_schedule_changes>-619</latest_schedule_changes><total_schedule_changes>1279</total_schedule_changes></row><row _id="row-t6eb~i537~c7yt" _uuid="00000000-0000-0000-F495-2B5ABDB20469" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-t6eb~i537~c7yt"><date_reported_as_of>2019-01-01T00:00:00</date_reported_as_of><pid>723</pid><project_name>Revenue Cycle Implementation</project_name><description>The Epic Revenue Cycle system will be  enterprise-wide and help increase revenue (by proper billing of services provided) in addition to ensuring patient safety and improved patient care, a top priority in workflows.</description><category>Health and Hospitals, IT</category><borough>Citywide</borough><managing_agency>HHC</managing_agency><client_agency>H+H</client_agency><current_phase>IT</current_phase><budget_forecast>289117990.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2019-11-23T00:00:00</forecast_completion><latest_schedule_changes>399</latest_schedule_changes><total_schedule_changes>1279</total_schedule_changes></row><row _id="row-4869~cuui~jgwu" _uuid="00000000-0000-0000-A62D-845C45D5D257" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-4869~cuui~jgwu"><date_reported_as_of>2019-05-01T00:00:00</date_reported_as_of><pid>723</pid><project_name>Revenue Cycle Implementation</project_name><description>The Epic Revenue Cycle system will be  enterprise-wide and help increase revenue (by proper billing of services provided) in addition to ensuring patient safety and improved patient care, a top priority in workflows.</description><category>Health and Hospitals, IT</category><borough>Citywide</borough><managing_agency>HHC</managing_agency><client_agency>H+H</client_agency><current_phase>IT</current_phase><budget_forecast>289117990.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2017-12-31T00:00:00</forecast_completion><latest_schedule_changes>-692</latest_schedule_changes><total_schedule_changes>1279</total_schedule_changes></row><row _id="row-z7mb.a52x-r2td" _uuid="00000000-0000-0000-72DA-38272F578916" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-z7mb.a52x-r2td"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>723</pid><project_name>Revenue Cycle Implementation</project_name><description>The Epic Revenue Cycle system will be  enterprise-wide and help increase revenue (by proper billing of services provided) in addition to ensuring patient safety and improved patient care, a top priority in workflows.</description><category>Health and Hospitals, IT</category><borough>Citywide</borough><managing_agency>HHC</managing_agency><client_agency>H+H</client_agency><current_phase>IT</current_phase><budget_forecast>289117990.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2019-12-07T00:00:00</forecast_completion><latest_schedule_changes>706</latest_schedule_changes><total_schedule_changes>1279</total_schedule_changes></row><row _id="row-vcu2_r756~6nfz" _uuid="00000000-0000-0000-0A10-53836975B4BC" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-vcu2_r756~6nfz"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>723</pid><project_name>Revenue Cycle Implementation</project_name><description>The Epic Revenue Cycle system will be  enterprise-wide and help increase revenue (by proper billing of services provided) in addition to ensuring patient safety and improved patient care, a top priority in workflows.</description><category>Health and Hospitals, IT</category><borough>Citywide</borough><managing_agency>HHC</managing_agency><client_agency>H+H</client_agency><current_phase>IT</current_phase><budget_forecast>289117990.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2020-11-15T00:00:00</forecast_completion><latest_schedule_changes>344</latest_schedule_changes><total_schedule_changes>1279</total_schedule_changes></row><row _id="row-f576.gnrj.uzga" _uuid="00000000-0000-0000-9297-244D6A858530" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-f576.gnrj.uzga"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>723</pid><project_name>Revenue Cycle Implementation</project_name><description>The Epic Revenue Cycle system will be  enterprise-wide and help increase revenue (by proper billing of services provided) in addition to ensuring patient safety and improved patient care, a top priority in workflows.</description><category>Health and Hospitals, IT</category><borough>Citywide</borough><managing_agency>HHC</managing_agency><client_agency>H+H</client_agency><current_phase>IT</current_phase><budget_forecast>289117990.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2021-05-30T00:00:00</forecast_completion><latest_schedule_changes>196</latest_schedule_changes><total_schedule_changes>1279</total_schedule_changes></row><row _id="row-vxrf-k2hj.93kb" _uuid="00000000-0000-0000-6AAF-89299149C27B" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-vxrf-k2hj.93kb"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>723</pid><project_name>Revenue Cycle Implementation</project_name><description>The Epic Revenue Cycle system will be  enterprise-wide and help increase revenue (by proper billing of services provided) in addition to ensuring patient safety and improved patient care, a top priority in workflows.</description><category>Health and Hospitals, IT</category><borough>Citywide</borough><managing_agency>HHC</managing_agency><client_agency>H+H</client_agency><current_phase>IT</current_phase><budget_forecast>289117990.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2021-05-30T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1279</total_schedule_changes></row><row _id="row-nza6-cphy~dwsn" _uuid="00000000-0000-0000-A4AB-03BC648CFDA9" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-nza6-cphy~dwsn"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>723</pid><project_name>Revenue Cycle Implementation</project_name><description>The Epic Revenue Cycle system will be  enterprise-wide and help increase revenue (by proper billing of services provided) in addition to ensuring patient safety and improved patient care, a top priority in workflows.</description><category>Health and Hospitals, IT</category><borough>Citywide</borough><managing_agency>HHC</managing_agency><client_agency>H+H</client_agency><current_phase>IT</current_phase><budget_forecast>289117990.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2022-12-31T00:00:00</forecast_completion><latest_schedule_changes>580</latest_schedule_changes><total_schedule_changes>1279</total_schedule_changes></row><row _id="row-h4xv~uyme-9ha4" _uuid="00000000-0000-0000-76D7-1E78EFC99FCB" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-h4xv~uyme-9ha4"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>723</pid><project_name>Revenue Cycle Implementation</project_name><description>The Epic Revenue Cycle system will be  enterprise-wide and help increase revenue (by proper billing of services provided) in addition to ensuring patient safety and improved patient care, a top priority in workflows.</description><category>Health and Hospitals, IT</category><borough>Citywide</borough><managing_agency>HHC</managing_agency><client_agency>H+H</client_agency><current_phase>IT</current_phase><budget_forecast>289117990.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2022-12-31T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1279</total_schedule_changes></row><row _id="row-w4im-zz7t-mxpj" _uuid="00000000-0000-0000-5E22-EBCDB2B1EA79" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-w4im-zz7t-mxpj"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>723</pid><project_name>Revenue Cycle Implementation</project_name><description>The Epic Revenue Cycle system will be  enterprise-wide and help increase revenue (by proper billing of services provided) in addition to ensuring patient safety and improved patient care, a top priority in workflows.</description><category>Health and Hospitals, IT</category><borough>Citywide</borough><managing_agency>HHC</managing_agency><client_agency>H+H</client_agency><current_phase>IT</current_phase><budget_forecast>289117990.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2022-12-31T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1279</total_schedule_changes></row><row _id="row-nnmi_5smk-nt24" _uuid="00000000-0000-0000-EA4C-B723D7EC596C" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-nnmi_5smk-nt24"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>723</pid><project_name>Revenue Cycle Implementation</project_name><description>The Epic Revenue Cycle system will be  enterprise-wide and help increase revenue (by proper billing of services provided) in addition to ensuring patient safety and improved patient care, a top priority in workflows.</description><category>Health and Hospitals, IT</category><borough>Citywide</borough><managing_agency>HHC</managing_agency><client_agency>H+H</client_agency><current_phase>IT</current_phase><budget_forecast>289117990.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2022-12-31T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1279</total_schedule_changes></row><row _id="row-mjyk.fgr2~tiab" _uuid="00000000-0000-0000-F4A8-8AF422045D48" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-mjyk.fgr2~tiab"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>723</pid><project_name>Revenue Cycle Implementation</project_name><description>The Epic Revenue Cycle system will be  enterprise-wide and help increase revenue (by proper billing of services provided) in addition to ensuring patient safety and improved patient care, a top priority in workflows.</description><category>Health and Hospitals, IT</category><borough>Citywide</borough><managing_agency>HHC</managing_agency><client_agency>H+H</client_agency><current_phase>IT</current_phase><budget_forecast>289117990.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2023-12-31T00:00:00</forecast_completion><latest_schedule_changes>365</latest_schedule_changes><total_schedule_changes>1279</total_schedule_changes></row><row _id="row-75rv~q454-ie6y" _uuid="00000000-0000-0000-487E-4E7B30434F4C" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-75rv~q454-ie6y"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>723</pid><project_name>Revenue Cycle Implementation</project_name><description>The Epic Revenue Cycle system will be  enterprise-wide and help increase revenue (by proper billing of services provided) in addition to ensuring patient safety and improved patient care, a top priority in workflows.</description><category>Health and Hospitals, IT</category><borough>Citywide</borough><managing_agency>HHC</managing_agency><client_agency>H+H</client_agency><current_phase>IT</current_phase><budget_forecast>289117990.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2023-12-31T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1279</total_schedule_changes></row><row _id="row-n3yx_cwj2.6cxc" _uuid="00000000-0000-0000-E421-23D437C4EB4E" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-n3yx_cwj2.6cxc"><date_reported_as_of>2019-01-01T00:00:00</date_reported_as_of><pid>730</pid><project_name>Far Rockaway New Facility</project_name><description>Construction of a new 18,000 sq.ft. Branch Library employing the latest technology and sustainable design.</description><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>Libraries-QBPL</client_agency><current_phase>Construction</current_phase><design_start>2012-01-10T00:00:00</design_start><budget_forecast>40155315.00</budget_forecast><total_budget_changes>-623757.91</total_budget_changes><forecast_completion>2023-08-16T00:00:00</forecast_completion><total_schedule_changes>-78</total_schedule_changes></row><row _id="row-jycy.qe4d~fff6" _uuid="00000000-0000-0000-E4FE-D2BB1179D62F" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-jycy.qe4d~fff6"><date_reported_as_of>2019-05-01T00:00:00</date_reported_as_of><pid>730</pid><project_name>Far Rockaway New Facility</project_name><description>Construction of a new 18,000 sq.ft. Branch employing the latest technology and sustainable design.</description><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>Libraries-QBPL</client_agency><current_phase>Close-Out</current_phase><design_start>2012-01-10T00:00:00</design_start><budget_forecast>32709000.00</budget_forecast><latest_budget_changes>-7446315.00</latest_budget_changes><total_budget_changes>-623757.91</total_budget_changes><forecast_completion>2021-07-30T00:00:00</forecast_completion><latest_schedule_changes>-747</latest_schedule_changes><total_schedule_changes>-78</total_schedule_changes></row><row _id="row-b58s~9nv4_2m33" _uuid="00000000-0000-0000-EF0D-529DBD9B4C9F" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-b58s~9nv4_2m33"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>730</pid><project_name>Far Rockaway New Facility</project_name><description>Construction of a new 18,000 sq.ft. Branch employing the latest technology and sustainable design.</description><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>Libraries-QBPL</client_agency><current_phase>Construction</current_phase><design_start>2012-01-10T00:00:00</design_start><budget_forecast>32709000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-623757.91</total_budget_changes><forecast_completion>2020-09-15T00:00:00</forecast_completion><latest_schedule_changes>-318</latest_schedule_changes><total_schedule_changes>-78</total_schedule_changes></row><row _id="row-97ka-t42p~by5n" _uuid="00000000-0000-0000-0A5D-60C88E9152C5" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-97ka-t42p~by5n"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>730</pid><project_name>Far Rockaway New Facility</project_name><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>Libraries-QBPL</client_agency><total_budget_changes>-623757.91</total_budget_changes><total_schedule_changes>-78</total_schedule_changes></row><row _id="row-w5qi.u7bg~w8su" _uuid="00000000-0000-0000-F71E-C596E46B3365" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-w5qi.u7bg~w8su"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>730</pid><project_name>Far Rockaway New Facility</project_name><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>Libraries-QBPL</client_agency><total_budget_changes>-623757.91</total_budget_changes><total_schedule_changes>-78</total_schedule_changes></row><row _id="row-x6xj_8d43-ykqj" _uuid="00000000-0000-0000-F809-CB7826862138" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-x6xj_8d43-ykqj"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>730</pid><project_name>Far Rockaway New Facility</project_name><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>Libraries-QBPL</client_agency><total_budget_changes>-623757.91</total_budget_changes><total_schedule_changes>-78</total_schedule_changes></row><row _id="row-h6u9.yafe~i53c" _uuid="00000000-0000-0000-3B51-8C9AF1A4C534" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-h6u9.yafe~i53c"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>730</pid><project_name>Far Rockaway New Facility</project_name><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>Libraries-QBPL</client_agency><total_budget_changes>-623757.91</total_budget_changes><total_schedule_changes>-78</total_schedule_changes></row><row _id="row-qh9k~6d6z_yn9k" _uuid="00000000-0000-0000-00C7-B6E94B16D7B1" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-qh9k~6d6z_yn9k"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>730</pid><project_name>Far Rockaway New Facility</project_name><description>Construction of a new 18,000 sq.ft. Branch employing the latest technology and sustainable design.</description><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>Libraries-QBPL</client_agency><current_phase>Construction</current_phase><design_start>2012-01-10T00:00:00</design_start><budget_forecast>39531556.00</budget_forecast><latest_budget_changes>6822556.00</latest_budget_changes><total_budget_changes>-623757.91</total_budget_changes><forecast_completion>2021-12-29T00:00:00</forecast_completion><latest_schedule_changes>470</latest_schedule_changes><total_schedule_changes>-78</total_schedule_changes></row><row _id="row-fmge~qjtt_ztjg" _uuid="00000000-0000-0000-AE0D-4D45E0E0CB9C" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-fmge~qjtt_ztjg"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>730</pid><project_name>Far Rockaway New Facility</project_name><description>Construction of a new 18,000 sq.ft. Branch employing the latest technology and sustainable design.</description><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>Libraries-QBPL</client_agency><current_phase>Construction</current_phase><design_start>2012-01-10T00:00:00</design_start><budget_forecast>39531557.09</budget_forecast><latest_budget_changes>1.09</latest_budget_changes><total_budget_changes>-623757.91</total_budget_changes><forecast_completion>2022-05-16T00:00:00</forecast_completion><latest_schedule_changes>138</latest_schedule_changes><total_schedule_changes>-78</total_schedule_changes></row><row _id="row-d7xf~25nt-26kp" _uuid="00000000-0000-0000-78BA-074510F74BBA" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-d7xf~25nt-26kp"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>730</pid><project_name>Far Rockaway New Facility</project_name><description>Construction of a new 18,000 sq.ft. Branch employing the latest technology and sustainable design.</description><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>Libraries-QBPL</client_agency><current_phase>Construction</current_phase><design_start>2012-01-10T00:00:00</design_start><budget_forecast>39531557.09</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-623757.91</total_budget_changes><forecast_completion>2022-05-30T00:00:00</forecast_completion><latest_schedule_changes>14</latest_schedule_changes><total_schedule_changes>-78</total_schedule_changes></row><row _id="row-sipn-pp5f.dszw" _uuid="00000000-0000-0000-D880-4146EF865D66" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-sipn-pp5f.dszw"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>730</pid><project_name>Far Rockaway New Facility</project_name><description>Construction of a new 18,000 sq.ft. Branch employing the latest technology and sustainable design.</description><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>Libraries-QBPL</client_agency><current_phase>Construction</current_phase><design_start>2012-01-10T00:00:00</design_start><budget_forecast>39531557.09</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-623757.91</total_budget_changes><forecast_completion>2023-02-01T00:00:00</forecast_completion><latest_schedule_changes>247</latest_schedule_changes><total_schedule_changes>-78</total_schedule_changes></row><row _id="row-hwff_zagr.ba8g" _uuid="00000000-0000-0000-F0DE-059394E2FA50" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-hwff_zagr.ba8g"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>730</pid><project_name>Far Rockaway New Facility</project_name><description>Construction of a new 18,000 sq.ft. Branch employing the latest technology and sustainable design.</description><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>Libraries-QBPL</client_agency><current_phase>Construction</current_phase><design_start>2012-01-10T00:00:00</design_start><budget_forecast>39531557.09</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-623757.91</total_budget_changes><forecast_completion>2023-05-30T00:00:00</forecast_completion><latest_schedule_changes>118</latest_schedule_changes><total_schedule_changes>-78</total_schedule_changes></row><row _id="row-ayp9-tmnd_jrp2" _uuid="00000000-0000-0000-D5D3-065DBA538926" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ayp9-tmnd_jrp2"><date_reported_as_of>2018-03-01T00:00:00</date_reported_as_of><pid>741</pid><project_name>Reconstruction Of Arthur Kill Road, Phase I</project_name><description>Reconstruction of Arthur Kill Road From Clark Avenue to Richmond Avenue including widening of roadway</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2016-12-16T00:00:00</design_start><budget_forecast>37796000.00</budget_forecast><total_budget_changes>22503000.00</total_budget_changes><forecast_completion>2022-06-30T00:00:00</forecast_completion><total_schedule_changes>1415</total_schedule_changes></row><row _id="row-vsk4-tzff_ib6z" _uuid="00000000-0000-0000-E5AB-E1AA9C6B6430" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-vsk4-tzff_ib6z"><date_reported_as_of>2018-08-01T00:00:00</date_reported_as_of><pid>741</pid><project_name>Reconstruction Of Arthur Kill Road, Phase I</project_name><description>Reconstruction of Arthur Kill Road From Clark Avenue to Richmond Avenue including widening of roadway</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2016-12-16T00:00:00</design_start><budget_forecast>39897000.00</budget_forecast><latest_budget_changes>2101000.00</latest_budget_changes><total_budget_changes>22503000.00</total_budget_changes><forecast_completion>2023-03-13T00:00:00</forecast_completion><latest_schedule_changes>256</latest_schedule_changes><total_schedule_changes>1415</total_schedule_changes></row><row _id="row-wjvx.9usc~p8fd" _uuid="00000000-0000-0000-57DA-6BD653080539" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-wjvx.9usc~p8fd"><date_reported_as_of>2019-01-01T00:00:00</date_reported_as_of><pid>741</pid><project_name>Reconstruction Of Arthur Kill Road, Phase I</project_name><description>Reconstruction of Arthur Kill Road From Clark Avenue to Richmond Avenue including widening of roadway</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2016-12-16T00:00:00</design_start><budget_forecast>40162000.00</budget_forecast><latest_budget_changes>265000.00</latest_budget_changes><total_budget_changes>22503000.00</total_budget_changes><forecast_completion>2025-03-02T00:00:00</forecast_completion><latest_schedule_changes>720</latest_schedule_changes><total_schedule_changes>1415</total_schedule_changes></row><row _id="row-dnqj_tyb9.8nke" _uuid="00000000-0000-0000-C524-3B8C8B23DA00" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-dnqj_tyb9.8nke"><date_reported_as_of>2019-05-01T00:00:00</date_reported_as_of><pid>741</pid><project_name>Reconstruction Of Arthur Kill Road, Phase I</project_name><description>Reconstruction of Arthur Kill Rd from Clark Avenue to Richmond Avenue including widening of roadway</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2016-12-16T00:00:00</design_start><budget_forecast>40098000.00</budget_forecast><latest_budget_changes>-64000.00</latest_budget_changes><total_budget_changes>22503000.00</total_budget_changes><forecast_completion>2023-10-31T00:00:00</forecast_completion><latest_schedule_changes>-488</latest_schedule_changes><total_schedule_changes>1415</total_schedule_changes></row><row _id="row-p6y2_s6j7.3zuz" _uuid="00000000-0000-0000-B4D6-F5856490275B" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-p6y2_s6j7.3zuz"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>741</pid><project_name>Reconstruction Of Arthur Kill Road, Phase I</project_name><description>Reconstruction of Arthur Kill Rd from Clark Avenue to Richmond Avenue including widening of roadway</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2016-12-16T00:00:00</design_start><budget_forecast>40398000.00</budget_forecast><latest_budget_changes>300000.00</latest_budget_changes><total_budget_changes>22503000.00</total_budget_changes><forecast_completion>2023-10-31T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1415</total_schedule_changes></row><row _id="row-fe7g_wwv4-cd84" _uuid="00000000-0000-0000-1EEE-658A06F55316" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-fe7g_wwv4-cd84"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>741</pid><project_name>Reconstruction Of Arthur Kill Road, Phase I</project_name><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><total_budget_changes>22503000.00</total_budget_changes><total_schedule_changes>1415</total_schedule_changes></row><row _id="row-pp5k~m4ib~ruzb" _uuid="00000000-0000-0000-E414-220A388AE50C" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-pp5k~m4ib~ruzb"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>741</pid><project_name>Reconstruction Of Arthur Kill Road, Phase I</project_name><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><total_budget_changes>22503000.00</total_budget_changes><total_schedule_changes>1415</total_schedule_changes></row><row _id="row-wvad-6et8_i4h5" _uuid="00000000-0000-0000-E750-EC63F4AF24D0" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-wvad-6et8_i4h5"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>741</pid><project_name>Reconstruction Of Arthur Kill Road, Phase I</project_name><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><total_budget_changes>22503000.00</total_budget_changes><total_schedule_changes>1415</total_schedule_changes></row><row _id="row-5zvd.kjha-t2im" _uuid="00000000-0000-0000-C9D8-60A2AF21CE59" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-5zvd.kjha-t2im"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>741</pid><project_name>Reconstruction Of Arthur Kill Road, Phase I</project_name><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><total_budget_changes>22503000.00</total_budget_changes><total_schedule_changes>1415</total_schedule_changes></row><row _id="row-ivy9-feji~cxzc" _uuid="00000000-0000-0000-746E-3236259557FB" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ivy9-feji~cxzc"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>741</pid><project_name>Reconstruction Of Arthur Kill Road, Phase I</project_name><description>Reconstruction of Arthur Kill Rd from Clark Avenue to Richmond Avenue including widening of roadway</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2016-12-16T00:00:00</design_start><budget_forecast>48245000.00</budget_forecast><latest_budget_changes>7847000.00</latest_budget_changes><total_budget_changes>22503000.00</total_budget_changes><forecast_completion>2025-10-30T00:00:00</forecast_completion><latest_schedule_changes>730</latest_schedule_changes><total_schedule_changes>1415</total_schedule_changes></row><row _id="row-xi92_ysgp_zxf2" _uuid="00000000-0000-0000-3006-8BEEE08D9696" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-xi92_ysgp_zxf2"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>741</pid><project_name>Reconstruction Of Arthur Kill Road, Phase I</project_name><description>Reconstruction of Arthur Kill Rd from Clark Avenue to Richmond Avenue including widening of roadway</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2016-12-16T00:00:00</design_start><budget_forecast>48243000.00</budget_forecast><latest_budget_changes>-2000.00</latest_budget_changes><total_budget_changes>22503000.00</total_budget_changes><forecast_completion>2025-10-30T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1415</total_schedule_changes></row><row _id="row-k5j7.5ww2-56zr" _uuid="00000000-0000-0000-A8D3-4BBCBAD0C20D" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-k5j7.5ww2-56zr"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>741</pid><project_name>Reconstruction Of Arthur Kill Road, Phase I</project_name><description>Reconstruction of Arthur Kill Rd from Clark Avenue to Richmond Avenue including widening of roadway</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2016-12-16T00:00:00</design_start><budget_forecast>50406000.00</budget_forecast><latest_budget_changes>2163000.00</latest_budget_changes><total_budget_changes>22503000.00</total_budget_changes><forecast_completion>2025-10-30T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1415</total_schedule_changes></row><row _id="row-rd43_sik9-5qz9" _uuid="00000000-0000-0000-B264-C007B8CB2D29" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-rd43_sik9-5qz9"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>741</pid><project_name>Reconstruction Of Arthur Kill Road, Phase I</project_name><description>Reconstruction of Arthur Kill Rd from Clark Avenue to Richmond Avenue including widening of roadway</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2016-12-16T00:00:00</design_start><budget_forecast>60299000.00</budget_forecast><latest_budget_changes>9893000.00</latest_budget_changes><total_budget_changes>22503000.00</total_budget_changes><forecast_completion>2026-05-15T00:00:00</forecast_completion><latest_schedule_changes>197</latest_schedule_changes><total_schedule_changes>1415</total_schedule_changes></row><row _id="row-szz5~85c6-rfay" _uuid="00000000-0000-0000-F637-D42F82DE1A28" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-szz5~85c6-rfay"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>741</pid><project_name>Reconstruction Of Arthur Kill Road, Phase I</project_name><description>Reconstruction of Arthur Kill Rd from Clark Avenue to Richmond Avenue including widening of roadway</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2016-12-16T00:00:00</design_start><budget_forecast>60299000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>22503000.00</total_budget_changes><forecast_completion>2026-05-15T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1415</total_schedule_changes></row><row _id="row-kp9t.dyce-73zg" _uuid="00000000-0000-0000-573A-7A643D62E823" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-kp9t.dyce-73zg"><date_reported_as_of>2018-03-01T00:00:00</date_reported_as_of><pid>747</pid><project_name>Croton Above Ground Structure And Landscaping</project_name><description>Croton Above Ground Structure And Water Management Systems</description><category>Industrial Development</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction Procurement</current_phase><design_start>2012-05-23T00:00:00</design_start><budget_forecast>58786000.00</budget_forecast><total_budget_changes>75117000.00</total_budget_changes><forecast_completion>2021-07-01T00:00:00</forecast_completion><total_schedule_changes>897</total_schedule_changes></row><row _id="row-n96q~zmpr-22a2" _uuid="00000000-0000-0000-9619-8439B46191E9" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-n96q~zmpr-22a2"><date_reported_as_of>2018-08-01T00:00:00</date_reported_as_of><pid>747</pid><project_name>Croton Above Ground Structure And Landscaping</project_name><category>Industrial Development</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><total_budget_changes>75117000.00</total_budget_changes><total_schedule_changes>897</total_schedule_changes></row><row _id="row-a9w2.2ue7.kpqx" _uuid="00000000-0000-0000-C365-B19F9317F0DD" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-a9w2.2ue7.kpqx"><date_reported_as_of>2019-01-01T00:00:00</date_reported_as_of><pid>747</pid><project_name>Croton Above Ground Structure And Landscaping</project_name><description>Croton Above Ground Structure And Water Management Systems</description><category>Industrial Development</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction</current_phase><design_start>2012-05-23T00:00:00</design_start><budget_forecast>110202000.00</budget_forecast><latest_budget_changes>51416000.00</latest_budget_changes><total_budget_changes>75117000.00</total_budget_changes><forecast_completion>2021-03-18T00:00:00</forecast_completion><latest_schedule_changes>-105</latest_schedule_changes><total_schedule_changes>897</total_schedule_changes></row><row _id="row-2jc5~rx8w-686z" _uuid="00000000-0000-0000-3211-329D2BFED8E6" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-2jc5~rx8w-686z"><date_reported_as_of>2019-05-01T00:00:00</date_reported_as_of><pid>747</pid><project_name>Croton Above Ground Structure And Landscaping</project_name><description>The new Mosholu Golf Course Club House, together with fifty-five Driving Range Tee Boxes and ten-acres of re-landscaping comprise the phase IV and final of the vast DEP Croton Water Treatment Plant project, currently under construction in Van Cortlandt Park in the Bronx. Through a multifunctional design strategy the project reinstates the pre-existing golf program and facility, creates civic space for community use and ensures security for a multi-billion dollar public works facility.</description><category>Industrial Development</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction</current_phase><design_start>2012-05-23T00:00:00</design_start><budget_forecast>103956000.00</budget_forecast><latest_budget_changes>-6246000.00</latest_budget_changes><total_budget_changes>75117000.00</total_budget_changes><forecast_completion>2021-03-18T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>897</total_schedule_changes></row><row _id="row-jnb3-6yrs~td76" _uuid="00000000-0000-0000-F078-BAB8985545AD" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-jnb3-6yrs~td76"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>747</pid><project_name>Croton Above Ground Structure And Landscaping</project_name><description>The new Mosholu Golf Course Club House, together with fifty-five Driving Range Tee Boxes and ten-acres of re-landscaping comprise the phase IV and final of the vast DEP Croton Water Treatment Plant project, currently under construction in Van Cortlandt Park in the Bronx. Through a multifunctional design strategy the project reinstates the pre-existing golf program and facility, creates civic space for community use and ensures security for a multi-billion dollar public works facility.</description><category>Industrial Development</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction</current_phase><design_start>2012-05-23T00:00:00</design_start><budget_forecast>103896000.00</budget_forecast><latest_budget_changes>-60000.00</latest_budget_changes><total_budget_changes>75117000.00</total_budget_changes><forecast_completion>2021-03-18T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>897</total_schedule_changes></row><row _id="row-e9ax-9pik~zf4a" _uuid="00000000-0000-0000-8E20-88ACDF5FEBFE" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-e9ax-9pik~zf4a"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>747</pid><project_name>Croton Above Ground Structure And Landscaping</project_name><category>Industrial Development</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><total_budget_changes>75117000.00</total_budget_changes><total_schedule_changes>897</total_schedule_changes></row><row _id="row-mnhw-yf79.xcze" _uuid="00000000-0000-0000-11A7-C98D8A79C2F0" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-mnhw-yf79.xcze"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>747</pid><project_name>Croton Above Ground Structure And Landscaping</project_name><category>Industrial Development</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><total_budget_changes>75117000.00</total_budget_changes><total_schedule_changes>897</total_schedule_changes></row><row _id="row-mvv4-ufum~6q54" _uuid="00000000-0000-0000-CCDA-11CAAF67EA27" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-mvv4-ufum~6q54"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>747</pid><project_name>Croton Above Ground Structure And Landscaping</project_name><category>Industrial Development</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><total_budget_changes>75117000.00</total_budget_changes><total_schedule_changes>897</total_schedule_changes></row><row _id="row-iddp.sacg_rwu7" _uuid="00000000-0000-0000-0547-F270E13C7C55" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-iddp.sacg_rwu7"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>747</pid><project_name>Croton Above Ground Structure And Landscaping</project_name><category>Industrial Development</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><total_budget_changes>75117000.00</total_budget_changes><total_schedule_changes>897</total_schedule_changes></row><row _id="row-za5v-7reu.6ecb" _uuid="00000000-0000-0000-156E-818663B43226" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-za5v-7reu.6ecb"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>1218</pid><project_name>Fort Greene Park Entrances, Paths, Plaza and Drainage Infrastructure Reconstruction</project_name><description>This project will reconstruct the entrances, paths, plaza and drainage infrastructure at Fort Greene Park.</description><category>Parks</category><managing_agency>DPR</managing_agency><client_agency>DPR</client_agency><current_phase>Design</current_phase><design_start>2021-02-22T00:00:00</design_start><budget_forecast>29284800.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2024-11-23T00:00:00</forecast_completion><total_schedule_changes>417</total_schedule_changes></row><row _id="row-e7yv_xn9w-n73c" _uuid="00000000-0000-0000-B3BE-660245409F04" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-e7yv_xn9w-n73c"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>747</pid><project_name>Croton Above Ground Structure And Landscaping</project_name><description>The new Mosholu Golf Course Club House, together with fifty-five Driving Range Tee Boxes and ten-acres of re-landscaping comprise the phase IV and final of the vast DEP Croton Water Treatment Plant project, currently under construction in Van Cortlandt Park in the Bronx. Through a multifunctional design strategy the project reinstates the pre-existing golf program and facility, creates civic space for community use and ensures security for a multi-billion dollar public works facility.</description><category>Industrial Development</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction</current_phase><design_start>2012-05-23T00:00:00</design_start><budget_forecast>107444000.00</budget_forecast><latest_budget_changes>3548000.00</latest_budget_changes><total_budget_changes>75117000.00</total_budget_changes><forecast_completion>2022-08-24T00:00:00</forecast_completion><latest_schedule_changes>524</latest_schedule_changes><total_schedule_changes>897</total_schedule_changes></row><row _id="row-t9qr~hcss~2kuv" _uuid="00000000-0000-0000-EE7C-89DF105B65BB" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-t9qr~hcss~2kuv"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>747</pid><project_name>Croton Above Ground Structure And Landscaping</project_name><description>The new Mosholu Golf Course Club House, together with fifty-five Driving Range Tee Boxes and ten-acres of re-landscaping comprise the phase IV and final of the vast DEP Croton Water Treatment Plant project, currently under construction in Van Cortlandt Park in the Bronx. Through a multifunctional design strategy the project reinstates the pre-existing golf program and facility, creates civic space for community use and ensures security for a multi-billion dollar public works facility.</description><category>Industrial Development</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction</current_phase><design_start>2012-05-23T00:00:00</design_start><budget_forecast>107444000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>75117000.00</total_budget_changes><forecast_completion>2023-02-01T00:00:00</forecast_completion><latest_schedule_changes>161</latest_schedule_changes><total_schedule_changes>897</total_schedule_changes></row><row _id="row-h3m7_3rk9-m32g" _uuid="00000000-0000-0000-CAED-413D1AA1B1A0" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-h3m7_3rk9-m32g"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>747</pid><project_name>Croton Above Ground Structure And Landscaping</project_name><description>The new Mosholu Golf Course Club House, together with fifty-five Driving Range Tee Boxes and ten-acres of re-landscaping comprise the phase IV and final of the vast DEP Croton Water Treatment Plant project, currently under construction in Van Cortlandt Park in the Bronx. Through a multifunctional design strategy the project reinstates the pre-existing golf program and facility, creates civic space for community use and ensures security for a multi-billion dollar public works facility.</description><category>Industrial Development</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction</current_phase><design_start>2012-05-23T00:00:00</design_start><budget_forecast>132780000.00</budget_forecast><latest_budget_changes>25336000.00</latest_budget_changes><total_budget_changes>75117000.00</total_budget_changes><forecast_completion>2023-02-23T00:00:00</forecast_completion><latest_schedule_changes>22</latest_schedule_changes><total_schedule_changes>897</total_schedule_changes></row><row _id="row-hbsj_3kvx-uucc" _uuid="00000000-0000-0000-F31D-D08AEE1D82B5" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-hbsj_3kvx-uucc"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>747</pid><project_name>Croton Above Ground Structure And Landscaping</project_name><description>The new Mosholu Golf Course Club House, together with fifty-five Driving Range Tee Boxes and ten-acres of re-landscaping comprise the phase IV and final of the vast DEP Croton Water Treatment Plant project, currently under construction in Van Cortlandt Park in the Bronx. Through a multifunctional design strategy the project reinstates the pre-existing golf program and facility, creates civic space for community use and ensures security for a multi-billion dollar public works facility.</description><category>Industrial Development</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction</current_phase><design_start>2012-05-23T00:00:00</design_start><budget_forecast>133625000.00</budget_forecast><latest_budget_changes>845000.00</latest_budget_changes><total_budget_changes>75117000.00</total_budget_changes><forecast_completion>2023-01-23T00:00:00</forecast_completion><latest_schedule_changes>-31</latest_schedule_changes><total_schedule_changes>897</total_schedule_changes></row><row _id="row-rsbp.8abs_6dgx" _uuid="00000000-0000-0000-085A-B95EC93BB6BC" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-rsbp.8abs_6dgx"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>747</pid><project_name>Croton Above Ground Structure And Landscaping</project_name><description>The new Mosholu Golf Course Club House, together with fifty-five Driving Range Tee Boxes and ten-acres of re-landscaping comprise the phase IV and final of the vast DEP Croton Water Treatment Plant project, currently under construction in Van Cortlandt Park in the Bronx. Through a multifunctional design strategy the project reinstates the pre-existing golf program and facility, creates civic space for community use and ensures security for a multi-billion dollar public works facility.</description><category>Industrial Development</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction</current_phase><design_start>2012-05-23T00:00:00</design_start><budget_forecast>133903000.00</budget_forecast><latest_budget_changes>278000.00</latest_budget_changes><total_budget_changes>75117000.00</total_budget_changes><forecast_completion>2023-12-15T00:00:00</forecast_completion><latest_schedule_changes>326</latest_schedule_changes><total_schedule_changes>897</total_schedule_changes></row><row _id="row-n73p~uz6b_vjde" _uuid="00000000-0000-0000-5C5C-156878254ECF" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-n73p~uz6b_vjde"><date_reported_as_of>2018-03-01T00:00:00</date_reported_as_of><pid>749</pid><project_name>Porpoise Bridge In Flushing Meadows-Corona Park</project_name><description>PORPOISE BRIDGE IN FLUSHING MEADOWS-CORONA PARK</description><category>Bridges</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2017-09-18T00:00:00</design_start><budget_forecast>64905000.00</budget_forecast><total_budget_changes>82000.00</total_budget_changes><forecast_completion>2023-07-29T00:00:00</forecast_completion><total_schedule_changes>1110</total_schedule_changes></row><row _id="row-uf7j.9vws.dyf6" _uuid="00000000-0000-0000-281A-D0044A617C90" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-uf7j.9vws.dyf6"><date_reported_as_of>2018-08-01T00:00:00</date_reported_as_of><pid>749</pid><project_name>Porpoise Bridge In Flushing Meadows-Corona Park</project_name><description>PORPOISE BRIDGE IN FLUSHING MEADOWS-CORONA PARK</description><category>Bridges</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2017-09-18T00:00:00</design_start><budget_forecast>64905000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>82000.00</total_budget_changes><forecast_completion>2023-07-29T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1110</total_schedule_changes></row><row _id="row-p7gm-6wki_y6xt" _uuid="00000000-0000-0000-4DFF-959C386A4C7C" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-p7gm-6wki_y6xt"><date_reported_as_of>2019-01-01T00:00:00</date_reported_as_of><pid>749</pid><project_name>Porpoise Bridge In Flushing Meadows-Corona Park</project_name><description>PORPOISE BRIDGE IN FLUSHING MEADOWS-CORONA PARK</description><category>Bridges</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2017-09-18T00:00:00</design_start><budget_forecast>60625000.00</budget_forecast><latest_budget_changes>-4280000.00</latest_budget_changes><total_budget_changes>82000.00</total_budget_changes><forecast_completion>2023-07-29T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1110</total_schedule_changes></row><row _id="row-yu4w~qsc4.gh23" _uuid="00000000-0000-0000-C0A1-D1605E8F188C" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-yu4w~qsc4.gh23"><date_reported_as_of>2019-05-01T00:00:00</date_reported_as_of><pid>749</pid><project_name>Porpoise Bridge In Flushing Meadows-Corona Park</project_name><description>Feasibility Study for the repair and or restoration for Porpoise (Tide Gate)  Bridge in Flushing Meadows Corona Park.</description><category>Bridges</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2017-09-18T00:00:00</design_start><budget_forecast>64905000.00</budget_forecast><latest_budget_changes>4280000.00</latest_budget_changes><total_budget_changes>82000.00</total_budget_changes><forecast_completion>2023-07-24T00:00:00</forecast_completion><latest_schedule_changes>-5</latest_schedule_changes><total_schedule_changes>1110</total_schedule_changes></row><row _id="row-ijcm_3uvu~hbuz" _uuid="00000000-0000-0000-68A9-3F68C06C91D3" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ijcm_3uvu~hbuz"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>749</pid><project_name>Porpoise Bridge In Flushing Meadows-Corona Park</project_name><description>Feasibility Study for the repair and or restoration for Porpoise (Tide Gate)  Bridge in Flushing Meadows Corona Park.</description><category>Bridges</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2017-09-18T00:00:00</design_start><budget_forecast>64905000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>82000.00</total_budget_changes><forecast_completion>2024-07-23T00:00:00</forecast_completion><latest_schedule_changes>365</latest_schedule_changes><total_schedule_changes>1110</total_schedule_changes></row><row _id="row-fz6r.q3jq.iek8" _uuid="00000000-0000-0000-D67B-1813E926567C" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-fz6r.q3jq.iek8"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>749</pid><project_name>Porpoise Bridge In Flushing Meadows-Corona Park</project_name><category>Bridges</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><total_budget_changes>82000.00</total_budget_changes><total_schedule_changes>1110</total_schedule_changes></row><row _id="row-2s8i_9utj_wvkn" _uuid="00000000-0000-0000-10FF-80DA7DEAE30C" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-2s8i_9utj_wvkn"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>749</pid><project_name>Porpoise Bridge In Flushing Meadows-Corona Park</project_name><category>Bridges</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><total_budget_changes>82000.00</total_budget_changes><total_schedule_changes>1110</total_schedule_changes></row><row _id="row-ypnv-hymy-cjxg" _uuid="00000000-0000-0000-156C-75C4EF926FCE" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ypnv-hymy-cjxg"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>749</pid><project_name>Porpoise Bridge In Flushing Meadows-Corona Park</project_name><category>Bridges</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><total_budget_changes>82000.00</total_budget_changes><total_schedule_changes>1110</total_schedule_changes></row><row _id="row-qzb7.ick4~x3dz" _uuid="00000000-0000-0000-2FD7-CF07E41D1142" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-qzb7.ick4~x3dz"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>749</pid><project_name>Porpoise Bridge In Flushing Meadows-Corona Park</project_name><category>Bridges</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><total_budget_changes>82000.00</total_budget_changes><total_schedule_changes>1110</total_schedule_changes></row><row _id="row-yp5h.4rm3.nwcq" _uuid="00000000-0000-0000-C940-CFA7B69168C0" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-yp5h.4rm3.nwcq"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>749</pid><project_name>Porpoise Bridge In Flushing Meadows-Corona Park</project_name><description>Feasibility Study for the repair and or restoration for Porpoise (Tide Gate)  Bridge in Flushing Meadows Corona Park.</description><category>Bridges</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2017-09-18T00:00:00</design_start><budget_forecast>62925000.00</budget_forecast><latest_budget_changes>-1980000.00</latest_budget_changes><total_budget_changes>82000.00</total_budget_changes><forecast_completion>2025-12-14T00:00:00</forecast_completion><latest_schedule_changes>509</latest_schedule_changes><total_schedule_changes>1110</total_schedule_changes></row><row _id="row-bv2b_zjzn~9hg7" _uuid="00000000-0000-0000-9812-2490A81A2506" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-bv2b_zjzn~9hg7"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>749</pid><project_name>Porpoise Bridge In Flushing Meadows-Corona Park</project_name><description>Feasibility Study for the repair and or restoration for Porpoise (Tide Gate)  Bridge in Flushing Meadows Corona Park.</description><category>Bridges</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2017-09-18T00:00:00</design_start><budget_forecast>63979000.00</budget_forecast><latest_budget_changes>1054000.00</latest_budget_changes><total_budget_changes>82000.00</total_budget_changes><forecast_completion>2026-04-06T00:00:00</forecast_completion><latest_schedule_changes>113</latest_schedule_changes><total_schedule_changes>1110</total_schedule_changes></row><row _id="row-p63f.q2sf-455e" _uuid="00000000-0000-0000-376F-824D89F6EC84" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-p63f.q2sf-455e"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>749</pid><project_name>Porpoise Bridge In Flushing Meadows-Corona Park</project_name><description>Feasibility Study for the repair and or restoration for Porpoise (Tide Gate)  Bridge in Flushing Meadows Corona Park.</description><category>Bridges</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2017-09-18T00:00:00</design_start><budget_forecast>63979000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>82000.00</total_budget_changes><forecast_completion>2026-05-06T00:00:00</forecast_completion><latest_schedule_changes>30</latest_schedule_changes><total_schedule_changes>1110</total_schedule_changes></row><row _id="row-6at3_5ip7~3c4v" _uuid="00000000-0000-0000-65F5-2C33CCDCCEE1" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-6at3_5ip7~3c4v"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>749</pid><project_name>Porpoise Bridge In Flushing Meadows-Corona Park</project_name><description>Feasibility Study for the repair and or restoration for Porpoise (Tide Gate)  Bridge in Flushing Meadows Corona Park.</description><category>Bridges</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Construction Procurement</current_phase><design_start>2017-09-18T00:00:00</design_start><budget_forecast>64999000.00</budget_forecast><latest_budget_changes>1020000.00</latest_budget_changes><total_budget_changes>82000.00</total_budget_changes><forecast_completion>2026-08-12T00:00:00</forecast_completion><latest_schedule_changes>98</latest_schedule_changes><total_schedule_changes>1110</total_schedule_changes></row><row _id="row-aqts_hsp6.j2yi" _uuid="00000000-0000-0000-4BF5-B887B4811BC5" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-aqts_hsp6.j2yi"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>749</pid><project_name>Porpoise Bridge In Flushing Meadows-Corona Park</project_name><description>Feasibility Study for the repair and or restoration for Porpoise (Tide Gate)  Bridge in Flushing Meadows Corona Park.</description><category>Bridges</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Construction Procurement</current_phase><design_start>2017-09-18T00:00:00</design_start><budget_forecast>64987000.00</budget_forecast><latest_budget_changes>-12000.00</latest_budget_changes><total_budget_changes>82000.00</total_budget_changes><forecast_completion>2026-08-12T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1110</total_schedule_changes></row><row _id="row-icqv_h6pq_6xqg" _uuid="00000000-0000-0000-A7AA-59F1709F77F5" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-icqv_h6pq_6xqg"><date_reported_as_of>2018-03-01T00:00:00</date_reported_as_of><pid>750</pid><project_name>Upgrades At Brooklyn Animal Shelter</project_name><description>Brooklyn Animal Care Center</description><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>Health</client_agency><current_phase>Design</current_phase><design_start>2016-07-20T00:00:00</design_start><budget_forecast>25844000.00</budget_forecast><total_budget_changes>21288000.00</total_budget_changes><forecast_completion>2022-04-15T00:00:00</forecast_completion><total_schedule_changes>1355</total_schedule_changes></row><row _id="row-6nqb_dr34-wp7v" _uuid="00000000-0000-0000-0506-63551E5A3D0E" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-6nqb_dr34-wp7v"><date_reported_as_of>2018-08-01T00:00:00</date_reported_as_of><pid>750</pid><project_name>Upgrades At Brooklyn Animal Shelter</project_name><description>Brooklyn Animal Care Center</description><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>Health</client_agency><current_phase>Design</current_phase><design_start>2016-07-20T00:00:00</design_start><budget_forecast>27284000.00</budget_forecast><latest_budget_changes>1440000.00</latest_budget_changes><total_budget_changes>21288000.00</total_budget_changes><forecast_completion>2022-04-15T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1355</total_schedule_changes></row><row _id="row-m7t3~g5ua_ppur" _uuid="00000000-0000-0000-99FB-48E910520A60" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-m7t3~g5ua_ppur"><date_reported_as_of>2019-01-01T00:00:00</date_reported_as_of><pid>750</pid><project_name>Upgrades At Brooklyn Animal Shelter</project_name><description>Brooklyn Animal Care Center</description><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>Health</client_agency><current_phase>Design</current_phase><design_start>2016-07-20T00:00:00</design_start><budget_forecast>35972966.00</budget_forecast><latest_budget_changes>8688966.00</latest_budget_changes><total_budget_changes>21288000.00</total_budget_changes><forecast_completion>2022-12-31T00:00:00</forecast_completion><latest_schedule_changes>260</latest_schedule_changes><total_schedule_changes>1355</total_schedule_changes></row><row _id="row-uirp~mkta.4gti" _uuid="00000000-0000-0000-3A14-671FDA101EE7" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-uirp~mkta.4gti"><date_reported_as_of>2019-05-01T00:00:00</date_reported_as_of><pid>750</pid><project_name>Upgrades At Brooklyn Animal Shelter</project_name><description>Demolish existing on-story facility. Construct a two-story new building for animal care center with a drive-through parking lot to meet the new program.  Phasing is required to meet 24/7 operation.</description><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>Health</client_agency><current_phase>Design</current_phase><design_start>2016-07-20T00:00:00</design_start><budget_forecast>27519000.00</budget_forecast><latest_budget_changes>-8453966.00</latest_budget_changes><total_budget_changes>21288000.00</total_budget_changes><forecast_completion>2023-08-10T00:00:00</forecast_completion><latest_schedule_changes>222</latest_schedule_changes><total_schedule_changes>1355</total_schedule_changes></row><row _id="row-znhy-f5qm_xg5s" _uuid="00000000-0000-0000-9BD5-5AF4602EC322" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-znhy-f5qm_xg5s"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>750</pid><project_name>Upgrades At Brooklyn Animal Shelter</project_name><description>Demolish existing on-story facility. Construct a two-story new building for animal care center with a drive-through parking lot to meet the new program.  Phasing is required to meet 24/7 operation.</description><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>Health</client_agency><current_phase>Design</current_phase><design_start>2016-07-20T00:00:00</design_start><budget_forecast>49019000.00</budget_forecast><latest_budget_changes>21500000.00</latest_budget_changes><total_budget_changes>21288000.00</total_budget_changes><forecast_completion>2023-10-10T00:00:00</forecast_completion><latest_schedule_changes>61</latest_schedule_changes><total_schedule_changes>1355</total_schedule_changes></row><row _id="row-vih7.a2hs.iud9" _uuid="00000000-0000-0000-1CBF-8B7E3B04D5E7" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-vih7.a2hs.iud9"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>750</pid><project_name>Upgrades At Brooklyn Animal Shelter</project_name><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>Health</client_agency><total_budget_changes>21288000.00</total_budget_changes><total_schedule_changes>1355</total_schedule_changes></row><row _id="row-zesn.88rm-w8tk" _uuid="00000000-0000-0000-772C-60FB15221BB0" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-zesn.88rm-w8tk"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>750</pid><project_name>Upgrades At Brooklyn Animal Shelter</project_name><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>Health</client_agency><total_budget_changes>21288000.00</total_budget_changes><total_schedule_changes>1355</total_schedule_changes></row><row _id="row-uucg-pce9~t7nb" _uuid="00000000-0000-0000-F237-CDB70C58DCE1" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-uucg-pce9~t7nb"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>750</pid><project_name>Upgrades At Brooklyn Animal Shelter</project_name><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>Health</client_agency><total_budget_changes>21288000.00</total_budget_changes><total_schedule_changes>1355</total_schedule_changes></row><row _id="row-eqpw.av7b~nf4b" _uuid="00000000-0000-0000-3875-C6DBCFEE9E0C" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-eqpw.av7b~nf4b"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>750</pid><project_name>Upgrades At Brooklyn Animal Shelter</project_name><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>Health</client_agency><total_budget_changes>21288000.00</total_budget_changes><total_schedule_changes>1355</total_schedule_changes></row><row _id="row-h2ua-dspe~uadi" _uuid="00000000-0000-0000-D963-571A38E1A6B5" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-h2ua-dspe~uadi"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>750</pid><project_name>Upgrades At Brooklyn Animal Shelter</project_name><description>Demolish existing on-story facility. Construct a two-story new building for animal care center with a drive-through parking lot to meet the new program.  Phasing is required to meet 24/7 operation.</description><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>Health</client_agency><current_phase>Construction Procurement</current_phase><design_start>2016-07-20T00:00:00</design_start><budget_forecast>47718000.00</budget_forecast><latest_budget_changes>-1301000.00</latest_budget_changes><total_budget_changes>21288000.00</total_budget_changes><forecast_completion>2024-08-18T00:00:00</forecast_completion><latest_schedule_changes>313</latest_schedule_changes><total_schedule_changes>1355</total_schedule_changes></row><row _id="row-87ee_ax8d-yy3r" _uuid="00000000-0000-0000-2917-9C0CB1FB141D" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-87ee_ax8d-yy3r"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>750</pid><project_name>Upgrades At Brooklyn Animal Shelter</project_name><description>Demolish existing on-story facility. Construct a two-story new building for animal care center with a drive-through parking lot to meet the new program.  Phasing is required to meet 24/7 operation.</description><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>Health</client_agency><current_phase>Construction Procurement</current_phase><design_start>2016-07-20T00:00:00</design_start><budget_forecast>45846000.00</budget_forecast><latest_budget_changes>-1872000.00</latest_budget_changes><total_budget_changes>21288000.00</total_budget_changes><forecast_completion>2025-05-18T00:00:00</forecast_completion><latest_schedule_changes>273</latest_schedule_changes><total_schedule_changes>1355</total_schedule_changes></row><row _id="row-vd7h-izez-k95s" _uuid="00000000-0000-0000-9779-8507C1756A4C" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-vd7h-izez-k95s"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>750</pid><project_name>Upgrades At Brooklyn Animal Shelter</project_name><description>Demolish existing on-story facility. Construct a two-story new building for animal care center with a drive-through parking lot to meet the new program.  Phasing is required to meet 24/7 operation.</description><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>Health</client_agency><current_phase>Construction Procurement</current_phase><design_start>2016-07-20T00:00:00</design_start><budget_forecast>45362000.00</budget_forecast><latest_budget_changes>-484000.00</latest_budget_changes><total_budget_changes>21288000.00</total_budget_changes><forecast_completion>2025-09-11T00:00:00</forecast_completion><latest_schedule_changes>116</latest_schedule_changes><total_schedule_changes>1355</total_schedule_changes></row><row _id="row-ne5b.djdz-792r" _uuid="00000000-0000-0000-D391-C749DFFFBAFD" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ne5b.djdz-792r"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>750</pid><project_name>Upgrades At Brooklyn Animal Shelter</project_name><description>Demolish existing on-story facility. Construct a two-story new building for animal care center with a drive-through parking lot to meet the new program.</description><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>Health</client_agency><current_phase>Construction Procurement</current_phase><design_start>2016-07-20T00:00:00</design_start><budget_forecast>47132000.00</budget_forecast><latest_budget_changes>1770000.00</latest_budget_changes><total_budget_changes>21288000.00</total_budget_changes><forecast_completion>2025-09-11T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1355</total_schedule_changes></row><row _id="row-skba-rg2v_u68p" _uuid="00000000-0000-0000-AC82-DC3818D92523" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-skba-rg2v_u68p"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>750</pid><project_name>Upgrades At Brooklyn Animal Shelter</project_name><description>Demolish existing on-story facility. Construct a two-story new building for animal care center with a drive-through parking lot to meet the new program.</description><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>Health</client_agency><current_phase>Construction Procurement</current_phase><design_start>2016-07-20T00:00:00</design_start><budget_forecast>47132000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>21288000.00</total_budget_changes><forecast_completion>2025-12-30T00:00:00</forecast_completion><latest_schedule_changes>110</latest_schedule_changes><total_schedule_changes>1355</total_schedule_changes></row><row _id="row-x4s9_vecs_xmdn" _uuid="00000000-0000-0000-9C0F-95EC608E0285" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-x4s9_vecs_xmdn"><date_reported_as_of>2019-01-01T00:00:00</date_reported_as_of><pid>755</pid><project_name>Reconstruction Of Trinity Pl</project_name><description>Reconstruction of Trinity Place from Morris Street to Cedar Street</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2018-10-01T00:00:00</design_start><budget_forecast>41510000.00</budget_forecast><latest_budget_changes>300000.00</latest_budget_changes><total_budget_changes>13224000.00</total_budget_changes><forecast_completion>2024-01-17T00:00:00</forecast_completion><latest_schedule_changes>-164</latest_schedule_changes><total_schedule_changes>730</total_schedule_changes></row><row _id="row-pvvc_2aej-p5dm" _uuid="00000000-0000-0000-E7A8-5AF2CF10958C" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-pvvc_2aej-p5dm"><date_reported_as_of>2019-05-01T00:00:00</date_reported_as_of><pid>755</pid><project_name>Reconstruction Of Trinity Pl</project_name><description>Reconstruction of Trinity Place from Morris Street to Cedar Street, Borough of Manhattan</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2018-10-01T00:00:00</design_start><budget_forecast>41510000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>13224000.00</total_budget_changes><forecast_completion>2024-01-17T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>730</total_schedule_changes></row><row _id="row-cshx.xhxb~duir" _uuid="00000000-0000-0000-D1B4-D1413EF94A95" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-cshx.xhxb~duir"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>755</pid><project_name>Reconstruction Of Trinity Pl</project_name><description>Reconstruction of Trinity Place from Morris Street to Cedar Street, Borough of Manhattan</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2018-10-01T00:00:00</design_start><budget_forecast>41510000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>13224000.00</total_budget_changes><forecast_completion>2024-01-17T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>730</total_schedule_changes></row><row _id="row-kyzz-jiax_kt8m" _uuid="00000000-0000-0000-867C-81C316C7DBE2" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-kyzz-jiax_kt8m"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>755</pid><project_name>Reconstruction Of Trinity Pl</project_name><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><total_budget_changes>13224000.00</total_budget_changes><total_schedule_changes>730</total_schedule_changes></row><row _id="row-c8bj_66eu_btss" _uuid="00000000-0000-0000-916F-B6471DB839FE" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-c8bj_66eu_btss"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>755</pid><project_name>Reconstruction Of Trinity Pl</project_name><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><total_budget_changes>13224000.00</total_budget_changes><total_schedule_changes>730</total_schedule_changes></row><row _id="row-rmxx.c62d.ny4y" _uuid="00000000-0000-0000-6321-E641F8C54191" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-rmxx.c62d.ny4y"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>755</pid><project_name>Reconstruction Of Trinity Pl</project_name><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><total_budget_changes>13224000.00</total_budget_changes><total_schedule_changes>730</total_schedule_changes></row><row _id="row-cmt6.9d7b~eidh" _uuid="00000000-0000-0000-714D-CEF6AEA7F826" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-cmt6.9d7b~eidh"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>755</pid><project_name>Reconstruction Of Trinity Pl</project_name><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><total_budget_changes>13224000.00</total_budget_changes><total_schedule_changes>730</total_schedule_changes></row><row _id="row-6wqv.8grg~43ns" _uuid="00000000-0000-0000-5FDC-4DDBB358C9A1" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-6wqv.8grg~43ns"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>755</pid><project_name>Reconstruction Of Trinity Pl</project_name><description>Reconstruction of Trinity Place from Morris Street to Cedar Street, Borough of Manhattan</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2018-10-01T00:00:00</design_start><budget_forecast>42174000.00</budget_forecast><latest_budget_changes>664000.00</latest_budget_changes><total_budget_changes>13224000.00</total_budget_changes><forecast_completion>2025-09-28T00:00:00</forecast_completion><latest_schedule_changes>620</latest_schedule_changes><total_schedule_changes>730</total_schedule_changes></row><row _id="row-wfyv-idbp_eg78" _uuid="00000000-0000-0000-AE02-511EB185003B" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-wfyv-idbp_eg78"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>755</pid><project_name>Reconstruction Of Trinity Pl</project_name><description>Reconstruction of Trinity Place from Morris Street to Cedar Street, Borough of Manhattan</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2018-10-01T00:00:00</design_start><budget_forecast>52881000.00</budget_forecast><latest_budget_changes>10707000.00</latest_budget_changes><total_budget_changes>13224000.00</total_budget_changes><forecast_completion>2026-02-23T00:00:00</forecast_completion><latest_schedule_changes>148</latest_schedule_changes><total_schedule_changes>730</total_schedule_changes></row><row _id="row-umbm_nt8m~3t9x" _uuid="00000000-0000-0000-6581-12635A20A867" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-umbm_nt8m~3t9x"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>755</pid><project_name>Reconstruction Of Trinity Pl</project_name><description>Reconstruction of Trinity Place from Morris Street to Cedar Street, Borough of Manhattan</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2018-10-01T00:00:00</design_start><budget_forecast>53255000.00</budget_forecast><latest_budget_changes>374000.00</latest_budget_changes><total_budget_changes>13224000.00</total_budget_changes><forecast_completion>2026-11-08T00:00:00</forecast_completion><latest_schedule_changes>258</latest_schedule_changes><total_schedule_changes>730</total_schedule_changes></row><row _id="row-faw9_iyme.kq2w" _uuid="00000000-0000-0000-CECE-C9B11CC03D60" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-faw9_iyme.kq2w"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>755</pid><project_name>Reconstruction Of Trinity Pl</project_name><description>Reconstruction of Trinity Place from Morris Street to Cedar Street, Borough of Manhattan</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Construction Procurement</current_phase><design_start>2018-10-01T00:00:00</design_start><budget_forecast>54434000.00</budget_forecast><latest_budget_changes>1179000.00</latest_budget_changes><total_budget_changes>13224000.00</total_budget_changes><forecast_completion>2026-06-29T00:00:00</forecast_completion><latest_schedule_changes>-132</latest_schedule_changes><total_schedule_changes>730</total_schedule_changes></row><row _id="row-i8dn-b9pp_qnyg" _uuid="00000000-0000-0000-4B2C-F29CF5B97D9A" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-i8dn-b9pp_qnyg"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>755</pid><project_name>Reconstruction Of Trinity Pl</project_name><description>Reconstruction of Trinity Place from Morris Street to Cedar Street, Borough of Manhattan</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Construction Procurement</current_phase><design_start>2018-10-01T00:00:00</design_start><budget_forecast>54434000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>13224000.00</total_budget_changes><forecast_completion>2026-06-29T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>730</total_schedule_changes></row><row _id="row-6wq8-krir.t37d" _uuid="00000000-0000-0000-0656-C7BA67D388B7" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-6wq8-krir.t37d"><date_reported_as_of>2018-03-01T00:00:00</date_reported_as_of><pid>760</pid><project_name>Construction Of Sanitary Sewers, Storm Sewers (Bm</project_name><description>Construction of storm sewers, sanitary sewers, water mains and Best Management Practice (BMP) NC-16 in Mason Avenue area</description><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Design</current_phase><design_start>2016-08-29T00:00:00</design_start><budget_forecast>32709000.00</budget_forecast><total_budget_changes>37691000.00</total_budget_changes><forecast_completion>2022-04-14T00:00:00</forecast_completion><total_schedule_changes>595</total_schedule_changes></row><row _id="row-agp6-brwb.phze" _uuid="00000000-0000-0000-9C5D-FA37D57BB991" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-agp6-brwb.phze"><date_reported_as_of>2018-08-01T00:00:00</date_reported_as_of><pid>760</pid><project_name>Construction Of Sanitary Sewers, Storm Sewers (Bm</project_name><description>Construction of storm sewers, sanitary sewers, water mains and Best Management Practice (BMP) NC-16 in Mason Avenue area</description><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction Procurement</current_phase><design_start>2016-08-29T00:00:00</design_start><budget_forecast>34271000.00</budget_forecast><latest_budget_changes>1562000.00</latest_budget_changes><total_budget_changes>37691000.00</total_budget_changes><forecast_completion>2022-04-15T00:00:00</forecast_completion><latest_schedule_changes>1</latest_schedule_changes><total_schedule_changes>595</total_schedule_changes></row><row _id="row-vk6i.j4xj_ub7m" _uuid="00000000-0000-0000-0FDE-10E1C7AA86DC" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-vk6i.j4xj_ub7m"><date_reported_as_of>2019-01-01T00:00:00</date_reported_as_of><pid>760</pid><project_name>Construction Of Sanitary Sewers, Storm Sewers (Bm</project_name><description>Construction of storm sewers, sanitary sewers, water mains and Best Management Practice (BMP) NC-16 in Mason Avenue area</description><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction Procurement</current_phase><design_start>2016-08-29T00:00:00</design_start><budget_forecast>51441000.00</budget_forecast><latest_budget_changes>17170000.00</latest_budget_changes><total_budget_changes>37691000.00</total_budget_changes><forecast_completion>2022-09-16T00:00:00</forecast_completion><latest_schedule_changes>154</latest_schedule_changes><total_schedule_changes>595</total_schedule_changes></row><row _id="row-2f2u~fijn_p4hb" _uuid="00000000-0000-0000-E19D-D533C7F192CC" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-2f2u~fijn_p4hb"><date_reported_as_of>2019-05-01T00:00:00</date_reported_as_of><pid>760</pid><project_name>Construction Of Sanitary Sewers, Storm Sewers (Bm</project_name><description>Construction of storm sewers, sanitary sewers, water mains and Best Management Practice (BMP) NC-16 in Mason Avenue area, Borough of Staten Island.</description><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction Procurement</current_phase><design_start>2016-08-29T00:00:00</design_start><budget_forecast>53468000.00</budget_forecast><latest_budget_changes>2027000.00</latest_budget_changes><total_budget_changes>37691000.00</total_budget_changes><forecast_completion>2022-09-15T00:00:00</forecast_completion><latest_schedule_changes>-1</latest_schedule_changes><total_schedule_changes>595</total_schedule_changes></row><row _id="row-gwtd.59k3.u933" _uuid="00000000-0000-0000-3A86-582156016AF3" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-gwtd.59k3.u933"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>760</pid><project_name>Construction Of Sanitary Sewers, Storm Sewers (Bm</project_name><description>Construction of storm sewers, sanitary sewers, water mains and Best Management Practice (BMP) NC-16 in Mason Avenue area, Borough of Staten Island.</description><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction Procurement</current_phase><design_start>2016-08-29T00:00:00</design_start><budget_forecast>53121000.00</budget_forecast><latest_budget_changes>-347000.00</latest_budget_changes><total_budget_changes>37691000.00</total_budget_changes><forecast_completion>2022-11-10T00:00:00</forecast_completion><latest_schedule_changes>56</latest_schedule_changes><total_schedule_changes>595</total_schedule_changes></row><row _id="row-h8bj.3kfd.xh6z" _uuid="00000000-0000-0000-1634-B392A3452803" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-h8bj.3kfd.xh6z"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>760</pid><project_name>Construction Of Sanitary Sewers, Storm Sewers (Bm</project_name><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><total_budget_changes>37691000.00</total_budget_changes><total_schedule_changes>595</total_schedule_changes></row><row _id="row-fn9a_ndv3.aud4" _uuid="00000000-0000-0000-FE78-CC4C105DC639" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-fn9a_ndv3.aud4"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>760</pid><project_name>Construction Of Sanitary Sewers, Storm Sewers (Bm</project_name><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><total_budget_changes>37691000.00</total_budget_changes><total_schedule_changes>595</total_schedule_changes></row><row _id="row-xzb8-n75j-sej3" _uuid="00000000-0000-0000-DF99-AB3B94B4DF5E" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-xzb8-n75j-sej3"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>760</pid><project_name>Construction Of Sanitary Sewers, Storm Sewers (Bm</project_name><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><total_budget_changes>37691000.00</total_budget_changes><total_schedule_changes>595</total_schedule_changes></row><row _id="row-2gxj~99na.pdp6" _uuid="00000000-0000-0000-6366-D5EB0CD819D4" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-2gxj~99na.pdp6"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>760</pid><project_name>Construction Of Sanitary Sewers, Storm Sewers (Bm</project_name><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><total_budget_changes>37691000.00</total_budget_changes><total_schedule_changes>595</total_schedule_changes></row><row _id="row-yfzu_p996_v69p" _uuid="00000000-0000-0000-85D4-E29F08C75E23" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-yfzu_p996_v69p"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>760</pid><project_name>Construction Of Sanitary Sewers, Storm Sewers (Bm</project_name><description>Construction of storm sewers, sanitary sewers, water mains and Best Management Practice (BMP) NC-16 in Mason Avenue area, Borough of Staten Island.</description><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction</current_phase><design_start>2016-08-29T00:00:00</design_start><budget_forecast>61626000.00</budget_forecast><latest_budget_changes>8505000.00</latest_budget_changes><total_budget_changes>37691000.00</total_budget_changes><forecast_completion>2023-06-26T00:00:00</forecast_completion><latest_schedule_changes>228</latest_schedule_changes><total_schedule_changes>595</total_schedule_changes></row><row _id="row-xvqm~3fm7~tkt4" _uuid="00000000-0000-0000-CD1E-F486DAB7B620" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-xvqm~3fm7~tkt4"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>760</pid><project_name>Construction Of Sanitary Sewers, Storm Sewers (Bm</project_name><description>Construction of storm sewers, sanitary sewers, water mains and Best Management Practice (BMP) NC-16 in Mason Avenue area, Borough of Staten Island.</description><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction</current_phase><design_start>2016-08-29T00:00:00</design_start><budget_forecast>61593000.00</budget_forecast><latest_budget_changes>-33000.00</latest_budget_changes><total_budget_changes>37691000.00</total_budget_changes><forecast_completion>2023-06-26T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>595</total_schedule_changes></row><row _id="row-emu8~t2m3_imy4" _uuid="00000000-0000-0000-930F-921E40CD1273" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-emu8~t2m3_imy4"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>760</pid><project_name>Construction Of Sanitary Sewers, Storm Sewers (Bm</project_name><description>Construction of storm sewers, sanitary sewers, water mains and Best Management Practice (BMP) NC-16 in Mason Avenue area, Borough of Staten Island.</description><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction</current_phase><design_start>2016-08-29T00:00:00</design_start><budget_forecast>69555000.00</budget_forecast><latest_budget_changes>7962000.00</latest_budget_changes><total_budget_changes>37691000.00</total_budget_changes><forecast_completion>2023-06-26T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>595</total_schedule_changes></row><row _id="row-8u2i.t7s5-qbfp" _uuid="00000000-0000-0000-37D8-FFF0010206C6" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-8u2i.t7s5-qbfp"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>760</pid><project_name>Construction Of Sanitary Sewers, Storm Sewers (Bm</project_name><description>Construction of storm sewers, sanitary sewers, water mains and Best Management Practice (BMP) NC-16 in Mason Avenue area, Borough of Staten Island.</description><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction</current_phase><design_start>2016-08-29T00:00:00</design_start><budget_forecast>70400000.00</budget_forecast><latest_budget_changes>845000.00</latest_budget_changes><total_budget_changes>37691000.00</total_budget_changes><forecast_completion>2023-06-26T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>595</total_schedule_changes></row><row _id="row-iaki-83zk_g8aq" _uuid="00000000-0000-0000-BCFE-DDAB6B68BE20" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-iaki-83zk_g8aq"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>760</pid><project_name>Construction Of Sanitary Sewers, Storm Sewers (Bm</project_name><description>Construction of storm sewers, sanitary sewers, water mains and Best Management Practice (BMP) NC-16 in Mason Avenue area, Borough of Staten Island.</description><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction</current_phase><design_start>2016-08-29T00:00:00</design_start><budget_forecast>70400000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>37691000.00</total_budget_changes><forecast_completion>2023-11-30T00:00:00</forecast_completion><latest_schedule_changes>157</latest_schedule_changes><total_schedule_changes>595</total_schedule_changes></row><row _id="row-dddt~s52m.cdnk" _uuid="00000000-0000-0000-CEC9-0A017EA43F04" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-dddt~s52m.cdnk"><date_reported_as_of>2018-03-01T00:00:00</date_reported_as_of><pid>762</pid><project_name>New 116Th Pct</project_name><description>New 116Th Precinct at 244-04 North Conduit Avenue, Queens, NY 11442.  Design and build of a 45,500 SF building on existing City owned property.</description><category>Public Safety and Criminal Justice</category><managing_agency>DDC</managing_agency><client_agency>Police</client_agency><current_phase>Design</current_phase><design_start>2017-09-14T00:00:00</design_start><budget_forecast>76911099.14</budget_forecast><total_budget_changes>33852900.86</total_budget_changes><forecast_completion>2022-04-05T00:00:00</forecast_completion><total_schedule_changes>727</total_schedule_changes></row><row _id="row-wuw6~trqf.bf8u" _uuid="00000000-0000-0000-18BF-486A5F99B3AB" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-wuw6~trqf.bf8u"><date_reported_as_of>2018-08-01T00:00:00</date_reported_as_of><pid>762</pid><project_name>New 116Th Pct</project_name><description>New 116Th Precinct at 244-04 North Conduit Avenue, Queens, NY 11442.  Design and build of a 45,700 SF building on existing City owned property.</description><category>Public Safety and Criminal Justice</category><managing_agency>DDC</managing_agency><client_agency>Police</client_agency><current_phase>Design</current_phase><design_start>2017-09-14T00:00:00</design_start><budget_forecast>76950000.00</budget_forecast><latest_budget_changes>38900.86</latest_budget_changes><total_budget_changes>33852900.86</total_budget_changes><forecast_completion>2022-04-05T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>727</total_schedule_changes></row><row _id="row-kaf7_px2z_6c5u" _uuid="00000000-0000-0000-EE4B-63A42A97DD20" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-kaf7_px2z_6c5u"><date_reported_as_of>2019-01-01T00:00:00</date_reported_as_of><pid>762</pid><project_name>New 116Th Pct</project_name><description>New 116Th Precinct at 244-04 North Conduit Avenue, Queens, NY 11442.  Design and build of a 45,700 SF building on existing City owned property.</description><category>Public Safety and Criminal Justice</category><managing_agency>DDC</managing_agency><client_agency>Police</client_agency><current_phase>Design</current_phase><design_start>2017-09-14T00:00:00</design_start><budget_forecast>97078483.00</budget_forecast><latest_budget_changes>20128483.00</latest_budget_changes><total_budget_changes>33852900.86</total_budget_changes><forecast_completion>2022-06-02T00:00:00</forecast_completion><latest_schedule_changes>58</latest_schedule_changes><total_schedule_changes>727</total_schedule_changes></row><row _id="row-dxsp-hng4~5ndc" _uuid="00000000-0000-0000-89F2-639991CEEDBF" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-dxsp-hng4~5ndc"><date_reported_as_of>2019-05-01T00:00:00</date_reported_as_of><pid>762</pid><project_name>New 116Th Pct</project_name><description>Construction of a new precinct station house facility and associated site work for the new 116th Precinct.</description><category>Public Safety and Criminal Justice</category><managing_agency>DDC</managing_agency><client_agency>Police</client_agency><current_phase>Construction Procurement</current_phase><design_start>2017-09-14T00:00:00</design_start><budget_forecast>94557000.00</budget_forecast><latest_budget_changes>-2521483.00</latest_budget_changes><total_budget_changes>33852900.86</total_budget_changes><forecast_completion>2022-04-05T00:00:00</forecast_completion><latest_schedule_changes>-58</latest_schedule_changes><total_schedule_changes>727</total_schedule_changes></row><row _id="row-nwvk~yyeb-3iqf" _uuid="00000000-0000-0000-DBA3-27F2948905C3" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-nwvk~yyeb-3iqf"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>762</pid><project_name>New 116Th Pct</project_name><description>Construction of a new precinct station house facility and associated site work for the new 116th Precinct.</description><category>Public Safety and Criminal Justice</category><managing_agency>DDC</managing_agency><client_agency>Police</client_agency><current_phase>Construction Procurement</current_phase><design_start>2017-09-14T00:00:00</design_start><budget_forecast>94624000.00</budget_forecast><latest_budget_changes>67000.00</latest_budget_changes><total_budget_changes>33852900.86</total_budget_changes><forecast_completion>2022-06-08T00:00:00</forecast_completion><latest_schedule_changes>64</latest_schedule_changes><total_schedule_changes>727</total_schedule_changes></row><row _id="row-9tj6~q4x5_szpz" _uuid="00000000-0000-0000-99E4-877E8F8CD92B" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-9tj6~q4x5_szpz"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>762</pid><project_name>New 116Th Pct</project_name><category>Public Safety and Criminal Justice</category><managing_agency>DDC</managing_agency><client_agency>Police</client_agency><total_budget_changes>33852900.86</total_budget_changes><total_schedule_changes>727</total_schedule_changes></row><row _id="row-haai_6spy.rne6" _uuid="00000000-0000-0000-0015-AC68264621F3" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-haai_6spy.rne6"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>762</pid><project_name>New 116Th Pct</project_name><category>Public Safety and Criminal Justice</category><managing_agency>DDC</managing_agency><client_agency>Police</client_agency><total_budget_changes>33852900.86</total_budget_changes><total_schedule_changes>727</total_schedule_changes></row><row _id="row-udgy-ybjp_tvgi" _uuid="00000000-0000-0000-76D1-7C6CB32A5484" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-udgy-ybjp_tvgi"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>762</pid><project_name>New 116Th Pct</project_name><category>Public Safety and Criminal Justice</category><managing_agency>DDC</managing_agency><client_agency>Police</client_agency><total_budget_changes>33852900.86</total_budget_changes><total_schedule_changes>727</total_schedule_changes></row><row _id="row-4iun_pm2m-qfgh" _uuid="00000000-0000-0000-9B79-1D4C55DA6D2E" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-4iun_pm2m-qfgh"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>762</pid><project_name>New 116Th Pct</project_name><category>Public Safety and Criminal Justice</category><managing_agency>DDC</managing_agency><client_agency>Police</client_agency><total_budget_changes>33852900.86</total_budget_changes><total_schedule_changes>727</total_schedule_changes></row><row _id="row-kic8.pswt_ndey" _uuid="00000000-0000-0000-0E18-B63C44C98E0A" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-kic8.pswt_ndey"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>762</pid><project_name>New 116Th Pct</project_name><description>Construction of a new precinct station house facility and associated site work for the new 116th Precinct.</description><category>Public Safety and Criminal Justice</category><managing_agency>DDC</managing_agency><client_agency>Police</client_agency><current_phase>Construction</current_phase><design_start>2017-09-14T00:00:00</design_start><budget_forecast>110640000.00</budget_forecast><latest_budget_changes>16016000.00</latest_budget_changes><total_budget_changes>33852900.86</total_budget_changes><forecast_completion>2023-12-30T00:00:00</forecast_completion><latest_schedule_changes>570</latest_schedule_changes><total_schedule_changes>727</total_schedule_changes></row><row _id="row-xxhi.sxda~ps8i" _uuid="00000000-0000-0000-9332-148FFF32A17C" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-xxhi.sxda~ps8i"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>762</pid><project_name>New 116Th Pct</project_name><description>Construction of a new precinct station house facility and associated site work for the new 116th Precinct.</description><category>Public Safety and Criminal Justice</category><managing_agency>DDC</managing_agency><client_agency>Police</client_agency><current_phase>Construction</current_phase><design_start>2017-09-14T00:00:00</design_start><budget_forecast>110640000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>33852900.86</total_budget_changes><forecast_completion>2023-12-30T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>727</total_schedule_changes></row><row _id="row-sds5~9cbk_y97i" _uuid="00000000-0000-0000-E312-2F6CEAF184D1" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-sds5~9cbk_y97i"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>762</pid><project_name>New 116Th Pct</project_name><description>Construction of a new precinct station house facility and associated site work for the new 116th Precinct.</description><category>Public Safety and Criminal Justice</category><managing_agency>DDC</managing_agency><client_agency>Police</client_agency><current_phase>Construction</current_phase><design_start>2017-09-14T00:00:00</design_start><budget_forecast>110640000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>33852900.86</total_budget_changes><forecast_completion>2023-12-30T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>727</total_schedule_changes></row><row _id="row-cb4b_iquv-dib6" _uuid="00000000-0000-0000-9B13-D00390C8D11F" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-cb4b_iquv-dib6"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>762</pid><project_name>New 116Th Pct</project_name><description>Construction of a new precinct station house facility and associated site work for the new 116th Precinct.</description><category>Public Safety and Criminal Justice</category><managing_agency>DDC</managing_agency><client_agency>Police</client_agency><current_phase>Construction</current_phase><design_start>2017-09-14T00:00:00</design_start><budget_forecast>110670000.00</budget_forecast><latest_budget_changes>30000.00</latest_budget_changes><total_budget_changes>33852900.86</total_budget_changes><forecast_completion>2024-01-21T00:00:00</forecast_completion><latest_schedule_changes>22</latest_schedule_changes><total_schedule_changes>727</total_schedule_changes></row><row _id="row-846e_5xfv~ig9n" _uuid="00000000-0000-0000-5DA6-6DB8171D89A4" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-846e_5xfv~ig9n"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>762</pid><project_name>New 116Th Pct</project_name><description>Construction of a new precinct station house facility and associated site work for the new 116th Precinct.</description><category>Public Safety and Criminal Justice</category><managing_agency>DDC</managing_agency><client_agency>Police</client_agency><current_phase>Construction</current_phase><design_start>2017-09-14T00:00:00</design_start><budget_forecast>110764000.00</budget_forecast><latest_budget_changes>94000.00</latest_budget_changes><total_budget_changes>33852900.86</total_budget_changes><forecast_completion>2024-04-01T00:00:00</forecast_completion><latest_schedule_changes>71</latest_schedule_changes><total_schedule_changes>727</total_schedule_changes></row><row _id="row-a584~fwns.gygk" _uuid="00000000-0000-0000-640F-7652F3CDE297" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-a584~fwns.gygk"><date_reported_as_of>2018-03-01T00:00:00</date_reported_as_of><pid>768</pid><project_name>Water Main Replacement In 222 Street, Queens</project_name><description>Water Main replacement in 222th Street</description><category>Water Supply</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Design</current_phase><design_start>2018-04-02T00:00:00</design_start><budget_forecast>34476000.00</budget_forecast><total_budget_changes>7195000.00</total_budget_changes><forecast_completion>2022-01-18T00:00:00</forecast_completion><total_schedule_changes>2236</total_schedule_changes></row><row _id="row-cw68~xudq-jpvj" _uuid="00000000-0000-0000-85A5-99CC91E339DC" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-cw68~xudq-jpvj"><date_reported_as_of>2018-08-01T00:00:00</date_reported_as_of><pid>768</pid><project_name>Water Main Replacement In 222 Street, Queens</project_name><description>Water Main replacement in 222th Street</description><category>Water Supply</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Design</current_phase><design_start>2018-04-02T00:00:00</design_start><budget_forecast>39691000.00</budget_forecast><latest_budget_changes>5215000.00</latest_budget_changes><total_budget_changes>7195000.00</total_budget_changes><forecast_completion>2022-01-18T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>2236</total_schedule_changes></row><row _id="row-pier.mutv_md4r" _uuid="00000000-0000-0000-545E-19968F5ECD10" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-pier.mutv_md4r"><date_reported_as_of>2019-01-01T00:00:00</date_reported_as_of><pid>768</pid><project_name>Water Main Replacement In 222 Street, Queens</project_name><description>Water Main replacement in 222th Street</description><category>Water Supply</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Design</current_phase><design_start>2018-04-02T00:00:00</design_start><budget_forecast>39530000.00</budget_forecast><latest_budget_changes>-161000.00</latest_budget_changes><total_budget_changes>7195000.00</total_budget_changes><forecast_completion>2022-01-18T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>2236</total_schedule_changes></row><row _id="row-jfms_jfcc~vk33" _uuid="00000000-0000-0000-C13F-63146B0F4234" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-jfms_jfcc~vk33"><date_reported_as_of>2019-05-01T00:00:00</date_reported_as_of><pid>768</pid><project_name>Water Main Replacement In 222 Street, Queens</project_name><description>WATER MAIN REPLACEMENT IN 222 STREET</description><category>Water Supply</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Design</current_phase><design_start>2018-04-02T00:00:00</design_start><budget_forecast>39530000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>7195000.00</total_budget_changes><forecast_completion>2023-01-18T00:00:00</forecast_completion><latest_schedule_changes>365</latest_schedule_changes><total_schedule_changes>2236</total_schedule_changes></row><row _id="row-8qp7_epj8_jnar" _uuid="00000000-0000-0000-9032-C0C66451E6C0" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-8qp7_epj8_jnar"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>768</pid><project_name>Water Main Replacement In 222 Street, Queens</project_name><description>WATER MAIN REPLACEMENT IN 222 STREET</description><category>Water Supply</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Design</current_phase><design_start>2018-04-02T00:00:00</design_start><budget_forecast>39530000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>7195000.00</total_budget_changes><forecast_completion>2024-01-19T00:00:00</forecast_completion><latest_schedule_changes>366</latest_schedule_changes><total_schedule_changes>2236</total_schedule_changes></row><row _id="row-pewr_zgeh-fcsu" _uuid="00000000-0000-0000-D51E-C02D72EE3CA2" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-pewr_zgeh-fcsu"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>768</pid><project_name>Water Main Replacement In 222 Street, Queens</project_name><category>Water Supply</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><total_budget_changes>7195000.00</total_budget_changes><total_schedule_changes>2236</total_schedule_changes></row><row _id="row-csbe.9393.gj2e" _uuid="00000000-0000-0000-F4EA-05BFD6B62D69" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-csbe.9393.gj2e"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>768</pid><project_name>Water Main Replacement In 222 Street, Queens</project_name><category>Water Supply</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><total_budget_changes>7195000.00</total_budget_changes><total_schedule_changes>2236</total_schedule_changes></row><row _id="row-dnga-wkwk.bfid" _uuid="00000000-0000-0000-54FC-EC6D42AA05AC" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-dnga-wkwk.bfid"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>768</pid><project_name>Water Main Replacement In 222 Street, Queens</project_name><category>Water Supply</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><total_budget_changes>7195000.00</total_budget_changes><total_schedule_changes>2236</total_schedule_changes></row><row _id="row-t7sr.fmnf.5svx" _uuid="00000000-0000-0000-42A4-F3B7391F8DDA" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-t7sr.fmnf.5svx"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>768</pid><project_name>Water Main Replacement In 222 Street, Queens</project_name><category>Water Supply</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><total_budget_changes>7195000.00</total_budget_changes><total_schedule_changes>2236</total_schedule_changes></row><row _id="row-9em7.zqyx_nh6m" _uuid="00000000-0000-0000-0CA7-B91CCEA80BBD" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-9em7.zqyx_nh6m"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>768</pid><project_name>Water Main Replacement In 222 Street, Queens</project_name><description>WATER MAIN REPLACEMENT IN 222 STREET</description><category>Water Supply</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Design</current_phase><design_start>2017-01-05T00:00:00</design_start><budget_forecast>41472000.00</budget_forecast><latest_budget_changes>1942000.00</latest_budget_changes><total_budget_changes>7195000.00</total_budget_changes><forecast_completion>2026-02-02T00:00:00</forecast_completion><latest_schedule_changes>745</latest_schedule_changes><total_schedule_changes>2236</total_schedule_changes></row><row _id="row-2mai~h4r2~b6qj" _uuid="00000000-0000-0000-0E39-E979ECD561E1" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-2mai~h4r2~b6qj"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>768</pid><project_name>Water Main Replacement In 222 Street, Queens</project_name><description>WATER MAIN REPLACEMENT IN 222 STREET</description><category>Water Supply</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Design</current_phase><design_start>2017-01-05T00:00:00</design_start><budget_forecast>41472000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>7195000.00</total_budget_changes><forecast_completion>2025-07-18T00:00:00</forecast_completion><latest_schedule_changes>-199</latest_schedule_changes><total_schedule_changes>2236</total_schedule_changes></row><row _id="row-269r_9jdw.9n7c" _uuid="00000000-0000-0000-69CD-5EBCE07C9778" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-269r_9jdw.9n7c"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>768</pid><project_name>Water Main Replacement In 222 Street, Queens</project_name><description>WATER MAIN REPLACEMENT IN 222 STREET</description><category>Water Supply</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Design</current_phase><design_start>2017-01-05T00:00:00</design_start><budget_forecast>41472000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>7195000.00</total_budget_changes><forecast_completion>2025-12-18T00:00:00</forecast_completion><latest_schedule_changes>153</latest_schedule_changes><total_schedule_changes>2236</total_schedule_changes></row><row _id="row-vq8q.ddf8_e8q6" _uuid="00000000-0000-0000-865D-1097E64C90EF" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-vq8q.ddf8_e8q6"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>768</pid><project_name>Water Main Replacement In 222 Street, Queens</project_name><description>WATER MAIN REPLACEMENT IN 222 STREET</description><category>Water Supply</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Design</current_phase><design_start>2017-01-05T00:00:00</design_start><budget_forecast>41671000.00</budget_forecast><latest_budget_changes>199000.00</latest_budget_changes><total_budget_changes>7195000.00</total_budget_changes><forecast_completion>2028-03-03T00:00:00</forecast_completion><latest_schedule_changes>806</latest_schedule_changes><total_schedule_changes>2236</total_schedule_changes></row><row _id="row-j3b6.j5ty~4eax" _uuid="00000000-0000-0000-91B5-0F32A866E717" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-j3b6.j5ty~4eax"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>768</pid><project_name>Water Main Replacement In 222 Street, Queens</project_name><description>WATER MAIN REPLACEMENT IN 222 STREET</description><category>Water Supply</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Design</current_phase><design_start>2017-01-05T00:00:00</design_start><budget_forecast>41671000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>7195000.00</total_budget_changes><forecast_completion>2028-03-03T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>2236</total_schedule_changes></row><row _id="row-gvrn-8tgi-gwfb" _uuid="00000000-0000-0000-6CC8-833BF41068D4" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-gvrn-8tgi-gwfb"><date_reported_as_of>2018-03-01T00:00:00</date_reported_as_of><pid>769</pid><project_name>Staten Island 1 &amp; 3 Garage Construction &amp; Rehab</project_name><description>The Department of Sanitation of the City of New York (DSNY) is planning to develop a Staten Island Districts 1 and 3 campus that will include a new garage serving both districts and renovation of the existing Borough Repair Shop.</description><category>Sanitation</category><borough>Staten Island</borough><managing_agency>DDC</managing_agency><client_agency>Sanitation</client_agency><current_phase>Design</current_phase><design_start>2017-07-14T00:00:00</design_start><budget_forecast>138144000.00</budget_forecast><total_budget_changes>68555000.00</total_budget_changes><forecast_completion>2023-02-13T00:00:00</forecast_completion><total_schedule_changes>406</total_schedule_changes></row><row _id="row-sxrm.bis4-6paj" _uuid="00000000-0000-0000-8959-E9871E67F585" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-sxrm.bis4-6paj"><date_reported_as_of>2018-08-01T00:00:00</date_reported_as_of><pid>769</pid><project_name>Staten Island 1 &amp; 3 Garage Construction &amp; Rehab</project_name><description>The Department of Sanitation of the City of New York (DSNY) is planning to develop a Staten Island Districts 1 and 3 campus that will include a new garage serving both districts and renovation of the existing Borough Repair Shop.</description><category>Sanitation</category><borough>Staten Island</borough><managing_agency>DDC</managing_agency><client_agency>Sanitation</client_agency><current_phase>Design</current_phase><design_start>2017-07-14T00:00:00</design_start><budget_forecast>159560000.00</budget_forecast><latest_budget_changes>21416000.00</latest_budget_changes><total_budget_changes>68555000.00</total_budget_changes><forecast_completion>2023-02-13T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>406</total_schedule_changes></row><row _id="row-r53w_ifwy-3tvz" _uuid="00000000-0000-0000-8618-B8997181755E" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-r53w_ifwy-3tvz"><date_reported_as_of>2019-01-01T00:00:00</date_reported_as_of><pid>769</pid><project_name>Staten Island 1 &amp; 3 Garage Construction &amp; Rehab</project_name><description>The Department of Sanitation of the City of New York (DSNY) is planning to develop a Staten Island Districts 1 and 3 campus that will include a new garage serving both districts and renovation of the existing Borough Repair Shop.</description><category>Sanitation</category><borough>Staten Island</borough><managing_agency>DDC</managing_agency><client_agency>Sanitation</client_agency><current_phase>Design</current_phase><design_start>2017-07-14T00:00:00</design_start><budget_forecast>175841000.00</budget_forecast><latest_budget_changes>16281000.00</latest_budget_changes><total_budget_changes>68555000.00</total_budget_changes><forecast_completion>2023-06-16T00:00:00</forecast_completion><latest_schedule_changes>123</latest_schedule_changes><total_schedule_changes>406</total_schedule_changes></row><row _id="row-puuf_xckw.6jqw" _uuid="00000000-0000-0000-3248-F19E95F53BCA" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-puuf_xckw.6jqw"><date_reported_as_of>2019-05-01T00:00:00</date_reported_as_of><pid>769</pid><project_name>Staten Island 1 &amp; 3 Garage Construction &amp; Rehab</project_name><description>The Department of Sanitation of the City of New York (DSNY) is planning to develop a Staten Island Districts 1 and 3 campus that will include a new garage serving both districts and renovation of the existing Borough Repair Shop.  The site is to be reconfigured with new grading and drainage, new covered salt storage, new outdoor fueling, new household special waste collection, outdoor DSNY truck parking and a new force main sanitary line to connect to the NYC DEP sewer.</description><category>Sanitation</category><borough>Staten Island</borough><managing_agency>DDC</managing_agency><client_agency>Sanitation</client_agency><current_phase>Construction Procurement</current_phase><design_start>2017-07-14T00:00:00</design_start><budget_forecast>175532000.00</budget_forecast><latest_budget_changes>-309000.00</latest_budget_changes><total_budget_changes>68555000.00</total_budget_changes><forecast_completion>2023-12-17T00:00:00</forecast_completion><latest_schedule_changes>184</latest_schedule_changes><total_schedule_changes>406</total_schedule_changes></row><row _id="row-f2iv~bmje_jxx8" _uuid="00000000-0000-0000-E27C-F427FA5C0F21" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-f2iv~bmje_jxx8"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>769</pid><project_name>Staten Island 1 &amp; 3 Garage Construction &amp; Rehab</project_name><description>The Department of Sanitation of the City of New York (DSNY) is planning to develop a Staten Island Districts 1 and 3 campus that will include a new garage serving both districts and renovation of the existing Borough Repair Shop.  The site is to be reconfigured with new grading and drainage, new covered salt storage, new outdoor fueling, new household special waste collection, outdoor DSNY truck parking and a new force main sanitary line to connect to the NYC DEP sewer.</description><category>Sanitation</category><borough>Staten Island</borough><managing_agency>DDC</managing_agency><client_agency>Sanitation</client_agency><current_phase>Construction Procurement</current_phase><design_start>2017-07-14T00:00:00</design_start><budget_forecast>183135000.00</budget_forecast><latest_budget_changes>7603000.00</latest_budget_changes><total_budget_changes>68555000.00</total_budget_changes><forecast_completion>2024-02-26T00:00:00</forecast_completion><latest_schedule_changes>71</latest_schedule_changes><total_schedule_changes>406</total_schedule_changes></row><row _id="row-stgd~xiz3-ik6t" _uuid="00000000-0000-0000-5E67-E878084D5661" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-stgd~xiz3-ik6t"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>769</pid><project_name>Staten Island 1 &amp; 3 Garage Construction &amp; Rehab</project_name><category>Sanitation</category><borough>Staten Island</borough><managing_agency>DDC</managing_agency><client_agency>Sanitation</client_agency><total_budget_changes>68555000.00</total_budget_changes><total_schedule_changes>406</total_schedule_changes></row><row _id="row-quiv-e8ta_4kev" _uuid="00000000-0000-0000-E0BB-30F97653F843" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-quiv-e8ta_4kev"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>769</pid><project_name>Staten Island 1 &amp; 3 Garage Construction &amp; Rehab</project_name><category>Sanitation</category><borough>Staten Island</borough><managing_agency>DDC</managing_agency><client_agency>Sanitation</client_agency><total_budget_changes>68555000.00</total_budget_changes><total_schedule_changes>406</total_schedule_changes></row><row _id="row-uhtg~6j32-ey5w" _uuid="00000000-0000-0000-C8FD-558908072708" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-uhtg~6j32-ey5w"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>769</pid><project_name>Staten Island 1 &amp; 3 Garage Construction &amp; Rehab</project_name><category>Sanitation</category><borough>Staten Island</borough><managing_agency>DDC</managing_agency><client_agency>Sanitation</client_agency><total_budget_changes>68555000.00</total_budget_changes><total_schedule_changes>406</total_schedule_changes></row><row _id="row-ecxy-884a~xn92" _uuid="00000000-0000-0000-F7C7-9D8B29CD8BEE" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ecxy-884a~xn92"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>769</pid><project_name>Staten Island 1 &amp; 3 Garage Construction &amp; Rehab</project_name><category>Sanitation</category><borough>Staten Island</borough><managing_agency>DDC</managing_agency><client_agency>Sanitation</client_agency><total_budget_changes>68555000.00</total_budget_changes><total_schedule_changes>406</total_schedule_changes></row><row _id="row-jivh-sbxh_xahk" _uuid="00000000-0000-0000-F5B4-06EF0087A72B" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-jivh-sbxh_xahk"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>769</pid><project_name>Staten Island 1 &amp; 3 Garage Construction &amp; Rehab</project_name><description>The Department of Sanitation of the City of New York (DSNY) is planning to develop a Staten Island Districts 1 and 3 campus that will include a new garage serving both districts and renovation of the existing Borough Repair Shop.  The site is to be reconfigured with new grading and drainage, new covered salt storage, new outdoor fueling, new household special waste collection, outdoor DSNY truck parking and a new force main sanitary line to connect to the NYC DEP sewer.</description><category>Sanitation</category><borough>Staten Island</borough><managing_agency>DDC</managing_agency><client_agency>Sanitation</client_agency><current_phase>Construction</current_phase><design_start>2017-07-14T00:00:00</design_start><budget_forecast>187208000.00</budget_forecast><latest_budget_changes>4073000.00</latest_budget_changes><total_budget_changes>68555000.00</total_budget_changes><forecast_completion>2023-09-01T00:00:00</forecast_completion><latest_schedule_changes>-178</latest_schedule_changes><total_schedule_changes>406</total_schedule_changes></row><row _id="row-2phq-6avz_gnvi" _uuid="00000000-0000-0000-6D14-78943747D535" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-2phq-6avz_gnvi"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>769</pid><project_name>Staten Island 1 &amp; 3 Garage Construction &amp; Rehab</project_name><description>The Department of Sanitation of the City of New York (DSNY) is planning to develop a Staten Island Districts 1 and 3 campus that will include a new garage serving both districts and renovation of the existing Borough Repair Shop.  The site is to be reconfigured with new grading and drainage, new covered salt storage, new outdoor fueling, new household special waste collection, outdoor DSNY truck parking and a new force main sanitary line to connect to the NYC DEP sewer.</description><category>Sanitation</category><borough>Staten Island</borough><managing_agency>DDC</managing_agency><client_agency>Sanitation</client_agency><current_phase>Construction</current_phase><design_start>2017-07-14T00:00:00</design_start><budget_forecast>190154000.00</budget_forecast><latest_budget_changes>2946000.00</latest_budget_changes><total_budget_changes>68555000.00</total_budget_changes><forecast_completion>2023-09-01T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>406</total_schedule_changes></row><row _id="row-my9z~xwni.hj6t" _uuid="00000000-0000-0000-2311-DCDA21B1B35A" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-my9z~xwni.hj6t"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>769</pid><project_name>Staten Island 1 &amp; 3 Garage Construction &amp; Rehab</project_name><description>The Department of Sanitation of the City of New York (DSNY) is planning to develop a Staten Island Districts 1 and 3 campus that will include a new garage serving both districts and renovation of the existing Borough Repair Shop.  The site is to be reconfigured with new grading and drainage, new covered salt storage, new outdoor fueling, new household special waste collection, outdoor DSNY truck parking and a new force main sanitary line to connect to the NYC DEP sewer.</description><category>Sanitation</category><borough>Staten Island</borough><managing_agency>DDC</managing_agency><client_agency>Sanitation</client_agency><current_phase>Construction</current_phase><design_start>2017-07-14T00:00:00</design_start><budget_forecast>201090000.00</budget_forecast><latest_budget_changes>10936000.00</latest_budget_changes><total_budget_changes>68555000.00</total_budget_changes><forecast_completion>2024-01-23T00:00:00</forecast_completion><latest_schedule_changes>144</latest_schedule_changes><total_schedule_changes>406</total_schedule_changes></row><row _id="row-4zfi_ebtb_c5yu" _uuid="00000000-0000-0000-77A3-A277F2B7464F" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-4zfi_ebtb_c5yu"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>769</pid><project_name>Staten Island 1 &amp; 3 Garage Construction &amp; Rehab</project_name><description>The Department of Sanitation of the City of New York (DSNY) is planning to develop a Staten Island Districts 1 and 3 campus that will include a new garage serving both districts and renovation of the existing Borough Repair Shop.  The site is to be reconfigured with new grading and drainage, new covered salt storage, new outdoor fueling, new household special waste collection, outdoor DSNY truck parking and a new force main sanitary line to connect to the NYC DEP sewer.</description><category>Sanitation</category><borough>Staten Island</borough><managing_agency>DDC</managing_agency><client_agency>Sanitation</client_agency><current_phase>Construction</current_phase><design_start>2017-07-14T00:00:00</design_start><budget_forecast>202104000.00</budget_forecast><latest_budget_changes>1014000.00</latest_budget_changes><total_budget_changes>68555000.00</total_budget_changes><forecast_completion>2024-03-25T00:00:00</forecast_completion><latest_schedule_changes>62</latest_schedule_changes><total_schedule_changes>406</total_schedule_changes></row><row _id="row-jxee~eb2m~v4g9" _uuid="00000000-0000-0000-184C-C76CF6956813" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-jxee~eb2m~v4g9"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>769</pid><project_name>Staten Island 1 &amp; 3 Garage Construction &amp; Rehab</project_name><description>The Department of Sanitation of the City of New York (DSNY) is planning to develop a Staten Island Districts 1 and 3 campus that will include a new garage serving both districts and renovation of the existing Borough Repair Shop.  The site is to be reconfigured with new grading and drainage, new covered salt storage, new outdoor fueling, new household special waste collection, outdoor DSNY truck parking and a new force main sanitary line to connect to the NYC DEP sewer.</description><category>Sanitation</category><borough>Staten Island</borough><managing_agency>DDC</managing_agency><client_agency>Sanitation</client_agency><current_phase>Construction</current_phase><design_start>2017-07-14T00:00:00</design_start><budget_forecast>206699000.00</budget_forecast><latest_budget_changes>4595000.00</latest_budget_changes><total_budget_changes>68555000.00</total_budget_changes><forecast_completion>2024-03-25T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>406</total_schedule_changes></row><row _id="row-r4vf~vgnz~ger8" _uuid="00000000-0000-0000-9D93-A635B582B236" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-r4vf~vgnz~ger8"><date_reported_as_of>2018-03-01T00:00:00</date_reported_as_of><pid>770</pid><project_name>Rehab Of Queens District 11/13 Sanitation Garage</project_name><description>Rehab Of Queens District 11/13 Sanitation Garage</description><category>Sanitation</category><borough>Queens</borough><managing_agency>DDC</managing_agency><client_agency>Sanitation</client_agency><current_phase>Design</current_phase><design_start>2017-03-06T00:00:00</design_start><budget_forecast>37825000.00</budget_forecast><total_budget_changes>36221000.00</total_budget_changes><forecast_completion>2022-10-31T00:00:00</forecast_completion><total_schedule_changes>1521</total_schedule_changes></row><row _id="row-ri9i.f6x4_vdsc" _uuid="00000000-0000-0000-5F1C-31EF14D329FB" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ri9i.f6x4_vdsc"><date_reported_as_of>2018-08-01T00:00:00</date_reported_as_of><pid>770</pid><project_name>Rehab Of Queens District 11/13 Sanitation Garage</project_name><description>Rehab Of Queens District 11/13 Sanitation Garage</description><category>Sanitation</category><borough>Queens</borough><managing_agency>DDC</managing_agency><client_agency>Sanitation</client_agency><current_phase>Design</current_phase><design_start>2017-03-06T00:00:00</design_start><budget_forecast>38097000.00</budget_forecast><latest_budget_changes>272000.00</latest_budget_changes><total_budget_changes>36221000.00</total_budget_changes><forecast_completion>2022-10-31T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1521</total_schedule_changes></row><row _id="row-x2cr-vpcc_mea7" _uuid="00000000-0000-0000-CAC9-2E6DB24FDCEE" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-x2cr-vpcc_mea7"><date_reported_as_of>2019-01-01T00:00:00</date_reported_as_of><pid>770</pid><project_name>Rehab Of Queens District 11/13 Sanitation Garage</project_name><description>Rehab Of Queens District 11/13 Sanitation Garage</description><category>Sanitation</category><borough>Queens</borough><managing_agency>DDC</managing_agency><client_agency>Sanitation</client_agency><current_phase>Design</current_phase><design_start>2017-03-06T00:00:00</design_start><budget_forecast>49196000.00</budget_forecast><latest_budget_changes>11099000.00</latest_budget_changes><total_budget_changes>36221000.00</total_budget_changes><forecast_completion>2023-10-06T00:00:00</forecast_completion><latest_schedule_changes>340</latest_schedule_changes><total_schedule_changes>1521</total_schedule_changes></row><row _id="row-k99a.x2m4-4d4g" _uuid="00000000-0000-0000-9C1A-1AFC5C7E94E9" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-k99a.x2m4-4d4g"><date_reported_as_of>2019-05-01T00:00:00</date_reported_as_of><pid>770</pid><project_name>Rehab Of Queens District 11/13 Sanitation Garage</project_name><description>The project is to extend the useful life of the facility through rehabilitation of the building structure and systems. This shall include: structural work, replacement of building MEP systems, architectural upgrade and replacement in kind of sidewalks and driveways</description><category>Sanitation</category><borough>Queens</borough><managing_agency>DDC</managing_agency><client_agency>Sanitation</client_agency><current_phase>Design</current_phase><design_start>2017-03-06T00:00:00</design_start><budget_forecast>61897000.00</budget_forecast><latest_budget_changes>12701000.00</latest_budget_changes><total_budget_changes>36221000.00</total_budget_changes><forecast_completion>2023-07-01T00:00:00</forecast_completion><latest_schedule_changes>-97</latest_schedule_changes><total_schedule_changes>1521</total_schedule_changes></row><row _id="row-isym~wded-sp2f" _uuid="00000000-0000-0000-7CAF-B008EEC31543" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-isym~wded-sp2f"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>770</pid><project_name>Rehab Of Queens District 11/13 Sanitation Garage</project_name><description>The project is to extend the useful life of the facility through rehabilitation of the building structure and systems. This shall include: structural work, replacement of building MEP systems, architectural upgrade and replacement in kind of sidewalks and driveways</description><category>Sanitation</category><borough>Queens</borough><managing_agency>DDC</managing_agency><client_agency>Sanitation</client_agency><current_phase>Design</current_phase><design_start>2017-03-06T00:00:00</design_start><budget_forecast>68094000.00</budget_forecast><latest_budget_changes>6197000.00</latest_budget_changes><total_budget_changes>36221000.00</total_budget_changes><forecast_completion>2023-07-01T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1521</total_schedule_changes></row><row _id="row-xgh2-8d7j-fe2q" _uuid="00000000-0000-0000-0166-16659AC16736" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-xgh2-8d7j-fe2q"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>770</pid><project_name>Rehab Of Queens District 11/13 Sanitation Garage</project_name><category>Sanitation</category><borough>Queens</borough><managing_agency>DDC</managing_agency><client_agency>Sanitation</client_agency><total_budget_changes>36221000.00</total_budget_changes><total_schedule_changes>1521</total_schedule_changes></row><row _id="row-dsz5-hkhq_4sz8" _uuid="00000000-0000-0000-8333-D9A262C566C7" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-dsz5-hkhq_4sz8"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>770</pid><project_name>Rehab Of Queens District 11/13 Sanitation Garage</project_name><category>Sanitation</category><borough>Queens</borough><managing_agency>DDC</managing_agency><client_agency>Sanitation</client_agency><total_budget_changes>36221000.00</total_budget_changes><total_schedule_changes>1521</total_schedule_changes></row><row _id="row-szyp.nwqz_6d3u" _uuid="00000000-0000-0000-1C06-0A535549245A" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-szyp.nwqz_6d3u"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>770</pid><project_name>Rehab Of Queens District 11/13 Sanitation Garage</project_name><category>Sanitation</category><borough>Queens</borough><managing_agency>DDC</managing_agency><client_agency>Sanitation</client_agency><total_budget_changes>36221000.00</total_budget_changes><total_schedule_changes>1521</total_schedule_changes></row><row _id="row-wrep~9aaw-bb49" _uuid="00000000-0000-0000-B802-27518C91FA3E" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-wrep~9aaw-bb49"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>770</pid><project_name>Rehab Of Queens District 11/13 Sanitation Garage</project_name><category>Sanitation</category><borough>Queens</borough><managing_agency>DDC</managing_agency><client_agency>Sanitation</client_agency><total_budget_changes>36221000.00</total_budget_changes><total_schedule_changes>1521</total_schedule_changes></row><row _id="row-d7j5-i8zp~za6b" _uuid="00000000-0000-0000-5B06-BB1DE1443E88" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-d7j5-i8zp~za6b"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>770</pid><project_name>Rehab Of Queens District 11/13 Sanitation Garage</project_name><description>The Department of Sanitation of the City of New York (DSNY) is planning to rehabilitate Queens Districts 11 and 13 garage. The renovation serving both districts is to extend the useful life of the facility through rehabilitation of the building structure and systems. The renovation includes: Extensive structural work that includes the replacement of reinforced concrete slabs and stiffening of the existing steel frame, select replacement of building MEP systems, including BMS systems, architectural renovation of the entire building, study and implementation of deep energy conservation measures (DECMs), and site work which includes new landscape work and replacement of sidewalks and driveways. Rehabilitation is required to meet LEED Silver requirements.</description><category>Sanitation</category><borough>Queens</borough><managing_agency>DDC</managing_agency><client_agency>Sanitation</client_agency><current_phase>Design</current_phase><design_start>2017-03-06T00:00:00</design_start><budget_forecast>72557000.00</budget_forecast><latest_budget_changes>4463000.00</latest_budget_changes><total_budget_changes>36221000.00</total_budget_changes><forecast_completion>2025-06-30T00:00:00</forecast_completion><latest_schedule_changes>730</latest_schedule_changes><total_schedule_changes>1521</total_schedule_changes></row><row _id="row-hkzp-psx7_c4nb" _uuid="00000000-0000-0000-84CE-43D56607C473" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-hkzp-psx7_c4nb"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>770</pid><project_name>Rehab Of Queens District 11/13 Sanitation Garage</project_name><description>The Department of Sanitation of the City of New York (DSNY) is planning to rehabilitate Queens Districts 11 and 13 garage. The renovation serving both districts is to extend the useful life of the facility through rehabilitation of the building structure and systems. The renovation includes: Extensive structural work that includes the replacement of reinforced concrete slabs and stiffening of the existing steel frame, select replacement of building MEP systems, including BMS systems, architectural renovation of the entire building, study and implementation of deep energy conservation measures (DECMs), and site work which includes new landscape work and replacement of sidewalks and driveways. Rehabilitation is required to meet LEED Silver requirements.</description><category>Sanitation</category><borough>Queens</borough><managing_agency>DDC</managing_agency><client_agency>Sanitation</client_agency><current_phase>Design</current_phase><design_start>2017-03-06T00:00:00</design_start><budget_forecast>72617000.00</budget_forecast><latest_budget_changes>60000.00</latest_budget_changes><total_budget_changes>36221000.00</total_budget_changes><forecast_completion>2025-12-30T00:00:00</forecast_completion><latest_schedule_changes>183</latest_schedule_changes><total_schedule_changes>1521</total_schedule_changes></row><row _id="row-2hxt-6crz_mzxs" _uuid="00000000-0000-0000-9EA9-3BE8502DBFFF" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-2hxt-6crz_mzxs"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>770</pid><project_name>Rehab Of Queens District 11/13 Sanitation Garage</project_name><description>The Department of Sanitation of the City of New York (DSNY) is planning to rehabilitate Queens Districts 11 and 13 garage. The renovation serving both districts is to extend the useful life of the facility through rehabilitation of the building structure and systems. The renovation includes: Extensive structural work that includes the replacement of reinforced concrete slabs and stiffening of the existing steel frame, select replacement of building MEP systems, including BMS systems, architectural renovation of the entire building, study and implementation of deep energy conservation measures (DECMs), and site work which includes new landscape work and replacement of sidewalks and driveways. Rehabilitation is required to meet LEED Silver requirements.</description><category>Sanitation</category><borough>Queens</borough><managing_agency>DDC</managing_agency><client_agency>Sanitation</client_agency><current_phase>Design</current_phase><design_start>2017-03-06T00:00:00</design_start><budget_forecast>73161000.00</budget_forecast><latest_budget_changes>544000.00</latest_budget_changes><total_budget_changes>36221000.00</total_budget_changes><forecast_completion>2026-06-12T00:00:00</forecast_completion><latest_schedule_changes>164</latest_schedule_changes><total_schedule_changes>1521</total_schedule_changes></row><row _id="row-msax.6tan_u5as" _uuid="00000000-0000-0000-2205-AF45F602069D" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-msax.6tan_u5as"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1218</pid><project_name>Fort Greene Park Entrances, Paths, Plaza and Drainage Infrastructure Reconstruction</project_name><description>This project will reconstruct the entrances, paths, plaza and drainage infrastructure at Fort Greene Park.</description><category>Parks</category><managing_agency>DPR</managing_agency><client_agency>DPR</client_agency><current_phase>Design</current_phase><design_start>2021-02-22T00:00:00</design_start><budget_forecast>29284800.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2025-05-10T00:00:00</forecast_completion><latest_schedule_changes>168</latest_schedule_changes><total_schedule_changes>417</total_schedule_changes></row><row _id="row-ze7f.x5gv.dqa7" _uuid="00000000-0000-0000-38EF-845136EF1500" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ze7f.x5gv.dqa7"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>770</pid><project_name>Rehab Of Queens District 11/13 Sanitation Garage</project_name><description>The Department of Sanitation of the City of New York (DSNY) is planning to rehabilitate Queens Districts 11 and 13 garage. The renovation serving both districts is to extend the useful life of the facility through rehabilitation of the building structure and systems. The renovation includes: Extensive structural work that includes the replacement of reinforced concrete slabs and stiffening of the existing steel frame, select replacement of building MEP systems, including BMS systems, architectural renovation of the entire building, study and implementation of deep energy conservation measures (DECMs), and site work which includes new landscape work and replacement of sidewalks and driveways. Rehabilitation is required to meet LEED Silver requirements.</description><category>Sanitation</category><borough>Queens</borough><managing_agency>DDC</managing_agency><client_agency>Sanitation</client_agency><current_phase>Design</current_phase><design_start>2017-03-06T00:00:00</design_start><budget_forecast>73391000.00</budget_forecast><latest_budget_changes>230000.00</latest_budget_changes><total_budget_changes>36221000.00</total_budget_changes><forecast_completion>2026-06-12T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1521</total_schedule_changes></row><row _id="row-jpsm-u5xu_78au" _uuid="00000000-0000-0000-DEAF-A079DE1F3DB4" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-jpsm-u5xu_78au"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>770</pid><project_name>Rehab Of Queens District 11/13 Sanitation Garage</project_name><description>The Department of Sanitation of the City of New York (DSNY) is planning to rehabilitate Queens Districts 11 and 13 garage. The renovation serving both districts is to extend the useful life of the facility through rehabilitation of the building structure and systems. The renovation includes: Extensive structural work that includes the replacement of reinforced concrete slabs and stiffening of the existing steel frame, select replacement of building MEP systems, including BMS systems, architectural renovation of the entire building, study and implementation of deep energy conservation measures (DECMs), and site work which includes new landscape work and replacement of sidewalks and driveways. Rehabilitation is required to meet LEED Silver requirements.</description><category>Sanitation</category><borough>Queens</borough><managing_agency>DDC</managing_agency><client_agency>Sanitation</client_agency><current_phase>Design</current_phase><design_start>2017-03-06T00:00:00</design_start><budget_forecast>74046000.00</budget_forecast><latest_budget_changes>655000.00</latest_budget_changes><total_budget_changes>36221000.00</total_budget_changes><forecast_completion>2026-12-30T00:00:00</forecast_completion><latest_schedule_changes>201</latest_schedule_changes><total_schedule_changes>1521</total_schedule_changes></row><row _id="row-tjzd~px33~fzph" _uuid="00000000-0000-0000-14E4-A8EE95FF52DC" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-tjzd~px33~fzph"><date_reported_as_of>2018-03-01T00:00:00</date_reported_as_of><pid>773</pid><project_name>Coastal Resiliency Area 1 - East 23Rd St. To Montg</project_name><description>East Side Coastal Resiliency - East 23rd St. to Montgomery St.</description><category>Industrial Development, Parks</category><managing_agency>DDC</managing_agency><client_agency>Parks &amp; Recreation</client_agency><current_phase>Design</current_phase><design_start>2017-04-01T00:00:00</design_start><budget_forecast>510854000.00</budget_forecast><total_budget_changes>-418193636.37</total_budget_changes><forecast_completion>2024-05-01T00:00:00</forecast_completion><total_schedule_changes>836</total_schedule_changes></row><row _id="row-j3jm~he5h~axpp" _uuid="00000000-0000-0000-0C53-C0730FB098A5" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-j3jm~he5h~axpp"><date_reported_as_of>2018-08-01T00:00:00</date_reported_as_of><pid>773</pid><project_name>Coastal Resiliency Area 1 - East 23Rd St. To Montg</project_name><description>East Side Coastal Resiliency - East 23rd St. to Montgomery St.</description><category>Industrial Development, Parks</category><managing_agency>DDC</managing_agency><client_agency>Parks &amp; Recreation</client_agency><current_phase>Design</current_phase><design_start>2017-04-01T00:00:00</design_start><budget_forecast>510854000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-418193636.37</total_budget_changes><forecast_completion>2025-04-30T00:00:00</forecast_completion><latest_schedule_changes>364</latest_schedule_changes><total_schedule_changes>836</total_schedule_changes></row><row _id="row-5ik6-vbxc~66x5" _uuid="00000000-0000-0000-5F6F-287D3A2B2E89" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-5ik6-vbxc~66x5"><date_reported_as_of>2019-01-01T00:00:00</date_reported_as_of><pid>773</pid><project_name>Coastal Resiliency Area 1 - East 23Rd St. To Montg</project_name><description>East Side Coastal Resiliency - East 23rd St. to Montgomery St.</description><category>Industrial Development, Parks</category><managing_agency>DDC</managing_agency><client_agency>Parks &amp; Recreation</client_agency><current_phase>Design</current_phase><design_start>2017-04-01T00:00:00</design_start><budget_forecast>1239704000.00</budget_forecast><latest_budget_changes>728850000.00</latest_budget_changes><total_budget_changes>-418193636.37</total_budget_changes><forecast_completion>2023-03-31T00:00:00</forecast_completion><latest_schedule_changes>-761</latest_schedule_changes><total_schedule_changes>836</total_schedule_changes></row><row _id="row-zdix-ayb3-5vnn" _uuid="00000000-0000-0000-352D-EA7358F349C5" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-zdix-ayb3-5vnn"><date_reported_as_of>2019-05-01T00:00:00</date_reported_as_of><pid>773</pid><project_name>Coastal Resiliency Area 1 - East 23Rd St. To Montg</project_name><description>East Side Coastal Resiliency - East 23rd St. to Montgomery St., Manhattan</description><category>Industrial Development, Parks</category><managing_agency>DDC</managing_agency><client_agency>Parks &amp; Recreation</client_agency><current_phase>Design</current_phase><design_start>2016-04-27T00:00:00</design_start><budget_forecast>1239704000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-418193636.37</total_budget_changes><forecast_completion>2023-03-31T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>836</total_schedule_changes></row><row _id="row-q63b~p7ra_443c" _uuid="00000000-0000-0000-B9A0-2903EB99DA93" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-q63b~p7ra_443c"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>773</pid><project_name>Coastal Resiliency Area 1 - East 23Rd St. To Montg</project_name><description>East Side Coastal Resiliency - Area 1 - East 23rd St. to Montgomery St., Manhattan</description><category>Industrial Development, Parks</category><managing_agency>DDC</managing_agency><client_agency>Parks &amp; Recreation</client_agency><current_phase>Design</current_phase><design_start>2016-04-27T00:00:00</design_start><budget_forecast>1231314000.00</budget_forecast><latest_budget_changes>-8390000.00</latest_budget_changes><total_budget_changes>-418193636.37</total_budget_changes><forecast_completion>2023-03-31T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>836</total_schedule_changes></row><row _id="row-g4k9-f2hc.j4r8" _uuid="00000000-0000-0000-B74E-F383A5E22594" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-g4k9-f2hc.j4r8"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>773</pid><project_name>Coastal Resiliency Area 1 - East 23Rd St. To Montg</project_name><category>Industrial Development, Parks</category><managing_agency>DDC</managing_agency><client_agency>Parks &amp; Recreation</client_agency><total_budget_changes>-418193636.37</total_budget_changes><total_schedule_changes>836</total_schedule_changes></row><row _id="row-9c49-v2pg-g68v" _uuid="00000000-0000-0000-9F6D-19C97E310CD6" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-9c49-v2pg-g68v"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>773</pid><project_name>Coastal Resiliency Area 1 - East 23Rd St. To Montg</project_name><category>Industrial Development, Parks</category><managing_agency>DDC</managing_agency><client_agency>Parks &amp; Recreation</client_agency><total_budget_changes>-418193636.37</total_budget_changes><total_schedule_changes>836</total_schedule_changes></row><row _id="row-qm4y-9scd-sxi4" _uuid="00000000-0000-0000-9CB8-CFF7C2F73780" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-qm4y-9scd-sxi4"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>773</pid><project_name>Coastal Resiliency Area 1 - East 23Rd St. To Montg</project_name><category>Industrial Development, Parks</category><managing_agency>DDC</managing_agency><client_agency>Parks &amp; Recreation</client_agency><total_budget_changes>-418193636.37</total_budget_changes><total_schedule_changes>836</total_schedule_changes></row><row _id="row-t6jh_dnn5_7s66" _uuid="00000000-0000-0000-C2A1-A03A73B4E498" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-t6jh_dnn5_7s66"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>773</pid><project_name>Coastal Resiliency Area 1 - East 23Rd St. To Montg</project_name><category>Industrial Development, Parks</category><managing_agency>DDC</managing_agency><client_agency>Parks &amp; Recreation</client_agency><total_budget_changes>-418193636.37</total_budget_changes><total_schedule_changes>836</total_schedule_changes></row><row _id="row-dqiv.p8kf_6jz6" _uuid="00000000-0000-0000-5FFE-5CEAB63311F4" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-dqiv.p8kf_6jz6"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>773</pid><project_name>Coastal Resiliency Area 1 - East 23Rd St. To Montg</project_name><description>East Side Coastal Resiliency - Montgomery Street to East 15th Street, Manhattan</description><category>Industrial Development, Parks</category><managing_agency>DDC</managing_agency><client_agency>Parks &amp; Recreation</client_agency><current_phase>Construction</current_phase><design_start>2016-04-27T00:00:00</design_start><budget_forecast>92660363.00</budget_forecast><latest_budget_changes>-1138653637.00</latest_budget_changes><total_budget_changes>-418193636.37</total_budget_changes><forecast_completion>2026-08-15T00:00:00</forecast_completion><latest_schedule_changes>1233</latest_schedule_changes><total_schedule_changes>836</total_schedule_changes></row><row _id="row-zydc-wwyr~3y4f" _uuid="00000000-0000-0000-444E-587A76D96C46" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-zydc-wwyr~3y4f"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>773</pid><project_name>Coastal Resiliency Area 1 - East 23Rd St. To Montg</project_name><description>East Side Coastal Resiliency - Montgomery Street to East 15th Street, Manhattan</description><category>Industrial Development, Parks</category><managing_agency>DDC</managing_agency><client_agency>Parks &amp; Recreation</client_agency><current_phase>Construction</current_phase><design_start>2016-04-27T00:00:00</design_start><budget_forecast>92660363.63</budget_forecast><latest_budget_changes>0.63</latest_budget_changes><total_budget_changes>-418193636.37</total_budget_changes><forecast_completion>2026-08-15T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>836</total_schedule_changes></row><row _id="row-49w2-b2b3_ytsr" _uuid="00000000-0000-0000-D78A-A58E7021779B" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-49w2-b2b3_ytsr"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>773</pid><project_name>Coastal Resiliency Area 1 - East 23Rd St. To Montg</project_name><description>East Side Coastal Resiliency - Montgomery Street to East 15th Street, Manhattan</description><category>Industrial Development, Parks</category><managing_agency>DDC</managing_agency><client_agency>Parks &amp; Recreation</client_agency><current_phase>Construction</current_phase><design_start>2016-04-27T00:00:00</design_start><budget_forecast>92660363.63</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-418193636.37</total_budget_changes><forecast_completion>2026-08-15T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>836</total_schedule_changes></row><row _id="row-7k28.pnej~jfkd" _uuid="00000000-0000-0000-7503-8CDFF7300B05" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-7k28.pnej~jfkd"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>773</pid><project_name>Coastal Resiliency Area 1 - East 23Rd St. To Montg</project_name><description>East Side Coastal Resiliency - Montgomery Street to East 15th Street, Manhattan</description><category>Industrial Development, Parks</category><managing_agency>DDC</managing_agency><client_agency>Parks &amp; Recreation</client_agency><current_phase>Construction</current_phase><design_start>2016-04-27T00:00:00</design_start><budget_forecast>92660363.63</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-418193636.37</total_budget_changes><forecast_completion>2026-08-15T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>836</total_schedule_changes></row><row _id="row-fx4k~wkvc_s7rn" _uuid="00000000-0000-0000-D1B5-C6286688E4B0" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-fx4k~wkvc_s7rn"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>773</pid><project_name>Coastal Resiliency Area 1 - East 23Rd St. To Montg</project_name><description>East Side Coastal Resiliency - Montgomery Street to East 15th Street, Manhattan</description><category>Industrial Development, Parks</category><managing_agency>DDC</managing_agency><client_agency>Parks &amp; Recreation</client_agency><current_phase>Construction</current_phase><design_start>2016-04-27T00:00:00</design_start><budget_forecast>92660363.63</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-418193636.37</total_budget_changes><forecast_completion>2026-08-15T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>836</total_schedule_changes></row><row _id="row-dwyv.ewey_9s9s" _uuid="00000000-0000-0000-9AF1-3CFD24CF3429" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-dwyv.ewey_9s9s"><date_reported_as_of>2018-03-01T00:00:00</date_reported_as_of><pid>776</pid><project_name>Storm &amp; Combined Sewers In 229 Street</project_name><description>High Level Storm and Combined Sewer in 229th Street and 230th Place Between 145th Avenue and 147th Ave. (Spine Springfield/Laurelton Blvd)</description><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction Procurement</current_phase><design_start>2015-04-30T00:00:00</design_start><budget_forecast>129607000.00</budget_forecast><total_budget_changes>-9148000.00</total_budget_changes><forecast_completion>2021-09-16T00:00:00</forecast_completion><total_schedule_changes>652</total_schedule_changes></row><row _id="row-e7ih~d692_iwun" _uuid="00000000-0000-0000-27C6-45DC515E04C1" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-e7ih~d692_iwun"><date_reported_as_of>2018-08-01T00:00:00</date_reported_as_of><pid>776</pid><project_name>Storm &amp; Combined Sewers In 229 Street</project_name><description>High Level Storm and Combined Sewer in 229th Street and 230th Place Between 145th Avenue and 147th Ave. (Spine Springfield/Laurelton Blvd)</description><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction</current_phase><design_start>2015-04-30T00:00:00</design_start><budget_forecast>132415000.00</budget_forecast><latest_budget_changes>2808000.00</latest_budget_changes><total_budget_changes>-9148000.00</total_budget_changes><forecast_completion>2021-07-28T00:00:00</forecast_completion><latest_schedule_changes>-50</latest_schedule_changes><total_schedule_changes>652</total_schedule_changes></row><row _id="row-qj45~xqpa~98g6" _uuid="00000000-0000-0000-AFA1-71948A878257" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-qj45~xqpa~98g6"><date_reported_as_of>2019-01-01T00:00:00</date_reported_as_of><pid>776</pid><project_name>Storm &amp; Combined Sewers In 229 Street</project_name><description>High Level Storm and Combined Sewer in 229th Street and 230th Place Between 145th Avenue and 147th Ave. (Spine Springfield/Laurelton Blvd)</description><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction</current_phase><design_start>2015-04-30T00:00:00</design_start><budget_forecast>47685000.00</budget_forecast><latest_budget_changes>-84730000.00</latest_budget_changes><total_budget_changes>-9148000.00</total_budget_changes><forecast_completion>2021-06-04T00:00:00</forecast_completion><latest_schedule_changes>-54</latest_schedule_changes><total_schedule_changes>652</total_schedule_changes></row><row _id="row-ht5u~ue33.gekz" _uuid="00000000-0000-0000-3074-49F95B8A4971" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ht5u~ue33.gekz"><date_reported_as_of>2019-05-01T00:00:00</date_reported_as_of><pid>776</pid><project_name>Storm &amp; Combined Sewers In 229 Street</project_name><description>Installation of storm, sanitary and combined sewers, and water main: Brookville section of Queens, including sections of 227th, 228th, 229th and 230th Streets, 230th Place, and 145th and 147th Avenues.</description><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction</current_phase><design_start>2015-04-30T00:00:00</design_start><budget_forecast>108295000.00</budget_forecast><latest_budget_changes>60610000.00</latest_budget_changes><total_budget_changes>-9148000.00</total_budget_changes><forecast_completion>2021-07-28T00:00:00</forecast_completion><latest_schedule_changes>54</latest_schedule_changes><total_schedule_changes>652</total_schedule_changes></row><row _id="row-dt2m_nr8b_9t4z" _uuid="00000000-0000-0000-7678-0B182C80FFBA" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-dt2m_nr8b_9t4z"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>776</pid><project_name>Storm &amp; Combined Sewers In 229 Street</project_name><description>Installation of storm, sanitary and combined sewers, and water main: Brookville section of Queens, including sections of 227th, 228th, 229th and 230th Streets, 230th Place, and 145th and 147th Avenues.</description><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction</current_phase><design_start>2015-04-30T00:00:00</design_start><budget_forecast>105624000.00</budget_forecast><latest_budget_changes>-2671000.00</latest_budget_changes><total_budget_changes>-9148000.00</total_budget_changes><forecast_completion>2021-07-28T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>652</total_schedule_changes></row><row _id="row-mvat~zi3h-3bhr" _uuid="00000000-0000-0000-628F-6BFB83F9E95F" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-mvat~zi3h-3bhr"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>776</pid><project_name>Storm &amp; Combined Sewers In 229 Street</project_name><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><total_budget_changes>-9148000.00</total_budget_changes><total_schedule_changes>652</total_schedule_changes></row><row _id="row-p35d~pbwm-cwjy" _uuid="00000000-0000-0000-8001-611724E56B15" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-p35d~pbwm-cwjy"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>776</pid><project_name>Storm &amp; Combined Sewers In 229 Street</project_name><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><total_budget_changes>-9148000.00</total_budget_changes><total_schedule_changes>652</total_schedule_changes></row><row _id="row-kbww~gay5.a35z" _uuid="00000000-0000-0000-32E7-FE97897BE3D2" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-kbww~gay5.a35z"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>776</pid><project_name>Storm &amp; Combined Sewers In 229 Street</project_name><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><total_budget_changes>-9148000.00</total_budget_changes><total_schedule_changes>652</total_schedule_changes></row><row _id="row-9ig7_ez7s~ne2x" _uuid="00000000-0000-0000-EDB1-CFFAC04082BB" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-9ig7_ez7s~ne2x"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>776</pid><project_name>Storm &amp; Combined Sewers In 229 Street</project_name><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><total_budget_changes>-9148000.00</total_budget_changes><total_schedule_changes>652</total_schedule_changes></row><row _id="row-j37h.w2wh_q3ue" _uuid="00000000-0000-0000-ACED-794611EE883E" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-j37h.w2wh_q3ue"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>776</pid><project_name>Storm &amp; Combined Sewers In 229 Street</project_name><description>Installation of storm, sanitary and combined sewers, and water main: Brookville section of Queens, including sections of 227th, 228th, 229th and 230th Streets, 230th Place, and 145th and 147th Avenues.</description><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction</current_phase><design_start>2015-04-30T00:00:00</design_start><budget_forecast>105373000.00</budget_forecast><latest_budget_changes>-251000.00</latest_budget_changes><total_budget_changes>-9148000.00</total_budget_changes><forecast_completion>2022-07-28T00:00:00</forecast_completion><latest_schedule_changes>365</latest_schedule_changes><total_schedule_changes>652</total_schedule_changes></row><row _id="row-kbkn_ybif~e7ta" _uuid="00000000-0000-0000-F5A8-03BE1FA3CB80" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-kbkn_ybif~e7ta"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>776</pid><project_name>Storm &amp; Combined Sewers In 229 Street</project_name><description>Installation of storm, sanitary and combined sewers, and water main: Brookville section of Queens, including sections of 227th, 228th, 229th and 230th Streets, 230th Place, and 145th and 147th Avenues.</description><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction</current_phase><design_start>2015-04-30T00:00:00</design_start><budget_forecast>105296000.00</budget_forecast><latest_budget_changes>-77000.00</latest_budget_changes><total_budget_changes>-9148000.00</total_budget_changes><forecast_completion>2022-07-28T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>652</total_schedule_changes></row><row _id="row-d5d8-avgi~ahjv" _uuid="00000000-0000-0000-0BCE-E6A7BBA0DB54" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-d5d8-avgi~ahjv"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>776</pid><project_name>Storm &amp; Combined Sewers In 229 Street</project_name><description>Installation of storm, sanitary and combined sewers, and water main: Brookville section of Queens, including sections of 227th, 228th, 229th and 230th Streets, 230th Place, and 145th and 147th Avenues.</description><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction</current_phase><design_start>2015-04-30T00:00:00</design_start><budget_forecast>119557000.00</budget_forecast><latest_budget_changes>14261000.00</latest_budget_changes><total_budget_changes>-9148000.00</total_budget_changes><forecast_completion>2022-07-08T00:00:00</forecast_completion><latest_schedule_changes>-20</latest_schedule_changes><total_schedule_changes>652</total_schedule_changes></row><row _id="row-c5dn_at7x_4yt3" _uuid="00000000-0000-0000-D5B7-96195131F5D0" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-c5dn_at7x_4yt3"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>776</pid><project_name>Storm &amp; Combined Sewers In 229 Street</project_name><description>Installation of storm, sanitary and combined sewers, and water main: Brookville section of Queens, including sections of 227th, 228th, 229th and 230th Streets, 230th Place, and 145th and 147th Avenues.</description><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction</current_phase><design_start>2015-04-30T00:00:00</design_start><budget_forecast>120459000.00</budget_forecast><latest_budget_changes>902000.00</latest_budget_changes><total_budget_changes>-9148000.00</total_budget_changes><forecast_completion>2022-12-31T00:00:00</forecast_completion><latest_schedule_changes>176</latest_schedule_changes><total_schedule_changes>652</total_schedule_changes></row><row _id="row-pngh-wff4.8dvr" _uuid="00000000-0000-0000-3DAF-80C1F9FBC02F" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-pngh-wff4.8dvr"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>776</pid><project_name>Storm &amp; Combined Sewers In 229 Street</project_name><description>Installation of storm, sanitary and combined sewers, and water main: Brookville section of Queens, including sections of 227th, 228th, 229th and 230th Streets, 230th Place, and 145th and 147th Avenues.</description><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction</current_phase><design_start>2015-04-30T00:00:00</design_start><budget_forecast>120459000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-9148000.00</total_budget_changes><forecast_completion>2023-06-30T00:00:00</forecast_completion><latest_schedule_changes>181</latest_schedule_changes><total_schedule_changes>652</total_schedule_changes></row><row _id="row-n39q~z22q.i2vk" _uuid="00000000-0000-0000-9782-9A8BF1AD370C" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-n39q~z22q.i2vk"><date_reported_as_of>2018-03-01T00:00:00</date_reported_as_of><pid>784</pid><project_name>Storm Sewer Outlet In 224Th St</project_name><description>Storm sewer at 224th St and 149th Ave and along the access road through Idlewild Parks known as Springfield Lane (Spine Farmers Blvd)</description><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Design</current_phase><design_start>2017-01-04T00:00:00</design_start><budget_forecast>1699000.00</budget_forecast><total_budget_changes>155854000.00</total_budget_changes><forecast_completion>2022-11-29T00:00:00</forecast_completion><total_schedule_changes>1238</total_schedule_changes></row><row _id="row-xyh6_nxxu.zz33" _uuid="00000000-0000-0000-CA90-89F6DE7E03B3" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-xyh6_nxxu.zz33"><date_reported_as_of>2018-08-01T00:00:00</date_reported_as_of><pid>784</pid><project_name>Storm Sewer Outlet In 224Th St</project_name><description>Storm sewer at 224th St and 149th Ave and along the access road through Idlewild Parks known as Springfield Lane (Spine Farmers Blvd)</description><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Design</current_phase><design_start>2017-01-04T00:00:00</design_start><budget_forecast>95490000.00</budget_forecast><latest_budget_changes>93791000.00</latest_budget_changes><total_budget_changes>155854000.00</total_budget_changes><forecast_completion>2023-11-29T00:00:00</forecast_completion><latest_schedule_changes>365</latest_schedule_changes><total_schedule_changes>1238</total_schedule_changes></row><row _id="row-ntpk-4ga2~fsbh" _uuid="00000000-0000-0000-1906-8BD514079B9A" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ntpk-4ga2~fsbh"><date_reported_as_of>2019-01-01T00:00:00</date_reported_as_of><pid>784</pid><project_name>Storm Sewer Outlet In 224Th St</project_name><description>Storm sewer at 224th St and 149th Ave and along the access road through Idlewild Parks known as Springfield Lane (Spine Farmers Blvd)</description><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Design</current_phase><design_start>2017-01-04T00:00:00</design_start><budget_forecast>155442000.00</budget_forecast><latest_budget_changes>59952000.00</latest_budget_changes><total_budget_changes>155854000.00</total_budget_changes><forecast_completion>2023-11-29T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1238</total_schedule_changes></row><row _id="row-ai28.8y44_47nc" _uuid="00000000-0000-0000-7929-AFFB5CF88F34" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ai28.8y44_47nc"><date_reported_as_of>2019-05-01T00:00:00</date_reported_as_of><pid>784</pid><project_name>Storm Sewer Outlet In 224Th St</project_name><description>Installation of storm sewers at 224th St and 149th Ave and along the access road through Idlewild Parks known as Springfield Lane (Spine Farmers Blvd)</description><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Design</current_phase><design_start>2017-01-04T00:00:00</design_start><budget_forecast>102946000.00</budget_forecast><latest_budget_changes>-52496000.00</latest_budget_changes><total_budget_changes>155854000.00</total_budget_changes><forecast_completion>2023-11-29T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1238</total_schedule_changes></row><row _id="row-bckd_bhxs.3f5f" _uuid="00000000-0000-0000-7CB5-77CADFBBC45E" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-bckd_bhxs.3f5f"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>784</pid><project_name>Storm Sewer Outlet In 224Th St</project_name><description>Installation of storm sewers at 224th St and 149th Ave and along the access road through Idlewild Parks known as Springfield Lane (Spine Farmers Blvd)</description><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Design</current_phase><design_start>2017-01-04T00:00:00</design_start><budget_forecast>102946000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>155854000.00</total_budget_changes><forecast_completion>2023-11-29T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1238</total_schedule_changes></row><row _id="row-m35i_mvmn-i8m5" _uuid="00000000-0000-0000-D897-C1144C3E5EC7" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-m35i_mvmn-i8m5"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>784</pid><project_name>Storm Sewer Outlet In 224Th St</project_name><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><total_budget_changes>155854000.00</total_budget_changes><total_schedule_changes>1238</total_schedule_changes></row><row _id="row-kd3b.6z62~zwnw" _uuid="00000000-0000-0000-7490-6F726D29D528" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-kd3b.6z62~zwnw"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>784</pid><project_name>Storm Sewer Outlet In 224Th St</project_name><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><total_budget_changes>155854000.00</total_budget_changes><total_schedule_changes>1238</total_schedule_changes></row><row _id="row-f22q.q8sf_8zrd" _uuid="00000000-0000-0000-1258-08473C6C4C85" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-f22q.q8sf_8zrd"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>784</pid><project_name>Storm Sewer Outlet In 224Th St</project_name><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><total_budget_changes>155854000.00</total_budget_changes><total_schedule_changes>1238</total_schedule_changes></row><row _id="row-hsgc~sa7x.ek2r" _uuid="00000000-0000-0000-A0E7-EAA859205B09" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-hsgc~sa7x.ek2r"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>784</pid><project_name>Storm Sewer Outlet In 224Th St</project_name><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><total_budget_changes>155854000.00</total_budget_changes><total_schedule_changes>1238</total_schedule_changes></row><row _id="row-kt7m.utgv.gf9z" _uuid="00000000-0000-0000-EE27-4E793AB40F51" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-kt7m.utgv.gf9z"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>784</pid><project_name>Storm Sewer Outlet In 224Th St</project_name><description>Installation of storm sewers at 224th St and 149th Ave and along the access road through Idlewild Parks known as Springfield Lane (Spine Farmers Blvd)</description><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Design</current_phase><design_start>2016-01-04T00:00:00</design_start><budget_forecast>101442000.00</budget_forecast><latest_budget_changes>-1504000.00</latest_budget_changes><total_budget_changes>155854000.00</total_budget_changes><forecast_completion>2025-12-07T00:00:00</forecast_completion><latest_schedule_changes>739</latest_schedule_changes><total_schedule_changes>1238</total_schedule_changes></row><row _id="row-qc25.9nc5.iah5" _uuid="00000000-0000-0000-091F-9485F7CB8C3A" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-qc25.9nc5.iah5"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>784</pid><project_name>Storm Sewer Outlet In 224Th St</project_name><description>Installation of storm sewers at 224th St and 149th Ave and along the access road through Idlewild Parks known as Springfield Lane (Spine Farmers Blvd)</description><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Design</current_phase><design_start>2016-01-04T00:00:00</design_start><budget_forecast>108554000.00</budget_forecast><latest_budget_changes>7112000.00</latest_budget_changes><total_budget_changes>155854000.00</total_budget_changes><forecast_completion>2026-02-14T00:00:00</forecast_completion><latest_schedule_changes>69</latest_schedule_changes><total_schedule_changes>1238</total_schedule_changes></row><row _id="row-g2rr-2b9b_zpea" _uuid="00000000-0000-0000-87C1-DD6393D16038" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-g2rr-2b9b_zpea"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>784</pid><project_name>Storm Sewer Outlet In 224Th St</project_name><description>Installation of storm sewers at 224th St and 149th Ave and along the access road through Idlewild Parks known as Springfield Lane (Spine Farmers Blvd)</description><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Design</current_phase><design_start>2016-01-04T00:00:00</design_start><budget_forecast>157088000.00</budget_forecast><latest_budget_changes>48534000.00</latest_budget_changes><total_budget_changes>155854000.00</total_budget_changes><forecast_completion>2026-05-17T00:00:00</forecast_completion><latest_schedule_changes>92</latest_schedule_changes><total_schedule_changes>1238</total_schedule_changes></row><row _id="row-egn6~wqqj.rbw5" _uuid="00000000-0000-0000-4B22-D955FB9FE0A6" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-egn6~wqqj.rbw5"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>784</pid><project_name>Storm Sewer Outlet In 224Th St</project_name><description>Installation of storm sewers at 224th St and 149th Ave and along the access road through Idlewild Parks known as Springfield Lane (Spine Farmers Blvd)</description><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction Procurement</current_phase><design_start>2016-01-04T00:00:00</design_start><budget_forecast>157553000.00</budget_forecast><latest_budget_changes>465000.00</latest_budget_changes><total_budget_changes>155854000.00</total_budget_changes><forecast_completion>2026-03-29T00:00:00</forecast_completion><latest_schedule_changes>-49</latest_schedule_changes><total_schedule_changes>1238</total_schedule_changes></row><row _id="row-765w.muc8~vxch" _uuid="00000000-0000-0000-7046-0A1BB912A516" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-765w.muc8~vxch"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>784</pid><project_name>Storm Sewer Outlet In 224Th St</project_name><description>Installation of storm sewers at 224th St and 149th Ave and along the access road through Idlewild Parks known as Springfield Lane (Spine Farmers Blvd)</description><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction Procurement</current_phase><design_start>2016-01-04T00:00:00</design_start><budget_forecast>157553000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>155854000.00</total_budget_changes><forecast_completion>2026-04-20T00:00:00</forecast_completion><latest_schedule_changes>22</latest_schedule_changes><total_schedule_changes>1238</total_schedule_changes></row><row _id="row-a244-svv9.3ucr" _uuid="00000000-0000-0000-FD7B-4E85EC49FA71" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-a244-svv9.3ucr"><date_reported_as_of>2018-03-01T00:00:00</date_reported_as_of><pid>788</pid><project_name>Combined Sewer In 70Th Street, Queens</project_name><description>COMBINED SEWER IN 70TH STREET, QUEENS</description><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Design</current_phase><design_start>2016-08-31T00:00:00</design_start><budget_forecast>37957000.00</budget_forecast><total_budget_changes>94201000.00</total_budget_changes><forecast_completion>2020-06-11T00:00:00</forecast_completion><total_schedule_changes>1155</total_schedule_changes></row><row _id="row-ydhc_qjsb_sgur" _uuid="00000000-0000-0000-CA66-7C9A370207AA" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ydhc_qjsb_sgur"><date_reported_as_of>2018-08-01T00:00:00</date_reported_as_of><pid>788</pid><project_name>Combined Sewer In 70Th Street, Queens</project_name><description>COMBINED SEWER IN 70TH STREET, QUEENS</description><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction Procurement</current_phase><design_start>2016-08-31T00:00:00</design_start><budget_forecast>117669000.00</budget_forecast><latest_budget_changes>79712000.00</latest_budget_changes><total_budget_changes>94201000.00</total_budget_changes><forecast_completion>2020-12-22T00:00:00</forecast_completion><latest_schedule_changes>194</latest_schedule_changes><total_schedule_changes>1155</total_schedule_changes></row><row _id="row-nwpu-4emw-fkd3" _uuid="00000000-0000-0000-5C8B-339B70A430A6" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-nwpu-4emw-fkd3"><date_reported_as_of>2019-01-01T00:00:00</date_reported_as_of><pid>788</pid><project_name>Combined Sewer In 70Th Street, Queens</project_name><description>COMBINED SEWER IN 70TH STREET, QUEENS</description><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction Procurement</current_phase><design_start>2016-08-31T00:00:00</design_start><budget_forecast>118600158.00</budget_forecast><latest_budget_changes>931158.00</latest_budget_changes><total_budget_changes>94201000.00</total_budget_changes><forecast_completion>2020-11-21T00:00:00</forecast_completion><latest_schedule_changes>-31</latest_schedule_changes><total_schedule_changes>1155</total_schedule_changes></row><row _id="row-7cn6~gzzi~axym" _uuid="00000000-0000-0000-78C2-3E53CB7FE030" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-7cn6~gzzi~axym"><date_reported_as_of>2019-05-01T00:00:00</date_reported_as_of><pid>788</pid><project_name>Combined Sewer In 70Th Street, Queens</project_name><description>COMBINED SEWER IN 70TH STREET, QUEENS</description><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction Procurement</current_phase><design_start>2016-08-31T00:00:00</design_start><budget_forecast>119840000.00</budget_forecast><latest_budget_changes>1239842.00</latest_budget_changes><total_budget_changes>94201000.00</total_budget_changes><forecast_completion>2023-08-10T00:00:00</forecast_completion><latest_schedule_changes>992</latest_schedule_changes><total_schedule_changes>1155</total_schedule_changes></row><row _id="row-hus2~35gw~rp2n" _uuid="00000000-0000-0000-5427-60C3ECC3ED45" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-hus2~35gw~rp2n"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>788</pid><project_name>Combined Sewer In 70Th Street, Queens</project_name><description>COMBINED SEWER IN 70TH STREET, QUEENS</description><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction</current_phase><design_start>2016-08-31T00:00:00</design_start><budget_forecast>119700000.00</budget_forecast><latest_budget_changes>-140000.00</latest_budget_changes><total_budget_changes>94201000.00</total_budget_changes><forecast_completion>2023-08-10T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1155</total_schedule_changes></row><row _id="row-2p2e-inhx~5uds" _uuid="00000000-0000-0000-0765-422E97060898" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-2p2e-inhx~5uds"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>788</pid><project_name>Combined Sewer In 70Th Street, Queens</project_name><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><total_budget_changes>94201000.00</total_budget_changes><total_schedule_changes>1155</total_schedule_changes></row><row _id="row-5xdf.ahx3-qyiy" _uuid="00000000-0000-0000-9583-22027C76D847" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-5xdf.ahx3-qyiy"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>788</pid><project_name>Combined Sewer In 70Th Street, Queens</project_name><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><total_budget_changes>94201000.00</total_budget_changes><total_schedule_changes>1155</total_schedule_changes></row><row _id="row-iydb-6bhg-da3a" _uuid="00000000-0000-0000-EABE-3D042CE2307F" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-iydb-6bhg-da3a"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>788</pid><project_name>Combined Sewer In 70Th Street, Queens</project_name><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><total_budget_changes>94201000.00</total_budget_changes><total_schedule_changes>1155</total_schedule_changes></row><row _id="row-9yz7-7qbv~2ez5" _uuid="00000000-0000-0000-F9BF-CA61033979FD" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-9yz7-7qbv~2ez5"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>788</pid><project_name>Combined Sewer In 70Th Street, Queens</project_name><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><total_budget_changes>94201000.00</total_budget_changes><total_schedule_changes>1155</total_schedule_changes></row><row _id="row-6rfc.kugd.brz7" _uuid="00000000-0000-0000-34B0-1F63A935F89A" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-6rfc.kugd.brz7"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>788</pid><project_name>Combined Sewer In 70Th Street, Queens</project_name><description>COMBINED SEWER IN 70TH STREET, QUEENS</description><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction</current_phase><design_start>2016-08-31T00:00:00</design_start><budget_forecast>123425000.00</budget_forecast><latest_budget_changes>3725000.00</latest_budget_changes><total_budget_changes>94201000.00</total_budget_changes><forecast_completion>2023-08-10T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1155</total_schedule_changes></row><row _id="row-e3cz_a9nz.fima" _uuid="00000000-0000-0000-BC80-34FC5F4F0C2D" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-e3cz_a9nz.fima"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>788</pid><project_name>Combined Sewer In 70Th Street, Queens</project_name><description>COMBINED SEWER IN 70TH STREET, QUEENS</description><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction</current_phase><design_start>2016-08-31T00:00:00</design_start><budget_forecast>123434000.00</budget_forecast><latest_budget_changes>9000.00</latest_budget_changes><total_budget_changes>94201000.00</total_budget_changes><forecast_completion>2023-08-10T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1155</total_schedule_changes></row><row _id="row-ggmf-aiuw-hd62" _uuid="00000000-0000-0000-6AE6-F6F2E3FA5E54" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ggmf-aiuw-hd62"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>788</pid><project_name>Combined Sewer In 70Th Street, Queens</project_name><description>COMBINED SEWER IN 70TH STREET, QUEENS</description><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction</current_phase><design_start>2016-08-31T00:00:00</design_start><budget_forecast>124773000.00</budget_forecast><latest_budget_changes>1339000.00</latest_budget_changes><total_budget_changes>94201000.00</total_budget_changes><forecast_completion>2023-08-10T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1155</total_schedule_changes></row><row _id="row-6byn.3u2i_yea2" _uuid="00000000-0000-0000-0DCB-BC2023B4E3E4" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-6byn.3u2i_yea2"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>788</pid><project_name>Combined Sewer In 70Th Street, Queens</project_name><description>COMBINED SEWER IN 70TH STREET, QUEENS</description><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction</current_phase><design_start>2016-08-31T00:00:00</design_start><budget_forecast>132158000.00</budget_forecast><latest_budget_changes>7385000.00</latest_budget_changes><total_budget_changes>94201000.00</total_budget_changes><forecast_completion>2023-08-10T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1155</total_schedule_changes></row><row _id="row-exba.mgr8~6e2u" _uuid="00000000-0000-0000-33C8-B2C7098156EB" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-exba.mgr8~6e2u"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>788</pid><project_name>Combined Sewer In 70Th Street, Queens</project_name><description>COMBINED SEWER IN 70TH STREET, QUEENS</description><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction</current_phase><design_start>2016-08-31T00:00:00</design_start><budget_forecast>132158000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>94201000.00</total_budget_changes><forecast_completion>2023-08-10T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1155</total_schedule_changes></row><row _id="row-jvgd~8sfn_9djd" _uuid="00000000-0000-0000-9F2B-F2817B13EEDE" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-jvgd~8sfn_9djd"><date_reported_as_of>2018-08-01T00:00:00</date_reported_as_of><pid>789</pid><project_name>Combined Sewer And Wm Work In 71 Street, Queens</project_name><description>Replacement of Combined Sewers in 71st Street between Juniper Blvd South and Queens Midtown Expressway; including water main work.</description><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Design</current_phase><design_start>2018-09-10T00:00:00</design_start><budget_forecast>59467000.00</budget_forecast><latest_budget_changes>10445000.00</latest_budget_changes><total_budget_changes>27172000.00</total_budget_changes><total_schedule_changes>1889</total_schedule_changes></row><row _id="row-fvzq_46bc-2587" _uuid="00000000-0000-0000-E3D7-F7C2B94763FC" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-fvzq_46bc-2587"><date_reported_as_of>2019-01-01T00:00:00</date_reported_as_of><pid>789</pid><project_name>Combined Sewer And Wm Work In 71 Street, Queens</project_name><description>Replacement of Combined Sewers in 71st Street between Juniper Blvd South and Queens Midtown Expressway; including water main work.</description><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Design</current_phase><design_start>2018-09-10T00:00:00</design_start><budget_forecast>59892000.00</budget_forecast><latest_budget_changes>425000.00</latest_budget_changes><total_budget_changes>27172000.00</total_budget_changes><forecast_completion>2020-08-30T00:00:00</forecast_completion><latest_schedule_changes>-1094</latest_schedule_changes><total_schedule_changes>1889</total_schedule_changes></row><row _id="row-iat9.sf7w-9yux" _uuid="00000000-0000-0000-B088-D0FF5F6F61F7" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-iat9.sf7w-9yux"><date_reported_as_of>2019-05-01T00:00:00</date_reported_as_of><pid>789</pid><project_name>Combined Sewer And Wm Work In 71 Street, Queens</project_name><description>Replacement of combined sewer in 71st Street between Juniper Boulevard South and Queens Midtown Expressway, etc.</description><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Design</current_phase><design_start>2018-09-10T00:00:00</design_start><budget_forecast>60142000.00</budget_forecast><latest_budget_changes>250000.00</latest_budget_changes><total_budget_changes>27172000.00</total_budget_changes><forecast_completion>2023-08-29T00:00:00</forecast_completion><latest_schedule_changes>1094</latest_schedule_changes><total_schedule_changes>1889</total_schedule_changes></row><row _id="row-buwu.gp6c~w6za" _uuid="00000000-0000-0000-A3DB-1786690F4F69" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-buwu.gp6c~w6za"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>789</pid><project_name>Combined Sewer And Wm Work In 71 Street, Queens</project_name><description>Replacement of combined sewer in 71st Street between Juniper Boulevard South and Queens Midtown Expressway, etc.</description><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Design</current_phase><design_start>2018-09-10T00:00:00</design_start><budget_forecast>60142000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>27172000.00</total_budget_changes><forecast_completion>2023-10-29T00:00:00</forecast_completion><latest_schedule_changes>61</latest_schedule_changes><total_schedule_changes>1889</total_schedule_changes></row><row _id="row-kdt6.3vf5~arbe" _uuid="00000000-0000-0000-9663-37D9BE8ACAA6" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-kdt6.3vf5~arbe"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>789</pid><project_name>Combined Sewer And Wm Work In 71 Street, Queens</project_name><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><total_budget_changes>27172000.00</total_budget_changes><total_schedule_changes>1889</total_schedule_changes></row><row _id="row-frys.ifh4~cvru" _uuid="00000000-0000-0000-AD53-6A0C652AFF2D" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-frys.ifh4~cvru"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>789</pid><project_name>Combined Sewer And Wm Work In 71 Street, Queens</project_name><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><total_budget_changes>27172000.00</total_budget_changes><total_schedule_changes>1889</total_schedule_changes></row><row _id="row-v97q.pdzk_dtfc" _uuid="00000000-0000-0000-EC86-7B488246A254" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-v97q.pdzk_dtfc"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>789</pid><project_name>Combined Sewer And Wm Work In 71 Street, Queens</project_name><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><total_budget_changes>27172000.00</total_budget_changes><total_schedule_changes>1889</total_schedule_changes></row><row _id="row-eicy~yrsu.vfhw" _uuid="00000000-0000-0000-9A67-AFA8B0F2BA01" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-eicy~yrsu.vfhw"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>789</pid><project_name>Combined Sewer And Wm Work In 71 Street, Queens</project_name><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><total_budget_changes>27172000.00</total_budget_changes><total_schedule_changes>1889</total_schedule_changes></row><row _id="row-94nr-j98c~iupb" _uuid="00000000-0000-0000-DC34-E3BF444CC347" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-94nr-j98c~iupb"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>789</pid><project_name>Combined Sewer And Wm Work In 71 Street, Queens</project_name><description>Replacement of combined sewer in 71st Street between Juniper Boulevard South and Queens Midtown Expressway, etc.</description><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Design</current_phase><design_start>2018-09-10T00:00:00</design_start><budget_forecast>66913000.00</budget_forecast><latest_budget_changes>6771000.00</latest_budget_changes><total_budget_changes>27172000.00</total_budget_changes><forecast_completion>2025-10-30T00:00:00</forecast_completion><latest_schedule_changes>732</latest_schedule_changes><total_schedule_changes>1889</total_schedule_changes></row><row _id="row-s6cc~3qg6~388p" _uuid="00000000-0000-0000-5BDA-EC46420B2BC0" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-s6cc~3qg6~388p"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>789</pid><project_name>Combined Sewer And Wm Work In 71 Street, Queens</project_name><description>Replacement of combined sewer in 71st Street between Juniper Boulevard South and Queens Midtown Expressway, etc.</description><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Design</current_phase><design_start>2018-09-10T00:00:00</design_start><budget_forecast>67213000.00</budget_forecast><latest_budget_changes>300000.00</latest_budget_changes><total_budget_changes>27172000.00</total_budget_changes><forecast_completion>2026-10-30T00:00:00</forecast_completion><latest_schedule_changes>365</latest_schedule_changes><total_schedule_changes>1889</total_schedule_changes></row><row _id="row-dhy3_3sr7_38qk" _uuid="00000000-0000-0000-1467-046C6D382652" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-dhy3_3sr7_38qk"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>789</pid><project_name>Combined Sewer And Wm Work In 71 Street, Queens</project_name><description>Replacement of combined sewer in 71st Street between Juniper Boulevard South and Queens Midtown Expressway, etc.</description><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Design</current_phase><design_start>2018-09-10T00:00:00</design_start><budget_forecast>73613000.00</budget_forecast><latest_budget_changes>6400000.00</latest_budget_changes><total_budget_changes>27172000.00</total_budget_changes><forecast_completion>2026-10-30T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1889</total_schedule_changes></row><row _id="row-skwm-64hc~w3qn" _uuid="00000000-0000-0000-69A4-3F348AEFE7FE" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-skwm-64hc~w3qn"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>789</pid><project_name>Combined Sewer And Wm Work In 71 Street, Queens</project_name><description>Replacement of combined sewer in 71st Street between Juniper Boulevard South and Queens Midtown Expressway, etc.</description><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Design</current_phase><design_start>2018-09-10T00:00:00</design_start><budget_forecast>75853000.00</budget_forecast><latest_budget_changes>2240000.00</latest_budget_changes><total_budget_changes>27172000.00</total_budget_changes><forecast_completion>2027-10-30T00:00:00</forecast_completion><latest_schedule_changes>365</latest_schedule_changes><total_schedule_changes>1889</total_schedule_changes></row><row _id="row-4a92-r3fm-g3yi" _uuid="00000000-0000-0000-AB3A-7842AFC2B549" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-4a92-r3fm-g3yi"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>789</pid><project_name>Combined Sewer And Wm Work In 71 Street, Queens</project_name><description>Replacement of combined sewer in 71st Street between Juniper Boulevard South and Queens Midtown Expressway, etc.</description><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Design</current_phase><design_start>2018-09-10T00:00:00</design_start><budget_forecast>76194000.00</budget_forecast><latest_budget_changes>341000.00</latest_budget_changes><total_budget_changes>27172000.00</total_budget_changes><forecast_completion>2028-10-30T00:00:00</forecast_completion><latest_schedule_changes>366</latest_schedule_changes><total_schedule_changes>1889</total_schedule_changes></row><row _id="row-2q3v_pybr~vy9u" _uuid="00000000-0000-0000-13A5-63C9CC5415DB" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-2q3v_pybr~vy9u"><date_reported_as_of>2018-08-01T00:00:00</date_reported_as_of><pid>790</pid><project_name>Storm Sanitary Sewer Repl Springfield Gardens</project_name><description>Springfield Gardens Reconstruction Phase 5 including Storm and Sanitary sewer extensions and upgrades, Water Main replacement on 146th Ave from 153rd Place to 159th St. (Design Consultant)</description><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Design</current_phase><design_start>2018-05-09T00:00:00</design_start><budget_forecast>100769000.00</budget_forecast><latest_budget_changes>23006000.00</latest_budget_changes><total_budget_changes>35414000.00</total_budget_changes><total_schedule_changes>1097</total_schedule_changes></row><row _id="row-5gsq.uhbw-nadt" _uuid="00000000-0000-0000-E04D-40E29EE69652" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-5gsq.uhbw-nadt"><date_reported_as_of>2019-01-01T00:00:00</date_reported_as_of><pid>790</pid><project_name>Storm Sanitary Sewer Repl Springfield Gardens</project_name><description>Springfield Gardens Reconstruction Phase 5 including Storm and Sanitary sewer extensions and upgrades, Water Main replacement on 146th Ave from 153rd Place to 159th St. (Design Consultant)</description><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Design</current_phase><design_start>2018-05-09T00:00:00</design_start><budget_forecast>83713000.00</budget_forecast><latest_budget_changes>-17056000.00</latest_budget_changes><total_budget_changes>35414000.00</total_budget_changes><forecast_completion>2025-01-06T00:00:00</forecast_completion><latest_schedule_changes>115</latest_schedule_changes><total_schedule_changes>1097</total_schedule_changes></row><row _id="row-etzm-93k6_qmwf" _uuid="00000000-0000-0000-DCD5-6E4890D21ADA" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-etzm-93k6_qmwf"><date_reported_as_of>2019-05-01T00:00:00</date_reported_as_of><pid>790</pid><project_name>Storm Sanitary Sewer Repl Springfield Gardens</project_name><description>SPRINGFIELD GARDENS RECONSTRUCTION PHASE 5; STORM AND SANITARY SEWER EXTENSIONS AND UPGRADES AND WATER MAIN REPLACEMENT IN 146TH AVENUE BETWEEN 153RD PLACE AND 159TH STREET, ETC, BOROUGH OF QUEENS (HWQ662G)</description><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Design</current_phase><design_start>2018-05-09T00:00:00</design_start><budget_forecast>103179000.00</budget_forecast><latest_budget_changes>19466000.00</latest_budget_changes><total_budget_changes>35414000.00</total_budget_changes><forecast_completion>2025-09-15T00:00:00</forecast_completion><latest_schedule_changes>252</latest_schedule_changes><total_schedule_changes>1097</total_schedule_changes></row><row _id="row-wkqg_j6mc~iq6n" _uuid="00000000-0000-0000-27E6-8F7330CD951B" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-wkqg_j6mc~iq6n"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>790</pid><project_name>Storm Sanitary Sewer Repl Springfield Gardens</project_name><description>SPRINGFIELD GARDENS RECONSTRUCTION PHASE 5; STORM AND SANITARY SEWER EXTENSIONS AND UPGRADES AND WATER MAIN REPLACEMENT IN 146TH AVENUE BETWEEN 153RD PLACE AND 159TH STREET, ETC, BOROUGH OF QUEENS (HWQ662G)</description><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Design</current_phase><design_start>2018-05-09T00:00:00</design_start><budget_forecast>103279000.00</budget_forecast><latest_budget_changes>100000.00</latest_budget_changes><total_budget_changes>35414000.00</total_budget_changes><forecast_completion>2025-09-15T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1097</total_schedule_changes></row><row _id="row-xct5.7acc~r2r5" _uuid="00000000-0000-0000-5AD5-C1B0E091A29A" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-xct5.7acc~r2r5"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>790</pid><project_name>Storm Sanitary Sewer Repl Springfield Gardens</project_name><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><total_budget_changes>35414000.00</total_budget_changes><total_schedule_changes>1097</total_schedule_changes></row><row _id="row-y3c2.jc9k_z5sw" _uuid="00000000-0000-0000-6BFD-7D4009CE6211" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-y3c2.jc9k_z5sw"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>790</pid><project_name>Storm Sanitary Sewer Repl Springfield Gardens</project_name><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><total_budget_changes>35414000.00</total_budget_changes><total_schedule_changes>1097</total_schedule_changes></row><row _id="row-vnts.9egt_kaed" _uuid="00000000-0000-0000-172B-59C0F9566A65" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-vnts.9egt_kaed"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>790</pid><project_name>Storm Sanitary Sewer Repl Springfield Gardens</project_name><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><total_budget_changes>35414000.00</total_budget_changes><total_schedule_changes>1097</total_schedule_changes></row><row _id="row-5ef6~u3sj_nrwe" _uuid="00000000-0000-0000-50C8-99924981EABF" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-5ef6~u3sj_nrwe"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>790</pid><project_name>Storm Sanitary Sewer Repl Springfield Gardens</project_name><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><total_budget_changes>35414000.00</total_budget_changes><total_schedule_changes>1097</total_schedule_changes></row><row _id="row-c6fe~z8z5.674t" _uuid="00000000-0000-0000-213D-56E5B603D4D7" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-c6fe~z8z5.674t"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>790</pid><project_name>Storm Sanitary Sewer Repl Springfield Gardens</project_name><description>SPRINGFIELD GARDENS RECONSTRUCTION PHASE 5; STORM AND SANITARY SEWER EXTENSIONS AND UPGRADES AND WATER MAIN REPLACEMENT IN 146TH AVENUE BETWEEN 153RD PLACE AND 159TH STREET, ETC, BOROUGH OF QUEENS (HWQ662G)</description><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Design</current_phase><design_start>2018-05-09T00:00:00</design_start><budget_forecast>113408000.00</budget_forecast><latest_budget_changes>10129000.00</latest_budget_changes><total_budget_changes>35414000.00</total_budget_changes><forecast_completion>2025-11-19T00:00:00</forecast_completion><latest_schedule_changes>65</latest_schedule_changes><total_schedule_changes>1097</total_schedule_changes></row><row _id="row-n6sr-zprp-6tsz" _uuid="00000000-0000-0000-E66D-ED9696CDB2BC" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-n6sr-zprp-6tsz"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>790</pid><project_name>Storm Sanitary Sewer Repl Springfield Gardens</project_name><description>SPRINGFIELD GARDENS RECONSTRUCTION PHASE 5; STORM AND SANITARY SEWER EXTENSIONS AND UPGRADES AND WATER MAIN REPLACEMENT IN 146TH AVENUE BETWEEN 153RD PLACE AND 159TH STREET, ETC, BOROUGH OF QUEENS (HWQ662G)</description><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Design</current_phase><design_start>2018-05-09T00:00:00</design_start><budget_forecast>112247000.00</budget_forecast><latest_budget_changes>-1161000.00</latest_budget_changes><total_budget_changes>35414000.00</total_budget_changes><forecast_completion>2026-03-25T00:00:00</forecast_completion><latest_schedule_changes>126</latest_schedule_changes><total_schedule_changes>1097</total_schedule_changes></row><row _id="row-qtgv.29aa-nutm" _uuid="00000000-0000-0000-7EE7-BF709C087DB8" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-qtgv.29aa-nutm"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>790</pid><project_name>Storm Sanitary Sewer Repl Springfield Gardens</project_name><description>SPRINGFIELD GARDENS RECONSTRUCTION PHASE 5; STORM AND SANITARY SEWER EXTENSIONS AND UPGRADES AND WATER MAIN REPLACEMENT IN 146TH AVENUE BETWEEN 153RD PLACE AND 159TH STREET, ETC, BOROUGH OF QUEENS (HWQ662G)</description><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Design</current_phase><design_start>2018-05-09T00:00:00</design_start><budget_forecast>112777000.00</budget_forecast><latest_budget_changes>530000.00</latest_budget_changes><total_budget_changes>35414000.00</total_budget_changes><forecast_completion>2027-09-15T00:00:00</forecast_completion><latest_schedule_changes>539</latest_schedule_changes><total_schedule_changes>1097</total_schedule_changes></row><row _id="row-59um.4zuz_g6xj" _uuid="00000000-0000-0000-C1C0-EA05CC955264" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-59um.4zuz_g6xj"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>790</pid><project_name>Storm Sanitary Sewer Repl Springfield Gardens</project_name><description>SPRINGFIELD GARDENS RECONSTRUCTION PHASE 5; STORM AND SANITARY SEWER EXTENSIONS AND UPGRADES AND WATER MAIN REPLACEMENT IN 146TH AVENUE BETWEEN 153RD PLACE AND 159TH STREET, ETC, BOROUGH OF QUEENS (HWQ662G)</description><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Design</current_phase><design_start>2018-05-09T00:00:00</design_start><budget_forecast>113177000.00</budget_forecast><latest_budget_changes>400000.00</latest_budget_changes><total_budget_changes>35414000.00</total_budget_changes><forecast_completion>2027-09-15T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1097</total_schedule_changes></row><row _id="row-p7f4_65s5~vjsj" _uuid="00000000-0000-0000-B7CB-8EEB40FBE6AF" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-p7f4_65s5~vjsj"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>790</pid><project_name>Storm Sanitary Sewer Repl Springfield Gardens</project_name><description>SPRINGFIELD GARDENS RECONSTRUCTION PHASE 5; STORM AND SANITARY SEWER EXTENSIONS AND UPGRADES AND WATER MAIN REPLACEMENT IN 146TH AVENUE BETWEEN 153RD PLACE AND 159TH STREET, ETC, BOROUGH OF QUEENS (HWQ662G)</description><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Design</current_phase><design_start>2018-05-09T00:00:00</design_start><budget_forecast>113177000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>35414000.00</total_budget_changes><forecast_completion>2027-09-15T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1097</total_schedule_changes></row><row _id="row-mrnp.rta5-622i" _uuid="00000000-0000-0000-F4B2-BD7E53142BAD" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-mrnp.rta5-622i"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>791</pid><project_name>150Th St Spine Phase 1 Storm Sewer At Bergen Basin</project_name><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><total_budget_changes>101452000.00</total_budget_changes><total_schedule_changes>753</total_schedule_changes></row><row _id="row-zsek.u987~yt7t" _uuid="00000000-0000-0000-2D60-D99A9BC3E41A" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-zsek.u987~yt7t"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>791</pid><project_name>150Th St Spine Phase 1 Storm Sewer At Bergen Basin</project_name><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><total_budget_changes>101452000.00</total_budget_changes><total_schedule_changes>753</total_schedule_changes></row><row _id="row-pbsb~iujv_w4fs" _uuid="00000000-0000-0000-1C64-FE04C483D381" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-pbsb~iujv_w4fs"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>791</pid><project_name>150Th St Spine Phase 1 Storm Sewer At Bergen Basin</project_name><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><total_budget_changes>101452000.00</total_budget_changes><total_schedule_changes>753</total_schedule_changes></row><row _id="row-bk65~x8m5-w6wh" _uuid="00000000-0000-0000-2CF8-AC468E77CB2C" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-bk65~x8m5-w6wh"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>791</pid><project_name>150Th St Spine Phase 1 Storm Sewer At Bergen Basin</project_name><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><total_budget_changes>101452000.00</total_budget_changes><total_schedule_changes>753</total_schedule_changes></row><row _id="row-wtgx_iefz.hvr8" _uuid="00000000-0000-0000-7BB3-743FCA205DDC" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-wtgx_iefz.hvr8"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>791</pid><project_name>150Th St Spine Phase 1 Storm Sewer At Bergen Basin</project_name><description>SOUTHEAST QUEENS 150TH STREET SPINE, PHASE 1.  TRUNK STORM SEWER AND OUTFALL AT BERGEN BASIN FOR THE 150TH STREET TRUNK SEWER WHICH SHARES AN OUTFALL WITH THE GUY R BREWER TRUNK SEWER</description><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Design</current_phase><design_start>2019-07-23T00:00:00</design_start><budget_forecast>142801000.00</budget_forecast><latest_budget_changes>91800000.00</latest_budget_changes><total_budget_changes>101452000.00</total_budget_changes><forecast_completion>2025-06-30T00:00:00</forecast_completion><latest_schedule_changes>319</latest_schedule_changes><total_schedule_changes>753</total_schedule_changes></row><row _id="row-c4f9-w9kp-3kp7" _uuid="00000000-0000-0000-739E-90FD6CD5263A" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-c4f9-w9kp-3kp7"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>791</pid><project_name>150Th St Spine Phase 1 Storm Sewer At Bergen Basin</project_name><description>SOUTHEAST QUEENS 150TH STREET SPINE, PHASE 1.  TRUNK STORM SEWER AND OUTFALL AT BERGEN BASIN FOR THE 150TH STREET TRUNK SEWER WHICH SHARES AN OUTFALL WITH THE GUY R BREWER TRUNK SEWER</description><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Design</current_phase><design_start>2019-07-23T00:00:00</design_start><budget_forecast>142511000.00</budget_forecast><latest_budget_changes>-290000.00</latest_budget_changes><total_budget_changes>101452000.00</total_budget_changes><forecast_completion>2025-11-03T00:00:00</forecast_completion><latest_schedule_changes>126</latest_schedule_changes><total_schedule_changes>753</total_schedule_changes></row><row _id="row-6hqh_9j3k_h49w" _uuid="00000000-0000-0000-07A8-4132E432B83D" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-6hqh_9j3k_h49w"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>791</pid><project_name>150Th St Spine Phase 1 Storm Sewer At Bergen Basin</project_name><description>SOUTHEAST QUEENS 150TH STREET SPINE, PHASE 1.  TRUNK STORM SEWER AND OUTFALL AT BERGEN BASIN FOR THE 150TH STREET TRUNK SEWER WHICH SHARES AN OUTFALL WITH THE GUY R BREWER TRUNK SEWER</description><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Design</current_phase><design_start>2019-07-23T00:00:00</design_start><budget_forecast>142511000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>101452000.00</total_budget_changes><forecast_completion>2025-10-04T00:00:00</forecast_completion><latest_schedule_changes>-30</latest_schedule_changes><total_schedule_changes>753</total_schedule_changes></row><row _id="row-jwc4-p9jw~5wx4" _uuid="00000000-0000-0000-2E21-A0A71EF88E77" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-jwc4-p9jw~5wx4"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>791</pid><project_name>150Th St Spine Phase 1 Storm Sewer At Bergen Basin</project_name><description>SOUTHEAST QUEENS 150TH STREET SPINE, PHASE 1.  DOUBLE BARREL STORM SEWER AND OUTFALL AT BERGEN BASIN FOR THE 150TH STREET TRUNK SEWER WHICH SHARES AN OUTFALL WITH THE GUY R BREWER TRUNK SEWER</description><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Design</current_phase><design_start>2019-07-23T00:00:00</design_start><budget_forecast>143211000.00</budget_forecast><latest_budget_changes>700000.00</latest_budget_changes><total_budget_changes>101452000.00</total_budget_changes><forecast_completion>2026-04-03T00:00:00</forecast_completion><latest_schedule_changes>181</latest_schedule_changes><total_schedule_changes>753</total_schedule_changes></row><row _id="row-gx8e_m7qy~rpnf" _uuid="00000000-0000-0000-CF41-C7E1F35F8F9F" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-gx8e_m7qy~rpnf"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>791</pid><project_name>150Th St Spine Phase 1 Storm Sewer At Bergen Basin</project_name><description>SOUTHEAST QUEENS 150TH STREET SPINE, PHASE 1.  DOUBLE BARREL STORM SEWER AND OUTFALL AT BERGEN BASIN FOR THE 150TH STREET TRUNK SEWER WHICH SHARES AN OUTFALL WITH THE GUY R BREWER TRUNK SEWER</description><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Design</current_phase><design_start>2019-07-23T00:00:00</design_start><budget_forecast>152453000.00</budget_forecast><latest_budget_changes>9242000.00</latest_budget_changes><total_budget_changes>101452000.00</total_budget_changes><forecast_completion>2026-09-07T00:00:00</forecast_completion><latest_schedule_changes>157</latest_schedule_changes><total_schedule_changes>753</total_schedule_changes></row><row _id="row-xmp5_yxk2.4zvy" _uuid="00000000-0000-0000-792C-9127C4541B73" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-xmp5_yxk2.4zvy"><date_reported_as_of>2018-08-01T00:00:00</date_reported_as_of><pid>792</pid><project_name>New Storm Sewer N Conduit Av-Baisley Blvd</project_name><description>Southeast Queens Guy Brewer Spine I. Storm, Sanitary and WM in North Conduit Ave bet Bailsey Blvd and Guy Brewer Blvd. (Spine Guy Brewer Blvd)</description><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Design</current_phase><design_start>2018-09-10T00:00:00</design_start><budget_forecast>82035000.00</budget_forecast><latest_budget_changes>35000.00</latest_budget_changes><total_budget_changes>31711000.00</total_budget_changes><forecast_completion>2024-09-13T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1619</total_schedule_changes></row><row _id="row-yc4v_66yg~42fn" _uuid="00000000-0000-0000-7C48-42E2D86AAFD5" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-yc4v_66yg~42fn"><date_reported_as_of>2019-01-01T00:00:00</date_reported_as_of><pid>792</pid><project_name>New Storm Sewer N Conduit Av-Baisley Blvd</project_name><description>Southeast Queens Guy Brewer Spine I. Storm, Sanitary and WM in North Conduit Ave bet Bailsey Blvd and Guy Brewer Blvd. (Spine Guy Brewer Blvd)</description><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Design</current_phase><design_start>2018-09-10T00:00:00</design_start><budget_forecast>111364000.00</budget_forecast><latest_budget_changes>29329000.00</latest_budget_changes><total_budget_changes>31711000.00</total_budget_changes><forecast_completion>2024-09-13T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1619</total_schedule_changes></row><row _id="row-8ksw~thmb-x54m" _uuid="00000000-0000-0000-0F81-59A02ADE4549" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-8ksw~thmb-x54m"><date_reported_as_of>2019-05-01T00:00:00</date_reported_as_of><pid>792</pid><project_name>New Storm Sewer N Conduit Av-Baisley Blvd</project_name><description>Storm, Sanitary and Water Mains work in North Conduit between Baisley Blvd and Guy Brewer Blvd, South Queens</description><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Design</current_phase><design_start>2018-09-10T00:00:00</design_start><budget_forecast>112064000.00</budget_forecast><latest_budget_changes>700000.00</latest_budget_changes><total_budget_changes>31711000.00</total_budget_changes><forecast_completion>2024-09-13T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1619</total_schedule_changes></row><row _id="row-2tp4.hps8.5i93" _uuid="00000000-0000-0000-3BAC-950D2824332C" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-2tp4.hps8.5i93"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>792</pid><project_name>New Storm Sewer N Conduit Av-Baisley Blvd</project_name><description>Storm, Sanitary and Water Mains work in North Conduit between Baisley Blvd and Guy Brewer Blvd, South Queens</description><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Design</current_phase><design_start>2018-09-10T00:00:00</design_start><budget_forecast>112064000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>31711000.00</total_budget_changes><forecast_completion>2024-09-13T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1619</total_schedule_changes></row><row _id="row-ftuw-v3rr_q4sc" _uuid="00000000-0000-0000-CBA7-C4654818BA52" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ftuw-v3rr_q4sc"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>792</pid><project_name>New Storm Sewer N Conduit Av-Baisley Blvd</project_name><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><total_budget_changes>31711000.00</total_budget_changes><total_schedule_changes>1619</total_schedule_changes></row><row _id="row-jzxd-besm~qnk6" _uuid="00000000-0000-0000-0A19-4F82DE5142AE" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-jzxd-besm~qnk6"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>792</pid><project_name>New Storm Sewer N Conduit Av-Baisley Blvd</project_name><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><total_budget_changes>31711000.00</total_budget_changes><total_schedule_changes>1619</total_schedule_changes></row><row _id="row-jhnu_aebc_mfcg" _uuid="00000000-0000-0000-D0EF-4E0A44A9B290" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-jhnu_aebc_mfcg"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>792</pid><project_name>New Storm Sewer N Conduit Av-Baisley Blvd</project_name><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><total_budget_changes>31711000.00</total_budget_changes><total_schedule_changes>1619</total_schedule_changes></row><row _id="row-uvrs~qyb8.fg2v" _uuid="00000000-0000-0000-FEE5-D732F63BAF9B" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-uvrs~qyb8.fg2v"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>792</pid><project_name>New Storm Sewer N Conduit Av-Baisley Blvd</project_name><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><total_budget_changes>31711000.00</total_budget_changes><total_schedule_changes>1619</total_schedule_changes></row><row _id="row-3ydn.98y5.7vww" _uuid="00000000-0000-0000-4993-96985D6EBD4D" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-3ydn.98y5.7vww"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>792</pid><project_name>New Storm Sewer N Conduit Av-Baisley Blvd</project_name><description>Storm, Sanitary and Water Mains work in North Conduit between Baisley Blvd and Guy Brewer Blvd, South Queens</description><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Design</current_phase><design_start>2018-07-30T00:00:00</design_start><budget_forecast>113711000.00</budget_forecast><latest_budget_changes>1647000.00</latest_budget_changes><total_budget_changes>31711000.00</total_budget_changes><forecast_completion>2026-05-22T00:00:00</forecast_completion><latest_schedule_changes>616</latest_schedule_changes><total_schedule_changes>1619</total_schedule_changes></row><row _id="row-u4yt.8hgp_idxm" _uuid="00000000-0000-0000-476A-E4E59BE91EDB" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-u4yt.8hgp_idxm"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>792</pid><project_name>New Storm Sewer N Conduit Av-Baisley Blvd</project_name><description>Storm, Sanitary and Water Mains work in North Conduit between Baisley Blvd and Guy Brewer Blvd, South Queens</description><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Design</current_phase><design_start>2018-07-30T00:00:00</design_start><budget_forecast>113711000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>31711000.00</total_budget_changes><forecast_completion>2026-09-25T00:00:00</forecast_completion><latest_schedule_changes>126</latest_schedule_changes><total_schedule_changes>1619</total_schedule_changes></row><row _id="row-5se6-876x-bv69" _uuid="00000000-0000-0000-F27A-B14C6DAB0805" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-5se6-876x-bv69"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>792</pid><project_name>New Storm Sewer N Conduit Av-Baisley Blvd</project_name><description>Storm, Sanitary and Water Mains work in North Conduit between Baisley Blvd and Guy Brewer Blvd, South Queens</description><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Design</current_phase><design_start>2018-07-30T00:00:00</design_start><budget_forecast>113711000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>31711000.00</total_budget_changes><forecast_completion>2028-04-22T00:00:00</forecast_completion><latest_schedule_changes>575</latest_schedule_changes><total_schedule_changes>1619</total_schedule_changes></row><row _id="row-ur43~rfr2-h5z8" _uuid="00000000-0000-0000-F689-DC0BD83ADD9A" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ur43~rfr2-h5z8"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>792</pid><project_name>New Storm Sewer N Conduit Av-Baisley Blvd</project_name><description>Storm, Sanitary and Water Mains work in North Conduit between Baisley Blvd and Guy Brewer Blvd, South Queens</description><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Design</current_phase><design_start>2018-07-30T00:00:00</design_start><budget_forecast>113711000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>31711000.00</total_budget_changes><forecast_completion>2028-11-20T00:00:00</forecast_completion><latest_schedule_changes>212</latest_schedule_changes><total_schedule_changes>1619</total_schedule_changes></row><row _id="row-umh5.uw4y-52j8" _uuid="00000000-0000-0000-E435-3019BEDC642C" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-umh5.uw4y-52j8"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>792</pid><project_name>New Storm Sewer N Conduit Av-Baisley Blvd</project_name><description>Storm, Sanitary and Water Mains work in North Conduit between Baisley Blvd and Guy Brewer Blvd, South Queens</description><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Design</current_phase><design_start>2018-07-30T00:00:00</design_start><budget_forecast>113711000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>31711000.00</total_budget_changes><forecast_completion>2029-02-18T00:00:00</forecast_completion><latest_schedule_changes>90</latest_schedule_changes><total_schedule_changes>1619</total_schedule_changes></row><row _id="row-tyaf-esdy.q4u8" _uuid="00000000-0000-0000-06AE-8CCBF2FF0644" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-tyaf-esdy.q4u8"><date_reported_as_of>2018-03-01T00:00:00</date_reported_as_of><pid>793</pid><project_name>Sewer When &amp; Where Contract In S.E. Queens</project_name><description>Construction of Storm and Sanitary sewers at various locations in Queens Priority Grid 13 &amp; 18</description><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Design</current_phase><design_start>2018-02-15T00:00:00</design_start><budget_forecast>29400000.00</budget_forecast><total_budget_changes>7404000.00</total_budget_changes><forecast_completion>2021-02-12T00:00:00</forecast_completion><total_schedule_changes>1834</total_schedule_changes></row><row _id="row-kziy~5gf4~jzbs" _uuid="00000000-0000-0000-7FE9-509313D623DA" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-kziy~5gf4~jzbs"><date_reported_as_of>2018-08-01T00:00:00</date_reported_as_of><pid>793</pid><project_name>Sewer When &amp; Where Contract In S.E. Queens</project_name><description>Construction of Storm and Sanitary sewers at various locations in Queens Priority Grid 13 &amp; 18</description><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Design</current_phase><design_start>2018-02-15T00:00:00</design_start><budget_forecast>39882000.00</budget_forecast><latest_budget_changes>10482000.00</latest_budget_changes><total_budget_changes>7404000.00</total_budget_changes><forecast_completion>2021-04-07T00:00:00</forecast_completion><latest_schedule_changes>54</latest_schedule_changes><total_schedule_changes>1834</total_schedule_changes></row><row _id="row-qnma_dgvr_vg2e" _uuid="00000000-0000-0000-B1CD-71B72315AACE" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-qnma_dgvr_vg2e"><date_reported_as_of>2019-01-01T00:00:00</date_reported_as_of><pid>793</pid><project_name>Sewer When &amp; Where Contract In S.E. Queens</project_name><description>Construction of Storm and Sanitary sewers at various locations in Queens Priority Grid 13 &amp; 18</description><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Design</current_phase><design_start>2018-02-15T00:00:00</design_start><budget_forecast>0.00</budget_forecast><latest_budget_changes>-39882000.00</latest_budget_changes><total_budget_changes>7404000.00</total_budget_changes><forecast_completion>2020-04-12T00:00:00</forecast_completion><latest_schedule_changes>-360</latest_schedule_changes><total_schedule_changes>1834</total_schedule_changes></row><row _id="row-yjzc-jxph.zt9m" _uuid="00000000-0000-0000-B0A0-52CC8F66A760" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-yjzc-jxph.zt9m"><date_reported_as_of>2019-05-01T00:00:00</date_reported_as_of><pid>793</pid><project_name>Sewer When &amp; Where Contract In S.E. Queens</project_name><description>SEWER WHEN &amp; WHERE CONTRACT IN South East Queens.  NEW STORM SEWER CONSTRUCTION, REPLACEMENT OR UPGRADES TO SANITARY SEWERS AND WATER MAIN IN PROJECT AREAS.  GREEN INFRASTRUCTURE PROJECTS IN CONJUNCTION WITH WHEN &amp; WHERE PROJECTS.</description><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Design</current_phase><design_start>2018-05-14T00:00:00</design_start><budget_forecast>30900000.00</budget_forecast><latest_budget_changes>30900000.00</latest_budget_changes><total_budget_changes>7404000.00</total_budget_changes><forecast_completion>2022-08-08T00:00:00</forecast_completion><latest_schedule_changes>848</latest_schedule_changes><total_schedule_changes>1834</total_schedule_changes></row><row _id="row-9w3q-irh5-y24r" _uuid="00000000-0000-0000-F1C7-255C127E1405" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-9w3q-irh5-y24r"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>793</pid><project_name>Sewer When &amp; Where Contract In S.E. Queens</project_name><description>SEWER WHEN &amp; WHERE CONTRACT IN South East Queens.  NEW STORM SEWER CONSTRUCTION, REPLACEMENT OR UPGRADES TO SANITARY SEWERS AND WATER MAIN IN PROJECT AREAS.  GREEN INFRASTRUCTURE PROJECTS IN CONJUNCTION WITH WHEN &amp; WHERE PROJECTS.</description><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Design</current_phase><design_start>2018-05-14T00:00:00</design_start><budget_forecast>30900000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>7404000.00</total_budget_changes><forecast_completion>2022-08-08T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1834</total_schedule_changes></row><row _id="row-tgde-cnbn_vur5" _uuid="00000000-0000-0000-8FD0-10A3786481DC" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-tgde-cnbn_vur5"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>793</pid><project_name>Sewer When &amp; Where Contract In S.E. Queens</project_name><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><total_budget_changes>7404000.00</total_budget_changes><total_schedule_changes>1834</total_schedule_changes></row><row _id="row-kwfz~efy8_buma" _uuid="00000000-0000-0000-2DFE-BE4E88BC0E0F" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-kwfz~efy8_buma"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>793</pid><project_name>Sewer When &amp; Where Contract In S.E. Queens</project_name><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><total_budget_changes>7404000.00</total_budget_changes><total_schedule_changes>1834</total_schedule_changes></row><row _id="row-mfdf_8gfa-7ujs" _uuid="00000000-0000-0000-17D0-BA1976F863C2" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-mfdf_8gfa-7ujs"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>793</pid><project_name>Sewer When &amp; Where Contract In S.E. Queens</project_name><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><total_budget_changes>7404000.00</total_budget_changes><total_schedule_changes>1834</total_schedule_changes></row><row _id="row-qh3j.sjd4.ud8g" _uuid="00000000-0000-0000-D2DA-88B993B91D90" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-qh3j.sjd4.ud8g"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>793</pid><project_name>Sewer When &amp; Where Contract In S.E. Queens</project_name><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><total_budget_changes>7404000.00</total_budget_changes><total_schedule_changes>1834</total_schedule_changes></row><row _id="row-f498~pxyv.pvav" _uuid="00000000-0000-0000-118A-22E9242C2D65" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-f498~pxyv.pvav"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>793</pid><project_name>Sewer When &amp; Where Contract In S.E. Queens</project_name><description>SEWER WHEN &amp; WHERE CONTRACT IN South East Queens.  NEW STORM SEWER CONSTRUCTION, REPLACEMENT OR UPGRADES TO SANITARY SEWERS AND WATER MAIN IN PROJECT AREAS.  GREEN INFRASTRUCTURE PROJECTS IN CONJUNCTION WITH WHEN &amp; WHERE PROJECTS.</description><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Design</current_phase><design_start>2018-05-14T00:00:00</design_start><budget_forecast>36060000.00</budget_forecast><latest_budget_changes>5160000.00</latest_budget_changes><total_budget_changes>7404000.00</total_budget_changes><forecast_completion>2024-08-23T00:00:00</forecast_completion><latest_schedule_changes>746</latest_schedule_changes><total_schedule_changes>1834</total_schedule_changes></row><row _id="row-i4js.5kvh-2mun" _uuid="00000000-0000-0000-F542-2F816B1AA325" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-i4js.5kvh-2mun"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>793</pid><project_name>Sewer When &amp; Where Contract In S.E. Queens</project_name><description>SEWER WHEN &amp; WHERE CONTRACT IN South East Queens.  NEW STORM SEWER CONSTRUCTION, REPLACEMENT OR UPGRADES TO SANITARY SEWERS AND WATER MAIN IN PROJECT AREAS.  GREEN INFRASTRUCTURE PROJECTS IN CONJUNCTION WITH WHEN &amp; WHERE PROJECTS.</description><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Design</current_phase><design_start>2018-05-14T00:00:00</design_start><budget_forecast>36450000.00</budget_forecast><latest_budget_changes>390000.00</latest_budget_changes><total_budget_changes>7404000.00</total_budget_changes><forecast_completion>2025-04-22T00:00:00</forecast_completion><latest_schedule_changes>242</latest_schedule_changes><total_schedule_changes>1834</total_schedule_changes></row><row _id="row-vb9x.sn8h~n8y7" _uuid="00000000-0000-0000-22CD-3343190E41D9" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-vb9x.sn8h~n8y7"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>793</pid><project_name>Sewer When &amp; Where Contract In S.E. Queens</project_name><description>SEWER WHEN &amp; WHERE CONTRACT IN South East Queens.  NEW STORM SEWER CONSTRUCTION, REPLACEMENT OR UPGRADES TO SANITARY SEWERS AND WATER MAIN IN PROJECT AREAS.  GREEN INFRASTRUCTURE PROJECTS IN CONJUNCTION WITH WHEN &amp; WHERE PROJECTS.</description><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Design</current_phase><design_start>2018-05-14T00:00:00</design_start><budget_forecast>36274000.00</budget_forecast><latest_budget_changes>-176000.00</latest_budget_changes><total_budget_changes>7404000.00</total_budget_changes><forecast_completion>2025-08-22T00:00:00</forecast_completion><latest_schedule_changes>122</latest_schedule_changes><total_schedule_changes>1834</total_schedule_changes></row><row _id="row-5a7y.d6jd-87hb" _uuid="00000000-0000-0000-09CF-E4601D51CCB4" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-5a7y.d6jd-87hb"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>793</pid><project_name>Sewer When &amp; Where Contract In S.E. Queens</project_name><description>SEWER WHEN &amp; WHERE CONTRACT IN South East Queens.  NEW STORM SEWER CONSTRUCTION, REPLACEMENT OR UPGRADES TO SANITARY SEWERS AND WATER MAIN IN PROJECT AREAS.  GREEN INFRASTRUCTURE PROJECTS IN CONJUNCTION WITH WHEN &amp; WHERE PROJECTS.</description><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Design</current_phase><design_start>2018-05-14T00:00:00</design_start><budget_forecast>36804000.00</budget_forecast><latest_budget_changes>530000.00</latest_budget_changes><total_budget_changes>7404000.00</total_budget_changes><forecast_completion>2025-09-22T00:00:00</forecast_completion><latest_schedule_changes>31</latest_schedule_changes><total_schedule_changes>1834</total_schedule_changes></row><row _id="row-f7pu_fv34.meht" _uuid="00000000-0000-0000-0028-5006DB776E82" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-f7pu_fv34.meht"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>793</pid><project_name>Sewer When &amp; Where Contract In S.E. Queens</project_name><description>SEWER WHEN &amp; WHERE CONTRACT IN South East Queens.  NEW STORM SEWER CONSTRUCTION, REPLACEMENT OR UPGRADES TO SANITARY SEWERS AND WATER MAIN IN PROJECT AREAS.  GREEN INFRASTRUCTURE PROJECTS IN CONJUNCTION WITH WHEN &amp; WHERE PROJECTS.</description><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Design</current_phase><design_start>2018-05-14T00:00:00</design_start><budget_forecast>36804000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>7404000.00</total_budget_changes><forecast_completion>2026-02-20T00:00:00</forecast_completion><latest_schedule_changes>151</latest_schedule_changes><total_schedule_changes>1834</total_schedule_changes></row><row _id="row-agps-6cpw_3baj" _uuid="00000000-0000-0000-5B03-025938C21A27" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-agps-6cpw_3baj"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>794</pid><project_name>Sewer When &amp; Where Seq</project_name><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><total_budget_changes>3200000.00</total_budget_changes><total_schedule_changes>1377</total_schedule_changes></row><row _id="row-e2xg-8myp-vmwg" _uuid="00000000-0000-0000-EADB-9F4C3633A71B" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-e2xg-8myp-vmwg"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>794</pid><project_name>Sewer When &amp; Where Seq</project_name><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><total_budget_changes>3200000.00</total_budget_changes><total_schedule_changes>1377</total_schedule_changes></row><row _id="row-ta7u.d9vn-zb8u" _uuid="00000000-0000-0000-FF85-B5DB4C2D0846" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ta7u.d9vn-zb8u"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>794</pid><project_name>Sewer When &amp; Where Seq</project_name><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><total_budget_changes>3200000.00</total_budget_changes><total_schedule_changes>1377</total_schedule_changes></row><row _id="row-3fwy_f6d2~kmih" _uuid="00000000-0000-0000-47EA-3A9B181B41F7" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-3fwy_f6d2~kmih"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>794</pid><project_name>Sewer When &amp; Where Seq</project_name><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><total_budget_changes>3200000.00</total_budget_changes><total_schedule_changes>1377</total_schedule_changes></row><row _id="row-5zvc~bqnu_u8qw" _uuid="00000000-0000-0000-66FD-D25E18375743" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-5zvc~bqnu_u8qw"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>794</pid><project_name>Sewer When &amp; Where Seq</project_name><description>NEW STORM SEWER CONSTRUCTION, REPLACEMENT OR UPGRADES TO SANITARY SEWERS AND WATER MAINS IN PROJECT AREAS. GREEN INFRASTRUCTURE PROJECTS TO BE DONE IN CONJUNCTION WITH THESE CAPITAL IMPROVEMENTS</description><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Design</current_phase><design_start>2020-03-09T00:00:00</design_start><budget_forecast>28200000.00</budget_forecast><latest_budget_changes>3200000.00</latest_budget_changes><total_budget_changes>3200000.00</total_budget_changes><forecast_completion>2024-12-16T00:00:00</forecast_completion><latest_schedule_changes>857</latest_schedule_changes><total_schedule_changes>1377</total_schedule_changes></row><row _id="row-gzg5-v2qv~smy4" _uuid="00000000-0000-0000-53DF-F2E58FB9A02D" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-gzg5-v2qv~smy4"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>794</pid><project_name>Sewer When &amp; Where Seq</project_name><description>NEW STORM SEWER CONSTRUCTION, REPLACEMENT OR UPGRADES TO SANITARY SEWERS AND WATER MAINS IN PROJECT AREAS. GREEN INFRASTRUCTURE PROJECTS TO BE DONE IN CONJUNCTION WITH THESE CAPITAL IMPROVEMENTS</description><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Design</current_phase><design_start>2020-03-09T00:00:00</design_start><budget_forecast>28200000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>3200000.00</total_budget_changes><forecast_completion>2025-04-21T00:00:00</forecast_completion><latest_schedule_changes>126</latest_schedule_changes><total_schedule_changes>1377</total_schedule_changes></row><row _id="row-ezae~nfin~ciem" _uuid="00000000-0000-0000-A202-2B7F35770FEF" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ezae~nfin~ciem"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>794</pid><project_name>Sewer When &amp; Where Seq</project_name><description>NEW STORM SEWER CONSTRUCTION, REPLACEMENT OR UPGRADES TO SANITARY SEWERS AND WATER MAINS IN PROJECT AREAS. GREEN INFRASTRUCTURE PROJECTS TO BE DONE IN CONJUNCTION WITH THESE CAPITAL IMPROVEMENTS</description><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Design</current_phase><design_start>2020-03-09T00:00:00</design_start><budget_forecast>28200000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>3200000.00</total_budget_changes><forecast_completion>2025-07-20T00:00:00</forecast_completion><latest_schedule_changes>90</latest_schedule_changes><total_schedule_changes>1377</total_schedule_changes></row><row _id="row-ixvs-3vu6~58q2" _uuid="00000000-0000-0000-534C-4471E16F55F7" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ixvs-3vu6~58q2"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>794</pid><project_name>Sewer When &amp; Where Seq</project_name><description>NEW STORM SEWER CONSTRUCTION, REPLACEMENT OR UPGRADES TO SANITARY SEWERS AND WATER MAINS IN PROJECT AREAS. GREEN INFRASTRUCTURE PROJECTS TO BE DONE IN CONJUNCTION WITH THESE CAPITAL IMPROVEMENTS</description><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Design</current_phase><design_start>2020-03-09T00:00:00</design_start><budget_forecast>28200000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>3200000.00</total_budget_changes><forecast_completion>2026-02-16T00:00:00</forecast_completion><latest_schedule_changes>211</latest_schedule_changes><total_schedule_changes>1377</total_schedule_changes></row><row _id="row-ixfw_ws9y-g7ya" _uuid="00000000-0000-0000-80C0-79ACF01075A1" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ixfw_ws9y-g7ya"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>794</pid><project_name>Sewer When &amp; Where Seq</project_name><description>NEW STORM SEWER CONSTRUCTION, REPLACEMENT OR UPGRADES TO SANITARY SEWERS AND WATER MAINS IN PROJECT AREAS. GREEN INFRASTRUCTURE PROJECTS TO BE DONE IN CONJUNCTION WITH THESE CAPITAL IMPROVEMENTS</description><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Design</current_phase><design_start>2020-03-09T00:00:00</design_start><budget_forecast>28200000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>3200000.00</total_budget_changes><forecast_completion>2026-05-20T00:00:00</forecast_completion><latest_schedule_changes>93</latest_schedule_changes><total_schedule_changes>1377</total_schedule_changes></row><row _id="row-zsfw-87h3_386a" _uuid="00000000-0000-0000-BA6D-DB619337C9A8" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-zsfw-87h3_386a"><date_reported_as_of>2018-03-01T00:00:00</date_reported_as_of><pid>801</pid><project_name>West 79th Street over Amtrak and Rotunda Complex Rehabilitation</project_name><description>Rehabilitation of the W. 79th St Bridge over Amtrak and Rotunda Complex</description><category>Bridges, Streets and Roadways</category><borough>Manhattan</borough><managing_agency>DOT</managing_agency><client_agency>DOT, DPR</client_agency><current_phase>Design</current_phase><design_start>2000-07-10T00:00:00</design_start><budget_forecast>250905250.00</budget_forecast><total_budget_changes>-51088528.00</total_budget_changes><forecast_completion>2023-09-20T00:00:00</forecast_completion><total_schedule_changes>604</total_schedule_changes></row><row _id="row-ca52-g97k~2823" _uuid="00000000-0000-0000-8863-5835245E7FB1" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ca52-g97k~2823"><date_reported_as_of>2018-08-01T00:00:00</date_reported_as_of><pid>801</pid><project_name>West 79th Street over Amtrak and Rotunda Complex Rehabilitation</project_name><description>Rehabilitation of the W. 79th St Bridge over Amtrak and Rotunda Complex</description><category>Bridges, Streets and Roadways</category><borough>Manhattan</borough><managing_agency>DOT</managing_agency><client_agency>DOT, DPR</client_agency><current_phase>Design</current_phase><design_start>2000-07-10T00:00:00</design_start><budget_forecast>207671058.00</budget_forecast><latest_budget_changes>-43234192.00</latest_budget_changes><total_budget_changes>-51088528.00</total_budget_changes><forecast_completion>2023-10-22T00:00:00</forecast_completion><latest_schedule_changes>32</latest_schedule_changes><total_schedule_changes>604</total_schedule_changes></row><row _id="row-muh4.ytv8~73y4" _uuid="00000000-0000-0000-4B93-FF9407045177" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-muh4.ytv8~73y4"><date_reported_as_of>2019-01-01T00:00:00</date_reported_as_of><pid>801</pid><project_name>West 79th Street over Amtrak and Rotunda Complex Rehabilitation</project_name><description>Rehabilitate the W. 79th St Bridge over Amtrak and Rotunda Complex</description><category>Bridges, Streets and Roadways</category><borough>Manhattan</borough><managing_agency>DOT</managing_agency><client_agency>DOT, DPR</client_agency><current_phase>Design</current_phase><design_start>2000-07-10T00:00:00</design_start><budget_forecast>34427058.00</budget_forecast><latest_budget_changes>-173244000.00</latest_budget_changes><total_budget_changes>-51088528.00</total_budget_changes><forecast_completion>2024-04-16T00:00:00</forecast_completion><latest_schedule_changes>177</latest_schedule_changes><total_schedule_changes>604</total_schedule_changes></row><row _id="row-ng6w.jxw9.9ssm" _uuid="00000000-0000-0000-A24B-856CF9408004" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ng6w.jxw9.9ssm"><date_reported_as_of>2019-05-01T00:00:00</date_reported_as_of><pid>801</pid><project_name>West 79th Street over Amtrak and Rotunda Complex Rehabilitation</project_name><description>Rehabilitate the W. 79th St Bridge over Amtrak and Rotunda Complex</description><category>Bridges, Streets and Roadways</category><borough>Manhattan</borough><managing_agency>DOT</managing_agency><client_agency>DOT, DPR</client_agency><current_phase>Construction Procurement</current_phase><design_start>2000-07-10T00:00:00</design_start><budget_forecast>40514808.00</budget_forecast><latest_budget_changes>6087750.00</latest_budget_changes><total_budget_changes>-51088528.00</total_budget_changes><forecast_completion>2024-10-26T00:00:00</forecast_completion><latest_schedule_changes>193</latest_schedule_changes><total_schedule_changes>604</total_schedule_changes></row><row _id="row-vuhb_5pb7-wdub" _uuid="00000000-0000-0000-7B4E-7346630264D9" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-vuhb_5pb7-wdub"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>801</pid><project_name>West 79th Street over Amtrak and Rotunda Complex Rehabilitation</project_name><description>Rehabilitate the W. 79th St Bridge over Amtrak and Rotunda Complex</description><category>Bridges, Streets and Roadways</category><borough>Manhattan</borough><managing_agency>DOT</managing_agency><client_agency>DOT, DPR</client_agency><current_phase>Construction Procurement</current_phase><design_start>2000-07-10T00:00:00</design_start><budget_forecast>202905808.00</budget_forecast><latest_budget_changes>162391000.00</latest_budget_changes><total_budget_changes>-51088528.00</total_budget_changes><forecast_completion>2024-09-30T00:00:00</forecast_completion><latest_schedule_changes>-26</latest_schedule_changes><total_schedule_changes>604</total_schedule_changes></row><row _id="row-j4v7_e3u9_p6nj" _uuid="00000000-0000-0000-27B9-176C372478CA" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-j4v7_e3u9_p6nj"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>801</pid><project_name>West 79th Street over Amtrak and Rotunda Complex Rehabilitation</project_name><description>Rehabilitate the W. 79th St Bridge over Amtrak and Rotunda Complex</description><category>Bridges, Streets and Roadways</category><borough>Manhattan</borough><managing_agency>DOT</managing_agency><client_agency>DOT, DPR</client_agency><current_phase>Construction Procurement</current_phase><design_start>2000-07-10T00:00:00</design_start><budget_forecast>200247808.00</budget_forecast><latest_budget_changes>-2658000.00</latest_budget_changes><total_budget_changes>-51088528.00</total_budget_changes><forecast_completion>2024-09-16T00:00:00</forecast_completion><latest_schedule_changes>-14</latest_schedule_changes><total_schedule_changes>604</total_schedule_changes></row><row _id="row-3ah6~gshv-mr75" _uuid="00000000-0000-0000-D91A-58D762F2C2B8" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-3ah6~gshv-mr75"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>801</pid><project_name>West 79th Street over Amtrak and Rotunda Complex Rehabilitation</project_name><description>Rehabilitate the W. 79th St Bridge over Amtrak and Rotunda Complex</description><category>Bridges, Streets and Roadways</category><borough>Manhattan</borough><managing_agency>DOT</managing_agency><client_agency>DOT, DPR</client_agency><current_phase>Construction Procurement</current_phase><design_start>2000-07-10T00:00:00</design_start><budget_forecast>200317808.00</budget_forecast><latest_budget_changes>70000.00</latest_budget_changes><total_budget_changes>-51088528.00</total_budget_changes><forecast_completion>2025-01-15T00:00:00</forecast_completion><latest_schedule_changes>121</latest_schedule_changes><total_schedule_changes>604</total_schedule_changes></row><row _id="row-i2t7.u6fx_ffms" _uuid="00000000-0000-0000-F494-35E573AFB85A" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-i2t7.u6fx_ffms"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>801</pid><project_name>West 79th Street over Amtrak and Rotunda Complex Rehabilitation</project_name><description>Rehabilitate the W. 79th St Bridge over Amtrak and Rotunda Complex</description><category>Bridges, Streets and Roadways</category><borough>Manhattan</borough><managing_agency>DOT</managing_agency><client_agency>DOT, DPR</client_agency><current_phase>Construction Procurement</current_phase><design_start>2000-07-10T00:00:00</design_start><budget_forecast>202769758.00</budget_forecast><latest_budget_changes>2451950.00</latest_budget_changes><total_budget_changes>-51088528.00</total_budget_changes><forecast_completion>2025-06-01T00:00:00</forecast_completion><latest_schedule_changes>137</latest_schedule_changes><total_schedule_changes>604</total_schedule_changes></row><row _id="row-2by4_urim.usd7" _uuid="00000000-0000-0000-2857-ED5B24D7FE59" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-2by4_urim.usd7"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>801</pid><project_name>West 79th Street over Amtrak and Rotunda Complex Rehabilitation</project_name><category>Bridges, Streets and Roadways</category><borough>Manhattan</borough><managing_agency>DOT</managing_agency><client_agency>DOT, DPR</client_agency><total_budget_changes>-51088528.00</total_budget_changes><total_schedule_changes>604</total_schedule_changes></row><row _id="row-azit-9t23~m2r9" _uuid="00000000-0000-0000-8EB2-854E260CC8C5" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-azit-9t23~m2r9"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>801</pid><project_name>West 79th Street over Amtrak and Rotunda Complex Rehabilitation</project_name><description>Rehabilitate the W. 79th St Bridge over Amtrak and Rotunda Complex</description><category>Bridges, Streets and Roadways</category><borough>Manhattan</borough><managing_agency>DOT</managing_agency><client_agency>DOT, DPR</client_agency><current_phase>Construction</current_phase><design_start>2000-07-10T00:00:00</design_start><budget_forecast>341264464.00</budget_forecast><latest_budget_changes>138494706.00</latest_budget_changes><total_budget_changes>-51088528.00</total_budget_changes><forecast_completion>2025-05-16T00:00:00</forecast_completion><latest_schedule_changes>-16</latest_schedule_changes><total_schedule_changes>604</total_schedule_changes></row><row _id="row-zm4j.u4tg-427n" _uuid="00000000-0000-0000-36D5-A2D742F2C448" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-zm4j.u4tg-427n"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>801</pid><project_name>West 79th Street over Amtrak and Rotunda Complex Rehabilitation</project_name><description>Rehabilitate the W. 79th St Bridge over Amtrak and Rotunda Complex</description><category>Bridges, Streets and Roadways</category><borough>Manhattan</borough><managing_agency>DOT</managing_agency><client_agency>DOT, DPR</client_agency><current_phase>Construction</current_phase><design_start>2000-07-10T00:00:00</design_start><budget_forecast>368889326.00</budget_forecast><latest_budget_changes>27624862.00</latest_budget_changes><total_budget_changes>-51088528.00</total_budget_changes><forecast_completion>2025-05-16T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>604</total_schedule_changes></row><row _id="row-hkrr~5swj_bn7b" _uuid="00000000-0000-0000-A9C6-92652BBE8647" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-hkrr~5swj_bn7b"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>801</pid><project_name>West 79th Street over Amtrak and Rotunda Complex Rehabilitation</project_name><description>Rehabilitate the W. 79th St Bridge over Amtrak and Rotunda Complex</description><category>Bridges, Streets and Roadways</category><borough>Manhattan</borough><managing_agency>DOT</managing_agency><client_agency>DOT, DPR</client_agency><current_phase>Construction</current_phase><design_start>2000-07-10T00:00:00</design_start><budget_forecast>195247481.00</budget_forecast><latest_budget_changes>-173641845.00</latest_budget_changes><total_budget_changes>-51088528.00</total_budget_changes><forecast_completion>2025-05-16T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>604</total_schedule_changes></row><row _id="row-p5pv.hv2p_6knm" _uuid="00000000-0000-0000-AB96-CD8668DEDC60" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-p5pv.hv2p_6knm"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>801</pid><project_name>West 79th Street over Amtrak and Rotunda Complex Rehabilitation</project_name><description>Rehabilitate the W. 79th St Bridge over Amtrak and Rotunda Complex</description><category>Bridges, Streets and Roadways</category><borough>Manhattan</borough><managing_agency>DOT</managing_agency><client_agency>DOT, DPR</client_agency><current_phase>Construction</current_phase><design_start>2000-07-10T00:00:00</design_start><budget_forecast>187556898.00</budget_forecast><latest_budget_changes>-7690583.00</latest_budget_changes><total_budget_changes>-51088528.00</total_budget_changes><forecast_completion>2025-05-16T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>604</total_schedule_changes></row><row _id="row-4vax.mrsg-cxbt" _uuid="00000000-0000-0000-B504-F0B943EE1DB5" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-4vax.mrsg-cxbt"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>801</pid><project_name>West 79th Street over Amtrak and Rotunda Complex Rehabilitation</project_name><description>Rehabilitate the W. 79th St Bridge over Amtrak and Rotunda Complex</description><category>Bridges, Streets and Roadways</category><borough>Manhattan</borough><managing_agency>DOT</managing_agency><client_agency>DOT, DPR</client_agency><current_phase>Construction</current_phase><design_start>2000-07-10T00:00:00</design_start><budget_forecast>199816722.00</budget_forecast><latest_budget_changes>12259824.00</latest_budget_changes><total_budget_changes>-51088528.00</total_budget_changes><forecast_completion>2025-05-16T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>604</total_schedule_changes></row><row _id="row-nr25.qu9x~bxaj" _uuid="00000000-0000-0000-0233-2BF9F64B9416" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-nr25.qu9x~bxaj"><date_reported_as_of>2018-03-01T00:00:00</date_reported_as_of><pid>811</pid><project_name>East 180th Street over Metro North Railroad (Harrison Line)</project_name><description>Rehabilitation of East 180th Street Bridge over Metro North Railroad, the Bronx</description><category>Bridges</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2017-02-06T00:00:00</design_start><budget_forecast>30038945.00</budget_forecast><total_budget_changes>4194366.00</total_budget_changes><forecast_completion>2021-12-04T00:00:00</forecast_completion><total_schedule_changes>664</total_schedule_changes></row><row _id="row-rzwn~mmxq-4y4i" _uuid="00000000-0000-0000-A3EB-359807ACD0F6" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-rzwn~mmxq-4y4i"><date_reported_as_of>2018-08-01T00:00:00</date_reported_as_of><pid>811</pid><project_name>East 180th Street over Metro North Railroad (Harrison Line)</project_name><description>Rehabilitation of East 180th Street Bridge over Metro North Railroad, the Bronx</description><category>Bridges</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction Procurement</current_phase><design_start>2017-02-06T00:00:00</design_start><budget_forecast>30850945.00</budget_forecast><latest_budget_changes>812000.00</latest_budget_changes><total_budget_changes>4194366.00</total_budget_changes><forecast_completion>2022-01-02T00:00:00</forecast_completion><latest_schedule_changes>29</latest_schedule_changes><total_schedule_changes>664</total_schedule_changes></row><row _id="row-fuii-ed6z-5c2w" _uuid="00000000-0000-0000-95D3-7D11A790E131" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-fuii-ed6z-5c2w"><date_reported_as_of>2019-01-01T00:00:00</date_reported_as_of><pid>811</pid><project_name>East 180th Street over Metro North Railroad (Harrison Line)</project_name><description>Rehabilitation of East 180th Street Bridge over Metro North Railroad, the Bronx</description><category>Bridges</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction Procurement</current_phase><design_start>2017-02-06T00:00:00</design_start><budget_forecast>37309945.00</budget_forecast><latest_budget_changes>6459000.00</latest_budget_changes><total_budget_changes>4194366.00</total_budget_changes><forecast_completion>2022-03-24T00:00:00</forecast_completion><latest_schedule_changes>81</latest_schedule_changes><total_schedule_changes>664</total_schedule_changes></row><row _id="row-2x6b-rtsg.z5ti" _uuid="00000000-0000-0000-07F6-E54D567CCFBE" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-2x6b-rtsg.z5ti"><date_reported_as_of>2019-05-01T00:00:00</date_reported_as_of><pid>811</pid><project_name>East 180th Street over Metro North Railroad (Harrison Line)</project_name><description>Rehabilitation of East 180th Street Bridge over Metro North Railroad, the Bronx</description><category>Bridges</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction Procurement</current_phase><design_start>2017-02-06T00:00:00</design_start><budget_forecast>38879945.00</budget_forecast><latest_budget_changes>1570000.00</latest_budget_changes><total_budget_changes>4194366.00</total_budget_changes><forecast_completion>2022-09-26T00:00:00</forecast_completion><latest_schedule_changes>186</latest_schedule_changes><total_schedule_changes>664</total_schedule_changes></row><row _id="row-2369~p8kh~hsau" _uuid="00000000-0000-0000-3E6E-55BC466EDFD8" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-2369~p8kh~hsau"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>811</pid><project_name>East 180th Street over Metro North Railroad (Harrison Line)</project_name><description>Rehabilitation of East 180th Street Bridge over Metro North Railroad, the Bronx</description><category>Bridges</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction Procurement</current_phase><design_start>2017-02-06T00:00:00</design_start><budget_forecast>38744944.00</budget_forecast><latest_budget_changes>-135001.00</latest_budget_changes><total_budget_changes>4194366.00</total_budget_changes><forecast_completion>2023-01-14T00:00:00</forecast_completion><latest_schedule_changes>110</latest_schedule_changes><total_schedule_changes>664</total_schedule_changes></row><row _id="row-jfej~z5j3.5z9q" _uuid="00000000-0000-0000-60DB-3384B0377C11" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-jfej~z5j3.5z9q"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>811</pid><project_name>East 180th Street over Metro North Railroad (Harrison Line)</project_name><description>Rehabilitation of East 180th Street Bridge over Metro North Railroad, the Bronx</description><category>Bridges</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction Procurement</current_phase><design_start>2017-02-06T00:00:00</design_start><budget_forecast>39568378.00</budget_forecast><latest_budget_changes>823434.00</latest_budget_changes><total_budget_changes>4194366.00</total_budget_changes><forecast_completion>2022-09-24T00:00:00</forecast_completion><latest_schedule_changes>-112</latest_schedule_changes><total_schedule_changes>664</total_schedule_changes></row><row _id="row-b4fc~gzni-qbjd" _uuid="00000000-0000-0000-EBDD-C0CE558DCAE2" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-b4fc~gzni-qbjd"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>811</pid><project_name>East 180th Street over Metro North Railroad (Harrison Line)</project_name><description>Rehabilitation of East 180th Street Bridge over Metro North Railroad, the Bronx</description><category>Bridges</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction Procurement</current_phase><design_start>2017-02-06T00:00:00</design_start><budget_forecast>37849378.00</budget_forecast><latest_budget_changes>-1719000.00</latest_budget_changes><total_budget_changes>4194366.00</total_budget_changes><total_schedule_changes>664</total_schedule_changes></row><row _id="row-3pv4_gc6k_netz" _uuid="00000000-0000-0000-D865-13D2A02D8FDC" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-3pv4_gc6k_netz"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>811</pid><project_name>East 180th Street over Metro North Railroad (Harrison Line)</project_name><description>Rehabilitation of East 180th Street Bridge over Metro North Railroad, the Bronx</description><category>Bridges</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction Procurement</current_phase><design_start>2017-02-06T00:00:00</design_start><budget_forecast>39349378.00</budget_forecast><latest_budget_changes>1500000.00</latest_budget_changes><total_budget_changes>4194366.00</total_budget_changes><forecast_completion>2023-10-16T00:00:00</forecast_completion><latest_schedule_changes>387</latest_schedule_changes><total_schedule_changes>664</total_schedule_changes></row><row _id="row-jknh~qa5x~ytuw" _uuid="00000000-0000-0000-F06E-6494F36FB37E" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-jknh~qa5x~ytuw"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>811</pid><project_name>East 180th Street over Metro North Railroad (Harrison Line)</project_name><category>Bridges</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><total_budget_changes>4194366.00</total_budget_changes><total_schedule_changes>664</total_schedule_changes></row><row _id="row-z3vr-qvfy-gnmw" _uuid="00000000-0000-0000-3DBA-B88BFA588816" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-z3vr-qvfy-gnmw"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>811</pid><project_name>East 180th Street over Metro North Railroad (Harrison Line)</project_name><description>Rehabilitation of East 180th Street Bridge over Metro North Railroad, the Bronx</description><category>Bridges</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><design_start>2017-02-06T00:00:00</design_start><budget_forecast>36999378.00</budget_forecast><latest_budget_changes>-2350000.00</latest_budget_changes><total_budget_changes>4194366.00</total_budget_changes><forecast_completion>2023-10-26T00:00:00</forecast_completion><latest_schedule_changes>10</latest_schedule_changes><total_schedule_changes>664</total_schedule_changes></row><row _id="row-d34a~vu5t_jmi8" _uuid="00000000-0000-0000-513D-0172CC0A9EE1" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-d34a~vu5t_jmi8"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>811</pid><project_name>East 180th Street over Metro North Railroad (Harrison Line)</project_name><description>Rehabilitation of East 180th Street Bridge over Metro North Railroad, the Bronx</description><category>Bridges</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><design_start>2017-02-06T00:00:00</design_start><budget_forecast>57535680.00</budget_forecast><latest_budget_changes>20536302.00</latest_budget_changes><total_budget_changes>4194366.00</total_budget_changes><forecast_completion>2023-09-29T00:00:00</forecast_completion><latest_schedule_changes>-27</latest_schedule_changes><total_schedule_changes>664</total_schedule_changes></row><row _id="row-w6s4_6v4m.xr8j" _uuid="00000000-0000-0000-3D67-08681AC1EA3B" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-w6s4_6v4m.xr8j"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>811</pid><project_name>East 180th Street over Metro North Railroad (Harrison Line)</project_name><description>Rehabilitation of East 180th Street Bridge over Metro North Railroad, the Bronx</description><category>Bridges</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><design_start>2017-02-06T00:00:00</design_start><budget_forecast>33425679.00</budget_forecast><latest_budget_changes>-24110001.00</latest_budget_changes><total_budget_changes>4194366.00</total_budget_changes><forecast_completion>2023-09-29T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>664</total_schedule_changes></row><row _id="row-ttbn~2fhg.n5ms" _uuid="00000000-0000-0000-1250-03E176D4DD36" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ttbn~2fhg.n5ms"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>811</pid><project_name>East 180th Street over Metro North Railroad (Harrison Line)</project_name><description>Rehabilitation of East 180th Street Bridge over Metro North Railroad, the Bronx</description><category>Bridges</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><design_start>2017-02-06T00:00:00</design_start><budget_forecast>33959655.00</budget_forecast><latest_budget_changes>533976.00</latest_budget_changes><total_budget_changes>4194366.00</total_budget_changes><forecast_completion>2023-09-29T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>664</total_schedule_changes></row><row _id="row-378z-juti_5jyd" _uuid="00000000-0000-0000-6EEE-57CC48057EA4" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-378z-juti_5jyd"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>811</pid><project_name>East 180th Street over Metro North Railroad (Harrison Line)</project_name><description>Rehabilitation of East 180th Street Bridge over Metro North Railroad, the Bronx</description><category>Bridges</category><borough>Bronx</borough><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><design_start>2017-02-06T00:00:00</design_start><budget_forecast>34233311.00</budget_forecast><latest_budget_changes>273656.00</latest_budget_changes><total_budget_changes>4194366.00</total_budget_changes><forecast_completion>2023-09-29T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>664</total_schedule_changes></row><row _id="row-ktm3-a3ns-6ip3" _uuid="00000000-0000-0000-B865-08EB7DB30C9D" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ktm3-a3ns-6ip3"><date_reported_as_of>2018-03-01T00:00:00</date_reported_as_of><pid>833</pid><project_name>4Th Ave. Safety Improvements Phase II-Vision Zero</project_name><description>The scope includes expanding and raising the existing medians (currently in temporary materials) and includes sidewalk extensions, street trees (where feasible), benches, and wayfinding.</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2016-07-14T00:00:00</design_start><budget_forecast>74377000.00</budget_forecast><total_budget_changes>-11525000.00</total_budget_changes><forecast_completion>2021-06-07T00:00:00</forecast_completion><total_schedule_changes>1106</total_schedule_changes></row><row _id="row-czj4.ytzi_hrxp" _uuid="00000000-0000-0000-FBE6-3DC099662A34" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-czj4.ytzi_hrxp"><date_reported_as_of>2018-08-01T00:00:00</date_reported_as_of><pid>833</pid><project_name>4Th Ave. Safety Improvements Phase II-Vision Zero</project_name><description>The scope includes expanding and raising the existing medians (currently in temporary materials) and includes sidewalk extensions, street trees (where feasible), benches, and wayfinding.</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Construction Procurement</current_phase><design_start>2016-07-14T00:00:00</design_start><budget_forecast>58175000.00</budget_forecast><latest_budget_changes>-16202000.00</latest_budget_changes><total_budget_changes>-11525000.00</total_budget_changes><forecast_completion>2021-07-28T00:00:00</forecast_completion><latest_schedule_changes>51</latest_schedule_changes><total_schedule_changes>1106</total_schedule_changes></row><row _id="row-mtiq_2rpf.3xix" _uuid="00000000-0000-0000-97BA-6BFD0301FF8F" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-mtiq_2rpf.3xix"><date_reported_as_of>2019-01-01T00:00:00</date_reported_as_of><pid>833</pid><project_name>4Th Ave. Safety Improvements Phase II-Vision Zero</project_name><description>The scope includes expanding and raising the existing medians (currently in temporary materials) and includes sidewalk extensions, street trees (where feasible), benches, and wayfinding.</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Construction Procurement</current_phase><design_start>2016-07-14T00:00:00</design_start><budget_forecast>62953000.00</budget_forecast><latest_budget_changes>4778000.00</latest_budget_changes><total_budget_changes>-11525000.00</total_budget_changes><forecast_completion>2021-06-29T00:00:00</forecast_completion><latest_schedule_changes>-29</latest_schedule_changes><total_schedule_changes>1106</total_schedule_changes></row><row _id="row-3zwp-pqxr~fxrq" _uuid="00000000-0000-0000-75F9-9FA534127E3A" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-3zwp-pqxr~fxrq"><date_reported_as_of>2019-05-01T00:00:00</date_reported_as_of><pid>833</pid><project_name>4Th Ave. Safety Improvements Phase II-Vision Zero</project_name><description>4TH AVENUE SAFETY IMPROVEMENTS PHASE II - VISION ZERO GREAT STREETS</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Construction Procurement</current_phase><design_start>2017-06-01T00:00:00</design_start><budget_forecast>58469000.00</budget_forecast><latest_budget_changes>-4484000.00</latest_budget_changes><total_budget_changes>-11525000.00</total_budget_changes><forecast_completion>2021-11-03T00:00:00</forecast_completion><latest_schedule_changes>127</latest_schedule_changes><total_schedule_changes>1106</total_schedule_changes></row><row _id="row-ahfb.d8wj_2wt7" _uuid="00000000-0000-0000-8BE6-5B9244902CCA" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ahfb.d8wj_2wt7"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>833</pid><project_name>4Th Ave. Safety Improvements Phase II-Vision Zero</project_name><description>4TH AVENUE SAFETY IMPROVEMENTS PHASE II - VISION ZERO GREAT STREETS</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Construction Procurement</current_phase><design_start>2017-06-01T00:00:00</design_start><budget_forecast>62844000.00</budget_forecast><latest_budget_changes>4375000.00</latest_budget_changes><total_budget_changes>-11525000.00</total_budget_changes><forecast_completion>2022-04-06T00:00:00</forecast_completion><latest_schedule_changes>154</latest_schedule_changes><total_schedule_changes>1106</total_schedule_changes></row><row _id="row-mrmx~9bv4.qdht" _uuid="00000000-0000-0000-6D6E-63E629FF3249" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-mrmx~9bv4.qdht"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>833</pid><project_name>4Th Ave. Safety Improvements Phase II-Vision Zero</project_name><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><total_budget_changes>-11525000.00</total_budget_changes><total_schedule_changes>1106</total_schedule_changes></row><row _id="row-6h8n-unv5~696u" _uuid="00000000-0000-0000-D28B-7223E83A6E57" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-6h8n-unv5~696u"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>833</pid><project_name>4Th Ave. Safety Improvements Phase II-Vision Zero</project_name><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><total_budget_changes>-11525000.00</total_budget_changes><total_schedule_changes>1106</total_schedule_changes></row><row _id="row-qnif.324u.8e2h" _uuid="00000000-0000-0000-5287-CC19A6BAC91A" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-qnif.324u.8e2h"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>833</pid><project_name>4Th Ave. Safety Improvements Phase II-Vision Zero</project_name><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><total_budget_changes>-11525000.00</total_budget_changes><total_schedule_changes>1106</total_schedule_changes></row><row _id="row-fmtc.9g8c.ara7" _uuid="00000000-0000-0000-B861-BCDDA7174002" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-fmtc.9g8c.ara7"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>833</pid><project_name>4Th Ave. Safety Improvements Phase II-Vision Zero</project_name><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><total_budget_changes>-11525000.00</total_budget_changes><total_schedule_changes>1106</total_schedule_changes></row><row _id="row-2gwy-afir-jix2" _uuid="00000000-0000-0000-3C5D-5D7C92B327D4" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-2gwy-afir-jix2"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>833</pid><project_name>4Th Ave. Safety Improvements Phase II-Vision Zero</project_name><description>4TH AVENUE SAFETY IMPROVEMENTS PHASE II - VISION ZERO GREAT STREETS</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Construction</current_phase><design_start>2017-06-01T00:00:00</design_start><budget_forecast>61857000.00</budget_forecast><latest_budget_changes>-987000.00</latest_budget_changes><total_budget_changes>-11525000.00</total_budget_changes><forecast_completion>2024-06-17T00:00:00</forecast_completion><latest_schedule_changes>803</latest_schedule_changes><total_schedule_changes>1106</total_schedule_changes></row><row _id="row-smxj_2v9j_qw2c" _uuid="00000000-0000-0000-6368-A662854737CD" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-smxj_2v9j_qw2c"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>833</pid><project_name>4Th Ave. Safety Improvements Phase II-Vision Zero</project_name><description>4TH AVENUE SAFETY IMPROVEMENTS PHASE II - VISION ZERO GREAT STREETS</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Construction</current_phase><design_start>2017-06-01T00:00:00</design_start><budget_forecast>61857000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-11525000.00</total_budget_changes><forecast_completion>2024-06-17T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1106</total_schedule_changes></row><row _id="row-bym7.2ykp-w8p9" _uuid="00000000-0000-0000-5C7E-4CE3E2912839" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-bym7.2ykp-w8p9"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>833</pid><project_name>4Th Ave. Safety Improvements Phase II-Vision Zero</project_name><description>4TH AVENUE SAFETY IMPROVEMENTS PHASE II - VISION ZERO GREAT STREETS</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Construction</current_phase><design_start>2017-06-01T00:00:00</design_start><budget_forecast>62857000.00</budget_forecast><latest_budget_changes>1000000.00</latest_budget_changes><total_budget_changes>-11525000.00</total_budget_changes><forecast_completion>2024-06-17T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1106</total_schedule_changes></row><row _id="row-fqg5.gp6g~2gjn" _uuid="00000000-0000-0000-35B4-068FD6ADA2F4" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-fqg5.gp6g~2gjn"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>833</pid><project_name>4Th Ave. Safety Improvements Phase II-Vision Zero</project_name><description>4TH AVENUE SAFETY IMPROVEMENTS PHASE II - VISION ZERO GREAT STREETS</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Construction</current_phase><design_start>2017-06-01T00:00:00</design_start><budget_forecast>62852000.00</budget_forecast><latest_budget_changes>-5000.00</latest_budget_changes><total_budget_changes>-11525000.00</total_budget_changes><forecast_completion>2024-06-17T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1106</total_schedule_changes></row><row _id="row-pqmw_wqw9~di4h" _uuid="00000000-0000-0000-4C4F-951932C2DB61" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-pqmw_wqw9~di4h"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>833</pid><project_name>4Th Ave. Safety Improvements Phase II-Vision Zero</project_name><description>4TH AVENUE SAFETY IMPROVEMENTS PHASE II - VISION ZERO GREAT STREETS</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Construction</current_phase><design_start>2017-06-01T00:00:00</design_start><budget_forecast>62852000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-11525000.00</total_budget_changes><forecast_completion>2024-06-17T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1106</total_schedule_changes></row><row _id="row-f2uc-xqc5-tkya" _uuid="00000000-0000-0000-5F92-DE867D3A1120" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-f2uc-xqc5-tkya"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>834</pid><project_name>Reconstruction of the Ashokan Headworks</project_name><description>CAT-213FAC Reconstruction of the Ashokan Reservoir Headworks.  This Contract is for design services.  The Headworks include the Upper and Lower Gate Chambers, the Screen Chamber and inter-connecting aquedcuts.</description><category>Water Supply</category><borough>Upstate</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2020-09-15T00:00:00</design_start><budget_forecast>320674983.75</budget_forecast><latest_budget_changes>19321977.00</latest_budget_changes><total_budget_changes>41950858.00</total_budget_changes><forecast_completion>2029-01-22T00:00:00</forecast_completion><latest_schedule_changes>76</latest_schedule_changes><total_schedule_changes>-67</total_schedule_changes></row><row _id="row-5v89-c2yr_yd5f" _uuid="00000000-0000-0000-5F9D-F32F24E249E7" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-5v89-c2yr_yd5f"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>834</pid><project_name>Reconstruction of the Ashokan Headworks</project_name><description>CAT-213FAC Reconstruction of the Ashokan Reservoir Headworks.  This Contract is for design services.  The Headworks include the Upper and Lower Gate Chambers, the Screen Chamber and inter-connecting aquedcuts.</description><category>Water Supply</category><borough>Upstate</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2020-09-15T00:00:00</design_start><budget_forecast>311610618.75</budget_forecast><latest_budget_changes>-9064365.00</latest_budget_changes><total_budget_changes>41950858.00</total_budget_changes><forecast_completion>2031-12-21T00:00:00</forecast_completion><latest_schedule_changes>1063</latest_schedule_changes><total_schedule_changes>-67</total_schedule_changes></row><row _id="row-6byz_sxgw~wf7r" _uuid="00000000-0000-0000-13DB-E8E0EEA48487" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-6byz_sxgw~wf7r"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>834</pid><project_name>Reconstruction of the Ashokan Headworks</project_name><description>CAT-213FAC Reconstruction of the Ashokan Reservoir Headworks.  This Contract is for design services.  The Headworks include the Upper and Lower Gate Chambers, the Screen Chamber and inter-connecting aquedcuts.</description><category>Water Supply</category><borough>Upstate</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2020-09-15T00:00:00</design_start><budget_forecast>319234719.75</budget_forecast><latest_budget_changes>7624101.00</latest_budget_changes><total_budget_changes>41950858.00</total_budget_changes><forecast_completion>2031-12-21T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>-67</total_schedule_changes></row><row _id="row-rz4q~wjvm.4ag5" _uuid="00000000-0000-0000-A230-43E1708D238E" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-rz4q~wjvm.4ag5"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>834</pid><project_name>Reconstruction of the Ashokan Headworks</project_name><description>CAT-213</description><category>Water Supply</category><borough>Upstate</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2020-09-15T00:00:00</design_start><budget_forecast>319234719.75</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>41950858.00</total_budget_changes><forecast_completion>2027-10-24T00:00:00</forecast_completion><latest_schedule_changes>-1519</latest_schedule_changes><total_schedule_changes>-67</total_schedule_changes></row><row _id="row-hrmz.a868~3r7t" _uuid="00000000-0000-0000-1244-88CB014EA5A2" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-hrmz.a868~3r7t"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>834</pid><project_name>Reconstruction of the Ashokan Headworks</project_name><description>CAT-213</description><category>Water Supply</category><borough>Upstate</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2020-08-07T00:00:00</design_start><budget_forecast>333066831.75</budget_forecast><latest_budget_changes>13832112.00</latest_budget_changes><total_budget_changes>41950858.00</total_budget_changes><forecast_completion>2027-11-04T00:00:00</forecast_completion><latest_schedule_changes>11</latest_schedule_changes><total_schedule_changes>-67</total_schedule_changes></row><row _id="row-9e7u.7ruj_jyqk" _uuid="00000000-0000-0000-3722-81429A527B8D" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-9e7u.7ruj_jyqk"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>834</pid><project_name>Reconstruction of the Ashokan Headworks</project_name><description>CAT-213</description><category>Water Supply</category><borough>Upstate</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2020-08-07T00:00:00</design_start><budget_forecast>316432595.75</budget_forecast><latest_budget_changes>-16634236.00</latest_budget_changes><total_budget_changes>41950858.00</total_budget_changes><forecast_completion>2028-04-16T00:00:00</forecast_completion><latest_schedule_changes>164</latest_schedule_changes><total_schedule_changes>-67</total_schedule_changes></row><row _id="row-h4qc_4c6w~6dx4" _uuid="00000000-0000-0000-4F4F-5D97B2D17433" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-h4qc_4c6w~6dx4"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>834</pid><project_name>Reconstruction of the Ashokan Headworks</project_name><description>CAT-213</description><category>Water Supply</category><borough>Upstate</borough><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2020-08-07T00:00:00</design_start><budget_forecast>343303864.75</budget_forecast><latest_budget_changes>26871269.00</latest_budget_changes><total_budget_changes>41950858.00</total_budget_changes><forecast_completion>2028-09-01T00:00:00</forecast_completion><latest_schedule_changes>138</latest_schedule_changes><total_schedule_changes>-67</total_schedule_changes></row><row _id="row-wfvu-55sc.m97i" _uuid="00000000-0000-0000-242A-BF896E2163CB" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-wfvu-55sc.m97i"><date_reported_as_of>2019-01-01T00:00:00</date_reported_as_of><pid>837</pid><project_name>Supreme Courthouse Fire Alarm/ Protection Upgrade</project_name><description>Fire Alarm Upgrade and Sprinkler Installation at 851 Grand Concourse, Bronx Supreme Court.</description><category>Public Safety and Criminal Justice</category><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><current_phase>Design</current_phase><design_start>2018-07-11T00:00:00</design_start><budget_forecast>43180390.00</budget_forecast><total_budget_changes>37248610.00</total_budget_changes><forecast_completion>2023-10-06T00:00:00</forecast_completion><total_schedule_changes>1319</total_schedule_changes></row><row _id="row-2ftr-jq4a-d8f2" _uuid="00000000-0000-0000-5374-0DB65940E8B1" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-2ftr-jq4a-d8f2"><date_reported_as_of>2019-05-01T00:00:00</date_reported_as_of><pid>837</pid><project_name>Supreme Courthouse Fire Alarm/ Protection Upgrade</project_name><description>Bronx Supreme Court, Fire Alarm, Sprinkler, 851 Grand Concourse - Replace the existing fire alarm system and install a new sprinkler system.</description><category>Public Safety and Criminal Justice</category><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><current_phase>Design</current_phase><design_start>2018-07-11T00:00:00</design_start><budget_forecast>55200000.00</budget_forecast><latest_budget_changes>12019610.00</latest_budget_changes><total_budget_changes>37248610.00</total_budget_changes><forecast_completion>2024-01-09T00:00:00</forecast_completion><latest_schedule_changes>95</latest_schedule_changes><total_schedule_changes>1319</total_schedule_changes></row><row _id="row-97pi~kha8.79g4" _uuid="00000000-0000-0000-BC76-86E52D4DF27A" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-97pi~kha8.79g4"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>837</pid><project_name>Supreme Courthouse Fire Alarm/ Protection Upgrade</project_name><description>Bronx Supreme Court, Fire Alarm, Sprinkler, 851 Grand Concourse - Replace the existing fire alarm system and install a new sprinkler system.</description><category>Public Safety and Criminal Justice</category><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><current_phase>Design</current_phase><design_start>2018-07-11T00:00:00</design_start><budget_forecast>55200000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>37248610.00</total_budget_changes><forecast_completion>2024-01-09T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1319</total_schedule_changes></row><row _id="row-9gtt_cx9g~db2i" _uuid="00000000-0000-0000-823D-D60F231D836F" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-9gtt_cx9g~db2i"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>837</pid><project_name>Supreme Courthouse Fire Alarm/ Protection Upgrade</project_name><category>Public Safety and Criminal Justice</category><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><total_budget_changes>37248610.00</total_budget_changes><total_schedule_changes>1319</total_schedule_changes></row><row _id="row-gsp2_62e7~w6is" _uuid="00000000-0000-0000-B8F8-F96D2E76DCCB" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-gsp2_62e7~w6is"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>837</pid><project_name>Supreme Courthouse Fire Alarm/ Protection Upgrade</project_name><category>Public Safety and Criminal Justice</category><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><total_budget_changes>37248610.00</total_budget_changes><total_schedule_changes>1319</total_schedule_changes></row><row _id="row-7kmw~5twp~zwfk" _uuid="00000000-0000-0000-B84D-9B0326AEF367" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-7kmw~5twp~zwfk"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>837</pid><project_name>Supreme Courthouse Fire Alarm/ Protection Upgrade</project_name><category>Public Safety and Criminal Justice</category><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><total_budget_changes>37248610.00</total_budget_changes><total_schedule_changes>1319</total_schedule_changes></row><row _id="row-yt3b-9qi3~4krw" _uuid="00000000-0000-0000-C25B-CDFC95514CBE" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-yt3b-9qi3~4krw"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>837</pid><project_name>Supreme Courthouse Fire Alarm/ Protection Upgrade</project_name><category>Public Safety and Criminal Justice</category><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><total_budget_changes>37248610.00</total_budget_changes><total_schedule_changes>1319</total_schedule_changes></row><row _id="row-sgxv_7pqh.vniz" _uuid="00000000-0000-0000-BE40-E1F2ECCCCB9D" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-sgxv_7pqh.vniz"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>837</pid><project_name>Supreme Courthouse Fire Alarm/ Protection Upgrade</project_name><description>Bronx Supreme Court, Fire Alarm, Sprinkler, 851 Grand Concourse - Replace the existing fire alarm system and install a new sprinkler system.</description><category>Public Safety and Criminal Justice</category><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><current_phase>Design</current_phase><design_start>2018-07-11T00:00:00</design_start><budget_forecast>80716000.00</budget_forecast><latest_budget_changes>25516000.00</latest_budget_changes><total_budget_changes>37248610.00</total_budget_changes><forecast_completion>2026-05-01T00:00:00</forecast_completion><latest_schedule_changes>843</latest_schedule_changes><total_schedule_changes>1319</total_schedule_changes></row><row _id="row-p9ws.2cbn~2pek" _uuid="00000000-0000-0000-BA1A-F5D251CE0099" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-p9ws.2cbn~2pek"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>837</pid><project_name>Supreme Courthouse Fire Alarm/ Protection Upgrade</project_name><description>Bronx Supreme Court, Fire Alarm, Sprinkler, 851 Grand Concourse - Replace the existing fire alarm system and install a new sprinkler system.</description><category>Public Safety and Criminal Justice</category><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><current_phase>Design</current_phase><design_start>2018-07-11T00:00:00</design_start><budget_forecast>80716000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>37248610.00</total_budget_changes><forecast_completion>2026-09-16T00:00:00</forecast_completion><latest_schedule_changes>138</latest_schedule_changes><total_schedule_changes>1319</total_schedule_changes></row><row _id="row-dnym.ym5n-naw8" _uuid="00000000-0000-0000-4133-F274B4A0ECFC" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-dnym.ym5n-naw8"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>837</pid><project_name>Supreme Courthouse Fire Alarm/ Protection Upgrade</project_name><description>Bronx Supreme Court, Fire Alarm, Sprinkler, 851 Grand Concourse - Replace the existing fire alarm system and install a new sprinkler system.</description><category>Public Safety and Criminal Justice</category><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><current_phase>Design</current_phase><design_start>2018-07-11T00:00:00</design_start><budget_forecast>80366000.00</budget_forecast><latest_budget_changes>-350000.00</latest_budget_changes><total_budget_changes>37248610.00</total_budget_changes><forecast_completion>2027-01-15T00:00:00</forecast_completion><latest_schedule_changes>121</latest_schedule_changes><total_schedule_changes>1319</total_schedule_changes></row><row _id="row-tyiz-6tvv.9gik" _uuid="00000000-0000-0000-8030-4F9917742A50" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-tyiz-6tvv.9gik"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>837</pid><project_name>Supreme Courthouse Fire Alarm/ Protection Upgrade</project_name><description>Bronx Supreme Court, Fire Alarm, Sprinkler, 851 Grand Concourse - Replace the existing fire alarm system and install a new sprinkler system.</description><category>Public Safety and Criminal Justice</category><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><current_phase>Design</current_phase><design_start>2018-07-11T00:00:00</design_start><budget_forecast>80429000.00</budget_forecast><latest_budget_changes>63000.00</latest_budget_changes><total_budget_changes>37248610.00</total_budget_changes><forecast_completion>2027-05-17T00:00:00</forecast_completion><latest_schedule_changes>122</latest_schedule_changes><total_schedule_changes>1319</total_schedule_changes></row><row _id="row-3w99.dfv3.9ez9" _uuid="00000000-0000-0000-FB4B-A6494D7D5270" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-3w99.dfv3.9ez9"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>837</pid><project_name>Supreme Courthouse Fire Alarm/ Protection Upgrade</project_name><description>Bronx Supreme Court, Fire Alarm, Sprinkler, 851 Grand Concourse - Replace the existing fire alarm system and install a new sprinkler system.</description><category>Public Safety and Criminal Justice</category><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><current_phase>Design</current_phase><design_start>2018-07-11T00:00:00</design_start><budget_forecast>80429000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>37248610.00</total_budget_changes><forecast_completion>2027-05-17T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1319</total_schedule_changes></row><row _id="row-gws4~hbm4_b333" _uuid="00000000-0000-0000-F0C7-2DB3C0939D98" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-gws4~hbm4_b333"><date_reported_as_of>2019-05-01T00:00:00</date_reported_as_of><pid>840</pid><project_name>Asphalt Plant, 30-01 Harper St, Queens Demo/Cons</project_name><description>Demolition and rebuild of the existing structures housing the equipment and related facilities necessary for the production, storage and distribution of asphalt at the NYC Harper Street Asphalt Plant facility. All of the existing equipment, storage facilities, and related buildings will be replaced with a new state of the art plant. In addition, the work will involve installing sanitary and storm drainage systems to comply with current government regulatory standard</description><category>Industrial Development</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2019-04-03T00:00:00</design_start><budget_forecast>41777000.00</budget_forecast><latest_budget_changes>1063745.00</latest_budget_changes><total_budget_changes>55883745.00</total_budget_changes><forecast_completion>2023-12-04T00:00:00</forecast_completion><latest_schedule_changes>175</latest_schedule_changes><total_schedule_changes>1211</total_schedule_changes></row><row _id="row-enga_zhm8_4i48" _uuid="00000000-0000-0000-7E98-482A7605C905" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-enga_zhm8_4i48"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>840</pid><project_name>Asphalt Plant, 30-01 Harper St, Queens Demo/Cons</project_name><description>Demolition and rebuild of the existing structures housing the equipment and related facilities necessary for the production, storage and distribution of asphalt at the NYC Harper Street Asphalt Plant facility. All of the existing equipment, storage facilities, and related buildings will be replaced with a new state of the art plant. In addition, the work will involve installing sanitary and storm drainage systems to comply with current government regulatory standard</description><category>Industrial Development</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2019-04-03T00:00:00</design_start><budget_forecast>41777000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>55883745.00</total_budget_changes><forecast_completion>2024-02-04T00:00:00</forecast_completion><latest_schedule_changes>62</latest_schedule_changes><total_schedule_changes>1211</total_schedule_changes></row><row _id="row-ykiy~25a4~c7kv" _uuid="00000000-0000-0000-B9EE-7070FE04D315" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ykiy~25a4~c7kv"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>840</pid><project_name>Asphalt Plant, 30-01 Harper St, Queens Demo/Cons</project_name><category>Industrial Development</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><total_budget_changes>55883745.00</total_budget_changes><total_schedule_changes>1211</total_schedule_changes></row><row _id="row-ua5w.wd25.cge3" _uuid="00000000-0000-0000-6F74-385C502F36E8" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ua5w.wd25.cge3"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>840</pid><project_name>Asphalt Plant, 30-01 Harper St, Queens Demo/Cons</project_name><category>Industrial Development</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><total_budget_changes>55883745.00</total_budget_changes><total_schedule_changes>1211</total_schedule_changes></row><row _id="row-us7w-hxh2.i72w" _uuid="00000000-0000-0000-6573-570C25A94549" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-us7w-hxh2.i72w"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>840</pid><project_name>Asphalt Plant, 30-01 Harper St, Queens Demo/Cons</project_name><category>Industrial Development</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><total_budget_changes>55883745.00</total_budget_changes><total_schedule_changes>1211</total_schedule_changes></row><row _id="row-bbpr_2fpm.9t3m" _uuid="00000000-0000-0000-6A3D-035CFB7704A6" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-bbpr_2fpm.9t3m"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>840</pid><project_name>Asphalt Plant, 30-01 Harper St, Queens Demo/Cons</project_name><category>Industrial Development</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><total_budget_changes>55883745.00</total_budget_changes><total_schedule_changes>1211</total_schedule_changes></row><row _id="row-7qru.r2aa~2ghn" _uuid="00000000-0000-0000-35AC-00ED079DE7DB" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-7qru.r2aa~2ghn"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1218</pid><project_name>Fort Greene Park Entrances, Paths, Plaza and Drainage Infrastructure Reconstruction</project_name><description>This project will reconstruct the entrances, paths, plaza and drainage infrastructure at Fort Greene Park.</description><category>Parks</category><managing_agency>DPR</managing_agency><client_agency>DPR</client_agency><current_phase>Design</current_phase><design_start>2021-02-22T00:00:00</design_start><budget_forecast>29284800.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2026-01-14T00:00:00</forecast_completion><latest_schedule_changes>249</latest_schedule_changes><total_schedule_changes>417</total_schedule_changes></row><row _id="row-jnwb-uazc_niri" _uuid="00000000-0000-0000-4D25-65A566F258AC" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-jnwb-uazc_niri"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>840</pid><project_name>Asphalt Plant, 30-01 Harper St, Queens Demo/Cons</project_name><description>Demolition and rebuild of the existing structures housing the equipment and related facilities necessary for the production, storage and distribution of asphalt at the NYC Harper Street Asphalt Plant facility. All of the existing equipment, storage facilities, and related buildings will be replaced with a new state of the art plant. In addition, the work will involve installing sanitary and storm drainage systems to comply with current government regulatory standard</description><category>Industrial Development</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2019-04-03T00:00:00</design_start><budget_forecast>59313000.00</budget_forecast><latest_budget_changes>17536000.00</latest_budget_changes><total_budget_changes>55883745.00</total_budget_changes><forecast_completion>2025-04-16T00:00:00</forecast_completion><latest_schedule_changes>437</latest_schedule_changes><total_schedule_changes>1211</total_schedule_changes></row><row _id="row-6fz4.cvr7_vsrz" _uuid="00000000-0000-0000-3904-C5BCE0066F11" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-6fz4.cvr7_vsrz"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>840</pid><project_name>Asphalt Plant, 30-01 Harper St, Queens Demo/Cons</project_name><description>Demolition and rebuild of the existing structures housing the equipment and related facilities necessary for the production, storage and distribution of asphalt at the NYC Harper Street Asphalt Plant facility. All of the existing equipment, storage facilities, and related buildings will be replaced with a new state of the art plant. In addition, the work will involve installing sanitary and storm drainage systems to comply with current government regulatory standard</description><category>Industrial Development</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2019-04-03T00:00:00</design_start><budget_forecast>59703000.00</budget_forecast><latest_budget_changes>390000.00</latest_budget_changes><total_budget_changes>55883745.00</total_budget_changes><forecast_completion>2025-07-12T00:00:00</forecast_completion><latest_schedule_changes>87</latest_schedule_changes><total_schedule_changes>1211</total_schedule_changes></row><row _id="row-qm5d.gsej~wgj8" _uuid="00000000-0000-0000-470D-098277770CC3" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-qm5d.gsej~wgj8"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>840</pid><project_name>Asphalt Plant, 30-01 Harper St, Queens Demo/Cons</project_name><description>Demolition and rebuild of the existing structures housing the equipment and related facilities necessary for the production, storage and distribution of asphalt at the NYC Harper Street Asphalt Plant facility. All of the existing equipment, storage facilities, and related buildings will be replaced with a new state of the art plant. In addition, the work will involve installing sanitary and storm drainage systems to comply with current government regulatory standard</description><category>Industrial Development</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2019-04-03T00:00:00</design_start><budget_forecast>59853000.00</budget_forecast><latest_budget_changes>150000.00</latest_budget_changes><total_budget_changes>55883745.00</total_budget_changes><forecast_completion>2025-07-12T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1211</total_schedule_changes></row><row _id="row-3acm-73s5.vzsc" _uuid="00000000-0000-0000-989C-495D8F769F57" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-3acm-73s5.vzsc"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>840</pid><project_name>Asphalt Plant, 30-01 Harper St, Queens Demo/Cons</project_name><description>Demolition and rebuild of the existing structures housing the equipment and related facilities necessary for the production, storage and distribution of asphalt at the NYC Harper Street Asphalt Plant facility. All of the existing equipment, storage facilities, and related buildings will be replaced with a new state of the art plant. In addition, the work will involve installing sanitary and storm drainage systems to comply with current government regulatory standard</description><category>Industrial Development</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2019-04-03T00:00:00</design_start><budget_forecast>60537000.00</budget_forecast><latest_budget_changes>684000.00</latest_budget_changes><total_budget_changes>55883745.00</total_budget_changes><forecast_completion>2026-06-16T00:00:00</forecast_completion><latest_schedule_changes>339</latest_schedule_changes><total_schedule_changes>1211</total_schedule_changes></row><row _id="row-8yvm_xzvd.6wdx" _uuid="00000000-0000-0000-9831-A5F93DC95E2F" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-8yvm_xzvd.6wdx"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>840</pid><project_name>Asphalt Plant, 30-01 Harper St, Queens Demo/Cons</project_name><description>Demolition and rebuild of the existing structures housing the equipment and related facilities necessary for the production, storage and distribution of asphalt at the NYC Harper Street Asphalt Plant facility. All of the existing equipment, storage facilities, and related buildings will be replaced with a new state of the art plant. In addition, the work will involve installing sanitary and storm drainage systems to comply with current government regulatory standard</description><category>Industrial Development</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2019-04-03T00:00:00</design_start><budget_forecast>96597000.00</budget_forecast><latest_budget_changes>36060000.00</latest_budget_changes><total_budget_changes>55883745.00</total_budget_changes><forecast_completion>2026-10-05T00:00:00</forecast_completion><latest_schedule_changes>111</latest_schedule_changes><total_schedule_changes>1211</total_schedule_changes></row><row _id="row-b2bj_iin5_egjc" _uuid="00000000-0000-0000-7665-8E1DA5EAF4B1" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-b2bj_iin5_egjc"><date_reported_as_of>2019-01-01T00:00:00</date_reported_as_of><pid>841</pid><project_name>NEW UTRECH LIBRARY MAJOR RENOVATIONS</project_name><description>Comprehensive interior and exterior renovation, which includes HVAC, BMS, FA, roof and envelope.</description><category>Libraries</category><managing_agency>DDC</managing_agency><client_agency>Libraries-BPL</client_agency><current_phase>Design</current_phase><design_start>2018-06-27T00:00:00</design_start><budget_forecast>26368000.00</budget_forecast><total_budget_changes>290000.00</total_budget_changes><forecast_completion>2024-08-31T00:00:00</forecast_completion><total_schedule_changes>1188</total_schedule_changes></row><row _id="row-xxhn-anvr~44au" _uuid="00000000-0000-0000-9A34-90C492191FC8" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-xxhn-anvr~44au"><date_reported_as_of>2019-05-01T00:00:00</date_reported_as_of><pid>841</pid><project_name>NEW UTRECH LIBRARY MAJOR RENOVATIONS</project_name><description>New Utrech branch library is a comprehensive interior and exterior renovation which includes new fire alarm/ BMS, new interior layout, new HVAC, new roof, exterior rehabilitation and landscape.</description><category>Libraries</category><managing_agency>DDC</managing_agency><client_agency>Libraries-BPL</client_agency><current_phase>Design</current_phase><design_start>2018-06-27T00:00:00</design_start><budget_forecast>26368000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>290000.00</total_budget_changes><forecast_completion>2024-06-18T00:00:00</forecast_completion><latest_schedule_changes>-74</latest_schedule_changes><total_schedule_changes>1188</total_schedule_changes></row><row _id="row-rh62~f9fu-sk2g" _uuid="00000000-0000-0000-A1C0-2FC8820ED739" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-rh62~f9fu-sk2g"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>841</pid><project_name>NEW UTRECH LIBRARY MAJOR RENOVATIONS</project_name><description>New Utrech branch library is a comprehensive interior and exterior renovation which includes new fire alarm/ BMS, new interior layout, new HVAC, new roof, exterior rehabilitation and landscape.</description><category>Libraries</category><managing_agency>DDC</managing_agency><client_agency>Libraries-BPL</client_agency><current_phase>Design</current_phase><design_start>2018-06-27T00:00:00</design_start><budget_forecast>26368000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>290000.00</total_budget_changes><forecast_completion>2024-09-16T00:00:00</forecast_completion><latest_schedule_changes>90</latest_schedule_changes><total_schedule_changes>1188</total_schedule_changes></row><row _id="row-urun~5zwa.cv9x" _uuid="00000000-0000-0000-8746-69C926028180" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-urun~5zwa.cv9x"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>841</pid><project_name>NEW UTRECH LIBRARY MAJOR RENOVATIONS</project_name><category>Libraries</category><managing_agency>DDC</managing_agency><client_agency>Libraries-BPL</client_agency><total_budget_changes>290000.00</total_budget_changes><total_schedule_changes>1188</total_schedule_changes></row><row _id="row-zx9j-7654-g6gq" _uuid="00000000-0000-0000-019A-FEB6AB836F25" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-zx9j-7654-g6gq"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>841</pid><project_name>NEW UTRECH LIBRARY MAJOR RENOVATIONS</project_name><category>Libraries</category><managing_agency>DDC</managing_agency><client_agency>Libraries-BPL</client_agency><total_budget_changes>290000.00</total_budget_changes><total_schedule_changes>1188</total_schedule_changes></row><row _id="row-46ns~ibtd~t8s9" _uuid="00000000-0000-0000-90E7-FFF4BE791DF0" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-46ns~ibtd~t8s9"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>841</pid><project_name>NEW UTRECH LIBRARY MAJOR RENOVATIONS</project_name><category>Libraries</category><managing_agency>DDC</managing_agency><client_agency>Libraries-BPL</client_agency><total_budget_changes>290000.00</total_budget_changes><total_schedule_changes>1188</total_schedule_changes></row><row _id="row-86kn-tg98_gfai" _uuid="00000000-0000-0000-AAF5-4C7C9B9E3FE8" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-86kn-tg98_gfai"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>841</pid><project_name>NEW UTRECH LIBRARY MAJOR RENOVATIONS</project_name><category>Libraries</category><managing_agency>DDC</managing_agency><client_agency>Libraries-BPL</client_agency><total_budget_changes>290000.00</total_budget_changes><total_schedule_changes>1188</total_schedule_changes></row><row _id="row-my3u~qkcw-dpc6" _uuid="00000000-0000-0000-6698-657ABD0F2B94" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-my3u~qkcw-dpc6"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>841</pid><project_name>NEW UTRECH LIBRARY MAJOR RENOVATIONS</project_name><description>New Utrech branch library is a comprehensive interior and exterior renovation which includes new fire alarm/ BMS, new interior layout, new HVAC, new roof, exterior rehabilitation and landscape.</description><category>Libraries</category><managing_agency>DDC</managing_agency><client_agency>Libraries-BPL</client_agency><current_phase>Design</current_phase><design_start>2018-06-27T00:00:00</design_start><budget_forecast>26658000.00</budget_forecast><latest_budget_changes>290000.00</latest_budget_changes><total_budget_changes>290000.00</total_budget_changes><forecast_completion>2026-11-27T00:00:00</forecast_completion><latest_schedule_changes>802</latest_schedule_changes><total_schedule_changes>1188</total_schedule_changes></row><row _id="row-3t2m-34ut-4qt5" _uuid="00000000-0000-0000-2FFB-9BED7BE05662" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-3t2m-34ut-4qt5"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>841</pid><project_name>NEW UTRECH LIBRARY MAJOR RENOVATIONS</project_name><description>New Utrech branch library is a comprehensive interior and exterior renovation which includes new fire alarm/ BMS, new interior layout, new HVAC, new roof, exterior rehabilitation and landscape.</description><category>Libraries</category><managing_agency>DDC</managing_agency><client_agency>Libraries-BPL</client_agency><current_phase>Design</current_phase><design_start>2018-06-27T00:00:00</design_start><budget_forecast>26658000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>290000.00</total_budget_changes><forecast_completion>2026-11-27T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1188</total_schedule_changes></row><row _id="row-r9se_bcwr~ikwy" _uuid="00000000-0000-0000-F6B4-A5E67B2F42AE" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-r9se_bcwr~ikwy"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>841</pid><project_name>NEW UTRECH LIBRARY MAJOR RENOVATIONS</project_name><description>New Utrech branch library is a comprehensive interior and exterior renovation which includes new fire alarm/ BMS, new interior layout, new HVAC, new roof, exterior rehabilitation and landscape.</description><category>Libraries</category><managing_agency>DDC</managing_agency><client_agency>Libraries-BPL</client_agency><current_phase>Design</current_phase><design_start>2018-06-27T00:00:00</design_start><budget_forecast>26658000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>290000.00</total_budget_changes><forecast_completion>2026-11-27T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1188</total_schedule_changes></row><row _id="row-k3ck_fdg2.6bgx" _uuid="00000000-0000-0000-F8EB-AB0C2F3698E3" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-k3ck_fdg2.6bgx"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>841</pid><project_name>NEW UTRECH LIBRARY MAJOR RENOVATIONS</project_name><description>New Utrech branch library is a comprehensive interior and exterior renovation which includes new fire alarm/ BMS, new interior layout, new HVAC, new roof, exterior rehabilitation and landscape.</description><category>Libraries</category><managing_agency>DDC</managing_agency><client_agency>Libraries-BPL</client_agency><current_phase>Design</current_phase><design_start>2018-06-27T00:00:00</design_start><budget_forecast>26658000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>290000.00</total_budget_changes><forecast_completion>2027-12-02T00:00:00</forecast_completion><latest_schedule_changes>370</latest_schedule_changes><total_schedule_changes>1188</total_schedule_changes></row><row _id="row-s9gw_9ien_rvhb" _uuid="00000000-0000-0000-7BCA-77FF02ED7AC9" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-s9gw_9ien_rvhb"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>841</pid><project_name>NEW UTRECH LIBRARY MAJOR RENOVATIONS</project_name><description>New Utrech branch library is a comprehensive interior and exterior renovation which includes new fire alarm/ BMS, new interior layout, new HVAC, new roof, exterior rehabilitation and landscape.</description><category>Libraries</category><managing_agency>DDC</managing_agency><client_agency>Libraries-BPL</client_agency><current_phase>Design</current_phase><design_start>2018-06-27T00:00:00</design_start><budget_forecast>26658000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>290000.00</total_budget_changes><forecast_completion>2027-12-02T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1188</total_schedule_changes></row><row _id="row-muzv.ahui.xj4z" _uuid="00000000-0000-0000-F694-3F0E596BFAF2" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-muzv.ahui.xj4z"><date_reported_as_of>2018-08-01T00:00:00</date_reported_as_of><pid>843</pid><project_name>SOUTH BROOKLYN CROSSTOWN SBS</project_name><description>Southern Brooklyn Crosstown Bus Roue Improvements</description><category>Industrial Development</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2018-07-17T00:00:00</design_start><budget_forecast>81809000.00</budget_forecast><total_budget_changes>29789000.00</total_budget_changes><forecast_completion>2024-08-01T00:00:00</forecast_completion><total_schedule_changes>819</total_schedule_changes></row><row _id="row-tmbn.8n6k-vmqa" _uuid="00000000-0000-0000-D2A5-E446B669397B" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-tmbn.8n6k-vmqa"><date_reported_as_of>2019-01-01T00:00:00</date_reported_as_of><pid>843</pid><project_name>SOUTH BROOKLYN CROSSTOWN SBS</project_name><description>Southern Brooklyn Crosstown Bus Roue Improvements</description><category>Industrial Development</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2018-07-17T00:00:00</design_start><budget_forecast>82809000.00</budget_forecast><latest_budget_changes>1000000.00</latest_budget_changes><total_budget_changes>29789000.00</total_budget_changes><forecast_completion>2025-09-20T00:00:00</forecast_completion><latest_schedule_changes>415</latest_schedule_changes><total_schedule_changes>819</total_schedule_changes></row><row _id="row-3s6p_pcnh.wh4r" _uuid="00000000-0000-0000-35DA-1C130AEE1DA8" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-3s6p_pcnh.wh4r"><date_reported_as_of>2019-05-01T00:00:00</date_reported_as_of><pid>843</pid><project_name>SOUTH BROOKLYN CROSSTOWN SBS</project_name><description>The construction of Southern Brooklyn Crosstown Select Bus Service (SBS)</description><category>Industrial Development</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2018-07-17T00:00:00</design_start><budget_forecast>82909000.00</budget_forecast><latest_budget_changes>100000.00</latest_budget_changes><total_budget_changes>29789000.00</total_budget_changes><forecast_completion>2024-11-13T00:00:00</forecast_completion><latest_schedule_changes>-311</latest_schedule_changes><total_schedule_changes>819</total_schedule_changes></row><row _id="row-4ams_jija_vgf9" _uuid="00000000-0000-0000-4DAB-C60DCF17843C" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-4ams_jija_vgf9"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>843</pid><project_name>SOUTH BROOKLYN CROSSTOWN SBS</project_name><description>The construction of Southern Brooklyn Crosstown Select Bus Service (SBS)</description><category>Industrial Development</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2018-07-17T00:00:00</design_start><budget_forecast>82909000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>29789000.00</total_budget_changes><forecast_completion>2024-11-13T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>819</total_schedule_changes></row><row _id="row-6t8g~ftcy-mke4" _uuid="00000000-0000-0000-D969-443E4FB04F02" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-6t8g~ftcy-mke4"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>843</pid><project_name>SOUTH BROOKLYN CROSSTOWN SBS</project_name><category>Industrial Development</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><total_budget_changes>29789000.00</total_budget_changes><total_schedule_changes>819</total_schedule_changes></row><row _id="row-mhuf_ei3v.2x5t" _uuid="00000000-0000-0000-E011-164DC676851D" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-mhuf_ei3v.2x5t"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>843</pid><project_name>SOUTH BROOKLYN CROSSTOWN SBS</project_name><category>Industrial Development</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><total_budget_changes>29789000.00</total_budget_changes><total_schedule_changes>819</total_schedule_changes></row><row _id="row-dhey~3kg8-zej3" _uuid="00000000-0000-0000-5785-2BAE54536FA2" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-dhey~3kg8-zej3"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>843</pid><project_name>SOUTH BROOKLYN CROSSTOWN SBS</project_name><category>Industrial Development</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><total_budget_changes>29789000.00</total_budget_changes><total_schedule_changes>819</total_schedule_changes></row><row _id="row-664z-at8v_g59j" _uuid="00000000-0000-0000-AACB-D90CA5729AB8" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-664z-at8v_g59j"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>843</pid><project_name>SOUTH BROOKLYN CROSSTOWN SBS</project_name><category>Industrial Development</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><total_budget_changes>29789000.00</total_budget_changes><total_schedule_changes>819</total_schedule_changes></row><row _id="row-jead_wc3j~48n8" _uuid="00000000-0000-0000-B7F5-4F4F2F022830" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-jead_wc3j~48n8"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>843</pid><project_name>SOUTH BROOKLYN CROSSTOWN SBS</project_name><description>The construction of Southern Brooklyn Crosstown Select Bus Service (SBS)</description><category>Industrial Development</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2018-07-17T00:00:00</design_start><budget_forecast>85714000.00</budget_forecast><latest_budget_changes>2805000.00</latest_budget_changes><total_budget_changes>29789000.00</total_budget_changes><forecast_completion>2026-03-18T00:00:00</forecast_completion><latest_schedule_changes>490</latest_schedule_changes><total_schedule_changes>819</total_schedule_changes></row><row _id="row-gnzh~wykt-j9ha" _uuid="00000000-0000-0000-FB68-0B25D839E095" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-gnzh~wykt-j9ha"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>843</pid><project_name>SOUTH BROOKLYN CROSSTOWN SBS</project_name><description>The construction of Southern Brooklyn Crosstown Select Bus Service (SBS)</description><category>Industrial Development</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2018-07-17T00:00:00</design_start><budget_forecast>86064000.00</budget_forecast><latest_budget_changes>350000.00</latest_budget_changes><total_budget_changes>29789000.00</total_budget_changes><forecast_completion>2026-03-18T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>819</total_schedule_changes></row><row _id="row-g7w8~ap6a_i697" _uuid="00000000-0000-0000-9524-3E9AD0BE0477" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-g7w8~ap6a_i697"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>843</pid><project_name>SOUTH BROOKLYN CROSSTOWN SBS</project_name><description>The construction of Southern Brooklyn Crosstown Select Bus Service (SBS)</description><category>Industrial Development</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2018-07-17T00:00:00</design_start><budget_forecast>86214000.00</budget_forecast><latest_budget_changes>150000.00</latest_budget_changes><total_budget_changes>29789000.00</total_budget_changes><forecast_completion>2026-08-18T00:00:00</forecast_completion><latest_schedule_changes>153</latest_schedule_changes><total_schedule_changes>819</total_schedule_changes></row><row _id="row-ccyh-8hjp-h96y" _uuid="00000000-0000-0000-7AF0-F91CD6090A81" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ccyh-8hjp-h96y"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>843</pid><project_name>SOUTH BROOKLYN CROSSTOWN SBS</project_name><description>The construction of Southern Brooklyn Crosstown Select Bus Service (SBS)</description><category>Industrial Development</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2018-07-17T00:00:00</design_start><budget_forecast>91085000.00</budget_forecast><latest_budget_changes>4871000.00</latest_budget_changes><total_budget_changes>29789000.00</total_budget_changes><forecast_completion>2026-09-17T00:00:00</forecast_completion><latest_schedule_changes>30</latest_schedule_changes><total_schedule_changes>819</total_schedule_changes></row><row _id="row-fakt-us8h~x2vy" _uuid="00000000-0000-0000-C92B-A9FA04E1E459" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-fakt-us8h~x2vy"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>843</pid><project_name>SOUTH BROOKLYN CROSSTOWN SBS</project_name><description>The construction of Southern Brooklyn Crosstown Select Bus Service (SBS)</description><category>Industrial Development</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Construction Procurement</current_phase><design_start>2018-07-17T00:00:00</design_start><budget_forecast>111598000.00</budget_forecast><latest_budget_changes>20513000.00</latest_budget_changes><total_budget_changes>29789000.00</total_budget_changes><forecast_completion>2026-10-29T00:00:00</forecast_completion><latest_schedule_changes>42</latest_schedule_changes><total_schedule_changes>819</total_schedule_changes></row><row _id="row-53r9_u2e8-fpax" _uuid="00000000-0000-0000-F6C4-62CF7BD4685F" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-53r9_u2e8-fpax"><date_reported_as_of>2019-05-01T00:00:00</date_reported_as_of><pid>845</pid><project_name>RECONST. OF COLUMBIA ST., PH II/BED-768B/SEK002321</project_name><description>Roadway reconstruction including new sewers, water main, street lighting and traffic signals: Columbia Street south of Hamilton Avenue.</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2019-07-01T00:00:00</design_start><budget_forecast>113874000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>6730000.00</total_budget_changes><forecast_completion>2024-07-14T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>972</total_schedule_changes></row><row _id="row-jmk7.tc3e-m4u2" _uuid="00000000-0000-0000-B86D-24440A372F63" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-jmk7.tc3e-m4u2"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>845</pid><project_name>RECONST. OF COLUMBIA ST., PH II/BED-768B/SEK002321</project_name><description>Roadway reconstruction including new sewers, water main, street lighting and traffic signals: Columbia Street south of Hamilton Avenue.</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2019-07-01T00:00:00</design_start><budget_forecast>113874000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>6730000.00</total_budget_changes><forecast_completion>2024-07-14T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>972</total_schedule_changes></row><row _id="row-u7ud-42p5_7dmd" _uuid="00000000-0000-0000-1E9B-EA0D8743F678" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-u7ud-42p5_7dmd"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>845</pid><project_name>RECONST. OF COLUMBIA ST., PH II/BED-768B/SEK002321</project_name><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><total_budget_changes>6730000.00</total_budget_changes><total_schedule_changes>972</total_schedule_changes></row><row _id="row-7z4a-w696.8w2v" _uuid="00000000-0000-0000-43F0-969F02E8EBA6" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-7z4a-w696.8w2v"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>845</pid><project_name>RECONST. OF COLUMBIA ST., PH II/BED-768B/SEK002321</project_name><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><total_budget_changes>6730000.00</total_budget_changes><total_schedule_changes>972</total_schedule_changes></row><row _id="row-u5ff-veui.zhxn" _uuid="00000000-0000-0000-CEE0-1466E913E4BF" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-u5ff-veui.zhxn"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>845</pid><project_name>RECONST. OF COLUMBIA ST., PH II/BED-768B/SEK002321</project_name><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><total_budget_changes>6730000.00</total_budget_changes><total_schedule_changes>972</total_schedule_changes></row><row _id="row-fnyy~iwqj.mgxa" _uuid="00000000-0000-0000-8F51-77601B5DF874" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-fnyy~iwqj.mgxa"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>845</pid><project_name>RECONST. OF COLUMBIA ST., PH II/BED-768B/SEK002321</project_name><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><total_budget_changes>6730000.00</total_budget_changes><total_schedule_changes>972</total_schedule_changes></row><row _id="row-zhpj.i3ir.jzqc" _uuid="00000000-0000-0000-A454-FFD3052CAD6F" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-zhpj.i3ir.jzqc"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>845</pid><project_name>RECONST. OF COLUMBIA ST., PH II/BED-768B/SEK002321</project_name><description>Roadway reconstruction including new sewers, water main, street lighting and traffic signals: Columbia Street south of Hamilton Avenue.</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2019-07-01T00:00:00</design_start><budget_forecast>116664000.00</budget_forecast><latest_budget_changes>2790000.00</latest_budget_changes><total_budget_changes>6730000.00</total_budget_changes><forecast_completion>2025-07-14T00:00:00</forecast_completion><latest_schedule_changes>365</latest_schedule_changes><total_schedule_changes>972</total_schedule_changes></row><row _id="row-avr2~dgss-4ukz" _uuid="00000000-0000-0000-ED1B-A0F9392799D9" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-avr2~dgss-4ukz"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>845</pid><project_name>RECONST. OF COLUMBIA ST., PH II/BED-768B/SEK002321</project_name><description>Roadway reconstruction including new sewers, water main, street lighting and traffic signals: Columbia Street south of Hamilton Avenue.</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2019-07-01T00:00:00</design_start><budget_forecast>116944000.00</budget_forecast><latest_budget_changes>280000.00</latest_budget_changes><total_budget_changes>6730000.00</total_budget_changes><forecast_completion>2025-07-14T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>972</total_schedule_changes></row><row _id="row-86yf~95bq_8ik6" _uuid="00000000-0000-0000-772E-9F44128A248E" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-86yf~95bq_8ik6"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>845</pid><project_name>RECONST. OF COLUMBIA ST., PH II/BED-768B/SEK002321</project_name><description>Roadway reconstruction including new sewers, water main, street lighting and traffic signals: Columbia Street south of Hamilton Avenue.</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2019-07-01T00:00:00</design_start><budget_forecast>120604000.00</budget_forecast><latest_budget_changes>3660000.00</latest_budget_changes><total_budget_changes>6730000.00</total_budget_changes><forecast_completion>2025-07-14T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>972</total_schedule_changes></row><row _id="row-eczr-4dnj-ijbv" _uuid="00000000-0000-0000-8345-487FE039C23C" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-eczr-4dnj-ijbv"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>845</pid><project_name>RECONST. OF COLUMBIA ST., PH II/BED-768B/SEK002321</project_name><description>Roadway reconstruction including new sewers, water main, street lighting and traffic signals: Columbia Street south of Hamilton Avenue.</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2019-07-01T00:00:00</design_start><budget_forecast>120604000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>6730000.00</total_budget_changes><forecast_completion>2026-09-08T00:00:00</forecast_completion><latest_schedule_changes>421</latest_schedule_changes><total_schedule_changes>972</total_schedule_changes></row><row _id="row-dww5~5ief_wyti" _uuid="00000000-0000-0000-25F3-6A54B9C74BAE" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-dww5~5ief_wyti"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>845</pid><project_name>RECONST. OF COLUMBIA ST., PH II/BED-768B/SEK002321</project_name><description>Roadway reconstruction including new sewers, water main, street lighting and traffic signals: Columbia Street south of Hamilton Avenue.</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2019-07-01T00:00:00</design_start><budget_forecast>120604000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>6730000.00</total_budget_changes><forecast_completion>2027-03-13T00:00:00</forecast_completion><latest_schedule_changes>186</latest_schedule_changes><total_schedule_changes>972</total_schedule_changes></row><row _id="row-skmw_qhxk~h9ga" _uuid="00000000-0000-0000-88CD-1792A1D2F688" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-skmw_qhxk~h9ga"><date_reported_as_of>2019-05-01T00:00:00</date_reported_as_of><pid>847</pid><project_name>SOUTHEAST QUEENS PRIORITY GRIDS - GROUP 2</project_name><description>SOUTHEAST QUEENS PRIORITY GRIDS - GROUP 2</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2018-10-09T00:00:00</design_start><budget_forecast>44050000.00</budget_forecast><latest_budget_changes>25549000.00</latest_budget_changes><total_budget_changes>14480000.00</total_budget_changes><forecast_completion>2024-07-10T00:00:00</forecast_completion><latest_schedule_changes>-65</latest_schedule_changes><total_schedule_changes>1630</total_schedule_changes></row><row _id="row-99c6_zeq8~e5wf" _uuid="00000000-0000-0000-3BBE-54C9E22587B6" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-99c6_zeq8~e5wf"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>847</pid><project_name>SOUTHEAST QUEENS PRIORITY GRIDS - GROUP 2</project_name><description>SOUTHEAST QUEENS PRIORITY GRIDS - GROUP 2</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2018-10-09T00:00:00</design_start><budget_forecast>44050000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>14480000.00</total_budget_changes><forecast_completion>2025-04-11T00:00:00</forecast_completion><latest_schedule_changes>275</latest_schedule_changes><total_schedule_changes>1630</total_schedule_changes></row><row _id="row-2t5e~styv~drwe" _uuid="00000000-0000-0000-B541-6324DD067035" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-2t5e~styv~drwe"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>847</pid><project_name>SOUTHEAST QUEENS PRIORITY GRIDS - GROUP 2</project_name><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><total_budget_changes>14480000.00</total_budget_changes><total_schedule_changes>1630</total_schedule_changes></row><row _id="row-hntu-9f4p_4gm2" _uuid="00000000-0000-0000-AB3F-0BE3DD93AE41" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-hntu-9f4p_4gm2"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>847</pid><project_name>SOUTHEAST QUEENS PRIORITY GRIDS - GROUP 2</project_name><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><total_budget_changes>14480000.00</total_budget_changes><total_schedule_changes>1630</total_schedule_changes></row><row _id="row-fvtw-dt42.fmkw" _uuid="00000000-0000-0000-50DA-9ADDBF765157" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-fvtw-dt42.fmkw"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>847</pid><project_name>SOUTHEAST QUEENS PRIORITY GRIDS - GROUP 2</project_name><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><total_budget_changes>14480000.00</total_budget_changes><total_schedule_changes>1630</total_schedule_changes></row><row _id="row-bu93~w9di~sp2z" _uuid="00000000-0000-0000-A608-5FCF6231F7D6" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-bu93~w9di~sp2z"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>847</pid><project_name>SOUTHEAST QUEENS PRIORITY GRIDS - GROUP 2</project_name><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><total_budget_changes>14480000.00</total_budget_changes><total_schedule_changes>1630</total_schedule_changes></row><row _id="row-2qn7-mnwf-muh5" _uuid="00000000-0000-0000-6B31-E35FD0E97F39" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-2qn7-mnwf-muh5"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>847</pid><project_name>SOUTHEAST QUEENS PRIORITY GRIDS - GROUP 2</project_name><description>SOUTHEAST QUEENS PRIORITY GRIDS - GROUP 2</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2018-10-09T00:00:00</design_start><budget_forecast>32463000.00</budget_forecast><latest_budget_changes>-11587000.00</latest_budget_changes><total_budget_changes>14480000.00</total_budget_changes><forecast_completion>2029-03-01T00:00:00</forecast_completion><latest_schedule_changes>1420</latest_schedule_changes><total_schedule_changes>1630</total_schedule_changes></row><row _id="row-3v76-jbwm-n9fd" _uuid="00000000-0000-0000-71F4-62D9186A62C0" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-3v76-jbwm-n9fd"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>847</pid><project_name>SOUTHEAST QUEENS PRIORITY GRIDS - GROUP 2</project_name><description>SOUTHEAST QUEENS PRIORITY GRIDS - GROUP 2</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2018-10-09T00:00:00</design_start><budget_forecast>32453000.00</budget_forecast><latest_budget_changes>-10000.00</latest_budget_changes><total_budget_changes>14480000.00</total_budget_changes><forecast_completion>2028-02-29T00:00:00</forecast_completion><latest_schedule_changes>-366</latest_schedule_changes><total_schedule_changes>1630</total_schedule_changes></row><row _id="row-5nb8.f8ng.hus2" _uuid="00000000-0000-0000-DF6E-03615866F2A2" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-5nb8.f8ng.hus2"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>847</pid><project_name>SOUTHEAST QUEENS PRIORITY GRIDS - GROUP 2</project_name><description>SOUTHEAST QUEENS PRIORITY GRIDS - GROUP 2</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2018-10-09T00:00:00</design_start><budget_forecast>32981000.00</budget_forecast><latest_budget_changes>528000.00</latest_budget_changes><total_budget_changes>14480000.00</total_budget_changes><forecast_completion>2028-02-29T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1630</total_schedule_changes></row><row _id="row-dsfa-wgau.mi6u" _uuid="00000000-0000-0000-6BCC-6A94EF672A80" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-dsfa-wgau.mi6u"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>847</pid><project_name>SOUTHEAST QUEENS PRIORITY GRIDS - GROUP 2</project_name><description>SOUTHEAST QUEENS PRIORITY GRIDS - GROUP 2</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2018-10-09T00:00:00</design_start><budget_forecast>32981000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>14480000.00</total_budget_changes><forecast_completion>2028-02-29T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1630</total_schedule_changes></row><row _id="row-jhf3.zy99.4hv8" _uuid="00000000-0000-0000-0EC4-C12C1E120657" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-jhf3.zy99.4hv8"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>847</pid><project_name>SOUTHEAST QUEENS PRIORITY GRIDS - GROUP 2</project_name><description>SOUTHEAST QUEENS PRIORITY GRIDS - GROUP 2</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2018-10-09T00:00:00</design_start><budget_forecast>32981000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>14480000.00</total_budget_changes><forecast_completion>2029-03-01T00:00:00</forecast_completion><latest_schedule_changes>366</latest_schedule_changes><total_schedule_changes>1630</total_schedule_changes></row><row _id="row-yeyd.6cm5.jbjv" _uuid="00000000-0000-0000-BD83-364BF992951E" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-yeyd.6cm5.jbjv"><date_reported_as_of>2018-08-01T00:00:00</date_reported_as_of><pid>849</pid><project_name>HIGH LEVEL STM SEWERS IN GOWANUS CANAL AREA-PH II</project_name><description>High Level Storm Sewer Installation and Water Main Replacement in Gowanus Canal Phase II in the Borough of Brooklyn.</description><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction Procurement</current_phase><design_start>2016-09-30T00:00:00</design_start><budget_forecast>33680000.00</budget_forecast><total_budget_changes>8657000.00</total_budget_changes><forecast_completion>2021-03-30T00:00:00</forecast_completion><total_schedule_changes>813</total_schedule_changes></row><row _id="row-kxg3~6jt5~5pft" _uuid="00000000-0000-0000-D5C1-EBABB7B6EACD" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-kxg3~6jt5~5pft"><date_reported_as_of>2019-01-01T00:00:00</date_reported_as_of><pid>849</pid><project_name>HIGH LEVEL STM SEWERS IN GOWANUS CANAL AREA-PH II</project_name><description>High Level Storm Sewer Installation and Water Main Replacement in Gowanus Canal Phase II in the Borough of Brooklyn.</description><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction</current_phase><design_start>2016-09-30T00:00:00</design_start><budget_forecast>34191000.00</budget_forecast><latest_budget_changes>511000.00</latest_budget_changes><total_budget_changes>8657000.00</total_budget_changes><forecast_completion>2021-09-29T00:00:00</forecast_completion><latest_schedule_changes>183</latest_schedule_changes><total_schedule_changes>813</total_schedule_changes></row><row _id="row-7ywv~s6ye-i8bk" _uuid="00000000-0000-0000-E00F-B6AE6BAF8E71" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-7ywv~s6ye-i8bk"><date_reported_as_of>2019-05-01T00:00:00</date_reported_as_of><pid>849</pid><project_name>HIGH LEVEL STM SEWERS IN GOWANUS CANAL AREA-PH II</project_name><description>High Level Storm and Combine Sewer installation and Water Main replacement in Gowanus Canal Area Phase-2, Brooklyn.</description><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction</current_phase><design_start>2016-09-30T00:00:00</design_start><budget_forecast>34583000.00</budget_forecast><latest_budget_changes>392000.00</latest_budget_changes><total_budget_changes>8657000.00</total_budget_changes><forecast_completion>2021-09-29T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>813</total_schedule_changes></row><row _id="row-fjpq~avv7_cxj2" _uuid="00000000-0000-0000-89C5-44128651546D" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-fjpq~avv7_cxj2"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>849</pid><project_name>HIGH LEVEL STM SEWERS IN GOWANUS CANAL AREA-PH II</project_name><description>High Level Storm and Combine Sewer installation and Water Main replacement in Gowanus Canal Area Phase-2, Brooklyn.</description><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction</current_phase><design_start>2016-09-30T00:00:00</design_start><budget_forecast>34583000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>8657000.00</total_budget_changes><forecast_completion>2021-09-29T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>813</total_schedule_changes></row><row _id="row-nvwg_fgn2.a2js" _uuid="00000000-0000-0000-ACA6-4CA7170493E8" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-nvwg_fgn2.a2js"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>849</pid><project_name>HIGH LEVEL STM SEWERS IN GOWANUS CANAL AREA-PH II</project_name><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><total_budget_changes>8657000.00</total_budget_changes><total_schedule_changes>813</total_schedule_changes></row><row _id="row-qkxd_nz9u.aq5p" _uuid="00000000-0000-0000-4794-C8A01C868B14" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-qkxd_nz9u.aq5p"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>849</pid><project_name>HIGH LEVEL STM SEWERS IN GOWANUS CANAL AREA-PH II</project_name><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><total_budget_changes>8657000.00</total_budget_changes><total_schedule_changes>813</total_schedule_changes></row><row _id="row-4bmm~ut2j_pqkf" _uuid="00000000-0000-0000-67FE-21BA2C3514A7" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-4bmm~ut2j_pqkf"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>849</pid><project_name>HIGH LEVEL STM SEWERS IN GOWANUS CANAL AREA-PH II</project_name><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><total_budget_changes>8657000.00</total_budget_changes><total_schedule_changes>813</total_schedule_changes></row><row _id="row-2nvn-6dvc-zycc" _uuid="00000000-0000-0000-5218-E41DAE127869" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-2nvn-6dvc-zycc"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>849</pid><project_name>HIGH LEVEL STM SEWERS IN GOWANUS CANAL AREA-PH II</project_name><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><total_budget_changes>8657000.00</total_budget_changes><total_schedule_changes>813</total_schedule_changes></row><row _id="row-4spa-xzcw-fe4g" _uuid="00000000-0000-0000-DA39-0B03865EA7AD" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-4spa-xzcw-fe4g"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>849</pid><project_name>HIGH LEVEL STM SEWERS IN GOWANUS CANAL AREA-PH II</project_name><description>High Level Storm and Combine Sewer installation and Water Main replacement in Gowanus Canal Area Phase-2, Brooklyn.</description><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction</current_phase><design_start>2016-09-30T00:00:00</design_start><budget_forecast>40014000.00</budget_forecast><latest_budget_changes>5431000.00</latest_budget_changes><total_budget_changes>8657000.00</total_budget_changes><forecast_completion>2022-04-27T00:00:00</forecast_completion><latest_schedule_changes>210</latest_schedule_changes><total_schedule_changes>813</total_schedule_changes></row><row _id="row-7caw-4uca.dgpr" _uuid="00000000-0000-0000-7453-44F16C394ACE" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-7caw-4uca.dgpr"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>849</pid><project_name>HIGH LEVEL STM SEWERS IN GOWANUS CANAL AREA-PH II</project_name><description>High Level Storm and Combine Sewer installation and Water Main replacement in Gowanus Canal Area Phase-2, Brooklyn.</description><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction</current_phase><design_start>2016-09-30T00:00:00</design_start><budget_forecast>40701000.00</budget_forecast><latest_budget_changes>687000.00</latest_budget_changes><total_budget_changes>8657000.00</total_budget_changes><forecast_completion>2022-04-27T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>813</total_schedule_changes></row><row _id="row-6ry5.3uet~5p49" _uuid="00000000-0000-0000-6833-6F475440FF81" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-6ry5.3uet~5p49"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>849</pid><project_name>HIGH LEVEL STM SEWERS IN GOWANUS CANAL AREA-PH II</project_name><description>High Level Storm and Combine Sewer installation and Water Main replacement in Gowanus Canal Area Phase-2, Brooklyn.</description><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction</current_phase><design_start>2016-09-30T00:00:00</design_start><budget_forecast>42105000.00</budget_forecast><latest_budget_changes>1404000.00</latest_budget_changes><total_budget_changes>8657000.00</total_budget_changes><forecast_completion>2022-11-23T00:00:00</forecast_completion><latest_schedule_changes>210</latest_schedule_changes><total_schedule_changes>813</total_schedule_changes></row><row _id="row-6ud7~dj7q-hx37" _uuid="00000000-0000-0000-DF70-24A9D114958B" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-6ud7~dj7q-hx37"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>849</pid><project_name>HIGH LEVEL STM SEWERS IN GOWANUS CANAL AREA-PH II</project_name><description>High Level Storm and Combine Sewer installation and Water Main replacement in Gowanus Canal Area Phase-2, Brooklyn.</description><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction</current_phase><design_start>2016-09-30T00:00:00</design_start><budget_forecast>42337000.00</budget_forecast><latest_budget_changes>232000.00</latest_budget_changes><total_budget_changes>8657000.00</total_budget_changes><forecast_completion>2023-06-21T00:00:00</forecast_completion><latest_schedule_changes>210</latest_schedule_changes><total_schedule_changes>813</total_schedule_changes></row><row _id="row-7xbv~cm6p-u4x4" _uuid="00000000-0000-0000-9899-030DE6BE7F34" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-7xbv~cm6p-u4x4"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>849</pid><project_name>HIGH LEVEL STM SEWERS IN GOWANUS CANAL AREA-PH II</project_name><description>High Level Storm and Combine Sewer installation and Water Main replacement in Gowanus Canal Area Phase-2, Brooklyn.</description><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction</current_phase><design_start>2016-09-30T00:00:00</design_start><budget_forecast>42337000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>8657000.00</total_budget_changes><forecast_completion>2023-06-21T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>813</total_schedule_changes></row><row _id="row-9yh7.qadb_22ex" _uuid="00000000-0000-0000-47FF-FD858F850E98" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-9yh7.qadb_22ex"><date_reported_as_of>2018-08-01T00:00:00</date_reported_as_of><pid>850</pid><project_name>253 Broadway NYC. Fire Alarm Raplacement</project_name><description>Installation of new building wide fire alarm, sprinkler distribution and BMS system throughout building.</description><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><current_phase>Design</current_phase><design_start>2018-01-22T00:00:00</design_start><budget_forecast>39342000.00</budget_forecast><total_budget_changes>17827000.00</total_budget_changes><forecast_completion>2022-09-30T00:00:00</forecast_completion><total_schedule_changes>1553</total_schedule_changes></row><row _id="row-rgqc-uumm~vc8m" _uuid="00000000-0000-0000-DECB-33CB354203A1" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-rgqc-uumm~vc8m"><date_reported_as_of>2019-01-01T00:00:00</date_reported_as_of><pid>850</pid><project_name>253 Broadway NYC. Fire Alarm Raplacement</project_name><description>Installation of new building wide fire alarm, sprinkler distribution and BMS system throughout building.</description><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><current_phase>Design</current_phase><design_start>2018-01-22T00:00:00</design_start><budget_forecast>41516985.40</budget_forecast><latest_budget_changes>2174985.40</latest_budget_changes><total_budget_changes>17827000.00</total_budget_changes><forecast_completion>2022-09-30T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1553</total_schedule_changes></row><row _id="row-ta7y-i9jc~a84w" _uuid="00000000-0000-0000-7135-43BE4768BA72" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ta7y-i9jc~a84w"><date_reported_as_of>2019-05-01T00:00:00</date_reported_as_of><pid>850</pid><project_name>253 Broadway NYC. Fire Alarm Raplacement</project_name><description>Installation of new building wide fire alarm and sprinkler distribution for 253 Broadway</description><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><current_phase>Design</current_phase><design_start>2018-01-22T00:00:00</design_start><budget_forecast>29634000.00</budget_forecast><latest_budget_changes>-11882985.40</latest_budget_changes><total_budget_changes>17827000.00</total_budget_changes><forecast_completion>2022-03-04T00:00:00</forecast_completion><latest_schedule_changes>-210</latest_schedule_changes><total_schedule_changes>1553</total_schedule_changes></row><row _id="row-yvty~f3hx~zxk3" _uuid="00000000-0000-0000-7746-6C98D07BB471" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-yvty~f3hx~zxk3"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>850</pid><project_name>253 Broadway NYC. Fire Alarm Raplacement</project_name><description>Installation of new building wide fire alarm and sprinkler distribution for 253 Broadway</description><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><current_phase>Design</current_phase><design_start>2018-01-22T00:00:00</design_start><budget_forecast>29634000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>17827000.00</total_budget_changes><forecast_completion>2022-05-05T00:00:00</forecast_completion><latest_schedule_changes>62</latest_schedule_changes><total_schedule_changes>1553</total_schedule_changes></row><row _id="row-e39j_gphn.bvgc" _uuid="00000000-0000-0000-8853-927D79606214" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-e39j_gphn.bvgc"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>850</pid><project_name>253 Broadway NYC. Fire Alarm Raplacement</project_name><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><total_budget_changes>17827000.00</total_budget_changes><total_schedule_changes>1553</total_schedule_changes></row><row _id="row-guha.f274-suna" _uuid="00000000-0000-0000-9C6F-DC4858C6B8F6" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-guha.f274-suna"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>850</pid><project_name>253 Broadway NYC. Fire Alarm Raplacement</project_name><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><total_budget_changes>17827000.00</total_budget_changes><total_schedule_changes>1553</total_schedule_changes></row><row _id="row-75yz.tr3m.neen" _uuid="00000000-0000-0000-5C9A-34B514E5DA7A" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-75yz.tr3m.neen"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>850</pid><project_name>253 Broadway NYC. Fire Alarm Raplacement</project_name><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><total_budget_changes>17827000.00</total_budget_changes><total_schedule_changes>1553</total_schedule_changes></row><row _id="row-2zve_nf8w_krab" _uuid="00000000-0000-0000-5B8A-35F8708442C4" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-2zve_nf8w_krab"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>850</pid><project_name>253 Broadway NYC. Fire Alarm Raplacement</project_name><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><total_budget_changes>17827000.00</total_budget_changes><total_schedule_changes>1553</total_schedule_changes></row><row _id="row-jwth.ttkn-kg24" _uuid="00000000-0000-0000-F31C-AFE8DBE15A83" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-jwth.ttkn-kg24"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>850</pid><project_name>253 Broadway NYC. Fire Alarm Raplacement</project_name><description>Installation of new building wide fire alarm and sprinkler distribution for 253 Broadway  The PW357FIRE project has been divided into two phases.  � Phase 1 - Fire alarm core to meet the PW77LYA project LPC office renovation - currently under construction � Phase 2 � Fire alarm branches, sprinkler system branches, and BMS � currently under bid package review phase</description><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><current_phase>Construction</current_phase><design_start>2018-01-22T00:00:00</design_start><budget_forecast>31917000.00</budget_forecast><latest_budget_changes>2283000.00</latest_budget_changes><total_budget_changes>17827000.00</total_budget_changes><forecast_completion>2026-12-31T00:00:00</forecast_completion><latest_schedule_changes>1701</latest_schedule_changes><total_schedule_changes>1553</total_schedule_changes></row><row _id="row-zd2s_uk8v~q2qi" _uuid="00000000-0000-0000-70D0-3744316AD3FE" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-zd2s_uk8v~q2qi"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>850</pid><project_name>253 Broadway NYC. Fire Alarm Raplacement</project_name><description>Installation of new building wide fire alarm and sprinkler distribution for 253 Broadway  The PW357FIRE project has been divided into two phases.  • Phase 1 - Fire alarm core to meet the PW77LYA project LPC office renovation - currently under construction • Phase 2 – Fire alarm branches, sprinkler system branches, and BMS – currently under bid package review phase</description><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><current_phase>Construction</current_phase><design_start>2018-01-22T00:00:00</design_start><budget_forecast>44267000.00</budget_forecast><latest_budget_changes>12350000.00</latest_budget_changes><total_budget_changes>17827000.00</total_budget_changes><forecast_completion>2026-12-31T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1553</total_schedule_changes></row><row _id="row-pcq6-c74r_8cnv" _uuid="00000000-0000-0000-FFA1-62E3B7759CEA" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-pcq6-c74r_8cnv"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>850</pid><project_name>253 Broadway NYC. Fire Alarm Raplacement</project_name><description>Installation of new building wide fire alarm and sprinkler distribution for 253 Broadway  The PW357FIRE project has been divided into two phases.  • Phase 1 - Fire alarm core to meet the PW77LYA project LPC office renovation - currently under construction • Phase 2 – Fire alarm branches, sprinkler system branches, and BMS – currently under bid package review phase</description><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><current_phase>Construction</current_phase><design_start>2018-01-22T00:00:00</design_start><budget_forecast>49531000.00</budget_forecast><latest_budget_changes>5264000.00</latest_budget_changes><total_budget_changes>17827000.00</total_budget_changes><forecast_completion>2026-12-31T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1553</total_schedule_changes></row><row _id="row-g2wa_eggy-vh92" _uuid="00000000-0000-0000-D6AD-B7D1DB5D8FA8" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-g2wa_eggy-vh92"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>850</pid><project_name>253 Broadway NYC. Fire Alarm Raplacement</project_name><description>Installation of new building wide fire alarm and sprinkler distribution for 253 Broadway  The PW357FIRE project has been divided into two phases.  • Phase 1 - Fire alarm core to meet the PW77LYA project LPC office renovation - currently under construction • Phase 2 – Fire alarm branches, sprinkler system branches, and BMS – currently under bid package review phase</description><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><current_phase>Construction</current_phase><design_start>2018-01-22T00:00:00</design_start><budget_forecast>57169000.00</budget_forecast><latest_budget_changes>7638000.00</latest_budget_changes><total_budget_changes>17827000.00</total_budget_changes><forecast_completion>2026-12-31T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1553</total_schedule_changes></row><row _id="row-i7gs_z5s8.bxtx" _uuid="00000000-0000-0000-546F-2ED9F7BD3DB4" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-i7gs_z5s8.bxtx"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>850</pid><project_name>253 Broadway NYC. Fire Alarm Raplacement</project_name><description>Installation of new building wide fire alarm and sprinkler distribution for 253 Broadway  The PW357FIRE project has been divided into two phases.  • Phase 1 - Fire alarm core to meet the PW77LYA project LPC office renovation - currently under construction • Phase 2 – Fire alarm branches, sprinkler system branches, and BMS – currently under bid package review phase</description><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><current_phase>Construction</current_phase><design_start>2018-01-22T00:00:00</design_start><budget_forecast>57169000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>17827000.00</total_budget_changes><forecast_completion>2026-12-31T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1553</total_schedule_changes></row><row _id="row-nv5z~a3rf-khfv" _uuid="00000000-0000-0000-41AA-DDBC9A6B748A" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-nv5z~a3rf-khfv"><date_reported_as_of>2018-08-01T00:00:00</date_reported_as_of><pid>851</pid><project_name>FUEL TANK REPLACEMENT</project_name><description>Upgrading, decommissioning, or replacement of petroleum product storage tanks at approximately 50 sites (multi-agency) in Brooklyn and Staten Island.</description><category>Industrial Development</category><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><current_phase>Design</current_phase><design_start>2017-10-30T00:00:00</design_start><budget_forecast>31493000.00</budget_forecast><total_budget_changes>207000.00</total_budget_changes><forecast_completion>2021-10-14T00:00:00</forecast_completion><total_schedule_changes>1278</total_schedule_changes></row><row _id="row-qn9j~x873~crwx" _uuid="00000000-0000-0000-7CC2-D052565BEB79" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-qn9j~x873~crwx"><date_reported_as_of>2019-01-01T00:00:00</date_reported_as_of><pid>851</pid><project_name>FUEL TANK REPLACEMENT</project_name><description>Upgrading, decommissioning, or replacement of petroleum product storage tanks at approximately 50 sites (multi-agency) in Brooklyn and Staten Island.</description><category>Industrial Development</category><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><current_phase>Construction</current_phase><design_start>2017-10-30T00:00:00</design_start><budget_forecast>31493000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>207000.00</total_budget_changes><forecast_completion>2021-10-14T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1278</total_schedule_changes></row><row _id="row-i8z7~cb78.9r9i" _uuid="00000000-0000-0000-C40B-355DF2AA3980" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-i8z7~cb78.9r9i"><date_reported_as_of>2019-05-01T00:00:00</date_reported_as_of><pid>851</pid><project_name>FUEL TANK REPLACEMENT</project_name><description>The scope of work consists of providing all necessary construction management, design, and  r.onstruction services required to perform ail phases of the project: Surveying, tank testing,  investigation, design, construction, and construction management for the closure, removal, upgrade,  or replacement of petroieum product storage tanks at various City owned sites. This work must  comply with all local, state, nnd federal laws nnd regulations governing tanks and associated work.    The general scope of work for tank replacement includes:    File NYSDEC PBS application; mobilization; securing all required NYC agency approvals &amp; permits;  site survey; geophysical survey; drilling for laboratory soil and groundwater samples; crane &amp; rigging;  saw cutting; demo &amp; disposal of old tanks, piping, and concrete vaults; dewatering� of excavation; tank  bottom sludge removal &amp; disposal; remove/transfer/dispose product; laboratory analysis of soil and  groundwater; excavate, remove, dispose incidental contaminated soil; install shoring, new tanks and  tan�k sumps, piping, monitoring and leak detection system, overfill protection and alarms, electrical  wiring; construction of concrete slabs and block piers; backfill excavation; resurfacing; demobilization;  performance of a closeout investigation and the preparation and filing of appropriate reports;  obtaining FDNY and DOB closeout documents; preparing ""As-built"" drawings.</description><category>Industrial Development</category><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><current_phase>Construction</current_phase><design_start>2017-10-30T00:00:00</design_start><budget_forecast>31493000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>207000.00</total_budget_changes><forecast_completion>2021-10-14T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1278</total_schedule_changes></row><row _id="row-iw54-djga_fenz" _uuid="00000000-0000-0000-037C-56F84961E6D6" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-iw54-djga_fenz"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>851</pid><project_name>FUEL TANK REPLACEMENT</project_name><description>The scope of work consists of providing all necessary construction management, design, and  r.onstruction services required to perform ail phases of the project: Surveying, tank testing,  investigation, design, construction, and construction management for the closure, removal, upgrade,  or replacement of petroieum product storage tanks at various City owned sites. This work must  comply with all local, state, nnd federal laws nnd regulations governing tanks and associated work.    The general scope of work for tank replacement includes:    File NYSDEC PBS application; mobilization; securing all required NYC agency approvals &amp; permits;  site survey; geophysical survey; drilling for laboratory soil and groundwater samples; crane &amp; rigging;  saw cutting; demo &amp; disposal of old tanks, piping, and concrete vaults; dewatering· of excavation; tank  bottom sludge removal &amp; disposal; remove/transfer/dispose product; laboratory analysis of soil and  groundwater; excavate, remove, dispose incidental contaminated soil; install shoring, new tanks and  tan·k sumps, piping, monitoring and leak detection system, overfill protection and alarms, electrical  wiring; construction of concrete slabs and block piers; backfill excavation; resurfacing; demobilization;  performance of a closeout investigation and the preparation and filing of appropriate reports;  obtaining FDNY and DOB closeout documents; preparing "As-built" drawings.</description><category>Industrial Development</category><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><current_phase>Construction</current_phase><design_start>2017-10-30T00:00:00</design_start><budget_forecast>31493000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>207000.00</total_budget_changes><forecast_completion>2021-10-14T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1278</total_schedule_changes></row><row _id="row-6nn8_sx7d_6ndg" _uuid="00000000-0000-0000-DA1C-86402A8CB78C" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-6nn8_sx7d_6ndg"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>851</pid><project_name>FUEL TANK REPLACEMENT</project_name><category>Industrial Development</category><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><total_budget_changes>207000.00</total_budget_changes><total_schedule_changes>1278</total_schedule_changes></row><row _id="row-m4zp-sm62.zz25" _uuid="00000000-0000-0000-D055-B1C8602D0AC5" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-m4zp-sm62.zz25"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>851</pid><project_name>FUEL TANK REPLACEMENT</project_name><category>Industrial Development</category><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><total_budget_changes>207000.00</total_budget_changes><total_schedule_changes>1278</total_schedule_changes></row><row _id="row-cjuj_jy5c.z8k3" _uuid="00000000-0000-0000-9A61-3171BE4F5FF1" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-cjuj_jy5c.z8k3"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>851</pid><project_name>FUEL TANK REPLACEMENT</project_name><category>Industrial Development</category><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><total_budget_changes>207000.00</total_budget_changes><total_schedule_changes>1278</total_schedule_changes></row><row _id="row-rp7t-dny2~k3mr" _uuid="00000000-0000-0000-2BC6-957D44C139D9" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-rp7t-dny2~k3mr"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>851</pid><project_name>FUEL TANK REPLACEMENT</project_name><category>Industrial Development</category><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><total_budget_changes>207000.00</total_budget_changes><total_schedule_changes>1278</total_schedule_changes></row><row _id="row-xmjd~9g83.9cwh" _uuid="00000000-0000-0000-9824-11AD88954559" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-xmjd~9g83.9cwh"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>851</pid><project_name>FUEL TANK REPLACEMENT</project_name><description>The scope of work consists of providing all necessary construction management, design, and  r.onstruction services required to perform ail phases of the project: Surveying, tank testing,  investigation, design, construction, and construction management for the closure, removal, upgrade,  or replacement of petroieum product storage tanks at various City owned sites. This work must  comply with all local, state, nnd federal laws nnd regulations governing tanks and associated work.    The general scope of work for tank replacement includes:    File NYSDEC PBS application; mobilization; securing all required NYC agency approvals &amp; permits;  site survey; geophysical survey; drilling for laboratory soil and groundwater samples; crane &amp; rigging;  saw cutting; demo &amp; disposal of old tanks, piping, and concrete vaults; dewatering� of excavation; tank  bottom sludge removal &amp; disposal; remove/transfer/dispose product; laboratory analysis of soil and  groundwater; excavate, remove, dispose incidental contaminated soil; install shoring, new tanks and  tan�k sumps, piping, monitoring and leak detection system, overfill protection and alarms, electrical  wiring; construction of concrete slabs and block piers; backfill excavation; resurfacing; demobilization;  performance of a closeout investigation and the preparation and filing of appropriate reports;  obtaining FDNY and DOB closeout documents; preparing "As-built" drawings.</description><category>Industrial Development</category><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><current_phase>Construction</current_phase><design_start>2017-10-30T00:00:00</design_start><budget_forecast>31094000.00</budget_forecast><latest_budget_changes>-399000.00</latest_budget_changes><total_budget_changes>207000.00</total_budget_changes><forecast_completion>2025-04-14T00:00:00</forecast_completion><latest_schedule_changes>1278</latest_schedule_changes><total_schedule_changes>1278</total_schedule_changes></row><row _id="row-2ufi_yz3s.4cmz" _uuid="00000000-0000-0000-631B-1A2F9C4C50C2" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-2ufi_yz3s.4cmz"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>851</pid><project_name>FUEL TANK REPLACEMENT</project_name><description>The scope of work consists of providing all necessary construction management, design, and  r.onstruction services required to perform ail phases of the project: Surveying, tank testing,  investigation, design, construction, and construction management for the closure, removal, upgrade,  or replacement of petroieum product storage tanks at various City owned sites. This work must  comply with all local, state, nnd federal laws nnd regulations governing tanks and associated work.    The general scope of work for tank replacement includes:    File NYSDEC PBS application; mobilization; securing all required NYC agency approvals &amp; permits;  site survey; geophysical survey; drilling for laboratory soil and groundwater samples; crane &amp; rigging;  saw cutting; demo &amp; disposal of old tanks, piping, and concrete vaults; dewatering· of excavation; tank  bottom sludge removal &amp; disposal; remove/transfer/dispose product; laboratory analysis of soil and  groundwater; excavate, remove, dispose incidental contaminated soil; install shoring, new tanks and  tan·k sumps, piping, monitoring and leak detection system, overfill protection and alarms, electrical  wiring; construction of concrete slabs and block piers; backfill excavation; resurfacing; demobilization;  performance of a closeout investigation and the preparation and filing of appropriate reports;  obtaining FDNY and DOB closeout documents; preparing "As-built" drawings.</description><category>Industrial Development</category><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><current_phase>Construction</current_phase><design_start>2017-10-30T00:00:00</design_start><budget_forecast>31294000.00</budget_forecast><latest_budget_changes>200000.00</latest_budget_changes><total_budget_changes>207000.00</total_budget_changes><forecast_completion>2025-04-14T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1278</total_schedule_changes></row><row _id="row-i8sk_i4c6.kpgs" _uuid="00000000-0000-0000-F6AD-DC1530170505" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-i8sk_i4c6.kpgs"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>851</pid><project_name>FUEL TANK REPLACEMENT</project_name><description>The scope of work consists of providing all necessary construction management, design, and  r.onstruction services required to perform ail phases of the project: Surveying, tank testing,  investigation, design, construction, and construction management for the closure, removal, upgrade,  or replacement of petroieum product storage tanks at various City owned sites. This work must  comply with all local, state, nnd federal laws nnd regulations governing tanks and associated work.    The general scope of work for tank replacement includes:    File NYSDEC PBS application; mobilization; securing all required NYC agency approvals &amp; permits;  site survey; geophysical survey; drilling for laboratory soil and groundwater samples; crane &amp; rigging;  saw cutting; demo &amp; disposal of old tanks, piping, and concrete vaults; dewatering· of excavation; tank  bottom sludge removal &amp; disposal; remove/transfer/dispose product; laboratory analysis of soil and  groundwater; excavate, remove, dispose incidental contaminated soil; install shoring, new tanks and  tan·k sumps, piping, monitoring and leak detection system, overfill protection and alarms, electrical  wiring; construction of concrete slabs and block piers; backfill excavation; resurfacing; demobilization;  performance of a closeout investigation and the preparation and filing of appropriate reports;  obtaining FDNY and DOB closeout documents; preparing "As-built" drawings.</description><category>Industrial Development</category><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><current_phase>Construction</current_phase><design_start>2017-10-30T00:00:00</design_start><budget_forecast>31294000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>207000.00</total_budget_changes><forecast_completion>2025-04-14T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1278</total_schedule_changes></row><row _id="row-c9gi.aynf_xhf7" _uuid="00000000-0000-0000-DEEF-AA6B1E5C6A57" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-c9gi.aynf_xhf7"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>851</pid><project_name>FUEL TANK REPLACEMENT</project_name><description>The scope of work consists of providing all necessary construction management, design, and  r.onstruction services required to perform ail phases of the project: Surveying, tank testing,  investigation, design, construction, and construction management for the closure, removal, upgrade,  or replacement of petroieum product storage tanks at various City owned sites. This work must  comply with all local, state, nnd federal laws nnd regulations governing tanks and associated work.    The general scope of work for tank replacement includes:    File NYSDEC PBS application; mobilization; securing all required NYC agency approvals &amp; permits;  site survey; geophysical survey; drilling for laboratory soil and groundwater samples; crane &amp; rigging;  saw cutting; demo &amp; disposal of old tanks, piping, and concrete vaults; dewatering· of excavation; tank  bottom sludge removal &amp; disposal; remove/transfer/dispose product; laboratory analysis of soil and  groundwater; excavate, remove, dispose incidental contaminated soil; install shoring, new tanks and  tan·k sumps, piping, monitoring and leak detection system, overfill protection and alarms, electrical  wiring; construction of concrete slabs and block piers; backfill excavation; resurfacing; demobilization;  performance of a closeout investigation and the preparation and filing of appropriate reports;  obtaining FDNY and DOB closeout documents; preparing "As-built" drawings.</description><category>Industrial Development</category><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><current_phase>Construction</current_phase><design_start>2017-10-30T00:00:00</design_start><budget_forecast>31494000.00</budget_forecast><latest_budget_changes>200000.00</latest_budget_changes><total_budget_changes>207000.00</total_budget_changes><forecast_completion>2025-04-14T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1278</total_schedule_changes></row><row _id="row-c5ua_zeu8.uidp" _uuid="00000000-0000-0000-8B4C-6B5B3B31D9B0" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-c5ua_zeu8.uidp"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>851</pid><project_name>FUEL TANK REPLACEMENT</project_name><description>The scope of work consists of providing all necessary construction management, design, and  r.onstruction services required to perform ail phases of the project: Surveying, tank testing,  investigation, design, construction, and construction management for the closure, removal, upgrade,  or replacement of petroieum product storage tanks at various City owned sites. This work must  comply with all local, state, nnd federal laws nnd regulations governing tanks and associated work.    The general scope of work for tank replacement includes:    File NYSDEC PBS application; mobilization; securing all required NYC agency approvals &amp; permits;  site survey; geophysical survey; drilling for laboratory soil and groundwater samples; crane &amp; rigging;  saw cutting; demo &amp; disposal of old tanks, piping, and concrete vaults; dewatering· of excavation; tank  bottom sludge removal &amp; disposal; remove/transfer/dispose product; laboratory analysis of soil and  groundwater; excavate, remove, dispose incidental contaminated soil; install shoring, new tanks and  tan·k sumps, piping, monitoring and leak detection system, overfill protection and alarms, electrical  wiring; construction of concrete slabs and block piers; backfill excavation; resurfacing; demobilization;  performance of a closeout investigation and the preparation and filing of appropriate reports;  obtaining FDNY and DOB closeout documents; preparing "As-built" drawings.</description><category>Industrial Development</category><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><current_phase>Construction</current_phase><design_start>2017-10-30T00:00:00</design_start><budget_forecast>31700000.00</budget_forecast><latest_budget_changes>206000.00</latest_budget_changes><total_budget_changes>207000.00</total_budget_changes><forecast_completion>2025-04-14T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1278</total_schedule_changes></row><row _id="row-ejsv~86k8_7qje" _uuid="00000000-0000-0000-F130-4197520D8E5A" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ejsv~86k8_7qje"><date_reported_as_of>2018-08-01T00:00:00</date_reported_as_of><pid>855</pid><project_name>TRENCH RESTORATION BROOKLYN</project_name><description>Trench Restoration including full reconstruction</description><category>Industrial Development</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2018-06-05T00:00:00</design_start><budget_forecast>26893000.00</budget_forecast><total_budget_changes>6536000.00</total_budget_changes><forecast_completion>2022-09-09T00:00:00</forecast_completion><total_schedule_changes>1467</total_schedule_changes></row><row _id="row-76rb_qq5t~5h6c" _uuid="00000000-0000-0000-1474-C991BDCBC21D" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-76rb_qq5t~5h6c"><date_reported_as_of>2019-01-01T00:00:00</date_reported_as_of><pid>855</pid><project_name>TRENCH RESTORATION BROOKLYN</project_name><description>Trench Restoration including full reconstruction</description><category>Industrial Development</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2018-06-05T00:00:00</design_start><budget_forecast>27038000.00</budget_forecast><latest_budget_changes>145000.00</latest_budget_changes><total_budget_changes>6536000.00</total_budget_changes><forecast_completion>2022-09-09T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1467</total_schedule_changes></row><row _id="row-njad~gr8j~mnkb" _uuid="00000000-0000-0000-7769-865BEFFF0E1D" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-njad~gr8j~mnkb"><date_reported_as_of>2019-05-01T00:00:00</date_reported_as_of><pid>855</pid><project_name>TRENCH RESTORATION BROOKLYN</project_name><description>Trench Restoration in The Borough Of Brooklyn including Full Street Reconstruction</description><category>Industrial Development</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2018-06-05T00:00:00</design_start><budget_forecast>27038000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>6536000.00</total_budget_changes><forecast_completion>2022-08-13T00:00:00</forecast_completion><latest_schedule_changes>-27</latest_schedule_changes><total_schedule_changes>1467</total_schedule_changes></row><row _id="row-zv6j_ib6k~sy6t" _uuid="00000000-0000-0000-463F-D05EB9C6186D" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-zv6j_ib6k~sy6t"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>855</pid><project_name>TRENCH RESTORATION BROOKLYN</project_name><description>Trench Restoration in The Borough Of Brooklyn including Full Street Reconstruction</description><category>Industrial Development</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2018-06-05T00:00:00</design_start><budget_forecast>25448000.00</budget_forecast><latest_budget_changes>-1590000.00</latest_budget_changes><total_budget_changes>6536000.00</total_budget_changes><forecast_completion>2023-08-14T00:00:00</forecast_completion><latest_schedule_changes>366</latest_schedule_changes><total_schedule_changes>1467</total_schedule_changes></row><row _id="row-cbaw.ww7e.568m" _uuid="00000000-0000-0000-F980-B6F4FA00BDFF" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-cbaw.ww7e.568m"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>855</pid><project_name>TRENCH RESTORATION BROOKLYN</project_name><category>Industrial Development</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><total_budget_changes>6536000.00</total_budget_changes><total_schedule_changes>1467</total_schedule_changes></row><row _id="row-ht8i_6tf6.k82u" _uuid="00000000-0000-0000-67E6-1129C1683A0C" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ht8i_6tf6.k82u"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>855</pid><project_name>TRENCH RESTORATION BROOKLYN</project_name><category>Industrial Development</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><total_budget_changes>6536000.00</total_budget_changes><total_schedule_changes>1467</total_schedule_changes></row><row _id="row-m897~8v5i_ee4n" _uuid="00000000-0000-0000-7146-4F574FE6ED98" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-m897~8v5i_ee4n"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>855</pid><project_name>TRENCH RESTORATION BROOKLYN</project_name><category>Industrial Development</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><total_budget_changes>6536000.00</total_budget_changes><total_schedule_changes>1467</total_schedule_changes></row><row _id="row-6fix~ybxq-jjmn" _uuid="00000000-0000-0000-5E19-32FD526DE180" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-6fix~ybxq-jjmn"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>855</pid><project_name>TRENCH RESTORATION BROOKLYN</project_name><category>Industrial Development</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><total_budget_changes>6536000.00</total_budget_changes><total_schedule_changes>1467</total_schedule_changes></row><row _id="row-8kkb~guxv.3n9s" _uuid="00000000-0000-0000-9DEC-469BA4BA320E" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-8kkb~guxv.3n9s"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>855</pid><project_name>TRENCH RESTORATION BROOKLYN</project_name><description>Trench Restoration in The Borough Of Brooklyn including Full Street Reconstruction</description><category>Industrial Development</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2018-06-05T00:00:00</design_start><budget_forecast>33429000.00</budget_forecast><latest_budget_changes>7981000.00</latest_budget_changes><total_budget_changes>6536000.00</total_budget_changes><forecast_completion>2024-08-13T00:00:00</forecast_completion><latest_schedule_changes>365</latest_schedule_changes><total_schedule_changes>1467</total_schedule_changes></row><row _id="row-2uqz.dt4p_7agx" _uuid="00000000-0000-0000-97AA-8E592CA02F0D" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-2uqz.dt4p_7agx"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>855</pid><project_name>TRENCH RESTORATION BROOKLYN</project_name><description>Trench Restoration in The Borough Of Brooklyn including Full Street Reconstruction</description><category>Industrial Development</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2018-06-05T00:00:00</design_start><budget_forecast>33569000.00</budget_forecast><latest_budget_changes>140000.00</latest_budget_changes><total_budget_changes>6536000.00</total_budget_changes><forecast_completion>2024-12-11T00:00:00</forecast_completion><latest_schedule_changes>120</latest_schedule_changes><total_schedule_changes>1467</total_schedule_changes></row><row _id="row-zkuw~3uaa_8izy" _uuid="00000000-0000-0000-A690-AADEF557FBBC" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-zkuw~3uaa_8izy"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>855</pid><project_name>TRENCH RESTORATION BROOKLYN</project_name><description>Trench Restoration in The Borough Of Brooklyn including Full Street Reconstruction</description><category>Industrial Development</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2018-06-05T00:00:00</design_start><budget_forecast>33639000.00</budget_forecast><latest_budget_changes>70000.00</latest_budget_changes><total_budget_changes>6536000.00</total_budget_changes><forecast_completion>2025-09-13T00:00:00</forecast_completion><latest_schedule_changes>276</latest_schedule_changes><total_schedule_changes>1467</total_schedule_changes></row><row _id="row-78a4_x8bg_pzcv" _uuid="00000000-0000-0000-D0E3-B4FB20CCAD0F" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-78a4_x8bg_pzcv"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>855</pid><project_name>TRENCH RESTORATION BROOKLYN</project_name><description>Trench Restoration in The Borough Of Brooklyn including Full Street Reconstruction</description><category>Industrial Development</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2018-06-05T00:00:00</design_start><budget_forecast>33429000.00</budget_forecast><latest_budget_changes>-210000.00</latest_budget_changes><total_budget_changes>6536000.00</total_budget_changes><forecast_completion>2025-09-13T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1467</total_schedule_changes></row><row _id="row-p56d~ukck-syk4" _uuid="00000000-0000-0000-D14F-1D98C874CC8F" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-p56d~ukck-syk4"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>855</pid><project_name>TRENCH RESTORATION BROOKLYN</project_name><description>Trench Restoration in The Borough Of Brooklyn including Full Street Reconstruction</description><category>Industrial Development</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2018-06-05T00:00:00</design_start><budget_forecast>33429000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>6536000.00</total_budget_changes><forecast_completion>2026-09-15T00:00:00</forecast_completion><latest_schedule_changes>367</latest_schedule_changes><total_schedule_changes>1467</total_schedule_changes></row><row _id="row-d7d3.d7r5~mmgn" _uuid="00000000-0000-0000-DAF6-C97319907D55" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-d7d3.d7r5~mmgn"><date_reported_as_of>2019-01-01T00:00:00</date_reported_as_of><pid>858</pid><project_name>Orchard Beach Pavilion</project_name><description>The restoration of the existing landmarked Orchard Beach Pavilion (located in Bronx, NY) which includes the construction of an ADA ramp at the main entrance of the Pavilion to improve accessibility to the beach passageway.</description><category>Parks</category><managing_agency>EDC</managing_agency><client_agency>DPR</client_agency><current_phase>Design</current_phase><design_start>2018-11-30T00:00:00</design_start><budget_forecast>60000000.00</budget_forecast><latest_budget_changes>7976256.00</latest_budget_changes><total_budget_changes>35628847.00</total_budget_changes><forecast_completion>2022-08-01T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>942</total_schedule_changes></row><row _id="row-wqnr-fctc_r4hw" _uuid="00000000-0000-0000-24C9-D5C502435EA7" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-wqnr-fctc_r4hw"><date_reported_as_of>2019-05-01T00:00:00</date_reported_as_of><pid>858</pid><project_name>Orchard Beach Pavilion</project_name><description>The restoration of the existing landmarked Orchard Beach Pavilion (located in Bronx, NY) which includes the construction of an ADA ramp at the main entrance of the Pavilion to improve accessibility to the beach passageway.</description><category>Parks</category><managing_agency>EDC</managing_agency><client_agency>DPR</client_agency><current_phase>Design</current_phase><design_start>2018-11-30T00:00:00</design_start><budget_forecast>60000000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>35628847.00</total_budget_changes><forecast_completion>2022-08-01T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>942</total_schedule_changes></row><row _id="row-nhc6_2wy2.8sxw" _uuid="00000000-0000-0000-12A5-B7CDB3729DAB" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-nhc6_2wy2.8sxw"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>858</pid><project_name>Orchard Beach Pavilion</project_name><description>The restoration of the existing landmarked Orchard Beach Pavilion (located in Bronx, NY) which includes the construction of an ADA ramp at the main entrance of the Pavilion to improve accessibility to the beach passageway.</description><category>Parks</category><managing_agency>EDC</managing_agency><client_agency>DPR</client_agency><current_phase>Design</current_phase><design_start>2018-11-30T00:00:00</design_start><budget_forecast>60000000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>35628847.00</total_budget_changes><forecast_completion>2022-08-01T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>942</total_schedule_changes></row><row _id="row-5zn6_5q44_ezkt" _uuid="00000000-0000-0000-5FF7-3D33193AD251" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-5zn6_5q44_ezkt"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>858</pid><project_name>Orchard Beach Pavilion</project_name><description>The restoration of the existing landmarked Orchard Beach Pavilion (located in Bronx, NY) which includes the construction of an ADA ramp at the main entrance of the Pavilion to improve accessibility to the beach passageway.</description><category>Parks</category><managing_agency>EDC</managing_agency><client_agency>DPR</client_agency><current_phase>Design</current_phase><design_start>2018-11-30T00:00:00</design_start><budget_forecast>60000000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>35628847.00</total_budget_changes><forecast_completion>2022-12-01T00:00:00</forecast_completion><latest_schedule_changes>122</latest_schedule_changes><total_schedule_changes>942</total_schedule_changes></row><row _id="row-kyiv-tcmm-sqn2" _uuid="00000000-0000-0000-EFE7-D5A76A6E5048" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-kyiv-tcmm-sqn2"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>858</pid><project_name>Orchard Beach Pavilion</project_name><description>The restoration of the existing landmarked Orchard Beach Pavilion (located in Bronx, NY) which includes the construction of an ADA ramp at the main entrance of the Pavilion to improve accessibility to the beach passageway.</description><category>Parks</category><managing_agency>EDC</managing_agency><client_agency>DPR</client_agency><current_phase>Design</current_phase><design_start>2018-11-30T00:00:00</design_start><budget_forecast>60000000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>35628847.00</total_budget_changes><forecast_completion>2023-06-03T00:00:00</forecast_completion><latest_schedule_changes>184</latest_schedule_changes><total_schedule_changes>942</total_schedule_changes></row><row _id="row-wn4n~e2vi.g4xc" _uuid="00000000-0000-0000-A537-AF95E88FAF9B" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-wn4n~e2vi.g4xc"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>858</pid><project_name>Orchard Beach Pavilion</project_name><description>The restoration of the existing landmarked Orchard Beach Pavilion (located in Bronx, NY) which includes the construction of an ADA ramp at the main entrance of the Pavilion to improve accessibility to the beach passageway.</description><category>Parks</category><managing_agency>EDC</managing_agency><client_agency>DPR</client_agency><current_phase>Design</current_phase><design_start>2018-11-30T00:00:00</design_start><budget_forecast>60000000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>35628847.00</total_budget_changes><forecast_completion>2022-09-01T00:00:00</forecast_completion><latest_schedule_changes>-275</latest_schedule_changes><total_schedule_changes>942</total_schedule_changes></row><row _id="row-bdif.xvxd-psks" _uuid="00000000-0000-0000-C7FF-111B83AF43C7" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-bdif.xvxd-psks"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>858</pid><project_name>Orchard Beach Pavilion</project_name><description>The restoration of the existing landmarked Orchard Beach Pavilion (located in Bronx, NY) which includes the construction of an ADA ramp at the main entrance of the Pavilion to improve accessibility to the beach passageway.</description><category>Parks</category><managing_agency>EDC</managing_agency><client_agency>DPR</client_agency><current_phase>Design</current_phase><design_start>2018-11-30T00:00:00</design_start><budget_forecast>60000000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>35628847.00</total_budget_changes><forecast_completion>2024-06-02T00:00:00</forecast_completion><latest_schedule_changes>640</latest_schedule_changes><total_schedule_changes>942</total_schedule_changes></row><row _id="row-qiyn-rg5k-p7pg" _uuid="00000000-0000-0000-0EB2-165F967DC232" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-qiyn-rg5k-p7pg"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>858</pid><project_name>Orchard Beach Pavilion</project_name><description>The restoration of the existing landmarked Orchard Beach Pavilion (located in Bronx, NY) which includes the construction of an ADA ramp at the main entrance of the Pavilion to improve accessibility to the beach passageway.</description><category>Parks</category><managing_agency>EDC</managing_agency><client_agency>DPR</client_agency><current_phase>Design</current_phase><design_start>2018-11-30T00:00:00</design_start><budget_forecast>60000000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>35628847.00</total_budget_changes><forecast_completion>2024-06-02T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>942</total_schedule_changes></row><row _id="row-sm9y-ax2q.k42h" _uuid="00000000-0000-0000-6667-D99AF2DC90F4" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-sm9y-ax2q.k42h"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>858</pid><project_name>Orchard Beach Pavilion</project_name><description>The restoration of the existing landmarked Orchard Beach Pavilion (located in Bronx, NY) which includes the construction of an ADA ramp at the main entrance of the Pavilion to improve accessibility to the beach passageway.</description><category>Parks</category><managing_agency>EDC</managing_agency><client_agency>DPR</client_agency><current_phase>Design</current_phase><design_start>2018-11-30T00:00:00</design_start><budget_forecast>60000000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>35628847.00</total_budget_changes><forecast_completion>2024-09-30T00:00:00</forecast_completion><latest_schedule_changes>120</latest_schedule_changes><total_schedule_changes>942</total_schedule_changes></row><row _id="row-3xkz.g2aj~vp5x" _uuid="00000000-0000-0000-BF09-5B7E88990792" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-3xkz.g2aj~vp5x"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>858</pid><project_name>Orchard Beach Pavilion</project_name><description>The restoration of the existing landmarked Orchard Beach Pavilion (located in Bronx, NY) which includes the construction of an ADA ramp at the main entrance of the Pavilion to improve accessibility to the beach passageway.</description><category>Parks</category><managing_agency>EDC</managing_agency><client_agency>DPR</client_agency><current_phase>Construction Procurement</current_phase><design_start>2018-11-30T00:00:00</design_start><budget_forecast>87652588.00</budget_forecast><latest_budget_changes>27652588.00</latest_budget_changes><total_budget_changes>35628847.00</total_budget_changes><forecast_completion>2025-03-31T00:00:00</forecast_completion><latest_schedule_changes>182</latest_schedule_changes><total_schedule_changes>942</total_schedule_changes></row><row _id="row-t376~9fdu~iffc" _uuid="00000000-0000-0000-925C-0F4CB73DAF8C" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-t376~9fdu~iffc"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>858</pid><project_name>Orchard Beach Pavilion</project_name><description>The restoration of the existing landmarked Orchard Beach Pavilion (located in Bronx, NY) which includes the construction of an ADA ramp at the main entrance of the Pavilion to improve accessibility to the beach passageway.</description><category>Parks</category><managing_agency>EDC</managing_agency><client_agency>DPR</client_agency><current_phase>Construction Procurement</current_phase><design_start>2018-11-30T00:00:00</design_start><budget_forecast>87652588.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>35628847.00</total_budget_changes><forecast_completion>2025-02-28T00:00:00</forecast_completion><latest_schedule_changes>-31</latest_schedule_changes><total_schedule_changes>942</total_schedule_changes></row><row _id="row-b79r.cn9d~3ude" _uuid="00000000-0000-0000-CA60-0E3C86AC11EE" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-b79r.cn9d~3ude"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>858</pid><project_name>Orchard Beach Pavilion</project_name><description>The restoration of the existing landmarked Orchard Beach Pavilion (located in Bronx, NY) which includes the construction of an ADA ramp at the main entrance of the Pavilion to improve accessibility to the beach passageway.</description><category>Parks</category><managing_agency>EDC</managing_agency><client_agency>DPR</client_agency><current_phase>Construction Procurement</current_phase><design_start>2018-11-30T00:00:00</design_start><budget_forecast>87652591.00</budget_forecast><latest_budget_changes>3.00</latest_budget_changes><total_budget_changes>35628847.00</total_budget_changes><forecast_completion>2025-02-28T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>942</total_schedule_changes></row><row _id="row-tba2_vhg4.kyag" _uuid="00000000-0000-0000-559B-A516C8F722CC" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-tba2_vhg4.kyag"><date_reported_as_of>2018-08-01T00:00:00</date_reported_as_of><pid>859</pid><project_name>Manhattan Greenway: East Midtown</project_name><description>The East Midtown Waterfront Greenway project involves the creation of a waterfront esplanade between East 53rd and East 59th Streets.</description><category>Parks</category><managing_agency>EDC</managing_agency><client_agency>EDC</client_agency><current_phase>Design</current_phase><design_start>2017-10-01T00:00:00</design_start><budget_forecast>130000000.00</budget_forecast><total_budget_changes>24840000.00</total_budget_changes><forecast_completion>2022-08-31T00:00:00</forecast_completion><total_schedule_changes>487</total_schedule_changes></row><row _id="row-ynar-ek4u.wy74" _uuid="00000000-0000-0000-E4B3-3872018FB343" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ynar-ek4u.wy74"><date_reported_as_of>2019-01-01T00:00:00</date_reported_as_of><pid>859</pid><project_name>Manhattan Greenway: East Midtown</project_name><description>The East Midtown Waterfront Greenway project involves the creation of a waterfront esplanade between East 53rd and East 59th Streets.</description><category>Parks</category><managing_agency>EDC</managing_agency><client_agency>EDC</client_agency><current_phase>Design</current_phase><design_start>2017-10-01T00:00:00</design_start><budget_forecast>130000000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>24840000.00</total_budget_changes><forecast_completion>2022-10-31T00:00:00</forecast_completion><latest_schedule_changes>61</latest_schedule_changes><total_schedule_changes>487</total_schedule_changes></row><row _id="row-wekx~4uxq-ebmt" _uuid="00000000-0000-0000-423C-5DACCD7231F9" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-wekx~4uxq-ebmt"><date_reported_as_of>2019-05-01T00:00:00</date_reported_as_of><pid>859</pid><project_name>Manhattan Greenway: East Midtown</project_name><description>The East Midtown Waterfront Greenway project involves the creation of a waterfront esplanade between East 53rd and East 59th Streets.</description><category>Parks</category><managing_agency>EDC</managing_agency><client_agency>EDC</client_agency><current_phase>Construction Procurement</current_phase><design_start>2017-10-01T00:00:00</design_start><budget_forecast>130000000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>24840000.00</total_budget_changes><forecast_completion>2022-11-01T00:00:00</forecast_completion><latest_schedule_changes>1</latest_schedule_changes><total_schedule_changes>487</total_schedule_changes></row><row _id="row-s76j.wv3v~74p6" _uuid="00000000-0000-0000-F7AB-1A716BF52E2F" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-s76j.wv3v~74p6"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>859</pid><project_name>Manhattan Greenway: East Midtown</project_name><description>The East Midtown Waterfront Greenway project involves the creation of a waterfront esplanade between East 53rd and East 59th Streets.</description><category>Parks</category><managing_agency>EDC</managing_agency><client_agency>EDC</client_agency><current_phase>Construction</current_phase><design_start>2017-10-01T00:00:00</design_start><budget_forecast>130000000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>24840000.00</total_budget_changes><forecast_completion>2022-11-30T00:00:00</forecast_completion><latest_schedule_changes>29</latest_schedule_changes><total_schedule_changes>487</total_schedule_changes></row><row _id="row-fygt-q3vh~672t" _uuid="00000000-0000-0000-D139-4FEAB7F88C89" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-fygt-q3vh~672t"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>859</pid><project_name>Manhattan Greenway: East Midtown</project_name><description>The East Midtown Waterfront Greenway project involves the creation of a waterfront esplanade between East 53rd and East 59th Streets.</description><category>Parks</category><managing_agency>EDC</managing_agency><client_agency>EDC</client_agency><current_phase>Construction</current_phase><design_start>2017-10-01T00:00:00</design_start><budget_forecast>130000000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>24840000.00</total_budget_changes><forecast_completion>2022-11-30T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>487</total_schedule_changes></row><row _id="row-xn8i~t7pe.8935" _uuid="00000000-0000-0000-2A66-7F8A706500AE" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-xn8i~t7pe.8935"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>859</pid><project_name>Manhattan Greenway: East Midtown</project_name><description>The East Midtown Waterfront Greenway project involves the creation of a waterfront esplanade between East 53rd and East 59th Streets.</description><category>Parks</category><managing_agency>EDC</managing_agency><client_agency>EDC</client_agency><current_phase>Construction</current_phase><design_start>2017-10-01T00:00:00</design_start><budget_forecast>130000000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>24840000.00</total_budget_changes><forecast_completion>2022-11-30T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>487</total_schedule_changes></row><row _id="row-8bf4-iymn.pbe9" _uuid="00000000-0000-0000-6104-CB87BE95C018" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-8bf4-iymn.pbe9"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>859</pid><project_name>Manhattan Greenway: East Midtown</project_name><description>The East Midtown Waterfront Greenway project involves the creation of a waterfront esplanade between East 53rd and East 59th Streets.</description><category>Parks</category><managing_agency>EDC</managing_agency><client_agency>EDC</client_agency><current_phase>Construction</current_phase><design_start>2017-10-01T00:00:00</design_start><budget_forecast>130000000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>24840000.00</total_budget_changes><forecast_completion>2022-11-30T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>487</total_schedule_changes></row><row _id="row-k78e~84np_ei2t" _uuid="00000000-0000-0000-56B9-C1A1B738A202" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-k78e~84np_ei2t"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>859</pid><project_name>Manhattan Greenway: East Midtown</project_name><description>The East Midtown Waterfront Greenway project involves the creation of a waterfront esplanade between East 53rd and East 59th Streets.</description><category>Parks</category><managing_agency>EDC</managing_agency><client_agency>EDC</client_agency><current_phase>Construction</current_phase><design_start>2017-10-01T00:00:00</design_start><budget_forecast>130000000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>24840000.00</total_budget_changes><forecast_completion>2022-11-30T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>487</total_schedule_changes></row><row _id="row-4ze8~gbpa-icvz" _uuid="00000000-0000-0000-CE46-EF2708E4AE14" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-4ze8~gbpa-icvz"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>859</pid><project_name>Manhattan Greenway: East Midtown</project_name><description>The East Midtown Waterfront Greenway project involves the creation of a waterfront esplanade between East 53rd and East 59th Streets.</description><category>Parks</category><managing_agency>EDC</managing_agency><client_agency>EDC</client_agency><current_phase>Construction</current_phase><design_start>2017-10-01T00:00:00</design_start><budget_forecast>130000000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>24840000.00</total_budget_changes><forecast_completion>2022-11-30T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>487</total_schedule_changes></row><row _id="row-niz6.h2vi~3adu" _uuid="00000000-0000-0000-AD45-DD43A32453EA" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-niz6.h2vi~3adu"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>859</pid><project_name>Manhattan Greenway: East Midtown</project_name><description>The East Midtown Waterfront Greenway project involves the creation of a waterfront esplanade between East 53rd and East 59th Streets.</description><category>Parks</category><managing_agency>EDC</managing_agency><client_agency>EDC</client_agency><current_phase>Construction</current_phase><design_start>2017-10-01T00:00:00</design_start><budget_forecast>136000000.00</budget_forecast><latest_budget_changes>6000000.00</latest_budget_changes><total_budget_changes>24840000.00</total_budget_changes><forecast_completion>2023-08-31T00:00:00</forecast_completion><latest_schedule_changes>274</latest_schedule_changes><total_schedule_changes>487</total_schedule_changes></row><row _id="row-w97s.uac4.6jt2" _uuid="00000000-0000-0000-6333-00E805248CC1" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-w97s.uac4.6jt2"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>859</pid><project_name>Manhattan Greenway: East Midtown</project_name><description>The East Midtown Waterfront Greenway project involves the creation of a waterfront esplanade between East 53rd and East 59th Streets.</description><category>Parks</category><managing_agency>EDC</managing_agency><client_agency>EDC</client_agency><current_phase>Construction</current_phase><design_start>2017-10-01T00:00:00</design_start><budget_forecast>154840000.00</budget_forecast><latest_budget_changes>18840000.00</latest_budget_changes><total_budget_changes>24840000.00</total_budget_changes><forecast_completion>2023-12-31T00:00:00</forecast_completion><latest_schedule_changes>122</latest_schedule_changes><total_schedule_changes>487</total_schedule_changes></row><row _id="row-7ww6~868x-ppke" _uuid="00000000-0000-0000-8DD8-DD799E3535ED" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-7ww6~868x-ppke"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>859</pid><project_name>Manhattan Greenway: East Midtown</project_name><description>The East Midtown Waterfront Greenway project involves the creation of a waterfront esplanade between East 53rd and East 59th Streets.</description><category>Parks</category><managing_agency>EDC</managing_agency><client_agency>EDC</client_agency><current_phase>Construction</current_phase><design_start>2017-10-01T00:00:00</design_start><budget_forecast>154840000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>24840000.00</total_budget_changes><forecast_completion>2023-12-31T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>487</total_schedule_changes></row><row _id="row-87sz.cs6h.xydt" _uuid="00000000-0000-0000-E7B9-C451DA82587D" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-87sz.cs6h.xydt"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>859</pid><project_name>Manhattan Greenway: East Midtown</project_name><description>The East Midtown Waterfront Greenway project involves the creation of a waterfront esplanade between East 53rd and East 59th Streets.</description><category>Parks</category><managing_agency>EDC</managing_agency><client_agency>EDC</client_agency><current_phase>Construction</current_phase><design_start>2017-10-01T00:00:00</design_start><budget_forecast>154840000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>24840000.00</total_budget_changes><forecast_completion>2023-12-31T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>487</total_schedule_changes></row><row _id="row-86kg.nxbm_2sj8" _uuid="00000000-0000-0000-17CA-437B1B878425" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-86kg.nxbm_2sj8"><date_reported_as_of>2019-05-01T00:00:00</date_reported_as_of><pid>860</pid><project_name>Manhattan Greenway: Harlem River</project_name><description>The Manhattan Greenway Harlem River project, between West 125th Street and Swindler Cove, involves the creation of a park, greenway, and the reconstruction of the bulkhead.</description><category>Parks</category><managing_agency>EDC</managing_agency><client_agency>DPR</client_agency><current_phase>Design</current_phase><design_start>2019-06-15T00:00:00</design_start><budget_forecast>227658000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2024-04-15T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>888</total_schedule_changes></row><row _id="row-e92j~spfv~zygd" _uuid="00000000-0000-0000-7E81-ED2F7D0FA850" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-e92j~spfv~zygd"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>860</pid><project_name>Manhattan Greenway: Harlem River</project_name><description>The Manhattan Greenway Harlem River project, between West 125th Street and Swindler Cove, involves the creation of a park, greenway, and the reconstruction of the bulkhead.</description><category>Parks</category><managing_agency>EDC</managing_agency><client_agency>DPR</client_agency><current_phase>Design</current_phase><design_start>2019-06-15T00:00:00</design_start><budget_forecast>227658000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2024-04-15T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>888</total_schedule_changes></row><row _id="row-k76d.gtzh_e826" _uuid="00000000-0000-0000-2BEA-B6FAC2230264" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-k76d.gtzh_e826"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>860</pid><project_name>Manhattan Greenway: Harlem River</project_name><description>The Manhattan Greenway Harlem River project, between West 125th Street and Swindler Cove, involves the creation of a park, greenway, and the reconstruction of the bulkhead.</description><category>Parks</category><managing_agency>EDC</managing_agency><client_agency>DPR</client_agency><current_phase>Design</current_phase><design_start>2019-06-15T00:00:00</design_start><budget_forecast>227658000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2024-06-30T00:00:00</forecast_completion><latest_schedule_changes>76</latest_schedule_changes><total_schedule_changes>888</total_schedule_changes></row><row _id="row-zkh6~3knq-dntm" _uuid="00000000-0000-0000-5E4A-56CF9A358125" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-zkh6~3knq-dntm"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>860</pid><project_name>Manhattan Greenway: Harlem River</project_name><description>The Manhattan Greenway Harlem River project, between West 125th Street and Swindler Cove, involves the creation of a park, greenway, and the reconstruction of the bulkhead.</description><category>Parks</category><managing_agency>EDC</managing_agency><client_agency>DPR</client_agency><current_phase>Design</current_phase><design_start>2019-06-15T00:00:00</design_start><budget_forecast>227658000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2024-06-30T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>888</total_schedule_changes></row><row _id="row-tr2h_v4ad_pwq9" _uuid="00000000-0000-0000-5CF9-674DB3E1CAA7" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-tr2h_v4ad_pwq9"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>860</pid><project_name>Manhattan Greenway: Harlem River</project_name><description>The Manhattan Greenway Harlem River project, between West 125th Street and Swindler Cove, involves the creation of a park, greenway, and the reconstruction of the bulkhead.</description><category>Parks</category><managing_agency>EDC</managing_agency><client_agency>DPR</client_agency><current_phase>Design</current_phase><design_start>2019-06-15T00:00:00</design_start><budget_forecast>227658000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2024-06-30T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>888</total_schedule_changes></row><row _id="row-ni8f_n9kx.crjf" _uuid="00000000-0000-0000-7AF2-A9DE913D703A" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ni8f_n9kx.crjf"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>860</pid><project_name>Manhattan Greenway: Harlem River</project_name><description>The Manhattan Greenway Harlem River project, between West 125th Street and Swindler Cove, involves the creation of a park, greenway, and the reconstruction of the bulkhead.</description><category>Parks</category><managing_agency>EDC</managing_agency><client_agency>DPR</client_agency><current_phase>Design</current_phase><design_start>2019-06-15T00:00:00</design_start><budget_forecast>227658000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2024-12-31T00:00:00</forecast_completion><latest_schedule_changes>184</latest_schedule_changes><total_schedule_changes>888</total_schedule_changes></row><row _id="row-m258-uva4-ymcx" _uuid="00000000-0000-0000-2FFD-1E687631F855" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-m258-uva4-ymcx"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>860</pid><project_name>Manhattan Greenway: Harlem River</project_name><description>The Manhattan Greenway Harlem River project, between West 125th Street and Swindler Cove, involves the creation of a park, greenway, and the reconstruction of the bulkhead.</description><category>Parks</category><managing_agency>EDC</managing_agency><client_agency>DPR</client_agency><current_phase>Design</current_phase><design_start>2019-06-15T00:00:00</design_start><budget_forecast>227658000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2024-12-31T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>888</total_schedule_changes></row><row _id="row-znm3_ksaa_t8jr" _uuid="00000000-0000-0000-F8BA-89D1A81DE35D" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-znm3_ksaa_t8jr"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>860</pid><project_name>Manhattan Greenway: Harlem River</project_name><description>The Manhattan Greenway Harlem River project, between West 125th Street and Swindler Cove, involves the creation of a park, greenway, and the reconstruction of the bulkhead.</description><category>Parks</category><managing_agency>EDC</managing_agency><client_agency>DPR</client_agency><current_phase>Design</current_phase><design_start>2019-06-15T00:00:00</design_start><budget_forecast>227658000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2025-05-31T00:00:00</forecast_completion><latest_schedule_changes>151</latest_schedule_changes><total_schedule_changes>888</total_schedule_changes></row><row _id="row-qk5a_k65n-wjpd" _uuid="00000000-0000-0000-64D7-A62231F70F64" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-qk5a_k65n-wjpd"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>860</pid><project_name>Manhattan Greenway: Harlem River</project_name><description>The Manhattan Greenway Harlem River project, between West 125th Street and Swindler Cove, involves the creation of a park, greenway, and the reconstruction of the bulkhead.</description><category>Parks</category><managing_agency>EDC</managing_agency><client_agency>DPR</client_agency><current_phase>Design</current_phase><design_start>2019-06-15T00:00:00</design_start><budget_forecast>309978000.00</budget_forecast><latest_budget_changes>82320000.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2025-09-30T00:00:00</forecast_completion><latest_schedule_changes>122</latest_schedule_changes><total_schedule_changes>888</total_schedule_changes></row><row _id="row-kfet_zxd5~n856" _uuid="00000000-0000-0000-DBA5-FD2CB02CC8C8" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-kfet_zxd5~n856"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>860</pid><project_name>Manhattan Greenway: Harlem River</project_name><description>The Manhattan Greenway Harlem River project, between West 125th Street and Swindler Cove, involves the creation of a park, greenway, and the reconstruction of the bulkhead.</description><category>Parks</category><managing_agency>EDC</managing_agency><client_agency>DPR</client_agency><current_phase>Design</current_phase><design_start>2019-06-15T00:00:00</design_start><budget_forecast>227658000.00</budget_forecast><latest_budget_changes>-82320000.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2026-02-15T00:00:00</forecast_completion><latest_schedule_changes>138</latest_schedule_changes><total_schedule_changes>888</total_schedule_changes></row><row _id="row-iikj-du5z~aem3" _uuid="00000000-0000-0000-96BB-6B6DF54FA3D7" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-iikj-du5z~aem3"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>860</pid><project_name>Manhattan Greenway: Harlem River</project_name><description>The Manhattan Greenway Harlem River project, between West 125th Street and Swindler Cove, involves the creation of a park, greenway, and the reconstruction of the bulkhead.</description><category>Parks</category><managing_agency>EDC</managing_agency><client_agency>DPR</client_agency><current_phase>Construction Procurement</current_phase><design_start>2019-06-15T00:00:00</design_start><budget_forecast>227658000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2026-09-20T00:00:00</forecast_completion><latest_schedule_changes>217</latest_schedule_changes><total_schedule_changes>888</total_schedule_changes></row><row _id="row-ir8c-6seg-387j" _uuid="00000000-0000-0000-3429-B9B0022D88A5" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ir8c-6seg-387j"><date_reported_as_of>2018-08-01T00:00:00</date_reported_as_of><pid>861</pid><project_name>West 33rd Street</project_name><description>Regrading and reconstruction of 33rd Street Viaduct between 11th and 12th Avenue..</description><category>Streets and Roadways</category><managing_agency>EDC</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2018-09-01T00:00:00</design_start><budget_forecast>100000000.00</budget_forecast><total_budget_changes>0.00</total_budget_changes><forecast_completion>2022-02-28T00:00:00</forecast_completion><total_schedule_changes>1736</total_schedule_changes></row><row _id="row-umh3-2tba-5595" _uuid="00000000-0000-0000-0ECF-BAE6232332F7" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-umh3-2tba-5595"><date_reported_as_of>2019-01-01T00:00:00</date_reported_as_of><pid>861</pid><project_name>West 33rd Street</project_name><description>Regrading and reconstruction of 33rd Street Viaduct between 11th and 12th Avenue..</description><category>Streets and Roadways</category><managing_agency>EDC</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2018-09-01T00:00:00</design_start><budget_forecast>100000000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2022-02-28T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1736</total_schedule_changes></row><row _id="row-frre-kt7p_38nx" _uuid="00000000-0000-0000-E02F-A78942F05EBF" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-frre-kt7p_38nx"><date_reported_as_of>2019-05-01T00:00:00</date_reported_as_of><pid>861</pid><project_name>West 33rd Street</project_name><description>Regrading and reconstruction of 33rd Street Viaduct between 11th and 12th Avenue..</description><category>Streets and Roadways</category><managing_agency>EDC</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2018-09-01T00:00:00</design_start><budget_forecast>100000000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2022-02-28T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1736</total_schedule_changes></row><row _id="row-uq3p_chce.u3im" _uuid="00000000-0000-0000-2465-05080B977BCB" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-uq3p_chce.u3im"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>861</pid><project_name>West 33rd Street</project_name><description>Regrading and reconstruction of 33rd Street Viaduct between 11th and 12th Avenue..</description><category>Streets and Roadways</category><managing_agency>EDC</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2018-09-01T00:00:00</design_start><budget_forecast>100000000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2022-11-30T00:00:00</forecast_completion><latest_schedule_changes>275</latest_schedule_changes><total_schedule_changes>1736</total_schedule_changes></row><row _id="row-6w4g_f2dz.6xb5" _uuid="00000000-0000-0000-6E27-E73251BFF35A" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-6w4g_f2dz.6xb5"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>861</pid><project_name>West 33rd Street</project_name><description>Regrading and reconstruction of 33rd Street Viaduct between 11th and 12th Avenue..</description><category>Streets and Roadways</category><managing_agency>EDC</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2018-09-01T00:00:00</design_start><budget_forecast>100000000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2022-11-30T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1736</total_schedule_changes></row><row _id="row-kwxw-qng6~83pq" _uuid="00000000-0000-0000-0CDA-3047B71B4948" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-kwxw-qng6~83pq"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>861</pid><project_name>West 33rd Street</project_name><description>Regrading and reconstruction of 33rd Street Viaduct between 11th and 12th Avenue..</description><category>Streets and Roadways</category><managing_agency>EDC</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2018-09-01T00:00:00</design_start><budget_forecast>100000000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2022-11-30T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1736</total_schedule_changes></row><row _id="row-fvc2-6u4e-riuc" _uuid="00000000-0000-0000-1059-FCECE2ADDFDB" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-fvc2-6u4e-riuc"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>861</pid><project_name>West 33rd Street</project_name><description>Regrading and reconstruction of 33rd Street Viaduct between 11th and 12th Avenue..</description><category>Streets and Roadways</category><managing_agency>EDC</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2018-09-01T00:00:00</design_start><budget_forecast>100000000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2024-11-29T00:00:00</forecast_completion><latest_schedule_changes>730</latest_schedule_changes><total_schedule_changes>1736</total_schedule_changes></row><row _id="row-s4i9-3kwm-af6c" _uuid="00000000-0000-0000-950C-418ABA05A88D" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-s4i9-3kwm-af6c"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>861</pid><project_name>West 33rd Street</project_name><description>Regrading and reconstruction of 33rd Street Viaduct between 11th and 12th Avenue..</description><category>Streets and Roadways</category><managing_agency>EDC</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2018-09-01T00:00:00</design_start><budget_forecast>100000000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2025-11-29T00:00:00</forecast_completion><latest_schedule_changes>365</latest_schedule_changes><total_schedule_changes>1736</total_schedule_changes></row><row _id="row-vhfv.8fbg.jhc8" _uuid="00000000-0000-0000-23FB-CCB0B85C5834" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-vhfv.8fbg.jhc8"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>861</pid><project_name>West 33rd Street</project_name><description>Regrading and reconstruction of 33rd Street Viaduct between 11th and 12th Avenue..</description><category>Streets and Roadways</category><managing_agency>EDC</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2018-09-01T00:00:00</design_start><budget_forecast>100000000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2025-11-29T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1736</total_schedule_changes></row><row _id="row-yuwe-jqbz~d9gr" _uuid="00000000-0000-0000-3867-74F51D1BCBE5" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-yuwe-jqbz~d9gr"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>861</pid><project_name>West 33rd Street</project_name><description>Regrading and reconstruction of 33rd Street Viaduct between 11th and 12th Avenue..</description><category>Streets and Roadways</category><managing_agency>EDC</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2018-09-01T00:00:00</design_start><budget_forecast>100000000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2025-11-29T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1736</total_schedule_changes></row><row _id="row-53k4.sqdq~3z9n" _uuid="00000000-0000-0000-917E-4C68465DFC86" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-53k4.sqdq~3z9n"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>861</pid><project_name>West 33rd Street</project_name><description>Regrading and reconstruction of 33rd Street Viaduct between 11th and 12th Avenue..</description><category>Streets and Roadways</category><managing_agency>EDC</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2018-09-01T00:00:00</design_start><budget_forecast>100000000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2026-11-30T00:00:00</forecast_completion><latest_schedule_changes>366</latest_schedule_changes><total_schedule_changes>1736</total_schedule_changes></row><row _id="row-ges2_fh8j~9w5t" _uuid="00000000-0000-0000-15F1-BEDF4606AA5B" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ges2_fh8j~9w5t"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>861</pid><project_name>West 33rd Street</project_name><description>Regrading and reconstruction of 33rd Street Viaduct between 11th and 12th Avenue..</description><category>Streets and Roadways</category><managing_agency>EDC</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2018-09-01T00:00:00</design_start><budget_forecast>100000000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2026-11-30T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1736</total_schedule_changes></row><row _id="row-r79a-jbad~fyag" _uuid="00000000-0000-0000-317F-2037B4665A26" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-r79a-jbad~fyag"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>861</pid><project_name>West 33rd Street</project_name><description>Regrading and reconstruction of 33rd Street Viaduct between 11th and 12th Avenue..</description><category>Streets and Roadways</category><managing_agency>EDC</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2018-09-01T00:00:00</design_start><budget_forecast>100000000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2026-11-30T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1736</total_schedule_changes></row><row _id="row-mqyc_tcrm~bfjd" _uuid="00000000-0000-0000-E104-23FDBA0B394E" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-mqyc_tcrm~bfjd"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>862</pid><project_name>79th St Boat Basin</project_name><description>Reconstruction of bulkhead and piers at 79th St Boat Basin on behalf of NYCDPR .</description><category>Parks</category><managing_agency>EDC</managing_agency><client_agency>DPR</client_agency><current_phase>Design</current_phase><design_start>2019-06-13T00:00:00</design_start><budget_forecast>89219175.00</budget_forecast><latest_budget_changes>-1131246.67</latest_budget_changes><total_budget_changes>-1131246.67</total_budget_changes><forecast_completion>2023-08-30T00:00:00</forecast_completion><latest_schedule_changes>112</latest_schedule_changes><total_schedule_changes>1036</total_schedule_changes></row><row _id="row-a9aq-8n4t.8wya" _uuid="00000000-0000-0000-61F1-D5006AAC662B" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-a9aq-8n4t.8wya"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>862</pid><project_name>79th St Boat Basin</project_name><description>Reconstruction of bulkhead and piers at 79th St Boat Basin on behalf of NYCDPR .</description><category>Parks</category><managing_agency>EDC</managing_agency><client_agency>DPR</client_agency><current_phase>Design</current_phase><design_start>2019-06-13T00:00:00</design_start><budget_forecast>89219175.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-1131246.67</total_budget_changes><forecast_completion>2023-08-30T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1036</total_schedule_changes></row><row _id="row-jg6b-hn72_rvcr" _uuid="00000000-0000-0000-982C-DE5B69063198" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-jg6b-hn72_rvcr"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>862</pid><project_name>79th St Boat Basin</project_name><description>Reconstruction of bulkhead and piers at 79th St Boat Basin on behalf of NYCDPR .</description><category>Parks</category><managing_agency>EDC</managing_agency><client_agency>DPR</client_agency><current_phase>Design</current_phase><design_start>2019-06-13T00:00:00</design_start><budget_forecast>89219175.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-1131246.67</total_budget_changes><forecast_completion>2023-08-30T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1036</total_schedule_changes></row><row _id="row-6sk5-72s7_cxz9" _uuid="00000000-0000-0000-7AF7-27A4D225058D" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-6sk5-72s7_cxz9"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>862</pid><project_name>79th St Boat Basin</project_name><description>Reconstruction of bulkhead and piers at 79th St Boat Basin on behalf of NYCDPR .</description><category>Parks</category><managing_agency>EDC</managing_agency><client_agency>DPR</client_agency><current_phase>Design</current_phase><design_start>2019-06-13T00:00:00</design_start><budget_forecast>89219175.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-1131246.67</total_budget_changes><forecast_completion>2023-08-30T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1036</total_schedule_changes></row><row _id="row-5bvn~4qsi~6m7m" _uuid="00000000-0000-0000-C059-BB4E3030C526" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-5bvn~4qsi~6m7m"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>862</pid><project_name>79th St Boat Basin</project_name><description>Reconstruction of bulkhead and piers at 79th St Boat Basin on behalf of NYCDPR .</description><category>Parks</category><managing_agency>EDC</managing_agency><client_agency>DPR</client_agency><current_phase>Design</current_phase><design_start>2019-06-13T00:00:00</design_start><budget_forecast>89219175.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-1131246.67</total_budget_changes><forecast_completion>2023-08-30T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1036</total_schedule_changes></row><row _id="row-hrem.ceyc_n85s" _uuid="00000000-0000-0000-B2B9-441ED2825532" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-hrem.ceyc_n85s"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>862</pid><project_name>79th St Boat Basin</project_name><description>Reconstruction of bulkhead and piers at 79th St Boat Basin on behalf of NYCDPR .</description><category>Parks</category><managing_agency>EDC</managing_agency><client_agency>DPR</client_agency><current_phase>Design</current_phase><design_start>2019-06-13T00:00:00</design_start><budget_forecast>89219175.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-1131246.67</total_budget_changes><forecast_completion>2023-12-10T00:00:00</forecast_completion><latest_schedule_changes>102</latest_schedule_changes><total_schedule_changes>1036</total_schedule_changes></row><row _id="row-vmy5~ek3s_u2at" _uuid="00000000-0000-0000-4BBC-7E60128A7EE5" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-vmy5~ek3s_u2at"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>862</pid><project_name>79th St Boat Basin</project_name><description>Reconstruction of bulkhead and piers at 79th St Boat Basin on behalf of NYCDPR .</description><category>Parks</category><managing_agency>EDC</managing_agency><client_agency>DPR</client_agency><current_phase>Design</current_phase><design_start>2019-06-13T00:00:00</design_start><budget_forecast>89219175.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-1131246.67</total_budget_changes><forecast_completion>2025-03-11T00:00:00</forecast_completion><latest_schedule_changes>457</latest_schedule_changes><total_schedule_changes>1036</total_schedule_changes></row><row _id="row-5bcy_4c8h.vcpw" _uuid="00000000-0000-0000-3B15-DEBDC9BD6EBD" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-5bcy_4c8h.vcpw"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>862</pid><project_name>79th St Boat Basin</project_name><description>Reconstruction of bulkhead and piers at 79th St Boat Basin on behalf of NYCDPR .</description><category>Parks</category><managing_agency>EDC</managing_agency><client_agency>DPR</client_agency><current_phase>Design</current_phase><design_start>2019-06-13T00:00:00</design_start><budget_forecast>89219175.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-1131246.67</total_budget_changes><forecast_completion>2025-09-08T00:00:00</forecast_completion><latest_schedule_changes>181</latest_schedule_changes><total_schedule_changes>1036</total_schedule_changes></row><row _id="row-hnx4~6r9u-z5tx" _uuid="00000000-0000-0000-91BE-AA92DD7F7159" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-hnx4~6r9u-z5tx"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>862</pid><project_name>79th St Boat Basin</project_name><description>Reconstruction of bulkhead and piers at 79th St Boat Basin on behalf of NYCDPR .</description><category>Parks</category><managing_agency>EDC</managing_agency><client_agency>DPR</client_agency><current_phase>Design</current_phase><design_start>2019-06-13T00:00:00</design_start><budget_forecast>89219175.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-1131246.67</total_budget_changes><forecast_completion>2026-03-11T00:00:00</forecast_completion><latest_schedule_changes>184</latest_schedule_changes><total_schedule_changes>1036</total_schedule_changes></row><row _id="row-acz6~htnc~v69u" _uuid="00000000-0000-0000-E843-73A73FF31FEF" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-acz6~htnc~v69u"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>862</pid><project_name>79th St Boat Basin</project_name><description>Reconstruction of bulkhead and piers at 79th St Boat Basin on behalf of NYCDPR .</description><category>Parks</category><managing_agency>EDC</managing_agency><client_agency>DPR</client_agency><current_phase>Design</current_phase><design_start>2019-06-13T00:00:00</design_start><budget_forecast>89219175.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-1131246.67</total_budget_changes><forecast_completion>2026-03-11T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1036</total_schedule_changes></row><row _id="row-p3e8~2fct-gug7" _uuid="00000000-0000-0000-0C47-4206842F2AB3" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-p3e8~2fct-gug7"><date_reported_as_of>2018-08-01T00:00:00</date_reported_as_of><pid>863</pid><project_name>Network Infrastructure Refresh Program</project_name><description>This project has a two-fold basis: 1) The ongoing Network Refresh which is needed to replace aging, end-of-life, end-of-support equipment across the NYC H+H. 2) Networking capacity needed to support the Electronic Medical Records system.</description><category>Health and Hospitals, IT</category><managing_agency>HHC</managing_agency><client_agency>H+H</client_agency><current_phase>IT</current_phase><budget_forecast>0.00</budget_forecast><total_budget_changes>180514000.00</total_budget_changes></row><row _id="row-tgzn~uew4~f94k" _uuid="00000000-0000-0000-16CA-4D19DDF00952" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-tgzn~uew4~f94k"><date_reported_as_of>2019-01-01T00:00:00</date_reported_as_of><pid>863</pid><project_name>Network Infrastructure Refresh Program</project_name><description>This project has a two-fold basis: 1) The ongoing Network Refresh which is needed to replace aging, end-of-life, end-of-support equipment across the NYC H+H. 2) Networking capacity needed to support the Electronic Medical Records system.</description><category>Health and Hospitals, IT</category><managing_agency>HHC</managing_agency><client_agency>H+H</client_agency><current_phase>IT</current_phase><budget_forecast>0.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>180514000.00</total_budget_changes></row><row _id="row-t4ba_2m47_ng6d" _uuid="00000000-0000-0000-2D5D-4CD6E864B506" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-t4ba_2m47_ng6d"><date_reported_as_of>2019-05-01T00:00:00</date_reported_as_of><pid>863</pid><project_name>Network Infrastructure Refresh Program</project_name><description>This project has a two-fold basis: 1) The ongoing Network Refresh which is needed to replace aging, end-of-life, end-of-support equipment across the NYC H+H. 2) Networking capacity needed to support the Electronic Medical Records system.</description><category>Health and Hospitals, IT</category><managing_agency>HHC</managing_agency><client_agency>H+H</client_agency><current_phase>IT</current_phase><budget_forecast>160090000.00</budget_forecast><latest_budget_changes>160090000.00</latest_budget_changes><total_budget_changes>180514000.00</total_budget_changes></row><row _id="row-hsrv.s72e~8syj" _uuid="00000000-0000-0000-4D89-A2D631999693" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-hsrv.s72e~8syj"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>863</pid><project_name>Network Infrastructure Refresh Program</project_name><description>This project has a two-fold basis: 1) The ongoing Network Refresh which is needed to replace aging, end-of-life, end-of-support equipment across the NYC H+H. 2) Networking capacity needed to support the Electronic Medical Records system.</description><category>Health and Hospitals, IT</category><managing_agency>HHC</managing_agency><client_agency>H+H</client_agency><current_phase>IT</current_phase><budget_forecast>160090000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>180514000.00</total_budget_changes><forecast_completion>2023-12-31T00:00:00</forecast_completion></row><row _id="row-v9kw~cfhn-gmxn" _uuid="00000000-0000-0000-CEB5-8ABF62038AFC" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-v9kw~cfhn-gmxn"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>863</pid><project_name>Network Infrastructure Refresh Program</project_name><description>This project has a two-fold basis: 1) The ongoing Network Refresh which is needed to replace aging, end-of-life, end-of-support equipment across the NYC H+H. 2) Networking capacity needed to support the Electronic Medical Records system.</description><category>Health and Hospitals, IT</category><managing_agency>HHC</managing_agency><client_agency>H+H</client_agency><current_phase>IT</current_phase><budget_forecast>0.00</budget_forecast><latest_budget_changes>-160090000.00</latest_budget_changes><total_budget_changes>180514000.00</total_budget_changes></row><row _id="row-3ahu-sq7w.qgnq" _uuid="00000000-0000-0000-5FE5-EBB55D1AF3C4" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-3ahu-sq7w.qgnq"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>863</pid><project_name>Network Infrastructure Refresh Program</project_name><description>This project has a two-fold basis: 1) The ongoing Network Refresh which is needed to replace aging, end-of-life, end-of-support equipment across the NYC H+H. 2) Networking capacity needed to support the Electronic Medical Records system.</description><category>Health and Hospitals, IT</category><managing_agency>HHC</managing_agency><client_agency>H+H</client_agency><current_phase>IT</current_phase><budget_forecast>0.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>180514000.00</total_budget_changes></row><row _id="row-3qu4.x475~f6g9" _uuid="00000000-0000-0000-130F-BB20E714EDE6" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-3qu4.x475~f6g9"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>863</pid><project_name>Network Infrastructure Refresh Program</project_name><description>This project has a two-fold basis: 1) The ongoing Network Refresh which is needed to replace aging, end-of-life, end-of-support equipment across the NYC H+H. 2) Networking capacity needed to support the Electronic Medical Records system.</description><category>Health and Hospitals, IT</category><managing_agency>HHC</managing_agency><client_agency>H+H</client_agency><current_phase>IT</current_phase><budget_forecast>0.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>180514000.00</total_budget_changes></row><row _id="row-99zh-5x5m-wz9k" _uuid="00000000-0000-0000-1A1E-A4E3F708BEDE" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-99zh-5x5m-wz9k"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>1219</pid><project_name>P.S. 163 - BRONX New Construction</project_name><description>NEW SCHOOL / DEMOLITION OF EXISTING X163 BUILDING</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Design</current_phase><design_start>2019-12-06T00:00:00</design_start><budget_forecast>113183328.00</budget_forecast><total_budget_changes>-6925988.00</total_budget_changes><forecast_completion>2024-09-03T00:00:00</forecast_completion><total_schedule_changes>0</total_schedule_changes></row><row _id="row-vgif_ubk3-m9cz" _uuid="00000000-0000-0000-0AB1-70AD48AE6639" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-vgif_ubk3-m9cz"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>863</pid><project_name>Network Infrastructure Refresh Program</project_name><description>This project has a two-fold basis: 1) The ongoing Network Refresh which is needed to replace aging, end-of-life, end-of-support equipment across the NYC H+H. 2) Networking capacity needed to support the Electronic Medical Records system.</description><category>Health and Hospitals, IT</category><managing_agency>HHC</managing_agency><client_agency>H+H</client_agency><current_phase>IT</current_phase><budget_forecast>0.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>180514000.00</total_budget_changes></row><row _id="row-cxge.rzqm-z2zq" _uuid="00000000-0000-0000-39CD-710237F9B0CB" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-cxge.rzqm-z2zq"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>863</pid><project_name>Network Infrastructure Refresh Program</project_name><description>This project has a two-fold basis: 1) The ongoing Network Refresh which is needed to replace aging, end-of-life, end-of-support equipment across the NYC H+H. 2) Networking capacity needed to support the Electronic Medical Records system.</description><category>Health and Hospitals, IT</category><managing_agency>HHC</managing_agency><client_agency>H+H</client_agency><current_phase>IT</current_phase><budget_forecast>0.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>180514000.00</total_budget_changes></row><row _id="row-759u.ipyv.9sqw" _uuid="00000000-0000-0000-E4E2-134B67D507C3" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-759u.ipyv.9sqw"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>863</pid><project_name>Network Infrastructure Refresh Program</project_name><description>This project has a two-fold basis: 1) The ongoing Network Refresh which is needed to replace aging, end-of-life, end-of-support equipment across the NYC H+H. 2) Networking capacity needed to support the Electronic Medical Records system.</description><category>Health and Hospitals, IT</category><managing_agency>HHC</managing_agency><client_agency>H+H</client_agency><current_phase>IT</current_phase><budget_forecast>0.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>180514000.00</total_budget_changes></row><row _id="row-v6nj_mauc_vejb" _uuid="00000000-0000-0000-07D1-DDE6CE5965BF" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-v6nj_mauc_vejb"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>863</pid><project_name>Network Infrastructure Refresh Program</project_name><description>This project has a two-fold basis: 1) The ongoing Network Refresh which is needed to replace aging, end-of-life, end-of-support equipment across the NYC H+H. 2) Networking capacity needed to support the Electronic Medical Records system.</description><category>Health and Hospitals, IT</category><managing_agency>HHC</managing_agency><client_agency>H+H</client_agency><current_phase>IT</current_phase><budget_forecast>0.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>180514000.00</total_budget_changes></row><row _id="row-xjqk-f5cz_iuqm" _uuid="00000000-0000-0000-E534-342F3904C5E6" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-xjqk-f5cz_iuqm"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>863</pid><project_name>Network Infrastructure Refresh Program</project_name><description>This project has a two-fold basis: 1) The ongoing Network Refresh which is needed to replace aging, end-of-life, end-of-support equipment across the NYC H+H. 2) Networking capacity needed to support the Electronic Medical Records system.</description><category>Health and Hospitals, IT</category><managing_agency>HHC</managing_agency><client_agency>H+H</client_agency><current_phase>IT</current_phase><budget_forecast>180514000.00</budget_forecast><latest_budget_changes>180514000.00</latest_budget_changes><total_budget_changes>180514000.00</total_budget_changes></row><row _id="row-ahie.dhug.ix7n" _uuid="00000000-0000-0000-CC7E-9F19D7F5A14E" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ahie.dhug.ix7n"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>863</pid><project_name>Network Infrastructure Refresh Program</project_name><description>This project has a two-fold basis: 1) The ongoing Network Refresh which is needed to replace aging, end-of-life, end-of-support equipment across the NYC H+H. 2) Networking capacity needed to support the Electronic Medical Records system.</description><category>Health and Hospitals, IT</category><managing_agency>HHC</managing_agency><client_agency>H+H</client_agency><current_phase>IT</current_phase><budget_forecast>180514000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>180514000.00</total_budget_changes></row><row _id="row-e6bg-s399.ygkb" _uuid="00000000-0000-0000-B99F-4EAB6FAE05AC" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-e6bg-s399.ygkb"><date_reported_as_of>2019-01-01T00:00:00</date_reported_as_of><pid>876</pid><project_name>Brooklyn Public School 730 New Construction</project_name><description>Design and construction of a new school</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction Procurement</current_phase><design_start>2018-01-26T00:00:00</design_start><budget_forecast>59869576.00</budget_forecast><total_budget_changes>6379885.00</total_budget_changes><forecast_completion>2021-09-03T00:00:00</forecast_completion><total_schedule_changes>730</total_schedule_changes></row><row _id="row-43qp~cc7u~6ik2" _uuid="00000000-0000-0000-A653-8D020251A0C4" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-43qp~cc7u~6ik2"><date_reported_as_of>2019-05-01T00:00:00</date_reported_as_of><pid>876</pid><project_name>Brooklyn Public School 730 New Construction</project_name><description>Design and construction of a new school</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2018-01-26T00:00:00</design_start><budget_forecast>50524662.00</budget_forecast><latest_budget_changes>-9344914.00</latest_budget_changes><total_budget_changes>6379885.00</total_budget_changes><forecast_completion>2021-09-03T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>730</total_schedule_changes></row><row _id="row-yghk.53nx-qhhc" _uuid="00000000-0000-0000-266A-286E22FC30FA" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-yghk.53nx-qhhc"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>876</pid><project_name>Brooklyn Public School 730 New Construction</project_name><description>Design and construction of a new school</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2018-01-26T00:00:00</design_start><budget_forecast>54362143.00</budget_forecast><latest_budget_changes>3837481.00</latest_budget_changes><total_budget_changes>6379885.00</total_budget_changes><forecast_completion>2021-09-03T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>730</total_schedule_changes></row><row _id="row-cupv-fsrc-ihem" _uuid="00000000-0000-0000-7BD2-4D5073597363" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-cupv-fsrc-ihem"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>876</pid><project_name>Brooklyn Public School 730 New Construction</project_name><description>NEW SCHOOL</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2018-01-26T00:00:00</design_start><budget_forecast>66249461.00</budget_forecast><latest_budget_changes>11887318.00</latest_budget_changes><total_budget_changes>6379885.00</total_budget_changes><forecast_completion>2021-09-03T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>730</total_schedule_changes></row><row _id="row-xni7.7df5.7hbh" _uuid="00000000-0000-0000-346A-3AA15B0D3B77" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-xni7.7df5.7hbh"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>876</pid><project_name>Brooklyn Public School 730 New Construction</project_name><description>NEW SCHOOL</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2018-01-26T00:00:00</design_start><budget_forecast>66249461.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>6379885.00</total_budget_changes><forecast_completion>2021-09-03T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>730</total_schedule_changes></row><row _id="row-vpmn~52wg~vex3" _uuid="00000000-0000-0000-5EEB-8DD40F00AE3C" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-vpmn~52wg~vex3"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>876</pid><project_name>Brooklyn Public School 730 New Construction</project_name><description>NEW SCHOOL</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2018-01-26T00:00:00</design_start><budget_forecast>66249461.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>6379885.00</total_budget_changes><forecast_completion>2022-09-03T00:00:00</forecast_completion><latest_schedule_changes>365</latest_schedule_changes><total_schedule_changes>730</total_schedule_changes></row><row _id="row-r5cf-x7ti-knke" _uuid="00000000-0000-0000-D479-663FBAC76ACF" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-r5cf-x7ti-knke"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>876</pid><project_name>Brooklyn Public School 730 New Construction</project_name><description>NEW SCHOOL</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2018-01-26T00:00:00</design_start><budget_forecast>66249461.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>6379885.00</total_budget_changes><forecast_completion>2022-09-03T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>730</total_schedule_changes></row><row _id="row-2yaz_jfv5~db2z" _uuid="00000000-0000-0000-BEFC-72DBB1E64924" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-2yaz_jfv5~db2z"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>876</pid><project_name>Brooklyn Public School 730 New Construction</project_name><description>NEW SCHOOL</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2018-01-26T00:00:00</design_start><budget_forecast>66249461.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>6379885.00</total_budget_changes><forecast_completion>2022-09-03T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>730</total_schedule_changes></row><row _id="row-3ty6-gx3i_276g" _uuid="00000000-0000-0000-47A4-6D3568568C32" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-3ty6-gx3i_276g"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>876</pid><project_name>Brooklyn Public School 730 New Construction</project_name><description>NEW SCHOOL</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2018-01-26T00:00:00</design_start><budget_forecast>66249461.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>6379885.00</total_budget_changes><forecast_completion>2023-09-03T00:00:00</forecast_completion><latest_schedule_changes>365</latest_schedule_changes><total_schedule_changes>730</total_schedule_changes></row><row _id="row-k682~x9uv~i9mj" _uuid="00000000-0000-0000-4114-C61479115ECA" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-k682~x9uv~i9mj"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>876</pid><project_name>Brooklyn Public School 730 New Construction</project_name><description>NEW SCHOOL</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2018-01-26T00:00:00</design_start><budget_forecast>66249461.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>6379885.00</total_budget_changes><forecast_completion>2023-09-03T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>730</total_schedule_changes></row><row _id="row-9bzj-5st6-mu25" _uuid="00000000-0000-0000-039E-C3779488031B" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-9bzj-5st6-mu25"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>876</pid><project_name>Brooklyn Public School 730 New Construction</project_name><description>NEW SCHOOL</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2018-01-26T00:00:00</design_start><budget_forecast>66249461.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>6379885.00</total_budget_changes><forecast_completion>2023-09-03T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>730</total_schedule_changes></row><row _id="row-f4e4.ik8u.c4hc" _uuid="00000000-0000-0000-A235-16FFDE8B8B5F" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-f4e4.ik8u.c4hc"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>876</pid><project_name>Brooklyn Public School 730 New Construction</project_name><description>NEW SCHOOL</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2018-01-26T00:00:00</design_start><budget_forecast>66249461.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>6379885.00</total_budget_changes><forecast_completion>2023-09-03T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>730</total_schedule_changes></row><row _id="row-uuek_93zn_x3i7" _uuid="00000000-0000-0000-40CF-157ABBF8677D" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-uuek_93zn_x3i7"><date_reported_as_of>2019-05-01T00:00:00</date_reported_as_of><pid>893</pid><project_name>Bronx Animal Care Center</project_name><description>Bronx Animal Care Center &amp; Veterinary Clinic is a new 50,000 SF facility that will be housing admissions, adoptions, medical services, and boarding for approximately 70 dogs, 140 cats, 30 rabbits and 20 animals or other species. In addition to the animal housing, the Bronx Animal Care Center will include a wildlife area to rehabilitate wild birds, academic partnership for youth, and enhanced senior services. Site work will include yards to facilitate dog adoptions, covered exercise runs, courtyards, and parking for staff, visitors, and shelter vehicles, as well as site lighting and low maintenance planting throughout. The building and associated landscape are to achieve LEED Gold standards.</description><category>Health and Hospitals</category><managing_agency>DDC</managing_agency><client_agency>Health</client_agency><current_phase>Design</current_phase><design_start>2019-06-20T00:00:00</design_start><budget_forecast>69375000.00</budget_forecast><latest_budget_changes>-2288383.00</latest_budget_changes><total_budget_changes>24815617.00</total_budget_changes><forecast_completion>2024-07-01T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>110</total_schedule_changes></row><row _id="row-pfuh.8urb-xwts" _uuid="00000000-0000-0000-D815-EF18E7922772" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-pfuh.8urb-xwts"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>893</pid><project_name>Bronx Animal Care Center</project_name><description>Bronx Animal Care Center &amp; Veterinary Clinic is a new 50,000 SF facility that will be housing admissions, adoptions, medical services, and boarding for approximately 70 dogs, 140 cats, 30 rabbits and 20 animals or other species. In addition to the animal housing, the Bronx Animal Care Center will include a wildlife area to rehabilitate wild birds, academic partnership for youth, and enhanced senior services. Site work will include yards to facilitate dog adoptions, covered exercise runs, courtyards, and parking for staff, visitors, and shelter vehicles, as well as site lighting and low maintenance planting throughout. The building and associated landscape are to achieve LEED Gold standards.</description><category>Health and Hospitals</category><managing_agency>DDC</managing_agency><client_agency>Health</client_agency><current_phase>Design</current_phase><design_start>2019-06-20T00:00:00</design_start><budget_forecast>69375000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>24815617.00</total_budget_changes><forecast_completion>2024-03-01T00:00:00</forecast_completion><latest_schedule_changes>-122</latest_schedule_changes><total_schedule_changes>110</total_schedule_changes></row><row _id="row-g9c7~gyx9-tkun" _uuid="00000000-0000-0000-955F-D93973CF254B" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-g9c7~gyx9-tkun"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>893</pid><project_name>Bronx Animal Care Center</project_name><category>Health and Hospitals</category><managing_agency>DDC</managing_agency><client_agency>Health</client_agency><total_budget_changes>24815617.00</total_budget_changes><total_schedule_changes>110</total_schedule_changes></row><row _id="row-ws3s~k5s3-2f5t" _uuid="00000000-0000-0000-164F-DC690F039C1A" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ws3s~k5s3-2f5t"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>893</pid><project_name>Bronx Animal Care Center</project_name><category>Health and Hospitals</category><managing_agency>DDC</managing_agency><client_agency>Health</client_agency><total_budget_changes>24815617.00</total_budget_changes><total_schedule_changes>110</total_schedule_changes></row><row _id="row-bf7e_7g3j~nje6" _uuid="00000000-0000-0000-1563-613192F7913B" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-bf7e_7g3j~nje6"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>893</pid><project_name>Bronx Animal Care Center</project_name><category>Health and Hospitals</category><managing_agency>DDC</managing_agency><client_agency>Health</client_agency><total_budget_changes>24815617.00</total_budget_changes><total_schedule_changes>110</total_schedule_changes></row><row _id="row-ic4k-y544.f6e5" _uuid="00000000-0000-0000-4B3A-6BEDC2463477" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ic4k-y544.f6e5"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>893</pid><project_name>Bronx Animal Care Center</project_name><category>Health and Hospitals</category><managing_agency>DDC</managing_agency><client_agency>Health</client_agency><total_budget_changes>24815617.00</total_budget_changes><total_schedule_changes>110</total_schedule_changes></row><row _id="row-jjze.gm3x~pud7" _uuid="00000000-0000-0000-21FD-07CAF32D6284" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-jjze.gm3x~pud7"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>1219</pid><project_name>P.S. 163 - BRONX New Construction</project_name><description>NEW SCHOOL / DEMOLITION OF EXISTING X163 BUILDING</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction Procurement</current_phase><design_start>2019-12-06T00:00:00</design_start><budget_forecast>105558715.00</budget_forecast><latest_budget_changes>-7624613.00</latest_budget_changes><total_budget_changes>-6925988.00</total_budget_changes><forecast_completion>2024-12-13T00:00:00</forecast_completion><latest_schedule_changes>101</latest_schedule_changes><total_schedule_changes>0</total_schedule_changes></row><row _id="row-hwrj.n933.an9q" _uuid="00000000-0000-0000-F8D1-E00D2D63C480" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-hwrj.n933.an9q"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>893</pid><project_name>Bronx Animal Care Center</project_name><description>Bronx Animal Care Center &amp; Veterinary Clinic is a new 50,000 SF facility that will be housing admissions, adoptions, medical services, and boarding for approximately 70 dogs, 140 cats, 30 rabbits and 20 animals or other species. In addition to the animal housing, the Bronx Animal Care Center will include a wildlife area to rehabilitate wild birds, academic partnership for youth, and enhanced senior services. Site work will include yards to facilitate dog adoptions, covered exercise runs, courtyards, and parking for staff, visitors, and center vehicles, as well as site lighting and low maintenance planting throughout. The building and associated landscape are to achieve LEED Silver standards or higher.</description><category>Health and Hospitals</category><managing_agency>DDC</managing_agency><client_agency>Health</client_agency><current_phase>Design</current_phase><design_start>2019-06-20T00:00:00</design_start><budget_forecast>91453000.00</budget_forecast><latest_budget_changes>22078000.00</latest_budget_changes><total_budget_changes>24815617.00</total_budget_changes><forecast_completion>2025-01-14T00:00:00</forecast_completion><latest_schedule_changes>319</latest_schedule_changes><total_schedule_changes>110</total_schedule_changes></row><row _id="row-kjyp~gts6-pdup" _uuid="00000000-0000-0000-1E7E-71EEE5A0CBC0" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-kjyp~gts6-pdup"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>893</pid><project_name>Bronx Animal Care Center</project_name><description>Bronx Animal Care Center &amp; Veterinary Clinic is a new 50,000 SF facility that will be housing admissions, adoptions, medical services, and boarding for approximately 70 dogs, 140 cats, 30 rabbits and 20 animals or other species. In addition to the animal housing, the Bronx Animal Care Center will include a wildlife area to rehabilitate wild birds, academic partnership for youth, and enhanced senior services. Site work will include yards to facilitate dog adoptions, covered exercise runs, courtyards, and parking for staff, visitors, and center vehicles, as well as site lighting and low maintenance planting throughout. The building and associated landscape are to achieve LEED Silver standards or higher.</description><category>Health and Hospitals</category><managing_agency>DDC</managing_agency><client_agency>Health</client_agency><current_phase>Design</current_phase><design_start>2019-06-20T00:00:00</design_start><budget_forecast>91853000.00</budget_forecast><latest_budget_changes>400000.00</latest_budget_changes><total_budget_changes>24815617.00</total_budget_changes><forecast_completion>2025-01-14T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>110</total_schedule_changes></row><row _id="row-ggpb-xkda-d4rm" _uuid="00000000-0000-0000-0006-A987833FDF34" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ggpb-xkda-d4rm"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>893</pid><project_name>Bronx Animal Care Center</project_name><description>Bronx Animal Care Center &amp; Veterinary Clinic is a new 50,000 SF facility that will be housing admissions, adoptions, medical services, and boarding for approximately 70 dogs, 140 cats, 30 rabbits and 20 animals or other species. In addition to the animal housing, the Bronx Animal Care Center will include a wildlife area to rehabilitate wild birds, academic partnership for youth, and enhanced senior services. Site work will include yards to facilitate dog adoptions, covered exercise runs, courtyards, and parking for staff, visitors, and center vehicles, as well as site lighting and low maintenance planting throughout. The building and associated landscape are to achieve LEED Silver standards or higher.</description><category>Health and Hospitals</category><managing_agency>DDC</managing_agency><client_agency>Health</client_agency><current_phase>Construction Procurement</current_phase><design_start>2019-06-20T00:00:00</design_start><budget_forecast>92103000.00</budget_forecast><latest_budget_changes>250000.00</latest_budget_changes><total_budget_changes>24815617.00</total_budget_changes><forecast_completion>2025-02-15T00:00:00</forecast_completion><latest_schedule_changes>32</latest_schedule_changes><total_schedule_changes>110</total_schedule_changes></row><row _id="row-vn4x-bpm9.mjsq" _uuid="00000000-0000-0000-F836-4D12B3091025" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-vn4x-bpm9.mjsq"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>893</pid><project_name>Bronx Animal Care Center</project_name><description>Bronx Animal Care Center &amp; Veterinary Clinic is a new 50,000 SF facility that will be housing admissions, adoptions, medical services, and boarding for approximately 70 dogs, 140 cats, 30 rabbits and 20 animals or other species. In addition to the animal housing, the Bronx Animal Care Center will include a wildlife area to rehabilitate wild birds, academic partnership for youth, and enhanced senior services. Site work will include yards to facilitate dog adoptions, covered exercise runs, courtyards, and parking for staff, visitors, and center vehicles, as well as site lighting and low maintenance planting throughout. The building and associated landscape are to achieve LEED Silver standards or higher.</description><category>Health and Hospitals</category><managing_agency>DDC</managing_agency><client_agency>Health</client_agency><current_phase>Construction</current_phase><design_start>2019-06-20T00:00:00</design_start><budget_forecast>91491000.00</budget_forecast><latest_budget_changes>-612000.00</latest_budget_changes><total_budget_changes>24815617.00</total_budget_changes><forecast_completion>2024-10-19T00:00:00</forecast_completion><latest_schedule_changes>-119</latest_schedule_changes><total_schedule_changes>110</total_schedule_changes></row><row _id="row-6aav~mank~mvqz" _uuid="00000000-0000-0000-0C9B-B4F108B0D7C8" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-6aav~mank~mvqz"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>893</pid><project_name>Bronx Animal Care Center</project_name><description>Bronx Animal Care Center &amp; Veterinary Clinic is a new 50,000 SF facility that will be housing admissions, adoptions, medical services, and boarding for approximately 70 dogs, 140 cats, 30 rabbits and 20 animals or other species. In addition to the animal housing, the Bronx Animal Care Center will include a wildlife area to rehabilitate wild birds, academic partnership for youth, and enhanced senior services. Site work will include yards to facilitate dog adoptions, covered exercise runs, courtyards, and parking for staff, visitors, and center vehicles, as well as site lighting and low maintenance planting throughout. The building and associated landscape are to achieve LEED Silver standards or higher.</description><category>Health and Hospitals</category><managing_agency>DDC</managing_agency><client_agency>Health</client_agency><current_phase>Construction</current_phase><design_start>2019-06-20T00:00:00</design_start><budget_forecast>96479000.00</budget_forecast><latest_budget_changes>4988000.00</latest_budget_changes><total_budget_changes>24815617.00</total_budget_changes><forecast_completion>2024-10-19T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>110</total_schedule_changes></row><row _id="row-7fs6_9zp4-6ji3" _uuid="00000000-0000-0000-FF80-2FDBBE824338" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-7fs6_9zp4-6ji3"><date_reported_as_of>2019-01-01T00:00:00</date_reported_as_of><pid>896</pid><project_name>Studio Museum in Harlem New Building</project_name><description>Construction of new museum building.</description><category>Arts and Culture</category><managing_agency>DDC</managing_agency><client_agency>Cultural Affairs</client_agency><current_phase>Construction</current_phase><design_start>2018-09-25T00:00:00</design_start><budget_forecast>59331000.00</budget_forecast><total_budget_changes>-190000.00</total_budget_changes><forecast_completion>2022-02-25T00:00:00</forecast_completion><total_schedule_changes>856</total_schedule_changes></row><row _id="row-ssmg-k2yx~qkmk" _uuid="00000000-0000-0000-1375-EFECE4D00400" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ssmg-k2yx~qkmk"><date_reported_as_of>2019-05-01T00:00:00</date_reported_as_of><pid>896</pid><project_name>Studio Museum in Harlem New Building</project_name><description>The Project will combine two adjacent lots on 125th Street: the sculpture court, City-owned lot 11, and the Museum building on lot 9, owned by the Museum. Existing structures on both lots will be demolished for the new, six story 82,000sf City owned building.</description><category>Arts and Culture</category><managing_agency>DDC</managing_agency><client_agency>Cultural Affairs</client_agency><current_phase>Construction</current_phase><design_start>2018-09-25T00:00:00</design_start><budget_forecast>59431000.00</budget_forecast><latest_budget_changes>100000.00</latest_budget_changes><total_budget_changes>-190000.00</total_budget_changes><forecast_completion>2022-11-25T00:00:00</forecast_completion><latest_schedule_changes>273</latest_schedule_changes><total_schedule_changes>856</total_schedule_changes></row><row _id="row-kk7r-pkyj.npez" _uuid="00000000-0000-0000-D19F-E7DB933794DD" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-kk7r-pkyj.npez"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>896</pid><project_name>Studio Museum in Harlem New Building</project_name><description>The Project will combine two adjacent lots on 125th Street: the sculpture court, City-owned lot 11, and the Museum building on lot 9, owned by the Museum. Existing structures on both lots will be demolished for the new, six story 82,000sf City owned building.</description><category>Arts and Culture</category><managing_agency>DDC</managing_agency><client_agency>Cultural Affairs</client_agency><current_phase>Construction</current_phase><design_start>2018-09-25T00:00:00</design_start><budget_forecast>59431000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-190000.00</total_budget_changes><forecast_completion>2022-11-25T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>856</total_schedule_changes></row><row _id="row-fpg9_cdc3-3bq7" _uuid="00000000-0000-0000-5B2E-57B85E92A1A0" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-fpg9_cdc3-3bq7"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>896</pid><project_name>Studio Museum in Harlem New Building</project_name><category>Arts and Culture</category><managing_agency>DDC</managing_agency><client_agency>Cultural Affairs</client_agency><total_budget_changes>-190000.00</total_budget_changes><total_schedule_changes>856</total_schedule_changes></row><row _id="row-jmzu~27kk_ybvw" _uuid="00000000-0000-0000-5AA3-5257B01E8CD6" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-jmzu~27kk_ybvw"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>896</pid><project_name>Studio Museum in Harlem New Building</project_name><category>Arts and Culture</category><managing_agency>DDC</managing_agency><client_agency>Cultural Affairs</client_agency><total_budget_changes>-190000.00</total_budget_changes><total_schedule_changes>856</total_schedule_changes></row><row _id="row-4dbm-6e9h~iihd" _uuid="00000000-0000-0000-BAF2-BEB3C2FE3BFF" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-4dbm-6e9h~iihd"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>896</pid><project_name>Studio Museum in Harlem New Building</project_name><category>Arts and Culture</category><managing_agency>DDC</managing_agency><client_agency>Cultural Affairs</client_agency><total_budget_changes>-190000.00</total_budget_changes><total_schedule_changes>856</total_schedule_changes></row><row _id="row-rs89-bu9g.r4td" _uuid="00000000-0000-0000-E936-12D41C518F2F" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-rs89-bu9g.r4td"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>896</pid><project_name>Studio Museum in Harlem New Building</project_name><category>Arts and Culture</category><managing_agency>DDC</managing_agency><client_agency>Cultural Affairs</client_agency><total_budget_changes>-190000.00</total_budget_changes><total_schedule_changes>856</total_schedule_changes></row><row _id="row-zjag-6w26_2yzf" _uuid="00000000-0000-0000-50F4-32A3BEBCD00B" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-zjag-6w26_2yzf"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>896</pid><project_name>Studio Museum in Harlem New Building</project_name><description>The Project will combine two adjacent lots on 125th Street: the sculpture court, City-owned lot 11, and the Museum building on lot 9, owned by the Museum. Existing structures on both lots will be demolished for the new, six story 82,000sf City owned building.</description><category>Arts and Culture</category><managing_agency>DDC</managing_agency><client_agency>Cultural Affairs</client_agency><current_phase>Construction</current_phase><design_start>2018-09-25T00:00:00</design_start><budget_forecast>58931000.00</budget_forecast><latest_budget_changes>-500000.00</latest_budget_changes><total_budget_changes>-190000.00</total_budget_changes><forecast_completion>2022-11-25T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>856</total_schedule_changes></row><row _id="row-6qt9_6a9k.cp7z" _uuid="00000000-0000-0000-EEE2-36742AF55D6A" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-6qt9_6a9k.cp7z"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>896</pid><project_name>Studio Museum in Harlem New Building</project_name><description>The Project will combine two adjacent lots on 125th Street: the sculpture court, City-owned lot 11, and the Museum building on lot 9, owned by the Museum. Existing structures on both lots will be demolished for the new, six story 82,000sf City owned building.</description><category>Arts and Culture</category><managing_agency>DDC</managing_agency><client_agency>Cultural Affairs</client_agency><current_phase>Construction</current_phase><design_start>2018-09-25T00:00:00</design_start><budget_forecast>58931000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-190000.00</total_budget_changes><forecast_completion>2024-06-30T00:00:00</forecast_completion><latest_schedule_changes>583</latest_schedule_changes><total_schedule_changes>856</total_schedule_changes></row><row _id="row-gkx6~y65w_mwvd" _uuid="00000000-0000-0000-B568-F21D5BBABEE2" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-gkx6~y65w_mwvd"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>896</pid><project_name>Studio Museum in Harlem New Building</project_name><description>The Project will combine two adjacent lots on 125th Street: the sculpture court, City-owned lot 11, and the Museum building on lot 9, owned by the Museum. Existing structures on both lots will be demolished for the new, six story 82,000sf City owned building.</description><category>Arts and Culture</category><managing_agency>DDC</managing_agency><client_agency>Cultural Affairs</client_agency><current_phase>Construction</current_phase><design_start>2018-09-25T00:00:00</design_start><budget_forecast>59001000.00</budget_forecast><latest_budget_changes>70000.00</latest_budget_changes><total_budget_changes>-190000.00</total_budget_changes><forecast_completion>2024-06-30T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>856</total_schedule_changes></row><row _id="row-m8ia~yzpf~63mn" _uuid="00000000-0000-0000-9592-BD0792D8EFC0" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-m8ia~yzpf~63mn"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>896</pid><project_name>Studio Museum in Harlem New Building</project_name><description>The Project will combine two adjacent lots on 125th Street: the sculpture court, City-owned lot 11, and the Museum building on lot 9, owned by the Museum. Existing structures on both lots will be demolished for the new, six story 82,000sf City owned building.</description><category>Arts and Culture</category><managing_agency>DDC</managing_agency><client_agency>Cultural Affairs</client_agency><current_phase>Construction</current_phase><design_start>2018-09-25T00:00:00</design_start><budget_forecast>59141000.00</budget_forecast><latest_budget_changes>140000.00</latest_budget_changes><total_budget_changes>-190000.00</total_budget_changes><forecast_completion>2024-06-30T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>856</total_schedule_changes></row><row _id="row-mx32~ps6u~aqai" _uuid="00000000-0000-0000-31E2-DB65924E61FF" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-mx32~ps6u~aqai"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>896</pid><project_name>Studio Museum in Harlem New Building</project_name><description>The Project will combine two adjacent lots on 125th Street: the sculpture court, City-owned lot 11, and the Museum building on lot 9, owned by the Museum. Existing structures on both lots will be demolished for the new, six story 82,000sf City owned building.</description><category>Arts and Culture</category><managing_agency>DDC</managing_agency><client_agency>Cultural Affairs</client_agency><current_phase>Construction</current_phase><design_start>2018-09-25T00:00:00</design_start><budget_forecast>59141000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-190000.00</total_budget_changes><forecast_completion>2024-06-30T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>856</total_schedule_changes></row><row _id="row-eee2-c9g4.9cii" _uuid="00000000-0000-0000-FB5E-2D685E0B14C3" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-eee2-c9g4.9cii"><date_reported_as_of>2019-05-01T00:00:00</date_reported_as_of><pid>898</pid><project_name>FUEL TANK &amp; SUMP REPLACEMENTS - QUEENS</project_name><category>Industrial Development</category><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><total_budget_changes>-1850000.00</total_budget_changes><total_schedule_changes>663</total_schedule_changes></row><row _id="row-7nwa_6gjm-xzxv" _uuid="00000000-0000-0000-EBD6-56C32BBDC122" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-7nwa_6gjm-xzxv"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>898</pid><project_name>FUEL TANK &amp; SUMP REPLACEMENTS - QUEENS</project_name><description>CITYWIDE FUEL TANK REPLACEMENT PROGRAM FOR NEW 2015 EPA PETROLEUM BULK STORAGE REGULATIONS</description><category>Industrial Development</category><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><current_phase>Design</current_phase><design_start>2019-07-16T00:00:00</design_start><budget_forecast>27500000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-1850000.00</total_budget_changes><forecast_completion>2023-06-30T00:00:00</forecast_completion><latest_schedule_changes>91</latest_schedule_changes><total_schedule_changes>663</total_schedule_changes></row><row _id="row-7v7k~wgmf.afxj" _uuid="00000000-0000-0000-0E95-01592E9DD25D" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-7v7k~wgmf.afxj"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>898</pid><project_name>FUEL TANK &amp; SUMP REPLACEMENTS - QUEENS</project_name><category>Industrial Development</category><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><total_budget_changes>-1850000.00</total_budget_changes><total_schedule_changes>663</total_schedule_changes></row><row _id="row-rzfw_9uyd~v38b" _uuid="00000000-0000-0000-209E-8D184A9401D5" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-rzfw_9uyd~v38b"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>898</pid><project_name>FUEL TANK &amp; SUMP REPLACEMENTS - QUEENS</project_name><category>Industrial Development</category><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><total_budget_changes>-1850000.00</total_budget_changes><total_schedule_changes>663</total_schedule_changes></row><row _id="row-aqg4~vzws-zn4h" _uuid="00000000-0000-0000-DD16-8C3ED9CCEE32" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-aqg4~vzws-zn4h"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>898</pid><project_name>FUEL TANK &amp; SUMP REPLACEMENTS - QUEENS</project_name><category>Industrial Development</category><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><total_budget_changes>-1850000.00</total_budget_changes><total_schedule_changes>663</total_schedule_changes></row><row _id="row-varm~63qm.qapu" _uuid="00000000-0000-0000-BAF9-E45FE78044C2" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-varm~63qm.qapu"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>898</pid><project_name>FUEL TANK &amp; SUMP REPLACEMENTS - QUEENS</project_name><category>Industrial Development</category><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><total_budget_changes>-1850000.00</total_budget_changes><total_schedule_changes>663</total_schedule_changes></row><row _id="row-ui8f_683h~km4b" _uuid="00000000-0000-0000-8B7A-1EBC11108542" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ui8f_683h~km4b"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>898</pid><project_name>FUEL TANK &amp; SUMP REPLACEMENTS - QUEENS</project_name><description>CITYWIDE FUEL TANK REPLACEMENT PROGRAM FOR NEW 2015 EPA PETROLEUM BULK STORAGE REGULATIONS</description><category>Industrial Development</category><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><current_phase>Design</current_phase><design_start>2019-07-16T00:00:00</design_start><budget_forecast>25350000.00</budget_forecast><latest_budget_changes>-2150000.00</latest_budget_changes><total_budget_changes>-1850000.00</total_budget_changes><forecast_completion>2025-01-02T00:00:00</forecast_completion><latest_schedule_changes>552</latest_schedule_changes><total_schedule_changes>663</total_schedule_changes></row><row _id="row-nays_9wj4_piie" _uuid="00000000-0000-0000-AE9B-83BBDE25ADAC" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-nays_9wj4_piie"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>898</pid><project_name>FUEL TANK &amp; SUMP REPLACEMENTS - QUEENS</project_name><description>CITYWIDE FUEL TANK REPLACEMENT PROGRAM FOR NEW 2015 EPA PETROLEUM BULK STORAGE REGULATIONS</description><category>Industrial Development</category><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><current_phase>Design</current_phase><design_start>2019-07-16T00:00:00</design_start><budget_forecast>25350000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-1850000.00</total_budget_changes><forecast_completion>2025-06-29T00:00:00</forecast_completion><latest_schedule_changes>178</latest_schedule_changes><total_schedule_changes>663</total_schedule_changes></row><row _id="row-2gdg.brxd~zfz3" _uuid="00000000-0000-0000-E9D0-51D322EF7F7C" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-2gdg.brxd~zfz3"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>898</pid><project_name>FUEL TANK &amp; SUMP REPLACEMENTS - QUEENS</project_name><description>CITYWIDE FUEL TANK REPLACEMENT PROGRAM FOR NEW 2015 EPA PETROLEUM BULK STORAGE REGULATIONS</description><category>Industrial Development</category><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><current_phase>Design</current_phase><design_start>2019-07-16T00:00:00</design_start><budget_forecast>25350000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-1850000.00</total_budget_changes><forecast_completion>2025-06-29T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>663</total_schedule_changes></row><row _id="row-mtqj-69ew~hev2" _uuid="00000000-0000-0000-46A5-34BD4460B9FF" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-mtqj-69ew~hev2"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>898</pid><project_name>FUEL TANK &amp; SUMP REPLACEMENTS - QUEENS</project_name><description>CITYWIDE FUEL TANK REPLACEMENT PROGRAM FOR NEW 2015 EPA PETROLEUM BULK STORAGE REGULATIONS</description><category>Industrial Development</category><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><current_phase>Construction</current_phase><design_start>2019-07-16T00:00:00</design_start><budget_forecast>25650000.00</budget_forecast><latest_budget_changes>300000.00</latest_budget_changes><total_budget_changes>-1850000.00</total_budget_changes><forecast_completion>2025-01-22T00:00:00</forecast_completion><latest_schedule_changes>-158</latest_schedule_changes><total_schedule_changes>663</total_schedule_changes></row><row _id="row-ciwx-tvcx.kfup" _uuid="00000000-0000-0000-B758-D050C8C094CA" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ciwx-tvcx.kfup"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>898</pid><project_name>FUEL TANK &amp; SUMP REPLACEMENTS - QUEENS</project_name><description>CITYWIDE FUEL TANK REPLACEMENT PROGRAM FOR NEW 2015 EPA PETROLEUM BULK STORAGE REGULATIONS</description><category>Industrial Development</category><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><current_phase>Construction</current_phase><design_start>2019-07-16T00:00:00</design_start><budget_forecast>25650000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-1850000.00</total_budget_changes><forecast_completion>2025-01-22T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>663</total_schedule_changes></row><row _id="row-jswh-qckg.ikw2" _uuid="00000000-0000-0000-E7E9-BEC8656B2FF4" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-jswh-qckg.ikw2"><date_reported_as_of>2019-05-01T00:00:00</date_reported_as_of><pid>899</pid><project_name>FUEL TANK &amp; SUMP REPLACEMENTS - BROOKLYN</project_name><category>Industrial Development</category><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><total_budget_changes>-1940000.00</total_budget_changes><total_schedule_changes>663</total_schedule_changes></row><row _id="row-76fe_xhg6~4iah" _uuid="00000000-0000-0000-60B0-ABBC262FC679" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-76fe_xhg6~4iah"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>899</pid><project_name>FUEL TANK &amp; SUMP REPLACEMENTS - BROOKLYN</project_name><description>CITYWIDE FUEL TANK REPLACEMENT PROGRAM FOR NEW 2015 EPA PETROLEUM BULK STORAGE REGULATIONS</description><category>Industrial Development</category><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><current_phase>Design</current_phase><design_start>2019-08-16T00:00:00</design_start><budget_forecast>27500000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-1940000.00</total_budget_changes><forecast_completion>2023-06-30T00:00:00</forecast_completion><latest_schedule_changes>91</latest_schedule_changes><total_schedule_changes>663</total_schedule_changes></row><row _id="row-tvma.aga3_pcm5" _uuid="00000000-0000-0000-001A-BC08DE07477D" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-tvma.aga3_pcm5"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>899</pid><project_name>FUEL TANK &amp; SUMP REPLACEMENTS - BROOKLYN</project_name><category>Industrial Development</category><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><total_budget_changes>-1940000.00</total_budget_changes><total_schedule_changes>663</total_schedule_changes></row><row _id="row-8g6b_7mfy.azvy" _uuid="00000000-0000-0000-58B9-B30C87A2D88F" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-8g6b_7mfy.azvy"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>899</pid><project_name>FUEL TANK &amp; SUMP REPLACEMENTS - BROOKLYN</project_name><category>Industrial Development</category><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><total_budget_changes>-1940000.00</total_budget_changes><total_schedule_changes>663</total_schedule_changes></row><row _id="row-erzb_wpa2_pvb3" _uuid="00000000-0000-0000-E9DB-3864A5B9443F" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-erzb_wpa2_pvb3"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>899</pid><project_name>FUEL TANK &amp; SUMP REPLACEMENTS - BROOKLYN</project_name><category>Industrial Development</category><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><total_budget_changes>-1940000.00</total_budget_changes><total_schedule_changes>663</total_schedule_changes></row><row _id="row-bbam~cbum_h77v" _uuid="00000000-0000-0000-C1E9-25E2DD9AF472" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-bbam~cbum_h77v"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>899</pid><project_name>FUEL TANK &amp; SUMP REPLACEMENTS - BROOKLYN</project_name><category>Industrial Development</category><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><total_budget_changes>-1940000.00</total_budget_changes><total_schedule_changes>663</total_schedule_changes></row><row _id="row-v59i~dagn~4uvr" _uuid="00000000-0000-0000-CD90-43024AE7B02F" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-v59i~dagn~4uvr"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>899</pid><project_name>FUEL TANK &amp; SUMP REPLACEMENTS - BROOKLYN</project_name><description>CITYWIDE FUEL TANK REPLACEMENT PROGRAM FOR NEW 2015 EPA PETROLEUM BULK STORAGE REGULATIONS</description><category>Industrial Development</category><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><current_phase>Design</current_phase><design_start>2019-08-16T00:00:00</design_start><budget_forecast>25210000.00</budget_forecast><latest_budget_changes>-2290000.00</latest_budget_changes><total_budget_changes>-1940000.00</total_budget_changes><forecast_completion>2025-01-02T00:00:00</forecast_completion><latest_schedule_changes>552</latest_schedule_changes><total_schedule_changes>663</total_schedule_changes></row><row _id="row-syes~ttar.7aze" _uuid="00000000-0000-0000-BB12-98704A7FDF64" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-syes~ttar.7aze"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>899</pid><project_name>FUEL TANK &amp; SUMP REPLACEMENTS - BROOKLYN</project_name><description>CITYWIDE FUEL TANK REPLACEMENT PROGRAM FOR NEW 2015 EPA PETROLEUM BULK STORAGE REGULATIONS</description><category>Industrial Development</category><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><current_phase>Design</current_phase><design_start>2019-08-16T00:00:00</design_start><budget_forecast>25210000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-1940000.00</total_budget_changes><forecast_completion>2025-06-29T00:00:00</forecast_completion><latest_schedule_changes>178</latest_schedule_changes><total_schedule_changes>663</total_schedule_changes></row><row _id="row-4v4v~ahk3~4ke8" _uuid="00000000-0000-0000-050F-D9FB35D49005" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-4v4v~ahk3~4ke8"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>899</pid><project_name>FUEL TANK &amp; SUMP REPLACEMENTS - BROOKLYN</project_name><description>CITYWIDE FUEL TANK REPLACEMENT PROGRAM FOR NEW 2015 EPA PETROLEUM BULK STORAGE REGULATIONS</description><category>Industrial Development</category><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><current_phase>Design</current_phase><design_start>2019-08-16T00:00:00</design_start><budget_forecast>25310000.00</budget_forecast><latest_budget_changes>100000.00</latest_budget_changes><total_budget_changes>-1940000.00</total_budget_changes><forecast_completion>2025-12-03T00:00:00</forecast_completion><latest_schedule_changes>157</latest_schedule_changes><total_schedule_changes>663</total_schedule_changes></row><row _id="row-78ac.6r8y.8zi2" _uuid="00000000-0000-0000-B7F8-3FBC4669EAAC" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-78ac.6r8y.8zi2"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>899</pid><project_name>FUEL TANK &amp; SUMP REPLACEMENTS - BROOKLYN</project_name><description>CITYWIDE FUEL TANK REPLACEMENT PROGRAM FOR NEW 2015 EPA PETROLEUM BULK STORAGE REGULATIONS</description><category>Industrial Development</category><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><current_phase>Design</current_phase><design_start>2019-08-16T00:00:00</design_start><budget_forecast>25560000.00</budget_forecast><latest_budget_changes>250000.00</latest_budget_changes><total_budget_changes>-1940000.00</total_budget_changes><forecast_completion>2025-12-03T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>663</total_schedule_changes></row><row _id="row-6iju_e8bj~ymmx" _uuid="00000000-0000-0000-4A1B-05170C0681CD" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-6iju_e8bj~ymmx"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>899</pid><project_name>FUEL TANK &amp; SUMP REPLACEMENTS - BROOKLYN</project_name><description>CITYWIDE FUEL TANK REPLACEMENT PROGRAM FOR NEW 2015 EPA PETROLEUM BULK STORAGE REGULATIONS</description><category>Industrial Development</category><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><current_phase>Construction</current_phase><design_start>2019-08-16T00:00:00</design_start><budget_forecast>25560000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-1940000.00</total_budget_changes><forecast_completion>2025-01-22T00:00:00</forecast_completion><latest_schedule_changes>-315</latest_schedule_changes><total_schedule_changes>663</total_schedule_changes></row><row _id="row-6mhp~mxqf-2but" _uuid="00000000-0000-0000-E78D-C751EBC45062" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-6mhp~mxqf-2but"><date_reported_as_of>2019-05-01T00:00:00</date_reported_as_of><pid>900</pid><project_name>FUEL TANK &amp; SUMP REPLACEMENTS - MANHATTAN/S.I.</project_name><category>Industrial Development</category><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><total_budget_changes>-1754000.00</total_budget_changes><total_schedule_changes>663</total_schedule_changes></row><row _id="row-gwqt-gmma-4ggh" _uuid="00000000-0000-0000-B156-E5EAA43C7F36" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-gwqt-gmma-4ggh"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>900</pid><project_name>FUEL TANK &amp; SUMP REPLACEMENTS - MANHATTAN/S.I.</project_name><description>CITYWIDE FUEL TANK REPLACEMENT PROGRAM FOR NEW 2015 EPA PETROLEUM BULK STORAGE REGULATIONS</description><category>Industrial Development</category><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><current_phase>Design</current_phase><design_start>2019-07-17T00:00:00</design_start><budget_forecast>27400000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-1754000.00</total_budget_changes><forecast_completion>2023-06-30T00:00:00</forecast_completion><latest_schedule_changes>91</latest_schedule_changes><total_schedule_changes>663</total_schedule_changes></row><row _id="row-rcsm-r459-bs67" _uuid="00000000-0000-0000-7CFE-7479D01B0148" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-rcsm-r459-bs67"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>900</pid><project_name>FUEL TANK &amp; SUMP REPLACEMENTS - MANHATTAN/S.I.</project_name><category>Industrial Development</category><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><total_budget_changes>-1754000.00</total_budget_changes><total_schedule_changes>663</total_schedule_changes></row><row _id="row-q72e-wrvk_s4bz" _uuid="00000000-0000-0000-142A-A682907E679C" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-q72e-wrvk_s4bz"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>900</pid><project_name>FUEL TANK &amp; SUMP REPLACEMENTS - MANHATTAN/S.I.</project_name><category>Industrial Development</category><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><total_budget_changes>-1754000.00</total_budget_changes><total_schedule_changes>663</total_schedule_changes></row><row _id="row-77jq-tzn4_dcrk" _uuid="00000000-0000-0000-1DB8-4CAF93E8B055" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-77jq-tzn4_dcrk"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>900</pid><project_name>FUEL TANK &amp; SUMP REPLACEMENTS - MANHATTAN/S.I.</project_name><category>Industrial Development</category><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><total_budget_changes>-1754000.00</total_budget_changes><total_schedule_changes>663</total_schedule_changes></row><row _id="row-betq-hujd.5m6p" _uuid="00000000-0000-0000-7F6C-107210C08714" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-betq-hujd.5m6p"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>900</pid><project_name>FUEL TANK &amp; SUMP REPLACEMENTS - MANHATTAN/S.I.</project_name><category>Industrial Development</category><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><total_budget_changes>-1754000.00</total_budget_changes><total_schedule_changes>663</total_schedule_changes></row><row _id="row-ysqu.pdgn~qsvj" _uuid="00000000-0000-0000-E218-A41B85CF2C14" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ysqu.pdgn~qsvj"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>900</pid><project_name>FUEL TANK &amp; SUMP REPLACEMENTS - MANHATTAN/S.I.</project_name><description>CITYWIDE FUEL TANK REPLACEMENT PROGRAM FOR NEW 2015 EPA PETROLEUM BULK STORAGE REGULATIONS</description><category>Industrial Development</category><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><current_phase>Design</current_phase><design_start>2019-07-17T00:00:00</design_start><budget_forecast>25246000.00</budget_forecast><latest_budget_changes>-2154000.00</latest_budget_changes><total_budget_changes>-1754000.00</total_budget_changes><forecast_completion>2025-01-02T00:00:00</forecast_completion><latest_schedule_changes>552</latest_schedule_changes><total_schedule_changes>663</total_schedule_changes></row><row _id="row-sx6j~p47u-6qb2" _uuid="00000000-0000-0000-F029-819D1BD33C19" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-sx6j~p47u-6qb2"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>900</pid><project_name>FUEL TANK &amp; SUMP REPLACEMENTS - MANHATTAN/S.I.</project_name><description>CITYWIDE FUEL TANK REPLACEMENT PROGRAM FOR NEW 2015 EPA PETROLEUM BULK STORAGE REGULATIONS</description><category>Industrial Development</category><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><current_phase>Design</current_phase><design_start>2019-07-17T00:00:00</design_start><budget_forecast>25246000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-1754000.00</total_budget_changes><forecast_completion>2025-06-29T00:00:00</forecast_completion><latest_schedule_changes>178</latest_schedule_changes><total_schedule_changes>663</total_schedule_changes></row><row _id="row-qbv8~rv6j.6h4c" _uuid="00000000-0000-0000-3ED5-060DFBC5847B" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-qbv8~rv6j.6h4c"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>900</pid><project_name>FUEL TANK &amp; SUMP REPLACEMENTS - MANHATTAN/S.I.</project_name><description>CITYWIDE FUEL TANK REPLACEMENT PROGRAM FOR NEW 2015 EPA PETROLEUM BULK STORAGE REGULATIONS</description><category>Industrial Development</category><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><current_phase>Design</current_phase><design_start>2019-07-17T00:00:00</design_start><budget_forecast>25546000.00</budget_forecast><latest_budget_changes>300000.00</latest_budget_changes><total_budget_changes>-1754000.00</total_budget_changes><forecast_completion>2025-06-29T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>663</total_schedule_changes></row><row _id="row-rryb.mu8v-6xug" _uuid="00000000-0000-0000-D209-E64D8B0397AE" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-rryb.mu8v-6xug"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>900</pid><project_name>FUEL TANK &amp; SUMP REPLACEMENTS - MANHATTAN/S.I.</project_name><description>CITYWIDE FUEL TANK REPLACEMENT PROGRAM FOR NEW 2015 EPA PETROLEUM BULK STORAGE REGULATIONS</description><category>Industrial Development</category><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><current_phase>Construction</current_phase><design_start>2019-07-17T00:00:00</design_start><budget_forecast>25646000.00</budget_forecast><latest_budget_changes>100000.00</latest_budget_changes><total_budget_changes>-1754000.00</total_budget_changes><forecast_completion>2025-01-22T00:00:00</forecast_completion><latest_schedule_changes>-158</latest_schedule_changes><total_schedule_changes>663</total_schedule_changes></row><row _id="row-e9zd.66em-4hr4" _uuid="00000000-0000-0000-6EC9-E314C1786385" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-e9zd.66em-4hr4"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>900</pid><project_name>FUEL TANK &amp; SUMP REPLACEMENTS - MANHATTAN/S.I.</project_name><description>CITYWIDE FUEL TANK REPLACEMENT PROGRAM FOR NEW 2015 EPA PETROLEUM BULK STORAGE REGULATIONS</description><category>Industrial Development</category><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><current_phase>Construction</current_phase><design_start>2019-07-17T00:00:00</design_start><budget_forecast>25646000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-1754000.00</total_budget_changes><forecast_completion>2025-01-22T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>663</total_schedule_changes></row><row _id="row-34rd_ujjr~eyck" _uuid="00000000-0000-0000-676E-85F0671CA48C" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-34rd_ujjr~eyck"><date_reported_as_of>2019-05-01T00:00:00</date_reported_as_of><pid>901</pid><project_name>FUEL TANK &amp; SUMP REPLACEMENTS - BRONX</project_name><category>Industrial Development</category><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><total_budget_changes>-1834000.00</total_budget_changes><total_schedule_changes>663</total_schedule_changes></row><row _id="row-gjzs_vdwq-nc7r" _uuid="00000000-0000-0000-E9B2-782B65A57020" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-gjzs_vdwq-nc7r"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>901</pid><project_name>FUEL TANK &amp; SUMP REPLACEMENTS - BRONX</project_name><description>CITYWIDE FUEL TANK REPLACEMENT PROGRAM FOR NEW 2015 EPA PETROLEUM BULK STORAGE REGULATIONS</description><category>Industrial Development</category><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><current_phase>Design</current_phase><design_start>2019-08-20T00:00:00</design_start><budget_forecast>27500000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-1834000.00</total_budget_changes><forecast_completion>2023-06-30T00:00:00</forecast_completion><latest_schedule_changes>91</latest_schedule_changes><total_schedule_changes>663</total_schedule_changes></row><row _id="row-62hj-ihjx.ww3k" _uuid="00000000-0000-0000-BFAF-5F1BD339C7C1" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-62hj-ihjx.ww3k"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>901</pid><project_name>FUEL TANK &amp; SUMP REPLACEMENTS - BRONX</project_name><category>Industrial Development</category><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><total_budget_changes>-1834000.00</total_budget_changes><total_schedule_changes>663</total_schedule_changes></row><row _id="row-72ad_khv2-fpy8" _uuid="00000000-0000-0000-5A11-B236905FC049" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-72ad_khv2-fpy8"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>901</pid><project_name>FUEL TANK &amp; SUMP REPLACEMENTS - BRONX</project_name><category>Industrial Development</category><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><total_budget_changes>-1834000.00</total_budget_changes><total_schedule_changes>663</total_schedule_changes></row><row _id="row-hxhj~bhm2~an3r" _uuid="00000000-0000-0000-D9F2-1E5D0F838A3A" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-hxhj~bhm2~an3r"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>901</pid><project_name>FUEL TANK &amp; SUMP REPLACEMENTS - BRONX</project_name><category>Industrial Development</category><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><total_budget_changes>-1834000.00</total_budget_changes><total_schedule_changes>663</total_schedule_changes></row><row _id="row-ecaw-qpx9~sj7y" _uuid="00000000-0000-0000-5E11-79544D682088" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ecaw-qpx9~sj7y"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>901</pid><project_name>FUEL TANK &amp; SUMP REPLACEMENTS - BRONX</project_name><category>Industrial Development</category><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><total_budget_changes>-1834000.00</total_budget_changes><total_schedule_changes>663</total_schedule_changes></row><row _id="row-ybjx~84bq~npx6" _uuid="00000000-0000-0000-EDD7-44DB193165FA" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ybjx~84bq~npx6"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>901</pid><project_name>FUEL TANK &amp; SUMP REPLACEMENTS - BRONX</project_name><description>CITYWIDE FUEL TANK REPLACEMENT PROGRAM FOR NEW 2015 EPA PETROLEUM BULK STORAGE REGULATIONS</description><category>Industrial Development</category><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><current_phase>Design</current_phase><design_start>2019-08-20T00:00:00</design_start><budget_forecast>25316000.00</budget_forecast><latest_budget_changes>-2184000.00</latest_budget_changes><total_budget_changes>-1834000.00</total_budget_changes><forecast_completion>2025-01-02T00:00:00</forecast_completion><latest_schedule_changes>552</latest_schedule_changes><total_schedule_changes>663</total_schedule_changes></row><row _id="row-fkvu_yqmv-fm7r" _uuid="00000000-0000-0000-54AA-487362DF499C" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-fkvu_yqmv-fm7r"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>901</pid><project_name>FUEL TANK &amp; SUMP REPLACEMENTS - BRONX</project_name><description>CITYWIDE FUEL TANK REPLACEMENT PROGRAM FOR NEW 2015 EPA PETROLEUM BULK STORAGE REGULATIONS</description><category>Industrial Development</category><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><current_phase>Construction</current_phase><design_start>2019-08-20T00:00:00</design_start><budget_forecast>25316000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-1834000.00</total_budget_changes><forecast_completion>2025-01-22T00:00:00</forecast_completion><latest_schedule_changes>20</latest_schedule_changes><total_schedule_changes>663</total_schedule_changes></row><row _id="row-77c2-36se-pn57" _uuid="00000000-0000-0000-F9C0-B066FDB6B54F" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-77c2-36se-pn57"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>901</pid><project_name>FUEL TANK &amp; SUMP REPLACEMENTS - BRONX</project_name><description>CITYWIDE FUEL TANK REPLACEMENT PROGRAM FOR NEW 2015 EPA PETROLEUM BULK STORAGE REGULATIONS</description><category>Industrial Development</category><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><current_phase>Construction</current_phase><design_start>2019-08-20T00:00:00</design_start><budget_forecast>25516000.00</budget_forecast><latest_budget_changes>200000.00</latest_budget_changes><total_budget_changes>-1834000.00</total_budget_changes><forecast_completion>2025-01-22T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>663</total_schedule_changes></row><row _id="row-tv6m-62q3.bftr" _uuid="00000000-0000-0000-1DC9-30D06C3F65E3" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-tv6m-62q3.bftr"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>901</pid><project_name>FUEL TANK &amp; SUMP REPLACEMENTS - BRONX</project_name><description>CITYWIDE FUEL TANK REPLACEMENT PROGRAM FOR NEW 2015 EPA PETROLEUM BULK STORAGE REGULATIONS</description><category>Industrial Development</category><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><current_phase>Construction</current_phase><design_start>2019-08-20T00:00:00</design_start><budget_forecast>25666000.00</budget_forecast><latest_budget_changes>150000.00</latest_budget_changes><total_budget_changes>-1834000.00</total_budget_changes><forecast_completion>2025-01-22T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>663</total_schedule_changes></row><row _id="row-hhpm_8c2m_jcva" _uuid="00000000-0000-0000-11DE-47BB9C3E9BD1" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-hhpm_8c2m_jcva"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>901</pid><project_name>FUEL TANK &amp; SUMP REPLACEMENTS - BRONX</project_name><description>CITYWIDE FUEL TANK REPLACEMENT PROGRAM FOR NEW 2015 EPA PETROLEUM BULK STORAGE REGULATIONS</description><category>Industrial Development</category><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><current_phase>Construction</current_phase><design_start>2019-08-20T00:00:00</design_start><budget_forecast>25666000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-1834000.00</total_budget_changes><forecast_completion>2025-01-22T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>663</total_schedule_changes></row><row _id="row-y23s.95qm-menn" _uuid="00000000-0000-0000-4EF0-E8A8B4ABA2A2" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-y23s.95qm-menn"><date_reported_as_of>2019-05-01T00:00:00</date_reported_as_of><pid>906</pid><project_name>Headworks Improvements at Tallman Island</project_name><description>Headworks Improvements at Tallman Island intended to bring the headworks into a state of good repair. The headworks was last upgraded in 1979, and the service lives of critical systems are nearing their endpoints.</description><category>Industrial Development</category><managing_agency>DEP</managing_agency><client_agency>WWC</client_agency><current_phase>Design</current_phase><design_start>2019-07-01T00:00:00</design_start><budget_forecast>47204478.00</budget_forecast><latest_budget_changes>17380000.00</latest_budget_changes><total_budget_changes>19975649.96</total_budget_changes><forecast_completion>2025-03-07T00:00:00</forecast_completion><latest_schedule_changes>61</latest_schedule_changes><total_schedule_changes>586</total_schedule_changes></row><row _id="row-j5wd~4a4v_62aj" _uuid="00000000-0000-0000-D202-D440A2C8D8E9" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-j5wd~4a4v_62aj"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>906</pid><project_name>Headworks Improvements at Tallman Island</project_name><description>Headworks Improvements</description><category>Industrial Development</category><managing_agency>DEP</managing_agency><client_agency>WWC</client_agency><current_phase>Design</current_phase><design_start>2019-07-07T00:00:00</design_start><budget_forecast>47204478.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>19975649.96</total_budget_changes><forecast_completion>2024-12-13T00:00:00</forecast_completion><latest_schedule_changes>-84</latest_schedule_changes><total_schedule_changes>586</total_schedule_changes></row><row _id="row-2hru_7kgf~23bm" _uuid="00000000-0000-0000-56F6-FB7CF1C33AF6" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-2hru_7kgf~23bm"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>906</pid><project_name>Headworks Improvements at Tallman Island</project_name><description>Headworks Improvements</description><category>Industrial Development</category><managing_agency>DEP</managing_agency><client_agency>WWC</client_agency><current_phase>Design</current_phase><design_start>2019-07-07T00:00:00</design_start><budget_forecast>47204478.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>19975649.96</total_budget_changes><forecast_completion>2024-12-13T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>586</total_schedule_changes></row><row _id="row-gv5s~my9p_p5qq" _uuid="00000000-0000-0000-8C59-0196371DAE80" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-gv5s~my9p_p5qq"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>906</pid><project_name>Headworks Improvements at Tallman Island</project_name><description>Headworks Improvements</description><category>Industrial Development</category><managing_agency>DEP</managing_agency><client_agency>WWC</client_agency><current_phase>Design</current_phase><design_start>2019-07-07T00:00:00</design_start><budget_forecast>41972972.00</budget_forecast><latest_budget_changes>-5231506.00</latest_budget_changes><total_budget_changes>19975649.96</total_budget_changes><forecast_completion>2024-12-13T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>586</total_schedule_changes></row><row _id="row-6qw3_znjc.madc" _uuid="00000000-0000-0000-05BE-C1CD3B20DADA" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-6qw3_znjc.madc"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>906</pid><project_name>Headworks Improvements at Tallman Island</project_name><description>Headworks Improvements</description><category>Industrial Development</category><managing_agency>DEP</managing_agency><client_agency>WWC</client_agency><current_phase>Design</current_phase><design_start>2019-07-07T00:00:00</design_start><budget_forecast>42150751.00</budget_forecast><latest_budget_changes>177779.00</latest_budget_changes><total_budget_changes>19975649.96</total_budget_changes><forecast_completion>2025-08-05T00:00:00</forecast_completion><latest_schedule_changes>235</latest_schedule_changes><total_schedule_changes>586</total_schedule_changes></row><row _id="row-jvux-8ym9~pgas" _uuid="00000000-0000-0000-487A-0EC73E425620" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-jvux-8ym9~pgas"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>906</pid><project_name>Headworks Improvements at Tallman Island</project_name><description>Headworks Improvements</description><category>Industrial Development</category><managing_agency>DEP</managing_agency><client_agency>WWC</client_agency><current_phase>Design</current_phase><design_start>2019-07-07T00:00:00</design_start><budget_forecast>48530751.00</budget_forecast><latest_budget_changes>6380000.00</latest_budget_changes><total_budget_changes>19975649.96</total_budget_changes><forecast_completion>2025-08-06T00:00:00</forecast_completion><latest_schedule_changes>1</latest_schedule_changes><total_schedule_changes>586</total_schedule_changes></row><row _id="row-5ymz.eurm-z329" _uuid="00000000-0000-0000-1B11-5294163F87F3" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-5ymz.eurm-z329"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>906</pid><project_name>Headworks Improvements at Tallman Island</project_name><description>Headworks Improvements</description><category>Industrial Development</category><managing_agency>DEP</managing_agency><client_agency>WWC</client_agency><current_phase>Design</current_phase><design_start>2019-07-07T00:00:00</design_start><budget_forecast>47455751.00</budget_forecast><latest_budget_changes>-1075000.00</latest_budget_changes><total_budget_changes>19975649.96</total_budget_changes><forecast_completion>2026-11-05T00:00:00</forecast_completion><latest_schedule_changes>456</latest_schedule_changes><total_schedule_changes>586</total_schedule_changes></row><row _id="row-z4e5_3jx9_pe48" _uuid="00000000-0000-0000-143A-DD3DAAF27A7B" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-z4e5_3jx9_pe48"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>906</pid><project_name>Headworks Improvements at Tallman Island</project_name><description>Headworks Improvements</description><category>Industrial Development</category><managing_agency>DEP</managing_agency><client_agency>WWC</client_agency><current_phase>Design</current_phase><design_start>2019-07-07T00:00:00</design_start><budget_forecast>52030751.00</budget_forecast><latest_budget_changes>4575000.00</latest_budget_changes><total_budget_changes>19975649.96</total_budget_changes><forecast_completion>2026-11-05T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>586</total_schedule_changes></row><row _id="row-nuqy-w3yz~y79t" _uuid="00000000-0000-0000-D5CE-4681F957F1E2" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-nuqy-w3yz~y79t"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>906</pid><project_name>Headworks Improvements at Tallman Island</project_name><description>Headworks Improvements</description><category>Industrial Development</category><managing_agency>DEP</managing_agency><client_agency>WWC</client_agency><current_phase>Design</current_phase><design_start>2019-07-07T00:00:00</design_start><budget_forecast>52030751.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>19975649.96</total_budget_changes><forecast_completion>2026-11-05T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>586</total_schedule_changes></row><row _id="row-v633_t558.4d8i" _uuid="00000000-0000-0000-3287-FF7707807527" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-v633_t558.4d8i"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>906</pid><project_name>Headworks Improvements at Tallman Island</project_name><description>Headworks Improvements</description><category>Industrial Development</category><managing_agency>DEP</managing_agency><client_agency>WWC</client_agency><current_phase>Construction Procurement</current_phase><design_start>2019-07-07T00:00:00</design_start><budget_forecast>52030751.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>19975649.96</total_budget_changes><forecast_completion>2026-08-14T00:00:00</forecast_completion><latest_schedule_changes>-83</latest_schedule_changes><total_schedule_changes>586</total_schedule_changes></row><row _id="row-qwer~g6a2~9e3s" _uuid="00000000-0000-0000-0B7C-E15205609754" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-qwer~g6a2~9e3s"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>906</pid><project_name>Headworks Improvements at Tallman Island</project_name><description>Headworks Improvements</description><category>Industrial Development</category><managing_agency>DEP</managing_agency><client_agency>WWC</client_agency><current_phase>Construction Procurement</current_phase><design_start>2019-07-07T00:00:00</design_start><budget_forecast>49800127.96</budget_forecast><latest_budget_changes>-2230623.04</latest_budget_changes><total_budget_changes>19975649.96</total_budget_changes><forecast_completion>2026-08-14T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>586</total_schedule_changes></row><row _id="row-pckz_maiy.ta2v" _uuid="00000000-0000-0000-6D7F-FE7DDBF50AE1" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-pckz_maiy.ta2v"><date_reported_as_of>2019-05-01T00:00:00</date_reported_as_of><pid>907</pid><project_name>Power Distribution Improvements at Tallman Island</project_name><description>Power Distribution Improvements</description><category>Industrial Development</category><managing_agency>DEP</managing_agency><client_agency>WWC</client_agency><current_phase>Design</current_phase><design_start>2018-05-29T00:00:00</design_start><budget_forecast>61053693.00</budget_forecast><latest_budget_changes>5671028.00</latest_budget_changes><total_budget_changes>10926063.83</total_budget_changes><forecast_completion>2025-04-28T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>651</total_schedule_changes></row><row _id="row-2aqj-6bjt-ps2z" _uuid="00000000-0000-0000-8001-AC381B8C59EE" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-2aqj-6bjt-ps2z"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>907</pid><project_name>Power Distribution Improvements at Tallman Island</project_name><description>Power Distribution Improvements</description><category>Industrial Development</category><managing_agency>DEP</managing_agency><client_agency>WWC</client_agency><current_phase>Design</current_phase><design_start>2019-05-31T00:00:00</design_start><budget_forecast>56322665.00</budget_forecast><latest_budget_changes>-4731028.00</latest_budget_changes><total_budget_changes>10926063.83</total_budget_changes><forecast_completion>2025-04-30T00:00:00</forecast_completion><latest_schedule_changes>2</latest_schedule_changes><total_schedule_changes>651</total_schedule_changes></row><row _id="row-3zy2.sw5h.fq94" _uuid="00000000-0000-0000-7117-ADB2A831B07D" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-3zy2.sw5h.fq94"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>907</pid><project_name>Power Distribution Improvements at Tallman Island</project_name><description>Power Distribution Improvements</description><category>Industrial Development</category><managing_agency>DEP</managing_agency><client_agency>WWC</client_agency><current_phase>Design</current_phase><design_start>2019-05-31T00:00:00</design_start><budget_forecast>61122665.00</budget_forecast><latest_budget_changes>4800000.00</latest_budget_changes><total_budget_changes>10926063.83</total_budget_changes><forecast_completion>2025-04-05T00:00:00</forecast_completion><latest_schedule_changes>-25</latest_schedule_changes><total_schedule_changes>651</total_schedule_changes></row><row _id="row-48cx.7e4m~xjgr" _uuid="00000000-0000-0000-227E-BC19389E80D0" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-48cx.7e4m~xjgr"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>907</pid><project_name>Power Distribution Improvements at Tallman Island</project_name><description>Power Distribution Improvements</description><category>Industrial Development</category><managing_agency>DEP</managing_agency><client_agency>WWC</client_agency><current_phase>Design</current_phase><design_start>2019-05-31T00:00:00</design_start><budget_forecast>58779818.00</budget_forecast><latest_budget_changes>-2342847.00</latest_budget_changes><total_budget_changes>10926063.83</total_budget_changes><forecast_completion>2025-04-05T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>651</total_schedule_changes></row><row _id="row-494u_vxvc~u5bj" _uuid="00000000-0000-0000-0CB4-4E25735C93DD" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-494u_vxvc~u5bj"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>907</pid><project_name>Power Distribution Improvements at Tallman Island</project_name><description>Power Distribution Improvements</description><category>Industrial Development</category><managing_agency>DEP</managing_agency><client_agency>WWC</client_agency><current_phase>Design</current_phase><design_start>2019-05-31T00:00:00</design_start><budget_forecast>59036622.00</budget_forecast><latest_budget_changes>256804.00</latest_budget_changes><total_budget_changes>10926063.83</total_budget_changes><forecast_completion>2025-12-02T00:00:00</forecast_completion><latest_schedule_changes>241</latest_schedule_changes><total_schedule_changes>651</total_schedule_changes></row><row _id="row-k3cq-epmg.hb8a" _uuid="00000000-0000-0000-D461-8E1F34A62AB0" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-k3cq-epmg.hb8a"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>907</pid><project_name>Power Distribution Improvements at Tallman Island</project_name><description>Power Distribution Improvements</description><category>Industrial Development</category><managing_agency>DEP</managing_agency><client_agency>WWC</client_agency><current_phase>Design</current_phase><design_start>2019-05-31T00:00:00</design_start><budget_forecast>62187140.80</budget_forecast><latest_budget_changes>3150518.80</latest_budget_changes><total_budget_changes>10926063.83</total_budget_changes><forecast_completion>2025-12-03T00:00:00</forecast_completion><latest_schedule_changes>1</latest_schedule_changes><total_schedule_changes>651</total_schedule_changes></row><row _id="row-whrw~fpze~myhp" _uuid="00000000-0000-0000-C2AB-BAE68E779943" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-whrw~fpze~myhp"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>907</pid><project_name>Power Distribution Improvements at Tallman Island</project_name><description>Power Distribution Improvements</description><category>Industrial Development</category><managing_agency>DEP</managing_agency><client_agency>WWC</client_agency><current_phase>Design</current_phase><design_start>2019-05-31T00:00:00</design_start><budget_forecast>62187140.80</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>10926063.83</total_budget_changes><forecast_completion>2026-01-02T00:00:00</forecast_completion><latest_schedule_changes>30</latest_schedule_changes><total_schedule_changes>651</total_schedule_changes></row><row _id="row-waj8~6fv7_nzy9" _uuid="00000000-0000-0000-7691-0F2D2AD035A3" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-waj8~6fv7_nzy9"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>907</pid><project_name>Power Distribution Improvements at Tallman Island</project_name><description>Power Distribution Improvements</description><category>Industrial Development</category><managing_agency>DEP</managing_agency><client_agency>WWC</client_agency><current_phase>Construction Procurement</current_phase><design_start>2019-05-31T00:00:00</design_start><budget_forecast>63387835.00</budget_forecast><latest_budget_changes>1200694.20</latest_budget_changes><total_budget_changes>10926063.83</total_budget_changes><forecast_completion>2026-03-16T00:00:00</forecast_completion><latest_schedule_changes>73</latest_schedule_changes><total_schedule_changes>651</total_schedule_changes></row><row _id="row-wnwz~d8nv.wkeq" _uuid="00000000-0000-0000-EFAE-7D213F4EF4AF" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-wnwz~d8nv.wkeq"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>907</pid><project_name>Power Distribution Improvements at Tallman Island</project_name><description>Power Distribution Improvements</description><category>Industrial Development</category><managing_agency>DEP</managing_agency><client_agency>WWC</client_agency><current_phase>Construction Procurement</current_phase><design_start>2019-05-31T00:00:00</design_start><budget_forecast>63387835.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>10926063.83</total_budget_changes><forecast_completion>2026-03-16T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>651</total_schedule_changes></row><row _id="row-tau7.7e47.2a4f" _uuid="00000000-0000-0000-D68D-3C33A2AFBB7B" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-tau7.7e47.2a4f"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>907</pid><project_name>Power Distribution Improvements at Tallman Island</project_name><description>Power Distribution Improvements</description><category>Industrial Development</category><managing_agency>DEP</managing_agency><client_agency>WWC</client_agency><current_phase>Construction Procurement</current_phase><design_start>2019-05-31T00:00:00</design_start><budget_forecast>63387835.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>10926063.83</total_budget_changes><forecast_completion>2026-06-04T00:00:00</forecast_completion><latest_schedule_changes>80</latest_schedule_changes><total_schedule_changes>651</total_schedule_changes></row><row _id="row-5e4j.a6cz.ptd3" _uuid="00000000-0000-0000-DFE4-C61F2E11C610" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-5e4j.a6cz.ptd3"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>907</pid><project_name>Power Distribution Improvements at Tallman Island</project_name><description>Power Distribution Improvements</description><category>Industrial Development</category><managing_agency>DEP</managing_agency><client_agency>WWC</client_agency><current_phase>Construction</current_phase><design_start>2019-05-31T00:00:00</design_start><budget_forecast>66308728.83</budget_forecast><latest_budget_changes>2920893.83</latest_budget_changes><total_budget_changes>10926063.83</total_budget_changes><forecast_completion>2027-02-08T00:00:00</forecast_completion><latest_schedule_changes>249</latest_schedule_changes><total_schedule_changes>651</total_schedule_changes></row><row _id="row-wtqd.gywt-4jba" _uuid="00000000-0000-0000-F719-1B1425F2227A" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-wtqd.gywt-4jba"><date_reported_as_of>2019-01-01T00:00:00</date_reported_as_of><pid>909</pid><project_name>DOH Public Health Lab</project_name><description>The construction of an approximately 230,000 sq ft municipal Public Health Lab building for DOHMH.</description><category>Health and Hospitals</category><managing_agency>EDC</managing_agency><client_agency>DOHMH</client_agency><current_phase>Design</current_phase><design_start>2019-01-01T00:00:00</design_start><budget_forecast>613797320.29</budget_forecast><total_budget_changes>19334959.71</total_budget_changes><forecast_completion>2025-01-01T00:00:00</forecast_completion><total_schedule_changes>1</total_schedule_changes></row><row _id="row-pheq.mbqg.7j2p" _uuid="00000000-0000-0000-2BFA-A0E9C2737C1F" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-pheq.mbqg.7j2p"><date_reported_as_of>2019-05-01T00:00:00</date_reported_as_of><pid>909</pid><project_name>DOH Public Health Lab</project_name><description>The construction of an approximately 230,000 sq ft municipal Public Health Lab building for DOHMH.</description><category>Health and Hospitals</category><managing_agency>EDC</managing_agency><client_agency>DOHMH</client_agency><current_phase>Design</current_phase><design_start>2019-01-01T00:00:00</design_start><budget_forecast>613797320.29</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>19334959.71</total_budget_changes><forecast_completion>2025-01-01T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1</total_schedule_changes></row><row _id="row-8p7j.e3kh.8ajp" _uuid="00000000-0000-0000-0BAF-94C90448F49A" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-8p7j.e3kh.8ajp"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>909</pid><project_name>DOH Public Health Lab</project_name><description>The construction of an approximately 230,000 sq ft municipal Public Health Lab building for DOHMH.</description><category>Health and Hospitals</category><managing_agency>EDC</managing_agency><client_agency>DOHMH</client_agency><current_phase>Design</current_phase><design_start>2019-01-01T00:00:00</design_start><budget_forecast>613797320.29</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>19334959.71</total_budget_changes><forecast_completion>2025-01-01T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1</total_schedule_changes></row><row _id="row-sfmm~u2p3-ewca" _uuid="00000000-0000-0000-5015-69FDB6066430" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-sfmm~u2p3-ewca"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>909</pid><project_name>DOH Public Health Lab</project_name><description>The construction of an approximately 230,000 sq ft municipal Public Health Lab building for DOHMH.</description><category>Health and Hospitals</category><managing_agency>EDC</managing_agency><client_agency>DOHMH</client_agency><current_phase>Design</current_phase><design_start>2019-01-01T00:00:00</design_start><budget_forecast>613797320.29</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>19334959.71</total_budget_changes><forecast_completion>2025-01-01T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1</total_schedule_changes></row><row _id="row-t2jw_9w46-k5ur" _uuid="00000000-0000-0000-B015-3EE5E53FE563" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-t2jw_9w46-k5ur"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>909</pid><project_name>DOH Public Health Lab</project_name><description>The construction of an approximately 230,000 sq ft municipal Public Health Lab building for DOHMH.</description><category>Health and Hospitals</category><managing_agency>EDC</managing_agency><client_agency>DOHMH</client_agency><current_phase>Design</current_phase><design_start>2019-01-01T00:00:00</design_start><budget_forecast>613797320.29</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>19334959.71</total_budget_changes><forecast_completion>2025-01-01T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1</total_schedule_changes></row><row _id="row-ykg8_xmp4_evkq" _uuid="00000000-0000-0000-8D86-A828148D9DF5" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ykg8_xmp4_evkq"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>909</pid><project_name>DOH Public Health Lab</project_name><description>The construction of an approximately 230,000 sq ft municipal Public Health Lab building for DOHMH.</description><category>Health and Hospitals</category><managing_agency>EDC</managing_agency><client_agency>DOHMH</client_agency><current_phase>Design</current_phase><design_start>2019-01-01T00:00:00</design_start><budget_forecast>613797320.29</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>19334959.71</total_budget_changes><forecast_completion>2025-01-01T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1</total_schedule_changes></row><row _id="row-ppd2~yvhd_4ttm" _uuid="00000000-0000-0000-6609-4B972C2B0577" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ppd2~yvhd_4ttm"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>909</pid><project_name>DOH Public Health Lab</project_name><description>The construction of an approximately 230,000 sq ft municipal Public Health Lab building for DOHMH.</description><category>Health and Hospitals</category><managing_agency>EDC</managing_agency><client_agency>DOHMH</client_agency><current_phase>Design</current_phase><design_start>2019-01-01T00:00:00</design_start><budget_forecast>633132280.00</budget_forecast><latest_budget_changes>19334959.71</latest_budget_changes><total_budget_changes>19334959.71</total_budget_changes><forecast_completion>2025-01-01T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1</total_schedule_changes></row><row _id="row-xiqz.7imn.mfjn" _uuid="00000000-0000-0000-4F7C-5DBD8FDB916F" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-xiqz.7imn.mfjn"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>909</pid><project_name>DOH Public Health Lab</project_name><description>The construction of an approximately 230,000 sq ft municipal Public Health Lab building for DOHMH.</description><category>Health and Hospitals</category><managing_agency>EDC</managing_agency><client_agency>DOHMH</client_agency><current_phase>Construction Procurement</current_phase><design_start>2019-01-01T00:00:00</design_start><budget_forecast>633132280.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>19334959.71</total_budget_changes><forecast_completion>2022-12-02T00:00:00</forecast_completion><latest_schedule_changes>-761</latest_schedule_changes><total_schedule_changes>1</total_schedule_changes></row><row _id="row-n5ei-72ak.h5yb" _uuid="00000000-0000-0000-2417-2F80CEE66109" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-n5ei-72ak.h5yb"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>909</pid><project_name>DOH Public Health Lab</project_name><description>The construction of an approximately 230,000 sq ft municipal Public Health Lab building for DOHMH.</description><category>Health and Hospitals</category><managing_agency>EDC</managing_agency><client_agency>DOHMH</client_agency><current_phase>Construction Procurement</current_phase><design_start>2019-01-01T00:00:00</design_start><budget_forecast>613797320.29</budget_forecast><latest_budget_changes>-19334959.71</latest_budget_changes><total_budget_changes>19334959.71</total_budget_changes><forecast_completion>2025-01-01T00:00:00</forecast_completion><latest_schedule_changes>761</latest_schedule_changes><total_schedule_changes>1</total_schedule_changes></row><row _id="row-vdtr-6sw8~z48e" _uuid="00000000-0000-0000-1C2A-A0D369693EDE" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-vdtr-6sw8~z48e"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>909</pid><project_name>DOH Public Health Lab</project_name><description>The construction of an approximately 230,000 sq ft municipal Public Health Lab building for DOHMH.</description><category>Health and Hospitals</category><managing_agency>EDC</managing_agency><client_agency>DOHMH</client_agency><current_phase>Construction Procurement</current_phase><design_start>2019-01-01T00:00:00</design_start><budget_forecast>633132280.00</budget_forecast><latest_budget_changes>19334959.71</latest_budget_changes><total_budget_changes>19334959.71</total_budget_changes><forecast_completion>2025-01-01T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1</total_schedule_changes></row><row _id="row-upkt-fgxs.f4ip" _uuid="00000000-0000-0000-0522-DA4FC16B2365" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-upkt-fgxs.f4ip"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>909</pid><project_name>DOH Public Health Lab</project_name><description>The construction of an approximately 230,000 sq ft municipal Public Health Lab building for DOHMH.</description><category>Health and Hospitals</category><managing_agency>EDC</managing_agency><client_agency>DOHMH</client_agency><current_phase>Construction Procurement</current_phase><design_start>2019-01-01T00:00:00</design_start><budget_forecast>633132280.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>19334959.71</total_budget_changes><forecast_completion>2025-01-01T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1</total_schedule_changes></row><row _id="row-get6-s3ps-rwpx" _uuid="00000000-0000-0000-0FA7-32D7030B0001" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-get6-s3ps-rwpx"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>909</pid><project_name>DOH Public Health Lab</project_name><description>The construction of an approximately 230,000 sq ft municipal Public Health Lab building for DOHMH.</description><category>Health and Hospitals</category><managing_agency>EDC</managing_agency><client_agency>DOHMH</client_agency><current_phase>Construction</current_phase><design_start>2019-01-01T00:00:00</design_start><budget_forecast>633132280.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>19334959.71</total_budget_changes><forecast_completion>2025-01-02T00:00:00</forecast_completion><latest_schedule_changes>1</latest_schedule_changes><total_schedule_changes>1</total_schedule_changes></row><row _id="row-qv9q_em7h~qj7u" _uuid="00000000-0000-0000-B1CA-7F2DD0C538BB" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-qv9q_em7h~qj7u"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>932</pid><project_name>Union Turnpike over Cross Island Parkway</project_name><description>Rehabilitation  of Union Turnpike  Bridge over Cross Island Parkway</description><category>Bridges</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2019-09-06T00:00:00</design_start><budget_forecast>66352022.00</budget_forecast><latest_budget_changes>400000.00</latest_budget_changes><total_budget_changes>3378281.00</total_budget_changes><forecast_completion>2027-06-21T00:00:00</forecast_completion><latest_schedule_changes>304</latest_schedule_changes><total_schedule_changes>834</total_schedule_changes></row><row _id="row-hi77~cas2-9x3d" _uuid="00000000-0000-0000-6923-FC46DF6EC292" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-hi77~cas2-9x3d"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>932</pid><project_name>Union Turnpike over Cross Island Parkway</project_name><description>Rehabilitation  of Union Turnpike  Bridge over Cross Island Parkway</description><category>Bridges</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2019-09-06T00:00:00</design_start><budget_forecast>67184778.00</budget_forecast><latest_budget_changes>832756.00</latest_budget_changes><total_budget_changes>3378281.00</total_budget_changes><forecast_completion>2028-03-02T00:00:00</forecast_completion><latest_schedule_changes>255</latest_schedule_changes><total_schedule_changes>834</total_schedule_changes></row><row _id="row-z5ua-v7w8-5xxx" _uuid="00000000-0000-0000-D603-29848541CC4B" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-z5ua-v7w8-5xxx"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>932</pid><project_name>Union Turnpike over Cross Island Parkway</project_name><category>Bridges</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><total_budget_changes>3378281.00</total_budget_changes><total_schedule_changes>834</total_schedule_changes></row><row _id="row-mwzd~cat6.yn9d" _uuid="00000000-0000-0000-BDD8-B14E4F4DF762" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-mwzd~cat6.yn9d"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>932</pid><project_name>Union Turnpike over Cross Island Parkway</project_name><description>Rehabilitation  of Union Turnpike  Bridge over Cross Island Parkway</description><category>Bridges</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2019-09-06T00:00:00</design_start><budget_forecast>66381778.00</budget_forecast><latest_budget_changes>-803000.00</latest_budget_changes><total_budget_changes>3378281.00</total_budget_changes><forecast_completion>2028-09-03T00:00:00</forecast_completion><latest_schedule_changes>185</latest_schedule_changes><total_schedule_changes>834</total_schedule_changes></row><row _id="row-qtug~wf95-edx2" _uuid="00000000-0000-0000-42A9-18349A6BB82B" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-qtug~wf95-edx2"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>932</pid><project_name>Union Turnpike over Cross Island Parkway</project_name><description>Rehabilitation  of Union Turnpike  Bridge over Cross Island Parkway</description><category>Bridges</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2019-09-06T00:00:00</design_start><budget_forecast>67281778.00</budget_forecast><latest_budget_changes>900000.00</latest_budget_changes><total_budget_changes>3378281.00</total_budget_changes><forecast_completion>2028-12-02T00:00:00</forecast_completion><latest_schedule_changes>90</latest_schedule_changes><total_schedule_changes>834</total_schedule_changes></row><row _id="row-upbz~wfyu-phkq" _uuid="00000000-0000-0000-A1A8-88BD59B75A68" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-upbz~wfyu-phkq"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>932</pid><project_name>Union Turnpike over Cross Island Parkway</project_name><description>Rehabilitation  of Union Turnpike  Bridge over Cross Island Parkway</description><category>Bridges</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2019-09-06T00:00:00</design_start><budget_forecast>64425695.00</budget_forecast><latest_budget_changes>-2856083.00</latest_budget_changes><total_budget_changes>3378281.00</total_budget_changes><forecast_completion>2028-12-02T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>834</total_schedule_changes></row><row _id="row-nrew_eyzp~u5rs" _uuid="00000000-0000-0000-737A-D55A0320AF93" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-nrew_eyzp~u5rs"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>932</pid><project_name>Union Turnpike over Cross Island Parkway</project_name><description>Rehabilitation  of Union Turnpike  Bridge over Cross Island Parkway</description><category>Bridges</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2019-09-06T00:00:00</design_start><budget_forecast>66975695.00</budget_forecast><latest_budget_changes>2550000.00</latest_budget_changes><total_budget_changes>3378281.00</total_budget_changes><forecast_completion>2028-12-02T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>834</total_schedule_changes></row><row _id="row-djus.3qkc_vx53" _uuid="00000000-0000-0000-EAFF-F7433174A770" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-djus.3qkc_vx53"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>932</pid><project_name>Union Turnpike over Cross Island Parkway</project_name><description>Rehabilitation  of Union Turnpike  Bridge over Cross Island Parkway</description><category>Bridges</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2019-09-06T00:00:00</design_start><budget_forecast>69330303.00</budget_forecast><latest_budget_changes>2354608.00</latest_budget_changes><total_budget_changes>3378281.00</total_budget_changes><forecast_completion>2028-12-02T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>834</total_schedule_changes></row><row _id="row-9bg5-i5cw-fi2w" _uuid="00000000-0000-0000-51AA-7C27E5F49726" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-9bg5-i5cw-fi2w"><date_reported_as_of>2019-01-01T00:00:00</date_reported_as_of><pid>935</pid><project_name>FUEL TANK REPLACEMENT - 71</project_name><description>Upgrading, decommissioning, or replacement of petroleum product storage tanks at 38 sites (multi-agency) in Manhattan.</description><category>Industrial Development</category><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><current_phase>Design</current_phase><design_start>2018-10-02T00:00:00</design_start><budget_forecast>29265000.00</budget_forecast><total_budget_changes>3444000.00</total_budget_changes><forecast_completion>2022-09-19T00:00:00</forecast_completion><total_schedule_changes>548</total_schedule_changes></row><row _id="row-fs5d~tyks_inw8" _uuid="00000000-0000-0000-DAFC-A27F4A680820" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-fs5d~tyks_inw8"><date_reported_as_of>2019-05-01T00:00:00</date_reported_as_of><pid>935</pid><project_name>FUEL TANK REPLACEMENT - 71</project_name><description>By Notice To Proceed letter dated September 21, 2018, the New York City Department of Design and Construction (�DDC�) directed PMS Construction Management Corp. (�PMS�) to commence work on Capis ID PW348-71, Contract No. 20191404531 CM/Design/Build for the Replacement and Upgrade of Petroleum Storage Tanks for the Borough of Manhattan. The contract was awarded for a maximum fee of $28,026,750.00 and was partially registered by the Comptroller on September 21, 2018 in the amount of $4,885,000.00. The term of the contract is 1,095 consecutive calendar days from September 21, 2018. Contract termination date is September 19, 2021.</description><category>Industrial Development</category><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><current_phase>Design</current_phase><design_start>2018-10-02T00:00:00</design_start><budget_forecast>29265000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>3444000.00</total_budget_changes><forecast_completion>2022-09-19T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>548</total_schedule_changes></row><row _id="row-3xut~v3t9~xqhd" _uuid="00000000-0000-0000-E319-BB1542DA1F37" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-3xut~v3t9~xqhd"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>935</pid><project_name>FUEL TANK REPLACEMENT - 71</project_name><description>By Notice To Proceed letter dated September 21, 2018, the New York City Department of Design and Construction (“DDC”) directed PMS Construction Management Corp. (“PMS”) to commence work on Capis ID PW348-71, Contract No. 20191404531 CM/Design/Build for the Replacement and Upgrade of Petroleum Storage Tanks for the Borough of Manhattan. The contract was awarded for a maximum fee of $28,026,750.00 and was partially registered by the Comptroller on September 21, 2018 in the amount of $4,885,000.00. The term of the contract is 1,095 consecutive calendar days from September 21, 2018. Contract termination date is September 19, 2021.</description><category>Industrial Development</category><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><current_phase>Construction Procurement</current_phase><design_start>2018-10-02T00:00:00</design_start><budget_forecast>29265000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>3444000.00</total_budget_changes><forecast_completion>2023-01-20T00:00:00</forecast_completion><latest_schedule_changes>123</latest_schedule_changes><total_schedule_changes>548</total_schedule_changes></row><row _id="row-qi9w.ynxh-w3yv" _uuid="00000000-0000-0000-7F32-7E5FDE90B434" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-qi9w.ynxh-w3yv"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>935</pid><project_name>FUEL TANK REPLACEMENT - 71</project_name><category>Industrial Development</category><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><total_budget_changes>3444000.00</total_budget_changes><total_schedule_changes>548</total_schedule_changes></row><row _id="row-9y6n-af2e~wreg" _uuid="00000000-0000-0000-D6ED-8A7EAFBDA54B" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-9y6n-af2e~wreg"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>935</pid><project_name>FUEL TANK REPLACEMENT - 71</project_name><category>Industrial Development</category><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><total_budget_changes>3444000.00</total_budget_changes><total_schedule_changes>548</total_schedule_changes></row><row _id="row-zdjz.6tap-jy7h" _uuid="00000000-0000-0000-4177-26DCBBB2AF86" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-zdjz.6tap-jy7h"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>935</pid><project_name>FUEL TANK REPLACEMENT - 71</project_name><category>Industrial Development</category><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><total_budget_changes>3444000.00</total_budget_changes><total_schedule_changes>548</total_schedule_changes></row><row _id="row-uez4-xzy2-i7eh" _uuid="00000000-0000-0000-8796-339A6629BF37" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-uez4-xzy2-i7eh"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>935</pid><project_name>FUEL TANK REPLACEMENT - 71</project_name><category>Industrial Development</category><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><total_budget_changes>3444000.00</total_budget_changes><total_schedule_changes>548</total_schedule_changes></row><row _id="row-msxy~aft8_6t5d" _uuid="00000000-0000-0000-58D7-39C28F0D3696" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-msxy~aft8_6t5d"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>935</pid><project_name>FUEL TANK REPLACEMENT - 71</project_name><description>By Notice To Proceed letter dated September 21, 2018, the New York City Department of Design and Construction (�DDC�) directed PMS Construction Management Corp. (�PMS�) to commence work on Capis ID PW348-71, Contract No. 20191404531 CM/Design/Build for the Replacement and Upgrade of Petroleum Storage Tanks for the Borough of Manhattan. The contract was awarded for a maximum fee of $28,026,750.00 and was partially registered by the Comptroller on September 21, 2018 in the amount of $4,885,000.00. The term of the contract is 1,095 consecutive calendar days from September 21, 2018. Contract termination date is September 19, 2021.</description><category>Industrial Development</category><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><current_phase>Construction</current_phase><design_start>2018-10-02T00:00:00</design_start><budget_forecast>32709000.00</budget_forecast><latest_budget_changes>3444000.00</latest_budget_changes><total_budget_changes>3444000.00</total_budget_changes><forecast_completion>2023-03-20T00:00:00</forecast_completion><latest_schedule_changes>59</latest_schedule_changes><total_schedule_changes>548</total_schedule_changes></row><row _id="row-rzb6-ghke.siae" _uuid="00000000-0000-0000-3B6A-35FF7BA8FA82" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-rzb6-ghke.siae"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>935</pid><project_name>FUEL TANK REPLACEMENT - 71</project_name><description>By Notice To Proceed letter dated September 21, 2018, the New York City Department of Design and Construction (“DDC”) directed PMS Construction Management Corp. (“PMS”) to commence work on Capis ID PW348-71, Contract No. 20191404531 CM/Design/Build for the Replacement and Upgrade of Petroleum Storage Tanks for the Borough of Manhattan. The contract was awarded for a maximum fee of $28,026,750.00 and was partially registered by the Comptroller on September 21, 2018 in the amount of $4,885,000.00. The term of the contract is 1,095 consecutive calendar days from September 21, 2018. Contract termination date is September 19, 2021.</description><category>Industrial Development</category><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><current_phase>Construction</current_phase><design_start>2018-10-02T00:00:00</design_start><budget_forecast>32709000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>3444000.00</total_budget_changes><forecast_completion>2023-03-20T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>548</total_schedule_changes></row><row _id="row-i6t7_b5mn-z39a" _uuid="00000000-0000-0000-443F-7851DCDC24D3" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-i6t7_b5mn-z39a"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>935</pid><project_name>FUEL TANK REPLACEMENT - 71</project_name><description>By Notice To Proceed letter dated September 21, 2018, the New York City Department of Design and Construction (“DDC”) directed PMS Construction Management Corp. (“PMS”) to commence work on Capis ID PW348-71, Contract No. 20191404531 CM/Design/Build for the Replacement and Upgrade of Petroleum Storage Tanks for the Borough of Manhattan. The contract was awarded for a maximum fee of $28,026,750.00 and was partially registered by the Comptroller on September 21, 2018 in the amount of $4,885,000.00. The term of the contract is 1,095 consecutive calendar days from September 21, 2018. Contract termination date is September 19, 2021.</description><category>Industrial Development</category><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><current_phase>Construction</current_phase><design_start>2018-10-02T00:00:00</design_start><budget_forecast>32709000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>3444000.00</total_budget_changes><forecast_completion>2024-03-20T00:00:00</forecast_completion><latest_schedule_changes>366</latest_schedule_changes><total_schedule_changes>548</total_schedule_changes></row><row _id="row-an89_vbgq.4gui" _uuid="00000000-0000-0000-0FF5-D3BF13E5C25D" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-an89_vbgq.4gui"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>935</pid><project_name>FUEL TANK REPLACEMENT - 71</project_name><description>By Notice To Proceed letter dated September 21, 2018, the New York City Department of Design and Construction (“DDC”) directed PMS Construction Management Corp. (“PMS”) to commence work on Capis ID PW348-71, Contract No. 20191404531 CM/Design/Build for the Replacement and Upgrade of Petroleum Storage Tanks for the Borough of Manhattan. The contract was awarded for a maximum fee of $28,026,750.00 and was partially registered by the Comptroller on September 21, 2018 in the amount of $4,885,000.00. The term of the contract is 1,095 consecutive calendar days from September 21, 2018. Contract termination date is September 19, 2021.</description><category>Industrial Development</category><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><current_phase>Construction</current_phase><design_start>2018-10-02T00:00:00</design_start><budget_forecast>32709000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>3444000.00</total_budget_changes><forecast_completion>2024-03-20T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>548</total_schedule_changes></row><row _id="row-jstv~dfcp_vftp" _uuid="00000000-0000-0000-2D2B-15C5456F8D54" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-jstv~dfcp_vftp"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>935</pid><project_name>FUEL TANK REPLACEMENT - 71</project_name><description>By Notice To Proceed letter dated September 21, 2018, the New York City Department of Design and Construction (“DDC”) directed PMS Construction Management Corp. (“PMS”) to commence work on Capis ID PW348-71, Contract No. 20191404531 CM/Design/Build for the Replacement and Upgrade of Petroleum Storage Tanks for the Borough of Manhattan. The contract was awarded for a maximum fee of $28,026,750.00 and was partially registered by the Comptroller on September 21, 2018 in the amount of $4,885,000.00. The term of the contract is 1,095 consecutive calendar days from September 21, 2018. Contract termination date is September 19, 2021.</description><category>Industrial Development</category><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><current_phase>Construction</current_phase><design_start>2018-10-02T00:00:00</design_start><budget_forecast>32709000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>3444000.00</total_budget_changes><forecast_completion>2024-03-20T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>548</total_schedule_changes></row><row _id="row-5arq~ez93_sdax" _uuid="00000000-0000-0000-F254-29B8DAE8967C" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-5arq~ez93_sdax"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>942</pid><project_name>Reconstruction Of Primary Tanks at Bowery Bay WPCP</project_name><description>Replacement of Primary Settling Tanks collection system mechanisms and miscellaneous improvements at Bowery Bay WRRF.</description><category>Wastewater Treatment</category><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2019-09-27T00:00:00</design_start><budget_forecast>100567697.00</budget_forecast><latest_budget_changes>32617508.00</latest_budget_changes><total_budget_changes>74442173.00</total_budget_changes><forecast_completion>2026-09-05T00:00:00</forecast_completion><latest_schedule_changes>74</latest_schedule_changes><total_schedule_changes>636</total_schedule_changes></row><row _id="row-bvvg.pxfs-jwvr" _uuid="00000000-0000-0000-5507-BB5A1ABBF518" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-bvvg.pxfs-jwvr"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>942</pid><project_name>Reconstruction Of Primary Tanks at Bowery Bay WPCP</project_name><description>Replacement of Primary Settling Tanks collection system mechanisms and miscellaneous improvements at Bowery Bay WRRF.</description><category>Wastewater Treatment</category><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2019-09-27T00:00:00</design_start><budget_forecast>99190376.00</budget_forecast><latest_budget_changes>-1377321.00</latest_budget_changes><total_budget_changes>74442173.00</total_budget_changes><forecast_completion>2025-12-16T00:00:00</forecast_completion><latest_schedule_changes>-263</latest_schedule_changes><total_schedule_changes>636</total_schedule_changes></row><row _id="row-yqgr~6mmy~tbsr" _uuid="00000000-0000-0000-7716-F831AD9021C4" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-yqgr~6mmy~tbsr"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>942</pid><project_name>Reconstruction Of Primary Tanks at Bowery Bay WPCP</project_name><description>Replacement of Primary Settling Tanks collection system mechanisms and miscellaneous improvements at Bowery Bay WRRF.</description><category>Wastewater Treatment</category><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2019-09-27T00:00:00</design_start><budget_forecast>99190376.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>74442173.00</total_budget_changes><forecast_completion>2026-02-17T00:00:00</forecast_completion><latest_schedule_changes>63</latest_schedule_changes><total_schedule_changes>636</total_schedule_changes></row><row _id="row-53h4-tt2a~5pis" _uuid="00000000-0000-0000-12CA-62A9959ACDE2" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-53h4-tt2a~5pis"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>942</pid><project_name>Reconstruction Of Primary Tanks at Bowery Bay WPCP</project_name><description>Replacement of Primary Settling Tanks collection system mechanisms and miscellaneous improvements at Bowery Bay WRRF.</description><category>Wastewater Treatment</category><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2019-09-27T00:00:00</design_start><budget_forecast>99190376.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>74442173.00</total_budget_changes><forecast_completion>2026-06-09T00:00:00</forecast_completion><latest_schedule_changes>112</latest_schedule_changes><total_schedule_changes>636</total_schedule_changes></row><row _id="row-bdah_8ruf-jt79" _uuid="00000000-0000-0000-074C-0D0AAC1D3F97" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-bdah_8ruf-jt79"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>942</pid><project_name>Reconstruction Of Primary Tanks at Bowery Bay WPCP</project_name><description>Replacement of Primary Settling Tanks collection system mechanisms and miscellaneous improvements at Bowery Bay WRRF.</description><category>Wastewater Treatment</category><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2019-09-27T00:00:00</design_start><budget_forecast>99190376.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>74442173.00</total_budget_changes><forecast_completion>2026-11-08T00:00:00</forecast_completion><latest_schedule_changes>152</latest_schedule_changes><total_schedule_changes>636</total_schedule_changes></row><row _id="row-nx3t-gyfs_hu98" _uuid="00000000-0000-0000-9360-879DB5CB7DEF" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-nx3t-gyfs_hu98"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>942</pid><project_name>Reconstruction Of Primary Tanks at Bowery Bay WPCP</project_name><description>Reconstruction Of Primary Tanks at Bowery Bay WPCP</description><category>Wastewater Treatment</category><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2019-09-27T00:00:00</design_start><budget_forecast>128275608.00</budget_forecast><latest_budget_changes>29085232.00</latest_budget_changes><total_budget_changes>74442173.00</total_budget_changes><forecast_completion>2027-07-09T00:00:00</forecast_completion><latest_schedule_changes>243</latest_schedule_changes><total_schedule_changes>636</total_schedule_changes></row><row _id="row-zfph-azt6~ufaj" _uuid="00000000-0000-0000-2B10-866628AE7302" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-zfph-azt6~ufaj"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>942</pid><project_name>Reconstruction Of Primary Tanks at Bowery Bay WPCP</project_name><description>Reconstruction Of Primary Tanks at Bowery Bay WPCP</description><category>Wastewater Treatment</category><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2019-09-27T00:00:00</design_start><budget_forecast>128275608.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>74442173.00</total_budget_changes><forecast_completion>2027-07-09T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>636</total_schedule_changes></row><row _id="row-zmdv-upa7-yaq9" _uuid="00000000-0000-0000-27B5-FE14616F7B17" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-zmdv-upa7-yaq9"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>942</pid><project_name>Reconstruction Of Primary Tanks at Bowery Bay WPCP</project_name><description>Reconstruction Of Primary Tanks at Bowery Bay WPCP</description><category>Wastewater Treatment</category><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2019-09-27T00:00:00</design_start><budget_forecast>131364829.00</budget_forecast><latest_budget_changes>3089221.00</latest_budget_changes><total_budget_changes>74442173.00</total_budget_changes><forecast_completion>2027-06-23T00:00:00</forecast_completion><latest_schedule_changes>-16</latest_schedule_changes><total_schedule_changes>636</total_schedule_changes></row><row _id="row-kffu_esv7~rabr" _uuid="00000000-0000-0000-E644-3A1B46667795" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-kffu_esv7~rabr"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>942</pid><project_name>Reconstruction Of Primary Tanks at Bowery Bay WPCP</project_name><description>Reconstruction Of Primary Tanks at Bowery Bay WPCP</description><category>Wastewater Treatment</category><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction Procurement</current_phase><design_start>2019-09-27T00:00:00</design_start><budget_forecast>142392362.00</budget_forecast><latest_budget_changes>11027533.00</latest_budget_changes><total_budget_changes>74442173.00</total_budget_changes><forecast_completion>2028-03-20T00:00:00</forecast_completion><latest_schedule_changes>271</latest_schedule_changes><total_schedule_changes>636</total_schedule_changes></row><row _id="row-saxk_w3tr-puug" _uuid="00000000-0000-0000-AE17-56FC23620B6A" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-saxk_w3tr-puug"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>943</pid><project_name>Bronx River CSO Reduction</project_name><description>The project will provide hydraulic relief to Outfalls HP-007 and HP-009 by creating new sewers parallel to the existing combined sewers. It will also provide floatables control at Outfall HP-011 by replacing Regulator 5.</description><category>Wastewater Treatment</category><managing_agency>DEP</managing_agency><client_agency>WWC</client_agency><current_phase>Design</current_phase><design_start>2020-04-16T00:00:00</design_start><budget_forecast>184768403.00</budget_forecast><latest_budget_changes>1630435.00</latest_budget_changes><total_budget_changes>1210235.00</total_budget_changes><forecast_completion>2028-12-13T00:00:00</forecast_completion><latest_schedule_changes>-435</latest_schedule_changes><total_schedule_changes>-712</total_schedule_changes></row><row _id="row-nkp9_5a63~tu9s" _uuid="00000000-0000-0000-2F44-D39A41EF31CA" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-nkp9_5a63~tu9s"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>943</pid><project_name>Bronx River CSO Reduction</project_name><description>The project will provide hydraulic relief to Outfalls HP-007 and HP-009 by creating new sewers parallel to the existing combined sewers. It will also provide floatables control at Outfall HP-011 by replacing Regulator 5.</description><category>Wastewater Treatment</category><managing_agency>DEP</managing_agency><client_agency>WWC</client_agency><current_phase>Design</current_phase><design_start>2020-04-16T00:00:00</design_start><budget_forecast>184347761.90</budget_forecast><latest_budget_changes>-420641.10</latest_budget_changes><total_budget_changes>1210235.00</total_budget_changes><forecast_completion>2028-12-14T00:00:00</forecast_completion><latest_schedule_changes>1</latest_schedule_changes><total_schedule_changes>-712</total_schedule_changes></row><row _id="row-mz4z-jbv3-wsmf" _uuid="00000000-0000-0000-2184-614DC2193C91" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-mz4z-jbv3-wsmf"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>943</pid><project_name>Bronx River CSO Reduction</project_name><description>The project will provide hydraulic relief to Outfalls HP-007 and HP-009 by creating new sewers parallel to the existing combined sewers. It will also provide floatables control at Outfall HP-011 by replacing Regulator 5.</description><category>Wastewater Treatment</category><managing_agency>DEP</managing_agency><client_agency>WWC</client_agency><current_phase>Design</current_phase><design_start>2020-04-16T00:00:00</design_start><budget_forecast>184348203.00</budget_forecast><latest_budget_changes>441.10</latest_budget_changes><total_budget_changes>1210235.00</total_budget_changes><forecast_completion>2028-12-14T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>-712</total_schedule_changes></row><row _id="row-vnba_5j8w.mm45" _uuid="00000000-0000-0000-7AA4-C38988691FCC" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-vnba_5j8w.mm45"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>943</pid><project_name>Bronx River CSO Reduction</project_name><description>The project will provide hydraulic relief to Outfalls HP-007 and HP-009 by creating new sewers parallel to the existing combined sewers. It will also provide floatables control at Outfall HP-011 by replacing Regulator 5.</description><category>Wastewater Treatment</category><managing_agency>DEP</managing_agency><client_agency>WWC</client_agency><current_phase>Design</current_phase><design_start>2020-04-16T00:00:00</design_start><budget_forecast>184348203.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>1210235.00</total_budget_changes><forecast_completion>2028-12-14T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>-712</total_schedule_changes></row><row _id="row-mm6n~vra7~nbk9" _uuid="00000000-0000-0000-4604-00B4A7AB54CE" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-mm6n~vra7~nbk9"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>943</pid><project_name>Bronx River CSO Reduction</project_name><description>The project will provide hydraulic relief to Outfalls HP-007 and HP-009 by creating new sewers parallel to the existing combined sewers. It will also provide floatables control at Outfall HP-011 by replacing Regulator 5.</description><category>Wastewater Treatment</category><managing_agency>DEP</managing_agency><client_agency>WWC</client_agency><current_phase>Design</current_phase><design_start>2020-04-16T00:00:00</design_start><budget_forecast>184348203.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>1210235.00</total_budget_changes><forecast_completion>2028-12-14T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>-712</total_schedule_changes></row><row _id="row-eq6b.xc7n_fiyc" _uuid="00000000-0000-0000-B771-35F56E7BBB72" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-eq6b.xc7n_fiyc"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>943</pid><project_name>Bronx River CSO Reduction</project_name><description>The project will provide hydraulic relief to Outfalls HP-007 and HP-009 by creating new sewers parallel to the existing combined sewers. It will also provide floatables control at Outfall HP-011 by replacing Regulator 5.</description><category>Wastewater Treatment</category><managing_agency>DEP</managing_agency><client_agency>WWC</client_agency><current_phase>Design</current_phase><design_start>2020-04-16T00:00:00</design_start><budget_forecast>184348203.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>1210235.00</total_budget_changes><forecast_completion>2028-12-14T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>-712</total_schedule_changes></row><row _id="row-jwsn_bfz2.m989" _uuid="00000000-0000-0000-8C6C-AE666508589A" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-jwsn_bfz2.m989"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>943</pid><project_name>Bronx River CSO Reduction</project_name><description>The project will provide hydraulic relief to Outfalls HP-007 and HP-009 by creating new sewers parallel to the existing combined sewers. It will also provide floatables control at Outfall HP-011 by replacing Regulator 5.</description><category>Wastewater Treatment</category><managing_agency>DEP</managing_agency><client_agency>WWC</client_agency><current_phase>Construction Procurement</current_phase><design_start>2020-04-16T00:00:00</design_start><budget_forecast>184348203.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>1210235.00</total_budget_changes><forecast_completion>2028-03-11T00:00:00</forecast_completion><latest_schedule_changes>-278</latest_schedule_changes><total_schedule_changes>-712</total_schedule_changes></row><row _id="row-nkmg_e97p~q93w" _uuid="00000000-0000-0000-64D2-3337D034ADB3" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-nkmg_e97p~q93w"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>943</pid><project_name>Bronx River CSO Reduction</project_name><description>The project will provide hydraulic relief to Outfalls HP-007 and HP-009 by creating new sewers parallel to the existing combined sewers. It will also provide floatables control at Outfall HP-011 by replacing Regulator 5.</description><category>Wastewater Treatment</category><managing_agency>DEP</managing_agency><client_agency>WWC</client_agency><current_phase>Construction Procurement</current_phase><design_start>2020-04-16T00:00:00</design_start><budget_forecast>184348203.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>1210235.00</total_budget_changes><forecast_completion>2028-03-11T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>-712</total_schedule_changes></row><row _id="row-uznj_x6a5.rkpd" _uuid="00000000-0000-0000-3397-E66F4588E0F9" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-uznj_x6a5.rkpd"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>944</pid><project_name>CSO Hutchinson River Disinfection Facility</project_name><description>Construction of disinfection/de-chlorination facility thru 14'x10' conduit ~ 1,650' long, with detention times of 5 min/30 sec, for a design flow rate of 300 MGD for seasonal operation (May-Oct). Floatables control for 100 MGD will also be provided.</description><category>Wastewater Treatment</category><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2020-09-23T00:00:00</design_start><budget_forecast>227858504.00</budget_forecast><latest_budget_changes>-7786418.00</latest_budget_changes><total_budget_changes>-24577348.00</total_budget_changes><forecast_completion>2030-08-31T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>894</total_schedule_changes></row><row _id="row-bwwj-cqgx.ysmw" _uuid="00000000-0000-0000-CB16-BAF26702369D" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-bwwj-cqgx.ysmw"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>944</pid><project_name>CSO Hutchinson River Disinfection Facility</project_name><description>Construction of disinfection/de-chlorination facility thru 14'x10' conduit ~ 1,650' long, with detention times of 5 min/30 sec, for a design flow rate of 300 MGD for seasonal operation (May-Oct). Floatables control for 100 MGD will also be provided.</description><category>Wastewater Treatment</category><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2020-09-23T00:00:00</design_start><budget_forecast>227079862.00</budget_forecast><latest_budget_changes>-778642.00</latest_budget_changes><total_budget_changes>-24577348.00</total_budget_changes><forecast_completion>2030-11-22T00:00:00</forecast_completion><latest_schedule_changes>83</latest_schedule_changes><total_schedule_changes>894</total_schedule_changes></row><row _id="row-is9m~k57d.c6yk" _uuid="00000000-0000-0000-B72B-4C7B9E5A55F7" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-is9m~k57d.c6yk"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>944</pid><project_name>CSO Hutchinson River Disinfection Facility</project_name><description>Construction of disinfection/de-chlorination facility thru 14'x10' conduit ~ 1,650' long, with detention times of 5 min/30 sec, for a design flow rate of 300 MGD for seasonal operation (May-Oct). Floatables control for 100 MGD will also be provided.</description><category>Wastewater Treatment</category><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2020-09-23T00:00:00</design_start><budget_forecast>227079862.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-24577348.00</total_budget_changes><forecast_completion>2030-11-22T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>894</total_schedule_changes></row><row _id="row-7kyx~fiku~6im9" _uuid="00000000-0000-0000-0995-1FAF2C32394F" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-7kyx~fiku~6im9"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>944</pid><project_name>CSO Hutchinson River Disinfection Facility</project_name><description>Construction of 1,200 double barrel 14W x 10H conduit to provide 2.8 MG of CSO storage; bar screens/baffle-weir system for floatables control; PS to drain conduit after each rain event; new outfall to provide relief for events which exceed 2.8 MG.</description><category>Wastewater Treatment</category><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2022-09-22T00:00:00</design_start><budget_forecast>210852514.00</budget_forecast><latest_budget_changes>-16012288.00</latest_budget_changes><total_budget_changes>-24577348.00</total_budget_changes><forecast_completion>2032-11-19T00:00:00</forecast_completion><latest_schedule_changes>811</latest_schedule_changes><total_schedule_changes>894</total_schedule_changes></row><row _id="row-i8sq.jt4g_tehz" _uuid="00000000-0000-0000-1420-B414121CFF35" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-i8sq.jt4g_tehz"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>944</pid><project_name>CSO Hutchinson River Disinfection Facility</project_name><description>Construction of 1,200 double barrel 14W x 10H conduit to provide 2.8 MG of CSO storage; bar screens/baffle-weir system for floatables control; PS to drain conduit after each rain event; new outfall to provide relief for events which exceed 2.8 MG.</description><category>Wastewater Treatment</category><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2022-09-22T00:00:00</design_start><budget_forecast>210852514.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-24577348.00</total_budget_changes><forecast_completion>2032-11-19T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>894</total_schedule_changes></row><row _id="row-wgtg-r6ky_fxi4" _uuid="00000000-0000-0000-8838-19235C750CF4" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-wgtg-r6ky_fxi4"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>945</pid><project_name>North River WWTP Primary Treatment Improvements</project_name><description>Rehabilitation of the Primary Settling Tanks at North River Wastewater Resources Recovery Facility.</description><category>Wastewater Treatment</category><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2021-05-17T00:00:00</design_start><budget_forecast>165300000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>35891899.00</total_budget_changes><forecast_completion>2027-11-25T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>121</total_schedule_changes></row><row _id="row-dbbt~278e.r3fr" _uuid="00000000-0000-0000-7CAA-5C5476EB0A3B" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-dbbt~278e.r3fr"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>945</pid><project_name>North River WWTP Primary Treatment Improvements</project_name><description>Rehabilitation of the Primary Settling Tanks at North River Wastewater Resources Recovery Facility.</description><category>Wastewater Treatment</category><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2021-05-17T00:00:00</design_start><budget_forecast>183134361.80</budget_forecast><latest_budget_changes>17834361.80</latest_budget_changes><total_budget_changes>35891899.00</total_budget_changes><forecast_completion>2027-12-27T00:00:00</forecast_completion><latest_schedule_changes>32</latest_schedule_changes><total_schedule_changes>121</total_schedule_changes></row><row _id="row-t4se-f24c~596v" _uuid="00000000-0000-0000-C35C-67F26EFE94B8" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-t4se-f24c~596v"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>945</pid><project_name>North River WWTP Primary Treatment Improvements</project_name><description>Rehabilitation of the Primary Settling Tanks at North River Wastewater Resources Recovery Facility.</description><category>Wastewater Treatment</category><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2021-05-17T00:00:00</design_start><budget_forecast>200316583.00</budget_forecast><latest_budget_changes>17182221.20</latest_budget_changes><total_budget_changes>35891899.00</total_budget_changes><forecast_completion>2028-05-20T00:00:00</forecast_completion><latest_schedule_changes>145</latest_schedule_changes><total_schedule_changes>121</total_schedule_changes></row><row _id="row-jvjk.s22r.pv33" _uuid="00000000-0000-0000-DA2A-031B0A1B9236" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-jvjk.s22r.pv33"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>945</pid><project_name>North River WWTP Primary Treatment Improvements</project_name><description>Rehabilitation of the Primary Settling Tanks at North River Wastewater Resources Recovery Facility.</description><category>Wastewater Treatment</category><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2021-05-17T00:00:00</design_start><budget_forecast>199919275.00</budget_forecast><latest_budget_changes>-397308.00</latest_budget_changes><total_budget_changes>35891899.00</total_budget_changes><forecast_completion>2028-08-06T00:00:00</forecast_completion><latest_schedule_changes>78</latest_schedule_changes><total_schedule_changes>121</total_schedule_changes></row><row _id="row-wd53-yhmw-4hwx" _uuid="00000000-0000-0000-1EA9-4381B2502EA2" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-wd53-yhmw-4hwx"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>945</pid><project_name>North River WWTP Primary Treatment Improvements</project_name><description>Rehabilitation of the Primary Settling Tanks at North River Wastewater Resources Recovery Facility.</description><category>Wastewater Treatment</category><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2021-05-17T00:00:00</design_start><budget_forecast>201191899.00</budget_forecast><latest_budget_changes>1272624.00</latest_budget_changes><total_budget_changes>35891899.00</total_budget_changes><forecast_completion>2028-03-25T00:00:00</forecast_completion><latest_schedule_changes>-134</latest_schedule_changes><total_schedule_changes>121</total_schedule_changes></row><row _id="row-pryf-zqk4~exuw" _uuid="00000000-0000-0000-3ED9-B86480B101F9" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-pryf-zqk4~exuw"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>946</pid><project_name>Owls Head WWTP Final Settling System Rehabilitation</project_name><description>Rehabilitation of the Final Settling Tanks at Owls Head Wastewater Resources Recovery Facility.</description><category>Wastewater Treatment</category><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2021-11-09T00:00:00</design_start><budget_forecast>212800000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-3573164.00</total_budget_changes><forecast_completion>2028-07-07T00:00:00</forecast_completion><latest_schedule_changes>225</latest_schedule_changes><total_schedule_changes>345</total_schedule_changes></row><row _id="row-84ep~843g~ngbb" _uuid="00000000-0000-0000-E259-E96B99907740" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-84ep~843g~ngbb"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>946</pid><project_name>Owls Head WWTP Final Settling System Rehabilitation</project_name><description>Rehabilitation of the Final Settling Tanks at Owls Head Wastewater Resources Recovery Facility.</description><category>Wastewater Treatment</category><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2021-11-09T00:00:00</design_start><budget_forecast>208757740.00</budget_forecast><latest_budget_changes>-4042260.00</latest_budget_changes><total_budget_changes>-3573164.00</total_budget_changes><forecast_completion>2029-05-25T00:00:00</forecast_completion><latest_schedule_changes>322</latest_schedule_changes><total_schedule_changes>345</total_schedule_changes></row><row _id="row-g6qy~x8b2.g9te" _uuid="00000000-0000-0000-296B-9774D920E10A" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-g6qy~x8b2.g9te"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>946</pid><project_name>Owls Head WWTP Final Settling System Rehabilitation</project_name><description>Rehabilitation of the Final Settling Tanks at Owls Head Wastewater Resources Recovery Facility.</description><category>Wastewater Treatment</category><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2021-11-09T00:00:00</design_start><budget_forecast>209226836.00</budget_forecast><latest_budget_changes>469096.00</latest_budget_changes><total_budget_changes>-3573164.00</total_budget_changes><forecast_completion>2028-08-06T00:00:00</forecast_completion><latest_schedule_changes>-292</latest_schedule_changes><total_schedule_changes>345</total_schedule_changes></row><row _id="row-cn34.b9xj_k2rm" _uuid="00000000-0000-0000-0738-B47965558EFC" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-cn34.b9xj_k2rm"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>946</pid><project_name>Owls Head WWTP Final Settling System Rehabilitation</project_name><description>Rehabilitation of the Final Settling Tanks at Owls Head Wastewater Resources Recovery Facility.</description><category>Wastewater Treatment</category><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2021-11-09T00:00:00</design_start><budget_forecast>209226836.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-3573164.00</total_budget_changes><forecast_completion>2028-11-04T00:00:00</forecast_completion><latest_schedule_changes>90</latest_schedule_changes><total_schedule_changes>345</total_schedule_changes></row><row _id="row-ve9f.ug4f_guqw" _uuid="00000000-0000-0000-680C-1F18F00CAE4B" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ve9f.ug4f_guqw"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>947</pid><project_name>Reconstruct Final Settling System Equipment at Port Richmond</project_name><description>Rehabilitation of the Final Settling Tanks at Port Richomnd Wastewater Resources Recovery Facility.</description><category>Wastewater Treatment</category><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2021-11-16T00:00:00</design_start><budget_forecast>144900000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>30972687.00</total_budget_changes><forecast_completion>2028-05-22T00:00:00</forecast_completion><latest_schedule_changes>179</latest_schedule_changes><total_schedule_changes>205</total_schedule_changes></row><row _id="row-nafx-gjsr-mnjh" _uuid="00000000-0000-0000-9D77-2DAB910D3978" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-nafx-gjsr-mnjh"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>947</pid><project_name>Reconstruct Final Settling System Equipment at Port Richmond</project_name><description>Rehabilitation of the Final Settling Tanks at Port Richomnd Wastewater Resources Recovery Facility.</description><category>Wastewater Treatment</category><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2021-11-16T00:00:00</design_start><budget_forecast>128435659.00</budget_forecast><latest_budget_changes>-16464341.00</latest_budget_changes><total_budget_changes>30972687.00</total_budget_changes><forecast_completion>2028-06-17T00:00:00</forecast_completion><latest_schedule_changes>26</latest_schedule_changes><total_schedule_changes>205</total_schedule_changes></row><row _id="row-jyiw-y8q2-rppe" _uuid="00000000-0000-0000-D214-8304BAF5B715" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-jyiw-y8q2-rppe"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>947</pid><project_name>Reconstruct Final Settling System Equipment at Port Richmond</project_name><description>Rehabilitation of the Final Settling Tanks at Port Richomnd Wastewater Resources Recovery Facility.</description><category>Wastewater Treatment</category><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2021-11-16T00:00:00</design_start><budget_forecast>176068861.00</budget_forecast><latest_budget_changes>47633202.00</latest_budget_changes><total_budget_changes>30972687.00</total_budget_changes><forecast_completion>2028-06-17T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>205</total_schedule_changes></row><row _id="row-4piv.5cz6~8ue7" _uuid="00000000-0000-0000-5EEB-FDE24F50A23F" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-4piv.5cz6~8ue7"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>947</pid><project_name>Reconstruct Final Settling System Equipment at Port Richmond</project_name><description>Rehabilitation of the Final Settling Tanks at Port Richomnd Wastewater Resources Recovery Facility.</description><category>Wastewater Treatment</category><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2021-11-16T00:00:00</design_start><budget_forecast>175872687.00</budget_forecast><latest_budget_changes>-196174.00</latest_budget_changes><total_budget_changes>30972687.00</total_budget_changes><forecast_completion>2028-06-17T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>205</total_schedule_changes></row><row _id="row-p2h2_smvu~drk8" _uuid="00000000-0000-0000-8511-62C64F8FCB93" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-p2h2_smvu~drk8"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>948</pid><project_name>Reconstruct Main Sewage Pump Controls at Port Richmond WWTP</project_name><description>Reconstruction of main sewage pumps and ancillary components including suction valves, suction piping, seal water system, pressure gauges, suction header, etc. New MSP's should meet the new design parameter of N+2 redundancy during wet weather flow</description><category>Wastewater Treatment</category><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2019-09-03T00:00:00</design_start><budget_forecast>54813236.00</budget_forecast><latest_budget_changes>7537200.00</latest_budget_changes><total_budget_changes>26923720.62</total_budget_changes><forecast_completion>2025-02-04T00:00:00</forecast_completion><latest_schedule_changes>43</latest_schedule_changes><total_schedule_changes>516</total_schedule_changes></row><row _id="row-ckg2_zw8y_a4zn" _uuid="00000000-0000-0000-FF81-EB0287A94822" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ckg2_zw8y_a4zn"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>948</pid><project_name>Reconstruct Main Sewage Pump Controls at Port Richmond WWTP</project_name><description>Reconstruction of main sewage pumps and ancillary components including suction valves, suction piping, seal water system, pressure gauges, suction header, etc. New MSP's should meet the new design parameter of N+2 redundancy during wet weather flow</description><category>Wastewater Treatment</category><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2019-09-03T00:00:00</design_start><budget_forecast>48213236.00</budget_forecast><latest_budget_changes>-6600000.00</latest_budget_changes><total_budget_changes>26923720.62</total_budget_changes><forecast_completion>2025-09-15T00:00:00</forecast_completion><latest_schedule_changes>223</latest_schedule_changes><total_schedule_changes>516</total_schedule_changes></row><row _id="row-gjv7.dj3d.ws3t" _uuid="00000000-0000-0000-6AC5-0138C592C797" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-gjv7.dj3d.ws3t"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>948</pid><project_name>Reconstruct Main Sewage Pump Controls at Port Richmond WWTP</project_name><description>Reconstruction of main sewage pumps and ancillary components including suction valves, suction piping, seal water system, pressure gauges, suction header, etc. New MSP's should meet the new design parameter of N+2 redundancy during wet weather flow</description><category>Wastewater Treatment</category><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2019-09-03T00:00:00</design_start><budget_forecast>48010068.39</budget_forecast><latest_budget_changes>-203167.61</latest_budget_changes><total_budget_changes>26923720.62</total_budget_changes><forecast_completion>2025-11-25T00:00:00</forecast_completion><latest_schedule_changes>71</latest_schedule_changes><total_schedule_changes>516</total_schedule_changes></row><row _id="row-p779-w89s.n4z3" _uuid="00000000-0000-0000-0B43-8566D90C46CF" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-p779-w89s.n4z3"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>948</pid><project_name>Reconstruct Main Sewage Pump Controls at Port Richmond WWTP</project_name><description>Reconstruction of main sewage pumps and ancillary components including suction valves, suction piping, seal water system, pressure gauges, suction header, etc. New MSP's should meet the new design parameter of N+2 redundancy during wet weather flow</description><category>Wastewater Treatment</category><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2019-09-03T00:00:00</design_start><budget_forecast>48010068.39</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>26923720.62</total_budget_changes><forecast_completion>2026-02-23T00:00:00</forecast_completion><latest_schedule_changes>90</latest_schedule_changes><total_schedule_changes>516</total_schedule_changes></row><row _id="row-wv7s.ea5s.ie7j" _uuid="00000000-0000-0000-27C6-8EEFF284A3C7" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-wv7s.ea5s.ie7j"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>948</pid><project_name>Reconstruct Main Sewage Pump Controls at Port Richmond WWTP</project_name><description>Reconstruction of main sewage pumps and ancillary components including suction valves, suction piping, seal water system, pressure gauges, suction header, etc. New MSP's should meet the new design parameter of N+2 redundancy during wet weather flow</description><category>Wastewater Treatment</category><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2019-09-03T00:00:00</design_start><budget_forecast>48220341.39</budget_forecast><latest_budget_changes>210273.00</latest_budget_changes><total_budget_changes>26923720.62</total_budget_changes><forecast_completion>2026-04-26T00:00:00</forecast_completion><latest_schedule_changes>62</latest_schedule_changes><total_schedule_changes>516</total_schedule_changes></row><row _id="row-unwc-zhi3-c25d" _uuid="00000000-0000-0000-09CD-9DBD3C5BB201" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-unwc-zhi3-c25d"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>948</pid><project_name>Reconstruct Main Sewage Pump Controls at Port Richmond WWTP</project_name><description>Reconstruction of main sewage pumps and ancillary components including suction valves, suction piping, seal water system, pressure gauges, suction header, etc. New MSP's should meet the new design parameter of N+2 redundancy during wet weather flow</description><category>Wastewater Treatment</category><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2019-11-27T00:00:00</design_start><budget_forecast>48273341.39</budget_forecast><latest_budget_changes>53000.00</latest_budget_changes><total_budget_changes>26923720.62</total_budget_changes><forecast_completion>2026-04-26T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>516</total_schedule_changes></row><row _id="row-uga3_vfe8~ukht" _uuid="00000000-0000-0000-0A38-B3692780DACD" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-uga3_vfe8~ukht"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>948</pid><project_name>Reconstruct Main Sewage Pump Controls at Port Richmond WWTP</project_name><description>Reconstruction of main sewage pumps and ancillary components including suction valves, suction piping, seal water system, pressure gauges, suction header, etc. New MSP's should meet the new design parameter of N+2 redundancy during wet weather flow</description><category>Wastewater Treatment</category><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2019-11-27T00:00:00</design_start><budget_forecast>48273341.39</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>26923720.62</total_budget_changes><forecast_completion>2026-05-27T00:00:00</forecast_completion><latest_schedule_changes>31</latest_schedule_changes><total_schedule_changes>516</total_schedule_changes></row><row _id="row-xqr4_e6tr~avvs" _uuid="00000000-0000-0000-1A88-5BCE967986D3" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-xqr4_e6tr~avvs"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>948</pid><project_name>Reconstruct Main Sewage Pump Controls at Port Richmond WWTP</project_name><description>Reconstruction of main sewage pumps and ancillary components including suction valves, suction piping, seal water system, pressure gauges, suction header, etc. New MSP's should meet the new design parameter of N+2 redundancy during wet weather flow</description><category>Wastewater Treatment</category><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2019-11-27T00:00:00</design_start><budget_forecast>50505064.39</budget_forecast><latest_budget_changes>2231723.00</latest_budget_changes><total_budget_changes>26923720.62</total_budget_changes><forecast_completion>2026-09-27T00:00:00</forecast_completion><latest_schedule_changes>123</latest_schedule_changes><total_schedule_changes>516</total_schedule_changes></row><row _id="row-qxxn_snbf.8f9k" _uuid="00000000-0000-0000-3070-2FE46F5FF2FC" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-qxxn_snbf.8f9k"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>948</pid><project_name>Reconstruct Main Sewage Pump Controls at Port Richmond WWTP</project_name><description>Reconstruction of main sewage pumps and ancillary components including suction valves, suction piping, seal water system, pressure gauges, suction header, etc. New MSP's should meet the new design parameter of N+2 redundancy during wet weather flow</description><category>Wastewater Treatment</category><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction Procurement</current_phase><design_start>2019-11-27T00:00:00</design_start><budget_forecast>74199756.62</budget_forecast><latest_budget_changes>23694692.23</latest_budget_changes><total_budget_changes>26923720.62</total_budget_changes><forecast_completion>2026-05-23T00:00:00</forecast_completion><latest_schedule_changes>-127</latest_schedule_changes><total_schedule_changes>516</total_schedule_changes></row><row _id="row-ghb4_vcip_6zfh" _uuid="00000000-0000-0000-5C5B-7F93D39E8D2C" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ghb4_vcip_6zfh"><date_reported_as_of>2019-05-01T00:00:00</date_reported_as_of><pid>949</pid><project_name>Brooklyn P.S. at 4302 4TH AVE</project_name><description>Design and construction of a new school</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction Procurement</current_phase><design_start>2017-11-17T00:00:00</design_start><budget_forecast>66279759.00</budget_forecast><total_budget_changes>-221356.00</total_budget_changes><forecast_completion>2022-09-03T00:00:00</forecast_completion><total_schedule_changes>365</total_schedule_changes></row><row _id="row-s2nf~jdcm-w97g" _uuid="00000000-0000-0000-ED0C-821EC0AB5706" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-s2nf~jdcm-w97g"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>949</pid><project_name>Brooklyn P.S. at 4302 4TH AVE</project_name><description>Design and construction of a new school</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction Procurement</current_phase><design_start>2017-11-17T00:00:00</design_start><budget_forecast>63922805.00</budget_forecast><latest_budget_changes>-2356954.00</latest_budget_changes><total_budget_changes>-221356.00</total_budget_changes><forecast_completion>2022-10-31T00:00:00</forecast_completion><latest_schedule_changes>58</latest_schedule_changes><total_schedule_changes>365</total_schedule_changes></row><row _id="row-usua~fjky.6vtz" _uuid="00000000-0000-0000-86BD-3FFC3700E891" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-usua~fjky.6vtz"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>949</pid><project_name>Brooklyn P.S. at 4302 4TH AVE</project_name><description>NEW SCHOOL (PHASE II)</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2017-11-17T00:00:00</design_start><budget_forecast>66058403.00</budget_forecast><latest_budget_changes>2135598.00</latest_budget_changes><total_budget_changes>-221356.00</total_budget_changes><forecast_completion>2022-09-03T00:00:00</forecast_completion><latest_schedule_changes>-58</latest_schedule_changes><total_schedule_changes>365</total_schedule_changes></row><row _id="row-rkpi~bidh_9gig" _uuid="00000000-0000-0000-7285-2F43464FE9AA" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-rkpi~bidh_9gig"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>949</pid><project_name>Brooklyn P.S. at 4302 4TH AVE</project_name><description>NEW SCHOOL (PHASE II)</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2017-11-17T00:00:00</design_start><budget_forecast>66058403.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-221356.00</total_budget_changes><forecast_completion>2022-09-03T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>365</total_schedule_changes></row><row _id="row-qezu_74pj-u8zy" _uuid="00000000-0000-0000-4AA0-86261713429A" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-qezu_74pj-u8zy"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>949</pid><project_name>Brooklyn P.S. at 4302 4TH AVE</project_name><description>NEW SCHOOL (PHASE II)</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2017-11-17T00:00:00</design_start><budget_forecast>66058403.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-221356.00</total_budget_changes><forecast_completion>2023-09-03T00:00:00</forecast_completion><latest_schedule_changes>365</latest_schedule_changes><total_schedule_changes>365</total_schedule_changes></row><row _id="row-k5ey~q9h6_398x" _uuid="00000000-0000-0000-88B3-0CFCCC717C61" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-k5ey~q9h6_398x"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>949</pid><project_name>Brooklyn P.S. at 4302 4TH AVE</project_name><description>NEW SCHOOL (PHASE II)</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2017-11-17T00:00:00</design_start><budget_forecast>66058403.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-221356.00</total_budget_changes><forecast_completion>2023-09-03T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>365</total_schedule_changes></row><row _id="row-42s5-jwsp~fn9s" _uuid="00000000-0000-0000-7740-7AA4D17AE3B3" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-42s5-jwsp~fn9s"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>949</pid><project_name>Brooklyn P.S. at 4302 4TH AVE</project_name><description>NEW SCHOOL (PHASE II)</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2017-11-17T00:00:00</design_start><budget_forecast>66058403.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-221356.00</total_budget_changes><forecast_completion>2023-09-03T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>365</total_schedule_changes></row><row _id="row-gv24~gc8m_54gp" _uuid="00000000-0000-0000-26E7-E2E4C119541F" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-gv24~gc8m_54gp"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>949</pid><project_name>Brooklyn P.S. at 4302 4TH AVE</project_name><description>NEW SCHOOL (PHASE II)</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2017-11-17T00:00:00</design_start><budget_forecast>66058403.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-221356.00</total_budget_changes><forecast_completion>2023-09-03T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>365</total_schedule_changes></row><row _id="row-auxx-z8ak~gt24" _uuid="00000000-0000-0000-3300-A3BB497F7C47" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-auxx-z8ak~gt24"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>949</pid><project_name>Brooklyn P.S. at 4302 4TH AVE</project_name><description>NEW SCHOOL (PHASE II)</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2017-11-17T00:00:00</design_start><budget_forecast>66058403.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-221356.00</total_budget_changes><forecast_completion>2023-09-03T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>365</total_schedule_changes></row><row _id="row-kehd-8fi3.2xz5" _uuid="00000000-0000-0000-2EDC-234F92801804" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-kehd-8fi3.2xz5"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>949</pid><project_name>Brooklyn P.S. at 4302 4TH AVE</project_name><description>NEW SCHOOL (PHASE II)</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2017-11-17T00:00:00</design_start><budget_forecast>66058403.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-221356.00</total_budget_changes><forecast_completion>2023-09-03T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>365</total_schedule_changes></row><row _id="row-rvp4~j7ka-87w8" _uuid="00000000-0000-0000-6804-292ACF518BA2" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-rvp4~j7ka-87w8"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>949</pid><project_name>Brooklyn P.S. at 4302 4TH AVE</project_name><description>NEW SCHOOL (PHASE II)</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2017-11-17T00:00:00</design_start><budget_forecast>66058403.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-221356.00</total_budget_changes><forecast_completion>2023-09-03T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>365</total_schedule_changes></row><row _id="row-bb2v~e7wz-tf5u" _uuid="00000000-0000-0000-96A2-671AECCE5A1F" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-bb2v~e7wz-tf5u"><date_reported_as_of>2019-05-01T00:00:00</date_reported_as_of><pid>956</pid><project_name>Bronx Sanitation Garage Rehabilitation: Community District 12</project_name><description>Rehabilitation of garage that serves Bronx Community District 12 located at 1635 East 233rd Street, Bronx.</description><category>Sanitation</category><managing_agency>DSNY</managing_agency><client_agency>DSNY</client_agency><current_phase>Design</current_phase><design_start>2017-11-01T00:00:00</design_start><budget_forecast>57376185.00</budget_forecast><total_budget_changes>0.00</total_budget_changes><forecast_completion>2024-07-31T00:00:00</forecast_completion><total_schedule_changes>1064</total_schedule_changes></row><row _id="row-mj9z-hpr9~zqeg" _uuid="00000000-0000-0000-CEEB-27BE3AE82AC0" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-mj9z-hpr9~zqeg"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>956</pid><project_name>Bronx Sanitation Garage Rehabilitation: Community District 12</project_name><description>Rehabilitation of garage that serves Bronx Community District 12 located at 1635 East 233rd Street, Bronx.</description><category>Sanitation</category><managing_agency>DSNY</managing_agency><client_agency>DSNY</client_agency><current_phase>Design</current_phase><design_start>2017-11-01T00:00:00</design_start><budget_forecast>57376185.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2024-07-31T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1064</total_schedule_changes></row><row _id="row-frh2~5a9q~cp6t" _uuid="00000000-0000-0000-F390-D519B9662472" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-frh2~5a9q~cp6t"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>956</pid><project_name>Bronx Sanitation Garage Rehabilitation: Community District 12</project_name><description>Rehabilitation of garage that serves Bronx Community District 12 located at 1635 East 233rd Street, Bronx.</description><category>Sanitation</category><managing_agency>DSNY</managing_agency><client_agency>DSNY</client_agency><current_phase>Design</current_phase><design_start>2017-11-01T00:00:00</design_start><budget_forecast>57376185.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2024-07-31T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1064</total_schedule_changes></row><row _id="row-rfqp_cdz7_dux2" _uuid="00000000-0000-0000-B1D1-36E25A4C1C7B" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-rfqp_cdz7_dux2"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>956</pid><project_name>Bronx Sanitation Garage Rehabilitation: Community District 12</project_name><description>Rehabilitation of garage that serves Bronx Community District 12 located at 1635 East 233rd Street, Bronx.</description><category>Sanitation</category><managing_agency>DSNY</managing_agency><client_agency>DSNY</client_agency><current_phase>Design</current_phase><design_start>2017-11-01T00:00:00</design_start><budget_forecast>57376185.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2025-07-31T00:00:00</forecast_completion><latest_schedule_changes>365</latest_schedule_changes><total_schedule_changes>1064</total_schedule_changes></row><row _id="row-ssn2-sc5q~shnf" _uuid="00000000-0000-0000-6218-97BDA98B055C" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ssn2-sc5q~shnf"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>956</pid><project_name>Bronx Sanitation Garage Rehabilitation: Community District 12</project_name><description>Rehabilitation of garage that serves Bronx Community District 12 located at 1635 East 233rd Street, Bronx.</description><category>Sanitation</category><managing_agency>DSNY</managing_agency><client_agency>DSNY</client_agency><current_phase>Design</current_phase><design_start>2017-11-01T00:00:00</design_start><budget_forecast>57376185.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2025-07-31T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1064</total_schedule_changes></row><row _id="row-hw3m~356z.3kxa" _uuid="00000000-0000-0000-E0AF-6A51F6A690AE" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-hw3m~356z.3kxa"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>956</pid><project_name>Bronx Sanitation Garage Rehabilitation: Community District 12</project_name><description>Rehabilitation of garage that serves Bronx Community District 12 located at 1635 East 233rd Street, Bronx.</description><category>Sanitation</category><managing_agency>DSNY</managing_agency><client_agency>DSNY</client_agency><current_phase>Design</current_phase><design_start>2017-11-01T00:00:00</design_start><budget_forecast>57376185.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2025-07-31T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1064</total_schedule_changes></row><row _id="row-tcz4~9ztw~y3v7" _uuid="00000000-0000-0000-A74A-5AE56A0218E5" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-tcz4~9ztw~y3v7"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>956</pid><project_name>Bronx Sanitation Garage Rehabilitation: Community District 12</project_name><description>Rehabilitation of garage that serves Bronx Community District 12 located at 1635 East 233rd Street, Bronx.</description><category>Sanitation</category><managing_agency>DSNY</managing_agency><client_agency>DSNY</client_agency><current_phase>Design</current_phase><design_start>2017-11-01T00:00:00</design_start><budget_forecast>57376185.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2026-07-31T00:00:00</forecast_completion><latest_schedule_changes>365</latest_schedule_changes><total_schedule_changes>1064</total_schedule_changes></row><row _id="row-fpq3~pvbk~m3mt" _uuid="00000000-0000-0000-BE26-23C016C72100" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-fpq3~pvbk~m3mt"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>956</pid><project_name>Bronx Sanitation Garage Rehabilitation: Community District 12</project_name><description>Rehabilitation of garage that serves Bronx Community District 12 located at 1635 East 233rd Street, Bronx.</description><category>Sanitation</category><managing_agency>DSNY</managing_agency><client_agency>DSNY</client_agency><current_phase>Design</current_phase><design_start>2017-11-01T00:00:00</design_start><budget_forecast>57376185.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2026-07-31T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1064</total_schedule_changes></row><row _id="row-p7gc-mrbm.axup" _uuid="00000000-0000-0000-94A2-7830F51CA3B2" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-p7gc-mrbm.axup"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>956</pid><project_name>Bronx Sanitation Garage Rehabilitation: Community District 12</project_name><description>Rehabilitation of garage that serves Bronx Community District 12 located at 1635 East 233rd Street, Bronx.</description><category>Sanitation</category><managing_agency>DSNY</managing_agency><client_agency>DSNY</client_agency><current_phase>Design</current_phase><design_start>2017-11-01T00:00:00</design_start><budget_forecast>57376185.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2026-12-31T00:00:00</forecast_completion><latest_schedule_changes>153</latest_schedule_changes><total_schedule_changes>1064</total_schedule_changes></row><row _id="row-5yec_hex3_jxnt" _uuid="00000000-0000-0000-0343-0EF061739F97" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-5yec_hex3_jxnt"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>956</pid><project_name>Bronx Sanitation Garage Rehabilitation: Community District 12</project_name><description>Rehabilitation of garage that serves Bronx Community District 12 located at 1635 East 233rd Street, Bronx.</description><category>Sanitation</category><managing_agency>DSNY</managing_agency><client_agency>DSNY</client_agency><current_phase>Design</current_phase><design_start>2017-11-01T00:00:00</design_start><budget_forecast>57376185.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2027-12-31T00:00:00</forecast_completion><latest_schedule_changes>365</latest_schedule_changes><total_schedule_changes>1064</total_schedule_changes></row><row _id="row-9zjz~xhxm-j86j" _uuid="00000000-0000-0000-0446-31C331903ED4" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-9zjz~xhxm-j86j"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>956</pid><project_name>Bronx Sanitation Garage Rehabilitation: Community District 12</project_name><description>Rehabilitation of garage that serves Bronx Community District 12 located at 1635 East 233rd Street, Bronx.</description><category>Sanitation</category><managing_agency>DSNY</managing_agency><client_agency>DSNY</client_agency><current_phase>Design</current_phase><design_start>2017-11-01T00:00:00</design_start><budget_forecast>57376185.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2027-06-30T00:00:00</forecast_completion><latest_schedule_changes>-184</latest_schedule_changes><total_schedule_changes>1064</total_schedule_changes></row><row _id="row-sww6.54nx-ynxs" _uuid="00000000-0000-0000-7DA0-5CABF73510CD" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-sww6.54nx-ynxs"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>960</pid><project_name>Douglaston New Facility</project_name><category>Libraries</category><managing_agency>DDC</managing_agency><client_agency>Libraries-QBPL</client_agency><total_budget_changes>5348000.00</total_budget_changes><total_schedule_changes>244</total_schedule_changes></row><row _id="row-if7v~wdez.4bw2" _uuid="00000000-0000-0000-19DD-25D060122030" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-if7v~wdez.4bw2"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>960</pid><project_name>Douglaston New Facility</project_name><category>Libraries</category><managing_agency>DDC</managing_agency><client_agency>Libraries-QBPL</client_agency><total_budget_changes>5348000.00</total_budget_changes><total_schedule_changes>244</total_schedule_changes></row><row _id="row-4w86-jp8a-ywws" _uuid="00000000-0000-0000-3AF2-C11AB0A763C8" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-4w86-jp8a-ywws"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>960</pid><project_name>Douglaston New Facility</project_name><category>Libraries</category><managing_agency>DDC</managing_agency><client_agency>Libraries-QBPL</client_agency><total_budget_changes>5348000.00</total_budget_changes><total_schedule_changes>244</total_schedule_changes></row><row _id="row-v4x4-as7g.jwtn" _uuid="00000000-0000-0000-3E09-A24736524177" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-v4x4-as7g.jwtn"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>960</pid><project_name>Douglaston New Facility</project_name><category>Libraries</category><managing_agency>DDC</managing_agency><client_agency>Libraries-QBPL</client_agency><total_budget_changes>5348000.00</total_budget_changes><total_schedule_changes>244</total_schedule_changes></row><row _id="row-hw5t_qbje~8c42" _uuid="00000000-0000-0000-2FC5-FBF02C65570A" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-hw5t_qbje~8c42"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>960</pid><project_name>Douglaston New Facility</project_name><category>Libraries</category><managing_agency>DDC</managing_agency><client_agency>Libraries-QBPL</client_agency><total_budget_changes>5348000.00</total_budget_changes><total_schedule_changes>244</total_schedule_changes></row><row _id="row-8wer-by8j-dugm" _uuid="00000000-0000-0000-2BB7-8C25D7C1AA2C" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-8wer-by8j-dugm"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>960</pid><project_name>Douglaston New Facility</project_name><description>New library facility for the Douglaston/Little Neck community.</description><category>Libraries</category><managing_agency>DDC</managing_agency><client_agency>Libraries-QBPL</client_agency><current_phase>Design</current_phase><design_start>2019-11-20T00:00:00</design_start><budget_forecast>30399000.00</budget_forecast><latest_budget_changes>4881000.00</latest_budget_changes><total_budget_changes>5348000.00</total_budget_changes><forecast_completion>2026-10-05T00:00:00</forecast_completion><total_schedule_changes>244</total_schedule_changes></row><row _id="row-k5vm~eq2v.avz2" _uuid="00000000-0000-0000-E055-44144B4C43D2" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-k5vm~eq2v.avz2"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>960</pid><project_name>Douglaston New Facility</project_name><description>New library facility for the Douglaston/Little Neck community.</description><category>Libraries</category><managing_agency>DDC</managing_agency><client_agency>Libraries-QBPL</client_agency><current_phase>Design</current_phase><design_start>2019-11-20T00:00:00</design_start><budget_forecast>30399000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>5348000.00</total_budget_changes><forecast_completion>2026-08-10T00:00:00</forecast_completion><latest_schedule_changes>-56</latest_schedule_changes><total_schedule_changes>244</total_schedule_changes></row><row _id="row-rujf.d3sa.wksj" _uuid="00000000-0000-0000-F59B-DFECB089FDB0" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-rujf.d3sa.wksj"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>960</pid><project_name>Douglaston New Facility</project_name><description>New library facility for the Douglaston/Little Neck community.</description><category>Libraries</category><managing_agency>DDC</managing_agency><client_agency>Libraries-QBPL</client_agency><current_phase>Design</current_phase><design_start>2019-11-20T00:00:00</design_start><budget_forecast>30706000.00</budget_forecast><latest_budget_changes>307000.00</latest_budget_changes><total_budget_changes>5348000.00</total_budget_changes><forecast_completion>2027-02-15T00:00:00</forecast_completion><latest_schedule_changes>189</latest_schedule_changes><total_schedule_changes>244</total_schedule_changes></row><row _id="row-2wh4-7v2x.trsz" _uuid="00000000-0000-0000-0482-BE3189C6407C" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-2wh4-7v2x.trsz"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>960</pid><project_name>Douglaston New Facility</project_name><description>New library facility for the Douglaston/Little Neck community.</description><category>Libraries</category><managing_agency>DDC</managing_agency><client_agency>Libraries-QBPL</client_agency><current_phase>Design</current_phase><design_start>2019-11-20T00:00:00</design_start><budget_forecast>30866000.00</budget_forecast><latest_budget_changes>160000.00</latest_budget_changes><total_budget_changes>5348000.00</total_budget_changes><forecast_completion>2027-06-06T00:00:00</forecast_completion><latest_schedule_changes>111</latest_schedule_changes><total_schedule_changes>244</total_schedule_changes></row><row _id="row-suxx.4qje_m435" _uuid="00000000-0000-0000-A33E-05FFE3FEB327" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-suxx.4qje_m435"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>961</pid><project_name>Lower Concourse: Park</project_name><description>Four-acre waterfront park in Lower Concourse, Bronx.</description><category>Parks</category><managing_agency>EDC</managing_agency><client_agency>DPR</client_agency><current_phase>Design</current_phase><design_start>2019-09-30T00:00:00</design_start><budget_forecast>35407359.00</budget_forecast><total_budget_changes>0.00</total_budget_changes><forecast_completion>2023-12-31T00:00:00</forecast_completion><total_schedule_changes>456</total_schedule_changes></row><row _id="row-i994.dp6i.mmgm" _uuid="00000000-0000-0000-208D-019F46AA430D" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-i994.dp6i.mmgm"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>961</pid><project_name>Lower Concourse: Park</project_name><description>Four-acre waterfront park in Lower Concourse, Bronx.</description><category>Parks</category><managing_agency>EDC</managing_agency><client_agency>DPR</client_agency><current_phase>Design</current_phase><design_start>2019-09-30T00:00:00</design_start><budget_forecast>35407359.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2023-12-31T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>456</total_schedule_changes></row><row _id="row-5yxq.4e5q~pxb6" _uuid="00000000-0000-0000-B6F6-25A9CECA6566" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-5yxq.4e5q~pxb6"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>961</pid><project_name>Lower Concourse: Park</project_name><description>Four-acre waterfront park in Lower Concourse, Bronx.</description><category>Parks</category><managing_agency>EDC</managing_agency><client_agency>DPR</client_agency><current_phase>Design</current_phase><design_start>2019-09-30T00:00:00</design_start><budget_forecast>35407359.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2023-12-31T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>456</total_schedule_changes></row><row _id="row-mif7-udx9-8698" _uuid="00000000-0000-0000-FB0E-73F5A239D008" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-mif7-udx9-8698"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>961</pid><project_name>Lower Concourse: Park</project_name><description>Four-acre waterfront park in Lower Concourse, Bronx.</description><category>Parks</category><managing_agency>EDC</managing_agency><client_agency>DPR</client_agency><current_phase>Design</current_phase><design_start>2019-09-30T00:00:00</design_start><budget_forecast>35407359.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2023-12-31T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>456</total_schedule_changes></row><row _id="row-yp6p-n8yk_vh6f" _uuid="00000000-0000-0000-F2AB-58201FE59FD7" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-yp6p-n8yk_vh6f"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>961</pid><project_name>Lower Concourse: Park</project_name><description>Four-acre waterfront park in Lower Concourse, Bronx.</description><category>Parks</category><managing_agency>EDC</managing_agency><client_agency>DPR</client_agency><current_phase>Design</current_phase><design_start>2019-09-30T00:00:00</design_start><budget_forecast>35407359.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2024-08-08T00:00:00</forecast_completion><latest_schedule_changes>221</latest_schedule_changes><total_schedule_changes>456</total_schedule_changes></row><row _id="row-2kiz_ceyw-b3he" _uuid="00000000-0000-0000-B6EC-6C52A6360B3C" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-2kiz_ceyw-b3he"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>961</pid><project_name>Lower Concourse: Park</project_name><description>Four-acre waterfront park in Lower Concourse, Bronx.</description><category>Parks</category><managing_agency>EDC</managing_agency><client_agency>DPR</client_agency><current_phase>Design</current_phase><design_start>2019-09-30T00:00:00</design_start><budget_forecast>35407359.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2024-08-08T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>456</total_schedule_changes></row><row _id="row-ftmk.p569.r54v" _uuid="00000000-0000-0000-0D44-6953940E19DA" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ftmk.p569.r54v"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>961</pid><project_name>Lower Concourse: Park</project_name><description>Four-acre waterfront park in Lower Concourse, Bronx.</description><category>Parks</category><managing_agency>EDC</managing_agency><client_agency>DPR</client_agency><current_phase>Design</current_phase><design_start>2019-09-30T00:00:00</design_start><budget_forecast>35407359.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2024-09-29T00:00:00</forecast_completion><latest_schedule_changes>52</latest_schedule_changes><total_schedule_changes>456</total_schedule_changes></row><row _id="row-u9ec-uh4y.sb4z" _uuid="00000000-0000-0000-7019-2F49134BCF6C" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-u9ec-uh4y.sb4z"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>961</pid><project_name>Lower Concourse: Park</project_name><description>Four-acre waterfront park in Lower Concourse, Bronx.</description><category>Parks</category><managing_agency>EDC</managing_agency><client_agency>DPR</client_agency><current_phase>Design</current_phase><design_start>2019-09-30T00:00:00</design_start><budget_forecast>35407359.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2024-10-30T00:00:00</forecast_completion><latest_schedule_changes>31</latest_schedule_changes><total_schedule_changes>456</total_schedule_changes></row><row _id="row-x4w6.r7fk-w9zu" _uuid="00000000-0000-0000-FC4A-BDDC47230206" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-x4w6.r7fk-w9zu"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>961</pid><project_name>Lower Concourse: Park</project_name><description>Four-acre waterfront park in Lower Concourse, Bronx.</description><category>Parks</category><managing_agency>EDC</managing_agency><client_agency>DPR</client_agency><current_phase>Construction Procurement</current_phase><design_start>2019-09-30T00:00:00</design_start><budget_forecast>35407359.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2025-03-31T00:00:00</forecast_completion><latest_schedule_changes>152</latest_schedule_changes><total_schedule_changes>456</total_schedule_changes></row><row _id="row-sy3a-kg8f-nvru" _uuid="00000000-0000-0000-2338-6BBE06687EC1" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-sy3a-kg8f-nvru"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>961</pid><project_name>Lower Concourse: Park</project_name><description>Four-acre waterfront park in Lower Concourse, Bronx.</description><category>Parks</category><managing_agency>EDC</managing_agency><client_agency>DPR</client_agency><current_phase>Construction Procurement</current_phase><design_start>2019-09-30T00:00:00</design_start><budget_forecast>35407359.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2025-03-31T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>456</total_schedule_changes></row><row _id="row-p4qz_3rzc-jubr" _uuid="00000000-0000-0000-A19A-1CB79EAD6E71" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-p4qz_3rzc-jubr"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>962</pid><project_name>New Stapleton Waterfront: Phases 2 and 3</project_name><description>Mixed-use residential community on Staten Island's North Shore.</description><category>Industrial Development</category><managing_agency>EDC</managing_agency><client_agency>EDC</client_agency><current_phase>Design</current_phase><design_start>2015-09-30T00:00:00</design_start><budget_forecast>98407645.00</budget_forecast><total_budget_changes>100733778.00</total_budget_changes><forecast_completion>2024-11-01T00:00:00</forecast_completion><total_schedule_changes>913</total_schedule_changes></row><row _id="row-ewp4_qmvd~sqjn" _uuid="00000000-0000-0000-4915-8D44DA6C48DA" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ewp4_qmvd~sqjn"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>962</pid><project_name>New Stapleton Waterfront: Phases 2 and 3</project_name><description>Mixed-use residential community on Staten Island's North Shore.</description><category>Industrial Development</category><managing_agency>EDC</managing_agency><client_agency>EDC</client_agency><current_phase>Design</current_phase><design_start>2015-09-30T00:00:00</design_start><budget_forecast>98407645.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>100733778.00</total_budget_changes><forecast_completion>2024-11-01T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>913</total_schedule_changes></row><row _id="row-b4zb~ni5n_qtkq" _uuid="00000000-0000-0000-FEBA-F606571B6D4D" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-b4zb~ni5n_qtkq"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>962</pid><project_name>New Stapleton Waterfront: Phases 2 and 3</project_name><description>Mixed-use residential community on Staten Island's North Shore.</description><category>Industrial Development</category><managing_agency>EDC</managing_agency><client_agency>EDC</client_agency><current_phase>Design</current_phase><design_start>2015-09-30T00:00:00</design_start><budget_forecast>98407645.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>100733778.00</total_budget_changes><forecast_completion>2024-11-01T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>913</total_schedule_changes></row><row _id="row-g9gf~gsht.iydr" _uuid="00000000-0000-0000-3677-4E3B00F31C18" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-g9gf~gsht.iydr"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>962</pid><project_name>New Stapleton Waterfront: Phases 2 and 3</project_name><description>Mixed-use residential community on Staten Island's North Shore.</description><category>Industrial Development</category><managing_agency>EDC</managing_agency><client_agency>EDC</client_agency><current_phase>Design</current_phase><design_start>2015-09-30T00:00:00</design_start><budget_forecast>98407645.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>100733778.00</total_budget_changes><forecast_completion>2026-05-01T00:00:00</forecast_completion><latest_schedule_changes>546</latest_schedule_changes><total_schedule_changes>913</total_schedule_changes></row><row _id="row-6ets_g46b.e8d7" _uuid="00000000-0000-0000-57D0-4C4277999C72" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-6ets_g46b.e8d7"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>962</pid><project_name>New Stapleton Waterfront: Phases 2 and 3</project_name><description>Mixed-use residential community on Staten Island's North Shore.</description><category>Industrial Development</category><managing_agency>EDC</managing_agency><client_agency>EDC</client_agency><current_phase>Design</current_phase><design_start>2015-09-30T00:00:00</design_start><budget_forecast>98407645.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>100733778.00</total_budget_changes><forecast_completion>2026-05-01T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>913</total_schedule_changes></row><row _id="row-2ygz~8eyp~sui4" _uuid="00000000-0000-0000-0A9F-410AC15D520A" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-2ygz~8eyp~sui4"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>962</pid><project_name>New Stapleton Waterfront: Phases 2 and 3</project_name><description>Mixed-use residential community on Staten Island's North Shore.</description><category>Industrial Development</category><managing_agency>EDC</managing_agency><client_agency>EDC</client_agency><current_phase>Design</current_phase><design_start>2015-09-30T00:00:00</design_start><budget_forecast>98407645.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>100733778.00</total_budget_changes><forecast_completion>2026-05-01T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>913</total_schedule_changes></row><row _id="row-427s_rbp8.yzi5" _uuid="00000000-0000-0000-9A90-9663B21159EA" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-427s_rbp8.yzi5"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>962</pid><project_name>New Stapleton Waterfront: Phases 2 and 3</project_name><description>Mixed-use residential community on Staten Island's North Shore.</description><category>Industrial Development</category><managing_agency>EDC</managing_agency><client_agency>EDC</client_agency><current_phase>Design</current_phase><design_start>2015-09-30T00:00:00</design_start><budget_forecast>185289814.00</budget_forecast><latest_budget_changes>86882169.00</latest_budget_changes><total_budget_changes>100733778.00</total_budget_changes><forecast_completion>2026-12-02T00:00:00</forecast_completion><latest_schedule_changes>215</latest_schedule_changes><total_schedule_changes>913</total_schedule_changes></row><row _id="row-yuds.emfw_zkyt" _uuid="00000000-0000-0000-EA8E-BB1DB42724EF" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-yuds.emfw_zkyt"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>962</pid><project_name>New Stapleton Waterfront: Phases 2 and 3</project_name><description>Mixed-use residential community on Staten Island's North Shore.</description><category>Industrial Development</category><managing_agency>EDC</managing_agency><client_agency>EDC</client_agency><current_phase>Design</current_phase><design_start>2015-09-30T00:00:00</design_start><budget_forecast>199142346.00</budget_forecast><latest_budget_changes>13852532.00</latest_budget_changes><total_budget_changes>100733778.00</total_budget_changes><forecast_completion>2026-12-02T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>913</total_schedule_changes></row><row _id="row-f9ze~rhxv.mz75" _uuid="00000000-0000-0000-323F-03F9C87F3394" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-f9ze~rhxv.mz75"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>962</pid><project_name>New Stapleton Waterfront: Phases 2 and 3</project_name><description>Mixed-use residential community on Staten Island's North Shore.</description><category>Industrial Development</category><managing_agency>EDC</managing_agency><client_agency>EDC</client_agency><current_phase>Design</current_phase><design_start>2015-09-30T00:00:00</design_start><budget_forecast>199141423.00</budget_forecast><latest_budget_changes>-923.00</latest_budget_changes><total_budget_changes>100733778.00</total_budget_changes><forecast_completion>2027-05-03T00:00:00</forecast_completion><latest_schedule_changes>152</latest_schedule_changes><total_schedule_changes>913</total_schedule_changes></row><row _id="row-igy3-rbvb_v6iu" _uuid="00000000-0000-0000-1608-A5468AA5B1DE" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-igy3-rbvb_v6iu"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>962</pid><project_name>New Stapleton Waterfront: Phases 2 and 3</project_name><description>Mixed-use residential community on Staten Island's North Shore.</description><category>Industrial Development</category><managing_agency>EDC</managing_agency><client_agency>EDC</client_agency><current_phase>Design</current_phase><design_start>2015-09-30T00:00:00</design_start><budget_forecast>199141423.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>100733778.00</total_budget_changes><forecast_completion>2027-05-03T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>913</total_schedule_changes></row><row _id="row-h5zq~2hsc~uy64" _uuid="00000000-0000-0000-0131-9CEB0B438338" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-h5zq~2hsc~uy64"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>963</pid><project_name>Tompkinsville Esplanade</project_name><description>Esplanade from Stapleton to the Lighthouse Museum and Pier for DOT Dockbuilders.</description><category>Parks</category><managing_agency>EDC</managing_agency><client_agency>EDC</client_agency><current_phase>Design</current_phase><design_start>2019-07-01T00:00:00</design_start><budget_forecast>151572069.00</budget_forecast><total_budget_changes>10582596.00</total_budget_changes><forecast_completion>2023-07-31T00:00:00</forecast_completion><total_schedule_changes>944</total_schedule_changes></row><row _id="row-h6my.e2vz~wzgf" _uuid="00000000-0000-0000-29CE-2259D437930E" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-h6my.e2vz~wzgf"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>963</pid><project_name>Tompkinsville Esplanade</project_name><description>Esplanade from Stapleton to the Lighthouse Museum and Pier for DOT Dockbuilders.</description><category>Parks</category><managing_agency>EDC</managing_agency><client_agency>EDC</client_agency><current_phase>Design</current_phase><design_start>2019-07-01T00:00:00</design_start><budget_forecast>151572069.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>10582596.00</total_budget_changes><forecast_completion>2023-07-31T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>944</total_schedule_changes></row><row _id="row-32qk~39wg.s7xm" _uuid="00000000-0000-0000-BC55-A6A1DB2AEEB0" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-32qk~39wg.s7xm"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>963</pid><project_name>Tompkinsville Esplanade</project_name><description>Esplanade from Stapleton to the Lighthouse Museum and Pier for DOT Dockbuilders.</description><category>Parks</category><managing_agency>EDC</managing_agency><client_agency>EDC</client_agency><current_phase>Design</current_phase><design_start>2019-07-01T00:00:00</design_start><budget_forecast>151572069.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>10582596.00</total_budget_changes><forecast_completion>2023-07-31T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>944</total_schedule_changes></row><row _id="row-h374~egnm-dhvw" _uuid="00000000-0000-0000-1CCF-3431D2B6A20C" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-h374~egnm-dhvw"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>963</pid><project_name>Tompkinsville Esplanade</project_name><description>Esplanade from Stapleton to the Lighthouse Museum and Pier for DOT Dockbuilders.</description><category>Parks</category><managing_agency>EDC</managing_agency><client_agency>EDC</client_agency><current_phase>Design</current_phase><design_start>2019-07-01T00:00:00</design_start><budget_forecast>151572069.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>10582596.00</total_budget_changes><forecast_completion>2022-12-30T00:00:00</forecast_completion><latest_schedule_changes>-213</latest_schedule_changes><total_schedule_changes>944</total_schedule_changes></row><row _id="row-umut~btfa.ed45" _uuid="00000000-0000-0000-1369-A675847CFEF8" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-umut~btfa.ed45"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>963</pid><project_name>Tompkinsville Esplanade</project_name><description>Esplanade from Stapleton to the Lighthouse Museum and Pier for DOT Dockbuilders.</description><category>Parks</category><managing_agency>EDC</managing_agency><client_agency>EDC</client_agency><current_phase>Design</current_phase><design_start>2019-07-01T00:00:00</design_start><budget_forecast>151572069.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>10582596.00</total_budget_changes><forecast_completion>2024-12-29T00:00:00</forecast_completion><latest_schedule_changes>730</latest_schedule_changes><total_schedule_changes>944</total_schedule_changes></row><row _id="row-wpdb~vk4z.vzkx" _uuid="00000000-0000-0000-434D-64B7C3C063F3" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-wpdb~vk4z.vzkx"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>963</pid><project_name>Tompkinsville Esplanade</project_name><description>Esplanade from Stapleton to the Lighthouse Museum and Pier for DOT Dockbuilders.</description><category>Parks</category><managing_agency>EDC</managing_agency><client_agency>EDC</client_agency><current_phase>Design</current_phase><design_start>2019-07-01T00:00:00</design_start><budget_forecast>151572069.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>10582596.00</total_budget_changes><forecast_completion>2024-12-29T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>944</total_schedule_changes></row><row _id="row-hip9~nv4x.2xxq" _uuid="00000000-0000-0000-A05A-25667306DBAF" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-hip9~nv4x.2xxq"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>963</pid><project_name>Tompkinsville Esplanade</project_name><description>Esplanade from Stapleton to the Lighthouse Museum and Pier for DOT Dockbuilders.</description><category>Parks</category><managing_agency>EDC</managing_agency><client_agency>EDC</client_agency><current_phase>Design</current_phase><design_start>2019-07-01T00:00:00</design_start><budget_forecast>151572069.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>10582596.00</total_budget_changes><forecast_completion>2025-10-30T00:00:00</forecast_completion><latest_schedule_changes>305</latest_schedule_changes><total_schedule_changes>944</total_schedule_changes></row><row _id="row-uaen_2dzf_be73" _uuid="00000000-0000-0000-E809-22FE2EC2E9AC" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-uaen_2dzf_be73"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>963</pid><project_name>Tompkinsville Esplanade</project_name><description>Esplanade from Stapleton to the Lighthouse Museum and Pier for DOT Dockbuilders.</description><category>Parks</category><managing_agency>EDC</managing_agency><client_agency>EDC</client_agency><current_phase>Design</current_phase><design_start>2019-07-01T00:00:00</design_start><budget_forecast>161572069.00</budget_forecast><latest_budget_changes>10000000.00</latest_budget_changes><total_budget_changes>10582596.00</total_budget_changes><forecast_completion>2025-10-30T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>944</total_schedule_changes></row><row _id="row-e5j7-abpw~3x7b" _uuid="00000000-0000-0000-19BE-C130145163DC" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-e5j7-abpw~3x7b"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>963</pid><project_name>Tompkinsville Esplanade</project_name><description>Esplanade from Stapleton to the Lighthouse Museum and Pier for DOT Dockbuilders.</description><category>Parks</category><managing_agency>EDC</managing_agency><client_agency>EDC</client_agency><current_phase>Design</current_phase><design_start>2019-07-01T00:00:00</design_start><budget_forecast>162154665.00</budget_forecast><latest_budget_changes>582596.00</latest_budget_changes><total_budget_changes>10582596.00</total_budget_changes><forecast_completion>2025-12-29T00:00:00</forecast_completion><latest_schedule_changes>60</latest_schedule_changes><total_schedule_changes>944</total_schedule_changes></row><row _id="row-suib_he6c_j9k4" _uuid="00000000-0000-0000-2AF8-D5170846BC3A" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-suib_he6c_j9k4"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>963</pid><project_name>Tompkinsville Esplanade</project_name><description>Esplanade from Stapleton to the Lighthouse Museum and Pier for DOT Dockbuilders.</description><category>Parks</category><managing_agency>EDC</managing_agency><client_agency>EDC</client_agency><current_phase>Construction Procurement</current_phase><design_start>2019-07-01T00:00:00</design_start><budget_forecast>162154665.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>10582596.00</total_budget_changes><forecast_completion>2026-03-01T00:00:00</forecast_completion><latest_schedule_changes>62</latest_schedule_changes><total_schedule_changes>944</total_schedule_changes></row><row _id="row-d4ea_jzbe~q4dw" _uuid="00000000-0000-0000-D694-46A6C7BC82F6" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-d4ea_jzbe~q4dw"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>967</pid><project_name>Queens IS at 47-10 Barnett Avenue Addition</project_name><description>Design and construction of a new school</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2018-07-02T00:00:00</design_start><budget_forecast>92201838.00</budget_forecast><total_budget_changes>3206657.00</total_budget_changes><forecast_completion>2022-09-03T00:00:00</forecast_completion><total_schedule_changes>365</total_schedule_changes></row><row _id="row-hae4.r2jg-n4wp" _uuid="00000000-0000-0000-9C3A-F0B7F830B643" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-hae4.r2jg-n4wp"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>967</pid><project_name>Queens IS at 47-10 Barnett Avenue Addition</project_name><description>NEW SCHOOL</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2018-07-02T00:00:00</design_start><budget_forecast>95408495.00</budget_forecast><latest_budget_changes>3206657.00</latest_budget_changes><total_budget_changes>3206657.00</total_budget_changes><forecast_completion>2022-09-03T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>365</total_schedule_changes></row><row _id="row-s9p3~sska-samd" _uuid="00000000-0000-0000-CA25-8A99A181F290" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-s9p3~sska-samd"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>967</pid><project_name>Queens IS at 47-10 Barnett Avenue Addition</project_name><description>NEW SCHOOL</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2018-07-02T00:00:00</design_start><budget_forecast>95408495.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>3206657.00</total_budget_changes><forecast_completion>2022-09-03T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>365</total_schedule_changes></row><row _id="row-kahe-uhvh.8ci4" _uuid="00000000-0000-0000-8B9F-CF0E3453AA5E" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-kahe-uhvh.8ci4"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>967</pid><project_name>Queens IS at 47-10 Barnett Avenue Addition</project_name><description>NEW SCHOOL</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2018-07-02T00:00:00</design_start><budget_forecast>95408495.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>3206657.00</total_budget_changes><forecast_completion>2023-09-03T00:00:00</forecast_completion><latest_schedule_changes>365</latest_schedule_changes><total_schedule_changes>365</total_schedule_changes></row><row _id="row-kfib.ivxc.89zt" _uuid="00000000-0000-0000-09F3-B3D001BC9AC9" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-kfib.ivxc.89zt"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>967</pid><project_name>Queens IS at 47-10 Barnett Avenue Addition</project_name><description>NEW SCHOOL</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2018-07-02T00:00:00</design_start><budget_forecast>95408495.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>3206657.00</total_budget_changes><forecast_completion>2023-09-03T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>365</total_schedule_changes></row><row _id="row-v2tv_fgvr_884j" _uuid="00000000-0000-0000-01D3-6F5E8BA8C8E7" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-v2tv_fgvr_884j"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>967</pid><project_name>Queens IS at 47-10 Barnett Avenue Addition</project_name><description>NEW SCHOOL</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2018-07-02T00:00:00</design_start><budget_forecast>95408495.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>3206657.00</total_budget_changes><forecast_completion>2023-09-03T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>365</total_schedule_changes></row><row _id="row-4vaj_44zv.xjmn" _uuid="00000000-0000-0000-CD78-33F87D45FE76" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-4vaj_44zv.xjmn"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>967</pid><project_name>Queens IS at 47-10 Barnett Avenue Addition</project_name><description>NEW SCHOOL</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2018-07-02T00:00:00</design_start><budget_forecast>95408495.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>3206657.00</total_budget_changes><forecast_completion>2023-09-03T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>365</total_schedule_changes></row><row _id="row-x9kw_weci-e2dw" _uuid="00000000-0000-0000-7BCE-ACCE6BD6B941" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-x9kw_weci-e2dw"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>967</pid><project_name>Queens IS at 47-10 Barnett Avenue Addition</project_name><description>NEW SCHOOL</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2018-07-02T00:00:00</design_start><budget_forecast>95408495.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>3206657.00</total_budget_changes><forecast_completion>2023-09-03T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>365</total_schedule_changes></row><row _id="row-azge.2w7y~9tf4" _uuid="00000000-0000-0000-1193-B48F47CD1AAC" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-azge.2w7y~9tf4"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>967</pid><project_name>Queens IS at 47-10 Barnett Avenue Addition</project_name><description>NEW SCHOOL</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2018-07-02T00:00:00</design_start><budget_forecast>95408495.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>3206657.00</total_budget_changes><forecast_completion>2023-09-03T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>365</total_schedule_changes></row><row _id="row-nabx~rsx3.cm2u" _uuid="00000000-0000-0000-D1D0-42A2F3F9DBDC" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-nabx~rsx3.cm2u"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>967</pid><project_name>Queens IS at 47-10 Barnett Avenue Addition</project_name><description>NEW SCHOOL</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2018-07-02T00:00:00</design_start><budget_forecast>95408495.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>3206657.00</total_budget_changes><forecast_completion>2023-09-03T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>365</total_schedule_changes></row><row _id="row-rk68.2kdt-we59" _uuid="00000000-0000-0000-CE14-979C4F09EE5F" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-rk68.2kdt-we59"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>970</pid><project_name>Queens PS 206  New Construction</project_name><description>Design and construction of a new school</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2018-09-10T00:00:00</design_start><budget_forecast>52315610.00</budget_forecast><total_budget_changes>2268625.00</total_budget_changes><forecast_completion>2022-09-03T00:00:00</forecast_completion><total_schedule_changes>365</total_schedule_changes></row><row _id="row-k249_6j87_kacg" _uuid="00000000-0000-0000-05A3-B477CBA8AA2B" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-k249_6j87_kacg"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>970</pid><project_name>Queens PS 206  New Construction</project_name><description>ADDITION</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2018-09-10T00:00:00</design_start><budget_forecast>54584235.00</budget_forecast><latest_budget_changes>2268625.00</latest_budget_changes><total_budget_changes>2268625.00</total_budget_changes><forecast_completion>2022-09-03T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>365</total_schedule_changes></row><row _id="row-i644.64ba_uwv4" _uuid="00000000-0000-0000-6843-F40BD884FFC9" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-i644.64ba_uwv4"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>970</pid><project_name>Queens PS 206  New Construction</project_name><description>ADDITION</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2018-09-10T00:00:00</design_start><budget_forecast>54584235.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>2268625.00</total_budget_changes><forecast_completion>2022-09-03T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>365</total_schedule_changes></row><row _id="row-3fqc-bym3-xqai" _uuid="00000000-0000-0000-2B7A-119C57842727" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-3fqc-bym3-xqai"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>970</pid><project_name>Queens PS 206  New Construction</project_name><description>ADDITION</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2018-09-10T00:00:00</design_start><budget_forecast>54584235.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>2268625.00</total_budget_changes><forecast_completion>2023-09-03T00:00:00</forecast_completion><latest_schedule_changes>365</latest_schedule_changes><total_schedule_changes>365</total_schedule_changes></row><row _id="row-garj~9ksh~8gq4" _uuid="00000000-0000-0000-E4F2-18CD33C59079" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-garj~9ksh~8gq4"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>970</pid><project_name>Queens PS 206  New Construction</project_name><description>ADDITION</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2018-09-10T00:00:00</design_start><budget_forecast>54584235.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>2268625.00</total_budget_changes><forecast_completion>2023-09-03T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>365</total_schedule_changes></row><row _id="row-xc87.de2s-4w4z" _uuid="00000000-0000-0000-F5EE-DC8654C8BC69" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-xc87.de2s-4w4z"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>970</pid><project_name>Queens PS 206  New Construction</project_name><description>ADDITION</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2018-09-10T00:00:00</design_start><budget_forecast>54584235.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>2268625.00</total_budget_changes><forecast_completion>2023-09-03T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>365</total_schedule_changes></row><row _id="row-z4wi-j72z_dm4t" _uuid="00000000-0000-0000-8440-143B8A2A441D" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-z4wi-j72z_dm4t"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>970</pid><project_name>Queens PS 206  New Construction</project_name><description>ADDITION</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2018-09-10T00:00:00</design_start><budget_forecast>54584235.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>2268625.00</total_budget_changes><forecast_completion>2023-09-03T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>365</total_schedule_changes></row><row _id="row-qypx~paht-eqfe" _uuid="00000000-0000-0000-6DEB-A77B3E21DFFA" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-qypx~paht-eqfe"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>970</pid><project_name>Queens PS 206  New Construction</project_name><description>ADDITION</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2018-09-10T00:00:00</design_start><budget_forecast>54584235.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>2268625.00</total_budget_changes><forecast_completion>2023-09-03T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>365</total_schedule_changes></row><row _id="row-h8ph~7y7w_en97" _uuid="00000000-0000-0000-4FB5-8FD837FF09C3" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-h8ph~7y7w_en97"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>970</pid><project_name>Queens PS 206  New Construction</project_name><description>ADDITION</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2018-09-10T00:00:00</design_start><budget_forecast>54584235.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>2268625.00</total_budget_changes><forecast_completion>2023-09-03T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>365</total_schedule_changes></row><row _id="row-vz64.95b7~wahu" _uuid="00000000-0000-0000-1265-DCC50BC746EF" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-vz64.95b7~wahu"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>970</pid><project_name>Queens PS 206  New Construction</project_name><description>ADDITION</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2018-09-10T00:00:00</design_start><budget_forecast>54584235.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>2268625.00</total_budget_changes><forecast_completion>2023-09-03T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>365</total_schedule_changes></row><row _id="row-k5id_h67f~6pwb" _uuid="00000000-0000-0000-58F5-75CE2E578C06" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-k5id_h67f~6pwb"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>971</pid><project_name>Bronx Sanitation Garage Rehabilitation: Community District 6</project_name><description>Rehabilitation of garage, broom garage and salt shed that serves Bronx Community Disrtict 6 located at 800 East 176th Street, Bronx.</description><category>Sanitation</category><managing_agency>DSNY</managing_agency><client_agency>DSNY</client_agency><current_phase>Design</current_phase><design_start>2017-06-20T00:00:00</design_start><budget_forecast>39941681.00</budget_forecast><total_budget_changes>0.00</total_budget_changes><forecast_completion>2025-06-30T00:00:00</forecast_completion><total_schedule_changes>913</total_schedule_changes></row><row _id="row-duvd~3kij_rpvp" _uuid="00000000-0000-0000-1BB3-2284095005BC" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-duvd~3kij_rpvp"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>971</pid><project_name>Bronx Sanitation Garage Rehabilitation: Community District 6</project_name><description>Rehabilitation of garage, broom garage and salt shed that serves Bronx Community Disrtict 6 located at 800 East 176th Street, Bronx.</description><category>Sanitation</category><managing_agency>DSNY</managing_agency><client_agency>DSNY</client_agency><current_phase>Design</current_phase><design_start>2017-06-20T00:00:00</design_start><budget_forecast>39941681.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2025-06-30T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>913</total_schedule_changes></row><row _id="row-8g85_sh59-j8xu" _uuid="00000000-0000-0000-ED11-00338D14A923" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-8g85_sh59-j8xu"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>971</pid><project_name>Bronx Sanitation Garage Rehabilitation: Community District 6</project_name><description>Rehabilitation of garage, broom garage and salt shed that serves Bronx Community Disrtict 6 located at 800 East 176th Street, Bronx.</description><category>Sanitation</category><managing_agency>DSNY</managing_agency><client_agency>DSNY</client_agency><current_phase>Design</current_phase><design_start>2017-06-20T00:00:00</design_start><budget_forecast>39941681.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2025-06-30T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>913</total_schedule_changes></row><row _id="row-gjtj.2rgn.d3b3" _uuid="00000000-0000-0000-83D0-95CAE07DC49F" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-gjtj.2rgn.d3b3"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>971</pid><project_name>Bronx Sanitation Garage Rehabilitation: Community District 6</project_name><description>Rehabilitation of garage, broom garage and salt shed that serves Bronx Community Disrtict 6 located at 800 East 176th Street, Bronx.</description><category>Sanitation</category><managing_agency>DSNY</managing_agency><client_agency>DSNY</client_agency><current_phase>Design</current_phase><design_start>2017-06-20T00:00:00</design_start><budget_forecast>39941681.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2025-06-30T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>913</total_schedule_changes></row><row _id="row-aazi-m6zc.abbj" _uuid="00000000-0000-0000-DFA1-83A793089098" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-aazi-m6zc.abbj"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>971</pid><project_name>Bronx Sanitation Garage Rehabilitation: Community District 6</project_name><description>Rehabilitation of garage, broom garage and salt shed that serves Bronx Community Disrtict 6 located at 800 East 176th Street, Bronx.</description><category>Sanitation</category><managing_agency>DSNY</managing_agency><client_agency>DSNY</client_agency><current_phase>Design</current_phase><design_start>2017-06-20T00:00:00</design_start><budget_forecast>39941681.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2026-06-30T00:00:00</forecast_completion><latest_schedule_changes>365</latest_schedule_changes><total_schedule_changes>913</total_schedule_changes></row><row _id="row-84tm-cbww_85cm" _uuid="00000000-0000-0000-487B-7F83749B4D60" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-84tm-cbww_85cm"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>971</pid><project_name>Bronx Sanitation Garage Rehabilitation: Community District 6</project_name><description>Rehabilitation of garage, broom garage and salt shed that serves Bronx Community Disrtict 6 located at 800 East 176th Street, Bronx.</description><category>Sanitation</category><managing_agency>DSNY</managing_agency><client_agency>DSNY</client_agency><current_phase>Design</current_phase><design_start>2017-06-20T00:00:00</design_start><budget_forecast>39941681.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2026-06-30T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>913</total_schedule_changes></row><row _id="row-uqtn~gsfw~dkhc" _uuid="00000000-0000-0000-BEC7-5CDBEFD743DB" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-uqtn~gsfw~dkhc"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>971</pid><project_name>Bronx Sanitation Garage Rehabilitation: Community District 6</project_name><description>Rehabilitation of garage, broom garage and salt shed that serves Bronx Community Disrtict 6 located at 800 East 176th Street, Bronx.</description><category>Sanitation</category><managing_agency>DSNY</managing_agency><client_agency>DSNY</client_agency><current_phase>Design</current_phase><design_start>2017-06-20T00:00:00</design_start><budget_forecast>39941681.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2026-06-30T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>913</total_schedule_changes></row><row _id="row-sx7b.xt5y~g3da" _uuid="00000000-0000-0000-5839-EB09BACF4CE7" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-sx7b.xt5y~g3da"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>971</pid><project_name>Bronx Sanitation Garage Rehabilitation: Community District 6</project_name><description>Rehabilitation of garage, broom garage and salt shed that serves Bronx Community Disrtict 6 located at 800 East 176th Street, Bronx.</description><category>Sanitation</category><managing_agency>DSNY</managing_agency><client_agency>DSNY</client_agency><current_phase>Design</current_phase><design_start>2017-06-20T00:00:00</design_start><budget_forecast>39941681.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2027-06-30T00:00:00</forecast_completion><latest_schedule_changes>365</latest_schedule_changes><total_schedule_changes>913</total_schedule_changes></row><row _id="row-s9p2.8mqy~c68v" _uuid="00000000-0000-0000-85F8-53E585ECF9DA" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-s9p2.8mqy~c68v"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>971</pid><project_name>Bronx Sanitation Garage Rehabilitation: Community District 6</project_name><description>Rehabilitation of garage, broom garage and salt shed that serves Bronx Community Disrtict 6 located at 800 East 176th Street, Bronx.</description><category>Sanitation</category><managing_agency>DSNY</managing_agency><client_agency>DSNY</client_agency><current_phase>Design</current_phase><design_start>2017-06-20T00:00:00</design_start><budget_forecast>39941681.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2028-06-30T00:00:00</forecast_completion><latest_schedule_changes>366</latest_schedule_changes><total_schedule_changes>913</total_schedule_changes></row><row _id="row-s9zy-8sv9~jvye" _uuid="00000000-0000-0000-9111-A4F8CF8EBDBE" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-s9zy-8sv9~jvye"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>971</pid><project_name>Bronx Sanitation Garage Rehabilitation: Community District 6</project_name><description>Rehabilitation of garage, broom garage and salt shed that serves Bronx Community Disrtict 6 located at 800 East 176th Street, Bronx.</description><category>Sanitation</category><managing_agency>DSNY</managing_agency><client_agency>DSNY</client_agency><current_phase>Design</current_phase><design_start>2017-06-20T00:00:00</design_start><budget_forecast>39941681.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2027-12-30T00:00:00</forecast_completion><latest_schedule_changes>-183</latest_schedule_changes><total_schedule_changes>913</total_schedule_changes></row><row _id="row-29ue~w88r-c8pk" _uuid="00000000-0000-0000-BFA1-36493FC35742" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-29ue~w88r-c8pk"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>973</pid><project_name>East River Esplanade Stabilization and Reconstruction Phase 3</project_name><description>This project will stabilize and reconstruct portions of the East River Esplanade from East 62nd Street to East 63rd Street and from East 90th Street to East 94th Street.</description><category>Parks</category><managing_agency>DPR</managing_agency><client_agency>DPR</client_agency><current_phase>Design</current_phase><design_start>2019-02-01T00:00:00</design_start><budget_forecast>61422000.00</budget_forecast><total_budget_changes>3616645.26</total_budget_changes><total_schedule_changes>612</total_schedule_changes></row><row _id="row-r8ak-zuyd-d8ja" _uuid="00000000-0000-0000-0EF7-3B6952B7A7FE" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-r8ak-zuyd-d8ja"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>973</pid><project_name>East River Esplanade Stabilization and Reconstruction Phase 3</project_name><description>This project will stabilize and reconstruct portions of the East River Esplanade from East 62nd Street to East 63rd Street and from East 90th Street to East 94th Street.</description><category>Parks</category><managing_agency>DPR</managing_agency><client_agency>DPR</client_agency><current_phase>Design</current_phase><design_start>2019-02-01T00:00:00</design_start><budget_forecast>72647778.13</budget_forecast><latest_budget_changes>11225778.13</latest_budget_changes><total_budget_changes>3616645.26</total_budget_changes><total_schedule_changes>612</total_schedule_changes></row><row _id="row-jpej.tiqe_kxqm" _uuid="00000000-0000-0000-9D26-5D2F8AA42A33" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-jpej.tiqe_kxqm"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1219</pid><project_name>P.S. 163 - BRONX New Construction</project_name><description>NEW SCHOOL / DEMOLITION OF EXISTING X163 BUILDING</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2019-12-06T00:00:00</design_start><budget_forecast>106257340.00</budget_forecast><latest_budget_changes>698625.00</latest_budget_changes><total_budget_changes>-6925988.00</total_budget_changes><forecast_completion>2024-09-03T00:00:00</forecast_completion><latest_schedule_changes>-101</latest_schedule_changes><total_schedule_changes>0</total_schedule_changes></row><row _id="row-vvwm-6vmy.m7s9" _uuid="00000000-0000-0000-1D4F-5090DB8A76F3" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-vvwm-6vmy.m7s9"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>973</pid><project_name>East River Esplanade Stabilization and Reconstruction Phase 3</project_name><description>This project will stabilize and reconstruct portions of the East River Esplanade from East 62nd Street to East 63rd Street, at East 76th Street, and from East 90th Street to East 94th Street.</description><category>Parks</category><managing_agency>DPR</managing_agency><client_agency>DPR</client_agency><current_phase>Design</current_phase><design_start>2019-02-01T00:00:00</design_start><budget_forecast>72647778.13</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>3616645.26</total_budget_changes><forecast_completion>2023-06-25T00:00:00</forecast_completion><total_schedule_changes>612</total_schedule_changes></row><row _id="row-eex6~yuwv~556p" _uuid="00000000-0000-0000-3712-9A1409D7C8B0" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-eex6~yuwv~556p"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1219</pid><project_name>P.S. 163 - BRONX New Construction</project_name><description>NEW SCHOOL / DEMOLITION OF EXISTING X163 BUILDING</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2019-12-06T00:00:00</design_start><budget_forecast>106257340.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-6925988.00</total_budget_changes><forecast_completion>2024-09-03T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>0</total_schedule_changes></row><row _id="row-hzu9-ayzr~63ve" _uuid="00000000-0000-0000-B3FE-95088382C531" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-hzu9-ayzr~63ve"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>1220</pid><project_name>P.S. 138 - BRONX Addition</project_name><description>ADDITION</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2020-10-26T00:00:00</design_start><budget_forecast>81207595.00</budget_forecast><total_budget_changes>0.00</total_budget_changes><forecast_completion>2024-09-03T00:00:00</forecast_completion><total_schedule_changes>0</total_schedule_changes></row><row _id="row-h4cd.fq95-cvjj" _uuid="00000000-0000-0000-4267-C7F79E098D01" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-h4cd.fq95-cvjj"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>1220</pid><project_name>P.S. 138 - BRONX Addition</project_name><description>ADDITION</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2020-10-26T00:00:00</design_start><budget_forecast>81207595.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2024-09-03T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>0</total_schedule_changes></row><row _id="row-a67p-t9v6-6usm" _uuid="00000000-0000-0000-D1EA-557C1F1B5B9E" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-a67p-t9v6-6usm"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1220</pid><project_name>P.S. 138 - BRONX Addition</project_name><description>ADDITION</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2020-10-26T00:00:00</design_start><budget_forecast>81207595.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2024-09-03T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>0</total_schedule_changes></row><row _id="row-putr_t93u_8mds" _uuid="00000000-0000-0000-40A4-F667EC4E76D3" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-putr_t93u_8mds"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1220</pid><project_name>P.S. 138 - BRONX Addition</project_name><description>ADDITION</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2020-10-26T00:00:00</design_start><budget_forecast>81207595.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2024-09-03T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>0</total_schedule_changes></row><row _id="row-exkw~jck9.km76" _uuid="00000000-0000-0000-55DD-70F6EFBC2EA0" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-exkw~jck9.km76"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>1221</pid><project_name>P.S. 96 - QUEENS Addition</project_name><description>ADDITION</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Design</current_phase><design_start>2021-02-26T00:00:00</design_start><budget_forecast>75688643.00</budget_forecast><total_budget_changes>-3902865.00</total_budget_changes><forecast_completion>2024-09-03T00:00:00</forecast_completion><total_schedule_changes>0</total_schedule_changes></row><row _id="row-tvyv_u8k2-5rhg" _uuid="00000000-0000-0000-68DE-E55FED7B0C1A" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-tvyv_u8k2-5rhg"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>1221</pid><project_name>P.S. 96 - QUEENS Addition</project_name><description>ADDITION</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Design</current_phase><design_start>2021-02-26T00:00:00</design_start><budget_forecast>75688643.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-3902865.00</total_budget_changes><forecast_completion>2024-09-03T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>0</total_schedule_changes></row><row _id="row-9pyk~w58v_tnr4" _uuid="00000000-0000-0000-CDBF-2B5EEAB53B0C" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-9pyk~w58v_tnr4"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1221</pid><project_name>P.S. 96 - QUEENS Addition</project_name><description>ADDITION / EXISTING BUILDING RENOVATION WORK / EXISTING BUILDING-AUDITORIUM / EXISTING BUILDING-CAFETERIA</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2021-02-26T00:00:00</design_start><budget_forecast>71785778.00</budget_forecast><latest_budget_changes>-3902865.00</latest_budget_changes><total_budget_changes>-3902865.00</total_budget_changes><forecast_completion>2024-09-03T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>0</total_schedule_changes></row><row _id="row-35i3_s4rr~3q8p" _uuid="00000000-0000-0000-219D-B22309269331" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-35i3_s4rr~3q8p"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1221</pid><project_name>P.S. 96 - QUEENS Addition</project_name><description>ADDITION / EXISTING BUILDING RENOVATION WORK / EXISTING BUILDING-AUDITORIUM / EXISTING BUILDING-CAFETERIA</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2021-02-26T00:00:00</design_start><budget_forecast>71785778.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-3902865.00</total_budget_changes><forecast_completion>2024-09-03T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>0</total_schedule_changes></row><row _id="row-rwrt.s8m2.427q" _uuid="00000000-0000-0000-70D1-14C08BB71770" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-rwrt.s8m2.427q"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>973</pid><project_name>East River Esplanade Stabilization and Reconstruction Phase 3</project_name><description>This project will stabilize and reconstruct portions of the East River Esplanade from East 62nd Street to East 63rd Street, at East 76th Street, and from East 90th Street to East 94th Street.</description><category>Parks</category><managing_agency>DPR</managing_agency><client_agency>DPR</client_agency><current_phase>Design</current_phase><design_start>2019-02-01T00:00:00</design_start><budget_forecast>73676645.26</budget_forecast><latest_budget_changes>1028867.13</latest_budget_changes><total_budget_changes>3616645.26</total_budget_changes><forecast_completion>2023-11-24T00:00:00</forecast_completion><latest_schedule_changes>152</latest_schedule_changes><total_schedule_changes>612</total_schedule_changes></row><row _id="row-9sbn~yrz9_2n6p" _uuid="00000000-0000-0000-8F44-5008D9E0C332" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-9sbn~yrz9_2n6p"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>973</pid><project_name>East River Esplanade Stabilization and Reconstruction Phase 3</project_name><description>This project will stabilize and reconstruct portions of the East River Esplanade from East 62nd Street to East 63rd Street, at East 76th Street, and from East 90th Street to East 94th Street.</description><category>Parks</category><managing_agency>DPR</managing_agency><client_agency>DPR</client_agency><current_phase>Design</current_phase><design_start>2019-02-01T00:00:00</design_start><budget_forecast>73676645.26</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>3616645.26</total_budget_changes><forecast_completion>2024-02-24T00:00:00</forecast_completion><latest_schedule_changes>92</latest_schedule_changes><total_schedule_changes>612</total_schedule_changes></row><row _id="row-bd5m.46f7~m82h" _uuid="00000000-0000-0000-CF91-A44AF552BD31" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-bd5m.46f7~m82h"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>973</pid><project_name>East River Esplanade Stabilization and Reconstruction Phase 3</project_name><description>This project will stabilize and reconstruct portions of the East River Esplanade from East 62nd Street to East 63rd Street, at East 76th Street, and from East 90th Street to East 94th Street.</description><category>Parks</category><managing_agency>DPR</managing_agency><client_agency>DPR</client_agency><current_phase>Design</current_phase><design_start>2019-02-01T00:00:00</design_start><budget_forecast>65038645.26</budget_forecast><latest_budget_changes>-8638000.00</latest_budget_changes><total_budget_changes>3616645.26</total_budget_changes><forecast_completion>2024-09-23T00:00:00</forecast_completion><latest_schedule_changes>212</latest_schedule_changes><total_schedule_changes>612</total_schedule_changes></row><row _id="row-6c4v.jfi2_nz6t" _uuid="00000000-0000-0000-0406-7BD399115BE3" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-6c4v.jfi2_nz6t"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>1222</pid><project_name>P.S./I.S. @ 3761 10TH AVENUE - Manhattan</project_name><description>NEW SCHOOL</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Design</current_phase><design_start>2021-03-24T00:00:00</design_start><budget_forecast>133550326.00</budget_forecast><total_budget_changes>9539089.00</total_budget_changes><forecast_completion>2024-09-03T00:00:00</forecast_completion><total_schedule_changes>0</total_schedule_changes></row><row _id="row-sra7.f9v8~9gef" _uuid="00000000-0000-0000-8FBE-208B1076FE6B" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-sra7.f9v8~9gef"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>1222</pid><project_name>P.S./I.S. @ 3761 10TH AVENUE - Manhattan</project_name><description>NEW SCHOOL</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Design</current_phase><design_start>2021-03-24T00:00:00</design_start><budget_forecast>133550326.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>9539089.00</total_budget_changes><forecast_completion>2024-09-03T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>0</total_schedule_changes></row><row _id="row-pfv4-3n79.7cwv" _uuid="00000000-0000-0000-DC9C-795411C77C6E" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-pfv4-3n79.7cwv"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1222</pid><project_name>P.S./I.S. @ 3761 10TH AVENUE - Manhattan</project_name><description>NEW SCHOOL</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2021-03-24T00:00:00</design_start><budget_forecast>143089415.00</budget_forecast><latest_budget_changes>9539089.00</latest_budget_changes><total_budget_changes>9539089.00</total_budget_changes><forecast_completion>2024-09-03T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>0</total_schedule_changes></row><row _id="row-bfrw.bmx7-8n7a" _uuid="00000000-0000-0000-2F4C-99EB6C40B3F9" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-bfrw.bmx7-8n7a"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1222</pid><project_name>P.S./I.S. @ 3761 10TH AVENUE - Manhattan</project_name><description>NEW SCHOOL</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2021-03-24T00:00:00</design_start><budget_forecast>143089415.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>9539089.00</total_budget_changes><forecast_completion>2024-09-03T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>0</total_schedule_changes></row><row _id="row-27vg-pi3b-6qpi" _uuid="00000000-0000-0000-32B6-E8D6E9F45E18" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-27vg-pi3b-6qpi"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>973</pid><project_name>East River Esplanade Stabilization and Reconstruction Phase 3</project_name><description>This project will stabilize and reconstruct portions of the East River Esplanade from East 62nd Street to East 63rd Street, at East 76th Street, and from East 90th Street to East 94th Street.</description><category>Parks</category><managing_agency>DPR</managing_agency><client_agency>DPR</client_agency><current_phase>Design</current_phase><design_start>2019-02-01T00:00:00</design_start><budget_forecast>65038645.26</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>3616645.26</total_budget_changes><forecast_completion>2024-11-23T00:00:00</forecast_completion><latest_schedule_changes>61</latest_schedule_changes><total_schedule_changes>612</total_schedule_changes></row><row _id="row-jrq8-pxf5-j8if" _uuid="00000000-0000-0000-0678-181D66276FDC" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-jrq8-pxf5-j8if"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>1223</pid><project_name>Lower Manhattan Coastal Resiliency (LMCR): Battery</project_name><description>Implementation of coastal resiliency measures to protect Battery Park and adjacent upland neighborhoods from storm surges and sea level rise.</description><category>Parks</category><managing_agency>EDC</managing_agency><client_agency>City Hall</client_agency><current_phase>Design</current_phase><design_start>2020-12-01T00:00:00</design_start><budget_forecast>165700000.00</budget_forecast><total_budget_changes>0.00</total_budget_changes><forecast_completion>2025-04-30T00:00:00</forecast_completion><total_schedule_changes>-29</total_schedule_changes></row><row _id="row-mt4r.vn73~9h6u" _uuid="00000000-0000-0000-E8F0-4EFAACEB00EA" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-mt4r.vn73~9h6u"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>1223</pid><project_name>Lower Manhattan Coastal Resiliency (LMCR): Battery</project_name><description>Implementation of coastal resiliency measures to protect Battery Park and adjacent upland neighborhoods from storm surges and sea level rise.</description><category>Parks</category><managing_agency>EDC</managing_agency><client_agency>City Hall</client_agency><current_phase>Design</current_phase><design_start>2020-12-01T00:00:00</design_start><budget_forecast>165700000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2025-02-28T00:00:00</forecast_completion><latest_schedule_changes>-61</latest_schedule_changes><total_schedule_changes>-29</total_schedule_changes></row><row _id="row-i7hn~xg6y.sbh3" _uuid="00000000-0000-0000-5057-ADD74B6FDC29" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-i7hn~xg6y.sbh3"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1223</pid><project_name>Lower Manhattan Coastal Resiliency (LMCR): Battery</project_name><description>Implementation of coastal resiliency measures to protect Battery Park and adjacent upland neighborhoods from storm surges and sea level rise.</description><category>Parks</category><managing_agency>EDC</managing_agency><client_agency>City Hall</client_agency><current_phase>Construction Procurement</current_phase><design_start>2020-12-01T00:00:00</design_start><budget_forecast>165700000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2025-04-01T00:00:00</forecast_completion><latest_schedule_changes>32</latest_schedule_changes><total_schedule_changes>-29</total_schedule_changes></row><row _id="row-bj6c.4hni~4ipc" _uuid="00000000-0000-0000-51C4-A1CD7AFF5025" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-bj6c.4hni~4ipc"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1334</pid><project_name>DOE - DIRECT INSTALL LIGHTING PROGRAM - 605 SHEPHERD AVE, BK</project_name><description>E22-0001 - DOE Direct Install Lighting Program - 605 Shepherd Ave, Brooklyn. Comprehensive lighting upgrades at multiple DOE schools across NYC</description><category>Schools</category><managing_agency>DCAS</managing_agency><client_agency>DOE</client_agency><current_phase>Design</current_phase><design_start>2022-11-01T00:00:00</design_start><budget_forecast>546963000.00</budget_forecast><forecast_completion>2024-07-31T00:00:00</forecast_completion></row><row _id="row-ufgr_vsyn-b9da" _uuid="00000000-0000-0000-92BD-12F41CAB9F7F" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ufgr_vsyn-b9da"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1337</pid><project_name>Jamaica Emergency Generators Upgrade</project_name><description>JA-179-L - Jamaica Emergency Generators Upgrade</description><category>Wastewater Treatment</category><managing_agency>DEP</managing_agency><client_agency>BWT</client_agency><current_phase>Construction</current_phase><design_start>2014-12-01T00:00:00</design_start><budget_forecast>49388447.32</budget_forecast><forecast_completion>2025-07-21T00:00:00</forecast_completion></row><row _id="row-34wx-6u7t_wf2q" _uuid="00000000-0000-0000-CE70-70B6E7B71F36" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-34wx-6u7t_wf2q"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1339</pid><project_name>P.S. @ 24 SHELLEY AVENUE - STATEN ISLAND</project_name><description>NEW SCHOOL</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction Procurement</current_phase><design_start>2021-08-30T00:00:00</design_start><budget_forecast>108030450.00</budget_forecast><forecast_completion>2025-09-03T00:00:00</forecast_completion></row><row _id="row-wpzf-3722-za4w" _uuid="00000000-0000-0000-3208-F08CAC6DBCA3" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-wpzf-3722-za4w"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1223</pid><project_name>Lower Manhattan Coastal Resiliency (LMCR): Battery</project_name><description>Implementation of coastal resiliency measures to protect Battery Park and adjacent upland neighborhoods from storm surges and sea level rise.</description><category>Parks</category><managing_agency>EDC</managing_agency><client_agency>City Hall</client_agency><current_phase>Construction Procurement</current_phase><design_start>2020-12-01T00:00:00</design_start><budget_forecast>165700000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2025-04-01T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>-29</total_schedule_changes></row><row _id="row-g693~m8vq.me8b" _uuid="00000000-0000-0000-B10E-0A2FBE6A6068" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-g693~m8vq.me8b"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1238</pid><project_name>42nd Street Pedestrian Security Measures</project_name><description>42nd Street Pedestrian Security Measures</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2022-07-25T00:00:00</design_start><budget_forecast>74207000.00</budget_forecast><latest_budget_changes>-1000.00</latest_budget_changes><total_budget_changes>-1000.00</total_budget_changes><forecast_completion>2029-05-29T00:00:00</forecast_completion><total_schedule_changes>0</total_schedule_changes></row><row _id="row-gmpt~dvvz.2j2t" _uuid="00000000-0000-0000-897D-25CC540672FC" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-gmpt~dvvz.2j2t"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>973</pid><project_name>East River Esplanade Stabilization and Reconstruction Phase 3</project_name><description>This project will stabilize and reconstruct portions of the East River Esplanade from East 62nd Street to East 63rd Street, at East 76th Street, and from East 90th Street to East 94th Street.</description><category>Parks</category><managing_agency>DPR</managing_agency><client_agency>DPR</client_agency><current_phase>Construction Procurement</current_phase><design_start>2019-02-01T00:00:00</design_start><budget_forecast>65038645.26</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>3616645.26</total_budget_changes><forecast_completion>2024-11-22T00:00:00</forecast_completion><latest_schedule_changes>-1</latest_schedule_changes><total_schedule_changes>612</total_schedule_changes></row><row _id="row-a7fx_534z-tcb5" _uuid="00000000-0000-0000-AEFA-235518571AA1" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-a7fx_534z-tcb5"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>973</pid><project_name>East River Esplanade Stabilization and Reconstruction Phase 3</project_name><description>This project will stabilize and reconstruct portions of the East River Esplanade from East 62nd Street to East 63rd Street, at East 76th Street, and from East 90th Street to East 94th Street.</description><category>Parks</category><managing_agency>DPR</managing_agency><client_agency>DPR</client_agency><current_phase>Construction Procurement</current_phase><design_start>2019-02-01T00:00:00</design_start><budget_forecast>65038645.26</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>3616645.26</total_budget_changes><forecast_completion>2025-02-26T00:00:00</forecast_completion><latest_schedule_changes>96</latest_schedule_changes><total_schedule_changes>612</total_schedule_changes></row><row _id="row-h3qc-b5ck.t3pa" _uuid="00000000-0000-0000-C1C4-AF20C7D85C47" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-h3qc-b5ck.t3pa"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>974</pid><project_name>Red Hook Recreation Area Track 1, Soccer Fields 3-5, and Ballfields 1-4 Reconstruction</project_name><description>This project will reconstruct the track &amp; field and convert three soccer fields and four ballfields from natural turf to synthetic turf at Red Hook Recreation Area.</description><category>Parks</category><managing_agency>DPR</managing_agency><client_agency>DPR</client_agency><current_phase>Construction Procurement</current_phase><design_start>2017-11-01T00:00:00</design_start><budget_forecast>79267000.00</budget_forecast><total_budget_changes>-10555000.00</total_budget_changes><forecast_completion>2021-09-15T00:00:00</forecast_completion><total_schedule_changes>1082</total_schedule_changes></row><row _id="row-4urp~g593_dr5p" _uuid="00000000-0000-0000-D0F7-9D184D27C3E3" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-4urp~g593_dr5p"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1340</pid><project_name>P.S. 105 - BRONX</project_name><description>ADDITION</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction Procurement</current_phase><design_start>2021-04-15T00:00:00</design_start><budget_forecast>72236920.00</budget_forecast><forecast_completion>2025-09-03T00:00:00</forecast_completion></row><row _id="row-vfz4.udqn~6hnx" _uuid="00000000-0000-0000-9C5F-A175E1078D9F" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-vfz4.udqn~6hnx"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1238</pid><project_name>42nd Street Pedestrian Security Measures</project_name><description>42nd Street Pedestrian Security Measures</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2022-07-25T00:00:00</design_start><budget_forecast>74207000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-1000.00</total_budget_changes><forecast_completion>2029-05-29T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>0</total_schedule_changes></row><row _id="row-dehj~zypp~4wma" _uuid="00000000-0000-0000-41E1-C68BE2C1652D" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-dehj~zypp~4wma"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1239</pid><project_name>Lexington Avenue Pedestrian Safety Improvements</project_name><description>Lexington Avenue Pedestrian Safety Improvements</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><budget_forecast>29819000.00</budget_forecast><latest_budget_changes>17000.00</latest_budget_changes><total_budget_changes>17000.00</total_budget_changes></row><row _id="row-rfrv.dgx7~csi5" _uuid="00000000-0000-0000-7369-0EA47799ECA8" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-rfrv.dgx7~csi5"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1342</pid><project_name>WEST 40TH ST AMTRAK 30ST BRANCH BIN# 2245440</project_name><category>Bridges</category><managing_agency>DOT</managing_agency><budget_forecast>51133176.00</budget_forecast></row><row _id="row-mubv-ftsa-8bqs" _uuid="00000000-0000-0000-1806-0F80B56542EB" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-mubv-ftsa-8bqs"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1345</pid><project_name>South East Queens Initiative</project_name><category>Streets and Roadways</category><managing_agency>DOT</managing_agency><budget_forecast>34017000.00</budget_forecast></row><row _id="row-seee~2tt8_pzbp" _uuid="00000000-0000-0000-2606-899830D899DB" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-seee~2tt8_pzbp"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1346</pid><project_name>Protective Coating of Macombs Dam Bridge</project_name><description>Protective Coating</description><category>Bridges</category><managing_agency>DOT</managing_agency><client_agency>n/a</client_agency><current_phase>Design</current_phase><design_start>2022-05-23T00:00:00</design_start><budget_forecast>42005000.00</budget_forecast><forecast_completion>2027-09-14T00:00:00</forecast_completion></row><row _id="row-sadt.y32t~p9fv" _uuid="00000000-0000-0000-F124-BB1C8E2B8BC0" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-sadt.y32t~p9fv"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1361</pid><project_name>Maspeth Climate Control and Air Quality Improvements</project_name><category>Other Government Facilities</category><managing_agency>DOT</managing_agency><budget_forecast>94000000.00</budget_forecast></row><row _id="row-x8fk.uh23_wr3m" _uuid="00000000-0000-0000-BFF8-26186212E807" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-x8fk.uh23_wr3m"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1239</pid><project_name>Lexington Avenue Pedestrian Safety Improvements</project_name><description>Lexington Avenue Pedestrian Safety Improvements</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><budget_forecast>29819000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>17000.00</total_budget_changes></row><row _id="row-nede-dexv_vmqa" _uuid="00000000-0000-0000-79AA-80ADBBB9FF70" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-nede-dexv_vmqa"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>1240</pid><project_name>TRAVIS AVENUE WIDENING</project_name><description>TRAVIS AVENUE WIDENING</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2015-01-15T00:00:00</design_start><budget_forecast>85587000.00</budget_forecast><total_budget_changes>50000.00</total_budget_changes><forecast_completion>2024-12-27T00:00:00</forecast_completion><total_schedule_changes>1029</total_schedule_changes></row><row _id="row-keh6_amff-xu3i" _uuid="00000000-0000-0000-81A3-F8BD14D505AF" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-keh6_amff-xu3i"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>1240</pid><project_name>TRAVIS AVENUE WIDENING</project_name><description>TRAVIS AVENUE WIDENING</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2015-01-15T00:00:00</design_start><budget_forecast>85607000.00</budget_forecast><latest_budget_changes>20000.00</latest_budget_changes><total_budget_changes>50000.00</total_budget_changes><forecast_completion>2027-10-22T00:00:00</forecast_completion><latest_schedule_changes>1029</latest_schedule_changes><total_schedule_changes>1029</total_schedule_changes></row><row _id="row-2cep.2bxc_q8tx" _uuid="00000000-0000-0000-60B7-85E5CB40F9B1" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-2cep.2bxc_q8tx"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1362</pid><project_name>Arrestors for all slips</project_name><category>Ferries</category><managing_agency>DOT</managing_agency><budget_forecast>59343167.00</budget_forecast></row><row _id="row-btcj.vtfy.ybxc" _uuid="00000000-0000-0000-0CAD-4F6384CB75B5" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-btcj.vtfy.ybxc"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>974</pid><project_name>Red Hook Recreation Area Track 1, Soccer Fields 3-5, and Ballfields 1-4 Reconstruction</project_name><description>This project will reconstruct the track &amp; field and convert three soccer fields and four ballfields from natural turf to synthetic turf at Red Hook Recreation Area.</description><category>Parks</category><managing_agency>DPR</managing_agency><client_agency>DPR</client_agency><current_phase>Construction Procurement</current_phase><design_start>2017-11-01T00:00:00</design_start><budget_forecast>79267000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-10555000.00</total_budget_changes><forecast_completion>2021-12-27T00:00:00</forecast_completion><latest_schedule_changes>103</latest_schedule_changes><total_schedule_changes>1082</total_schedule_changes></row><row _id="row-6az4~b6fh~7q2s" _uuid="00000000-0000-0000-2FF5-0C088374B149" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-6az4~b6fh~7q2s"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1240</pid><project_name>TRAVIS AVENUE WIDENING</project_name><description>TRAVIS AVENUE WIDENING</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2015-01-15T00:00:00</design_start><budget_forecast>85637000.00</budget_forecast><latest_budget_changes>30000.00</latest_budget_changes><total_budget_changes>50000.00</total_budget_changes><forecast_completion>2027-10-22T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1029</total_schedule_changes></row><row _id="row-sf2w-djvm_usxb" _uuid="00000000-0000-0000-2311-14E7251EDBC5" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-sf2w-djvm_usxb"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1240</pid><project_name>TRAVIS AVENUE WIDENING</project_name><description>TRAVIS AVENUE WIDENING</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2015-01-15T00:00:00</design_start><budget_forecast>85637000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>50000.00</total_budget_changes><forecast_completion>2027-10-22T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1029</total_schedule_changes></row><row _id="row-fwqp.4jvf~ztkb" _uuid="00000000-0000-0000-BA8E-9511D573F47B" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-fwqp.4jvf~ztkb"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>974</pid><project_name>Red Hook Recreation Area Track 1, Soccer Fields 3-5, and Ballfields 1-4 Reconstruction</project_name><description>This project will reconstruct the track &amp; field and convert three soccer fields and four ballfields from natural turf to synthetic turf at Red Hook Recreation Area.</description><category>Parks</category><managing_agency>DPR</managing_agency><client_agency>DPR</client_agency><current_phase>Construction Procurement</current_phase><design_start>2017-11-01T00:00:00</design_start><budget_forecast>75928000.00</budget_forecast><latest_budget_changes>-3339000.00</latest_budget_changes><total_budget_changes>-10555000.00</total_budget_changes><forecast_completion>2022-03-18T00:00:00</forecast_completion><latest_schedule_changes>81</latest_schedule_changes><total_schedule_changes>1082</total_schedule_changes></row><row _id="row-jtu8_sshn-3vyf" _uuid="00000000-0000-0000-BFE0-A1991B85C393" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-jtu8_sshn-3vyf"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1310</pid><project_name>EDUCATIONAL CAMPUS @ 2202 60TH STREET - BROOKLYN</project_name><description>LEASE</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2021-11-02T00:00:00</design_start><budget_forecast>38246910.00</budget_forecast><total_budget_changes>0.00</total_budget_changes><forecast_completion>2025-09-03T00:00:00</forecast_completion><total_schedule_changes>0</total_schedule_changes></row><row _id="row-zi86.fks8.fgc7" _uuid="00000000-0000-0000-81C5-DBF2B4AC2C34" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-zi86.fks8.fgc7"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1310</pid><project_name>EDUCATIONAL CAMPUS @ 2202 60TH STREET - BROOKLYN</project_name><description>LEASE</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2021-11-02T00:00:00</design_start><budget_forecast>38246910.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2025-09-03T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>0</total_schedule_changes></row><row _id="row-nvfz~eqyc_aag2" _uuid="00000000-0000-0000-B11D-C4353BDC20D7" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-nvfz~eqyc_aag2"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>974</pid><project_name>Red Hook Recreation Area Track 1, Soccer Fields 3-5, and Ballfields 1-4 Reconstruction</project_name><description>This project will reconstruct the track &amp; field and convert three soccer fields and four ballfields from natural turf to synthetic turf at Red Hook Recreation Area.</description><category>Parks</category><managing_agency>DPR</managing_agency><client_agency>DPR</client_agency><current_phase>Construction Procurement</current_phase><design_start>2017-11-01T00:00:00</design_start><budget_forecast>75928000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-10555000.00</total_budget_changes><forecast_completion>2023-01-14T00:00:00</forecast_completion><latest_schedule_changes>302</latest_schedule_changes><total_schedule_changes>1082</total_schedule_changes></row><row _id="row-qcfw_r6tq~hnhk" _uuid="00000000-0000-0000-0C02-A5ABA9512AF1" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-qcfw_r6tq~hnhk"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1311</pid><project_name>H.S. @ 165-18 HILLSIDE AVENUE - QUEENS</project_name><description>NEW SCHOOL</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2021-09-01T00:00:00</design_start><budget_forecast>155610775.00</budget_forecast><total_budget_changes>0.00</total_budget_changes><forecast_completion>2026-09-03T00:00:00</forecast_completion><total_schedule_changes>0</total_schedule_changes></row><row _id="row-72bc.e9rf_xfda" _uuid="00000000-0000-0000-9D6B-4C334FAF84D4" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-72bc.e9rf_xfda"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1311</pid><project_name>H.S. @ 165-18 HILLSIDE AVENUE - QUEENS</project_name><description>NEW SCHOOL</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2021-09-01T00:00:00</design_start><budget_forecast>155610775.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2026-09-03T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>0</total_schedule_changes></row><row _id="row-y33m.qutm~xp7z" _uuid="00000000-0000-0000-741F-F384F7EE4BD0" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-y33m.qutm~xp7z"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>974</pid><project_name>Red Hook Recreation Area Track 1, Soccer Fields 3-5, and Ballfields 1-4 Reconstruction</project_name><description>This project will reconstruct the track &amp; field and convert three soccer fields and four ballfields from natural turf to synthetic turf at Red Hook Recreation Area.</description><category>Parks</category><managing_agency>DPR</managing_agency><client_agency>DPR</client_agency><current_phase>Construction</current_phase><design_start>2017-11-01T00:00:00</design_start><budget_forecast>68712000.00</budget_forecast><latest_budget_changes>-7216000.00</latest_budget_changes><total_budget_changes>-10555000.00</total_budget_changes><forecast_completion>2023-01-03T00:00:00</forecast_completion><latest_schedule_changes>-11</latest_schedule_changes><total_schedule_changes>1082</total_schedule_changes></row><row _id="row-i64b.hqk2~zqud" _uuid="00000000-0000-0000-B0E0-775703A24272" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-i64b.hqk2~zqud"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1313</pid><project_name>3K CENTER @ 47-09 36TH STREET - QUEENS</project_name><description>LEASE</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2021-11-05T00:00:00</design_start><budget_forecast>25191650.00</budget_forecast><total_budget_changes>0.00</total_budget_changes><forecast_completion>2024-09-03T00:00:00</forecast_completion><total_schedule_changes>-366</total_schedule_changes></row><row _id="row-wxwf~vjbb_ph8p" _uuid="00000000-0000-0000-C622-B6CF7C22B631" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-wxwf~vjbb_ph8p"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1313</pid><project_name>3K CENTER @ 47-09 36TH STREET - QUEENS</project_name><description>LEASE</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2021-11-05T00:00:00</design_start><budget_forecast>25191650.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2023-09-03T00:00:00</forecast_completion><latest_schedule_changes>-366</latest_schedule_changes><total_schedule_changes>-366</total_schedule_changes></row><row _id="row-x59r~mnza.h9fv" _uuid="00000000-0000-0000-55E7-FE55F8851140" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-x59r~mnza.h9fv"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>974</pid><project_name>Red Hook Recreation Area Track 1, Soccer Fields 3-5, and Ballfields 1-4 Reconstruction</project_name><description>This project will reconstruct the track &amp; field and convert three soccer fields and four ballfields from natural turf to synthetic turf at Red Hook Recreation Area.</description><category>Parks</category><managing_agency>DPR</managing_agency><client_agency>DPR</client_agency><current_phase>Construction</current_phase><design_start>2017-11-01T00:00:00</design_start><budget_forecast>68712000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-10555000.00</total_budget_changes><forecast_completion>2023-01-03T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1082</total_schedule_changes></row><row _id="row-fayv.c2cn~92r9" _uuid="00000000-0000-0000-C6C9-48B6DCAFC691" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-fayv.c2cn~92r9"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1314</pid><project_name>I.S. 653 - BROOKLYN</project_name><description>NEW SCHOOL</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2016-06-07T00:00:00</design_start><budget_forecast>58771150.00</budget_forecast><total_budget_changes>0.00</total_budget_changes><forecast_completion>2025-09-03T00:00:00</forecast_completion><total_schedule_changes>0</total_schedule_changes></row><row _id="row-s8zx.nuhc.jxqm" _uuid="00000000-0000-0000-41AC-EFEC55F4C72E" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-s8zx.nuhc.jxqm"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>974</pid><project_name>Red Hook Recreation Area Track 1, Soccer Fields 3-5, and Ballfields 1-4 Reconstruction</project_name><description>This project will reconstruct the track &amp; field and convert three soccer fields and four ballfields from natural turf to synthetic turf at Red Hook Recreation Area.</description><category>Parks</category><managing_agency>DPR</managing_agency><client_agency>DPR</client_agency><current_phase>Construction</current_phase><design_start>2017-11-01T00:00:00</design_start><budget_forecast>68712000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-10555000.00</total_budget_changes><forecast_completion>2023-01-03T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1082</total_schedule_changes></row><row _id="row-z5u4-5udr_cgbs" _uuid="00000000-0000-0000-A885-32140103B47C" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-z5u4-5udr_cgbs"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1314</pid><project_name>I.S. 653 - BROOKLYN</project_name><description>NEW SCHOOL</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2016-06-07T00:00:00</design_start><budget_forecast>58771150.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2025-09-03T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>0</total_schedule_changes></row><row _id="row-dmey.n8v4~fe6w" _uuid="00000000-0000-0000-DF9B-FD5522976AC2" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-dmey.n8v4~fe6w"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1316</pid><project_name>New Signals Installation requirement, citywide FY23</project_name><description>New Signals Installation requirement, citywide FY23</description><category>Streets and Roadways</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction Procurement</current_phase><budget_forecast>36520000.00</budget_forecast><total_budget_changes>-35484942.00</total_budget_changes></row><row _id="row-j9ge_qsmb-zgd2" _uuid="00000000-0000-0000-906F-846D3C5E281B" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-j9ge_qsmb-zgd2"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>974</pid><project_name>Red Hook Recreation Area Track 1, Soccer Fields 3-5, and Ballfields 1-4 Reconstruction</project_name><description>This project will reconstruct the track &amp; field and convert three soccer fields and four ballfields from natural turf to synthetic turf at Red Hook Recreation Area.</description><category>Parks</category><managing_agency>DPR</managing_agency><client_agency>DPR</client_agency><current_phase>Construction</current_phase><design_start>2017-11-01T00:00:00</design_start><budget_forecast>68712000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-10555000.00</total_budget_changes><forecast_completion>2023-01-03T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1082</total_schedule_changes></row><row _id="row-ypi9~nfuq-37fj" _uuid="00000000-0000-0000-404F-807CBBE8DDFF" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ypi9~nfuq-37fj"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>974</pid><project_name>Red Hook Recreation Area Track 1, Soccer Fields 3-5, and Ballfields 1-4 Reconstruction</project_name><description>This project will reconstruct the track &amp; field and convert three soccer fields and four ballfields from natural turf to synthetic turf at Red Hook Recreation Area.</description><category>Parks</category><managing_agency>DPR</managing_agency><client_agency>DPR</client_agency><current_phase>Construction</current_phase><design_start>2017-11-01T00:00:00</design_start><budget_forecast>68712000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-10555000.00</total_budget_changes><forecast_completion>2023-01-03T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1082</total_schedule_changes></row><row _id="row-ng6k~arai_msd5" _uuid="00000000-0000-0000-2C58-E82969E2106E" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ng6k~arai_msd5"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>974</pid><project_name>Red Hook Recreation Area Track 1, Soccer Fields 3-5, and Ballfields 1-4 Reconstruction</project_name><description>This project will reconstruct the track &amp; field and convert three soccer fields and four ballfields from natural turf to synthetic turf at Red Hook Recreation Area.</description><category>Parks</category><managing_agency>DPR</managing_agency><client_agency>DPR</client_agency><current_phase>Construction</current_phase><design_start>2017-11-01T00:00:00</design_start><budget_forecast>68712000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-10555000.00</total_budget_changes><forecast_completion>2024-09-01T00:00:00</forecast_completion><latest_schedule_changes>607</latest_schedule_changes><total_schedule_changes>1082</total_schedule_changes></row><row _id="row-dyi5-rsms~hv27" _uuid="00000000-0000-0000-8637-A36174D72408" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-dyi5-rsms~hv27"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>977</pid><project_name>BROWNSVILLE LIBRARY MAJOR RENOVATIONS</project_name><category>Libraries</category><managing_agency>DDC</managing_agency><client_agency>Libraries-BPL</client_agency><current_phase>Design</current_phase><design_start>2018-06-28T00:00:00</design_start><budget_forecast>25502000.00</budget_forecast><total_budget_changes>6752000.00</total_budget_changes><forecast_completion>2024-12-30T00:00:00</forecast_completion><total_schedule_changes>916</total_schedule_changes></row><row _id="row-tq85.5ms5.huvy" _uuid="00000000-0000-0000-458C-5E2F89EA1974" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-tq85.5ms5.huvy"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>977</pid><project_name>BROWNSVILLE LIBRARY MAJOR RENOVATIONS</project_name><category>Libraries</category><managing_agency>DDC</managing_agency><client_agency>Libraries-BPL</client_agency><total_budget_changes>6752000.00</total_budget_changes><total_schedule_changes>916</total_schedule_changes></row><row _id="row-ncqn_g557-xcpa" _uuid="00000000-0000-0000-654C-8A6E6B962658" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ncqn_g557-xcpa"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>977</pid><project_name>BROWNSVILLE LIBRARY MAJOR RENOVATIONS</project_name><category>Libraries</category><managing_agency>DDC</managing_agency><client_agency>Libraries-BPL</client_agency><total_budget_changes>6752000.00</total_budget_changes><total_schedule_changes>916</total_schedule_changes></row><row _id="row-qdnm~b6bi.dui8" _uuid="00000000-0000-0000-6685-E949F2252D28" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-qdnm~b6bi.dui8"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>977</pid><project_name>BROWNSVILLE LIBRARY MAJOR RENOVATIONS</project_name><category>Libraries</category><managing_agency>DDC</managing_agency><client_agency>Libraries-BPL</client_agency><total_budget_changes>6752000.00</total_budget_changes><total_schedule_changes>916</total_schedule_changes></row><row _id="row-9xqt_b72h-b6wy" _uuid="00000000-0000-0000-74F4-DD231C8ED18B" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-9xqt_b72h-b6wy"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>977</pid><project_name>BROWNSVILLE LIBRARY MAJOR RENOVATIONS</project_name><category>Libraries</category><managing_agency>DDC</managing_agency><client_agency>Libraries-BPL</client_agency><total_budget_changes>6752000.00</total_budget_changes><total_schedule_changes>916</total_schedule_changes></row><row _id="row-vdp9-fwes~7mff" _uuid="00000000-0000-0000-6623-39439868FADD" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-vdp9-fwes~7mff"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>977</pid><project_name>BROWNSVILLE LIBRARY MAJOR RENOVATIONS</project_name><description>The Brownsville Library is a comprehensive interior/exterior renovation and addition which includes new fire alarm/BMS, new interior layout, new HVAC, new accessible restrooms, exterior rehabilitation and landscape.</description><category>Libraries</category><managing_agency>DDC</managing_agency><client_agency>Libraries-BPL</client_agency><current_phase>Design</current_phase><design_start>2018-07-27T00:00:00</design_start><budget_forecast>32015000.00</budget_forecast><latest_budget_changes>6513000.00</latest_budget_changes><total_budget_changes>6752000.00</total_budget_changes><forecast_completion>2026-01-02T00:00:00</forecast_completion><latest_schedule_changes>368</latest_schedule_changes><total_schedule_changes>916</total_schedule_changes></row><row _id="row-iqx7.bhvq_hjn3" _uuid="00000000-0000-0000-1721-C10518BC6F84" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-iqx7.bhvq_hjn3"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>977</pid><project_name>BROWNSVILLE LIBRARY MAJOR RENOVATIONS</project_name><description>The Brownsville Library is a comprehensive interior/exterior renovation and addition which includes new fire alarm/BMS, new interior layout, new HVAC, new accessible restrooms, exterior rehabilitation and landscape.</description><category>Libraries</category><managing_agency>DDC</managing_agency><client_agency>Libraries-BPL</client_agency><current_phase>Design</current_phase><design_start>2018-07-27T00:00:00</design_start><budget_forecast>31899000.00</budget_forecast><latest_budget_changes>-116000.00</latest_budget_changes><total_budget_changes>6752000.00</total_budget_changes><forecast_completion>2026-07-02T00:00:00</forecast_completion><latest_schedule_changes>181</latest_schedule_changes><total_schedule_changes>916</total_schedule_changes></row><row _id="row-nhb5~v5ie-sabq" _uuid="00000000-0000-0000-E459-5414399F6606" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-nhb5~v5ie-sabq"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>977</pid><project_name>BROWNSVILLE LIBRARY MAJOR RENOVATIONS</project_name><description>The Brownsville Library is a comprehensive interior/exterior renovation and addition which includes new fire alarm/BMS, new interior layout, new HVAC, new accessible restrooms, exterior rehabilitation and landscape.</description><category>Libraries</category><managing_agency>DDC</managing_agency><client_agency>Libraries-BPL</client_agency><current_phase>Design</current_phase><design_start>2018-07-27T00:00:00</design_start><budget_forecast>32074000.00</budget_forecast><latest_budget_changes>175000.00</latest_budget_changes><total_budget_changes>6752000.00</total_budget_changes><forecast_completion>2026-12-19T00:00:00</forecast_completion><latest_schedule_changes>170</latest_schedule_changes><total_schedule_changes>916</total_schedule_changes></row><row _id="row-re56~yzur.38sy" _uuid="00000000-0000-0000-527F-0D7A583224AB" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-re56~yzur.38sy"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>977</pid><project_name>BROWNSVILLE LIBRARY MAJOR RENOVATIONS</project_name><description>The Brownsville Library is a comprehensive interior/exterior renovation and addition which includes new fire alarm/BMS, new interior layout, new HVAC, new accessible restrooms, exterior rehabilitation and landscape.</description><category>Libraries</category><managing_agency>DDC</managing_agency><client_agency>Libraries-BPL</client_agency><current_phase>Design</current_phase><design_start>2018-07-27T00:00:00</design_start><budget_forecast>32254000.00</budget_forecast><latest_budget_changes>180000.00</latest_budget_changes><total_budget_changes>6752000.00</total_budget_changes><forecast_completion>2026-12-19T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>916</total_schedule_changes></row><row _id="row-f9tb~c9we_ckun" _uuid="00000000-0000-0000-A0D2-CC1AD740DC07" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-f9tb~c9we_ckun"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>977</pid><project_name>BROWNSVILLE LIBRARY MAJOR RENOVATIONS</project_name><description>The Brownsville Library is a comprehensive interior/exterior renovation and addition which includes new fire alarm/BMS, new interior layout, new HVAC, new accessible restrooms, exterior rehabilitation and landscape.</description><category>Libraries</category><managing_agency>DDC</managing_agency><client_agency>Libraries-BPL</client_agency><current_phase>Design</current_phase><design_start>2018-07-27T00:00:00</design_start><budget_forecast>32254000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>6752000.00</total_budget_changes><forecast_completion>2027-07-04T00:00:00</forecast_completion><latest_schedule_changes>197</latest_schedule_changes><total_schedule_changes>916</total_schedule_changes></row><row _id="row-35q8_iimu.fr3a" _uuid="00000000-0000-0000-ADF8-16D8BFA607D5" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-35q8_iimu.fr3a"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>979</pid><project_name>SUNSET PARK GOWANUS CONNECTOR, BK</project_name><description>Sunset Park Gowanus Connector - Brooklyn Waterfront Greenway.</description><category>Parks, Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Construction Procurement</current_phase><design_start>2017-09-18T00:00:00</design_start><budget_forecast>45271000.00</budget_forecast><total_budget_changes>-16441000.00</total_budget_changes><forecast_completion>2022-06-26T00:00:00</forecast_completion><total_schedule_changes>445</total_schedule_changes></row><row _id="row-zjz2.eh9m.5b4a" _uuid="00000000-0000-0000-F36D-C4E0DC421F3D" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-zjz2.eh9m.5b4a"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>979</pid><project_name>SUNSET PARK GOWANUS CONNECTOR, BK</project_name><category>Parks, Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><total_budget_changes>-16441000.00</total_budget_changes><total_schedule_changes>445</total_schedule_changes></row><row _id="row-yupk_pfn8-aknb" _uuid="00000000-0000-0000-09E6-EF4496B9AD46" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-yupk_pfn8-aknb"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>979</pid><project_name>SUNSET PARK GOWANUS CONNECTOR, BK</project_name><category>Parks, Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><total_budget_changes>-16441000.00</total_budget_changes><total_schedule_changes>445</total_schedule_changes></row><row _id="row-6qth_f7e4-pdsj" _uuid="00000000-0000-0000-2108-1BADC20A9903" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-6qth_f7e4-pdsj"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>979</pid><project_name>SUNSET PARK GOWANUS CONNECTOR, BK</project_name><category>Parks, Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><total_budget_changes>-16441000.00</total_budget_changes><total_schedule_changes>445</total_schedule_changes></row><row _id="row-ad58-gd45.4vqa" _uuid="00000000-0000-0000-B926-A965D3F6F00A" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ad58-gd45.4vqa"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>979</pid><project_name>SUNSET PARK GOWANUS CONNECTOR, BK</project_name><category>Parks, Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><total_budget_changes>-16441000.00</total_budget_changes><total_schedule_changes>445</total_schedule_changes></row><row _id="row-6cfi.44xe~2yck" _uuid="00000000-0000-0000-6293-1CF38D86C3B9" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-6cfi.44xe~2yck"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>979</pid><project_name>SUNSET PARK GOWANUS CONNECTOR, BK</project_name><description>Sunset Park Gowanus Connector - Brooklyn Waterfront Greenway.</description><category>Parks, Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Construction</current_phase><design_start>2017-09-18T00:00:00</design_start><budget_forecast>30614000.00</budget_forecast><latest_budget_changes>-14657000.00</latest_budget_changes><total_budget_changes>-16441000.00</total_budget_changes><forecast_completion>2022-11-27T00:00:00</forecast_completion><latest_schedule_changes>154</latest_schedule_changes><total_schedule_changes>445</total_schedule_changes></row><row _id="row-amfu-jmrp~gped" _uuid="00000000-0000-0000-DA5C-2F8D52E615C5" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-amfu-jmrp~gped"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>979</pid><project_name>SUNSET PARK GOWANUS CONNECTOR, BK</project_name><description>Sunset Park Gowanus Connector - Brooklyn Waterfront Greenway.</description><category>Parks, Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Construction</current_phase><design_start>2017-09-18T00:00:00</design_start><budget_forecast>28998000.00</budget_forecast><latest_budget_changes>-1616000.00</latest_budget_changes><total_budget_changes>-16441000.00</total_budget_changes><forecast_completion>2022-11-27T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>445</total_schedule_changes></row><row _id="row-4ixp_m7u7-2e9y" _uuid="00000000-0000-0000-6CAB-25C2CED6DD15" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-4ixp_m7u7-2e9y"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>979</pid><project_name>SUNSET PARK GOWANUS CONNECTOR, BK</project_name><description>Sunset Park Gowanus Connector - Brooklyn Waterfront Greenway.</description><category>Parks, Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Construction</current_phase><design_start>2017-09-18T00:00:00</design_start><budget_forecast>29984000.00</budget_forecast><latest_budget_changes>986000.00</latest_budget_changes><total_budget_changes>-16441000.00</total_budget_changes><forecast_completion>2022-11-27T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>445</total_schedule_changes></row><row _id="row-7cjq_9kk5_2ycu" _uuid="00000000-0000-0000-6272-338B17B06F39" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-7cjq_9kk5_2ycu"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>979</pid><project_name>SUNSET PARK GOWANUS CONNECTOR, BK</project_name><description>Sunset Park Gowanus Connector - Brooklyn Waterfront Greenway.</description><category>Parks, Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Construction</current_phase><design_start>2017-09-18T00:00:00</design_start><budget_forecast>28830000.00</budget_forecast><latest_budget_changes>-1154000.00</latest_budget_changes><total_budget_changes>-16441000.00</total_budget_changes><forecast_completion>2023-05-16T00:00:00</forecast_completion><latest_schedule_changes>170</latest_schedule_changes><total_schedule_changes>445</total_schedule_changes></row><row _id="row-c2pa_pyze.p8s2" _uuid="00000000-0000-0000-981D-A8111DEC8AE4" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-c2pa_pyze.p8s2"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>979</pid><project_name>SUNSET PARK GOWANUS CONNECTOR, BK</project_name><description>Sunset Park Gowanus Connector - Brooklyn Waterfront Greenway.</description><category>Parks, Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Construction</current_phase><design_start>2017-09-18T00:00:00</design_start><budget_forecast>28830000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-16441000.00</total_budget_changes><forecast_completion>2023-09-14T00:00:00</forecast_completion><latest_schedule_changes>121</latest_schedule_changes><total_schedule_changes>445</total_schedule_changes></row><row _id="row-e8j8-xpvh-pcnx" _uuid="00000000-0000-0000-DCFF-BA2FDA031966" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-e8j8-xpvh-pcnx"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>981</pid><project_name>WESTBOURNE - DUNBAR ROADWAYS/BULKHEADS, QNS</project_name><description>PRELIMINARY AND FINAL DESIGN SERVICES FOR RECONSTRUCTION OF WESTBOURNE NORTON DRIVE.   BOROUGH OF QUEENS</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2016-12-15T00:00:00</design_start><budget_forecast>45442000.00</budget_forecast><total_budget_changes>47223000.00</total_budget_changes><forecast_completion>2024-09-12T00:00:00</forecast_completion><total_schedule_changes>1840</total_schedule_changes></row><row _id="row-qqct-jzfj-73gb" _uuid="00000000-0000-0000-BD55-CE172B83FC3A" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-qqct-jzfj-73gb"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>981</pid><project_name>WESTBOURNE - DUNBAR ROADWAYS/BULKHEADS, QNS</project_name><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><total_budget_changes>47223000.00</total_budget_changes><total_schedule_changes>1840</total_schedule_changes></row><row _id="row-ia5i~u6jk_3pa6" _uuid="00000000-0000-0000-BA24-5DE352E08A0C" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ia5i~u6jk_3pa6"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>981</pid><project_name>WESTBOURNE - DUNBAR ROADWAYS/BULKHEADS, QNS</project_name><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><total_budget_changes>47223000.00</total_budget_changes><total_schedule_changes>1840</total_schedule_changes></row><row _id="row-g7am.k4nj.d8bv" _uuid="00000000-0000-0000-EAAD-0E7AE045C245" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-g7am.k4nj.d8bv"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>981</pid><project_name>WESTBOURNE - DUNBAR ROADWAYS/BULKHEADS, QNS</project_name><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><total_budget_changes>47223000.00</total_budget_changes><total_schedule_changes>1840</total_schedule_changes></row><row _id="row-brx7.mgnv.85tn" _uuid="00000000-0000-0000-D05F-00A5F85C707A" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-brx7.mgnv.85tn"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>981</pid><project_name>WESTBOURNE - DUNBAR ROADWAYS/BULKHEADS, QNS</project_name><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><total_budget_changes>47223000.00</total_budget_changes><total_schedule_changes>1840</total_schedule_changes></row><row _id="row-wavw~muyt_ec2p" _uuid="00000000-0000-0000-6E49-347E2F3D237D" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-wavw~muyt_ec2p"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>981</pid><project_name>WESTBOURNE - DUNBAR ROADWAYS/BULKHEADS, QNS</project_name><description>PRELIMINARY AND FINAL DESIGN SERVICES FOR RECONSTRUCTION OF WESTBOURNE NORTON DRIVE.   BOROUGH OF QUEENS</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2016-12-15T00:00:00</design_start><budget_forecast>39253000.00</budget_forecast><latest_budget_changes>-6189000.00</latest_budget_changes><total_budget_changes>47223000.00</total_budget_changes><forecast_completion>2029-09-26T00:00:00</forecast_completion><latest_schedule_changes>1840</latest_schedule_changes><total_schedule_changes>1840</total_schedule_changes></row><row _id="row-xdhc.2hnt-ngrv" _uuid="00000000-0000-0000-0D91-3FA8FBA0F493" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-xdhc.2hnt-ngrv"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>981</pid><project_name>WESTBOURNE - DUNBAR ROADWAYS/BULKHEADS, QNS</project_name><description>PRELIMINARY AND FINAL DESIGN SERVICES FOR RECONSTRUCTION OF WESTBOURNE NORTON DRIVE.   BOROUGH OF QUEENS</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2016-12-15T00:00:00</design_start><budget_forecast>61323000.00</budget_forecast><latest_budget_changes>22070000.00</latest_budget_changes><total_budget_changes>47223000.00</total_budget_changes><forecast_completion>2029-09-26T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1840</total_schedule_changes></row><row _id="row-kfgs_hgsd_th8b" _uuid="00000000-0000-0000-6C90-D905170E57DD" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-kfgs_hgsd_th8b"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>981</pid><project_name>WESTBOURNE - DUNBAR ROADWAYS/BULKHEADS, QNS</project_name><description>PRELIMINARY AND FINAL DESIGN SERVICES FOR RECONSTRUCTION OF WESTBOURNE NORTON DRIVE.   BOROUGH OF QUEENS</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2016-12-15T00:00:00</design_start><budget_forecast>60672000.00</budget_forecast><latest_budget_changes>-651000.00</latest_budget_changes><total_budget_changes>47223000.00</total_budget_changes><forecast_completion>2029-09-26T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1840</total_schedule_changes></row><row _id="row-qasa~62vb_jju4" _uuid="00000000-0000-0000-A90E-6C6C00AACFC1" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-qasa~62vb_jju4"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>981</pid><project_name>WESTBOURNE - DUNBAR ROADWAYS/BULKHEADS, QNS</project_name><description>PRELIMINARY AND FINAL DESIGN SERVICES FOR RECONSTRUCTION OF WESTBOURNE NORTON DRIVE.   BOROUGH OF QUEENS</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2016-12-15T00:00:00</design_start><budget_forecast>64665000.00</budget_forecast><latest_budget_changes>3993000.00</latest_budget_changes><total_budget_changes>47223000.00</total_budget_changes><forecast_completion>2029-09-26T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1840</total_schedule_changes></row><row _id="row-p3a7.py7g~wg2d" _uuid="00000000-0000-0000-9800-6CC3AB66ED56" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-p3a7.py7g~wg2d"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>981</pid><project_name>WESTBOURNE - DUNBAR ROADWAYS/BULKHEADS, QNS</project_name><description>PRELIMINARY AND FINAL DESIGN SERVICES FOR RECONSTRUCTION OF WESTBOURNE NORTON DRIVE.   BOROUGH OF QUEENS</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2016-12-15T00:00:00</design_start><budget_forecast>92665000.00</budget_forecast><latest_budget_changes>28000000.00</latest_budget_changes><total_budget_changes>47223000.00</total_budget_changes><forecast_completion>2029-09-26T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1840</total_schedule_changes></row><row _id="row-27ni-gehi.2ndy" _uuid="00000000-0000-0000-B958-CBAF540D9263" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-27ni-gehi.2ndy"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>983</pid><project_name>DELANCEY STREET SAFETY IMPROVEMENTS</project_name><description>DELANCEY STREET SAFETY IMPROVEMENTS</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2017-07-19T00:00:00</design_start><budget_forecast>35594000.00</budget_forecast><total_budget_changes>20937000.00</total_budget_changes><forecast_completion>2024-06-22T00:00:00</forecast_completion><total_schedule_changes>1217</total_schedule_changes></row><row _id="row-5ghw-b79b.pcct" _uuid="00000000-0000-0000-0B94-9C5A54D40AE2" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-5ghw-b79b.pcct"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>983</pid><project_name>DELANCEY STREET SAFETY IMPROVEMENTS</project_name><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><total_budget_changes>20937000.00</total_budget_changes><total_schedule_changes>1217</total_schedule_changes></row><row _id="row-pg74_9ier~89bd" _uuid="00000000-0000-0000-6091-5EA764FB1C6E" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-pg74_9ier~89bd"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>983</pid><project_name>DELANCEY STREET SAFETY IMPROVEMENTS</project_name><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><total_budget_changes>20937000.00</total_budget_changes><total_schedule_changes>1217</total_schedule_changes></row><row _id="row-nqpx.7295.e485" _uuid="00000000-0000-0000-7AE5-4C5BD904F41D" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-nqpx.7295.e485"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>983</pid><project_name>DELANCEY STREET SAFETY IMPROVEMENTS</project_name><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><total_budget_changes>20937000.00</total_budget_changes><total_schedule_changes>1217</total_schedule_changes></row><row _id="row-u4z9_7e4c_fx5c" _uuid="00000000-0000-0000-57C7-17E8C00B1645" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-u4z9_7e4c_fx5c"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>983</pid><project_name>DELANCEY STREET SAFETY IMPROVEMENTS</project_name><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><total_budget_changes>20937000.00</total_budget_changes><total_schedule_changes>1217</total_schedule_changes></row><row _id="row-ryit.zzsh.rzgj" _uuid="00000000-0000-0000-F02C-2B907522F131" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ryit.zzsh.rzgj"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>983</pid><project_name>DELANCEY STREET SAFETY IMPROVEMENTS</project_name><description>DELANCEY STREET SAFETY IMPROVEMENTS</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2017-07-19T00:00:00</design_start><budget_forecast>55121000.00</budget_forecast><latest_budget_changes>19527000.00</latest_budget_changes><total_budget_changes>20937000.00</total_budget_changes><forecast_completion>2025-11-22T00:00:00</forecast_completion><latest_schedule_changes>518</latest_schedule_changes><total_schedule_changes>1217</total_schedule_changes></row><row _id="row-4yiy~d9sg~dtps" _uuid="00000000-0000-0000-2533-B72C15F0E146" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-4yiy~d9sg~dtps"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>983</pid><project_name>DELANCEY STREET SAFETY IMPROVEMENTS</project_name><description>DELANCEY STREET SAFETY IMPROVEMENTS</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2017-07-19T00:00:00</design_start><budget_forecast>56381000.00</budget_forecast><latest_budget_changes>1260000.00</latest_budget_changes><total_budget_changes>20937000.00</total_budget_changes><forecast_completion>2026-06-22T00:00:00</forecast_completion><latest_schedule_changes>212</latest_schedule_changes><total_schedule_changes>1217</total_schedule_changes></row><row _id="row-xt7s-izvf.zk34" _uuid="00000000-0000-0000-1AC8-D226E838F6DD" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-xt7s-izvf.zk34"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>983</pid><project_name>DELANCEY STREET SAFETY IMPROVEMENTS</project_name><description>DELANCEY STREET SAFETY IMPROVEMENTS</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2017-07-19T00:00:00</design_start><budget_forecast>56381000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>20937000.00</total_budget_changes><forecast_completion>2026-10-23T00:00:00</forecast_completion><latest_schedule_changes>123</latest_schedule_changes><total_schedule_changes>1217</total_schedule_changes></row><row _id="row-f3iv.jk82_ij6a" _uuid="00000000-0000-0000-C2BB-A5FEDE68933F" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-f3iv.jk82_ij6a"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>983</pid><project_name>DELANCEY STREET SAFETY IMPROVEMENTS</project_name><description>DELANCEY STREET SAFETY IMPROVEMENTS</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2017-07-19T00:00:00</design_start><budget_forecast>56531000.00</budget_forecast><latest_budget_changes>150000.00</latest_budget_changes><total_budget_changes>20937000.00</total_budget_changes><forecast_completion>2027-10-22T00:00:00</forecast_completion><latest_schedule_changes>364</latest_schedule_changes><total_schedule_changes>1217</total_schedule_changes></row><row _id="row-vjga~jr7b~hqxj" _uuid="00000000-0000-0000-3B17-6F9884E601EC" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-vjga~jr7b~hqxj"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>983</pid><project_name>DELANCEY STREET SAFETY IMPROVEMENTS</project_name><description>DELANCEY STREET SAFETY IMPROVEMENTS</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2017-07-19T00:00:00</design_start><budget_forecast>56531000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>20937000.00</total_budget_changes><forecast_completion>2027-10-22T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1217</total_schedule_changes></row><row _id="row-jdgp-ecxf-rwfh" _uuid="00000000-0000-0000-2B0F-405A5B2F0224" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-jdgp-ecxf-rwfh"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>985</pid><project_name>RED HOOK INTEGRATED FLOOD PROTECTION SYSTEM</project_name><description>Reconstruction of Beard Street in the Red Hook neighborhood of Brooklyn, including raising the streets, reconstruction of roadway, curbs and sidewalk, and installing a new bulkhead and floodwall along the waterfront. The reconstruction/raising for Beard Street will cover two blocks (Van Brunt St. to Dwight St).</description><category>Public Safety and Criminal Justice</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2019-08-17T00:00:00</design_start><budget_forecast>97486000.00</budget_forecast><total_budget_changes>86623000.00</total_budget_changes><forecast_completion>2024-02-14T00:00:00</forecast_completion><total_schedule_changes>1172</total_schedule_changes></row><row _id="row-knyt.fpd3-j5nw" _uuid="00000000-0000-0000-7C34-E9E8CCC27420" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-knyt.fpd3-j5nw"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>985</pid><project_name>RED HOOK INTEGRATED FLOOD PROTECTION SYSTEM</project_name><category>Public Safety and Criminal Justice</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><total_budget_changes>86623000.00</total_budget_changes><total_schedule_changes>1172</total_schedule_changes></row><row _id="row-t3gn-5mna_ae27" _uuid="00000000-0000-0000-9864-77B0D8E957AB" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-t3gn-5mna_ae27"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>985</pid><project_name>RED HOOK INTEGRATED FLOOD PROTECTION SYSTEM</project_name><category>Public Safety and Criminal Justice</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><total_budget_changes>86623000.00</total_budget_changes><total_schedule_changes>1172</total_schedule_changes></row><row _id="row-fs8h-7anh.7ndj" _uuid="00000000-0000-0000-00E1-CCBB7E98194B" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-fs8h-7anh.7ndj"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>985</pid><project_name>RED HOOK INTEGRATED FLOOD PROTECTION SYSTEM</project_name><category>Public Safety and Criminal Justice</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><total_budget_changes>86623000.00</total_budget_changes><total_schedule_changes>1172</total_schedule_changes></row><row _id="row-kg6w-6vr2-pnem" _uuid="00000000-0000-0000-9443-B0133700C13E" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-kg6w-6vr2-pnem"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>985</pid><project_name>RED HOOK INTEGRATED FLOOD PROTECTION SYSTEM</project_name><category>Public Safety and Criminal Justice</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><total_budget_changes>86623000.00</total_budget_changes><total_schedule_changes>1172</total_schedule_changes></row><row _id="row-c8t8-3wrv_hh7m" _uuid="00000000-0000-0000-6E82-E1935973CA18" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-c8t8-3wrv_hh7m"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>985</pid><project_name>RED HOOK INTEGRATED FLOOD PROTECTION SYSTEM</project_name><description>Reconstruction of Beard Street in the Red Hook neighborhood of Brooklyn, including raising the streets, reconstruction of roadway, curbs and sidewalk, and installing a new bulkhead and floodwall along the waterfront. The reconstruction/raising for Beard Street will cover two blocks (Van Brunt St. to Dwight St).</description><category>Public Safety and Criminal Justice</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2019-08-17T00:00:00</design_start><budget_forecast>99486000.00</budget_forecast><latest_budget_changes>2000000.00</latest_budget_changes><total_budget_changes>86623000.00</total_budget_changes><forecast_completion>2025-12-26T00:00:00</forecast_completion><latest_schedule_changes>681</latest_schedule_changes><total_schedule_changes>1172</total_schedule_changes></row><row _id="row-v65k-gpfj-nra5" _uuid="00000000-0000-0000-00BB-84229E68EFBF" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-v65k-gpfj-nra5"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>985</pid><project_name>RED HOOK INTEGRATED FLOOD PROTECTION SYSTEM</project_name><description>Reconstruction of Beard Street in the Red Hook neighborhood of Brooklyn, including raising the streets, reconstruction of roadway, curbs and sidewalk, and installing a new bulkhead and floodwall along the waterfront. The reconstruction/raising for Beard Street will cover two blocks (Van Brunt St. to Dwight St).</description><category>Public Safety and Criminal Justice</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2019-08-17T00:00:00</design_start><budget_forecast>99486000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>86623000.00</total_budget_changes><forecast_completion>2025-09-30T00:00:00</forecast_completion><latest_schedule_changes>-87</latest_schedule_changes><total_schedule_changes>1172</total_schedule_changes></row><row _id="row-v46z_bxuu~gy8t" _uuid="00000000-0000-0000-C455-168BA65C6C68" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-v46z_bxuu~gy8t"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>985</pid><project_name>RED HOOK INTEGRATED FLOOD PROTECTION SYSTEM</project_name><description>Reconstruction of Beard Street in the Red Hook neighborhood of Brooklyn, including raising the streets, reconstruction of roadway, curbs and sidewalk, and installing a new bulkhead and floodwall along the waterfront. The reconstruction/raising for Beard Street will cover two blocks (Van Brunt St. to Dwight St).</description><category>Public Safety and Criminal Justice</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2019-08-17T00:00:00</design_start><budget_forecast>100955000.00</budget_forecast><latest_budget_changes>1469000.00</latest_budget_changes><total_budget_changes>86623000.00</total_budget_changes><forecast_completion>2025-09-30T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1172</total_schedule_changes></row><row _id="row-6jhh.x9b9~gjp6" _uuid="00000000-0000-0000-152C-16E630B935F7" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-6jhh.x9b9~gjp6"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>985</pid><project_name>RED HOOK INTEGRATED FLOOD PROTECTION SYSTEM</project_name><description>Reconstruction of Beard Street in the Red Hook neighborhood of Brooklyn, including raising the streets, reconstruction of roadway, curbs and sidewalk, and installing a new bulkhead and floodwall along the waterfront. The reconstruction/raising for Beard Street will cover two blocks (Van Brunt St. to Dwight St).</description><category>Public Safety and Criminal Justice</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2019-08-17T00:00:00</design_start><budget_forecast>100955000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>86623000.00</total_budget_changes><forecast_completion>2026-03-30T00:00:00</forecast_completion><latest_schedule_changes>181</latest_schedule_changes><total_schedule_changes>1172</total_schedule_changes></row><row _id="row-m543.evth_n4yq" _uuid="00000000-0000-0000-D132-E5EA925EABBA" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-m543.evth_n4yq"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>985</pid><project_name>RED HOOK INTEGRATED FLOOD PROTECTION SYSTEM</project_name><description>Reconstruction of Beard Street in the Red Hook neighborhood of Brooklyn, including raising the streets, reconstruction of roadway, curbs and sidewalk, and installing a new bulkhead and floodwall along the waterfront. The reconstruction/raising for Beard Street will cover two blocks (Van Brunt St. to Dwight St).</description><category>Public Safety and Criminal Justice</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2019-08-19T00:00:00</design_start><budget_forecast>184109000.00</budget_forecast><latest_budget_changes>83154000.00</latest_budget_changes><total_budget_changes>86623000.00</total_budget_changes><forecast_completion>2027-05-01T00:00:00</forecast_completion><latest_schedule_changes>397</latest_schedule_changes><total_schedule_changes>1172</total_schedule_changes></row><row _id="row-r9th~thr2-ubwt" _uuid="00000000-0000-0000-2908-C364E4E452F7" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-r9th~thr2-ubwt"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>986</pid><project_name>UNION TURNPIKE CENTER MEDIAN REPLACEMENT</project_name><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2019-05-23T00:00:00</design_start><budget_forecast>26232000.00</budget_forecast><total_budget_changes>23766000.00</total_budget_changes><forecast_completion>2023-09-14T00:00:00</forecast_completion><total_schedule_changes>341</total_schedule_changes></row><row _id="row-j275_garx_ssaj" _uuid="00000000-0000-0000-A27D-7757F658C934" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-j275_garx_ssaj"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>986</pid><project_name>UNION TURNPIKE CENTER MEDIAN REPLACEMENT</project_name><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><total_budget_changes>23766000.00</total_budget_changes><total_schedule_changes>341</total_schedule_changes></row><row _id="row-vyxv~pcmr~3bww" _uuid="00000000-0000-0000-762B-46E2AD258350" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-vyxv~pcmr~3bww"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>986</pid><project_name>UNION TURNPIKE CENTER MEDIAN REPLACEMENT</project_name><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><total_budget_changes>23766000.00</total_budget_changes><total_schedule_changes>341</total_schedule_changes></row><row _id="row-cz8e.rkrx~3hbg" _uuid="00000000-0000-0000-A733-CE004EDE9463" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-cz8e.rkrx~3hbg"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>986</pid><project_name>UNION TURNPIKE CENTER MEDIAN REPLACEMENT</project_name><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><total_budget_changes>23766000.00</total_budget_changes><total_schedule_changes>341</total_schedule_changes></row><row _id="row-yjg7_9u5p_sxqx" _uuid="00000000-0000-0000-4F93-DDFA2539F91A" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-yjg7_9u5p_sxqx"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>986</pid><project_name>UNION TURNPIKE CENTER MEDIAN REPLACEMENT</project_name><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><total_budget_changes>23766000.00</total_budget_changes><total_schedule_changes>341</total_schedule_changes></row><row _id="row-vcjk~wz93~sker" _uuid="00000000-0000-0000-7B2E-97951DB89400" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-vcjk~wz93~sker"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>986</pid><project_name>UNION TURNPIKE CENTER MEDIAN REPLACEMENT</project_name><description>Union Turnpike Center Median Replacement from Hollis Court Blvd to 226th Street, Borough of Queens</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2019-05-23T00:00:00</design_start><budget_forecast>27919000.00</budget_forecast><latest_budget_changes>1687000.00</latest_budget_changes><total_budget_changes>23766000.00</total_budget_changes><forecast_completion>2024-09-13T00:00:00</forecast_completion><latest_schedule_changes>365</latest_schedule_changes><total_schedule_changes>341</total_schedule_changes></row><row _id="row-s9mu.wmim-c548" _uuid="00000000-0000-0000-D4FE-DA1D4E4C4B4F" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-s9mu.wmim-c548"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>986</pid><project_name>UNION TURNPIKE CENTER MEDIAN REPLACEMENT</project_name><description>Union Turnpike Center Median Replacement from Hollis Court Blvd to 226th Street, Borough of Queens</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Construction Procurement</current_phase><design_start>2019-05-23T00:00:00</design_start><budget_forecast>29769000.00</budget_forecast><latest_budget_changes>1850000.00</latest_budget_changes><total_budget_changes>23766000.00</total_budget_changes><forecast_completion>2024-09-10T00:00:00</forecast_completion><latest_schedule_changes>-3</latest_schedule_changes><total_schedule_changes>341</total_schedule_changes></row><row _id="row-dpsv~r2gb-erip" _uuid="00000000-0000-0000-C437-25CD5B80E2AE" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-dpsv~r2gb-erip"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>986</pid><project_name>UNION TURNPIKE CENTER MEDIAN REPLACEMENT</project_name><description>Union Turnpike Center Median Replacement from Hollis Court Blvd to 226th Street, Borough of Queens</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Construction Procurement</current_phase><design_start>2019-05-23T00:00:00</design_start><budget_forecast>50000000.00</budget_forecast><latest_budget_changes>20231000.00</latest_budget_changes><total_budget_changes>23766000.00</total_budget_changes><forecast_completion>2024-09-10T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>341</total_schedule_changes></row><row _id="row-3gmr-yrip_wsdy" _uuid="00000000-0000-0000-8A15-0DB3CC42F2C0" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-3gmr-yrip_wsdy"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>986</pid><project_name>UNION TURNPIKE CENTER MEDIAN REPLACEMENT</project_name><description>Union Turnpike Center Median Replacement from Hollis Court Blvd to 226th Street, Borough of Queens</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Construction</current_phase><design_start>2019-05-23T00:00:00</design_start><budget_forecast>49998000.00</budget_forecast><latest_budget_changes>-2000.00</latest_budget_changes><total_budget_changes>23766000.00</total_budget_changes><forecast_completion>2024-08-20T00:00:00</forecast_completion><latest_schedule_changes>-21</latest_schedule_changes><total_schedule_changes>341</total_schedule_changes></row><row _id="row-bzev-887r_ugcr" _uuid="00000000-0000-0000-738F-CC11FFDED0AD" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-bzev-887r_ugcr"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>986</pid><project_name>UNION TURNPIKE CENTER MEDIAN REPLACEMENT</project_name><description>Union Turnpike Center Median Replacement from Hollis Court Blvd to 226th Street, Borough of Queens</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Construction</current_phase><design_start>2019-05-23T00:00:00</design_start><budget_forecast>49998000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>23766000.00</total_budget_changes><forecast_completion>2024-08-20T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>341</total_schedule_changes></row><row _id="row-n6h6-z6hg_sqrp" _uuid="00000000-0000-0000-E598-B886C3012661" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-n6h6-z6hg_sqrp"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>991</pid><project_name>WM REPLMT EAST NEW YORK AVE</project_name><description>Trunk Water Main replacement in East New York Avenue between Howard Avenue and Pacific Street; Jamaica Avenue between Herkimer Street and Vermont Street; and Atlantic Avenue between Van Sinderen Avenue and Pennsylvania Avenue.</description><category>Water Supply</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Design</current_phase><design_start>2015-02-16T00:00:00</design_start><budget_forecast>73613000.00</budget_forecast><total_budget_changes>29337000.00</total_budget_changes><forecast_completion>2022-03-11T00:00:00</forecast_completion><total_schedule_changes>913</total_schedule_changes></row><row _id="row-p46j-3z8h~765c" _uuid="00000000-0000-0000-2BDD-5A553959D5D3" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-p46j-3z8h~765c"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>991</pid><project_name>WM REPLMT EAST NEW YORK AVE</project_name><category>Water Supply</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><total_budget_changes>29337000.00</total_budget_changes><total_schedule_changes>913</total_schedule_changes></row><row _id="row-kmsg_qkfn_qjh2" _uuid="00000000-0000-0000-EDE2-FEBA4A6729EB" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-kmsg_qkfn_qjh2"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>991</pid><project_name>WM REPLMT EAST NEW YORK AVE</project_name><category>Water Supply</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><total_budget_changes>29337000.00</total_budget_changes><total_schedule_changes>913</total_schedule_changes></row><row _id="row-dp42.b3yf_va8q" _uuid="00000000-0000-0000-D4CB-B5D495CE059C" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-dp42.b3yf_va8q"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>991</pid><project_name>WM REPLMT EAST NEW YORK AVE</project_name><category>Water Supply</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><total_budget_changes>29337000.00</total_budget_changes><total_schedule_changes>913</total_schedule_changes></row><row _id="row-zgij_nviy_5uck" _uuid="00000000-0000-0000-A10D-F63C79270A0A" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-zgij_nviy_5uck"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>991</pid><project_name>WM REPLMT EAST NEW YORK AVE</project_name><category>Water Supply</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><total_budget_changes>29337000.00</total_budget_changes><total_schedule_changes>913</total_schedule_changes></row><row _id="row-2e5d.4swm-aygf" _uuid="00000000-0000-0000-0E56-4A131C8C370D" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-2e5d.4swm-aygf"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>991</pid><project_name>WM REPLMT EAST NEW YORK AVE</project_name><description>Trunk Water Main replacement in East New York Avenue between Howard Avenue and Pacific Street; Jamaica Avenue between Herkimer Street and Vermont Street; and Atlantic Avenue between Van Sinderen Avenue and Pennsylvania Avenue.</description><category>Water Supply</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction</current_phase><design_start>2015-02-16T00:00:00</design_start><budget_forecast>89723000.00</budget_forecast><latest_budget_changes>16110000.00</latest_budget_changes><total_budget_changes>29337000.00</total_budget_changes><forecast_completion>2024-09-09T00:00:00</forecast_completion><latest_schedule_changes>913</latest_schedule_changes><total_schedule_changes>913</total_schedule_changes></row><row _id="row-ts6q~83vp-8tcy" _uuid="00000000-0000-0000-0677-DFF681901E37" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ts6q~83vp-8tcy"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>991</pid><project_name>WM REPLMT EAST NEW YORK AVE</project_name><description>Trunk Water Main replacement in East New York Avenue between Howard Avenue and Pacific Street; Jamaica Avenue between Herkimer Street and Vermont Street; and Atlantic Avenue between Van Sinderen Avenue and Pennsylvania Avenue.</description><category>Water Supply</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction</current_phase><design_start>2015-02-16T00:00:00</design_start><budget_forecast>89963000.00</budget_forecast><latest_budget_changes>240000.00</latest_budget_changes><total_budget_changes>29337000.00</total_budget_changes><forecast_completion>2024-09-09T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>913</total_schedule_changes></row><row _id="row-9rqm~ktrr_uswq" _uuid="00000000-0000-0000-74F6-2AFB2872E2A1" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-9rqm~ktrr_uswq"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>991</pid><project_name>WM REPLMT EAST NEW YORK AVE</project_name><description>Trunk Water Main replacement in East New York Avenue between Howard Avenue and Pacific Street; Jamaica Avenue between Herkimer Street and Vermont Street; and Atlantic Avenue between Van Sinderen Avenue and Pennsylvania Avenue.</description><category>Water Supply</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction</current_phase><design_start>2015-02-16T00:00:00</design_start><budget_forecast>101963000.00</budget_forecast><latest_budget_changes>12000000.00</latest_budget_changes><total_budget_changes>29337000.00</total_budget_changes><forecast_completion>2024-09-09T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>913</total_schedule_changes></row><row _id="row-pkk5~8xkz-wcfn" _uuid="00000000-0000-0000-C224-331E49FDCA48" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-pkk5~8xkz-wcfn"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>991</pid><project_name>WM REPLMT EAST NEW YORK AVE</project_name><description>Trunk Water Main replacement in East New York Avenue between Howard Avenue and Pacific Street; Jamaica Avenue between Herkimer Street and Vermont Street; and Atlantic Avenue between Van Sinderen Avenue and Pennsylvania Avenue.</description><category>Water Supply</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction</current_phase><design_start>2015-02-16T00:00:00</design_start><budget_forecast>102950000.00</budget_forecast><latest_budget_changes>987000.00</latest_budget_changes><total_budget_changes>29337000.00</total_budget_changes><forecast_completion>2024-09-09T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>913</total_schedule_changes></row><row _id="row-vgcf_pfvc-ky9g" _uuid="00000000-0000-0000-169C-05A0BE0821E2" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-vgcf_pfvc-ky9g"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>991</pid><project_name>WM REPLMT EAST NEW YORK AVE</project_name><description>Trunk Water Main replacement in East New York Avenue between Howard Avenue and Pacific Street; Jamaica Avenue between Herkimer Street and Vermont Street; and Atlantic Avenue between Van Sinderen Avenue and Pennsylvania Avenue.</description><category>Water Supply</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction</current_phase><design_start>2015-02-16T00:00:00</design_start><budget_forecast>102950000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>29337000.00</total_budget_changes><forecast_completion>2024-09-09T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>913</total_schedule_changes></row><row _id="row-f7b8-bfzt-r37b" _uuid="00000000-0000-0000-F760-60E024B9B7EA" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-f7b8-bfzt-r37b"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>998</pid><project_name>NEW 48" TRUNK WATER MAIN IN E 233 STREET</project_name><description>New 48" Trunk Water Main in E 233rd Street between Bronxwood Avenue &amp; Baychester Avenue, etc.</description><category>Water Supply</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Design</current_phase><design_start>2015-10-01T00:00:00</design_start><budget_forecast>32877000.00</budget_forecast><total_budget_changes>1077000.00</total_budget_changes><forecast_completion>2022-03-12T00:00:00</forecast_completion><total_schedule_changes>1796</total_schedule_changes></row><row _id="row-cevx_gemh~s2jd" _uuid="00000000-0000-0000-C7BD-49BB1CA935FE" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-cevx_gemh~s2jd"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>998</pid><project_name>NEW 48" TRUNK WATER MAIN IN E 233 STREET</project_name><category>Water Supply</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><total_budget_changes>1077000.00</total_budget_changes><total_schedule_changes>1796</total_schedule_changes></row><row _id="row-2iif~6had.6w4w" _uuid="00000000-0000-0000-FF9A-636AFB028EF1" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-2iif~6had.6w4w"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>998</pid><project_name>NEW 48" TRUNK WATER MAIN IN E 233 STREET</project_name><category>Water Supply</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><total_budget_changes>1077000.00</total_budget_changes><total_schedule_changes>1796</total_schedule_changes></row><row _id="row-je6q-7dzd-9d76" _uuid="00000000-0000-0000-FB86-6D98D49BE679" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-je6q-7dzd-9d76"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>998</pid><project_name>NEW 48" TRUNK WATER MAIN IN E 233 STREET</project_name><category>Water Supply</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><total_budget_changes>1077000.00</total_budget_changes><total_schedule_changes>1796</total_schedule_changes></row><row _id="row-psq7_rewd-wp54" _uuid="00000000-0000-0000-2DDC-1A8CE21C4729" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-psq7_rewd-wp54"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>998</pid><project_name>NEW 48" TRUNK WATER MAIN IN E 233 STREET</project_name><category>Water Supply</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><total_budget_changes>1077000.00</total_budget_changes><total_schedule_changes>1796</total_schedule_changes></row><row _id="row-gni6~ww44.gybb" _uuid="00000000-0000-0000-317D-6B46A5EE4DDB" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-gni6~ww44.gybb"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>998</pid><project_name>NEW 48" TRUNK WATER MAIN IN E 233 STREET</project_name><description>New 48" Trunk Water Main in E 233rd Street between Bronxwood Avenue &amp; Baychester Avenue, etc.</description><category>Water Supply</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Design</current_phase><design_start>2015-10-01T00:00:00</design_start><budget_forecast>33583000.00</budget_forecast><latest_budget_changes>706000.00</latest_budget_changes><total_budget_changes>1077000.00</total_budget_changes><forecast_completion>2024-03-11T00:00:00</forecast_completion><latest_schedule_changes>730</latest_schedule_changes><total_schedule_changes>1796</total_schedule_changes></row><row _id="row-wbcf_g7xr.9ry4" _uuid="00000000-0000-0000-A597-02AE4A640F1F" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-wbcf_g7xr.9ry4"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>998</pid><project_name>NEW 48" TRUNK WATER MAIN IN E 233 STREET</project_name><description>New 48" Trunk Water Main in E 233rd Street between Bronxwood Avenue &amp; Baychester Avenue, etc.</description><category>Water Supply</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Design</current_phase><design_start>2015-10-01T00:00:00</design_start><budget_forecast>33831000.00</budget_forecast><latest_budget_changes>248000.00</latest_budget_changes><total_budget_changes>1077000.00</total_budget_changes><forecast_completion>2025-02-24T00:00:00</forecast_completion><latest_schedule_changes>350</latest_schedule_changes><total_schedule_changes>1796</total_schedule_changes></row><row _id="row-8w7a~sib4~2b5u" _uuid="00000000-0000-0000-E439-C4D058A4B909" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-8w7a~sib4~2b5u"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>998</pid><project_name>NEW 48" TRUNK WATER MAIN IN E 233 STREET</project_name><description>New 48" Trunk Water Main in E 233rd Street between Bronxwood Avenue &amp; Baychester Avenue, etc.</description><category>Water Supply</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Design</current_phase><design_start>2015-10-01T00:00:00</design_start><budget_forecast>33905000.00</budget_forecast><latest_budget_changes>74000.00</latest_budget_changes><total_budget_changes>1077000.00</total_budget_changes><forecast_completion>2025-02-24T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1796</total_schedule_changes></row><row _id="row-sfhz.5unh-quz8" _uuid="00000000-0000-0000-4C84-966C9A2D5FF6" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-sfhz.5unh-quz8"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>998</pid><project_name>NEW 48" TRUNK WATER MAIN IN E 233 STREET</project_name><description>New 48" Trunk Water Main in E 233rd Street between Bronxwood Avenue &amp; Baychester Avenue, etc.</description><category>Water Supply</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Design</current_phase><design_start>2015-10-01T00:00:00</design_start><budget_forecast>33954000.00</budget_forecast><latest_budget_changes>49000.00</latest_budget_changes><total_budget_changes>1077000.00</total_budget_changes><forecast_completion>2027-02-10T00:00:00</forecast_completion><latest_schedule_changes>716</latest_schedule_changes><total_schedule_changes>1796</total_schedule_changes></row><row _id="row-tgme~adi8~gm3q" _uuid="00000000-0000-0000-012B-2B45F7909811" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-tgme~adi8~gm3q"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>998</pid><project_name>NEW 48" TRUNK WATER MAIN IN E 233 STREET</project_name><description>New 48" Trunk Water Main in E 233rd Street between Bronxwood Avenue &amp; Baychester Avenue, etc.</description><category>Water Supply</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Design</current_phase><design_start>2015-10-01T00:00:00</design_start><budget_forecast>33954000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>1077000.00</total_budget_changes><forecast_completion>2027-02-10T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1796</total_schedule_changes></row><row _id="row-wj4h~qu8k~85iy" _uuid="00000000-0000-0000-7579-C6DDE8CDF6AD" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-wj4h~qu8k~85iy"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>999</pid><project_name>150 ST SPINE: PHASE II TRUNK SEWER AT BERGEN BASIN</project_name><description>Southeast Queens 150th Street Spine, Phase II - Installation of a new double barrel trunk storm sewer that will run through JFK airport; approximately 1,000 feet east of Bergen Basin, to the north side of the Belt Parkway at Inwood Street and 150th Street</description><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Design</current_phase><design_start>2019-08-19T00:00:00</design_start><budget_forecast>207886000.00</budget_forecast><total_budget_changes>-158027000.00</total_budget_changes><forecast_completion>2025-09-13T00:00:00</forecast_completion><total_schedule_changes>646</total_schedule_changes></row><row _id="row-anb2-3n9y_fejj" _uuid="00000000-0000-0000-31F8-78793176B39E" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-anb2-3n9y_fejj"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>999</pid><project_name>150 ST SPINE: PHASE II TRUNK SEWER AT BERGEN BASIN</project_name><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><total_budget_changes>-158027000.00</total_budget_changes><total_schedule_changes>646</total_schedule_changes></row><row _id="row-2e3f_mt8n-bakm" _uuid="00000000-0000-0000-2BA9-022DE468DEBF" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-2e3f_mt8n-bakm"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>999</pid><project_name>150 ST SPINE: PHASE II TRUNK SEWER AT BERGEN BASIN</project_name><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><total_budget_changes>-158027000.00</total_budget_changes><total_schedule_changes>646</total_schedule_changes></row><row _id="row-ynrs.mgpj-8knr" _uuid="00000000-0000-0000-6BEC-63A148206ADE" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ynrs.mgpj-8knr"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>999</pid><project_name>150 ST SPINE: PHASE II TRUNK SEWER AT BERGEN BASIN</project_name><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><total_budget_changes>-158027000.00</total_budget_changes><total_schedule_changes>646</total_schedule_changes></row><row _id="row-tpwk_nn5v~9qrc" _uuid="00000000-0000-0000-BB6A-6F3471574693" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-tpwk_nn5v~9qrc"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>999</pid><project_name>150 ST SPINE: PHASE II TRUNK SEWER AT BERGEN BASIN</project_name><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><total_budget_changes>-158027000.00</total_budget_changes><total_schedule_changes>646</total_schedule_changes></row><row _id="row-yney.qduu~3egw" _uuid="00000000-0000-0000-ACD4-7A8F6A2C4EDC" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-yney.qduu~3egw"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>999</pid><project_name>150 ST SPINE: PHASE II TRUNK SEWER AT BERGEN BASIN</project_name><description>Southeast Queens 150th Street Spine, Phase II - Installation of a new double barrel trunk storm sewer that will run through JFK airport; approximately 1,000 feet east of Bergen Basin, to the north side of the Belt Parkway at Inwood Street and 150th Street</description><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Design</current_phase><design_start>2020-03-02T00:00:00</design_start><budget_forecast>47590000.00</budget_forecast><latest_budget_changes>-160296000.00</latest_budget_changes><total_budget_changes>-158027000.00</total_budget_changes><forecast_completion>2026-01-19T00:00:00</forecast_completion><latest_schedule_changes>128</latest_schedule_changes><total_schedule_changes>646</total_schedule_changes></row><row _id="row-evx9_ibjs_n224" _uuid="00000000-0000-0000-7F57-6E34F86FB180" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-evx9_ibjs_n224"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>999</pid><project_name>150 ST SPINE: PHASE II TRUNK SEWER AT BERGEN BASIN</project_name><description>Southeast Queens 150th Street Spine, Phase II - Installation of a new double barrel trunk storm sewer that will run through JFK airport; approximately 1,000 feet east of Bergen Basin, to the north side of the Belt Parkway at Inwood Street and 150th Street</description><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Design</current_phase><design_start>2020-03-02T00:00:00</design_start><budget_forecast>47590000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-158027000.00</total_budget_changes><forecast_completion>2026-05-20T00:00:00</forecast_completion><latest_schedule_changes>121</latest_schedule_changes><total_schedule_changes>646</total_schedule_changes></row><row _id="row-pv6u~fffq.muzh" _uuid="00000000-0000-0000-3291-A35FE7D6CF55" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-pv6u~fffq.muzh"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>999</pid><project_name>150 ST SPINE: PHASE II TRUNK SEWER AT BERGEN BASIN</project_name><description>Southeast Queens 150th Street Spine, Phase II - Installation of a new double barrel trunk storm sewer that will run through JFK airport; approximately 1,000 feet east of Bergen Basin, to the north side of the Belt Parkway at Inwood Street and 150th Street</description><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Design</current_phase><design_start>2020-03-02T00:00:00</design_start><budget_forecast>47307000.00</budget_forecast><latest_budget_changes>-283000.00</latest_budget_changes><total_budget_changes>-158027000.00</total_budget_changes><forecast_completion>2026-08-20T00:00:00</forecast_completion><latest_schedule_changes>92</latest_schedule_changes><total_schedule_changes>646</total_schedule_changes></row><row _id="row-ii7h~tr5s.b6e9" _uuid="00000000-0000-0000-CD06-40E08FBF6CFE" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ii7h~tr5s.b6e9"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>999</pid><project_name>150 ST SPINE: PHASE II TRUNK SEWER AT BERGEN BASIN</project_name><description>Southeast Queens 150th Street Spine, Phase II - Installation of a new double barrel trunk storm sewer that will run through JFK airport; approximately 1,000 feet east of Bergen Basin, to the north side of the Belt Parkway at Inwood Street and 150th Street</description><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Design</current_phase><design_start>2020-03-02T00:00:00</design_start><budget_forecast>49859000.00</budget_forecast><latest_budget_changes>2552000.00</latest_budget_changes><total_budget_changes>-158027000.00</total_budget_changes><forecast_completion>2027-06-21T00:00:00</forecast_completion><latest_schedule_changes>305</latest_schedule_changes><total_schedule_changes>646</total_schedule_changes></row><row _id="row-mcsx_6qzc-qibq" _uuid="00000000-0000-0000-475E-5E88EC22818D" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-mcsx_6qzc-qibq"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>999</pid><project_name>150 ST SPINE: PHASE II TRUNK SEWER AT BERGEN BASIN</project_name><description>Southeast Queens 150th Street Spine, Phase II - Installation of a new double barrel trunk storm sewer that will run through JFK airport; approximately 1,000 feet east of Bergen Basin, to the north side of the Belt Parkway at Inwood Street and 150th Street</description><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Design</current_phase><design_start>2020-03-02T00:00:00</design_start><budget_forecast>49859000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-158027000.00</total_budget_changes><forecast_completion>2027-06-21T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>646</total_schedule_changes></row><row _id="row-ykji~tsut.757u" _uuid="00000000-0000-0000-DDDD-426DC04A8C01" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ykji~tsut.757u"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>1004</pid><project_name>MULTI-SITE PEDESTRIAN SAFETY PHASE 5</project_name><description>PEDESTRIAN SAFETY GEOMETRIC IMPROVEMENTS AT VARIOUS SPECIFIED LOCATIONS, CITYWIDE</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Construction Procurement</current_phase><design_start>2017-08-01T00:00:00</design_start><budget_forecast>29860000.00</budget_forecast><total_budget_changes>-4087000.00</total_budget_changes><forecast_completion>2021-05-02T00:00:00</forecast_completion><total_schedule_changes>1126</total_schedule_changes></row><row _id="row-qf7n.r3r5-tff4" _uuid="00000000-0000-0000-5B9C-A34D4FBC36FC" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-qf7n.r3r5-tff4"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>1004</pid><project_name>MULTI-SITE PEDESTRIAN SAFETY PHASE 5</project_name><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><total_budget_changes>-4087000.00</total_budget_changes><total_schedule_changes>1126</total_schedule_changes></row><row _id="row-vhhy_2g4u~gkzw" _uuid="00000000-0000-0000-C830-186D5D656546" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-vhhy_2g4u~gkzw"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>1004</pid><project_name>MULTI-SITE PEDESTRIAN SAFETY PHASE 5</project_name><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><total_budget_changes>-4087000.00</total_budget_changes><total_schedule_changes>1126</total_schedule_changes></row><row _id="row-gfhw-4p2s.ucsv" _uuid="00000000-0000-0000-CC26-434F296B24E1" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-gfhw-4p2s.ucsv"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>1004</pid><project_name>MULTI-SITE PEDESTRIAN SAFETY PHASE 5</project_name><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><total_budget_changes>-4087000.00</total_budget_changes><total_schedule_changes>1126</total_schedule_changes></row><row _id="row-jswx.yt6d~7ye9" _uuid="00000000-0000-0000-1C8F-E94EFF2ABD82" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-jswx.yt6d~7ye9"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>1004</pid><project_name>MULTI-SITE PEDESTRIAN SAFETY PHASE 5</project_name><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><total_budget_changes>-4087000.00</total_budget_changes><total_schedule_changes>1126</total_schedule_changes></row><row _id="row-jwp5_h4ae_n28h" _uuid="00000000-0000-0000-8642-620D1C9583FF" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-jwp5_h4ae_n28h"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>1004</pid><project_name>MULTI-SITE PEDESTRIAN SAFETY PHASE 5</project_name><description>PEDESTRIAN SAFETY GEOMETRIC IMPROVEMENTS AT VARIOUS SPECIFIED LOCATIONS, CITYWIDE</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Construction</current_phase><design_start>2017-08-01T00:00:00</design_start><budget_forecast>26069000.00</budget_forecast><latest_budget_changes>-3791000.00</latest_budget_changes><total_budget_changes>-4087000.00</total_budget_changes><forecast_completion>2024-06-01T00:00:00</forecast_completion><latest_schedule_changes>1126</latest_schedule_changes><total_schedule_changes>1126</total_schedule_changes></row><row _id="row-ey47_a9k6~j2p5" _uuid="00000000-0000-0000-228B-6F1D6BAE351F" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ey47_a9k6~j2p5"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>1004</pid><project_name>MULTI-SITE PEDESTRIAN SAFETY PHASE 5</project_name><description>PEDESTRIAN SAFETY GEOMETRIC IMPROVEMENTS AT VARIOUS SPECIFIED LOCATIONS, CITYWIDE</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Construction</current_phase><design_start>2017-08-01T00:00:00</design_start><budget_forecast>26219000.00</budget_forecast><latest_budget_changes>150000.00</latest_budget_changes><total_budget_changes>-4087000.00</total_budget_changes><forecast_completion>2024-06-01T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1126</total_schedule_changes></row><row _id="row-tzaz_tazj~r89b" _uuid="00000000-0000-0000-455A-88BD6D264392" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-tzaz_tazj~r89b"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>1004</pid><project_name>MULTI-SITE PEDESTRIAN SAFETY PHASE 5</project_name><description>PEDESTRIAN SAFETY GEOMETRIC IMPROVEMENTS AT VARIOUS SPECIFIED LOCATIONS, CITYWIDE</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Construction</current_phase><design_start>2017-08-01T00:00:00</design_start><budget_forecast>26189000.00</budget_forecast><latest_budget_changes>-30000.00</latest_budget_changes><total_budget_changes>-4087000.00</total_budget_changes><forecast_completion>2024-06-01T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1126</total_schedule_changes></row><row _id="row-8t2u.95a8~zstg" _uuid="00000000-0000-0000-D7BD-0A69A6FEFD4C" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-8t2u.95a8~zstg"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1004</pid><project_name>MULTI-SITE PEDESTRIAN SAFETY PHASE 5</project_name><description>PEDESTRIAN SAFETY GEOMETRIC IMPROVEMENTS AT VARIOUS SPECIFIED LOCATIONS, CITYWIDE</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Construction</current_phase><design_start>2017-08-01T00:00:00</design_start><budget_forecast>25773000.00</budget_forecast><latest_budget_changes>-416000.00</latest_budget_changes><total_budget_changes>-4087000.00</total_budget_changes><forecast_completion>2024-06-01T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1126</total_schedule_changes></row><row _id="row-nzzn.4hcj~2xd2" _uuid="00000000-0000-0000-1495-6597FE56EA4D" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-nzzn.4hcj~2xd2"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1004</pid><project_name>MULTI-SITE PEDESTRIAN SAFETY PHASE 5</project_name><description>PEDESTRIAN SAFETY GEOMETRIC IMPROVEMENTS AT VARIOUS SPECIFIED LOCATIONS, CITYWIDE</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Construction</current_phase><design_start>2017-08-01T00:00:00</design_start><budget_forecast>25773000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-4087000.00</total_budget_changes><forecast_completion>2024-06-01T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1126</total_schedule_changes></row><row _id="row-apq7.2qzc-t7tb" _uuid="00000000-0000-0000-FDDC-04CDFE8E5D77" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-apq7.2qzc-t7tb"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>1005</pid><project_name>FUEL TANK REPLACEMENT</project_name><description>FUEL TANK REPLACEMENT</description><category>Industrial Development</category><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><current_phase>Construction</current_phase><design_start>2018-04-25T00:00:00</design_start><budget_forecast>32145000.00</budget_forecast><total_budget_changes>-6429000.00</total_budget_changes><forecast_completion>2022-04-04T00:00:00</forecast_completion><total_schedule_changes>914</total_schedule_changes></row><row _id="row-s53u_9bsu~4398" _uuid="00000000-0000-0000-C42A-6D8CAB1E7652" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-s53u_9bsu~4398"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>1005</pid><project_name>FUEL TANK REPLACEMENT</project_name><category>Industrial Development</category><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><total_budget_changes>-6429000.00</total_budget_changes><total_schedule_changes>914</total_schedule_changes></row><row _id="row-xynb.p4sb_22y9" _uuid="00000000-0000-0000-B068-5C0EECFEC291" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-xynb.p4sb_22y9"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>1005</pid><project_name>FUEL TANK REPLACEMENT</project_name><category>Industrial Development</category><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><total_budget_changes>-6429000.00</total_budget_changes><total_schedule_changes>914</total_schedule_changes></row><row _id="row-cx85.6wd2-u5ya" _uuid="00000000-0000-0000-518C-F85776C00A6C" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-cx85.6wd2-u5ya"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>1005</pid><project_name>FUEL TANK REPLACEMENT</project_name><category>Industrial Development</category><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><total_budget_changes>-6429000.00</total_budget_changes><total_schedule_changes>914</total_schedule_changes></row><row _id="row-s566_r5f7.mxiu" _uuid="00000000-0000-0000-5458-A29811B030D4" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-s566_r5f7.mxiu"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>1005</pid><project_name>FUEL TANK REPLACEMENT</project_name><category>Industrial Development</category><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><total_budget_changes>-6429000.00</total_budget_changes><total_schedule_changes>914</total_schedule_changes></row><row _id="row-gwfm-r2uz-w7n6" _uuid="00000000-0000-0000-1ED0-39A92D4EE1CD" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-gwfm-r2uz-w7n6"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>1005</pid><project_name>FUEL TANK REPLACEMENT</project_name><description>FUEL TANK REPLACEMENT</description><category>Industrial Development</category><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><current_phase>Construction</current_phase><design_start>2018-04-25T00:00:00</design_start><budget_forecast>25370000.00</budget_forecast><latest_budget_changes>-6775000.00</latest_budget_changes><total_budget_changes>-6429000.00</total_budget_changes><forecast_completion>2024-10-04T00:00:00</forecast_completion><latest_schedule_changes>914</latest_schedule_changes><total_schedule_changes>914</total_schedule_changes></row><row _id="row-wmxz_g9e7.rhfg" _uuid="00000000-0000-0000-D341-AF22F5865563" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-wmxz_g9e7.rhfg"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>1005</pid><project_name>FUEL TANK REPLACEMENT</project_name><description>FUEL TANK REPLACEMENT</description><category>Industrial Development</category><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><current_phase>Construction</current_phase><design_start>2018-04-25T00:00:00</design_start><budget_forecast>25370000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-6429000.00</total_budget_changes><forecast_completion>2024-10-04T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>914</total_schedule_changes></row><row _id="row-ic5r-ehmm-ne2m" _uuid="00000000-0000-0000-627C-BB455B39AB50" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ic5r-ehmm-ne2m"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>1005</pid><project_name>FUEL TANK REPLACEMENT</project_name><description>FUEL TANK REPLACEMENT</description><category>Industrial Development</category><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><current_phase>Construction</current_phase><design_start>2018-04-25T00:00:00</design_start><budget_forecast>25520000.00</budget_forecast><latest_budget_changes>150000.00</latest_budget_changes><total_budget_changes>-6429000.00</total_budget_changes><forecast_completion>2024-10-04T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>914</total_schedule_changes></row><row _id="row-s2si.d6dx-v865" _uuid="00000000-0000-0000-CED9-42420C2DC3AE" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-s2si.d6dx-v865"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1005</pid><project_name>FUEL TANK REPLACEMENT</project_name><description>FUEL TANK REPLACEMENT</description><category>Industrial Development</category><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><current_phase>Construction</current_phase><design_start>2018-04-25T00:00:00</design_start><budget_forecast>25716000.00</budget_forecast><latest_budget_changes>196000.00</latest_budget_changes><total_budget_changes>-6429000.00</total_budget_changes><forecast_completion>2024-10-04T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>914</total_schedule_changes></row><row _id="row-mqh7_vwzz-kms5" _uuid="00000000-0000-0000-ED6D-8EF18F08F47C" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-mqh7_vwzz-kms5"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1005</pid><project_name>FUEL TANK REPLACEMENT</project_name><description>FUEL TANK REPLACEMENT</description><category>Industrial Development</category><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><current_phase>Construction</current_phase><design_start>2018-04-25T00:00:00</design_start><budget_forecast>25716000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-6429000.00</total_budget_changes><forecast_completion>2024-10-04T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>914</total_schedule_changes></row><row _id="row-d5gp~uj52_2qxw" _uuid="00000000-0000-0000-80B9-BBF94F40B9BF" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-d5gp~uj52_2qxw"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>1008</pid><project_name>South Bronx East-West Crosstown SBS</project_name><description>The South Bronx Crosstown SBS capital project (BRT) will add bus pads and construct bus bulbs, curb and median extensions, and pedestrian islands for enhanced pedestrian safety and access improvements.</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2019-07-01T00:00:00</design_start><budget_forecast>50608000.00</budget_forecast><total_budget_changes>3130000.00</total_budget_changes><forecast_completion>2025-09-13T00:00:00</forecast_completion><total_schedule_changes>626</total_schedule_changes></row><row _id="row-sbm4~93y3-auqy" _uuid="00000000-0000-0000-DB8C-3E91FCB15414" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-sbm4~93y3-auqy"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>1008</pid><project_name>South Bronx East-West Crosstown SBS</project_name><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><total_budget_changes>3130000.00</total_budget_changes><total_schedule_changes>626</total_schedule_changes></row><row _id="row-nauz_a3en~6cdf" _uuid="00000000-0000-0000-3C40-EC1F7F6D9700" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-nauz_a3en~6cdf"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>1008</pid><project_name>South Bronx East-West Crosstown SBS</project_name><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><total_budget_changes>3130000.00</total_budget_changes><total_schedule_changes>626</total_schedule_changes></row><row _id="row-meum-8d7f~5mzx" _uuid="00000000-0000-0000-0B96-ED7FFE6731DA" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-meum-8d7f~5mzx"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>1008</pid><project_name>South Bronx East-West Crosstown SBS</project_name><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><total_budget_changes>3130000.00</total_budget_changes><total_schedule_changes>626</total_schedule_changes></row><row _id="row-mfbb.nyfx.8psy" _uuid="00000000-0000-0000-1C49-2452C7DDC077" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-mfbb.nyfx.8psy"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>1008</pid><project_name>South Bronx East-West Crosstown SBS</project_name><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><total_budget_changes>3130000.00</total_budget_changes><total_schedule_changes>626</total_schedule_changes></row><row _id="row-3ez4.gekd-a3ei" _uuid="00000000-0000-0000-A9B4-70FDD1A06951" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-3ez4.gekd-a3ei"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>1008</pid><project_name>South Bronx East-West Crosstown SBS</project_name><description>The South Bronx Crosstown SBS capital project (BRT) will add bus pads and construct bus bulbs, curb and median extensions, and pedestrian islands for enhanced pedestrian safety and access improvements.</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2019-07-01T00:00:00</design_start><budget_forecast>51883000.00</budget_forecast><latest_budget_changes>1275000.00</latest_budget_changes><total_budget_changes>3130000.00</total_budget_changes><forecast_completion>2025-10-21T00:00:00</forecast_completion><latest_schedule_changes>38</latest_schedule_changes><total_schedule_changes>626</total_schedule_changes></row><row _id="row-bbcc_ccnp.nscw" _uuid="00000000-0000-0000-2E02-774199E2620B" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-bbcc_ccnp.nscw"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>1008</pid><project_name>South Bronx East-West Crosstown SBS</project_name><description>The South Bronx Crosstown SBS capital project (BRT) will add bus pads and construct bus bulbs, curb and median extensions, and pedestrian islands for enhanced pedestrian safety and access improvements.</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2019-07-01T00:00:00</design_start><budget_forecast>53618000.00</budget_forecast><latest_budget_changes>1735000.00</latest_budget_changes><total_budget_changes>3130000.00</total_budget_changes><forecast_completion>2026-07-14T00:00:00</forecast_completion><latest_schedule_changes>266</latest_schedule_changes><total_schedule_changes>626</total_schedule_changes></row><row _id="row-nppr_3nv3-bey9" _uuid="00000000-0000-0000-D427-6E3234D0D011" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-nppr_3nv3-bey9"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>1008</pid><project_name>South Bronx East-West Crosstown SBS</project_name><description>The South Bronx Crosstown SBS capital project (BRT) will add bus pads and construct bus bulbs, curb and median extensions, and pedestrian islands for enhanced pedestrian safety and access improvements.</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2019-07-01T00:00:00</design_start><budget_forecast>53718000.00</budget_forecast><latest_budget_changes>100000.00</latest_budget_changes><total_budget_changes>3130000.00</total_budget_changes><forecast_completion>2026-11-03T00:00:00</forecast_completion><latest_schedule_changes>112</latest_schedule_changes><total_schedule_changes>626</total_schedule_changes></row><row _id="row-9ejn.3ue3_gtbe" _uuid="00000000-0000-0000-A2FC-644F153807C4" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-9ejn.3ue3_gtbe"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1008</pid><project_name>South Bronx East-West Crosstown SBS</project_name><description>The South Bronx Crosstown SBS capital project (BRT) will add bus pads and construct bus bulbs, curb and median extensions, and pedestrian islands for enhanced pedestrian safety and access improvements.</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2019-07-01T00:00:00</design_start><budget_forecast>53738000.00</budget_forecast><latest_budget_changes>20000.00</latest_budget_changes><total_budget_changes>3130000.00</total_budget_changes><forecast_completion>2027-06-01T00:00:00</forecast_completion><latest_schedule_changes>210</latest_schedule_changes><total_schedule_changes>626</total_schedule_changes></row><row _id="row-a5f2.6ecx~77he" _uuid="00000000-0000-0000-0DFB-32CABDAC4C8D" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-a5f2.6ecx~77he"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1008</pid><project_name>South Bronx East-West Crosstown SBS</project_name><description>The South Bronx Crosstown SBS capital project (BRT) will add bus pads and construct bus bulbs, curb and median extensions, and pedestrian islands for enhanced pedestrian safety and access improvements.</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2019-07-01T00:00:00</design_start><budget_forecast>53738000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>3130000.00</total_budget_changes><forecast_completion>2027-06-01T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>626</total_schedule_changes></row><row _id="row-mb8x-32mp_7z22" _uuid="00000000-0000-0000-BF79-4E923804E1B4" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-mb8x-32mp_7z22"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>1009</pid><project_name>SAN &amp; STRM SEWER, WM IN CONEY ISLAND AREA, PH 4</project_name><description>Storm, Sanitary Sewers &amp; Water Mains in Coney Island Area - Phase 04, Brooklyn</description><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Design</current_phase><design_start>2019-07-25T00:00:00</design_start><budget_forecast>27929000.00</budget_forecast><total_budget_changes>1984000.00</total_budget_changes><forecast_completion>2024-08-09T00:00:00</forecast_completion><total_schedule_changes>1431</total_schedule_changes></row><row _id="row-6i9y.pkqz~f3bx" _uuid="00000000-0000-0000-32F4-E3964F7D422D" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-6i9y.pkqz~f3bx"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>1009</pid><project_name>SAN &amp; STRM SEWER, WM IN CONEY ISLAND AREA, PH 4</project_name><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><total_budget_changes>1984000.00</total_budget_changes><total_schedule_changes>1431</total_schedule_changes></row><row _id="row-59n8.aavc_zzrx" _uuid="00000000-0000-0000-0C2C-73E71C0C19C8" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-59n8.aavc_zzrx"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>1009</pid><project_name>SAN &amp; STRM SEWER, WM IN CONEY ISLAND AREA, PH 4</project_name><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><total_budget_changes>1984000.00</total_budget_changes><total_schedule_changes>1431</total_schedule_changes></row><row _id="row-jgdm_6riu_xub4" _uuid="00000000-0000-0000-CCA2-C88EDF9B5863" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-jgdm_6riu_xub4"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>1009</pid><project_name>SAN &amp; STRM SEWER, WM IN CONEY ISLAND AREA, PH 4</project_name><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><total_budget_changes>1984000.00</total_budget_changes><total_schedule_changes>1431</total_schedule_changes></row><row _id="row-9pwz~zqtx~gyhi" _uuid="00000000-0000-0000-5BA6-2863D85BCD08" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-9pwz~zqtx~gyhi"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>1009</pid><project_name>SAN &amp; STRM SEWER, WM IN CONEY ISLAND AREA, PH 4</project_name><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><total_budget_changes>1984000.00</total_budget_changes><total_schedule_changes>1431</total_schedule_changes></row><row _id="row-sk52.t9vv-yk53" _uuid="00000000-0000-0000-4857-9CA38AEDAAE5" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-sk52.t9vv-yk53"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>1009</pid><project_name>SAN &amp; STRM SEWER, WM IN CONEY ISLAND AREA, PH 4</project_name><description>Storm, Sanitary Sewers &amp; Water Mains in Coney Island Area - Phase 04, Brooklyn</description><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Design</current_phase><design_start>2019-07-25T00:00:00</design_start><budget_forecast>29449000.00</budget_forecast><latest_budget_changes>1520000.00</latest_budget_changes><total_budget_changes>1984000.00</total_budget_changes><forecast_completion>2027-02-07T00:00:00</forecast_completion><latest_schedule_changes>912</latest_schedule_changes><total_schedule_changes>1431</total_schedule_changes></row><row _id="row-cnas_cwqp~c9ah" _uuid="00000000-0000-0000-A9A8-E75A0947FBA2" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-cnas_cwqp~c9ah"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>1009</pid><project_name>SAN &amp; STRM SEWER, WM IN CONEY ISLAND AREA, PH 4</project_name><description>Storm, Sanitary Sewers &amp; Water Mains in Coney Island Area - Phase 04, Brooklyn</description><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Design</current_phase><design_start>2019-07-25T00:00:00</design_start><budget_forecast>29619000.00</budget_forecast><latest_budget_changes>170000.00</latest_budget_changes><total_budget_changes>1984000.00</total_budget_changes><forecast_completion>2027-02-07T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1431</total_schedule_changes></row><row _id="row-24ck-a77g_jtne" _uuid="00000000-0000-0000-E9D5-93251F24E8E3" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-24ck-a77g_jtne"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>1009</pid><project_name>SAN &amp; STRM SEWER, WM IN CONEY ISLAND AREA, PH 4</project_name><description>Storm, Sanitary Sewers &amp; Water Mains in Coney Island Area - Phase 04, Brooklyn</description><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Design</current_phase><design_start>2019-07-25T00:00:00</design_start><budget_forecast>29669000.00</budget_forecast><latest_budget_changes>50000.00</latest_budget_changes><total_budget_changes>1984000.00</total_budget_changes><forecast_completion>2027-02-07T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1431</total_schedule_changes></row><row _id="row-wgyg.dt5t_d7t9" _uuid="00000000-0000-0000-9B51-8F642044722D" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-wgyg.dt5t_d7t9"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1009</pid><project_name>SAN &amp; STRM SEWER, WM IN CONEY ISLAND AREA, PH 4</project_name><description>Storm, Sanitary Sewers &amp; Water Mains in Coney Island Area - Phase 04, Brooklyn</description><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Design</current_phase><design_start>2019-07-25T00:00:00</design_start><budget_forecast>28860000.00</budget_forecast><latest_budget_changes>-809000.00</latest_budget_changes><total_budget_changes>1984000.00</total_budget_changes><forecast_completion>2027-07-10T00:00:00</forecast_completion><latest_schedule_changes>153</latest_schedule_changes><total_schedule_changes>1431</total_schedule_changes></row><row _id="row-yvwv-xg7m.nfmy" _uuid="00000000-0000-0000-9365-C4F715A516C2" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-yvwv-xg7m.nfmy"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1009</pid><project_name>SAN &amp; STRM SEWER, WM IN CONEY ISLAND AREA, PH 4</project_name><description>Storm, Sanitary Sewers &amp; Water Mains in Coney Island Area - Phase 04, Brooklyn</description><category>Sewers</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Design</current_phase><design_start>2019-07-25T00:00:00</design_start><budget_forecast>29913000.00</budget_forecast><latest_budget_changes>1053000.00</latest_budget_changes><total_budget_changes>1984000.00</total_budget_changes><forecast_completion>2028-07-10T00:00:00</forecast_completion><latest_schedule_changes>366</latest_schedule_changes><total_schedule_changes>1431</total_schedule_changes></row><row _id="row-kjsu_2qja-rycu" _uuid="00000000-0000-0000-1F78-C721A40CF1BC" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-kjsu_2qja-rycu"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>1011</pid><project_name>RECONSTRUCTION OF ROSEDALE AREA, PHASE 2</project_name><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2018-06-07T00:00:00</design_start><budget_forecast>39360000.00</budget_forecast><total_budget_changes>61291000.00</total_budget_changes><forecast_completion>2024-08-14T00:00:00</forecast_completion><total_schedule_changes>829</total_schedule_changes></row><row _id="row-e8m7-tv84~8vkj" _uuid="00000000-0000-0000-7614-072B6A2EF0BC" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-e8m7-tv84~8vkj"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>1011</pid><project_name>RECONSTRUCTION OF ROSEDALE AREA, PHASE 2</project_name><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><total_budget_changes>61291000.00</total_budget_changes><total_schedule_changes>829</total_schedule_changes></row><row _id="row-huni.zv3z.smgw" _uuid="00000000-0000-0000-931B-E33A8414C675" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-huni.zv3z.smgw"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>1011</pid><project_name>RECONSTRUCTION OF ROSEDALE AREA, PHASE 2</project_name><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><total_budget_changes>61291000.00</total_budget_changes><total_schedule_changes>829</total_schedule_changes></row><row _id="row-k47q.jifr_vj4t" _uuid="00000000-0000-0000-8652-5172738838DB" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-k47q.jifr_vj4t"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>1011</pid><project_name>RECONSTRUCTION OF ROSEDALE AREA, PHASE 2</project_name><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><total_budget_changes>61291000.00</total_budget_changes><total_schedule_changes>829</total_schedule_changes></row><row _id="row-3s6m~anfn-ubju" _uuid="00000000-0000-0000-E9A1-981B0C89276D" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-3s6m~anfn-ubju"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>1011</pid><project_name>RECONSTRUCTION OF ROSEDALE AREA, PHASE 2</project_name><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><total_budget_changes>61291000.00</total_budget_changes><total_schedule_changes>829</total_schedule_changes></row><row _id="row-qwaa.ai64.26if" _uuid="00000000-0000-0000-AA24-1BBD55DC10F9" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-qwaa.ai64.26if"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>1011</pid><project_name>RECONSTRUCTION OF ROSEDALE AREA, PHASE 2</project_name><description>RECONSTRUCTION OF STREETS IN ROSEDALE AREA - PHASE 2</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2018-06-07T00:00:00</design_start><budget_forecast>46870000.00</budget_forecast><latest_budget_changes>7510000.00</latest_budget_changes><total_budget_changes>61291000.00</total_budget_changes><forecast_completion>2026-03-13T00:00:00</forecast_completion><latest_schedule_changes>576</latest_schedule_changes><total_schedule_changes>829</total_schedule_changes></row><row _id="row-59hv-wz6f~piyk" _uuid="00000000-0000-0000-4565-432ACF52BE8E" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-59hv-wz6f~piyk"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>1011</pid><project_name>RECONSTRUCTION OF ROSEDALE AREA, PHASE 2</project_name><description>RECONSTRUCTION OF STREETS IN ROSEDALE AREA - PHASE 2</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2018-06-07T00:00:00</design_start><budget_forecast>48837000.00</budget_forecast><latest_budget_changes>1967000.00</latest_budget_changes><total_budget_changes>61291000.00</total_budget_changes><forecast_completion>2026-06-22T00:00:00</forecast_completion><latest_schedule_changes>101</latest_schedule_changes><total_schedule_changes>829</total_schedule_changes></row><row _id="row-nnih_vdwn-fyr8" _uuid="00000000-0000-0000-AD73-40F5A235EEBB" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-nnih_vdwn-fyr8"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>1011</pid><project_name>RECONSTRUCTION OF ROSEDALE AREA, PHASE 2</project_name><description>RECONSTRUCTION OF STREETS IN ROSEDALE AREA - PHASE 2</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2018-06-07T00:00:00</design_start><budget_forecast>50547000.00</budget_forecast><latest_budget_changes>1710000.00</latest_budget_changes><total_budget_changes>61291000.00</total_budget_changes><forecast_completion>2026-07-15T00:00:00</forecast_completion><latest_schedule_changes>23</latest_schedule_changes><total_schedule_changes>829</total_schedule_changes></row><row _id="row-pmz6~93y4_viij" _uuid="00000000-0000-0000-EE9D-1003AD979786" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-pmz6~93y4_viij"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1011</pid><project_name>RECONSTRUCTION OF ROSEDALE AREA, PHASE 2</project_name><description>RECONSTRUCTION OF STREETS IN ROSEDALE AREA - PHASE 2</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2018-06-07T00:00:00</design_start><budget_forecast>100651000.00</budget_forecast><latest_budget_changes>50104000.00</latest_budget_changes><total_budget_changes>61291000.00</total_budget_changes><forecast_completion>2026-07-15T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>829</total_schedule_changes></row><row _id="row-uyh6~cmdg.whsn" _uuid="00000000-0000-0000-EEE2-EA879EB96CA2" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-uyh6~cmdg.whsn"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1011</pid><project_name>RECONSTRUCTION OF ROSEDALE AREA, PHASE 2</project_name><description>RECONSTRUCTION OF STREETS IN ROSEDALE AREA - PHASE 2</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Construction Procurement</current_phase><design_start>2018-06-07T00:00:00</design_start><budget_forecast>100651000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>61291000.00</total_budget_changes><forecast_completion>2026-11-21T00:00:00</forecast_completion><latest_schedule_changes>129</latest_schedule_changes><total_schedule_changes>829</total_schedule_changes></row><row _id="row-ydaf.a9wz.k2gc" _uuid="00000000-0000-0000-E5F9-B7D68CC0F19B" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ydaf.a9wz.k2gc"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>1012</pid><project_name>RECONSTRUCTION OF FRONT STREET, MANHATTAN</project_name><description>Reconstruction of Front Street, Manhattan</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Construction Procurement</current_phase><design_start>2015-07-31T00:00:00</design_start><budget_forecast>27356000.00</budget_forecast><total_budget_changes>6153000.00</total_budget_changes><forecast_completion>2022-06-16T00:00:00</forecast_completion><total_schedule_changes>484</total_schedule_changes></row><row _id="row-8k54-kgix_xygh" _uuid="00000000-0000-0000-0B45-7B7CAAB5B630" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-8k54-kgix_xygh"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>1012</pid><project_name>RECONSTRUCTION OF FRONT STREET, MANHATTAN</project_name><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><total_budget_changes>6153000.00</total_budget_changes><total_schedule_changes>484</total_schedule_changes></row><row _id="row-ze7h_2f6d~iy2e" _uuid="00000000-0000-0000-368A-F0BAAE5E2FA7" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ze7h_2f6d~iy2e"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>1012</pid><project_name>RECONSTRUCTION OF FRONT STREET, MANHATTAN</project_name><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><total_budget_changes>6153000.00</total_budget_changes><total_schedule_changes>484</total_schedule_changes></row><row _id="row-8q2f~vba7-55vs" _uuid="00000000-0000-0000-E4D6-01D5773DEDB8" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-8q2f~vba7-55vs"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>1012</pid><project_name>RECONSTRUCTION OF FRONT STREET, MANHATTAN</project_name><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><total_budget_changes>6153000.00</total_budget_changes><total_schedule_changes>484</total_schedule_changes></row><row _id="row-63ap-kxvv.tpxc" _uuid="00000000-0000-0000-2ADB-C5FF415E4833" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-63ap-kxvv.tpxc"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>1012</pid><project_name>RECONSTRUCTION OF FRONT STREET, MANHATTAN</project_name><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><total_budget_changes>6153000.00</total_budget_changes><total_schedule_changes>484</total_schedule_changes></row><row _id="row-izw9~rzuf_skxp" _uuid="00000000-0000-0000-EE7D-16D143B4E0F0" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-izw9~rzuf_skxp"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>1012</pid><project_name>RECONSTRUCTION OF FRONT STREET, MANHATTAN</project_name><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><total_budget_changes>6153000.00</total_budget_changes><total_schedule_changes>484</total_schedule_changes></row><row _id="row-wm9a-zjit.gche" _uuid="00000000-0000-0000-7C86-EF5247AE3D8D" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-wm9a-zjit.gche"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>1012</pid><project_name>RECONSTRUCTION OF FRONT STREET, MANHATTAN</project_name><description>Reconstruction of Front Street, Manhattan</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Construction</current_phase><design_start>2015-07-31T00:00:00</design_start><budget_forecast>31079000.00</budget_forecast><latest_budget_changes>3723000.00</latest_budget_changes><total_budget_changes>6153000.00</total_budget_changes><forecast_completion>2022-06-16T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>484</total_schedule_changes></row><row _id="row-kivu.k6vi.8cde" _uuid="00000000-0000-0000-89EB-736605C386EC" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-kivu.k6vi.8cde"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>1012</pid><project_name>RECONSTRUCTION OF FRONT STREET, MANHATTAN</project_name><description>Reconstruction of Front Street, Manhattan</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Construction</current_phase><design_start>2015-07-31T00:00:00</design_start><budget_forecast>31066000.00</budget_forecast><latest_budget_changes>-13000.00</latest_budget_changes><total_budget_changes>6153000.00</total_budget_changes><forecast_completion>2023-10-13T00:00:00</forecast_completion><latest_schedule_changes>484</latest_schedule_changes><total_schedule_changes>484</total_schedule_changes></row><row _id="row-dee6_wd6c.wugw" _uuid="00000000-0000-0000-5657-290862735ADF" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-dee6_wd6c.wugw"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1012</pid><project_name>RECONSTRUCTION OF FRONT STREET, MANHATTAN</project_name><description>Reconstruction of Front Street, Manhattan</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Construction</current_phase><design_start>2015-07-31T00:00:00</design_start><budget_forecast>33509000.00</budget_forecast><latest_budget_changes>2443000.00</latest_budget_changes><total_budget_changes>6153000.00</total_budget_changes><forecast_completion>2023-10-13T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>484</total_schedule_changes></row><row _id="row-dxwq~zzdt.cgga" _uuid="00000000-0000-0000-7C16-21CBDC016171" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-dxwq~zzdt.cgga"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1012</pid><project_name>RECONSTRUCTION OF FRONT STREET, MANHATTAN</project_name><description>Reconstruction of Front Street, Manhattan</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Construction</current_phase><design_start>2015-07-31T00:00:00</design_start><budget_forecast>33509000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>6153000.00</total_budget_changes><forecast_completion>2023-10-13T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>484</total_schedule_changes></row><row _id="row-pb8w_w6i9~83yz" _uuid="00000000-0000-0000-1419-3E31CB4733FF" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-pb8w_w6i9~83yz"><date_reported_as_of>2019-09-01T00:00:00</date_reported_as_of><pid>1013</pid><project_name>GRAND CONCOURSE, PHASE 5</project_name><description>THE FIFTH PHASE OF THE RECONSTRUCTION OF THE GRAND CONCOURSE WILL CONTINUE THE DESIGN AND SAFETY IMPROVEMENTS IMPLEMENTED IN THE PREVIOUS PHASES OF THIS VISION ZERO GREAT STREETS PROJECTS. . AS IN THE PREVIOUS PHASES, PHASE 5 WILL INCLUDE THE RECONSTRUCTION OF THE CONCOURSES SERVICE ROADS AND RESURFACING OF THE MAINLINE ROADWAY WHERE NECESSARY.</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2019-09-16T00:00:00</design_start><budget_forecast>78921000.00</budget_forecast><total_budget_changes>26673000.00</total_budget_changes><forecast_completion>2025-09-13T00:00:00</forecast_completion><total_schedule_changes>729</total_schedule_changes></row><row _id="row-rjhv.ha7u_cx67" _uuid="00000000-0000-0000-E861-3B8A56F32E1F" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-rjhv.ha7u_cx67"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>1013</pid><project_name>GRAND CONCOURSE, PHASE 5</project_name><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><total_budget_changes>26673000.00</total_budget_changes><total_schedule_changes>729</total_schedule_changes></row><row _id="row-cd9y_ye2k_fsef" _uuid="00000000-0000-0000-386D-DA7AB6F6CE0B" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-cd9y_ye2k_fsef"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>1013</pid><project_name>GRAND CONCOURSE, PHASE 5</project_name><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><total_budget_changes>26673000.00</total_budget_changes><total_schedule_changes>729</total_schedule_changes></row><row _id="row-5n6v_rm64_j9ie" _uuid="00000000-0000-0000-EDEC-7883F89FBF5C" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-5n6v_rm64_j9ie"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>1013</pid><project_name>GRAND CONCOURSE, PHASE 5</project_name><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><total_budget_changes>26673000.00</total_budget_changes><total_schedule_changes>729</total_schedule_changes></row><row _id="row-x75e.fpix.vksa" _uuid="00000000-0000-0000-0F13-1F97549930BC" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-x75e.fpix.vksa"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>1013</pid><project_name>GRAND CONCOURSE, PHASE 5</project_name><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><total_budget_changes>26673000.00</total_budget_changes><total_schedule_changes>729</total_schedule_changes></row><row _id="row-eaj3-w9vp_gc8z" _uuid="00000000-0000-0000-AC79-41BD343647D6" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-eaj3-w9vp_gc8z"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>1013</pid><project_name>GRAND CONCOURSE, PHASE 5</project_name><description>THE FIFTH PHASE OF THE RECONSTRUCTION OF THE GRAND CONCOURSE WILL CONTINUE THE DESIGN AND SAFETY IMPROVEMENTS IMPLEMENTED IN THE PREVIOUS PHASES OF THIS VISION ZERO GREAT STREETS PROJECTS. . AS IN THE PREVIOUS PHASES, PHASE 5 WILL INCLUDE THE RECONSTRUCTION OF THE CONCOURSES SERVICE ROADS AND RESURFACING OF THE MAINLINE ROADWAY WHERE NECESSARY.</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2019-09-16T00:00:00</design_start><budget_forecast>79721000.00</budget_forecast><latest_budget_changes>800000.00</latest_budget_changes><total_budget_changes>26673000.00</total_budget_changes><forecast_completion>2026-09-12T00:00:00</forecast_completion><latest_schedule_changes>364</latest_schedule_changes><total_schedule_changes>729</total_schedule_changes></row><row _id="row-np85.5f77-wxad" _uuid="00000000-0000-0000-2693-765792DDDC6A" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-np85.5f77-wxad"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>1013</pid><project_name>GRAND CONCOURSE, PHASE 5</project_name><description>THE FIFTH PHASE OF THE RECONSTRUCTION OF THE GRAND CONCOURSE WILL CONTINUE THE DESIGN AND SAFETY IMPROVEMENTS IMPLEMENTED IN THE PREVIOUS PHASES OF THIS VISION ZERO GREAT STREETS PROJECTS. . AS IN THE PREVIOUS PHASES, PHASE 5 WILL INCLUDE THE RECONSTRUCTION OF THE CONCOURSES SERVICE ROADS AND RESURFACING OF THE MAINLINE ROADWAY WHERE NECESSARY.</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2019-09-16T00:00:00</design_start><budget_forecast>79796000.00</budget_forecast><latest_budget_changes>75000.00</latest_budget_changes><total_budget_changes>26673000.00</total_budget_changes><forecast_completion>2028-04-14T00:00:00</forecast_completion><latest_schedule_changes>580</latest_schedule_changes><total_schedule_changes>729</total_schedule_changes></row><row _id="row-jian-64g4_5vrh" _uuid="00000000-0000-0000-4291-76934D85CF1E" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-jian-64g4_5vrh"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>1013</pid><project_name>GRAND CONCOURSE, PHASE 5</project_name><description>THE FIFTH PHASE OF THE RECONSTRUCTION OF THE GRAND CONCOURSE WILL CONTINUE THE DESIGN AND SAFETY IMPROVEMENTS IMPLEMENTED IN THE PREVIOUS PHASES OF THIS VISION ZERO GREAT STREETS PROJECTS. . AS IN THE PREVIOUS PHASES, PHASE 5 WILL INCLUDE THE RECONSTRUCTION OF THE CONCOURSES SERVICE ROADS AND RESURFACING OF THE MAINLINE ROADWAY WHERE NECESSARY.</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2019-09-16T00:00:00</design_start><budget_forecast>102796000.00</budget_forecast><latest_budget_changes>23000000.00</latest_budget_changes><total_budget_changes>26673000.00</total_budget_changes><forecast_completion>2028-04-14T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>729</total_schedule_changes></row><row _id="row-yh42~59kb_rtvi" _uuid="00000000-0000-0000-EB2D-5798A2E3410F" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-yh42~59kb_rtvi"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1013</pid><project_name>GRAND CONCOURSE, PHASE 5</project_name><description>THE FIFTH PHASE OF THE RECONSTRUCTION OF THE GRAND CONCOURSE WILL CONTINUE THE DESIGN AND SAFETY IMPROVEMENTS IMPLEMENTED IN THE PREVIOUS PHASES OF THIS VISION ZERO GREAT STREETS PROJECTS. . AS IN THE PREVIOUS PHASES, PHASE 5 WILL INCLUDE THE RECONSTRUCTION OF THE CONCOURSES SERVICE ROADS AND RESURFACING OF THE MAINLINE ROADWAY WHERE NECESSARY.</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2019-09-16T00:00:00</design_start><budget_forecast>102896000.00</budget_forecast><latest_budget_changes>100000.00</latest_budget_changes><total_budget_changes>26673000.00</total_budget_changes><forecast_completion>2028-04-14T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>729</total_schedule_changes></row><row _id="row-5kp7.2hre~4duf" _uuid="00000000-0000-0000-3EB3-D5A9DAEA09D8" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-5kp7.2hre~4duf"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1013</pid><project_name>GRAND CONCOURSE, PHASE 5</project_name><description>THE FIFTH PHASE OF THE RECONSTRUCTION OF THE GRAND CONCOURSE WILL CONTINUE THE DESIGN AND SAFETY IMPROVEMENTS IMPLEMENTED IN THE PREVIOUS PHASES OF THIS VISION ZERO GREAT STREETS PROJECTS. . AS IN THE PREVIOUS PHASES, PHASE 5 WILL INCLUDE THE RECONSTRUCTION OF THE CONCOURSES SERVICE ROADS AND RESURFACING OF THE MAINLINE ROADWAY WHERE NECESSARY.</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2019-09-16T00:00:00</design_start><budget_forecast>105594000.00</budget_forecast><latest_budget_changes>2698000.00</latest_budget_changes><total_budget_changes>26673000.00</total_budget_changes><forecast_completion>2027-09-12T00:00:00</forecast_completion><latest_schedule_changes>-215</latest_schedule_changes><total_schedule_changes>729</total_schedule_changes></row><row _id="row-mmjd~bd6y~zmdk" _uuid="00000000-0000-0000-D4EE-B276574876E4" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-mmjd~bd6y~zmdk"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>1015</pid><project_name>Grant Park Construction</project_name><description>This project will construct Grant Park, including converting the roadbed to recreational space.</description><category>Parks</category><managing_agency>DPR</managing_agency><client_agency>DPR</client_agency><current_phase>Design</current_phase><design_start>2019-05-29T00:00:00</design_start><budget_forecast>31101000.00</budget_forecast><total_budget_changes>1489000.00</total_budget_changes><total_schedule_changes>612</total_schedule_changes></row><row _id="row-bi6j.8yxa_c8gg" _uuid="00000000-0000-0000-B907-7BCC880F72F1" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-bi6j.8yxa_c8gg"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>1015</pid><project_name>Grant Park Construction</project_name><description>This project will construct Grant Park, including converting the roadbed to recreational space.</description><category>Parks</category><managing_agency>DPR</managing_agency><client_agency>DPR</client_agency><current_phase>Design</current_phase><design_start>2019-05-29T00:00:00</design_start><budget_forecast>31101000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>1489000.00</total_budget_changes><total_schedule_changes>612</total_schedule_changes></row><row _id="row-f9xq_js5e~78rb" _uuid="00000000-0000-0000-50B1-CBC21B88FACF" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-f9xq_js5e~78rb"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>1015</pid><project_name>Grant Park Construction</project_name><description>This project will construct Grant Park, including converting the roadbed to recreational space.</description><category>Parks</category><managing_agency>DPR</managing_agency><client_agency>DPR</client_agency><current_phase>Design</current_phase><design_start>2019-05-29T00:00:00</design_start><budget_forecast>32590000.00</budget_forecast><latest_budget_changes>1489000.00</latest_budget_changes><total_budget_changes>1489000.00</total_budget_changes><forecast_completion>2023-12-24T00:00:00</forecast_completion><total_schedule_changes>612</total_schedule_changes></row><row _id="row-qeft-fyva-479i" _uuid="00000000-0000-0000-1845-D2787E9532E7" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-qeft-fyva-479i"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>1015</pid><project_name>Grant Park Construction</project_name><description>This project will construct Grant Park, including converting the roadbed to recreational space.</description><category>Parks</category><managing_agency>DPR</managing_agency><client_agency>DPR</client_agency><current_phase>Construction Procurement</current_phase><design_start>2019-05-29T00:00:00</design_start><budget_forecast>32590000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>1489000.00</total_budget_changes><forecast_completion>2024-02-08T00:00:00</forecast_completion><latest_schedule_changes>46</latest_schedule_changes><total_schedule_changes>612</total_schedule_changes></row><row _id="row-acn3-p9k2_qinv" _uuid="00000000-0000-0000-8779-69DF3AB491C1" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-acn3-p9k2_qinv"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>1015</pid><project_name>Grant Park Construction</project_name><description>This project will construct Grant Park, including converting the roadbed to recreational space.</description><category>Parks</category><managing_agency>DPR</managing_agency><client_agency>DPR</client_agency><current_phase>Construction Procurement</current_phase><design_start>2019-05-29T00:00:00</design_start><budget_forecast>32590000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>1489000.00</total_budget_changes><forecast_completion>2024-02-08T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>612</total_schedule_changes></row><row _id="row-bjhh-six8-d8qu" _uuid="00000000-0000-0000-D1E6-A25D6B1E82F5" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-bjhh-six8-d8qu"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>1015</pid><project_name>Grant Park Construction</project_name><description>This project will construct Grant Park, including converting the roadbed to recreational space.</description><category>Parks</category><managing_agency>DPR</managing_agency><client_agency>DPR</client_agency><current_phase>Construction Procurement</current_phase><design_start>2019-05-29T00:00:00</design_start><budget_forecast>32590000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>1489000.00</total_budget_changes><forecast_completion>2025-01-27T00:00:00</forecast_completion><latest_schedule_changes>354</latest_schedule_changes><total_schedule_changes>612</total_schedule_changes></row><row _id="row-sy83~2uyy_jqnj" _uuid="00000000-0000-0000-C7F3-DB3B4BE954BB" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-sy83~2uyy_jqnj"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>1015</pid><project_name>Grant Park Construction</project_name><description>This project will construct Grant Park, including converting the roadbed to recreational space.</description><category>Parks</category><managing_agency>DPR</managing_agency><client_agency>DPR</client_agency><current_phase>Construction Procurement</current_phase><design_start>2019-05-29T00:00:00</design_start><budget_forecast>32590000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>1489000.00</total_budget_changes><forecast_completion>2025-01-27T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>612</total_schedule_changes></row><row _id="row-hqcs-fjxv~a872" _uuid="00000000-0000-0000-3B98-19A29238A177" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-hqcs-fjxv~a872"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1015</pid><project_name>Grant Park Construction</project_name><description>This project will construct Grant Park, including converting the roadbed to recreational space.</description><category>Parks</category><managing_agency>DPR</managing_agency><client_agency>DPR</client_agency><current_phase>Construction Procurement</current_phase><design_start>2019-05-29T00:00:00</design_start><budget_forecast>32590000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>1489000.00</total_budget_changes><forecast_completion>2025-08-27T00:00:00</forecast_completion><latest_schedule_changes>212</latest_schedule_changes><total_schedule_changes>612</total_schedule_changes></row><row _id="row-3399~637q_92f3" _uuid="00000000-0000-0000-11A5-EC625CCC106E" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-3399~637q_92f3"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1015</pid><project_name>Grant Park Construction</project_name><description>This project will construct Grant Park, including converting the roadbed to recreational space.</description><category>Parks</category><managing_agency>DPR</managing_agency><client_agency>DPR</client_agency><current_phase>Construction Procurement</current_phase><design_start>2019-05-29T00:00:00</design_start><budget_forecast>32590000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>1489000.00</total_budget_changes><forecast_completion>2025-08-27T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>612</total_schedule_changes></row><row _id="row-ca3x~79hz-b6bz" _uuid="00000000-0000-0000-9E73-65C2E5754C0B" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ca3x~79hz-b6bz"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>1016</pid><project_name>Freshkills South Park Synthetic Turf Fields and Landscape Construction</project_name><description>This project will construct synthetic turf athletic fields, roadways, a parking lot with associated landscaping and stormwater management, multi-use and pedestrian paths, benches, signage, fencing, and lighting, and restore woodlands and wetlands.</description><category>Parks</category><managing_agency>DPR</managing_agency><client_agency>DPR</client_agency><current_phase>Design</current_phase><design_start>2016-11-30T00:00:00</design_start><budget_forecast>37674141.28</budget_forecast><total_budget_changes>1436858.72</total_budget_changes><forecast_completion>2022-09-16T00:00:00</forecast_completion><total_schedule_changes>1309</total_schedule_changes></row><row _id="row-xbae~buhx~2f7z" _uuid="00000000-0000-0000-A189-EC42A79C828F" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-xbae~buhx~2f7z"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>1016</pid><project_name>Freshkills South Park Synthetic Turf Fields and Landscape Construction</project_name><description>This project will construct synthetic turf athletic fields, roadways, a parking lot with associated landscaping and stormwater management, multi-use and pedestrian paths, benches, signage, fencing, and lighting, and restore woodlands and wetlands.</description><category>Parks</category><managing_agency>DPR</managing_agency><client_agency>DPR</client_agency><current_phase>Design</current_phase><design_start>2016-11-30T00:00:00</design_start><budget_forecast>37674141.28</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>1436858.72</total_budget_changes><forecast_completion>2023-04-18T00:00:00</forecast_completion><latest_schedule_changes>214</latest_schedule_changes><total_schedule_changes>1309</total_schedule_changes></row><row _id="row-hxsi~c52z_84d2" _uuid="00000000-0000-0000-EA66-76C1B374CF66" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-hxsi~c52z_84d2"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>1016</pid><project_name>Freshkills South Park Synthetic Turf Fields and Landscape Construction</project_name><description>This project will construct synthetic turf athletic fields, roadways, a parking lot with associated landscaping and stormwater management, multi-use and pedestrian paths, benches, signage, fencing, and lighting, and restore woodlands and wetlands.</description><category>Parks</category><managing_agency>DPR</managing_agency><client_agency>DPR</client_agency><current_phase>Design</current_phase><design_start>2016-11-30T00:00:00</design_start><budget_forecast>37815086.28</budget_forecast><latest_budget_changes>140945.00</latest_budget_changes><total_budget_changes>1436858.72</total_budget_changes><forecast_completion>2024-04-17T00:00:00</forecast_completion><latest_schedule_changes>365</latest_schedule_changes><total_schedule_changes>1309</total_schedule_changes></row><row _id="row-jdsr~2vxq.ybcq" _uuid="00000000-0000-0000-4908-E4D730FEC337" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-jdsr~2vxq.ybcq"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>1016</pid><project_name>Freshkills South Park Synthetic Turf Fields and Landscape Construction</project_name><description>This project will construct synthetic turf athletic fields, roadways, a parking lot with associated landscaping and stormwater management, multi-use and pedestrian paths, benches, signage, fencing, and lighting, and restore woodlands and wetlands.</description><category>Parks</category><managing_agency>DPR</managing_agency><client_agency>DPR</client_agency><current_phase>Design</current_phase><design_start>2016-11-30T00:00:00</design_start><budget_forecast>37945586.28</budget_forecast><latest_budget_changes>130500.00</latest_budget_changes><total_budget_changes>1436858.72</total_budget_changes><forecast_completion>2024-04-17T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1309</total_schedule_changes></row><row _id="row-kcqs.s894_i2i7" _uuid="00000000-0000-0000-C0BB-A195F30927D1" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-kcqs.s894_i2i7"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>1016</pid><project_name>Freshkills South Park Synthetic Turf Fields and Landscape Construction</project_name><description>This project will construct synthetic turf athletic fields, roadways, a parking lot with associated landscaping and stormwater management, multi-use and pedestrian paths, benches, signage, fencing, and lighting, and restore woodlands and wetlands.</description><category>Parks</category><managing_agency>DPR</managing_agency><client_agency>DPR</client_agency><current_phase>Design</current_phase><design_start>2016-11-30T00:00:00</design_start><budget_forecast>39111000.00</budget_forecast><latest_budget_changes>1165413.72</latest_budget_changes><total_budget_changes>1436858.72</total_budget_changes><forecast_completion>2024-04-17T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1309</total_schedule_changes></row><row _id="row-2m93.y5ti-92qp" _uuid="00000000-0000-0000-41CD-DC9427BD1FD9" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-2m93.y5ti-92qp"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>1016</pid><project_name>Freshkills South Park Synthetic Turf Fields and Landscape Construction</project_name><description>This project will construct synthetic turf athletic fields, roadways, a parking lot with associated landscaping and stormwater management, multi-use and pedestrian paths, benches, signage, fencing, and lighting, and restore woodlands and wetlands.</description><category>Parks</category><managing_agency>DPR</managing_agency><client_agency>DPR</client_agency><current_phase>Design</current_phase><design_start>2016-11-30T00:00:00</design_start><budget_forecast>39111000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>1436858.72</total_budget_changes><forecast_completion>2025-05-17T00:00:00</forecast_completion><latest_schedule_changes>395</latest_schedule_changes><total_schedule_changes>1309</total_schedule_changes></row><row _id="row-9f9x_bsuw.9i2x" _uuid="00000000-0000-0000-BE25-650C72803201" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-9f9x_bsuw.9i2x"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>1016</pid><project_name>Freshkills South Park Synthetic Turf Fields and Landscape Construction</project_name><description>This project will construct synthetic turf athletic fields, roadways, a parking lot with associated landscaping and stormwater management, multi-use and pedestrian paths, benches, signage, fencing, and lighting, and restore woodlands and wetlands.</description><category>Parks</category><managing_agency>DPR</managing_agency><client_agency>DPR</client_agency><current_phase>Design</current_phase><design_start>2016-11-30T00:00:00</design_start><budget_forecast>39111000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>1436858.72</total_budget_changes><forecast_completion>2025-05-17T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1309</total_schedule_changes></row><row _id="row-h9u8.hkxp.j92e" _uuid="00000000-0000-0000-D2BC-94CE550C7EA3" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-h9u8.hkxp.j92e"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1016</pid><project_name>Freshkills South Park Synthetic Turf Fields and Landscape Construction</project_name><description>This project will construct synthetic turf athletic fields, roadways, a parking lot with associated landscaping and stormwater management, multi-use and pedestrian paths, benches, signage, fencing, and lighting, and restore woodlands and wetlands.</description><category>Parks</category><managing_agency>DPR</managing_agency><client_agency>DPR</client_agency><current_phase>Design</current_phase><design_start>2016-11-30T00:00:00</design_start><budget_forecast>39111000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>1436858.72</total_budget_changes><forecast_completion>2025-05-17T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1309</total_schedule_changes></row><row _id="row-84kx.5es4-bba6" _uuid="00000000-0000-0000-F300-A7D0AD7E608D" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-84kx.5es4-bba6"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1016</pid><project_name>Freshkills South Park Synthetic Turf Fields and Landscape Construction</project_name><description>This project will construct synthetic turf athletic fields, roadways, a parking lot with associated landscaping and stormwater management, multi-use and pedestrian paths, benches, signage, fencing, and lighting, and restore woodlands and wetlands.</description><category>Parks</category><managing_agency>DPR</managing_agency><client_agency>DPR</client_agency><current_phase>Design</current_phase><design_start>2016-11-30T00:00:00</design_start><budget_forecast>39111000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>1436858.72</total_budget_changes><forecast_completion>2026-04-17T00:00:00</forecast_completion><latest_schedule_changes>335</latest_schedule_changes><total_schedule_changes>1309</total_schedule_changes></row><row _id="row-qyms.33cu-escm" _uuid="00000000-0000-0000-F58F-3A3389516EC7" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-qyms.33cu-escm"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>1017</pid><project_name>Alley Pond Environmental Center Reconstruction</project_name><description>This project will demolish and construct a new environmental center in Alley Pond Park.</description><category>Parks</category><managing_agency>DPR</managing_agency><client_agency>DPR</client_agency><current_phase>Construction</current_phase><design_start>2010-02-24T00:00:00</design_start><budget_forecast>30346000.00</budget_forecast><total_budget_changes>1641000.00</total_budget_changes><forecast_completion>2021-09-14T00:00:00</forecast_completion><total_schedule_changes>556</total_schedule_changes></row><row _id="row-u2fv.2eck~55h9" _uuid="00000000-0000-0000-A4EB-091647D7FD82" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-u2fv.2eck~55h9"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>1017</pid><project_name>Alley Pond Environmental Center Reconstruction</project_name><description>This project will demolish and construct a new environmental center in Alley Pond Park.</description><category>Parks</category><managing_agency>DPR</managing_agency><client_agency>DPR</client_agency><current_phase>Construction</current_phase><design_start>2010-02-24T00:00:00</design_start><budget_forecast>30466000.00</budget_forecast><latest_budget_changes>120000.00</latest_budget_changes><total_budget_changes>1641000.00</total_budget_changes><forecast_completion>2021-11-29T00:00:00</forecast_completion><latest_schedule_changes>76</latest_schedule_changes><total_schedule_changes>556</total_schedule_changes></row><row _id="row-9su6_m9c2.wzmz" _uuid="00000000-0000-0000-6FDD-80B36BA09A9A" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-9su6_m9c2.wzmz"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>1017</pid><project_name>Alley Pond Environmental Center Reconstruction</project_name><description>This project will demolish and construct a new environmental center in Alley Pond Park.</description><category>Parks</category><managing_agency>DPR</managing_agency><client_agency>DPR</client_agency><current_phase>Construction</current_phase><design_start>2010-02-24T00:00:00</design_start><budget_forecast>30466000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>1641000.00</total_budget_changes><forecast_completion>2021-12-14T00:00:00</forecast_completion><latest_schedule_changes>15</latest_schedule_changes><total_schedule_changes>556</total_schedule_changes></row><row _id="row-t4pi_z9xu-g9nn" _uuid="00000000-0000-0000-368A-21FE28A3B1E2" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-t4pi_z9xu-g9nn"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>1017</pid><project_name>Alley Pond Environmental Center Reconstruction</project_name><description>This project will demolish and construct a new environmental center in Alley Pond Park.</description><category>Parks</category><managing_agency>DPR</managing_agency><client_agency>DPR</client_agency><current_phase>Construction</current_phase><design_start>2010-02-24T00:00:00</design_start><budget_forecast>30498000.00</budget_forecast><latest_budget_changes>32000.00</latest_budget_changes><total_budget_changes>1641000.00</total_budget_changes><forecast_completion>2021-12-14T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>556</total_schedule_changes></row><row _id="row-em48-wqd5~fkmu" _uuid="00000000-0000-0000-1AAA-4AAD103E5832" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-em48-wqd5~fkmu"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>1017</pid><project_name>Alley Pond Environmental Center Reconstruction</project_name><description>This project will demolish and construct a new environmental center in Alley Pond Park.</description><category>Parks</category><managing_agency>DPR</managing_agency><client_agency>DPR</client_agency><current_phase>Construction</current_phase><design_start>2010-02-24T00:00:00</design_start><budget_forecast>30497000.00</budget_forecast><latest_budget_changes>-1000.00</latest_budget_changes><total_budget_changes>1641000.00</total_budget_changes><forecast_completion>2022-07-29T00:00:00</forecast_completion><latest_schedule_changes>227</latest_schedule_changes><total_schedule_changes>556</total_schedule_changes></row><row _id="row-xtdc-qir3.rrps" _uuid="00000000-0000-0000-EB28-E534F35E4784" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-xtdc-qir3.rrps"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>1017</pid><project_name>Alley Pond Environmental Center Reconstruction</project_name><description>This project will demolish and construct a new environmental center in Alley Pond Park.</description><category>Parks</category><managing_agency>DPR</managing_agency><client_agency>DPR</client_agency><current_phase>Construction</current_phase><design_start>2010-02-24T00:00:00</design_start><budget_forecast>31987000.00</budget_forecast><latest_budget_changes>1490000.00</latest_budget_changes><total_budget_changes>1641000.00</total_budget_changes><forecast_completion>2022-07-29T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>556</total_schedule_changes></row><row _id="row-2upq.utwq-pt8i" _uuid="00000000-0000-0000-7E35-66F5BA2BF815" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-2upq.utwq-pt8i"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>1017</pid><project_name>Alley Pond Environmental Center Reconstruction</project_name><description>This project will demolish and construct a new environmental center in Alley Pond Park.</description><category>Parks</category><managing_agency>DPR</managing_agency><client_agency>DPR</client_agency><current_phase>Construction</current_phase><design_start>2010-02-24T00:00:00</design_start><budget_forecast>31987000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>1641000.00</total_budget_changes><forecast_completion>2022-07-29T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>556</total_schedule_changes></row><row _id="row-nfah_md4i~mkt6" _uuid="00000000-0000-0000-F566-D2061B9A4DFF" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-nfah_md4i~mkt6"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1017</pid><project_name>Alley Pond Environmental Center Reconstruction</project_name><description>This project will demolish and construct a new environmental center in Alley Pond Park.</description><category>Parks</category><managing_agency>DPR</managing_agency><client_agency>DPR</client_agency><current_phase>Construction</current_phase><design_start>2010-02-24T00:00:00</design_start><budget_forecast>31987000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>1641000.00</total_budget_changes><forecast_completion>2023-03-24T00:00:00</forecast_completion><latest_schedule_changes>238</latest_schedule_changes><total_schedule_changes>556</total_schedule_changes></row><row _id="row-9hwj_fack_u8iq" _uuid="00000000-0000-0000-F3BB-E4178C14175E" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-9hwj_fack_u8iq"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1017</pid><project_name>Alley Pond Environmental Center Reconstruction</project_name><description>This project will demolish and construct a new environmental center in Alley Pond Park.</description><category>Parks</category><managing_agency>DPR</managing_agency><client_agency>DPR</client_agency><current_phase>Construction</current_phase><design_start>2010-02-24T00:00:00</design_start><budget_forecast>31987000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>1641000.00</total_budget_changes><forecast_completion>2023-03-24T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>556</total_schedule_changes></row><row _id="row-k3dz-eaau~fka8" _uuid="00000000-0000-0000-A0CA-D548120EE84D" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-k3dz-eaau~fka8"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>1018</pid><project_name>New York State Pavilion Observation Towers Reconstruction</project_name><description>This project will reconstruct portions of the New York State Pavilion Observation Towers in Flushing Meadows Corona Park.</description><category>Parks</category><managing_agency>DPR</managing_agency><client_agency>DPR</client_agency><current_phase>Construction</current_phase><design_start>2015-09-21T00:00:00</design_start><budget_forecast>28778000.00</budget_forecast><total_budget_changes>1000.00</total_budget_changes><forecast_completion>2021-04-20T00:00:00</forecast_completion><total_schedule_changes>772</total_schedule_changes></row><row _id="row-r29u_ibhf~ew6c" _uuid="00000000-0000-0000-2F28-F66F68C615C5" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-r29u_ibhf~ew6c"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>1018</pid><project_name>New York State Pavilion Observation Towers Reconstruction</project_name><description>This project will reconstruct portions of the New York State Pavilion Observation Towers in Flushing Meadows Corona Park.</description><category>Parks</category><managing_agency>DPR</managing_agency><client_agency>DPR</client_agency><current_phase>Construction</current_phase><design_start>2015-09-21T00:00:00</design_start><budget_forecast>28778000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>1000.00</total_budget_changes><forecast_completion>2021-07-20T00:00:00</forecast_completion><latest_schedule_changes>91</latest_schedule_changes><total_schedule_changes>772</total_schedule_changes></row><row _id="row-rwtj~rqqq-ydxj" _uuid="00000000-0000-0000-4D25-53CC9A0FA3B5" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-rwtj~rqqq-ydxj"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>1018</pid><project_name>New York State Pavilion Observation Towers Reconstruction</project_name><description>This project will reconstruct portions of the New York State Pavilion Observation Towers in Flushing Meadows Corona Park.</description><category>Parks</category><managing_agency>DPR</managing_agency><client_agency>DPR</client_agency><current_phase>Construction</current_phase><design_start>2015-09-21T00:00:00</design_start><budget_forecast>28778000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>1000.00</total_budget_changes><forecast_completion>2021-07-20T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>772</total_schedule_changes></row><row _id="row-rj7e~h5n6.kkry" _uuid="00000000-0000-0000-02A9-4D66F0092814" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-rj7e~h5n6.kkry"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>1018</pid><project_name>New York State Pavilion Observation Towers Reconstruction</project_name><description>This project will reconstruct portions of the New York State Pavilion Observation Towers in Flushing Meadows Corona Park.</description><category>Parks</category><managing_agency>DPR</managing_agency><client_agency>DPR</client_agency><current_phase>Construction</current_phase><design_start>2015-09-21T00:00:00</design_start><budget_forecast>28778000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>1000.00</total_budget_changes><forecast_completion>2021-07-20T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>772</total_schedule_changes></row><row _id="row-64sb-ksax_9hs2" _uuid="00000000-0000-0000-2187-9A57C086CE43" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-64sb-ksax_9hs2"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>1018</pid><project_name>New York State Pavilion Observation Towers Reconstruction</project_name><description>This project will reconstruct portions of the New York State Pavilion Observation Towers in Flushing Meadows Corona Park.</description><category>Parks</category><managing_agency>DPR</managing_agency><client_agency>DPR</client_agency><current_phase>Construction</current_phase><design_start>2015-09-21T00:00:00</design_start><budget_forecast>28778000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>1000.00</total_budget_changes><forecast_completion>2022-02-28T00:00:00</forecast_completion><latest_schedule_changes>223</latest_schedule_changes><total_schedule_changes>772</total_schedule_changes></row><row _id="row-8eur_w97e.gmvw" _uuid="00000000-0000-0000-F59A-A26400C22564" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-8eur_w97e.gmvw"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>1018</pid><project_name>New York State Pavilion Observation Towers Reconstruction</project_name><description>This project will reconstruct portions of the New York State Pavilion Observation Towers in Flushing Meadows Corona Park.</description><category>Parks</category><managing_agency>DPR</managing_agency><client_agency>DPR</client_agency><current_phase>Construction</current_phase><design_start>2015-09-21T00:00:00</design_start><budget_forecast>28779000.00</budget_forecast><latest_budget_changes>1000.00</latest_budget_changes><total_budget_changes>1000.00</total_budget_changes><forecast_completion>2022-02-28T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>772</total_schedule_changes></row><row _id="row-iy9x.qz44_a62h" _uuid="00000000-0000-0000-1D37-CADF4BDBF340" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-iy9x.qz44_a62h"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>1018</pid><project_name>New York State Pavilion Observation Towers Reconstruction</project_name><description>This project will reconstruct portions of the New York State Pavilion Observation Towers in Flushing Meadows Corona Park.</description><category>Parks</category><managing_agency>DPR</managing_agency><client_agency>DPR</client_agency><current_phase>Construction</current_phase><design_start>2015-09-21T00:00:00</design_start><budget_forecast>28779000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>1000.00</total_budget_changes><forecast_completion>2022-07-01T00:00:00</forecast_completion><latest_schedule_changes>123</latest_schedule_changes><total_schedule_changes>772</total_schedule_changes></row><row _id="row-mjcv.qiee-puk2" _uuid="00000000-0000-0000-ABFA-9EA17B2F4146" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-mjcv.qiee-puk2"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1018</pid><project_name>New York State Pavilion Observation Towers Reconstruction</project_name><description>This project will reconstruct portions of the New York State Pavilion Observation Towers in Flushing Meadows Corona Park.</description><category>Parks</category><managing_agency>DPR</managing_agency><client_agency>DPR</client_agency><current_phase>Construction</current_phase><design_start>2015-09-21T00:00:00</design_start><budget_forecast>28779000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>1000.00</total_budget_changes><forecast_completion>2023-06-01T00:00:00</forecast_completion><latest_schedule_changes>335</latest_schedule_changes><total_schedule_changes>772</total_schedule_changes></row><row _id="row-afq9-etiw-rhqc" _uuid="00000000-0000-0000-E3C0-3A2B429211B9" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-afq9-etiw-rhqc"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1018</pid><project_name>New York State Pavilion Observation Towers Reconstruction</project_name><description>This project will reconstruct portions of the New York State Pavilion Observation Towers in Flushing Meadows Corona Park.</description><category>Parks</category><managing_agency>DPR</managing_agency><client_agency>DPR</client_agency><current_phase>Construction</current_phase><design_start>2015-09-21T00:00:00</design_start><budget_forecast>28779000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>1000.00</total_budget_changes><forecast_completion>2023-06-01T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>772</total_schedule_changes></row><row _id="row-a3ep.5s4t_ngz4" _uuid="00000000-0000-0000-4F6B-96585E8AF0BE" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-a3ep.5s4t_ngz4"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>1019</pid><project_name>Cunningham Park Garage Reconstruction</project_name><description>This project will reconstruct the garage in Cunningham Park.</description><category>Parks</category><managing_agency>DPR</managing_agency><client_agency>DPR</client_agency><current_phase>Design</current_phase><design_start>2018-11-19T00:00:00</design_start><budget_forecast>27060000.00</budget_forecast><total_budget_changes>0.00</total_budget_changes><total_schedule_changes>703</total_schedule_changes></row><row _id="row-ypy9.8pvp.g6zh" _uuid="00000000-0000-0000-5F4C-6D7AAC38DCD6" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ypy9.8pvp.g6zh"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>1019</pid><project_name>Cunningham Park Garage Reconstruction</project_name><description>This project will reconstruct the garage in Cunningham Park.</description><category>Parks</category><managing_agency>DPR</managing_agency><client_agency>DPR</client_agency><current_phase>Design</current_phase><design_start>2018-11-19T00:00:00</design_start><budget_forecast>27060000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2023-02-24T00:00:00</forecast_completion><total_schedule_changes>703</total_schedule_changes></row><row _id="row-3xim~v5gc.7dtb" _uuid="00000000-0000-0000-5895-F2407FA7F67E" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-3xim~v5gc.7dtb"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>1019</pid><project_name>Cunningham Park Garage Reconstruction</project_name><description>This project will reconstruct the garage in Cunningham Park.</description><category>Parks</category><managing_agency>DPR</managing_agency><client_agency>DPR</client_agency><current_phase>Construction Procurement</current_phase><design_start>2018-11-19T00:00:00</design_start><budget_forecast>27060000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2023-05-27T00:00:00</forecast_completion><latest_schedule_changes>92</latest_schedule_changes><total_schedule_changes>703</total_schedule_changes></row><row _id="row-2b3q.4v5w-6yvt" _uuid="00000000-0000-0000-865B-12A495967854" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-2b3q.4v5w-6yvt"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>1019</pid><project_name>Cunningham Park Garage Reconstruction</project_name><description>This project will reconstruct the garage in Cunningham Park.</description><category>Parks</category><managing_agency>DPR</managing_agency><client_agency>DPR</client_agency><current_phase>Construction Procurement</current_phase><design_start>2018-11-19T00:00:00</design_start><budget_forecast>27060000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2023-05-27T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>703</total_schedule_changes></row><row _id="row-yt4h-5s8y.f5gf" _uuid="00000000-0000-0000-7582-2F89D292B3C3" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-yt4h-5s8y.f5gf"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>1019</pid><project_name>Cunningham Park Garage Reconstruction</project_name><description>This project will reconstruct the garage in Cunningham Park.</description><category>Parks</category><managing_agency>DPR</managing_agency><client_agency>DPR</client_agency><current_phase>Construction Procurement</current_phase><design_start>2018-11-19T00:00:00</design_start><budget_forecast>27060000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2023-08-30T00:00:00</forecast_completion><latest_schedule_changes>95</latest_schedule_changes><total_schedule_changes>703</total_schedule_changes></row><row _id="row-unqg-3849_nbwh" _uuid="00000000-0000-0000-A663-D184BCBD3B40" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-unqg-3849_nbwh"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>1019</pid><project_name>Cunningham Park Garage Reconstruction</project_name><description>This project will reconstruct the garage in Cunningham Park.</description><category>Parks</category><managing_agency>DPR</managing_agency><client_agency>DPR</client_agency><current_phase>Construction Procurement</current_phase><design_start>2018-11-19T00:00:00</design_start><budget_forecast>27060000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2024-07-29T00:00:00</forecast_completion><latest_schedule_changes>334</latest_schedule_changes><total_schedule_changes>703</total_schedule_changes></row><row _id="row-i7vk~r5m9_8yjs" _uuid="00000000-0000-0000-F77D-53003E6326C1" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-i7vk~r5m9_8yjs"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>1019</pid><project_name>Cunningham Park Garage Reconstruction</project_name><description>This project will reconstruct the garage in Cunningham Park.</description><category>Parks</category><managing_agency>DPR</managing_agency><client_agency>DPR</client_agency><current_phase>Construction Procurement</current_phase><design_start>2018-11-19T00:00:00</design_start><budget_forecast>27060000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2024-07-29T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>703</total_schedule_changes></row><row _id="row-h6jt.zk4v-mxya" _uuid="00000000-0000-0000-1C2A-F614FF6C7746" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-h6jt.zk4v-mxya"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1019</pid><project_name>Cunningham Park Garage Reconstruction</project_name><description>This project will reconstruct the garage in Cunningham Park.</description><category>Parks</category><managing_agency>DPR</managing_agency><client_agency>DPR</client_agency><current_phase>Construction Procurement</current_phase><design_start>2018-11-19T00:00:00</design_start><budget_forecast>27060000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2025-01-27T00:00:00</forecast_completion><latest_schedule_changes>182</latest_schedule_changes><total_schedule_changes>703</total_schedule_changes></row><row _id="row-sevn_m358-8h9q" _uuid="00000000-0000-0000-A9A2-680A94DC534F" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-sevn_m358-8h9q"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1019</pid><project_name>Cunningham Park Garage Reconstruction</project_name><description>This project will reconstruct the garage in Cunningham Park.</description><category>Parks</category><managing_agency>DPR</managing_agency><client_agency>DPR</client_agency><current_phase>Construction Procurement</current_phase><design_start>2018-11-19T00:00:00</design_start><budget_forecast>27060000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2025-01-27T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>703</total_schedule_changes></row><row _id="row-5thc.r82j_j2ut" _uuid="00000000-0000-0000-751D-FE16AEC43132" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-5thc.r82j_j2ut"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>1022</pid><project_name>NYCF Homeport 2</project_name><description>Development, design, and construction of NYC Ferry Homeport II within Atlantic Basin.</description><category>Ferries</category><managing_agency>EDC</managing_agency><client_agency>EDC</client_agency><current_phase>Design</current_phase><design_start>2020-02-01T00:00:00</design_start><budget_forecast>65000000.00</budget_forecast><total_budget_changes>51220834.00</total_budget_changes><forecast_completion>2023-02-28T00:00:00</forecast_completion><total_schedule_changes>153</total_schedule_changes></row><row _id="row-2zqi.uuac.zzk9" _uuid="00000000-0000-0000-0530-3AE494FFB2F4" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-2zqi.uuac.zzk9"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>1022</pid><project_name>NYCF Homeport 2</project_name><description>Development, design, and construction of NYC Ferry Homeport II within Atlantic Basin.</description><category>Ferries</category><managing_agency>EDC</managing_agency><client_agency>EDC</client_agency><current_phase>Design</current_phase><design_start>2020-02-01T00:00:00</design_start><budget_forecast>65000000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>51220834.00</total_budget_changes><forecast_completion>2023-02-28T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>153</total_schedule_changes></row><row _id="row-bsrd_gxcw~dcwz" _uuid="00000000-0000-0000-B9DE-7F5CCFF25CFC" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-bsrd_gxcw~dcwz"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>1022</pid><project_name>NYCF Homeport 2</project_name><description>Development, design, and construction of NYC Ferry Homeport II within Atlantic Basin.</description><category>Ferries</category><managing_agency>EDC</managing_agency><client_agency>EDC</client_agency><current_phase>Design</current_phase><design_start>2020-02-01T00:00:00</design_start><budget_forecast>65000000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>51220834.00</total_budget_changes><forecast_completion>2023-02-28T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>153</total_schedule_changes></row><row _id="row-7p57_5g5d~jz3e" _uuid="00000000-0000-0000-708D-149E8C11DA78" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-7p57_5g5d~jz3e"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>1022</pid><project_name>NYCF Homeport 2</project_name><description>Development, design, and construction of NYC Ferry Homeport II within Atlantic Basin.</description><category>Ferries</category><managing_agency>EDC</managing_agency><client_agency>EDC</client_agency><current_phase>Design</current_phase><design_start>2020-02-01T00:00:00</design_start><budget_forecast>65000000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>51220834.00</total_budget_changes><forecast_completion>2023-09-17T00:00:00</forecast_completion><latest_schedule_changes>201</latest_schedule_changes><total_schedule_changes>153</total_schedule_changes></row><row _id="row-vgeu-irj7.swb4" _uuid="00000000-0000-0000-7F16-F5C4FDD0C897" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-vgeu-irj7.swb4"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>1022</pid><project_name>NYCF Homeport 2</project_name><description>Development, design, and construction of NYC Ferry Homeport II within Atlantic Basin.</description><category>Ferries</category><managing_agency>EDC</managing_agency><client_agency>EDC</client_agency><current_phase>Construction Procurement</current_phase><design_start>2020-02-01T00:00:00</design_start><budget_forecast>65054340.00</budget_forecast><latest_budget_changes>54340.00</latest_budget_changes><total_budget_changes>51220834.00</total_budget_changes><forecast_completion>2023-09-30T00:00:00</forecast_completion><latest_schedule_changes>13</latest_schedule_changes><total_schedule_changes>153</total_schedule_changes></row><row _id="row-jmzr~z79e.56id" _uuid="00000000-0000-0000-A19B-C3EAACEC8B3E" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-jmzr~z79e.56id"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>1022</pid><project_name>NYCF Homeport 2</project_name><description>Development, design, and construction of NYC Ferry Homeport II within Atlantic Basin.</description><category>Ferries</category><managing_agency>EDC</managing_agency><client_agency>EDC</client_agency><current_phase>Construction Procurement</current_phase><design_start>2020-02-01T00:00:00</design_start><budget_forecast>65000000.00</budget_forecast><latest_budget_changes>-54340.00</latest_budget_changes><total_budget_changes>51220834.00</total_budget_changes><forecast_completion>2024-09-29T00:00:00</forecast_completion><latest_schedule_changes>365</latest_schedule_changes><total_schedule_changes>153</total_schedule_changes></row><row _id="row-yy2z.kmgc_f4sa" _uuid="00000000-0000-0000-4834-12A9676D3810" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-yy2z.kmgc_f4sa"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>1022</pid><project_name>NYCF Homeport 2</project_name><description>Development, design, and construction of NYC Ferry Homeport II within Atlantic Basin.</description><category>Ferries</category><managing_agency>EDC</managing_agency><client_agency>EDC</client_agency><current_phase>Construction Procurement</current_phase><design_start>2020-02-01T00:00:00</design_start><budget_forecast>116220834.00</budget_forecast><latest_budget_changes>51220834.00</latest_budget_changes><total_budget_changes>51220834.00</total_budget_changes><forecast_completion>2024-09-29T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>153</total_schedule_changes></row><row _id="row-gzcd-ydgg_t5ht" _uuid="00000000-0000-0000-1747-2CCCEF2CA2EC" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-gzcd-ydgg_t5ht"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1022</pid><project_name>NYCF Homeport 2</project_name><description>Development, design, and construction of NYC Ferry Homeport II within Atlantic Basin.</description><category>Ferries</category><managing_agency>EDC</managing_agency><client_agency>EDC</client_agency><current_phase>Construction Procurement</current_phase><design_start>2020-02-01T00:00:00</design_start><budget_forecast>116220834.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>51220834.00</total_budget_changes><forecast_completion>2024-09-29T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>153</total_schedule_changes></row><row _id="row-ph8n_gzym_xmz2" _uuid="00000000-0000-0000-EBC8-516D599EEC4F" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ph8n_gzym_xmz2"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1022</pid><project_name>NYCF Homeport 2</project_name><description>Development, design, and construction of NYC Ferry Homeport II within Atlantic Basin.</description><category>Ferries</category><managing_agency>EDC</managing_agency><client_agency>EDC</client_agency><current_phase>Construction</current_phase><design_start>2020-02-01T00:00:00</design_start><budget_forecast>116220834.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>51220834.00</total_budget_changes><forecast_completion>2023-07-31T00:00:00</forecast_completion><latest_schedule_changes>-426</latest_schedule_changes><total_schedule_changes>153</total_schedule_changes></row><row _id="row-vfub-u6sf_6bpp" _uuid="00000000-0000-0000-294F-6EDC2F3A8BA0" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-vfub-u6sf_6bpp"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>1027</pid><project_name>Queens Public School 46 Additionl</project_name><description>ADDITION/PLAYGROUND REDEVELOPMENT PROJECT</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction Procurement</current_phase><design_start>2019-02-01T00:00:00</design_start><budget_forecast>63735015.00</budget_forecast><total_budget_changes>0.00</total_budget_changes><forecast_completion>2022-09-03T00:00:00</forecast_completion><total_schedule_changes>365</total_schedule_changes></row><row _id="row-ihqz_rpxs.rab6" _uuid="00000000-0000-0000-30CD-0D8540E46DC8" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ihqz_rpxs.rab6"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>1027</pid><project_name>Queens Public School 46 Additionl</project_name><description>ADDITION/PLAYGROUND REDEVELOPMENT PROJECT</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2019-02-01T00:00:00</design_start><budget_forecast>63735015.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2022-09-03T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>365</total_schedule_changes></row><row _id="row-bsq4_p68u.zfub" _uuid="00000000-0000-0000-6E28-34B8080CD862" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-bsq4_p68u.zfub"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>1027</pid><project_name>Queens Public School 46 Additionl</project_name><description>ADDITION/PLAYGROUND REDEVELOPMENT PROJECT</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2019-02-01T00:00:00</design_start><budget_forecast>63735015.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2023-09-03T00:00:00</forecast_completion><latest_schedule_changes>365</latest_schedule_changes><total_schedule_changes>365</total_schedule_changes></row><row _id="row-r2mn-2bc4_5yw6" _uuid="00000000-0000-0000-A1E0-2AE42B181C29" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-r2mn-2bc4_5yw6"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>1027</pid><project_name>Queens Public School 46 Additionl</project_name><description>ADDITION / PLAYGROUND REDEVELOPMENT PROJECT</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2019-02-01T00:00:00</design_start><budget_forecast>63735015.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2023-09-03T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>365</total_schedule_changes></row><row _id="row-8fr5~2wt3_mi3u" _uuid="00000000-0000-0000-B1A5-E85EFBC78C17" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-8fr5~2wt3_mi3u"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>1027</pid><project_name>Queens Public School 46 Additionl</project_name><description>ADDITION / PLAYGROUND REDEVELOPMENT PROJECT</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2019-02-01T00:00:00</design_start><budget_forecast>63735015.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2023-09-03T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>365</total_schedule_changes></row><row _id="row-rms5~fa47-uakm" _uuid="00000000-0000-0000-E43E-121116B105A6" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-rms5~fa47-uakm"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>1027</pid><project_name>Queens Public School 46 Additionl</project_name><description>ADDITION / PLAYGROUND REDEVELOPMENT PROJECT</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2019-02-01T00:00:00</design_start><budget_forecast>63735015.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2023-09-03T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>365</total_schedule_changes></row><row _id="row-53js.agui_8yvu" _uuid="00000000-0000-0000-A71B-123DA834DA6F" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-53js.agui_8yvu"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>1027</pid><project_name>Queens Public School 46 Additionl</project_name><description>ADDITION / PLAYGROUND REDEVELOPMENT PROJECT</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2019-02-01T00:00:00</design_start><budget_forecast>63735015.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2023-09-03T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>365</total_schedule_changes></row><row _id="row-e5e8.fkxd_pwm2" _uuid="00000000-0000-0000-F6C4-A23AC2534781" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-e5e8.fkxd_pwm2"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1027</pid><project_name>Queens Public School 46 Additionl</project_name><description>ADDITION / PLAYGROUND REDEVELOPMENT PROJECT</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2019-02-01T00:00:00</design_start><budget_forecast>63735015.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2023-09-03T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>365</total_schedule_changes></row><row _id="row-nps7.w8ka.8b7k" _uuid="00000000-0000-0000-CDA4-AE77EAD14806" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-nps7.w8ka.8b7k"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1027</pid><project_name>Queens Public School 46 Additionl</project_name><description>ADDITION / PLAYGROUND REDEVELOPMENT PROJECT</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2019-02-01T00:00:00</design_start><budget_forecast>63735015.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2023-09-03T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>365</total_schedule_changes></row><row _id="row-72mv-vckv.9bf4" _uuid="00000000-0000-0000-7F3A-98F5D553A681" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-72mv-vckv.9bf4"><date_reported_as_of>2020-01-01T00:00:00</date_reported_as_of><pid>1028</pid><project_name>Queens Public School 169 Addition</project_name><description>ADDITION/WORK IN SUPPORT OF ADDITION/FIRE ALARM SYSTEM</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction Procurement</current_phase><design_start>2019-01-29T00:00:00</design_start><budget_forecast>84400494.00</budget_forecast><total_budget_changes>5307201.00</total_budget_changes><forecast_completion>2023-09-03T00:00:00</forecast_completion><total_schedule_changes>366</total_schedule_changes></row><row _id="row-yicj.y955-nr8x" _uuid="00000000-0000-0000-AB0E-1C49DA947A7C" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-yicj.y955-nr8x"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>1028</pid><project_name>Queens Public School 169 Addition</project_name><description>ADDITION/WORK IN SUPPORT OF ADDITION/FIRE ALARM SYSTEM</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2019-01-29T00:00:00</design_start><budget_forecast>87185686.00</budget_forecast><latest_budget_changes>2785192.00</latest_budget_changes><total_budget_changes>5307201.00</total_budget_changes><forecast_completion>2023-09-03T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>366</total_schedule_changes></row><row _id="row-tkg4.wkrv_f9hd" _uuid="00000000-0000-0000-ADD0-7206727D86FB" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-tkg4.wkrv_f9hd"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>1028</pid><project_name>Queens Public School 169 Addition</project_name><description>ADDITION/WORK IN SUPPORT OF ADDITION/FIRE ALARM SYSTEM</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2019-01-29T00:00:00</design_start><budget_forecast>89707695.00</budget_forecast><latest_budget_changes>2522009.00</latest_budget_changes><total_budget_changes>5307201.00</total_budget_changes><forecast_completion>2023-09-03T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>366</total_schedule_changes></row><row _id="row-t6v7-4esz.qsn9" _uuid="00000000-0000-0000-D35D-40DFDE332ED9" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-t6v7-4esz.qsn9"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>1028</pid><project_name>Queens Public School 169 Addition</project_name><description>ADDITION / WORK IN SUPPORT OF ADDITION / FIRE ALARM SYSTEM</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2019-01-29T00:00:00</design_start><budget_forecast>89707695.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>5307201.00</total_budget_changes><forecast_completion>2024-09-03T00:00:00</forecast_completion><latest_schedule_changes>366</latest_schedule_changes><total_schedule_changes>366</total_schedule_changes></row><row _id="row-3ind~8e8t~xd5s" _uuid="00000000-0000-0000-2BD7-735FDBD7E420" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-3ind~8e8t~xd5s"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>1028</pid><project_name>Queens Public School 169 Addition</project_name><description>ADDITION / WORK IN SUPPORT OF ADDITION / FIRE ALARM SYSTEM</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2019-01-29T00:00:00</design_start><budget_forecast>89707695.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>5307201.00</total_budget_changes><forecast_completion>2024-09-03T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>366</total_schedule_changes></row><row _id="row-6mqn_ymx9_akpk" _uuid="00000000-0000-0000-9929-824F1A686F98" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-6mqn_ymx9_akpk"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>1028</pid><project_name>Queens Public School 169 Addition</project_name><description>ADDITION / WORK IN SUPPORT OF ADDITION / FIRE ALARM SYSTEM</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2019-01-29T00:00:00</design_start><budget_forecast>89707695.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>5307201.00</total_budget_changes><forecast_completion>2024-09-03T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>366</total_schedule_changes></row><row _id="row-zdj3-847m-26ev" _uuid="00000000-0000-0000-80FC-DAB1C1D06407" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-zdj3-847m-26ev"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>1028</pid><project_name>Queens Public School 169 Addition</project_name><description>ADDITION / WORK IN SUPPORT OF ADDITION / FIRE ALARM SYSTEM</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2019-01-29T00:00:00</design_start><budget_forecast>89707695.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>5307201.00</total_budget_changes><forecast_completion>2024-09-03T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>366</total_schedule_changes></row><row _id="row-fx5v~etkj~mpyn" _uuid="00000000-0000-0000-96D2-7DAF8CF207E6" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-fx5v~etkj~mpyn"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1028</pid><project_name>Queens Public School 169 Addition</project_name><description>ADDITION / WORK IN SUPPORT OF ADDITION / FIRE ALARM SYSTEM</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2019-01-29T00:00:00</design_start><budget_forecast>89707695.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>5307201.00</total_budget_changes><forecast_completion>2024-09-03T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>366</total_schedule_changes></row><row _id="row-8ydc.eueu-pg2d" _uuid="00000000-0000-0000-D4DE-C8512A602BCE" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-8ydc.eueu-pg2d"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1028</pid><project_name>Queens Public School 169 Addition</project_name><description>ADDITION / WORK IN SUPPORT OF ADDITION / FIRE ALARM SYSTEM</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2019-01-29T00:00:00</design_start><budget_forecast>89707695.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>5307201.00</total_budget_changes><forecast_completion>2024-09-03T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>366</total_schedule_changes></row><row _id="row-6475~98eu_m556" _uuid="00000000-0000-0000-6865-6477583B63B1" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-6475~98eu_m556"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>1031</pid><project_name>Flushing Meadows Corona Park World's Fair Marina Reconstruction (Hurricane Sandy)</project_name><description>This project will reconstruct the deteriorated fixed piers, floating docks, bulkhead, and related components, including Sandy-damaged elements.</description><category>Parks</category><managing_agency>DPR</managing_agency><client_agency>DPR</client_agency><current_phase>Design</current_phase><design_start>2017-08-15T00:00:00</design_start><budget_forecast>43539637.32</budget_forecast><total_budget_changes>4947362.68</total_budget_changes><total_schedule_changes>708</total_schedule_changes></row><row _id="row-7jnx~jk6r-8ubg" _uuid="00000000-0000-0000-BE7F-F06F98CD1E8C" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-7jnx~jk6r-8ubg"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>1031</pid><project_name>Flushing Meadows Corona Park World's Fair Marina Reconstruction (Hurricane Sandy)</project_name><description>This project will reconstruct the deteriorated fixed piers, floating docks, bulkhead, and related components, including Sandy-damaged elements.</description><category>Parks</category><managing_agency>DPR</managing_agency><client_agency>DPR</client_agency><current_phase>Design</current_phase><design_start>2017-08-15T00:00:00</design_start><budget_forecast>46419218.98</budget_forecast><latest_budget_changes>2879581.66</latest_budget_changes><total_budget_changes>4947362.68</total_budget_changes><forecast_completion>2023-12-17T00:00:00</forecast_completion><total_schedule_changes>708</total_schedule_changes></row><row _id="row-mxhf_93pk~c28g" _uuid="00000000-0000-0000-D52A-F497970C8EF0" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-mxhf_93pk~c28g"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>1031</pid><project_name>Flushing Meadows Corona Park World's Fair Marina Reconstruction (Hurricane Sandy)</project_name><description>This project will reconstruct the deteriorated fixed piers, floating docks, bulkhead, and related components, including Sandy-damaged elements.</description><category>Parks</category><managing_agency>DPR</managing_agency><client_agency>DPR</client_agency><current_phase>Design</current_phase><design_start>2017-08-15T00:00:00</design_start><budget_forecast>48487000.00</budget_forecast><latest_budget_changes>2067781.02</latest_budget_changes><total_budget_changes>4947362.68</total_budget_changes><forecast_completion>2024-10-27T00:00:00</forecast_completion><latest_schedule_changes>315</latest_schedule_changes><total_schedule_changes>708</total_schedule_changes></row><row _id="row-uf4t-42mp-dfmb" _uuid="00000000-0000-0000-AA19-9686782AEC5B" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-uf4t-42mp-dfmb"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>1031</pid><project_name>Flushing Meadows Corona Park World's Fair Marina Reconstruction (Hurricane Sandy)</project_name><description>This project will reconstruct the deteriorated fixed piers, floating docks, bulkhead, and related components, including Sandy-damaged elements.</description><category>Parks</category><managing_agency>DPR</managing_agency><client_agency>DPR</client_agency><current_phase>Design</current_phase><design_start>2017-08-15T00:00:00</design_start><budget_forecast>48487000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>4947362.68</total_budget_changes><forecast_completion>2024-10-27T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>708</total_schedule_changes></row><row _id="row-5d7x~arx2_6e8u" _uuid="00000000-0000-0000-2284-A817D073CE6F" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-5d7x~arx2_6e8u"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>1031</pid><project_name>Flushing Meadows Corona Park World's Fair Marina Reconstruction (Hurricane Sandy)</project_name><description>This project will reconstruct the deteriorated fixed piers, floating docks, bulkhead, and related components, including Sandy-damaged elements.</description><category>Parks</category><managing_agency>DPR</managing_agency><client_agency>DPR</client_agency><current_phase>Design</current_phase><design_start>2017-08-15T00:00:00</design_start><budget_forecast>48487000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>4947362.68</total_budget_changes><forecast_completion>2025-03-23T00:00:00</forecast_completion><latest_schedule_changes>147</latest_schedule_changes><total_schedule_changes>708</total_schedule_changes></row><row _id="row-ax8r-ki2h.h9fh" _uuid="00000000-0000-0000-3C3F-B5DB63C84BE6" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ax8r-ki2h.h9fh"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>1031</pid><project_name>Flushing Meadows Corona Park World's Fair Marina Reconstruction (Hurricane Sandy)</project_name><description>This project will reconstruct the deteriorated fixed piers, floating docks, bulkhead, and related components, including Sandy-damaged elements.</description><category>Parks</category><managing_agency>DPR</managing_agency><client_agency>DPR</client_agency><current_phase>Design</current_phase><design_start>2017-08-15T00:00:00</design_start><budget_forecast>48487000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>4947362.68</total_budget_changes><forecast_completion>2025-06-23T00:00:00</forecast_completion><latest_schedule_changes>92</latest_schedule_changes><total_schedule_changes>708</total_schedule_changes></row><row _id="row-znge.yuby-pz4v" _uuid="00000000-0000-0000-0B6F-2070C7192E4B" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-znge.yuby-pz4v"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1031</pid><project_name>Flushing Meadows Corona Park World's Fair Marina Reconstruction (Hurricane Sandy)</project_name><description>This project will reconstruct the deteriorated fixed piers, floating docks, bulkhead, and related components, including Sandy-damaged elements.</description><category>Parks</category><managing_agency>DPR</managing_agency><client_agency>DPR</client_agency><current_phase>Design</current_phase><design_start>2017-08-15T00:00:00</design_start><budget_forecast>48487000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>4947362.68</total_budget_changes><forecast_completion>2025-11-24T00:00:00</forecast_completion><latest_schedule_changes>154</latest_schedule_changes><total_schedule_changes>708</total_schedule_changes></row><row _id="row-7prd-kdyv_2v9z" _uuid="00000000-0000-0000-46A4-78EC2E68EA10" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-7prd-kdyv_2v9z"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1031</pid><project_name>Flushing Meadows Corona Park World's Fair Marina Reconstruction (Hurricane Sandy)</project_name><description>This project will reconstruct the deteriorated fixed piers, floating docks, bulkhead, and related components, including Sandy-damaged elements.</description><category>Parks</category><managing_agency>DPR</managing_agency><client_agency>DPR</client_agency><current_phase>Design</current_phase><design_start>2017-08-15T00:00:00</design_start><budget_forecast>48487000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>4947362.68</total_budget_changes><total_schedule_changes>708</total_schedule_changes></row><row _id="row-kmv8_54e9-5pdn" _uuid="00000000-0000-0000-1F28-82150E635F94" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-kmv8_54e9-5pdn"><date_reported_as_of>2020-05-01T00:00:00</date_reported_as_of><pid>1032</pid><project_name>Michaelis-Bayswater Park Reconstruction</project_name><description>This project will reconstruct Michaelis-Bayswater Park.</description><category>Parks</category><managing_agency>DPR</managing_agency><client_agency>DPR</client_agency><current_phase>Design</current_phase><design_start>2018-10-29T00:00:00</design_start><budget_forecast>52496606.39</budget_forecast><total_budget_changes>4849393.61</total_budget_changes><total_schedule_changes>280</total_schedule_changes></row><row _id="row-ztqu_3prs~p7cn" _uuid="00000000-0000-0000-5624-81D7DD79A85A" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ztqu_3prs~p7cn"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>1032</pid><project_name>Michaelis-Bayswater Park Reconstruction</project_name><description>This project will reconstruct Michaelis-Bayswater Park.</description><category>Parks</category><managing_agency>DPR</managing_agency><client_agency>DPR</client_agency><current_phase>Design</current_phase><design_start>2018-10-29T00:00:00</design_start><budget_forecast>52329205.34</budget_forecast><latest_budget_changes>-167401.05</latest_budget_changes><total_budget_changes>4849393.61</total_budget_changes><total_schedule_changes>280</total_schedule_changes></row><row _id="row-nxdt~qwat.zyta" _uuid="00000000-0000-0000-35DA-9E3CA88303D7" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-nxdt~qwat.zyta"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>1032</pid><project_name>Michaelis-Bayswater Park Reconstruction</project_name><description>This project will reconstruct Michaelis-Bayswater Park.</description><category>Parks</category><managing_agency>DPR</managing_agency><client_agency>DPR</client_agency><current_phase>Design</current_phase><design_start>2018-10-29T00:00:00</design_start><budget_forecast>52625930.34</budget_forecast><latest_budget_changes>296725.00</latest_budget_changes><total_budget_changes>4849393.61</total_budget_changes><total_schedule_changes>280</total_schedule_changes></row><row _id="row-nuxu_rsvs_8uj6" _uuid="00000000-0000-0000-9293-40512BC4E53A" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-nuxu_rsvs_8uj6"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>1032</pid><project_name>Michaelis-Bayswater Park Reconstruction</project_name><description>This project will reconstruct Michaelis-Bayswater Park.</description><category>Parks</category><managing_agency>DPR</managing_agency><client_agency>DPR</client_agency><current_phase>Design</current_phase><design_start>2018-10-29T00:00:00</design_start><budget_forecast>52705930.34</budget_forecast><latest_budget_changes>80000.00</latest_budget_changes><total_budget_changes>4849393.61</total_budget_changes><total_schedule_changes>280</total_schedule_changes></row><row _id="row-d9uh.pym4-yxa4" _uuid="00000000-0000-0000-8695-9C8A27F34EE2" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-d9uh.pym4-yxa4"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>1032</pid><project_name>Michaelis-Bayswater Park Reconstruction</project_name><description>This project will reconstruct Michaelis-Bayswater Park.</description><category>Parks</category><managing_agency>DPR</managing_agency><client_agency>DPR</client_agency><current_phase>Design</current_phase><design_start>2018-10-29T00:00:00</design_start><budget_forecast>57346000.00</budget_forecast><latest_budget_changes>4640069.66</latest_budget_changes><total_budget_changes>4849393.61</total_budget_changes><forecast_completion>2025-03-23T00:00:00</forecast_completion><total_schedule_changes>280</total_schedule_changes></row><row _id="row-fwye~rrhj~eidz" _uuid="00000000-0000-0000-4795-5DEB050CD083" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-fwye~rrhj~eidz"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>1032</pid><project_name>Michaelis-Bayswater Park Reconstruction</project_name><description>This project will reconstruct Michaelis-Bayswater Park.</description><category>Parks</category><managing_agency>DPR</managing_agency><client_agency>DPR</client_agency><current_phase>Design</current_phase><design_start>2018-10-29T00:00:00</design_start><budget_forecast>57346000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>4849393.61</total_budget_changes><forecast_completion>2025-04-24T00:00:00</forecast_completion><latest_schedule_changes>32</latest_schedule_changes><total_schedule_changes>280</total_schedule_changes></row><row _id="row-mewu-4at5_t2ey" _uuid="00000000-0000-0000-6636-2DF3C2086027" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-mewu-4at5_t2ey"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1032</pid><project_name>Michaelis-Bayswater Park Reconstruction</project_name><description>This project will reconstruct Michaelis-Bayswater Park.</description><category>Parks</category><managing_agency>DPR</managing_agency><client_agency>DPR</client_agency><current_phase>Construction Procurement</current_phase><design_start>2018-10-29T00:00:00</design_start><budget_forecast>57346000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>4849393.61</total_budget_changes><forecast_completion>2025-09-13T00:00:00</forecast_completion><latest_schedule_changes>142</latest_schedule_changes><total_schedule_changes>280</total_schedule_changes></row><row _id="row-acm2_q6hw~3q5s" _uuid="00000000-0000-0000-9A63-0BD67B4E4994" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-acm2_q6hw~3q5s"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1032</pid><project_name>Michaelis-Bayswater Park Reconstruction</project_name><description>This project will reconstruct Michaelis-Bayswater Park.</description><category>Parks</category><managing_agency>DPR</managing_agency><client_agency>DPR</client_agency><current_phase>Construction Procurement</current_phase><design_start>2018-10-29T00:00:00</design_start><budget_forecast>57346000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>4849393.61</total_budget_changes><forecast_completion>2025-12-28T00:00:00</forecast_completion><latest_schedule_changes>106</latest_schedule_changes><total_schedule_changes>280</total_schedule_changes></row><row _id="row-a9fb.xsna~j7i6" _uuid="00000000-0000-0000-F2B8-4907A8C94265" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-a9fb.xsna~j7i6"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>1035</pid><project_name>Next Generation 911 Program</project_name><description>The goal of this program is to replace the current end of life analog system with an Emergency Response System that meets the latest Public Safety standards and regulations in compliance with NENA standards.</description><category>IT, Public Safety and Criminal Justice</category><managing_agency>DOITT</managing_agency><client_agency>NYPD &amp; FDNY</client_agency><current_phase>IT</current_phase><budget_forecast>274307733.78</budget_forecast><total_budget_changes>30123504.48</total_budget_changes><forecast_completion>2024-02-21T00:00:00</forecast_completion><total_schedule_changes>1558</total_schedule_changes></row><row _id="row-j8nw.9hbr.pvhq" _uuid="00000000-0000-0000-77FC-C097926357E0" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-j8nw.9hbr.pvhq"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>1035</pid><project_name>Next Generation 911 Program</project_name><description>The goal of this program is to replace the current end of life analog system with an Emergency Response System that meets the latest Public Safety standards and regulations in compliance with NENA standards.</description><category>IT, Public Safety and Criminal Justice</category><managing_agency>DOITT</managing_agency><client_agency>NYPD &amp; FDNY</client_agency><current_phase>IT</current_phase><budget_forecast>308767387.16</budget_forecast><latest_budget_changes>34459653.38</latest_budget_changes><total_budget_changes>30123504.48</total_budget_changes><forecast_completion>2024-02-21T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1558</total_schedule_changes></row><row _id="row-f7nm~v9yx_yuhk" _uuid="00000000-0000-0000-1681-90627C12B6FA" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-f7nm~v9yx_yuhk"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>1035</pid><project_name>Next Generation 911 Program</project_name><description>The goal of this program is to replace the current end of life analog system with an Emergency Response System that meets the latest Public Safety standards and regulations in compliance with NENA standards.</description><category>IT, Public Safety and Criminal Justice</category><managing_agency>DOITT</managing_agency><client_agency>NYPD &amp; FDNY</client_agency><current_phase>IT</current_phase><budget_forecast>262070251.70</budget_forecast><latest_budget_changes>-46697135.46</latest_budget_changes><total_budget_changes>30123504.48</total_budget_changes><forecast_completion>2020-09-25T00:00:00</forecast_completion><total_schedule_changes>1558</total_schedule_changes></row><row _id="row-8kfi~gcbi.awdz" _uuid="00000000-0000-0000-7B83-FE48D681502B" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-8kfi~gcbi.awdz"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>1035</pid><project_name>Next Generation 911 Program</project_name><description>The goal of this program is to replace the current end of life analog system with an Emergency Response System that meets the latest Public Safety standards and regulations in compliance with NENA standards.</description><category>IT, Public Safety and Criminal Justice</category><managing_agency>DOITT</managing_agency><client_agency>NYPD &amp; FDNY</client_agency><current_phase>IT</current_phase><budget_forecast>279671960.27</budget_forecast><latest_budget_changes>17601708.57</latest_budget_changes><total_budget_changes>30123504.48</total_budget_changes><forecast_completion>2024-12-31T00:00:00</forecast_completion><latest_schedule_changes>1558</latest_schedule_changes><total_schedule_changes>1558</total_schedule_changes></row><row _id="row-mmsa-8mqu-bjfa" _uuid="00000000-0000-0000-F056-4757F1236981" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-mmsa-8mqu-bjfa"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>1035</pid><project_name>Next Generation 911 Program</project_name><description>The goal of this program is to replace the current end of life analog system with an Emergency Response System that meets the latest Public Safety standards and regulations in compliance with NENA standards.</description><category>IT, Public Safety and Criminal Justice</category><managing_agency>DOITT</managing_agency><client_agency>NYPD &amp; FDNY</client_agency><current_phase>IT</current_phase><budget_forecast>293867126.52</budget_forecast><latest_budget_changes>14195166.25</latest_budget_changes><total_budget_changes>30123504.48</total_budget_changes><forecast_completion>2024-12-31T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1558</total_schedule_changes></row><row _id="row-cj4w~xb8g_nquc" _uuid="00000000-0000-0000-E077-19E3906DC1DC" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-cj4w~xb8g_nquc"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1035</pid><project_name>Next Generation 911 Program</project_name><description>The goal of this program is to replace the current end of life analog system with an Emergency Response System that meets the latest Public Safety standards and regulations in compliance with NENA standards.</description><category>IT, Public Safety and Criminal Justice</category><managing_agency>DOITT</managing_agency><client_agency>NYPD &amp; FDNY</client_agency><current_phase>IT</current_phase><budget_forecast>285460866.72</budget_forecast><latest_budget_changes>-8406259.80</latest_budget_changes><total_budget_changes>30123504.48</total_budget_changes><forecast_completion>2024-12-31T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1558</total_schedule_changes></row><row _id="row-ndgu-de3f-atcu" _uuid="00000000-0000-0000-1FCA-FEE4A5028EB0" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ndgu-de3f-atcu"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1035</pid><project_name>Next Generation 911 Program</project_name><description>The goal of this program is to replace the current end of life analog system with an Emergency Response System that meets the latest Public Safety standards and regulations in compliance with NENA standards.</description><category>IT, Public Safety and Criminal Justice</category><managing_agency>DOITT</managing_agency><client_agency>NYPD &amp; FDNY</client_agency><current_phase>IT</current_phase><budget_forecast>304431238.26</budget_forecast><latest_budget_changes>18970371.54</latest_budget_changes><total_budget_changes>30123504.48</total_budget_changes><forecast_completion>2024-12-31T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1558</total_schedule_changes></row><row _id="row-mt3n_zh3e.bw4h" _uuid="00000000-0000-0000-8386-07D0BB8232CE" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-mt3n_zh3e.bw4h"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1039</pid><project_name>Upgrade of Paerdegat, Avenue U, and 19th Street Pumping Stations</project_name><description>Design for the reconstruction or  rehabilitation of the Paerdegat, Avenue U, and 19th Street Pumping Stations.</description><category>Wastewater Treatment</category><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2022-09-01T00:00:00</design_start><budget_forecast>101030936.00</budget_forecast><latest_budget_changes>-8003328.00</latest_budget_changes><total_budget_changes>-8003328.00</total_budget_changes><forecast_completion>2027-05-09T00:00:00</forecast_completion><latest_schedule_changes>525</latest_schedule_changes><total_schedule_changes>525</total_schedule_changes></row><row _id="row-vvsz~pfs6-34fg" _uuid="00000000-0000-0000-2AD5-35CC4EA4CDBA" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-vvsz~pfs6-34fg"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1039</pid><project_name>Upgrade of Paerdegat, Avenue U, and 19th Street Pumping Stations</project_name><description>Design for the reconstruction or  rehabilitation of the Paerdegat, Avenue U, and 19th Street Pumping Stations.</description><category>Wastewater Treatment</category><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2022-09-01T00:00:00</design_start><budget_forecast>101030936.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-8003328.00</total_budget_changes><forecast_completion>2027-05-09T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>525</total_schedule_changes></row><row _id="row-msd8.sg8v_cfzk" _uuid="00000000-0000-0000-2D6E-637F4815FCA6" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-msd8.sg8v_cfzk"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>1040</pid><project_name>Reconstruction of Mersereau, Richmond Ave and Mayflower Ave PSs</project_name><description>Design &amp; DSDC for the upgrade of three NYCDEP Pumping Stations. The scope of the project is to provide a safe, reliable, efficient, resilient and low maintenance pumping station for the Operating Bureau.</description><category>Wastewater Treatment</category><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2021-04-30T00:00:00</design_start><budget_forecast>110301093.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>45860651.80</total_budget_changes><forecast_completion>2024-07-04T00:00:00</forecast_completion><latest_schedule_changes>88</latest_schedule_changes><total_schedule_changes>641</total_schedule_changes></row><row _id="row-wjmx_yuvr.37re" _uuid="00000000-0000-0000-1773-629E47A46469" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-wjmx_yuvr.37re"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>1040</pid><project_name>Reconstruction of Mersereau, Richmond Ave and Mayflower Ave PSs</project_name><description>Design &amp; DSDC for the upgrade of three NYCDEP Pumping Stations. The scope of the project is to provide a safe, reliable, efficient, resilient and low maintenance pumping station for the Operating Bureau.</description><category>Wastewater Treatment</category><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2021-04-30T00:00:00</design_start><budget_forecast>110301093.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>45860651.80</total_budget_changes><forecast_completion>2024-07-04T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>641</total_schedule_changes></row><row _id="row-2vcx~rsdt_kv26" _uuid="00000000-0000-0000-18F5-437881DA659A" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-2vcx~rsdt_kv26"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>1040</pid><project_name>Reconstruction of Mersereau, Richmond Ave and Mayflower Ave PSs</project_name><description>Design &amp; DSDC for the upgrade of three NYCDEP Pumping Stations. The scope of the project is to provide a safe, reliable, efficient, resilient and low maintenance pumping station for the Operating Bureau.</description><category>Wastewater Treatment</category><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2021-04-30T00:00:00</design_start><budget_forecast>139539613.00</budget_forecast><latest_budget_changes>29238520.00</latest_budget_changes><total_budget_changes>45860651.80</total_budget_changes><forecast_completion>2024-11-07T00:00:00</forecast_completion><latest_schedule_changes>126</latest_schedule_changes><total_schedule_changes>641</total_schedule_changes></row><row _id="row-qzge-ex2u.2gg5" _uuid="00000000-0000-0000-4ABB-0CE346B59F67" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-qzge-ex2u.2gg5"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>1040</pid><project_name>Reconstruction of Mersereau, Richmond Ave and Mayflower Ave PSs</project_name><description>Design &amp; DSDC for the upgrade of three NYCDEP Pumping Stations. The scope of the project is to provide a safe, reliable, efficient, resilient and low maintenance pumping station for the Operating Bureau.</description><category>Wastewater Treatment</category><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2021-04-30T00:00:00</design_start><budget_forecast>139539613.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>45860651.80</total_budget_changes><forecast_completion>2025-05-09T00:00:00</forecast_completion><latest_schedule_changes>183</latest_schedule_changes><total_schedule_changes>641</total_schedule_changes></row><row _id="row-9pis~3urc~zcjp" _uuid="00000000-0000-0000-A6AF-7BDC3B34DCAA" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-9pis~3urc~zcjp"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1040</pid><project_name>Reconstruction of Mersereau, Richmond Ave and Mayflower Ave PSs</project_name><description>Design &amp; DSDC for the upgrade of three NYCDEP Pumping Stations. The scope of the project is to provide a safe, reliable, efficient, resilient and low maintenance pumping station for the Operating Bureau.</description><category>Wastewater Treatment</category><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2021-04-30T00:00:00</design_start><budget_forecast>155194829.80</budget_forecast><latest_budget_changes>15655216.80</latest_budget_changes><total_budget_changes>45860651.80</total_budget_changes><forecast_completion>2025-11-07T00:00:00</forecast_completion><latest_schedule_changes>182</latest_schedule_changes><total_schedule_changes>641</total_schedule_changes></row><row _id="row-6d25-5unf-6su2" _uuid="00000000-0000-0000-6288-FAE121F976DC" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-6d25-5unf-6su2"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1040</pid><project_name>Reconstruction of Mersereau, Richmond Ave and Mayflower Ave PSs</project_name><description>Design &amp; DSDC for the upgrade of three NYCDEP Pumping Stations. The scope of the project is to provide a safe, reliable, efficient, resilient and low maintenance pumping station for the Operating Bureau.</description><category>Wastewater Treatment</category><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2021-04-30T00:00:00</design_start><budget_forecast>156161744.80</budget_forecast><latest_budget_changes>966915.00</latest_budget_changes><total_budget_changes>45860651.80</total_budget_changes><forecast_completion>2026-01-08T00:00:00</forecast_completion><latest_schedule_changes>62</latest_schedule_changes><total_schedule_changes>641</total_schedule_changes></row><row _id="row-msf5_25be~gxz2" _uuid="00000000-0000-0000-6BE2-8E25700F7F8D" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-msf5_25be~gxz2"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>1042</pid><project_name>City Tunnel No.3, Stage 2 in Queens and Brooklyn, Construction of Shaft 17B and 18B</project_name><description>Contract C547A is for the construction of two shafts (17B-1 and 18B-1) on City Tunnel No. 3 (CT3), Stage 2 in Queens and Brooklyn</description><category>Water Supply</category><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2019-01-30T00:00:00</design_start><budget_forecast>443063583.00</budget_forecast><total_budget_changes>3150108.42</total_budget_changes><forecast_completion>2027-01-11T00:00:00</forecast_completion><total_schedule_changes>119</total_schedule_changes></row><row _id="row-2ksg.f42e-hhzc" _uuid="00000000-0000-0000-3298-5D085572EA29" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-2ksg.f42e-hhzc"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>1042</pid><project_name>City Tunnel No.3, Stage 2 in Queens and Brooklyn, Construction of Shaft 17B and 18B</project_name><description>Contract C547A is for the construction of two shafts (17B-1 and 18B-1) on City Tunnel No. 3 (CT3), Stage 2 in Queens and Brooklyn</description><category>Water Supply</category><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2019-01-30T00:00:00</design_start><budget_forecast>440909294.76</budget_forecast><latest_budget_changes>-2154288.24</latest_budget_changes><total_budget_changes>3150108.42</total_budget_changes><forecast_completion>2027-01-24T00:00:00</forecast_completion><latest_schedule_changes>13</latest_schedule_changes><total_schedule_changes>119</total_schedule_changes></row><row _id="row-tyqr~khn3.gugm" _uuid="00000000-0000-0000-53D5-A0A046A8A437" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-tyqr~khn3.gugm"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>1042</pid><project_name>City Tunnel No.3, Stage 2 in Queens and Brooklyn, Construction of Shaft 17B and 18B</project_name><description>Contract C547A is for the construction of two shafts (17B-1 and 18B-1) on City Tunnel No. 3 (CT3), Stage 2 in Queens and Brooklyn</description><category>Water Supply</category><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2019-01-30T00:00:00</design_start><budget_forecast>441764060.05</budget_forecast><latest_budget_changes>854765.29</latest_budget_changes><total_budget_changes>3150108.42</total_budget_changes><forecast_completion>2027-01-24T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>119</total_schedule_changes></row><row _id="row-yiir~hjtx~iivc" _uuid="00000000-0000-0000-AD9C-91F1282A895A" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-yiir~hjtx~iivc"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>1042</pid><project_name>City Tunnel No.3, Stage 2 in Queens and Brooklyn, Construction of Shaft 17B and 18B</project_name><description>Contract C547A is for the construction of two shafts (17B-1 and 18B-1) on City Tunnel No. 3 (CT3), Stage 2 in Queens and Brooklyn</description><category>Water Supply</category><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2019-01-30T00:00:00</design_start><budget_forecast>438180571.59</budget_forecast><latest_budget_changes>-3583488.46</latest_budget_changes><total_budget_changes>3150108.42</total_budget_changes><forecast_completion>2027-01-24T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>119</total_schedule_changes></row><row _id="row-sfdg-5nk2~mgha" _uuid="00000000-0000-0000-A96E-042BFCC36692" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-sfdg-5nk2~mgha"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>1042</pid><project_name>City Tunnel No.3, Stage 2 in Queens and Brooklyn, Construction of Shaft 17B and 18B</project_name><description>Contract C547A is for the construction of two shafts (17B-1 and 18B-1) on City Tunnel No. 3 (CT3), Stage 2 in Queens and Brooklyn</description><category>Water Supply</category><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2019-01-30T00:00:00</design_start><budget_forecast>438646645.87</budget_forecast><latest_budget_changes>466074.28</latest_budget_changes><total_budget_changes>3150108.42</total_budget_changes><forecast_completion>2027-01-24T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>119</total_schedule_changes></row><row _id="row-diej~ufdy_npw5" _uuid="00000000-0000-0000-ECC8-17C36B591A6D" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-diej~ufdy_npw5"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1042</pid><project_name>City Tunnel No.3, Stage 2 in Queens and Brooklyn, Construction of Shaft 17B and 18B</project_name><description>Contract C547A is for the construction of two shafts (17B-1 and 18B-1) on City Tunnel No. 3 (CT3), Stage 2 in Queens and Brooklyn</description><category>Water Supply</category><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2019-01-30T00:00:00</design_start><budget_forecast>444603572.68</budget_forecast><latest_budget_changes>5956926.81</latest_budget_changes><total_budget_changes>3150108.42</total_budget_changes><forecast_completion>2027-01-24T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>119</total_schedule_changes></row><row _id="row-5mqn_mqub_hdh9" _uuid="00000000-0000-0000-473B-4FFEFBAE1FCD" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-5mqn_mqub_hdh9"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1042</pid><project_name>City Tunnel No.3, Stage 2 in Queens and Brooklyn, Construction of Shaft 17B and 18B</project_name><description>Contract C547A is for the construction of two shafts (17B-1 and 18B-1) on City Tunnel No. 3 (CT3), Stage 2 in Queens and Brooklyn</description><category>Water Supply</category><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Construction</current_phase><design_start>2019-01-30T00:00:00</design_start><budget_forecast>446213691.42</budget_forecast><latest_budget_changes>1610118.74</latest_budget_changes><total_budget_changes>3150108.42</total_budget_changes><forecast_completion>2027-05-10T00:00:00</forecast_completion><latest_schedule_changes>106</latest_schedule_changes><total_schedule_changes>119</total_schedule_changes></row><row _id="row-7dzp-xwes-dbcx" _uuid="00000000-0000-0000-88EA-6497111CC9C7" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-7dzp-xwes-dbcx"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>1043</pid><project_name>33rd Street West of 11th Avenue (Hudson Yards)</project_name><category>Bridges</category><managing_agency>DOT</managing_agency><client_agency>EDC</client_agency><current_phase>Design</current_phase><budget_forecast>100000104.00</budget_forecast><total_budget_changes>-1399960.00</total_budget_changes><total_schedule_changes>611</total_schedule_changes></row><row _id="row-zgpc_gpug_ftgr" _uuid="00000000-0000-0000-07E5-33ED39660B53" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-zgpc_gpug_ftgr"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>1043</pid><project_name>33rd Street West of 11th Avenue (Hudson Yards)</project_name><category>Bridges</category><managing_agency>DOT</managing_agency><client_agency>EDC</client_agency><total_budget_changes>-1399960.00</total_budget_changes><total_schedule_changes>611</total_schedule_changes></row><row _id="row-3tir~k2ev-ypmq" _uuid="00000000-0000-0000-7C2D-13CE0441ED16" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-3tir~k2ev-ypmq"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>1043</pid><project_name>33rd Street West of 11th Avenue (Hudson Yards)</project_name><category>Bridges</category><managing_agency>DOT</managing_agency><client_agency>EDC</client_agency><current_phase>Design</current_phase><design_start>2017-04-01T00:00:00</design_start><budget_forecast>100580144.00</budget_forecast><latest_budget_changes>580040.00</latest_budget_changes><total_budget_changes>-1399960.00</total_budget_changes><forecast_completion>2028-02-28T00:00:00</forecast_completion><total_schedule_changes>611</total_schedule_changes></row><row _id="row-aeij-7xyg-ekw5" _uuid="00000000-0000-0000-01DB-8CD8700F39C8" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-aeij-7xyg-ekw5"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>1043</pid><project_name>33rd Street West of 11th Avenue (Hudson Yards)</project_name><category>Bridges</category><managing_agency>DOT</managing_agency><client_agency>EDC</client_agency><current_phase>Design</current_phase><design_start>2017-04-01T00:00:00</design_start><budget_forecast>100000104.00</budget_forecast><latest_budget_changes>-580040.00</latest_budget_changes><total_budget_changes>-1399960.00</total_budget_changes><forecast_completion>2029-01-11T00:00:00</forecast_completion><latest_schedule_changes>318</latest_schedule_changes><total_schedule_changes>611</total_schedule_changes></row><row _id="row-q96p~cn3n.7ksz" _uuid="00000000-0000-0000-0939-883058C616AB" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-q96p~cn3n.7ksz"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>1043</pid><project_name>33rd Street West of 11th Avenue (Hudson Yards)</project_name><category>Bridges</category><managing_agency>DOT</managing_agency><client_agency>EDC</client_agency><current_phase>Design</current_phase><design_start>2017-04-01T00:00:00</design_start><budget_forecast>100000104.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-1399960.00</total_budget_changes><forecast_completion>2029-01-11T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>611</total_schedule_changes></row><row _id="row-fqvx.tk35~4qda" _uuid="00000000-0000-0000-5D24-F436277B8BD3" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-fqvx.tk35~4qda"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1043</pid><project_name>33rd Street West of 11th Avenue (Hudson Yards)</project_name><category>Bridges</category><managing_agency>DOT</managing_agency><client_agency>EDC</client_agency><current_phase>Design</current_phase><design_start>2017-04-01T00:00:00</design_start><budget_forecast>100196144.00</budget_forecast><latest_budget_changes>196040.00</latest_budget_changes><total_budget_changes>-1399960.00</total_budget_changes><forecast_completion>2029-05-04T00:00:00</forecast_completion><latest_schedule_changes>113</latest_schedule_changes><total_schedule_changes>611</total_schedule_changes></row><row _id="row-4ggc~xj7w~4p85" _uuid="00000000-0000-0000-7224-20B1DF9DB211" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-4ggc~xj7w~4p85"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1043</pid><project_name>33rd Street West of 11th Avenue (Hudson Yards)</project_name><description>Project On Hold awaiting potential reprogramming
33rd Street West of 11th Avenue (Hudson Yards)</description><category>Bridges</category><managing_agency>DOT</managing_agency><client_agency>EDC</client_agency><current_phase>Design</current_phase><design_start>2017-04-01T00:00:00</design_start><budget_forecast>98600144.00</budget_forecast><latest_budget_changes>-1596000.00</latest_budget_changes><total_budget_changes>-1399960.00</total_budget_changes><forecast_completion>2029-10-31T00:00:00</forecast_completion><latest_schedule_changes>180</latest_schedule_changes><total_schedule_changes>611</total_schedule_changes></row><row _id="row-dj5a_y2pp~zv2b" _uuid="00000000-0000-0000-170E-BDF0EF34DA6E" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-dj5a_y2pp~zv2b"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1048</pid><project_name>FDNY/NFPA CODE UPDATE HHP VARIOUS AND PARK AVE TUNNEL</project_name><description>Total Design and Construction Support Services to Bring Following Three Locations in Compliance with NYC Fire Codes: Overbuild Bridge (Amtrak Tunnel) Situated over Amtrak Rail Tracks within Riverside Park between West 72nd St to West 123rd St (BIN: Various), 1st Ave Tunnel (BIN: 2-24657-0) and Park Ave Tunnel (BIN: 2-24654-0)</description><category>Bridges</category><managing_agency>DOT</managing_agency><client_agency>n/a</client_agency><current_phase>Design</current_phase><design_start>2019-07-08T00:00:00</design_start><budget_forecast>62927040.00</budget_forecast><latest_budget_changes>-765000.00</latest_budget_changes><total_budget_changes>328000.00</total_budget_changes><forecast_completion>2030-05-05T00:00:00</forecast_completion><latest_schedule_changes>200</latest_schedule_changes><total_schedule_changes>428</total_schedule_changes></row><row _id="row-pdf7~wnue-ec85" _uuid="00000000-0000-0000-6FE1-4A8C05D163BB" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-pdf7~wnue-ec85"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>1049</pid><project_name>HEMPSTEAD AVE BR/CIP 2231780</project_name><category>Bridges, Streets and Roadways</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><total_budget_changes>1747189.00</total_budget_changes><total_schedule_changes>327</total_schedule_changes></row><row _id="row-7ugn-zsiu_ixhk" _uuid="00000000-0000-0000-FCD0-5CA03E43DC4B" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-7ugn-zsiu_ixhk"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>1049</pid><project_name>HEMPSTEAD AVE BR/CIP 2231780</project_name><description>Rehabilitation of Hempstead Avenue Bridge over Cross island Parkway</description><category>Bridges, Streets and Roadways</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2022-01-31T00:00:00</design_start><budget_forecast>87976719.00</budget_forecast><latest_budget_changes>-1.00</latest_budget_changes><total_budget_changes>1747189.00</total_budget_changes><forecast_completion>2030-04-23T00:00:00</forecast_completion><latest_schedule_changes>327</latest_schedule_changes><total_schedule_changes>327</total_schedule_changes></row><row _id="row-pper_mfmx~f7xu" _uuid="00000000-0000-0000-3243-0EF7D8130C89" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-pper_mfmx~f7xu"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>1049</pid><project_name>HEMPSTEAD AVE BR/CIP 2231780</project_name><description>Rehabilitation of Hempstead Avenue Bridge over Cross island Parkway</description><category>Bridges, Streets and Roadways</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2022-01-31T00:00:00</design_start><budget_forecast>2279189.00</budget_forecast><latest_budget_changes>-85697530.00</latest_budget_changes><total_budget_changes>1747189.00</total_budget_changes><forecast_completion>2030-04-23T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>327</total_schedule_changes></row><row _id="row-n44x-m28y_fyi9" _uuid="00000000-0000-0000-813A-739B3FB5DD26" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-n44x-m28y_fyi9"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1049</pid><project_name>HEMPSTEAD AVE BR/CIP 2231780</project_name><description>Rehabilitation of Hempstead Avenue Bridge over Cross island Parkway</description><category>Bridges, Streets and Roadways</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2022-01-31T00:00:00</design_start><budget_forecast>88672189.00</budget_forecast><latest_budget_changes>86393000.00</latest_budget_changes><total_budget_changes>1747189.00</total_budget_changes><forecast_completion>2030-04-23T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>327</total_schedule_changes></row><row _id="row-d8gz~9j3e-ehy6" _uuid="00000000-0000-0000-78FB-3A5A66FC8FE1" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-d8gz~9j3e-ehy6"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1049</pid><project_name>HEMPSTEAD AVE BR/CIP 2231780</project_name><description>Rehabilitation of Hempstead Avenue Bridge over Cross island Parkway</description><category>Bridges, Streets and Roadways</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2022-01-31T00:00:00</design_start><budget_forecast>89723909.00</budget_forecast><latest_budget_changes>1051720.00</latest_budget_changes><total_budget_changes>1747189.00</total_budget_changes><forecast_completion>2030-04-23T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>327</total_schedule_changes></row><row _id="row-xisn.xnug~t69s" _uuid="00000000-0000-0000-88D0-B2BE23692004" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-xisn.xnug~t69s"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>1050</pid><project_name>HEMPSTEAD AVE OVER BCIP RAMP NB BIN 2266149</project_name><category>Bridges, Streets and Roadways</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><total_budget_changes>597042.00</total_budget_changes><total_schedule_changes>402</total_schedule_changes></row><row _id="row-z6h9.syc2-7wep" _uuid="00000000-0000-0000-63B1-D24BE6535FD8" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-z6h9.syc2-7wep"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>1050</pid><project_name>HEMPSTEAD AVE OVER BCIP RAMP NB BIN 2266149</project_name><description>Rehabilitation of Hempstead Avenue Bridges over Cross island Parkway (Northbound)</description><category>Bridges, Streets and Roadways</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2022-01-31T00:00:00</design_start><budget_forecast>32021000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>597042.00</total_budget_changes><forecast_completion>2030-04-23T00:00:00</forecast_completion><latest_schedule_changes>327</latest_schedule_changes><total_schedule_changes>402</total_schedule_changes></row><row _id="row-bf3m~phc5_ec63" _uuid="00000000-0000-0000-0869-4877887C4039" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-bf3m~phc5_ec63"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>1050</pid><project_name>HEMPSTEAD AVE OVER BCIP RAMP NB BIN 2266149</project_name><description>Rehabilitation of Hempstead Avenue Bridges over Cross island Parkway (Northbound)</description><category>Bridges, Streets and Roadways</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2022-01-31T00:00:00</design_start><budget_forecast>32168000.00</budget_forecast><latest_budget_changes>147000.00</latest_budget_changes><total_budget_changes>597042.00</total_budget_changes><forecast_completion>2030-07-07T00:00:00</forecast_completion><latest_schedule_changes>75</latest_schedule_changes><total_schedule_changes>402</total_schedule_changes></row><row _id="row-yk9x-yrqr_dxrh" _uuid="00000000-0000-0000-24D1-7108934CE3A9" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-yk9x-yrqr_dxrh"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1050</pid><project_name>HEMPSTEAD AVE OVER BCIP RAMP NB BIN 2266149</project_name><description>Rehabilitation of Hempstead Avenue Bridges over Cross island Parkway (Northbound)</description><category>Bridges, Streets and Roadways</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2022-01-31T00:00:00</design_start><budget_forecast>33743042.00</budget_forecast><latest_budget_changes>1575042.00</latest_budget_changes><total_budget_changes>597042.00</total_budget_changes><forecast_completion>2030-07-07T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>402</total_schedule_changes></row><row _id="row-dwjk-9p3m.e8bf" _uuid="00000000-0000-0000-9A0A-5D7367D7F067" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-dwjk-9p3m.e8bf"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1050</pid><project_name>HEMPSTEAD AVE OVER BCIP RAMP NB BIN 2266149</project_name><description>Rehabilitation of Hempstead Avenue Bridge over Cross Island Parkway (Service Road), In Borough of Queens</description><category>Bridges, Streets and Roadways</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2022-01-31T00:00:00</design_start><budget_forecast>32618042.00</budget_forecast><latest_budget_changes>-1125000.00</latest_budget_changes><total_budget_changes>597042.00</total_budget_changes><forecast_completion>2030-07-07T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>402</total_schedule_changes></row><row _id="row-9vzc_sqrg-x3b6" _uuid="00000000-0000-0000-707C-6FAB1DA5AE2B" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-9vzc_sqrg-x3b6"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>1069</pid><project_name>Parking Meters Retrofitted for License Plate Recognition</project_name><category>Streets and Roadways</category><managing_agency>DOT</managing_agency><current_phase>Construction</current_phase><budget_forecast>55820500.00</budget_forecast><latest_budget_changes>14307500.00</latest_budget_changes><total_budget_changes>-500.00</total_budget_changes></row><row _id="row-nu27.5eue_mg7i" _uuid="00000000-0000-0000-45A5-DF2697B3A223" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-nu27.5eue_mg7i"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>1069</pid><project_name>Parking Meters Retrofitted for License Plate Recognition</project_name><category>Streets and Roadways</category><managing_agency>DOT</managing_agency><current_phase>Construction</current_phase><budget_forecast>41512500.00</budget_forecast><latest_budget_changes>-14308000.00</latest_budget_changes><total_budget_changes>-500.00</total_budget_changes></row><row _id="row-b6wk-uxvx-amd5" _uuid="00000000-0000-0000-2B89-ED99AF6F445E" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-b6wk-uxvx-amd5"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1069</pid><project_name>Parking Meters Retrofitted for License Plate Recognition</project_name><category>Streets and Roadways</category><managing_agency>DOT</managing_agency><current_phase>Construction</current_phase><budget_forecast>43522500.00</budget_forecast><latest_budget_changes>2010000.00</latest_budget_changes><total_budget_changes>-500.00</total_budget_changes></row><row _id="row-cs9u~4jxx_ihti" _uuid="00000000-0000-0000-A2E9-8C0BA8D2E2EF" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-cs9u~4jxx_ihti"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1069</pid><project_name>Parking Meters Retrofitted for License Plate Recognition</project_name><category>Streets and Roadways</category><managing_agency>DOT</managing_agency><current_phase>Construction</current_phase><budget_forecast>41512500.00</budget_forecast><latest_budget_changes>-2010000.00</latest_budget_changes><total_budget_changes>-500.00</total_budget_changes></row><row _id="row-cr2r~ieer-kshg" _uuid="00000000-0000-0000-2ECA-3AFCBAB31F6E" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-cr2r~ieer-kshg"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>1071</pid><project_name>Purchase and Install Speed Cameras in School  Zones Areas</project_name><category>Streets and Roadways</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><budget_forecast>254481068.00</budget_forecast><latest_budget_changes>62938080.00</latest_budget_changes><total_budget_changes>-19999521.00</total_budget_changes></row><row _id="row-hg8i~z86x-fd38" _uuid="00000000-0000-0000-8024-2C42D69C31DE" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-hg8i~z86x-fd38"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>1071</pid><project_name>Purchase and Install Speed Cameras in School  Zones Areas</project_name><category>Streets and Roadways</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><budget_forecast>191543068.00</budget_forecast><latest_budget_changes>-62938000.00</latest_budget_changes><total_budget_changes>-19999521.00</total_budget_changes></row><row _id="row-8j4n-xvsz.8pt8" _uuid="00000000-0000-0000-177A-167E964E761C" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-8j4n-xvsz.8pt8"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1071</pid><project_name>Purchase and Install Speed Cameras in School  Zones Areas</project_name><category>Streets and Roadways</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><budget_forecast>256354467.00</budget_forecast><latest_budget_changes>64811399.00</latest_budget_changes><total_budget_changes>-19999521.00</total_budget_changes></row><row _id="row-q2jp.99tt-wsc8" _uuid="00000000-0000-0000-D601-DE76C462DFAE" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-q2jp.99tt-wsc8"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1071</pid><project_name>Purchase and Install Speed Cameras in School  Zones Areas</project_name><category>Streets and Roadways</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><design_start>2019-08-01T00:00:00</design_start><budget_forecast>191543467.00</budget_forecast><latest_budget_changes>-64811000.00</latest_budget_changes><total_budget_changes>-19999521.00</total_budget_changes><forecast_completion>2023-06-30T00:00:00</forecast_completion></row><row _id="row-jg9x-thid.htjt" _uuid="00000000-0000-0000-D875-524C49D4DB7B" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-jg9x-thid.htjt"><date_reported_as_of>2020-10-01T00:00:00</date_reported_as_of><pid>1073</pid><project_name>HILL DR (TERRACE BR) OVER PROSPECT PARK LAKE BIN 2244120</project_name><category>Bridges</category><managing_agency>DOT</managing_agency><client_agency>NYC Parks</client_agency><current_phase>Design</current_phase><design_start>2020-01-06T00:00:00</design_start><budget_forecast>29036244.00</budget_forecast><total_budget_changes>-785268.00</total_budget_changes><forecast_completion>2027-06-07T00:00:00</forecast_completion><total_schedule_changes>636</total_schedule_changes></row><row _id="row-bc32_g3jw-erh6" _uuid="00000000-0000-0000-B40A-0B06242EC669" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-bc32_g3jw-erh6"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>1073</pid><project_name>HILL DR (TERRACE BR) OVER PROSPECT PARK LAKE BIN 2244120</project_name><category>Bridges</category><managing_agency>DOT</managing_agency><client_agency>NYC Parks</client_agency><total_budget_changes>-785268.00</total_budget_changes><total_schedule_changes>636</total_schedule_changes></row><row _id="row-4dua_9bg7.iujz" _uuid="00000000-0000-0000-A9ED-7BD2A26EB03F" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-4dua_9bg7.iujz"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>1073</pid><project_name>HILL DR (TERRACE BR) OVER PROSPECT PARK LAKE BIN 2244120</project_name><category>Bridges</category><managing_agency>DOT</managing_agency><client_agency>NYC Parks</client_agency><current_phase>Design</current_phase><design_start>2020-01-06T00:00:00</design_start><budget_forecast>28153244.00</budget_forecast><latest_budget_changes>-883000.00</latest_budget_changes><total_budget_changes>-785268.00</total_budget_changes><forecast_completion>2027-12-14T00:00:00</forecast_completion><latest_schedule_changes>190</latest_schedule_changes><total_schedule_changes>636</total_schedule_changes></row><row _id="row-cfxg_rdt8-umta" _uuid="00000000-0000-0000-58CE-9C2BB7FCDBF5" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-cfxg_rdt8-umta"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>1073</pid><project_name>HILL DR (TERRACE BR) OVER PROSPECT PARK LAKE BIN 2244120</project_name><description>Hill Dr (Terrace Br) over Prospect Park Lake</description><category>Bridges</category><managing_agency>DOT</managing_agency><client_agency>NYC Parks</client_agency><current_phase>Design</current_phase><design_start>2020-01-06T00:00:00</design_start><budget_forecast>28152976.00</budget_forecast><latest_budget_changes>-268.00</latest_budget_changes><total_budget_changes>-785268.00</total_budget_changes><forecast_completion>2028-05-25T00:00:00</forecast_completion><latest_schedule_changes>163</latest_schedule_changes><total_schedule_changes>636</total_schedule_changes></row><row _id="row-dq68_d4ei~e9ng" _uuid="00000000-0000-0000-0958-825F75E0CABC" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-dq68_d4ei~e9ng"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>1073</pid><project_name>HILL DR (TERRACE BR) OVER PROSPECT PARK LAKE BIN 2244120</project_name><description>Hill Dr (Terrace Br) over Prospect Park Lake</description><category>Bridges</category><managing_agency>DOT</managing_agency><client_agency>NYC Parks</client_agency><current_phase>Design</current_phase><design_start>2020-01-06T00:00:00</design_start><budget_forecast>27845976.00</budget_forecast><latest_budget_changes>-307000.00</latest_budget_changes><total_budget_changes>-785268.00</total_budget_changes><forecast_completion>2028-08-08T00:00:00</forecast_completion><latest_schedule_changes>75</latest_schedule_changes><total_schedule_changes>636</total_schedule_changes></row><row _id="row-nags_enmv.pp4j" _uuid="00000000-0000-0000-9544-75C8864C639F" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-nags_enmv.pp4j"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1073</pid><project_name>HILL DR (TERRACE BR) OVER PROSPECT PARK LAKE BIN 2244120</project_name><description>Hill Dr (Terrace Br) over Prospect Park Lake</description><category>Bridges</category><managing_agency>DOT</managing_agency><client_agency>NYC Parks</client_agency><current_phase>Design</current_phase><design_start>2020-01-06T00:00:00</design_start><budget_forecast>0.00</budget_forecast><latest_budget_changes>-27845976.00</latest_budget_changes><total_budget_changes>-785268.00</total_budget_changes><forecast_completion>2028-12-06T00:00:00</forecast_completion><latest_schedule_changes>120</latest_schedule_changes><total_schedule_changes>636</total_schedule_changes></row><row _id="row-wt3q~ny6a-rbtj" _uuid="00000000-0000-0000-0246-4C35A1FD4E29" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-wt3q~ny6a-rbtj"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1073</pid><project_name>HILL DR (TERRACE BR) OVER PROSPECT PARK LAKE BIN 2244120</project_name><description>Hill Dr (Terrace Br) over Prospect Park Lake</description><category>Bridges</category><managing_agency>DOT</managing_agency><client_agency>NYC Parks</client_agency><current_phase>Design</current_phase><design_start>2020-01-06T00:00:00</design_start><budget_forecast>28250976.00</budget_forecast><latest_budget_changes>28250976.00</latest_budget_changes><total_budget_changes>-785268.00</total_budget_changes><forecast_completion>2029-03-04T00:00:00</forecast_completion><latest_schedule_changes>88</latest_schedule_changes><total_schedule_changes>636</total_schedule_changes></row><row _id="row-7np9_c2nf.2rf3" _uuid="00000000-0000-0000-F1D4-02FF1249727B" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-7np9_c2nf.2rf3"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>1079</pid><project_name>Mobile Radios</project_name><description>Mobile Radios Procurement - Vehicular and Fixed Location Installations</description><category>Public Safety and Criminal Justice</category><managing_agency>FDNY</managing_agency><current_phase>IT</current_phase><budget_forecast>29091961.57</budget_forecast><total_budget_changes>-8074214.27</total_budget_changes><total_schedule_changes>0</total_schedule_changes></row><row _id="row-sat7~j8vf-kxrp" _uuid="00000000-0000-0000-BBD0-AD5ACF0EA36B" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-sat7~j8vf-kxrp"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>1079</pid><project_name>Mobile Radios</project_name><category>Public Safety and Criminal Justice</category><managing_agency>FDNY</managing_agency><current_phase>IT</current_phase><total_budget_changes>-8074214.27</total_budget_changes><total_schedule_changes>0</total_schedule_changes></row><row _id="row-f8g9.iiwe.n8jt" _uuid="00000000-0000-0000-88AB-F7F0E53F0A0E" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-f8g9.iiwe.n8jt"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>1079</pid><project_name>Mobile Radios</project_name><description>Mobile Radios Procurement - Vehicular and Fixed Location Installations</description><category>Public Safety and Criminal Justice</category><managing_agency>FDNY</managing_agency><current_phase>IT</current_phase><budget_forecast>0.00</budget_forecast><latest_budget_changes>-29091961.57</latest_budget_changes><total_budget_changes>-8074214.27</total_budget_changes><total_schedule_changes>0</total_schedule_changes></row><row _id="row-auv9~pbxx_p4yh" _uuid="00000000-0000-0000-475A-CAC92A781E69" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-auv9~pbxx_p4yh"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>1079</pid><project_name>Mobile Radios</project_name><category>Public Safety and Criminal Justice</category><managing_agency>FDNY</managing_agency><current_phase>IT</current_phase><total_budget_changes>-8074214.27</total_budget_changes><total_schedule_changes>0</total_schedule_changes></row><row _id="row-jtxn.n26u.v63q" _uuid="00000000-0000-0000-780B-B5A210A18F68" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-jtxn.n26u.v63q"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1079</pid><project_name>Mobile Radios</project_name><description>Mobile Radios Procurement - Vehicular and Fixed Location Installations</description><category>Public Safety and Criminal Justice</category><managing_agency>FDNY</managing_agency><current_phase>IT</current_phase><budget_forecast>29091961.57</budget_forecast><latest_budget_changes>29091961.57</latest_budget_changes><total_budget_changes>-8074214.27</total_budget_changes><forecast_completion>2024-06-30T00:00:00</forecast_completion><total_schedule_changes>0</total_schedule_changes></row><row _id="row-vdc4_ct84~hcds" _uuid="00000000-0000-0000-88F9-4B95EDF9B22D" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-vdc4_ct84~hcds"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1079</pid><project_name>Mobile Radios</project_name><description>Mobile Radios Procurement - Vehicular and Fixed Location Installations</description><category>Public Safety and Criminal Justice</category><managing_agency>FDNY</managing_agency><current_phase>IT</current_phase><budget_forecast>21017747.30</budget_forecast><latest_budget_changes>-8074214.27</latest_budget_changes><total_budget_changes>-8074214.27</total_budget_changes><forecast_completion>2024-06-30T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>0</total_schedule_changes></row><row _id="row-nf28-7b4n.6bxf" _uuid="00000000-0000-0000-27C0-3092D612EBCD" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-nf28-7b4n.6bxf"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>1082</pid><project_name>East River Esplanade Stabilization and Reconstruction Phase 2</project_name><description>This project will stabilize and reconstruct portions of the East River Esplanade.</description><category>Parks</category><managing_agency>DPR</managing_agency><client_agency>DPR</client_agency><current_phase>Design</current_phase><design_start>2019-02-01T00:00:00</design_start><budget_forecast>29475000.00</budget_forecast><total_budget_changes>0.00</total_budget_changes><total_schedule_changes>156</total_schedule_changes></row><row _id="row-n4q6~prwk~w76q" _uuid="00000000-0000-0000-6B61-436FAE7D7B70" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-n4q6~prwk~w76q"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>1082</pid><project_name>East River Esplanade Stabilization and Reconstruction Phase 2</project_name><description>This project will stabilize and reconstruct portions of the East River Esplanade.</description><category>Parks</category><managing_agency>DPR</managing_agency><client_agency>DPR</client_agency><current_phase>Design</current_phase><design_start>2019-02-01T00:00:00</design_start><budget_forecast>29475000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><total_schedule_changes>156</total_schedule_changes></row><row _id="row-rnx4.gctt-azkk" _uuid="00000000-0000-0000-E635-4F7542503175" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-rnx4.gctt-azkk"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>1082</pid><project_name>East River Esplanade Stabilization and Reconstruction Phase 2</project_name><description>This project will stabilize and reconstruct portions of the East River Esplanade.</description><category>Parks</category><managing_agency>DPR</managing_agency><client_agency>DPR</client_agency><current_phase>Design</current_phase><design_start>2019-02-01T00:00:00</design_start><budget_forecast>29475000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2024-09-23T00:00:00</forecast_completion><total_schedule_changes>156</total_schedule_changes></row><row _id="row-t2gk-nkhn~dqn9" _uuid="00000000-0000-0000-B040-304D733506B3" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-t2gk-nkhn~dqn9"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>1082</pid><project_name>East River Esplanade Stabilization and Reconstruction Phase 2</project_name><description>This project will stabilize and reconstruct portions of the East River Esplanade.</description><category>Parks</category><managing_agency>DPR</managing_agency><client_agency>DPR</client_agency><current_phase>Design</current_phase><design_start>2019-02-01T00:00:00</design_start><budget_forecast>29475000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2024-11-23T00:00:00</forecast_completion><latest_schedule_changes>61</latest_schedule_changes><total_schedule_changes>156</total_schedule_changes></row><row _id="row-fnbp.kg27.aumd" _uuid="00000000-0000-0000-0E53-F69C2828E35B" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-fnbp.kg27.aumd"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1082</pid><project_name>East River Esplanade Stabilization and Reconstruction Phase 2</project_name><description>This project will stabilize and reconstruct portions of the East River Esplanade.</description><category>Parks</category><managing_agency>DPR</managing_agency><client_agency>DPR</client_agency><current_phase>Construction Procurement</current_phase><design_start>2019-02-01T00:00:00</design_start><budget_forecast>29475000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2024-11-16T00:00:00</forecast_completion><latest_schedule_changes>-7</latest_schedule_changes><total_schedule_changes>156</total_schedule_changes></row><row _id="row-hvzs_pmft_8uzm" _uuid="00000000-0000-0000-D878-02089C6556EE" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-hvzs_pmft_8uzm"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1082</pid><project_name>East River Esplanade Stabilization and Reconstruction Phase 2</project_name><description>This project will stabilize and reconstruct portions of the East River Esplanade.</description><category>Parks</category><managing_agency>DPR</managing_agency><client_agency>DPR</client_agency><current_phase>Construction Procurement</current_phase><design_start>2019-02-01T00:00:00</design_start><budget_forecast>29475000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2025-02-26T00:00:00</forecast_completion><latest_schedule_changes>102</latest_schedule_changes><total_schedule_changes>156</total_schedule_changes></row><row _id="row-5p8k.97hw-kd5j" _uuid="00000000-0000-0000-787D-3EECBC7D1A6C" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-5p8k.97hw-kd5j"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>1083</pid><project_name>Flushing Meadows Corona Park Electrical Vault Reconstruction (Hurricane Sandy)</project_name><description>This project will reconstruct the electrical vaults in Flushing Meadows Corona Park that were damaged by Hurricane Sandy.</description><category>Parks</category><managing_agency>DPR</managing_agency><client_agency>DPR</client_agency><current_phase>Design</current_phase><design_start>2019-08-21T00:00:00</design_start><budget_forecast>59432909.00</budget_forecast><total_budget_changes>-3555909.00</total_budget_changes></row><row _id="row-jwj8_wxcw-wnki" _uuid="00000000-0000-0000-408E-4E6B0923751F" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-jwj8_wxcw-wnki"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>1083</pid><project_name>Flushing Meadows Corona Park Electrical Vault Reconstruction (Hurricane Sandy)</project_name><description>This project will reconstruct the electrical vaults in Flushing Meadows Corona Park that were damaged by Hurricane Sandy.</description><category>Parks</category><managing_agency>DPR</managing_agency><client_agency>DPR</client_agency><current_phase>Design</current_phase><design_start>2019-08-21T00:00:00</design_start><budget_forecast>59432909.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-3555909.00</total_budget_changes></row><row _id="row-ig4k.xq5e~eu63" _uuid="00000000-0000-0000-7E2F-E35F4FA856A0" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ig4k.xq5e~eu63"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>1083</pid><project_name>Flushing Meadows Corona Park Electrical Vault Reconstruction (Hurricane Sandy)</project_name><description>This project will reconstruct the electrical vaults in Flushing Meadows Corona Park that were damaged by Hurricane Sandy.</description><category>Parks</category><managing_agency>DPR</managing_agency><client_agency>DPR</client_agency><current_phase>Design</current_phase><design_start>2019-08-21T00:00:00</design_start><budget_forecast>59527909.00</budget_forecast><latest_budget_changes>95000.00</latest_budget_changes><total_budget_changes>-3555909.00</total_budget_changes></row><row _id="row-paqj_6ecm.pq4b" _uuid="00000000-0000-0000-D37B-8C6C5470C85A" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-paqj_6ecm.pq4b"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>1083</pid><project_name>Flushing Meadows Corona Park Electrical Vault Reconstruction (Hurricane Sandy)</project_name><description>This project will reconstruct the electrical vaults in Flushing Meadows Corona Park that were damaged by Hurricane Sandy.</description><category>Parks</category><managing_agency>DPR</managing_agency><client_agency>DPR</client_agency><current_phase>Design</current_phase><design_start>2019-08-21T00:00:00</design_start><budget_forecast>59827909.00</budget_forecast><latest_budget_changes>300000.00</latest_budget_changes><total_budget_changes>-3555909.00</total_budget_changes></row><row _id="row-kjyt~3jam_k5xy" _uuid="00000000-0000-0000-5DFA-9B9C315BF6D1" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-kjyt~3jam_k5xy"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1083</pid><project_name>Flushing Meadows Corona Park Electrical Vault Reconstruction (Hurricane Sandy)</project_name><description>This project will reconstruct the electrical vaults in Flushing Meadows Corona Park that were damaged by Hurricane Sandy.</description><category>Parks</category><managing_agency>DPR</managing_agency><client_agency>DPR</client_agency><current_phase>Design</current_phase><design_start>2019-08-21T00:00:00</design_start><budget_forecast>56237000.00</budget_forecast><latest_budget_changes>-3590909.00</latest_budget_changes><total_budget_changes>-3555909.00</total_budget_changes></row><row _id="row-zgf9~9ryt~h6yz" _uuid="00000000-0000-0000-F28D-006347975FFE" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-zgf9~9ryt~h6yz"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1083</pid><project_name>Flushing Meadows Corona Park Electrical Vault Reconstruction (Hurricane Sandy)</project_name><description>This project will reconstruct the electrical vaults in Flushing Meadows Corona Park that were damaged by Hurricane Sandy.</description><category>Parks</category><managing_agency>DPR</managing_agency><client_agency>DPR</client_agency><current_phase>Design</current_phase><design_start>2019-08-21T00:00:00</design_start><budget_forecast>55877000.00</budget_forecast><latest_budget_changes>-360000.00</latest_budget_changes><total_budget_changes>-3555909.00</total_budget_changes></row><row _id="row-xy9c.t22h.srwv" _uuid="00000000-0000-0000-2195-38F6DAEF3EE5" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-xy9c.t22h.srwv"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>1085</pid><project_name>Pier 42 and East River Park Connector Program</project_name><description>Abatement, demolition, and replacement of shed with an upland park on Pier 42 in Manhattan.</description><category>Parks</category><managing_agency>EDC</managing_agency><client_agency>DPR</client_agency><current_phase>Construction Procurement</current_phase><design_start>2017-06-01T00:00:00</design_start><budget_forecast>60115737.00</budget_forecast><total_budget_changes>100000.00</total_budget_changes><forecast_completion>2023-03-31T00:00:00</forecast_completion><total_schedule_changes>214</total_schedule_changes></row><row _id="row-df96-fpc7_gihb" _uuid="00000000-0000-0000-42EF-39840252D820" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-df96-fpc7_gihb"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>1085</pid><project_name>Pier 42 and East River Park Connector Program</project_name><description>Abatement, demolition, and replacement of shed with an upland park on Pier 42 in Manhattan.</description><category>Parks</category><managing_agency>EDC</managing_agency><client_agency>DPR</client_agency><current_phase>Construction Procurement</current_phase><design_start>2017-06-01T00:00:00</design_start><budget_forecast>60115737.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>100000.00</total_budget_changes><forecast_completion>2023-03-31T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>214</total_schedule_changes></row><row _id="row-gimy~u4e5.b73u" _uuid="00000000-0000-0000-0461-14CB4FFD9BEB" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-gimy~u4e5.b73u"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>1085</pid><project_name>Pier 42 and East River Park Connector Program</project_name><description>Abatement, demolition, and replacement of shed with an upland park on Pier 42 in Manhattan.</description><category>Parks</category><managing_agency>EDC</managing_agency><client_agency>DPR</client_agency><current_phase>Construction</current_phase><design_start>2017-06-01T00:00:00</design_start><budget_forecast>60115737.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>100000.00</total_budget_changes><forecast_completion>2023-08-31T00:00:00</forecast_completion><latest_schedule_changes>153</latest_schedule_changes><total_schedule_changes>214</total_schedule_changes></row><row _id="row-x47h.7tyw~xvq2" _uuid="00000000-0000-0000-0D8C-6CCBDB93386F" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-x47h.7tyw~xvq2"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>1085</pid><project_name>Pier 42 and East River Park Connector Program</project_name><description>Abatement, demolition, and replacement of shed with an upland park on Pier 42 in Manhattan.</description><category>Parks</category><managing_agency>EDC</managing_agency><client_agency>DPR</client_agency><current_phase>Construction</current_phase><design_start>2017-06-01T00:00:00</design_start><budget_forecast>60115737.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>100000.00</total_budget_changes><forecast_completion>2023-08-31T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>214</total_schedule_changes></row><row _id="row-wjug.3pts_4mrg" _uuid="00000000-0000-0000-2096-3DD70F4FFCCA" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-wjug.3pts_4mrg"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1085</pid><project_name>Pier 42 and East River Park Connector Program</project_name><description>Abatement, demolition, and replacement of shed with an upland park on Pier 42 in Manhattan.</description><category>Parks</category><managing_agency>EDC</managing_agency><client_agency>DPR</client_agency><current_phase>Construction</current_phase><design_start>2017-06-01T00:00:00</design_start><budget_forecast>60215737.00</budget_forecast><latest_budget_changes>100000.00</latest_budget_changes><total_budget_changes>100000.00</total_budget_changes><forecast_completion>2023-08-31T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>214</total_schedule_changes></row><row _id="row-v739.2ms7.5m48" _uuid="00000000-0000-0000-B582-1A58BA3EF378" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-v739.2ms7.5m48"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1085</pid><project_name>Pier 42 and East River Park Connector Program</project_name><description>Abatement, demolition, and replacement of shed with an upland park on Pier 42 in Manhattan.</description><category>Parks</category><managing_agency>EDC</managing_agency><client_agency>DPR</client_agency><current_phase>Construction</current_phase><design_start>2017-06-01T00:00:00</design_start><budget_forecast>60215737.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>100000.00</total_budget_changes><forecast_completion>2023-10-31T00:00:00</forecast_completion><latest_schedule_changes>61</latest_schedule_changes><total_schedule_changes>214</total_schedule_changes></row><row _id="row-gxpq-9qa2~ecxq" _uuid="00000000-0000-0000-1F9E-DC90EE437059" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-gxpq-9qa2~ecxq"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>1086</pid><project_name>Bush Terminal Development Site Preparation</project_name><description>Sitework (including but not limited to: excavation, utility, and bulkhead work) at Bush Terminal in preparation of the Steiner Studio campus.</description><category>Industrial Development</category><managing_agency>EDC</managing_agency><client_agency>EDC</client_agency><current_phase>Design</current_phase><design_start>2021-03-01T00:00:00</design_start><budget_forecast>29000000.00</budget_forecast><total_budget_changes>0.00</total_budget_changes><forecast_completion>2023-12-31T00:00:00</forecast_completion><total_schedule_changes>517</total_schedule_changes></row><row _id="row-9cq5.eb36.in5u" _uuid="00000000-0000-0000-2C5D-1AB51FE78FF1" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-9cq5.eb36.in5u"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>1086</pid><project_name>Bush Terminal Development Site Preparation</project_name><description>Sitework (including but not limited to: excavation, utility, and bulkhead work) at Bush Terminal in preparation of the Steiner Studio campus.</description><category>Industrial Development</category><managing_agency>EDC</managing_agency><client_agency>EDC</client_agency><current_phase>Design</current_phase><design_start>2021-03-01T00:00:00</design_start><budget_forecast>29000000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2023-12-31T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>517</total_schedule_changes></row><row _id="row-4q4j~jqsv-6mkh" _uuid="00000000-0000-0000-E343-F291CABB8D89" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-4q4j~jqsv-6mkh"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>1086</pid><project_name>Bush Terminal Development Site Preparation</project_name><description>Sitework (including but not limited to: excavation, utility, and bulkhead work) at Bush Terminal in preparation of the Steiner Studio campus.</description><category>Industrial Development</category><managing_agency>EDC</managing_agency><client_agency>EDC</client_agency><current_phase>Design</current_phase><design_start>2021-03-01T00:00:00</design_start><budget_forecast>29000000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2024-06-30T00:00:00</forecast_completion><latest_schedule_changes>182</latest_schedule_changes><total_schedule_changes>517</total_schedule_changes></row><row _id="row-mbzi.qcqu.vqas" _uuid="00000000-0000-0000-781F-28DC9696932F" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-mbzi.qcqu.vqas"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>1086</pid><project_name>Bush Terminal Development Site Preparation</project_name><description>Sitework (including but not limited to: excavation, utility, and bulkhead work) at Bush Terminal in preparation of the Steiner Studio campus.</description><category>Industrial Development</category><managing_agency>EDC</managing_agency><client_agency>EDC</client_agency><current_phase>Design</current_phase><design_start>2021-03-01T00:00:00</design_start><budget_forecast>29000000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2025-01-30T00:00:00</forecast_completion><latest_schedule_changes>214</latest_schedule_changes><total_schedule_changes>517</total_schedule_changes></row><row _id="row-g9dk.52h3~b4bb" _uuid="00000000-0000-0000-B124-083872876A35" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-g9dk.52h3~b4bb"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1086</pid><project_name>Bush Terminal Development Site Preparation</project_name><description>Sitework (including but not limited to: excavation, utility, and bulkhead work) at Bush Terminal in preparation of the Steiner Studio campus.</description><category>Industrial Development</category><managing_agency>EDC</managing_agency><client_agency>EDC</client_agency><current_phase>Construction Procurement</current_phase><design_start>2021-03-01T00:00:00</design_start><budget_forecast>29000000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2025-05-31T00:00:00</forecast_completion><latest_schedule_changes>121</latest_schedule_changes><total_schedule_changes>517</total_schedule_changes></row><row _id="row-ce3g.bwfu_fymp" _uuid="00000000-0000-0000-7A9A-F80662D4454B" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ce3g.bwfu_fymp"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1086</pid><project_name>Bush Terminal Development Site Preparation</project_name><description>Sitework (including but not limited to: excavation, utility, and bulkhead work) at Bush Terminal in preparation of the Steiner Studio campus.</description><category>Industrial Development</category><managing_agency>EDC</managing_agency><client_agency>EDC</client_agency><current_phase>Construction Procurement</current_phase><design_start>2021-03-01T00:00:00</design_start><budget_forecast>29000000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2025-05-31T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>517</total_schedule_changes></row><row _id="row-79ep-6u68_96xg" _uuid="00000000-0000-0000-DC0E-19B8770BF30D" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-79ep-6u68_96xg"><date_reported_as_of>2021-03-01T00:00:00</date_reported_as_of><pid>1089</pid><project_name>Bronx Public School @ 639 ST ANN'S AVENUE</project_name><description>NEW SCHOOL</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction Procurement</current_phase><design_start>2019-08-29T00:00:00</design_start><budget_forecast>95764583.00</budget_forecast><total_budget_changes>-1926038.00</total_budget_changes><forecast_completion>2024-09-03T00:00:00</forecast_completion><total_schedule_changes>0</total_schedule_changes></row><row _id="row-2vf5~ai2d.bvyg" _uuid="00000000-0000-0000-C488-DDF639C0C0BC" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-2vf5~ai2d.bvyg"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>1089</pid><project_name>Bronx Public School @ 639 ST ANN'S AVENUE</project_name><description>NEW SCHOOL</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2019-08-29T00:00:00</design_start><budget_forecast>93838545.00</budget_forecast><latest_budget_changes>-1926038.00</latest_budget_changes><total_budget_changes>-1926038.00</total_budget_changes><forecast_completion>2024-09-03T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>0</total_schedule_changes></row><row _id="row-p68h.tqvz.9nr2" _uuid="00000000-0000-0000-3F65-72EA12445786" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-p68h.tqvz.9nr2"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>1089</pid><project_name>Bronx Public School @ 639 ST ANN'S AVENUE</project_name><description>NEW SCHOOL</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2019-08-29T00:00:00</design_start><budget_forecast>93838545.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-1926038.00</total_budget_changes><forecast_completion>2024-09-03T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>0</total_schedule_changes></row><row _id="row-n46m~xq3p-tyjv" _uuid="00000000-0000-0000-AD62-2F8D26EA92C6" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-n46m~xq3p-tyjv"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>1089</pid><project_name>Bronx Public School @ 639 ST ANN'S AVENUE</project_name><description>NEW SCHOOL</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2019-08-29T00:00:00</design_start><budget_forecast>93838545.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-1926038.00</total_budget_changes><forecast_completion>2024-09-03T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>0</total_schedule_changes></row><row _id="row-y4zn~f33r-s3zy" _uuid="00000000-0000-0000-E582-CA8C75F32A14" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-y4zn~f33r-s3zy"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1089</pid><project_name>Bronx Public School @ 639 ST ANN'S AVENUE</project_name><description>NEW SCHOOL</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2019-08-29T00:00:00</design_start><budget_forecast>93838545.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-1926038.00</total_budget_changes><forecast_completion>2024-09-03T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>0</total_schedule_changes></row><row _id="row-f2vp~7xth.zhrf" _uuid="00000000-0000-0000-412C-B857542B73CC" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-f2vp~7xth.zhrf"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1089</pid><project_name>Bronx Public School @ 639 ST ANN'S AVENUE</project_name><description>NEW SCHOOL</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2019-08-29T00:00:00</design_start><budget_forecast>93838545.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-1926038.00</total_budget_changes><forecast_completion>2024-09-03T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>0</total_schedule_changes></row><row _id="row-vuja.2sjh.pgr9" _uuid="00000000-0000-0000-1DA9-AAAC915F68C8" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-vuja.2sjh.pgr9"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>1090</pid><project_name>Hansborough Recreation Center Reconstruction</project_name><description>This project will reconstruct the pool, entrance and interior spaces of the Hansborough Recreation Center.</description><category>Parks</category><managing_agency>DPR</managing_agency><client_agency>DPR</client_agency><current_phase>Design</current_phase><design_start>2020-03-23T00:00:00</design_start><budget_forecast>41368800.00</budget_forecast><total_budget_changes>-4700000.00</total_budget_changes><total_schedule_changes>186</total_schedule_changes></row><row _id="row-j7wm~s6qn_cjpd" _uuid="00000000-0000-0000-37D6-CAA56CB007F3" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-j7wm~s6qn_cjpd"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>1090</pid><project_name>Hansborough Recreation Center Reconstruction</project_name><description>This project will reconstruct the pool, entrance and interior spaces of the Hansborough Recreation Center.</description><category>Parks</category><managing_agency>DPR</managing_agency><client_agency>DPR</client_agency><current_phase>Design</current_phase><design_start>2020-03-23T00:00:00</design_start><budget_forecast>36668800.00</budget_forecast><latest_budget_changes>-4700000.00</latest_budget_changes><total_budget_changes>-4700000.00</total_budget_changes><total_schedule_changes>186</total_schedule_changes></row><row _id="row-4xzq-u8d8~px9z" _uuid="00000000-0000-0000-19BA-384D58764C79" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-4xzq-u8d8~px9z"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>1090</pid><project_name>Hansborough Recreation Center Reconstruction</project_name><description>This project will reconstruct the pool, entrance and interior spaces of the Hansborough Recreation Center.</description><category>Parks</category><managing_agency>DPR</managing_agency><client_agency>DPR</client_agency><current_phase>Construction Procurement</current_phase><design_start>2020-03-23T00:00:00</design_start><budget_forecast>36668800.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-4700000.00</total_budget_changes><forecast_completion>2025-02-22T00:00:00</forecast_completion><total_schedule_changes>186</total_schedule_changes></row><row _id="row-4nw3~fq5y~ukwi" _uuid="00000000-0000-0000-8227-C0D587877D61" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-4nw3~fq5y~ukwi"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1090</pid><project_name>Hansborough Recreation Center Reconstruction</project_name><description>This project will reconstruct the pool, entrance and interior spaces of the Hansborough Recreation Center.</description><category>Parks</category><managing_agency>DPR</managing_agency><client_agency>DPR</client_agency><current_phase>Construction Procurement</current_phase><design_start>2020-03-23T00:00:00</design_start><budget_forecast>36668800.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-4700000.00</total_budget_changes><forecast_completion>2025-08-27T00:00:00</forecast_completion><latest_schedule_changes>186</latest_schedule_changes><total_schedule_changes>186</total_schedule_changes></row><row _id="row-u8s4.t96q~qatj" _uuid="00000000-0000-0000-4995-1C2722118710" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-u8s4.t96q~qatj"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1090</pid><project_name>Hansborough Recreation Center Reconstruction</project_name><description>This project will reconstruct the pool, entrance and interior spaces of the Hansborough Recreation Center.</description><category>Parks</category><managing_agency>DPR</managing_agency><client_agency>DPR</client_agency><current_phase>Construction Procurement</current_phase><design_start>2020-03-23T00:00:00</design_start><budget_forecast>36668800.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-4700000.00</total_budget_changes><forecast_completion>2025-08-27T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>186</total_schedule_changes></row><row _id="row-vqdg-2a4i~dnik" _uuid="00000000-0000-0000-786E-141BA3D0373E" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-vqdg-2a4i~dnik"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>1092</pid><project_name>Cross River and Croton Falls Dam Refacing</project_name><description>Provide design and design services during construction for the dam refacing, and drainage work at Cross River and Croton Falls Dams, including but not limited to resurface fascia, address seepage from the dams face.</description><category>Water Supply</category><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2021-03-23T00:00:00</design_start><budget_forecast>45195800.00</budget_forecast><total_budget_changes>23950000.00</total_budget_changes><forecast_completion>2026-06-06T00:00:00</forecast_completion><total_schedule_changes>298</total_schedule_changes></row><row _id="row-7de2.r8jy_zs8i" _uuid="00000000-0000-0000-66AD-DC6D563BC984" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-7de2.r8jy_zs8i"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>1092</pid><project_name>Cross River and Croton Falls Dam Refacing</project_name><description>Provide design and design services during construction for the dam refacing, and drainage work at Cross River and Croton Falls Dams, including but not limited to resurface fascia, address seepage from the dams face.</description><category>Water Supply</category><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2021-03-23T00:00:00</design_start><budget_forecast>45195800.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>23950000.00</total_budget_changes><forecast_completion>2026-09-14T00:00:00</forecast_completion><latest_schedule_changes>100</latest_schedule_changes><total_schedule_changes>298</total_schedule_changes></row><row _id="row-36hj-d6pz-x34u" _uuid="00000000-0000-0000-47FD-038E5F853F82" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-36hj-d6pz-x34u"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>1092</pid><project_name>Cross River and Croton Falls Dam Refacing</project_name><description>Provide design and design services during construction for the dam refacing, and drainage work at Cross River and Croton Falls Dams, including but not limited to resurface fascia, address seepage from the dams face.</description><category>Water Supply</category><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2021-03-23T00:00:00</design_start><budget_forecast>45195800.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>23950000.00</total_budget_changes><forecast_completion>2026-11-27T00:00:00</forecast_completion><latest_schedule_changes>74</latest_schedule_changes><total_schedule_changes>298</total_schedule_changes></row><row _id="row-dtw9~2pkx~4i6h" _uuid="00000000-0000-0000-4374-474741A2D717" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-dtw9~2pkx~4i6h"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1092</pid><project_name>Cross River and Croton Falls Dam Refacing</project_name><description>Provide design and design services during construction for the dam refacing, and drainage work at Cross River and Croton Falls Dams, including but not limited to resurface fascia, address seepage from the dams face.</description><category>Water Supply</category><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2021-03-23T00:00:00</design_start><budget_forecast>69145800.00</budget_forecast><latest_budget_changes>23950000.00</latest_budget_changes><total_budget_changes>23950000.00</total_budget_changes><forecast_completion>2027-03-31T00:00:00</forecast_completion><latest_schedule_changes>124</latest_schedule_changes><total_schedule_changes>298</total_schedule_changes></row><row _id="row-u4th-668z_2k5c" _uuid="00000000-0000-0000-AD58-5BB2D7A907B7" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-u4th-668z_2k5c"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1092</pid><project_name>Cross River and Croton Falls Dam Refacing</project_name><description>Provide design and design services during construction for the dam refacing, and drainage work at Cross River and Croton Falls Dams, including but not limited to resurface fascia, address seepage from the dams face.</description><category>Water Supply</category><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2021-03-23T00:00:00</design_start><budget_forecast>69145800.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>23950000.00</total_budget_changes><forecast_completion>2027-03-31T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>298</total_schedule_changes></row><row _id="row-75kc_43u3~dxhh" _uuid="00000000-0000-0000-7947-609CD4F430A2" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-75kc_43u3~dxhh"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>1094</pid><project_name>Installation of Dechlorination System at Hunts Point WRRF</project_name><description>Install a Dechlorination System, replace the existing chlorination system including chemical storage tanks, metering pumps, electrical distribution equipment and upgrade the HVAC within the existing Chlorination Building.</description><category>Wastewater Treatment</category><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2021-05-25T00:00:00</design_start><budget_forecast>34756021.00</budget_forecast><total_budget_changes>-6856021.00</total_budget_changes><forecast_completion>2027-06-30T00:00:00</forecast_completion><total_schedule_changes>-9</total_schedule_changes></row><row _id="row-wk8t.4trq-y4zk" _uuid="00000000-0000-0000-E232-9FA7F710EF90" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-wk8t.4trq-y4zk"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1316</pid><project_name>New Signals Installation requirement, citywide FY23</project_name><description>New Signals Installation requirement, citywide FY23</description><category>Streets and Roadways</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><design_start>2022-07-01T00:00:00</design_start><budget_forecast>1035058.00</budget_forecast><latest_budget_changes>-35484942.00</latest_budget_changes><total_budget_changes>-35484942.00</total_budget_changes><forecast_completion>2024-10-31T00:00:00</forecast_completion></row><row _id="row-46hk~zsd3_bxgd" _uuid="00000000-0000-0000-715F-DEDAD418E9A9" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-46hk~zsd3_bxgd"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>1094</pid><project_name>Installation of Dechlorination System at Hunts Point WRRF</project_name><description>Install a Dechlorination System, replace the existing chlorination system including chemical storage tanks, metering pumps, electrical distribution equipment and upgrade the HVAC within the existing Chlorination Building.</description><category>Wastewater Treatment</category><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2021-05-25T00:00:00</design_start><budget_forecast>34679510.00</budget_forecast><latest_budget_changes>-76511.00</latest_budget_changes><total_budget_changes>-6856021.00</total_budget_changes><forecast_completion>2028-05-20T00:00:00</forecast_completion><latest_schedule_changes>325</latest_schedule_changes><total_schedule_changes>-9</total_schedule_changes></row><row _id="row-76wh.fjs3.jqqq" _uuid="00000000-0000-0000-966B-D0816958EE5B" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-76wh.fjs3.jqqq"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>1094</pid><project_name>Installation of Dechlorination System at Hunts Point WRRF</project_name><description>Install a Dechlorination System, replace the existing chlorination system including chemical storage tanks, metering pumps, electrical distribution equipment and upgrade the HVAC within the existing Chlorination Building.</description><category>Wastewater Treatment</category><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2021-05-25T00:00:00</design_start><budget_forecast>27562510.00</budget_forecast><latest_budget_changes>-7117000.00</latest_budget_changes><total_budget_changes>-6856021.00</total_budget_changes><forecast_completion>2027-03-27T00:00:00</forecast_completion><latest_schedule_changes>-420</latest_schedule_changes><total_schedule_changes>-9</total_schedule_changes></row><row _id="row-ykyb-24dq_bk52" _uuid="00000000-0000-0000-B121-129BFFA45B3C" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ykyb-24dq_bk52"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1094</pid><project_name>Installation of Dechlorination System at Hunts Point WRRF</project_name><description>Install a Dechlorination System, replace the existing chlorination system including chemical storage tanks, metering pumps, electrical distribution equipment and upgrade the HVAC within the existing Chlorination Building.</description><category>Wastewater Treatment</category><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2021-05-25T00:00:00</design_start><budget_forecast>27900000.00</budget_forecast><latest_budget_changes>337490.00</latest_budget_changes><total_budget_changes>-6856021.00</total_budget_changes><forecast_completion>2027-06-21T00:00:00</forecast_completion><latest_schedule_changes>86</latest_schedule_changes><total_schedule_changes>-9</total_schedule_changes></row><row _id="row-xsvt~tmdz_jiw7" _uuid="00000000-0000-0000-C30D-FCE0B6905562" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-xsvt~tmdz_jiw7"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1094</pid><project_name>Installation of Dechlorination System at Hunts Point WRRF</project_name><description>Install a Dechlorination System, replace the existing chlorination system including chemical storage tanks, metering pumps, electrical distribution equipment and upgrade the HVAC within the existing Chlorination Building.</description><category>Wastewater Treatment</category><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2021-05-25T00:00:00</design_start><budget_forecast>27900000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-6856021.00</total_budget_changes><forecast_completion>2027-06-21T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>-9</total_schedule_changes></row><row _id="row-ai6r_rz5j_n34p" _uuid="00000000-0000-0000-F086-C40656CA02C2" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ai6r_rz5j_n34p"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>1097</pid><project_name>Brooklyn Public School 710  Pre-K</project_name><description>NEW SCHOOL</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2019-06-17T00:00:00</design_start><budget_forecast>38697915.00</budget_forecast><total_budget_changes>0.00</total_budget_changes><forecast_completion>2023-09-03T00:00:00</forecast_completion><total_schedule_changes>0</total_schedule_changes></row><row _id="row-j83h~isem.9ftp" _uuid="00000000-0000-0000-8F83-660CC04704B7" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-j83h~isem.9ftp"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>1097</pid><project_name>Brooklyn Public School 710  Pre-K</project_name><description>NEW SCHOOL</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2019-06-17T00:00:00</design_start><budget_forecast>38697915.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2023-09-03T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>0</total_schedule_changes></row><row _id="row-pix5~jwjm-2wmt" _uuid="00000000-0000-0000-BEF5-81552F819918" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-pix5~jwjm-2wmt"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>1097</pid><project_name>Brooklyn Public School 710  Pre-K</project_name><description>NEW SCHOOL</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2019-06-17T00:00:00</design_start><budget_forecast>38697915.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2023-09-03T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>0</total_schedule_changes></row><row _id="row-vbv3.h8in.jzd5" _uuid="00000000-0000-0000-BCFD-B26D89B19754" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-vbv3.h8in.jzd5"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1097</pid><project_name>Brooklyn Public School 710  Pre-K</project_name><description>NEW SCHOOL</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2019-06-17T00:00:00</design_start><budget_forecast>38697915.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2023-09-03T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>0</total_schedule_changes></row><row _id="row-9na8~jzxd~g85b" _uuid="00000000-0000-0000-025F-0F1BF75BCB73" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-9na8~jzxd~g85b"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1097</pid><project_name>Brooklyn Public School 710  Pre-K</project_name><description>NEW SCHOOL</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2019-06-17T00:00:00</design_start><budget_forecast>38697915.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2023-09-03T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>0</total_schedule_changes></row><row _id="row-9shj.agda-ppif" _uuid="00000000-0000-0000-3DF2-77591039C6D1" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-9shj.agda-ppif"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>1098</pid><project_name>Brooklyn Public School 748  New Construction</project_name><description>LEASE</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction Procurement</current_phase><design_start>2018-02-23T00:00:00</design_start><budget_forecast>31421420.00</budget_forecast><total_budget_changes>0.00</total_budget_changes><forecast_completion>2023-09-03T00:00:00</forecast_completion><total_schedule_changes>0</total_schedule_changes></row><row _id="row-v4qr.anbz~p7bd" _uuid="00000000-0000-0000-CF9C-35540BF512F0" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-v4qr.anbz~p7bd"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>1098</pid><project_name>Brooklyn Public School 748  New Construction</project_name><description>LEASE</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2018-02-23T00:00:00</design_start><budget_forecast>31421420.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2023-09-03T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>0</total_schedule_changes></row><row _id="row-e7t9_ypmn~gak3" _uuid="00000000-0000-0000-D1C1-C8C642AF103E" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-e7t9_ypmn~gak3"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>1098</pid><project_name>Brooklyn Public School 748  New Construction</project_name><description>LEASE</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2018-02-23T00:00:00</design_start><budget_forecast>31421420.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2023-09-03T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>0</total_schedule_changes></row><row _id="row-6jmq.i94k_h3as" _uuid="00000000-0000-0000-FA9F-E822FBF8E21B" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-6jmq.i94k_h3as"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1098</pid><project_name>Brooklyn Public School 748  New Construction</project_name><description>LEASE</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2018-02-23T00:00:00</design_start><budget_forecast>31421420.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2023-09-03T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>0</total_schedule_changes></row><row _id="row-fcnw_xujx~wuhw" _uuid="00000000-0000-0000-5FD0-0FA9467A74F2" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-fcnw_xujx~wuhw"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1098</pid><project_name>Brooklyn Public School 748  New Construction</project_name><description>LEASE</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2018-02-23T00:00:00</design_start><budget_forecast>31421420.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2023-09-03T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>0</total_schedule_changes></row><row _id="row-4qbu.gtnu_sa6e" _uuid="00000000-0000-0000-67D0-496C9C2745E2" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-4qbu.gtnu_sa6e"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>1099</pid><project_name>Queens Public School 472  New Construction</project_name><description>NEW SCHOOL</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2019-01-07T00:00:00</design_start><budget_forecast>251284250.00</budget_forecast><total_budget_changes>0.00</total_budget_changes><forecast_completion>2025-09-03T00:00:00</forecast_completion><total_schedule_changes>0</total_schedule_changes></row><row _id="row-bntr.34gj-ayqy" _uuid="00000000-0000-0000-6A85-DABE89DA23CF" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-bntr.34gj-ayqy"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>1099</pid><project_name>Queens Public School 472  New Construction</project_name><description>NEW SCHOOL</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2019-01-07T00:00:00</design_start><budget_forecast>251284250.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2025-09-03T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>0</total_schedule_changes></row><row _id="row-9p22_u7ir_w6v4" _uuid="00000000-0000-0000-EDCD-AD853905E118" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-9p22_u7ir_w6v4"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>1099</pid><project_name>Queens Public School 472  New Construction</project_name><description>NEW SCHOOL</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2019-01-07T00:00:00</design_start><budget_forecast>251284250.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2025-09-03T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>0</total_schedule_changes></row><row _id="row-pjrz-u7g8.bw9u" _uuid="00000000-0000-0000-B6E3-F5E07FC47101" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-pjrz-u7g8.bw9u"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1099</pid><project_name>Queens Public School 472  New Construction</project_name><description>NEW SCHOOL</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2019-01-07T00:00:00</design_start><budget_forecast>251284250.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2025-09-03T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>0</total_schedule_changes></row><row _id="row-kj4j-9z9z-thb7" _uuid="00000000-0000-0000-3BAD-C9A30126E722" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-kj4j-9z9z-thb7"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1099</pid><project_name>Queens Public School 472  New Construction</project_name><description>NEW SCHOOL</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2019-01-07T00:00:00</design_start><budget_forecast>251284250.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2025-09-03T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>0</total_schedule_changes></row><row _id="row-ms2z_yt2j_vkqu" _uuid="00000000-0000-0000-C557-053F187678A7" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ms2z_yt2j_vkqu"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>1100</pid><project_name>Brooklyn Public School 676  New Construction</project_name><description>NEW SCHOOL</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2020-08-12T00:00:00</design_start><budget_forecast>92786690.00</budget_forecast><total_budget_changes>1339880.00</total_budget_changes><forecast_completion>2024-09-03T00:00:00</forecast_completion><total_schedule_changes>0</total_schedule_changes></row><row _id="row-9ar5-3prf.6bqt" _uuid="00000000-0000-0000-1C66-14A68751F1CA" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-9ar5-3prf.6bqt"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>1100</pid><project_name>Brooklyn Public School 676  New Construction</project_name><description>NEW SCHOOL</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2020-08-12T00:00:00</design_start><budget_forecast>92786690.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>1339880.00</total_budget_changes><forecast_completion>2024-09-03T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>0</total_schedule_changes></row><row _id="row-ffh5~ed7e_sixx" _uuid="00000000-0000-0000-3EE1-579689733923" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ffh5~ed7e_sixx"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>1100</pid><project_name>Brooklyn Public School 676  New Construction</project_name><description>NEW SCHOOL</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2020-08-12T00:00:00</design_start><budget_forecast>92786690.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>1339880.00</total_budget_changes><forecast_completion>2024-09-03T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>0</total_schedule_changes></row><row _id="row-bk4m.dya4-htji" _uuid="00000000-0000-0000-52B8-8859A1D3BCCF" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-bk4m.dya4-htji"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1100</pid><project_name>Brooklyn Public School 676  New Construction</project_name><description>NEW SCHOOL</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2020-08-12T00:00:00</design_start><budget_forecast>94126570.00</budget_forecast><latest_budget_changes>1339880.00</latest_budget_changes><total_budget_changes>1339880.00</total_budget_changes><forecast_completion>2024-09-03T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>0</total_schedule_changes></row><row _id="row-vutb.kr66~ntsn" _uuid="00000000-0000-0000-C054-C0DFD0C06A91" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-vutb.kr66~ntsn"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1100</pid><project_name>Brooklyn Public School 676  New Construction</project_name><description>NEW SCHOOL</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2020-08-12T00:00:00</design_start><budget_forecast>94126570.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>1339880.00</total_budget_changes><forecast_completion>2024-09-03T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>0</total_schedule_changes></row><row _id="row-qxxu.jnxq_qyq5" _uuid="00000000-0000-0000-B7DC-5822AF9EAA57" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-qxxu.jnxq_qyq5"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>1101</pid><project_name>Bronx Public School 077  Addition</project_name><description>ADDITION / EXISTING SCHOOL RENOVATION WORK (PHASE I) / DEMOLITION (PHASE II)</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2019-09-25T00:00:00</design_start><budget_forecast>86862349.00</budget_forecast><total_budget_changes>0.00</total_budget_changes><forecast_completion>2024-09-03T00:00:00</forecast_completion><total_schedule_changes>0</total_schedule_changes></row><row _id="row-mxb3.u5fi~sg98" _uuid="00000000-0000-0000-748E-E658E34E886F" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-mxb3.u5fi~sg98"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>1101</pid><project_name>Bronx Public School 077  Addition</project_name><description>ADDITION / EXISTING SCHOOL RENOVATION WORK (PHASE I) / DEMOLITION (PHASE II)</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2019-09-25T00:00:00</design_start><budget_forecast>86862349.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2024-09-03T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>0</total_schedule_changes></row><row _id="row-8tuv-m6my_4dhd" _uuid="00000000-0000-0000-967D-8F5D922C701A" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-8tuv-m6my_4dhd"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>1101</pid><project_name>Bronx Public School 077  Addition</project_name><description>ADDITION / EXISTING SCHOOL RENOVATION WORK (PHASE I) / DEMOLITION (PHASE II)</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2019-09-25T00:00:00</design_start><budget_forecast>86862349.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2024-09-03T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>0</total_schedule_changes></row><row _id="row-wm3k_4fp7.ib8t" _uuid="00000000-0000-0000-F26E-8D9559DAA690" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-wm3k_4fp7.ib8t"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1101</pid><project_name>Bronx Public School 077  Addition</project_name><description>ADDITION / EXISTING SCHOOL RENOVATION WORK (PHASE I) / DEMOLITION (PHASE II)</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2019-09-25T00:00:00</design_start><budget_forecast>86862349.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2024-09-03T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>0</total_schedule_changes></row><row _id="row-hvzm_sbdn_qaf4" _uuid="00000000-0000-0000-15DE-AFC7389EFDC9" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-hvzm_sbdn_qaf4"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1101</pid><project_name>Bronx Public School 077  Addition</project_name><description>ADDITION / EXISTING SCHOOL RENOVATION WORK (PHASE I) / DEMOLITION (PHASE II)</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2019-09-25T00:00:00</design_start><budget_forecast>86862349.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2024-09-03T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>0</total_schedule_changes></row><row _id="row-a6w6-vmvj.k66v" _uuid="00000000-0000-0000-763D-A6B20A9CDE2D" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-a6w6-vmvj.k66v"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>1102</pid><project_name>Bronx Public School 469  New Construction</project_name><description>NEW SCHOOL</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction Procurement</current_phase><design_start>2020-03-13T00:00:00</design_start><budget_forecast>81015110.00</budget_forecast><total_budget_changes>-505800.00</total_budget_changes><forecast_completion>2024-09-03T00:00:00</forecast_completion><total_schedule_changes>0</total_schedule_changes></row><row _id="row-p645-gkie.f5vc" _uuid="00000000-0000-0000-ADAE-503AACDB8398" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-p645-gkie.f5vc"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>1102</pid><project_name>Bronx Public School 469  New Construction</project_name><description>NEW SCHOOL / PLAYGROUND REDEVELOPMENT</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2020-03-13T00:00:00</design_start><budget_forecast>81015110.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-505800.00</total_budget_changes><forecast_completion>2024-09-03T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>0</total_schedule_changes></row><row _id="row-4fr6_ir4y.k3z3" _uuid="00000000-0000-0000-788F-0B9C0DE2C881" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-4fr6_ir4y.k3z3"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>1102</pid><project_name>Bronx Public School 469  New Construction</project_name><description>NEW SCHOOL / PLAYGROUND REDEVELOPMENT</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2020-03-13T00:00:00</design_start><budget_forecast>80509310.00</budget_forecast><latest_budget_changes>-505800.00</latest_budget_changes><total_budget_changes>-505800.00</total_budget_changes><forecast_completion>2024-09-03T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>0</total_schedule_changes></row><row _id="row-vynf~rfiw~i2ju" _uuid="00000000-0000-0000-A1D6-553ECB2A1F4D" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-vynf~rfiw~i2ju"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1102</pid><project_name>Bronx Public School 469  New Construction</project_name><description>NEW SCHOOL / PLAYGROUND REDEVELOPMENT</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2020-03-13T00:00:00</design_start><budget_forecast>80509310.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-505800.00</total_budget_changes><forecast_completion>2024-09-03T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>0</total_schedule_changes></row><row _id="row-2sgk.r6gy~tdks" _uuid="00000000-0000-0000-6B16-3A8293BA6E85" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-2sgk.r6gy~tdks"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1102</pid><project_name>Bronx Public School 469  New Construction</project_name><description>NEW SCHOOL / PLAYGROUND REDEVELOPMENT</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2020-03-13T00:00:00</design_start><budget_forecast>80509310.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-505800.00</total_budget_changes><forecast_completion>2024-09-03T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>0</total_schedule_changes></row><row _id="row-ersm-6uqf~j4ek" _uuid="00000000-0000-0000-2FB1-864F4A2EF944" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ersm-6uqf~j4ek"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>1103</pid><project_name>Bronx Public School 87  Addition</project_name><description>ADDITION / EXISTING SCHOOL RENOVATION WORK</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2019-09-23T00:00:00</design_start><budget_forecast>70834393.00</budget_forecast><total_budget_changes>0.00</total_budget_changes><forecast_completion>2024-09-03T00:00:00</forecast_completion><total_schedule_changes>0</total_schedule_changes></row><row _id="row-q4ej_2suz.9cwz" _uuid="00000000-0000-0000-A33B-39233AB40F31" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-q4ej_2suz.9cwz"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>1103</pid><project_name>Bronx Public School 87  Addition</project_name><description>ADDITION / EXISTING SCHOOL RENOVATION WORK</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2019-09-23T00:00:00</design_start><budget_forecast>70834393.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2024-09-03T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>0</total_schedule_changes></row><row _id="row-ty9m_gbv6~rpzw" _uuid="00000000-0000-0000-8AE9-693EA81666AE" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ty9m_gbv6~rpzw"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>1103</pid><project_name>Bronx Public School 87  Addition</project_name><description>ADDITION / EXISTING SCHOOL RENOVATION WORK</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2019-09-23T00:00:00</design_start><budget_forecast>70834393.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2024-09-03T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>0</total_schedule_changes></row><row _id="row-cmje-wnkz_bndy" _uuid="00000000-0000-0000-C033-B5A521D06E18" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-cmje-wnkz_bndy"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1103</pid><project_name>Bronx Public School 87  Addition</project_name><description>ADDITION / EXISTING SCHOOL RENOVATION WORK</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2019-09-23T00:00:00</design_start><budget_forecast>70834393.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2024-09-03T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>0</total_schedule_changes></row><row _id="row-t85s-ev8j.n3ue" _uuid="00000000-0000-0000-9AD6-70611830A29E" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-t85s-ev8j.n3ue"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1103</pid><project_name>Bronx Public School 87  Addition</project_name><description>ADDITION / EXISTING SCHOOL RENOVATION WORK</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2019-09-23T00:00:00</design_start><budget_forecast>70834393.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2024-09-03T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>0</total_schedule_changes></row><row _id="row-rach~3euj_8tjn" _uuid="00000000-0000-0000-F25A-3A24B9E3E795" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-rach~3euj_8tjn"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>1104</pid><project_name>Brooklyn Public School 322  New Construction</project_name><description>NEW SCHOOL</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction Procurement</current_phase><design_start>2020-06-04T00:00:00</design_start><budget_forecast>85395900.00</budget_forecast><total_budget_changes>0.00</total_budget_changes><forecast_completion>2024-09-03T00:00:00</forecast_completion><total_schedule_changes>0</total_schedule_changes></row><row _id="row-2f6y.8dnu-jaxb" _uuid="00000000-0000-0000-770E-49390E7E2324" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-2f6y.8dnu-jaxb"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>1104</pid><project_name>Brooklyn Public School 322  New Construction</project_name><description>NEW SCHOOL</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2020-06-04T00:00:00</design_start><budget_forecast>85395900.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2024-09-03T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>0</total_schedule_changes></row><row _id="row-kfii_tapy-6iz6" _uuid="00000000-0000-0000-A7A3-205621F838FD" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-kfii_tapy-6iz6"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>1104</pid><project_name>Brooklyn Public School 322  New Construction</project_name><description>NEW SCHOOL</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2020-06-04T00:00:00</design_start><budget_forecast>85395900.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2024-09-03T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>0</total_schedule_changes></row><row _id="row-6582-ifve.bx3w" _uuid="00000000-0000-0000-7005-276D66B6F9D2" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-6582-ifve.bx3w"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1104</pid><project_name>Brooklyn Public School 322  New Construction</project_name><description>NEW SCHOOL</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2020-06-04T00:00:00</design_start><budget_forecast>85395900.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2024-09-03T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>0</total_schedule_changes></row><row _id="row-3eth.b87c.hrkx" _uuid="00000000-0000-0000-FFBB-38FDA8E53D5A" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-3eth.b87c.hrkx"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1104</pid><project_name>Brooklyn Public School 322  New Construction</project_name><description>NEW SCHOOL</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2020-06-04T00:00:00</design_start><budget_forecast>85395900.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2024-09-03T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>0</total_schedule_changes></row><row _id="row-5c96-8rym-4p98" _uuid="00000000-0000-0000-AD6F-32D62F2F0992" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-5c96-8rym-4p98"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>1105</pid><project_name>Queens Public School 41  SSBA Addition</project_name><description>ADDITION / DEMOLITION</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2019-08-05T00:00:00</design_start><budget_forecast>70755417.00</budget_forecast><total_budget_changes>0.00</total_budget_changes><forecast_completion>2024-09-03T00:00:00</forecast_completion><total_schedule_changes>0</total_schedule_changes></row><row _id="row-vxre.gmj3-wkp5" _uuid="00000000-0000-0000-CD99-303A23145664" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-vxre.gmj3-wkp5"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>1105</pid><project_name>Queens Public School 41  SSBA Addition</project_name><description>ADDITION / DEMOLITION</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2019-08-05T00:00:00</design_start><budget_forecast>70755417.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2024-09-03T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>0</total_schedule_changes></row><row _id="row-xs57-b4ag~e5xh" _uuid="00000000-0000-0000-0AF6-A5902AD5F4C2" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-xs57-b4ag~e5xh"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>1105</pid><project_name>Queens Public School 41  SSBA Addition</project_name><description>ADDITION / DEMOLITION</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2019-08-05T00:00:00</design_start><budget_forecast>70755417.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2024-09-03T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>0</total_schedule_changes></row><row _id="row-pv68-p7sz-kjgi" _uuid="00000000-0000-0000-D8C0-EDF11590C33A" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-pv68-p7sz-kjgi"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1105</pid><project_name>Queens Public School 41  SSBA Addition</project_name><description>ADDITION / DEMOLITION</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2019-08-05T00:00:00</design_start><budget_forecast>70755417.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2024-09-03T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>0</total_schedule_changes></row><row _id="row-kmag_jjdg~gkdi" _uuid="00000000-0000-0000-10A8-A0AF1E107F85" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-kmag_jjdg~gkdi"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1105</pid><project_name>Queens Public School 41  SSBA Addition</project_name><description>ADDITION / DEMOLITION</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2019-08-05T00:00:00</design_start><budget_forecast>70755417.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2024-09-03T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>0</total_schedule_changes></row><row _id="row-6ebf.94sk.jet3" _uuid="00000000-0000-0000-1714-6F3F0964CCC0" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-6ebf.94sk.jet3"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>1106</pid><project_name>Bronx Public School 468  New Construction</project_name><description>NEW SCHOOL</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction Procurement</current_phase><design_start>2020-01-16T00:00:00</design_start><budget_forecast>80833865.00</budget_forecast><total_budget_changes>0.00</total_budget_changes><forecast_completion>2024-09-03T00:00:00</forecast_completion><total_schedule_changes>0</total_schedule_changes></row><row _id="row-xskp-x7h4-aq94" _uuid="00000000-0000-0000-2B68-18FD1FEF41DC" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-xskp-x7h4-aq94"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>1106</pid><project_name>Bronx Public School 468  New Construction</project_name><description>NEW SCHOOL</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2020-01-16T00:00:00</design_start><budget_forecast>80833865.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2024-09-03T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>0</total_schedule_changes></row><row _id="row-8vcw.ehvd~f4xj" _uuid="00000000-0000-0000-DDD9-1B2AF026A5AF" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-8vcw.ehvd~f4xj"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>1106</pid><project_name>Bronx Public School 468  New Construction</project_name><description>NEW SCHOOL</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2020-01-16T00:00:00</design_start><budget_forecast>80833865.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2024-09-03T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>0</total_schedule_changes></row><row _id="row-mvar~zbu6-53gj" _uuid="00000000-0000-0000-7B9A-4A0F33D8EA10" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-mvar~zbu6-53gj"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1106</pid><project_name>Bronx Public School 468  New Construction</project_name><description>NEW SCHOOL</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2020-01-16T00:00:00</design_start><budget_forecast>80833865.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2024-09-03T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>0</total_schedule_changes></row><row _id="row-xukb.hmeg-yy9i" _uuid="00000000-0000-0000-791F-0865BFCB9A11" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-xukb.hmeg-yy9i"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1106</pid><project_name>Bronx Public School 468  New Construction</project_name><description>NEW SCHOOL</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2020-01-16T00:00:00</design_start><budget_forecast>80833865.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2024-09-03T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>0</total_schedule_changes></row><row _id="row-nskn~rzs5-cct2" _uuid="00000000-0000-0000-A2C5-E88FDEF0D3CE" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-nskn~rzs5-cct2"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>1107</pid><project_name>Queens Public School 489  Annex</project_name><description>NEW SCHOOL</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction Procurement</current_phase><design_start>2019-12-16T00:00:00</design_start><budget_forecast>79171750.00</budget_forecast><total_budget_changes>0.00</total_budget_changes><forecast_completion>2024-09-03T00:00:00</forecast_completion><total_schedule_changes>0</total_schedule_changes></row><row _id="row-wwpf-vm5k_um4c" _uuid="00000000-0000-0000-B33D-DE978246F464" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-wwpf-vm5k_um4c"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>1107</pid><project_name>Queens Public School 489  Annex</project_name><description>NEW SCHOOL</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2019-12-16T00:00:00</design_start><budget_forecast>79171750.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2024-09-03T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>0</total_schedule_changes></row><row _id="row-6j8a-p8fw-63yq" _uuid="00000000-0000-0000-513A-A2D22E7C5210" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-6j8a-p8fw-63yq"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>1107</pid><project_name>Queens Public School 489  Annex</project_name><description>NEW SCHOOL</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2019-12-16T00:00:00</design_start><budget_forecast>79171750.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2024-09-03T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>0</total_schedule_changes></row><row _id="row-n34w_yh68~j77i" _uuid="00000000-0000-0000-60E2-74F09D82D381" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-n34w_yh68~j77i"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1107</pid><project_name>Queens Public School 489  Annex</project_name><description>NEW SCHOOL</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2019-12-16T00:00:00</design_start><budget_forecast>79171750.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2024-09-03T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>0</total_schedule_changes></row><row _id="row-w3bt-i6dw-dxw6" _uuid="00000000-0000-0000-3FEE-955D38E9DF25" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-w3bt-i6dw-dxw6"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1107</pid><project_name>Queens Public School 489  Annex</project_name><description>NEW SCHOOL</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2019-12-16T00:00:00</design_start><budget_forecast>79171750.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2024-09-03T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>0</total_schedule_changes></row><row _id="row-ji6p-gezu~gjii" _uuid="00000000-0000-0000-602A-F7F78EB4B981" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ji6p-gezu~gjii"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>1108</pid><project_name>Queens Public School 032  Addition</project_name><description>ADDITION</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction Procurement</current_phase><design_start>2020-02-24T00:00:00</design_start><budget_forecast>67965151.00</budget_forecast><total_budget_changes>0.00</total_budget_changes><forecast_completion>2024-09-03T00:00:00</forecast_completion><total_schedule_changes>0</total_schedule_changes></row><row _id="row-vbv5_gbpf_iacc" _uuid="00000000-0000-0000-350A-6F5C3E78D0E3" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-vbv5_gbpf_iacc"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>1108</pid><project_name>Queens Public School 032  Addition</project_name><description>ADDITION</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2020-02-24T00:00:00</design_start><budget_forecast>67965151.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2024-09-03T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>0</total_schedule_changes></row><row _id="row-u4h4-u493-63vf" _uuid="00000000-0000-0000-FB68-187E3306A949" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-u4h4-u493-63vf"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>1108</pid><project_name>Queens Public School 032  Addition</project_name><description>ADDITION</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2020-02-24T00:00:00</design_start><budget_forecast>67965151.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2024-09-03T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>0</total_schedule_changes></row><row _id="row-se3t~m8n7-2kvs" _uuid="00000000-0000-0000-93E5-506B6A9FD7E0" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-se3t~m8n7-2kvs"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1108</pid><project_name>Queens Public School 032  Addition</project_name><description>ADDITION</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2020-02-24T00:00:00</design_start><budget_forecast>67965151.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2024-09-03T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>0</total_schedule_changes></row><row _id="row-5emv.uait.apkw" _uuid="00000000-0000-0000-2752-D568B9230867" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-5emv.uait.apkw"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1108</pid><project_name>Queens Public School 032  Addition</project_name><description>ADDITION</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2020-02-24T00:00:00</design_start><budget_forecast>67965151.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2024-09-03T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>0</total_schedule_changes></row><row _id="row-bhsp-9urs-dbeg" _uuid="00000000-0000-0000-9B68-2343B4F9857E" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-bhsp-9urs-dbeg"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>1109</pid><project_name>Bronx Public School 108  Addition</project_name><description>ADDITION</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction Procurement</current_phase><design_start>2020-01-17T00:00:00</design_start><budget_forecast>86927350.00</budget_forecast><total_budget_changes>0.00</total_budget_changes><forecast_completion>2024-09-03T00:00:00</forecast_completion><total_schedule_changes>0</total_schedule_changes></row><row _id="row-cs5i~ysf5~t8kg" _uuid="00000000-0000-0000-A693-4421165E6B63" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-cs5i~ysf5~t8kg"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>1109</pid><project_name>Bronx Public School 108  Addition</project_name><description>ADDITION</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2020-01-17T00:00:00</design_start><budget_forecast>86927350.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2024-09-03T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>0</total_schedule_changes></row><row _id="row-32qn~n26s_x6fr" _uuid="00000000-0000-0000-BFDE-6669BFA9239F" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-32qn~n26s_x6fr"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>1109</pid><project_name>Bronx Public School 108  Addition</project_name><description>ADDITION</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2020-01-17T00:00:00</design_start><budget_forecast>86927350.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2024-09-03T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>0</total_schedule_changes></row><row _id="row-eaca~hxfd.btfi" _uuid="00000000-0000-0000-4D38-5EAC9E537486" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-eaca~hxfd.btfi"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1109</pid><project_name>Bronx Public School 108  Addition</project_name><description>ADDITION</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2020-01-17T00:00:00</design_start><budget_forecast>86927350.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2024-09-03T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>0</total_schedule_changes></row><row _id="row-8i6y.enjd~9mpm" _uuid="00000000-0000-0000-010E-0CCEEFB5306C" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-8i6y.enjd~9mpm"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1109</pid><project_name>Bronx Public School 108  Addition</project_name><description>ADDITION</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2020-01-17T00:00:00</design_start><budget_forecast>86927350.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2024-09-03T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>0</total_schedule_changes></row><row _id="row-97gt-8vay.cwbx" _uuid="00000000-0000-0000-9EB1-F5D470891255" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-97gt-8vay.cwbx"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>1110</pid><project_name>Brooklyn Public School 253  Addition</project_name><description>ADDITION</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction Procurement</current_phase><design_start>2020-03-09T00:00:00</design_start><budget_forecast>75767435.00</budget_forecast><total_budget_changes>0.00</total_budget_changes><forecast_completion>2024-09-03T00:00:00</forecast_completion><total_schedule_changes>0</total_schedule_changes></row><row _id="row-jfma-eynp~jxf3" _uuid="00000000-0000-0000-3373-F5E0DD1568CC" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-jfma-eynp~jxf3"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>1110</pid><project_name>Brooklyn Public School 253  Addition</project_name><description>ADDITION</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2020-03-09T00:00:00</design_start><budget_forecast>75767435.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2024-09-03T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>0</total_schedule_changes></row><row _id="row-vgmm.msrv-gn65" _uuid="00000000-0000-0000-B84C-EE9056F489D7" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-vgmm.msrv-gn65"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>1110</pid><project_name>Brooklyn Public School 253  Addition</project_name><description>ADDITION</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2020-03-09T00:00:00</design_start><budget_forecast>75767435.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2024-09-03T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>0</total_schedule_changes></row><row _id="row-piab_da3s.hces" _uuid="00000000-0000-0000-B2D9-224581733C69" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-piab_da3s.hces"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1110</pid><project_name>Brooklyn Public School 253  Addition</project_name><description>ADDITION</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2020-03-09T00:00:00</design_start><budget_forecast>75767435.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2024-09-03T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>0</total_schedule_changes></row><row _id="row-8462~6frc_grda" _uuid="00000000-0000-0000-FC60-F5C1609BE48E" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-8462~6frc_grda"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1110</pid><project_name>Brooklyn Public School 253  Addition</project_name><description>ADDITION</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2020-03-09T00:00:00</design_start><budget_forecast>75767435.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2024-09-03T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>0</total_schedule_changes></row><row _id="row-9rbc~fy4b-2zmq" _uuid="00000000-0000-0000-5D2D-45EB268B4829" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-9rbc~fy4b-2zmq"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>1111</pid><project_name>Queens Public School 343  New Construction</project_name><description>NEW SCHOOL</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction Procurement</current_phase><design_start>2020-03-03T00:00:00</design_start><budget_forecast>70167105.00</budget_forecast><total_budget_changes>0.00</total_budget_changes><forecast_completion>2023-09-03T00:00:00</forecast_completion><total_schedule_changes>0</total_schedule_changes></row><row _id="row-3q96_tsu8~cdwd" _uuid="00000000-0000-0000-7CDC-B18EDE49061B" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-3q96_tsu8~cdwd"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>1111</pid><project_name>Queens Public School 343  New Construction</project_name><description>NEW SCHOOL</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2020-03-03T00:00:00</design_start><budget_forecast>70167105.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2023-09-03T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>0</total_schedule_changes></row><row _id="row-cpbc_u9uy~dxc7" _uuid="00000000-0000-0000-A63F-368956AC5C1A" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-cpbc_u9uy~dxc7"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>1111</pid><project_name>Queens Public School 343  New Construction</project_name><description>NEW SCHOOL</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2020-03-03T00:00:00</design_start><budget_forecast>70167105.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2023-09-03T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>0</total_schedule_changes></row><row _id="row-296k-b7c7-qf8k" _uuid="00000000-0000-0000-8487-DDB123B8FDC0" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-296k-b7c7-qf8k"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1111</pid><project_name>Queens Public School 343  New Construction</project_name><description>NEW SCHOOL</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2020-03-03T00:00:00</design_start><budget_forecast>70167105.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2023-09-03T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>0</total_schedule_changes></row><row _id="row-dmzm~d2ti~59sj" _uuid="00000000-0000-0000-B5D2-E6C25CF19B84" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-dmzm~d2ti~59sj"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1111</pid><project_name>Queens Public School 343  New Construction</project_name><description>NEW SCHOOL</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2020-03-03T00:00:00</design_start><budget_forecast>70167105.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2023-09-03T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>0</total_schedule_changes></row><row _id="row-5irq~rvdv~7yx2" _uuid="00000000-0000-0000-8A06-CCAE9C054947" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-5irq~rvdv~7yx2"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>1119</pid><project_name>SEELY STREET OVER PROSPECT AVENUE  BIN: 2244470</project_name><description>Rehabilitation of Seeley Street bridge over Prospect Avenue</description><category>Bridges</category><managing_agency>DOT</managing_agency><client_agency>n/a</client_agency><current_phase>Design</current_phase><design_start>2019-11-12T00:00:00</design_start><budget_forecast>31221267.00</budget_forecast><total_budget_changes>0.00</total_budget_changes><forecast_completion>2028-03-06T00:00:00</forecast_completion><total_schedule_changes>253</total_schedule_changes></row><row _id="row-8htb_g5ib-7nr3" _uuid="00000000-0000-0000-96A7-360BBC47C99C" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-8htb_g5ib-7nr3"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>1119</pid><project_name>SEELY STREET OVER PROSPECT AVENUE  BIN: 2244470</project_name><description>Rehabilitation of Seeley Street bridge over Prospect Avenue</description><category>Bridges</category><managing_agency>DOT</managing_agency><client_agency>n/a</client_agency><current_phase>Design</current_phase><design_start>2019-11-12T00:00:00</design_start><budget_forecast>31221267.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2027-09-06T00:00:00</forecast_completion><latest_schedule_changes>-182</latest_schedule_changes><total_schedule_changes>253</total_schedule_changes></row><row _id="row-8x2k~hhnd.4tme" _uuid="00000000-0000-0000-0425-B148B4E9E217" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-8x2k~hhnd.4tme"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>1119</pid><project_name>SEELY STREET OVER PROSPECT AVENUE  BIN: 2244470</project_name><description>Rehabilitation of Seeley Street bridge over Prospect Avenue</description><category>Bridges</category><managing_agency>DOT</managing_agency><client_agency>n/a</client_agency><current_phase>Design</current_phase><design_start>2019-11-12T00:00:00</design_start><budget_forecast>30709037.00</budget_forecast><latest_budget_changes>-512230.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2027-10-03T00:00:00</forecast_completion><latest_schedule_changes>27</latest_schedule_changes><total_schedule_changes>253</total_schedule_changes></row><row _id="row-yjhp.sqky~wxtd" _uuid="00000000-0000-0000-9D06-9CEBF9458C00" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-yjhp.sqky~wxtd"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1119</pid><project_name>SEELY STREET OVER PROSPECT AVENUE  BIN: 2244470</project_name><description>Rehabilitation of Seeley Street bridge over Prospect Avenue</description><category>Bridges</category><managing_agency>DOT</managing_agency><client_agency>n/a</client_agency><current_phase>Design</current_phase><design_start>2019-11-12T00:00:00</design_start><budget_forecast>33358754.00</budget_forecast><latest_budget_changes>2649717.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2029-06-21T00:00:00</forecast_completion><latest_schedule_changes>627</latest_schedule_changes><total_schedule_changes>253</total_schedule_changes></row><row _id="row-k37h~hsw4-ysq9" _uuid="00000000-0000-0000-8A14-F5AF3C160362" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-k37h~hsw4-ysq9"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1119</pid><project_name>SEELY STREET OVER PROSPECT AVENUE  BIN: 2244470</project_name><description>Rehabilitation of Seeley Street bridge over Prospect Avenue</description><category>Bridges</category><managing_agency>DOT</managing_agency><client_agency>n/a</client_agency><current_phase>Design</current_phase><design_start>2019-11-12T00:00:00</design_start><budget_forecast>31221267.00</budget_forecast><latest_budget_changes>-2137487.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2028-11-14T00:00:00</forecast_completion><latest_schedule_changes>-219</latest_schedule_changes><total_schedule_changes>253</total_schedule_changes></row><row _id="row-ug4z~6sm7_d5hn" _uuid="00000000-0000-0000-ABFC-740E460EC895" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ug4z~6sm7_d5hn"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1120</pid><project_name>PARKSIDE AVE AND OCEAN AVE RR BR 2-24302-0</project_name><description>Rehab of Ocean &amp; Parkside Avenue Bridge over NYCTA Brighton Line</description><category>Bridges</category><managing_agency>DOT</managing_agency><client_agency>n/a</client_agency><current_phase>Design</current_phase><design_start>2018-01-04T00:00:00</design_start><budget_forecast>49586146.00</budget_forecast><latest_budget_changes>1020577.00</latest_budget_changes><total_budget_changes>-9890000.00</total_budget_changes><forecast_completion>2029-02-04T00:00:00</forecast_completion><latest_schedule_changes>200</latest_schedule_changes><total_schedule_changes>-208</total_schedule_changes></row><row _id="row-4thu.a4k2.y5ix" _uuid="00000000-0000-0000-2505-614E24A58838" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-4thu.a4k2.y5ix"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>1128</pid><project_name>WOODHAVEN BLVD QUEENS BLVD BIN# 2248159</project_name><description>This bridge is a two span concrete encased structure, 153.3 feet wide, 75 feet long and carries a total of 9 lanes of traffic. The bridge itself is an integral part of the Woodhaven Blvd. subway station structure owned and operated by the MTA. The superstructure consists of concrete encased steel stringers framing into concrete encased steel columns which are also used to serve as the retaining wall holding up Queens Blvd. service road.</description><category>Bridges</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2018-10-10T00:00:00</design_start><budget_forecast>63916241.00</budget_forecast><total_budget_changes>2052000.00</total_budget_changes><forecast_completion>2025-07-06T00:00:00</forecast_completion><total_schedule_changes>932</total_schedule_changes></row><row _id="row-a286-b6mk_dg5y" _uuid="00000000-0000-0000-7721-AF34E6617F1D" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-a286-b6mk_dg5y"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>1128</pid><project_name>WOODHAVEN BLVD QUEENS BLVD BIN# 2248159</project_name><description>This bridge is a two span concrete encased structure, 153.3 feet wide, 75 feet long and carries a total of 9 lanes of traffic. The bridge itself is an integral part of the Woodhaven Blvd. subway station structure owned and operated by the MTA. The superstructure consists of concrete encased steel stringers framing into concrete encased steel columns which are also used to serve as the retaining wall holding up Queens Blvd. service road.</description><category>Bridges</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2018-10-10T00:00:00</design_start><budget_forecast>65116241.00</budget_forecast><latest_budget_changes>1200000.00</latest_budget_changes><total_budget_changes>2052000.00</total_budget_changes><forecast_completion>2027-04-07T00:00:00</forecast_completion><latest_schedule_changes>640</latest_schedule_changes><total_schedule_changes>932</total_schedule_changes></row><row _id="row-drrv.xtyc-n3dr" _uuid="00000000-0000-0000-7074-9CD70B7A6BDB" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-drrv.xtyc-n3dr"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>1128</pid><project_name>WOODHAVEN BLVD QUEENS BLVD BIN# 2248159</project_name><description>This bridge is a two span concrete encased structure, 153.3 feet wide, 75 feet long and carries a total of 9 lanes of traffic. The bridge itself is an integral part of the Woodhaven Blvd. subway station structure owned and operated by the MTA. The superstructure consists of concrete encased steel stringers framing into concrete encased steel columns which are also used to serve as the retaining wall holding up Queens Blvd. service road.</description><category>Bridges</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2018-10-10T00:00:00</design_start><budget_forecast>65231241.00</budget_forecast><latest_budget_changes>115000.00</latest_budget_changes><total_budget_changes>2052000.00</total_budget_changes><forecast_completion>2027-05-03T00:00:00</forecast_completion><latest_schedule_changes>26</latest_schedule_changes><total_schedule_changes>932</total_schedule_changes></row><row _id="row-7ewj.mtbc.e4it" _uuid="00000000-0000-0000-382E-1F7982CC00A3" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-7ewj.mtbc.e4it"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1128</pid><project_name>WOODHAVEN BLVD QUEENS BLVD BIN# 2248159</project_name><description>This bridge is a two span concrete encased structure, 153.3 feet wide, 75 feet long and carries a total of 9 lanes of traffic. The bridge itself is an integral part of the Woodhaven Blvd. subway station structure owned and operated by the MTA. The superstructure consists of concrete encased steel stringers framing into concrete encased steel columns which are also used to serve as the retaining wall holding up Queens Blvd. service road.</description><category>Bridges</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2018-10-10T00:00:00</design_start><budget_forecast>65211241.00</budget_forecast><latest_budget_changes>-20000.00</latest_budget_changes><total_budget_changes>2052000.00</total_budget_changes><forecast_completion>2027-10-10T00:00:00</forecast_completion><latest_schedule_changes>160</latest_schedule_changes><total_schedule_changes>932</total_schedule_changes></row><row _id="row-mhj5.y9bj_yj8b" _uuid="00000000-0000-0000-4D4B-E9A30B24DA10" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-mhj5.y9bj_yj8b"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1128</pid><project_name>WOODHAVEN BLVD QUEENS BLVD BIN# 2248159</project_name><description>This bridge is a two span concrete encased structure, 153.3 feet wide, 75 feet long and carries a total of 9 lanes of traffic. The bridge itself is an integral part of the Woodhaven Blvd. subway station structure owned and operated by the MTA. The superstructure consists of concrete encased steel stringers framing into concrete encased steel columns which are also used to serve as the retaining wall holding up Queens Blvd. service road.</description><category>Bridges</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Design</current_phase><design_start>2018-10-10T00:00:00</design_start><budget_forecast>65968241.00</budget_forecast><latest_budget_changes>757000.00</latest_budget_changes><total_budget_changes>2052000.00</total_budget_changes><forecast_completion>2028-01-24T00:00:00</forecast_completion><latest_schedule_changes>106</latest_schedule_changes><total_schedule_changes>932</total_schedule_changes></row><row _id="row-ntrd_c84s_9vu7" _uuid="00000000-0000-0000-61A5-8CE6E39D18A0" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ntrd_c84s_9vu7"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>1145</pid><project_name>Rego Park New Facility</project_name><description>New Library for Rego Park</description><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>Libraries-QBPL</client_agency><current_phase>Design</current_phase><design_start>2019-04-11T00:00:00</design_start><budget_forecast>41001000.00</budget_forecast><total_budget_changes>535000.00</total_budget_changes><forecast_completion>2025-12-13T00:00:00</forecast_completion><total_schedule_changes>474</total_schedule_changes></row><row _id="row-atku.kzmn-99xj" _uuid="00000000-0000-0000-B2BE-6171916EAC4C" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-atku.kzmn-99xj"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>1145</pid><project_name>Rego Park New Facility</project_name><description>New Library for Rego Park</description><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>Libraries-QBPL</client_agency><current_phase>Design</current_phase><design_start>2019-04-11T00:00:00</design_start><budget_forecast>41311000.00</budget_forecast><latest_budget_changes>310000.00</latest_budget_changes><total_budget_changes>535000.00</total_budget_changes><forecast_completion>2026-03-07T00:00:00</forecast_completion><latest_schedule_changes>84</latest_schedule_changes><total_schedule_changes>474</total_schedule_changes></row><row _id="row-5ean~89rd.hmhc" _uuid="00000000-0000-0000-1690-06D3D820E740" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-5ean~89rd.hmhc"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>1145</pid><project_name>Rego Park New Facility</project_name><description>New Library for Rego Park</description><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>Libraries-QBPL</client_agency><current_phase>Design</current_phase><design_start>2019-04-11T00:00:00</design_start><budget_forecast>41511000.00</budget_forecast><latest_budget_changes>200000.00</latest_budget_changes><total_budget_changes>535000.00</total_budget_changes><forecast_completion>2026-03-07T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>474</total_schedule_changes></row><row _id="row-ifc3-f462-4wq5" _uuid="00000000-0000-0000-7C27-2C6ABD496C98" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ifc3-f462-4wq5"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1145</pid><project_name>Rego Park New Facility</project_name><description>New Library for Rego Park</description><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>Libraries-QBPL</client_agency><current_phase>Design</current_phase><design_start>2019-04-11T00:00:00</design_start><budget_forecast>41536000.00</budget_forecast><latest_budget_changes>25000.00</latest_budget_changes><total_budget_changes>535000.00</total_budget_changes><forecast_completion>2026-11-30T00:00:00</forecast_completion><latest_schedule_changes>268</latest_schedule_changes><total_schedule_changes>474</total_schedule_changes></row><row _id="row-nh9y.b38g.ftbg" _uuid="00000000-0000-0000-3954-D53D67ADE506" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-nh9y.b38g.ftbg"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1145</pid><project_name>Rego Park New Facility</project_name><description>New Library for Rego Park</description><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>Libraries-QBPL</client_agency><current_phase>Design</current_phase><design_start>2019-04-11T00:00:00</design_start><budget_forecast>41536000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>535000.00</total_budget_changes><forecast_completion>2027-04-01T00:00:00</forecast_completion><latest_schedule_changes>122</latest_schedule_changes><total_schedule_changes>474</total_schedule_changes></row><row _id="row-nehu~zwas.yz6t" _uuid="00000000-0000-0000-10CD-827BD3EE1F24" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-nehu~zwas.yz6t"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1317</pid><project_name>Accessible Pedestrian Signals</project_name><description>Accessible Pedestrian Signals</description><category>Streets and Roadways</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction Procurement</current_phase><budget_forecast>158025000.00</budget_forecast><total_budget_changes>-3567000.00</total_budget_changes></row><row _id="row-ipju~fg6m_7d7b" _uuid="00000000-0000-0000-D075-6CB9AAA20840" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ipju~fg6m_7d7b"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>1147</pid><project_name>New Westchester Square</project_name><description>DDC Constructability comments anticipated by 5/31/17.  Anticipated Construction Budget shortfall of $600k. Funding required to submit initial Construction CP.</description><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>Libraries-NYPL</client_agency><current_phase>Construction Procurement</current_phase><design_start>2013-05-13T00:00:00</design_start><budget_forecast>36429630.00</budget_forecast><total_budget_changes>0.00</total_budget_changes><forecast_completion>2025-08-28T00:00:00</forecast_completion><total_schedule_changes>471</total_schedule_changes></row><row _id="row-wbcu-3eej-jbkp" _uuid="00000000-0000-0000-4A92-64813BE11119" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-wbcu-3eej-jbkp"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>1147</pid><project_name>New Westchester Square</project_name><description>DDC Constructability comments anticipated by 5/31/17.  Anticipated Construction Budget shortfall of $600k. Funding required to submit initial Construction CP.</description><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>Libraries-NYPL</client_agency><current_phase>Construction Procurement</current_phase><design_start>2013-05-13T00:00:00</design_start><budget_forecast>36429630.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2026-02-28T00:00:00</forecast_completion><latest_schedule_changes>184</latest_schedule_changes><total_schedule_changes>471</total_schedule_changes></row><row _id="row-ep7f-m376~2s84" _uuid="00000000-0000-0000-2F8E-21784454B9CF" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ep7f-m376~2s84"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>1147</pid><project_name>New Westchester Square</project_name><description>DDC Constructability comments anticipated by 5/31/17.  Anticipated Construction Budget shortfall of $600k. Funding required to submit initial Construction CP.</description><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>Libraries-NYPL</client_agency><current_phase>Construction Procurement</current_phase><design_start>2013-05-13T00:00:00</design_start><budget_forecast>36429630.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2026-02-28T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>471</total_schedule_changes></row><row _id="row-sh4s.6ymu.fztc" _uuid="00000000-0000-0000-47D6-4A70E23D9532" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-sh4s.6ymu.fztc"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1147</pid><project_name>New Westchester Square</project_name><description>DDC Constructability comments anticipated by 5/31/17.  Anticipated Construction Budget shortfall of $600k. Funding required to submit initial Construction CP.</description><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>Libraries-NYPL</client_agency><current_phase>Construction Procurement</current_phase><design_start>2013-05-13T00:00:00</design_start><budget_forecast>36429630.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2026-12-12T00:00:00</forecast_completion><latest_schedule_changes>287</latest_schedule_changes><total_schedule_changes>471</total_schedule_changes></row><row _id="row-6rd3.aiup_jusz" _uuid="00000000-0000-0000-A158-A1753D418B2A" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-6rd3.aiup_jusz"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1147</pid><project_name>New Westchester Square</project_name><description>DDC Constructability comments anticipated by 5/31/17.  Anticipated Construction Budget shortfall of $600k. Funding required to submit initial Construction CP.</description><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>Libraries-NYPL</client_agency><current_phase>Construction Procurement</current_phase><design_start>2013-05-13T00:00:00</design_start><budget_forecast>36429630.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2026-12-12T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>471</total_schedule_changes></row><row _id="row-ripe~f6ad~ibsm" _uuid="00000000-0000-0000-BF5C-1C845CED8792" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ripe~f6ad~ibsm"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>1151</pid><project_name>Reconstruction of Beach Channel Drive -- Phase B</project_name><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2021-04-15T00:00:00</design_start><budget_forecast>42510000.00</budget_forecast><total_budget_changes>642000.00</total_budget_changes><total_schedule_changes>0</total_schedule_changes></row><row _id="row-64uw~i6yc-h5j6" _uuid="00000000-0000-0000-BF53-4E3AF7783050" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-64uw~i6yc-h5j6"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>1151</pid><project_name>Reconstruction of Beach Channel Drive -- Phase B</project_name><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2021-04-15T00:00:00</design_start><budget_forecast>42510000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>642000.00</total_budget_changes><forecast_completion>2028-09-01T00:00:00</forecast_completion><total_schedule_changes>0</total_schedule_changes></row><row _id="row-z7ea.7b34.r2ac" _uuid="00000000-0000-0000-55E8-908B9D15F9A4" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-z7ea.7b34.r2ac"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>1151</pid><project_name>Reconstruction of Beach Channel Drive -- Phase B</project_name><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2021-04-15T00:00:00</design_start><budget_forecast>42592000.00</budget_forecast><latest_budget_changes>82000.00</latest_budget_changes><total_budget_changes>642000.00</total_budget_changes><forecast_completion>2028-09-01T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>0</total_schedule_changes></row><row _id="row-wbgj~vjsk.a3zn" _uuid="00000000-0000-0000-2D27-EF6F589BAF7B" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-wbgj~vjsk.a3zn"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1151</pid><project_name>Reconstruction of Beach Channel Drive -- Phase B</project_name><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2021-04-15T00:00:00</design_start><budget_forecast>42952000.00</budget_forecast><latest_budget_changes>360000.00</latest_budget_changes><total_budget_changes>642000.00</total_budget_changes><forecast_completion>2028-09-01T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>0</total_schedule_changes></row><row _id="row-d6e6-uyfd-cav5" _uuid="00000000-0000-0000-BD56-FF0D6CBD076F" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-d6e6-uyfd-cav5"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1151</pid><project_name>Reconstruction of Beach Channel Drive -- Phase B</project_name><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2021-04-15T00:00:00</design_start><budget_forecast>43152000.00</budget_forecast><latest_budget_changes>200000.00</latest_budget_changes><total_budget_changes>642000.00</total_budget_changes><forecast_completion>2028-09-01T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>0</total_schedule_changes></row><row _id="row-9i88-svny.enuq" _uuid="00000000-0000-0000-ACF4-260924DC150D" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-9i88-svny.enuq"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>1152</pid><project_name>RECONSTRUCTION OF QUEENS BLVD - PHASE 3</project_name><description>Vision Zero - Queens Boulevard - Segment 3: Eliot Avenue to Yellowstone Boulevard. Variety of safety and streetscape improvements including partial street reconstruction and resurfacing to address roadway conditions.</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2018-04-26T00:00:00</design_start><budget_forecast>99344000.00</budget_forecast><total_budget_changes>0.00</total_budget_changes><total_schedule_changes>0</total_schedule_changes></row><row _id="row-d5xw-mvyh_n6ca" _uuid="00000000-0000-0000-2A6F-947AA8370C21" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-d5xw-mvyh_n6ca"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>1152</pid><project_name>RECONSTRUCTION OF QUEENS BLVD - PHASE 3</project_name><description>Vision Zero - Queens Boulevard - Segment 3: Eliot Avenue to Yellowstone Boulevard. Variety of safety and streetscape improvements including partial street reconstruction and resurfacing to address roadway conditions.</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2018-04-26T00:00:00</design_start><budget_forecast>99344000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><total_schedule_changes>0</total_schedule_changes></row><row _id="row-rnrt~8k2s-562t" _uuid="00000000-0000-0000-7FA1-85CA2F2643E7" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-rnrt~8k2s-562t"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>1152</pid><project_name>RECONSTRUCTION OF QUEENS BLVD - PHASE 3</project_name><description>Vision Zero - Queens Boulevard - Segment 3: Eliot Avenue to Yellowstone Boulevard. Variety of safety and streetscape improvements including partial street reconstruction and resurfacing to address roadway conditions.</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2018-04-26T00:00:00</design_start><budget_forecast>99344000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><total_schedule_changes>0</total_schedule_changes></row><row _id="row-nkzu~qkv3.fwnv" _uuid="00000000-0000-0000-B40D-3217CDD1BFE5" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-nkzu~qkv3.fwnv"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1152</pid><project_name>RECONSTRUCTION OF QUEENS BLVD - PHASE 3</project_name><description>Vision Zero - Queens Boulevard - Segment 3: Eliot Avenue to Yellowstone Boulevard. Variety of safety and streetscape improvements including partial street reconstruction and resurfacing to address roadway conditions.</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2018-04-26T00:00:00</design_start><budget_forecast>99344000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2032-08-30T00:00:00</forecast_completion><total_schedule_changes>0</total_schedule_changes></row><row _id="row-6q3m~43v3_q8cy" _uuid="00000000-0000-0000-4EF3-94E3F61C277D" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-6q3m~43v3_q8cy"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1152</pid><project_name>RECONSTRUCTION OF QUEENS BLVD - PHASE 3</project_name><description>Vision Zero - Queens Boulevard - Segment 3: Eliot Avenue to Yellowstone Boulevard. Variety of safety and streetscape improvements including partial street reconstruction and resurfacing to address roadway conditions.</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2018-04-26T00:00:00</design_start><budget_forecast>99344000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2032-08-30T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>0</total_schedule_changes></row><row _id="row-wqmi_kqb7~rkbi" _uuid="00000000-0000-0000-CE2B-E0208C448C89" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-wqmi_kqb7~rkbi"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>1153</pid><project_name>EMS Station 17 - New Facility</project_name><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>Fire</client_agency><current_phase>Design</current_phase><design_start>2019-01-18T00:00:00</design_start><budget_forecast>31176000.00</budget_forecast><total_budget_changes>13113000.00</total_budget_changes><forecast_completion>2024-03-30T00:00:00</forecast_completion><total_schedule_changes>434</total_schedule_changes></row><row _id="row-xz7d_ufcy~bh7t" _uuid="00000000-0000-0000-2D47-3E22BBC6B71A" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-xz7d_ufcy~bh7t"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>1153</pid><project_name>EMS Station 17 - New Facility</project_name><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>Fire</client_agency><current_phase>Design</current_phase><design_start>2019-01-18T00:00:00</design_start><budget_forecast>31526000.00</budget_forecast><latest_budget_changes>350000.00</latest_budget_changes><total_budget_changes>13113000.00</total_budget_changes><forecast_completion>2024-06-08T00:00:00</forecast_completion><latest_schedule_changes>70</latest_schedule_changes><total_schedule_changes>434</total_schedule_changes></row><row _id="row-zik4-wpmv_3msm" _uuid="00000000-0000-0000-F089-E972BF664BD3" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-zik4-wpmv_3msm"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>1153</pid><project_name>EMS Station 17 - New Facility</project_name><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>Fire</client_agency><current_phase>Design</current_phase><design_start>2019-01-18T00:00:00</design_start><budget_forecast>43914000.00</budget_forecast><latest_budget_changes>12388000.00</latest_budget_changes><total_budget_changes>13113000.00</total_budget_changes><forecast_completion>2024-08-19T00:00:00</forecast_completion><latest_schedule_changes>72</latest_schedule_changes><total_schedule_changes>434</total_schedule_changes></row><row _id="row-74pw_pwz5-kbd9" _uuid="00000000-0000-0000-9C1C-0AD42D214359" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-74pw_pwz5-kbd9"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1153</pid><project_name>EMS Station 17 - New Facility</project_name><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>Fire</client_agency><current_phase>Design</current_phase><design_start>2019-01-18T00:00:00</design_start><budget_forecast>44126000.00</budget_forecast><latest_budget_changes>212000.00</latest_budget_changes><total_budget_changes>13113000.00</total_budget_changes><forecast_completion>2025-01-07T00:00:00</forecast_completion><latest_schedule_changes>141</latest_schedule_changes><total_schedule_changes>434</total_schedule_changes></row><row _id="row-3jyw_9pt5-skwp" _uuid="00000000-0000-0000-51A0-70CF931F83B5" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-3jyw_9pt5-skwp"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1153</pid><project_name>EMS Station 17 - New Facility</project_name><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>Fire</client_agency><current_phase>Design</current_phase><design_start>2019-01-18T00:00:00</design_start><budget_forecast>44289000.00</budget_forecast><latest_budget_changes>163000.00</latest_budget_changes><total_budget_changes>13113000.00</total_budget_changes><forecast_completion>2025-06-07T00:00:00</forecast_completion><latest_schedule_changes>151</latest_schedule_changes><total_schedule_changes>434</total_schedule_changes></row><row _id="row-ngjp~z8br-txxj" _uuid="00000000-0000-0000-344D-DB8F811F4345" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ngjp~z8br-txxj"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>1154</pid><project_name>Fort Totten Infrastructure Upgrade</project_name><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>FDNY</client_agency><current_phase>Design</current_phase><design_start>2021-05-06T00:00:00</design_start><budget_forecast>57786000.00</budget_forecast><total_budget_changes>100000.00</total_budget_changes><forecast_completion>2025-10-13T00:00:00</forecast_completion><total_schedule_changes>318</total_schedule_changes></row><row _id="row-tn39~aa97_at7m" _uuid="00000000-0000-0000-9E28-1B1E18B933D2" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-tn39~aa97_at7m"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>1154</pid><project_name>Fort Totten Infrastructure Upgrade</project_name><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>FDNY</client_agency><current_phase>Design</current_phase><design_start>2021-05-06T00:00:00</design_start><budget_forecast>57786000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>100000.00</total_budget_changes><forecast_completion>2025-10-13T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>318</total_schedule_changes></row><row _id="row-v7qk_mvf4_pxbp" _uuid="00000000-0000-0000-A568-71EEA8404929" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-v7qk_mvf4_pxbp"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>1154</pid><project_name>Fort Totten Infrastructure Upgrade</project_name><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>FDNY</client_agency><current_phase>Design</current_phase><design_start>2021-05-06T00:00:00</design_start><budget_forecast>57786000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>100000.00</total_budget_changes><forecast_completion>2025-10-13T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>318</total_schedule_changes></row><row _id="row-zena.4p6u-e5g9" _uuid="00000000-0000-0000-3EA1-DBD38DAD7E02" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-zena.4p6u-e5g9"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1154</pid><project_name>Fort Totten Infrastructure Upgrade</project_name><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>FDNY</client_agency><current_phase>Design</current_phase><design_start>2021-05-06T00:00:00</design_start><budget_forecast>57886000.00</budget_forecast><latest_budget_changes>100000.00</latest_budget_changes><total_budget_changes>100000.00</total_budget_changes><forecast_completion>2026-04-09T00:00:00</forecast_completion><latest_schedule_changes>178</latest_schedule_changes><total_schedule_changes>318</total_schedule_changes></row><row _id="row-ggrq-z6d7-vmcn" _uuid="00000000-0000-0000-2BC3-C3FB4E1A0FD8" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ggrq-z6d7-vmcn"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1154</pid><project_name>Fort Totten Infrastructure Upgrade</project_name><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>FDNY</client_agency><current_phase>Design</current_phase><design_start>2021-05-06T00:00:00</design_start><budget_forecast>57886000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>100000.00</total_budget_changes><forecast_completion>2026-08-27T00:00:00</forecast_completion><latest_schedule_changes>140</latest_schedule_changes><total_schedule_changes>318</total_schedule_changes></row><row _id="row-kh3k_9rf3_gh4v" _uuid="00000000-0000-0000-B68C-2B0FBE89E2D6" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-kh3k_9rf3_gh4v"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>1156</pid><project_name>BBJ Queens Garage - Construction of new multi-level Garage with Community Space</project_name><description>BBJ Queens Garage - Construction of new multi-level Garage with Community Space</description><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>Corrections</client_agency><current_phase>Design</current_phase><design_start>2021-03-25T00:00:00</design_start><budget_forecast>95967000.00</budget_forecast><latest_budget_changes>1490000.00</latest_budget_changes><total_budget_changes>1314000.00</total_budget_changes><forecast_completion>2021-10-11T00:00:00</forecast_completion><total_schedule_changes>547</total_schedule_changes></row><row _id="row-6bs5.3dw7~7n4k" _uuid="00000000-0000-0000-5AA2-420C2A5A3A20" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-6bs5.3dw7~7n4k"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>1156</pid><project_name>BBJ Queens Garage - Construction of new multi-level Garage with Community Space</project_name><description>BBJ Queens Garage - Construction of new multi-level Garage with Community Space</description><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>Corrections</client_agency><current_phase>Design</current_phase><design_start>2021-03-25T00:00:00</design_start><budget_forecast>95611000.00</budget_forecast><latest_budget_changes>-356000.00</latest_budget_changes><total_budget_changes>1314000.00</total_budget_changes><forecast_completion>2021-10-11T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>547</total_schedule_changes></row><row _id="row-hd4q.t4d9_4y79" _uuid="00000000-0000-0000-8A7B-8D219DD46491" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-hd4q.t4d9_4y79"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1156</pid><project_name>BBJ Queens Garage - Construction of new multi-level Garage with Community Space</project_name><description>BBJ Queens Garage - Construction of new multi-level Garage with Community Space</description><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>Corrections</client_agency><current_phase>Design</current_phase><design_start>2021-03-25T00:00:00</design_start><budget_forecast>95791000.00</budget_forecast><latest_budget_changes>180000.00</latest_budget_changes><total_budget_changes>1314000.00</total_budget_changes><forecast_completion>2021-10-11T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>547</total_schedule_changes></row><row _id="row-bvev.454d.2tk4" _uuid="00000000-0000-0000-B422-3364744B6AFA" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-bvev.454d.2tk4"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1156</pid><project_name>BBJ Queens Garage - Construction of new multi-level Garage with Community Space</project_name><description>BBJ Queens Garage - Construction of new multi-level Garage with Community Space</description><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>Corrections</client_agency><design_start>2020-11-13T00:00:00</design_start><budget_forecast>95791000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>1314000.00</total_budget_changes><forecast_completion>2023-04-11T00:00:00</forecast_completion><latest_schedule_changes>547</latest_schedule_changes><total_schedule_changes>547</total_schedule_changes></row><row _id="row-u9vf~genz~w8s7" _uuid="00000000-0000-0000-F919-AAC6C2CD32A8" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-u9vf~genz~w8s7"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>1158</pid><project_name>12th Avenue Accessibility Improvements</project_name><description>12TH AVENUE ACCESSIBILITY IMPROVEMENTS</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2020-03-02T00:00:00</design_start><budget_forecast>57920000.00</budget_forecast><total_budget_changes>51571000.00</total_budget_changes><total_schedule_changes>-98</total_schedule_changes></row><row _id="row-4ej6-3mzu-u9ma" _uuid="00000000-0000-0000-358F-E1C868924A28" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-4ej6-3mzu-u9ma"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>1158</pid><project_name>12th Avenue Accessibility Improvements</project_name><description>12TH AVENUE ACCESSIBILITY IMPROVEMENTS</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2020-03-02T00:00:00</design_start><budget_forecast>57920000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>51571000.00</total_budget_changes><forecast_completion>2027-01-06T00:00:00</forecast_completion><total_schedule_changes>-98</total_schedule_changes></row><row _id="row-54jb-jvd5_at9c" _uuid="00000000-0000-0000-88C2-167106E005A6" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-54jb-jvd5_at9c"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>1158</pid><project_name>12th Avenue Accessibility Improvements</project_name><description>12TH AVENUE ACCESSIBILITY IMPROVEMENTS</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2020-03-02T00:00:00</design_start><budget_forecast>109491000.00</budget_forecast><latest_budget_changes>51571000.00</latest_budget_changes><total_budget_changes>51571000.00</total_budget_changes><forecast_completion>2027-01-06T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>-98</total_schedule_changes></row><row _id="row-cp7j~9hyz-5dpm" _uuid="00000000-0000-0000-8624-4B02B8712976" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-cp7j~9hyz-5dpm"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1158</pid><project_name>12th Avenue Accessibility Improvements</project_name><description>12TH AVENUE ACCESSIBILITY IMPROVEMENTS</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2020-03-02T00:00:00</design_start><budget_forecast>109491000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>51571000.00</total_budget_changes><forecast_completion>2026-01-31T00:00:00</forecast_completion><latest_schedule_changes>-340</latest_schedule_changes><total_schedule_changes>-98</total_schedule_changes></row><row _id="row-d9he_6kka-m6jg" _uuid="00000000-0000-0000-9759-3FE3139C07CA" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-d9he_6kka-m6jg"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1158</pid><project_name>12th Avenue Accessibility Improvements</project_name><description>12TH AVENUE ACCESSIBILITY IMPROVEMENTS</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2020-03-02T00:00:00</design_start><budget_forecast>109491000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>51571000.00</total_budget_changes><forecast_completion>2026-09-30T00:00:00</forecast_completion><latest_schedule_changes>242</latest_schedule_changes><total_schedule_changes>-98</total_schedule_changes></row><row _id="row-chec~nr4k-mxpm" _uuid="00000000-0000-0000-E4A8-12DD72DF868B" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-chec~nr4k-mxpm"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>1163</pid><project_name>RECONSTRUCTION OF SOUTH JAMAICA AREA (SEQ200562)</project_name><description>Total reconstruction of two street grids in South Jamaica approximately bounded by Sutphin Boulevard, 109th Avenue, 155th Street and Linden Boulevard, and by 157th Street, 111th Avenue, Beddell Street and 116th Avenue.</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2014-02-04T00:00:00</design_start><budget_forecast>56391000.00</budget_forecast><total_budget_changes>1360000.00</total_budget_changes><forecast_completion>2026-02-09T00:00:00</forecast_completion><total_schedule_changes>366</total_schedule_changes></row><row _id="row-jmum~zbx5~zmkn" _uuid="00000000-0000-0000-0EBF-E8EDD6D14F87" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-jmum~zbx5~zmkn"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>1163</pid><project_name>RECONSTRUCTION OF SOUTH JAMAICA AREA (SEQ200562)</project_name><description>Total reconstruction of two street grids in South Jamaica approximately bounded by Sutphin Boulevard, 109th Avenue, 155th Street and Linden Boulevard, and by 157th Street, 111th Avenue, Beddell Street and 116th Avenue.</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2014-02-04T00:00:00</design_start><budget_forecast>56386000.00</budget_forecast><latest_budget_changes>-5000.00</latest_budget_changes><total_budget_changes>1360000.00</total_budget_changes><forecast_completion>2026-02-09T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>366</total_schedule_changes></row><row _id="row-cek5~twch_fhud" _uuid="00000000-0000-0000-AA08-64ECFAB7E814" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-cek5~twch_fhud"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>1163</pid><project_name>RECONSTRUCTION OF SOUTH JAMAICA AREA (SEQ200562)</project_name><description>Total reconstruction of two street grids in South Jamaica approximately bounded by Sutphin Boulevard, 109th Avenue, 155th Street and Linden Boulevard, and by 157th Street, 111th Avenue, Beddell Street and 116th Avenue.</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2014-02-04T00:00:00</design_start><budget_forecast>57023000.00</budget_forecast><latest_budget_changes>637000.00</latest_budget_changes><total_budget_changes>1360000.00</total_budget_changes><forecast_completion>2027-01-11T00:00:00</forecast_completion><latest_schedule_changes>336</latest_schedule_changes><total_schedule_changes>366</total_schedule_changes></row><row _id="row-qcu5-bzxv~unh3" _uuid="00000000-0000-0000-6770-8BF5DB8F0531" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-qcu5-bzxv~unh3"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1163</pid><project_name>RECONSTRUCTION OF SOUTH JAMAICA AREA (SEQ200562)</project_name><description>Total reconstruction of two street grids in South Jamaica approximately bounded by Sutphin Boulevard, 109th Avenue, 155th Street and Linden Boulevard, and by 157th Street, 111th Avenue, Beddell Street and 116th Avenue.</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2014-02-04T00:00:00</design_start><budget_forecast>57751000.00</budget_forecast><latest_budget_changes>728000.00</latest_budget_changes><total_budget_changes>1360000.00</total_budget_changes><forecast_completion>2027-02-10T00:00:00</forecast_completion><latest_schedule_changes>30</latest_schedule_changes><total_schedule_changes>366</total_schedule_changes></row><row _id="row-px3i~etz3.cba9" _uuid="00000000-0000-0000-26C6-DAA85BAFB688" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-px3i~etz3.cba9"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1163</pid><project_name>RECONSTRUCTION OF SOUTH JAMAICA AREA (SEQ200562)</project_name><description>Total reconstruction of two street grids in South Jamaica approximately bounded by Sutphin Boulevard, 109th Avenue, 155th Street and Linden Boulevard, and by 157th Street, 111th Avenue, Beddell Street and 116th Avenue.</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2014-02-04T00:00:00</design_start><budget_forecast>57751000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>1360000.00</total_budget_changes><forecast_completion>2027-02-10T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>366</total_schedule_changes></row><row _id="row-ufgm~jh3u-m2z2" _uuid="00000000-0000-0000-484C-7D1F57A2C3AF" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ufgm~jh3u-m2z2"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>1165</pid><project_name>WATERMAIN REPLACEMENT IN ORIENTAL BLVD, BROOKLYN</project_name><description>WATERMAIN REPLACEMENT IN ORIENTAL BLVD, BROOKLYN</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Design</current_phase><design_start>2017-02-15T00:00:00</design_start><budget_forecast>43932000.00</budget_forecast><total_budget_changes>3715000.00</total_budget_changes><forecast_completion>2023-07-02T00:00:00</forecast_completion><total_schedule_changes>443</total_schedule_changes></row><row _id="row-m2xf~gcm5.4yw6" _uuid="00000000-0000-0000-78AD-8474AA4F8AC8" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-m2xf~gcm5.4yw6"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>1165</pid><project_name>WATERMAIN REPLACEMENT IN ORIENTAL BLVD, BROOKLYN</project_name><description>WATERMAIN REPLACEMENT IN ORIENTAL BLVD, BROOKLYN</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction Procurement</current_phase><design_start>2017-02-15T00:00:00</design_start><budget_forecast>50884000.00</budget_forecast><latest_budget_changes>6952000.00</latest_budget_changes><total_budget_changes>3715000.00</total_budget_changes><forecast_completion>2023-08-28T00:00:00</forecast_completion><latest_schedule_changes>57</latest_schedule_changes><total_schedule_changes>443</total_schedule_changes></row><row _id="row-jeis~k253.wbqi" _uuid="00000000-0000-0000-5D86-A451545FB9B4" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-jeis~k253.wbqi"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>1165</pid><project_name>WATERMAIN REPLACEMENT IN ORIENTAL BLVD, BROOKLYN</project_name><description>WATERMAIN REPLACEMENT IN ORIENTAL BLVD, BROOKLYN</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction Procurement</current_phase><design_start>2017-02-15T00:00:00</design_start><budget_forecast>52382000.00</budget_forecast><latest_budget_changes>1498000.00</latest_budget_changes><total_budget_changes>3715000.00</total_budget_changes><forecast_completion>2023-08-28T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>443</total_schedule_changes></row><row _id="row-ks5f.mxje_vx7b" _uuid="00000000-0000-0000-6E8C-18009F84469A" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ks5f.mxje_vx7b"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1165</pid><project_name>WATERMAIN REPLACEMENT IN ORIENTAL BLVD, BROOKLYN</project_name><description>WATERMAIN REPLACEMENT IN ORIENTAL BLVD, BROOKLYN</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction</current_phase><design_start>2017-02-15T00:00:00</design_start><budget_forecast>47647000.00</budget_forecast><latest_budget_changes>-4735000.00</latest_budget_changes><total_budget_changes>3715000.00</total_budget_changes><forecast_completion>2024-09-17T00:00:00</forecast_completion><latest_schedule_changes>386</latest_schedule_changes><total_schedule_changes>443</total_schedule_changes></row><row _id="row-678w_q6rz~93js" _uuid="00000000-0000-0000-7937-000DA4EF51DA" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-678w_q6rz~93js"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1165</pid><project_name>WATERMAIN REPLACEMENT IN ORIENTAL BLVD, BROOKLYN</project_name><description>WATERMAIN REPLACEMENT IN ORIENTAL BLVD, BROOKLYN</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction</current_phase><design_start>2017-02-15T00:00:00</design_start><budget_forecast>47647000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>3715000.00</total_budget_changes><forecast_completion>2024-09-17T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>443</total_schedule_changes></row><row _id="row-zs9e.mwvg~qfqw" _uuid="00000000-0000-0000-E64C-3B68D0FC7DCC" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-zs9e.mwvg~qfqw"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>1167</pid><project_name>Queens Botanical Garden Educ Bldg Renovation</project_name><description>New education building at Queens Botanical Garden (QBG). Design and construction of a new 14,500 SF building to provide year-round programming and educational spaces to serve students, children, community gardeners, and others.  The New Education Building will add six new teaching spaces, including four classrooms, a teaching kitchen and a teaching greenhouse where educators will be able to grow and maintain plants for educational purposes. Ideally, the four regular classrooms will be able to opened up into one large space to accommodate larger training programs.</description><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>Cultural Affairs</client_agency><current_phase>Design</current_phase><design_start>2019-06-18T00:00:00</design_start><budget_forecast>28686000.00</budget_forecast><total_budget_changes>905000.00</total_budget_changes><forecast_completion>2024-11-08T00:00:00</forecast_completion><total_schedule_changes>357</total_schedule_changes></row><row _id="row-mt2h_7765_kd7v" _uuid="00000000-0000-0000-376A-D99D24BD9044" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-mt2h_7765_kd7v"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>1167</pid><project_name>Queens Botanical Garden Educ Bldg Renovation</project_name><description>New education building at Queens Botanical Garden (QBG). Design and construction of a new 14,500 SF building to provide year-round programming and educational spaces to serve students, children, community gardeners, and others.  The New Education Building will add six new teaching spaces, including four classrooms, a teaching kitchen and a teaching greenhouse where educators will be able to grow and maintain plants for educational purposes. Ideally, the four regular classrooms will be able to opened up into one large space to accommodate larger training programs.</description><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>Cultural Affairs</client_agency><current_phase>Design</current_phase><design_start>2019-06-18T00:00:00</design_start><budget_forecast>28686000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>905000.00</total_budget_changes><forecast_completion>2025-04-11T00:00:00</forecast_completion><latest_schedule_changes>154</latest_schedule_changes><total_schedule_changes>357</total_schedule_changes></row><row _id="row-ntp4~pwrk_pb56" _uuid="00000000-0000-0000-0FDA-025B5DEC3E5A" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ntp4~pwrk_pb56"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>1210</pid><project_name>Woodhaven Blvd SBS Phase B</project_name><description>HWQ100SBB, Woodhaven Blvd � SBS � Phase B, calls for capital improvements along Woodhaven Blvd between Union Turnpike and 107th Avenue in the borough of Queens. These improvements include but are not limited to median widening, building out neck downs, normalizing intersections and other features to increase safety and support the Woodhaven SBS.</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2021-07-12T00:00:00</design_start><budget_forecast>50738000.00</budget_forecast><total_budget_changes>-20000.00</total_budget_changes><forecast_completion>2028-10-14T00:00:00</forecast_completion><total_schedule_changes>15</total_schedule_changes></row><row _id="row-yxs7~a727_vjsx" _uuid="00000000-0000-0000-54C2-F5F6ABCA815E" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-yxs7~a727_vjsx"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1317</pid><project_name>Accessible Pedestrian Signals</project_name><description>Accessible Pedestrian Signals</description><category>Streets and Roadways</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction Procurement</current_phase><budget_forecast>154458000.00</budget_forecast><latest_budget_changes>-3567000.00</latest_budget_changes><total_budget_changes>-3567000.00</total_budget_changes></row><row _id="row-6hjy-s6gz_9zgc" _uuid="00000000-0000-0000-A02A-294052BBC2C1" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-6hjy-s6gz_9zgc"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>1167</pid><project_name>Queens Botanical Garden Educ Bldg Renovation</project_name><description>New education building at Queens Botanical Garden (QBG). Design and construction of a new 14,500 SF building to provide year-round programming and educational spaces to serve students, children, community gardeners, and others.  The New Education Building will add six new teaching spaces, including four classrooms, a teaching kitchen and a teaching greenhouse where educators will be able to grow and maintain plants for educational purposes. Ideally, the four regular classrooms will be able to opened up into one large space to accommodate larger training programs.</description><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>Cultural Affairs</client_agency><current_phase>Design</current_phase><design_start>2019-06-18T00:00:00</design_start><budget_forecast>29692000.00</budget_forecast><latest_budget_changes>1006000.00</latest_budget_changes><total_budget_changes>905000.00</total_budget_changes><forecast_completion>2025-06-23T00:00:00</forecast_completion><latest_schedule_changes>73</latest_schedule_changes><total_schedule_changes>357</total_schedule_changes></row><row _id="row-8aqa~bwwa~kmdr" _uuid="00000000-0000-0000-5882-AF0567377323" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-8aqa~bwwa~kmdr"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1167</pid><project_name>Queens Botanical Garden Educ Bldg Renovation</project_name><description>New education building at Queens Botanical Garden (QBG). Design and construction of a new 14,500 SF building to provide year-round programming and educational spaces to serve students, children, community gardeners, and others.  The New Education Building will add six new teaching spaces, including four classrooms, a teaching kitchen and a teaching greenhouse where educators will be able to grow and maintain plants for educational purposes. Ideally, the four regular classrooms will be able to opened up into one large space to accommodate larger training programs.</description><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>Cultural Affairs</client_agency><current_phase>Design</current_phase><design_start>2019-06-18T00:00:00</design_start><budget_forecast>29574000.00</budget_forecast><latest_budget_changes>-118000.00</latest_budget_changes><total_budget_changes>905000.00</total_budget_changes><forecast_completion>2025-11-10T00:00:00</forecast_completion><latest_schedule_changes>140</latest_schedule_changes><total_schedule_changes>357</total_schedule_changes></row><row _id="row-4izu.8h72_b7r9" _uuid="00000000-0000-0000-6CAF-72C4CDB21130" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-4izu.8h72_b7r9"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1167</pid><project_name>Queens Botanical Garden Educ Bldg Renovation</project_name><description>New education building at Queens Botanical Garden (QBG). Design and construction of a new 14,500 SF building to provide year-round programming and educational spaces to serve students, children, community gardeners, and others.  The New Education Building will add six new teaching spaces, including four classrooms, a teaching kitchen and a teaching greenhouse where educators will be able to grow and maintain plants for educational purposes. Ideally, the four regular classrooms will be able to opened up into one large space to accommodate larger training programs.</description><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>Cultural Affairs</client_agency><current_phase>Construction Procurement</current_phase><design_start>2019-06-18T00:00:00</design_start><budget_forecast>29591000.00</budget_forecast><latest_budget_changes>17000.00</latest_budget_changes><total_budget_changes>905000.00</total_budget_changes><forecast_completion>2025-10-31T00:00:00</forecast_completion><latest_schedule_changes>-10</latest_schedule_changes><total_schedule_changes>357</total_schedule_changes></row><row _id="row-pkuf-kmkt.kniq" _uuid="00000000-0000-0000-E3F6-1FFB6AF13C1B" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-pkuf-kmkt.kniq"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>1169</pid><project_name>Coastal Resiliency Area 1 - East 23rd St. to Montg</project_name><description>East Side Coastal Resiliency - Montgomery Street to East 15th Street, Manhattan</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Parks &amp; Recreation</client_agency><current_phase>Construction Procurement</current_phase><design_start>2016-04-27T00:00:00</design_start><budget_forecast>1328351541.00</budget_forecast><total_budget_changes>0.76</total_budget_changes></row><row _id="row-pupj-yjag.ucab" _uuid="00000000-0000-0000-6963-808C1C91945E" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-pupj-yjag.ucab"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>1169</pid><project_name>Coastal Resiliency Area 1 - East 23rd St. to Montg</project_name><description>East Side Coastal Resiliency - Montgomery Street to East 15th Street, Manhattan</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Parks &amp; Recreation</client_agency><current_phase>Construction Procurement</current_phase><design_start>2016-04-27T00:00:00</design_start><budget_forecast>1328351541.76</budget_forecast><latest_budget_changes>0.76</latest_budget_changes><total_budget_changes>0.76</total_budget_changes></row><row _id="row-uj5m-ejuc-q4nm" _uuid="00000000-0000-0000-D3AE-3448451EF275" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-uj5m-ejuc-q4nm"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>1169</pid><project_name>Coastal Resiliency Area 1 - East 23rd St. to Montg</project_name><description>East Side Coastal Resiliency - Montgomery Street to East 15th Street, Manhattan</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Parks &amp; Recreation</client_agency><current_phase>Construction Procurement</current_phase><design_start>2016-04-27T00:00:00</design_start><budget_forecast>1328351541.76</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.76</total_budget_changes></row><row _id="row-k92n~r7ks-gscu" _uuid="00000000-0000-0000-895F-E43BC4C9CA13" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-k92n~r7ks-gscu"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1169</pid><project_name>Coastal Resiliency Area 1 - East 23rd St. to Montg</project_name><description>East Side Coastal Resiliency - Montgomery Street to East 15th Street, Manhattan</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Parks &amp; Recreation</client_agency><current_phase>Construction Procurement</current_phase><design_start>2016-04-27T00:00:00</design_start><budget_forecast>1328351541.76</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.76</total_budget_changes></row><row _id="row-greu~st7j_28gr" _uuid="00000000-0000-0000-4E04-0D7A41396D76" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-greu~st7j_28gr"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1169</pid><project_name>Coastal Resiliency Area 1 - East 23rd St. to Montg</project_name><description>East Side Coastal Resiliency - Montgomery Street to East 15th Street, Manhattan</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Parks &amp; Recreation</client_agency><current_phase>Construction Procurement</current_phase><design_start>2016-04-27T00:00:00</design_start><budget_forecast>1328351541.76</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.76</total_budget_changes></row><row _id="row-32my_wstw~t9p4" _uuid="00000000-0000-0000-ECD2-FBE6F235C67C" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-32my_wstw~t9p4"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>1170</pid><project_name>Coastal Resiliency – Project Area 2</project_name><description>INSTALLATION OF EAST SIDE COASTAL RESILIENCY (ESCR) PROJECT AREA 2 FROM EAST 15TH STREET TO EAST 25TH STREET</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Parks &amp; Recreation</client_agency><current_phase>Construction</current_phase><design_start>2016-04-27T00:00:00</design_start><budget_forecast>216897000.00</budget_forecast><total_budget_changes>448000.00</total_budget_changes><forecast_completion>2024-10-13T00:00:00</forecast_completion><total_schedule_changes>0</total_schedule_changes></row><row _id="row-xnnw_2g9d.qg9q" _uuid="00000000-0000-0000-002F-D13C3022394B" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-xnnw_2g9d.qg9q"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>1170</pid><project_name>Coastal Resiliency – Project Area 2</project_name><description>INSTALLATION OF EAST SIDE COASTAL RESILIENCY (ESCR) PROJECT AREA 2 FROM EAST 15TH STREET TO EAST 25TH STREET</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Parks &amp; Recreation</client_agency><current_phase>Construction</current_phase><design_start>2016-04-27T00:00:00</design_start><budget_forecast>223136000.00</budget_forecast><latest_budget_changes>6239000.00</latest_budget_changes><total_budget_changes>448000.00</total_budget_changes><forecast_completion>2024-10-13T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>0</total_schedule_changes></row><row _id="row-tuvq-ni69-ev8x" _uuid="00000000-0000-0000-A7D4-245D9140A3A3" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-tuvq-ni69-ev8x"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>1170</pid><project_name>Coastal Resiliency – Project Area 2</project_name><description>INSTALLATION OF EAST SIDE COASTAL RESILIENCY (ESCR) PROJECT AREA 2 FROM EAST 15TH STREET TO EAST 25TH STREET</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Parks &amp; Recreation</client_agency><current_phase>Construction</current_phase><design_start>2016-04-27T00:00:00</design_start><budget_forecast>217335000.00</budget_forecast><latest_budget_changes>-5801000.00</latest_budget_changes><total_budget_changes>448000.00</total_budget_changes><forecast_completion>2024-10-13T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>0</total_schedule_changes></row><row _id="row-uzy4~a42c.85jw" _uuid="00000000-0000-0000-1CA0-0F96C0C728CF" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-uzy4~a42c.85jw"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1170</pid><project_name>Coastal Resiliency – Project Area 2</project_name><description>INSTALLATION OF EAST SIDE COASTAL RESILIENCY (ESCR) PROJECT AREA 2 FROM EAST 15TH STREET TO EAST 25TH STREET</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Parks &amp; Recreation</client_agency><current_phase>Construction</current_phase><design_start>2016-04-27T00:00:00</design_start><budget_forecast>217345000.00</budget_forecast><latest_budget_changes>10000.00</latest_budget_changes><total_budget_changes>448000.00</total_budget_changes><forecast_completion>2024-10-13T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>0</total_schedule_changes></row><row _id="row-hppw_hksh-vv9x" _uuid="00000000-0000-0000-5095-738036E2D6E5" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-hppw_hksh-vv9x"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1170</pid><project_name>Coastal Resiliency – Project Area 2</project_name><description>INSTALLATION OF EAST SIDE COASTAL RESILIENCY (ESCR) PROJECT AREA 2 FROM EAST 15TH STREET TO EAST 25TH STREET</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Parks &amp; Recreation</client_agency><current_phase>Construction</current_phase><design_start>2016-04-27T00:00:00</design_start><budget_forecast>217345000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>448000.00</total_budget_changes><forecast_completion>2024-10-13T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>0</total_schedule_changes></row><row _id="row-n7n5.7isq~xuvq" _uuid="00000000-0000-0000-8DF3-4E456B9624AC" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-n7n5.7isq~xuvq"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>1171</pid><project_name>Coastal Resiliency -- Parallel Conveyances</project_name><description>Coastal Resiliency -- Parallel Conveyances</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Parks &amp; Recreation</client_agency><current_phase>Construction Procurement</current_phase><design_start>2016-04-27T00:00:00</design_start><budget_forecast>167779000.00</budget_forecast><total_budget_changes>32327000.00</total_budget_changes><forecast_completion>2026-06-11T00:00:00</forecast_completion><total_schedule_changes>92</total_schedule_changes></row><row _id="row-r3vb.cn9p.ehat" _uuid="00000000-0000-0000-67BF-607C2AE7A1D2" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-r3vb.cn9p.ehat"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>1171</pid><project_name>Coastal Resiliency -- Parallel Conveyances</project_name><description>Coastal Resiliency -- Parallel Conveyances</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Parks &amp; Recreation</client_agency><current_phase>Construction Procurement</current_phase><design_start>2016-04-27T00:00:00</design_start><budget_forecast>167831000.00</budget_forecast><latest_budget_changes>52000.00</latest_budget_changes><total_budget_changes>32327000.00</total_budget_changes><forecast_completion>2026-06-11T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>92</total_schedule_changes></row><row _id="row-4u2t_kudd.gxpg" _uuid="00000000-0000-0000-35DB-90371807A86B" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-4u2t_kudd.gxpg"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>1171</pid><project_name>Coastal Resiliency -- Parallel Conveyances</project_name><description>Coastal Resiliency -- Parallel Conveyances</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Parks &amp; Recreation</client_agency><current_phase>Construction Procurement</current_phase><design_start>2016-04-27T00:00:00</design_start><budget_forecast>174561000.00</budget_forecast><latest_budget_changes>6730000.00</latest_budget_changes><total_budget_changes>32327000.00</total_budget_changes><forecast_completion>2026-06-11T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>92</total_schedule_changes></row><row _id="row-hmty.7njx~ftjc" _uuid="00000000-0000-0000-C12B-B38156B9A9B9" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-hmty.7njx~ftjc"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1171</pid><project_name>Coastal Resiliency -- Parallel Conveyances</project_name><description>Coastal Resiliency -- Parallel Conveyances</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Parks &amp; Recreation</client_agency><current_phase>Construction</current_phase><design_start>2016-04-27T00:00:00</design_start><budget_forecast>200111000.00</budget_forecast><latest_budget_changes>25550000.00</latest_budget_changes><total_budget_changes>32327000.00</total_budget_changes><forecast_completion>2026-09-11T00:00:00</forecast_completion><latest_schedule_changes>92</latest_schedule_changes><total_schedule_changes>92</total_schedule_changes></row><row _id="row-s5xu-zxsy_bett" _uuid="00000000-0000-0000-221E-3D05D5C783D4" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-s5xu-zxsy_bett"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1171</pid><project_name>Coastal Resiliency -- Parallel Conveyances</project_name><description>Coastal Resiliency -- Parallel Conveyances</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Parks &amp; Recreation</client_agency><current_phase>Construction</current_phase><design_start>2016-04-27T00:00:00</design_start><budget_forecast>200106000.00</budget_forecast><latest_budget_changes>-5000.00</latest_budget_changes><total_budget_changes>32327000.00</total_budget_changes><forecast_completion>2026-09-11T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>92</total_schedule_changes></row><row _id="row-vc3i.f87n-xt6p" _uuid="00000000-0000-0000-D806-66E5F6F93EA5" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-vc3i.f87n-xt6p"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>1174</pid><project_name>80 CENTRE ST.- FIRE ALARMS/SPRINKLERS</project_name><description>Fire Alarm and Sprinklers Upgrade</description><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><current_phase>Design</current_phase><design_start>2021-07-26T00:00:00</design_start><budget_forecast>44469000.00</budget_forecast><total_budget_changes>0.00</total_budget_changes><total_schedule_changes>340</total_schedule_changes></row><row _id="row-85uy~cyjs.63un" _uuid="00000000-0000-0000-FD72-8C5DE8A4E891" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-85uy~cyjs.63un"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>1174</pid><project_name>80 CENTRE ST.- FIRE ALARMS/SPRINKLERS</project_name><description>Fire Alarm and Sprinklers Upgrade</description><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><current_phase>Design</current_phase><design_start>2021-07-26T00:00:00</design_start><budget_forecast>44469000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2026-03-23T00:00:00</forecast_completion><total_schedule_changes>340</total_schedule_changes></row><row _id="row-yxzy_vugh~ccrv" _uuid="00000000-0000-0000-397C-6C29BDAC194E" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-yxzy_vugh~ccrv"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>1174</pid><project_name>80 CENTRE ST.- FIRE ALARMS/SPRINKLERS</project_name><description>Fire Alarm and Sprinklers Upgrade</description><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><current_phase>Design</current_phase><design_start>2021-07-26T00:00:00</design_start><budget_forecast>44469000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2026-09-11T00:00:00</forecast_completion><latest_schedule_changes>172</latest_schedule_changes><total_schedule_changes>340</total_schedule_changes></row><row _id="row-vj9p~6aen~hq5z" _uuid="00000000-0000-0000-FF01-5C517FDAA5EF" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-vj9p~6aen~hq5z"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1174</pid><project_name>80 CENTRE ST.- FIRE ALARMS/SPRINKLERS</project_name><description>Fire Alarm and Sprinklers Upgrade</description><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><current_phase>Design</current_phase><design_start>2021-07-26T00:00:00</design_start><budget_forecast>44469000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2027-01-21T00:00:00</forecast_completion><latest_schedule_changes>132</latest_schedule_changes><total_schedule_changes>340</total_schedule_changes></row><row _id="row-jtpi-3if5~wjq2" _uuid="00000000-0000-0000-74CB-88BEF32BFE51" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-jtpi-3if5~wjq2"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1174</pid><project_name>80 CENTRE ST.- FIRE ALARMS/SPRINKLERS</project_name><description>Fire Alarm and Sprinklers Upgrade</description><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><current_phase>Design</current_phase><design_start>2021-07-26T00:00:00</design_start><budget_forecast>44469000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2027-02-26T00:00:00</forecast_completion><latest_schedule_changes>36</latest_schedule_changes><total_schedule_changes>340</total_schedule_changes></row><row _id="row-vyhy~jbeb_qang" _uuid="00000000-0000-0000-4E5B-5B01FFD6BF4D" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-vyhy~jbeb_qang"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>1175</pid><project_name>GREENWICH STREET RECONSTRUCTION</project_name><description>RECONSTRUCTION OF GREENWICH STREET FROM BARCLAY STREET TO CHAMBERS STREET, MANHATTAN</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Construction Procurement</current_phase><design_start>2018-04-25T00:00:00</design_start><budget_forecast>31802000.00</budget_forecast><total_budget_changes>4449000.00</total_budget_changes><forecast_completion>2024-11-07T00:00:00</forecast_completion><total_schedule_changes>-1</total_schedule_changes></row><row _id="row-xham.3h5e.2c74" _uuid="00000000-0000-0000-558D-BEE544C773A3" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-xham.3h5e.2c74"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>1175</pid><project_name>GREENWICH STREET RECONSTRUCTION</project_name><description>RECONSTRUCTION OF GREENWICH STREET FROM BARCLAY STREET TO CHAMBERS STREET, MANHATTAN</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Construction</current_phase><design_start>2018-04-25T00:00:00</design_start><budget_forecast>35696000.00</budget_forecast><latest_budget_changes>3894000.00</latest_budget_changes><total_budget_changes>4449000.00</total_budget_changes><forecast_completion>2024-11-06T00:00:00</forecast_completion><latest_schedule_changes>-1</latest_schedule_changes><total_schedule_changes>-1</total_schedule_changes></row><row _id="row-ub6v.4nut-et8g" _uuid="00000000-0000-0000-3136-1630D37B5C5A" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ub6v.4nut-et8g"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>1175</pid><project_name>GREENWICH STREET RECONSTRUCTION</project_name><description>RECONSTRUCTION OF GREENWICH STREET FROM BARCLAY STREET TO CHAMBERS STREET, MANHATTAN</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Construction</current_phase><design_start>2018-04-25T00:00:00</design_start><budget_forecast>35740000.00</budget_forecast><latest_budget_changes>44000.00</latest_budget_changes><total_budget_changes>4449000.00</total_budget_changes><forecast_completion>2024-11-06T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>-1</total_schedule_changes></row><row _id="row-djm9~zwq9_qj84" _uuid="00000000-0000-0000-9CB1-BEB292DE3DED" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-djm9~zwq9_qj84"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1175</pid><project_name>GREENWICH STREET RECONSTRUCTION</project_name><description>RECONSTRUCTION OF GREENWICH STREET FROM BARCLAY STREET TO CHAMBERS STREET, MANHATTAN</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Construction</current_phase><design_start>2018-04-25T00:00:00</design_start><budget_forecast>36251000.00</budget_forecast><latest_budget_changes>511000.00</latest_budget_changes><total_budget_changes>4449000.00</total_budget_changes><forecast_completion>2024-11-06T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>-1</total_schedule_changes></row><row _id="row-tqaj-9ty5.vv9k" _uuid="00000000-0000-0000-45CE-690D5B717B44" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-tqaj-9ty5.vv9k"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1175</pid><project_name>GREENWICH STREET RECONSTRUCTION</project_name><description>RECONSTRUCTION OF GREENWICH STREET FROM BARCLAY STREET TO CHAMBERS STREET, MANHATTAN</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Construction</current_phase><design_start>2018-04-25T00:00:00</design_start><budget_forecast>36251000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>4449000.00</total_budget_changes><forecast_completion>2024-11-06T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>-1</total_schedule_changes></row><row _id="row-zzzq_scbn-96cw" _uuid="00000000-0000-0000-10EF-85861AC23891" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-zzzq_scbn-96cw"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>1176</pid><project_name>SUNSET PARK NORTH BK WATERFRONT GREENWAY</project_name><description>Reconstruction of Sunset Park North Section of the Brooklyn Waterfront Greenway.</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2018-09-06T00:00:00</design_start><budget_forecast>25951000.00</budget_forecast><total_budget_changes>20345000.00</total_budget_changes><forecast_completion>2024-03-15T00:00:00</forecast_completion><total_schedule_changes>1096</total_schedule_changes></row><row _id="row-xzvt-sd7b-yn3g" _uuid="00000000-0000-0000-32F0-1EE38DD382D5" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-xzvt-sd7b-yn3g"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>1176</pid><project_name>SUNSET PARK NORTH BK WATERFRONT GREENWAY</project_name><description>Reconstruction of Sunset Park North Section of the Brooklyn Waterfront Greenway.</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2018-09-06T00:00:00</design_start><budget_forecast>26661000.00</budget_forecast><latest_budget_changes>710000.00</latest_budget_changes><total_budget_changes>20345000.00</total_budget_changes><forecast_completion>2024-07-13T00:00:00</forecast_completion><latest_schedule_changes>120</latest_schedule_changes><total_schedule_changes>1096</total_schedule_changes></row><row _id="row-ir66_kzut~refh" _uuid="00000000-0000-0000-C288-F73997686145" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ir66_kzut~refh"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>1176</pid><project_name>SUNSET PARK NORTH BK WATERFRONT GREENWAY</project_name><description>Reconstruction of Sunset Park North Section of the Brooklyn Waterfront Greenway.</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2018-09-06T00:00:00</design_start><budget_forecast>38399000.00</budget_forecast><latest_budget_changes>11738000.00</latest_budget_changes><total_budget_changes>20345000.00</total_budget_changes><forecast_completion>2025-04-14T00:00:00</forecast_completion><latest_schedule_changes>275</latest_schedule_changes><total_schedule_changes>1096</total_schedule_changes></row><row _id="row-cbx8.7ifx_tmgm" _uuid="00000000-0000-0000-22BD-BE51E47C99A6" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-cbx8.7ifx_tmgm"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1176</pid><project_name>SUNSET PARK NORTH BK WATERFRONT GREENWAY</project_name><description>Reconstruction of Sunset Park North Section of the Brooklyn Waterfront Greenway.</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2018-09-06T00:00:00</design_start><budget_forecast>46296000.00</budget_forecast><latest_budget_changes>7897000.00</latest_budget_changes><total_budget_changes>20345000.00</total_budget_changes><forecast_completion>2025-04-14T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>1096</total_schedule_changes></row><row _id="row-k2ww~vwzu.f6vt" _uuid="00000000-0000-0000-FFCC-DEDB5962288F" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-k2ww~vwzu.f6vt"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1176</pid><project_name>SUNSET PARK NORTH BK WATERFRONT GREENWAY</project_name><description>Reconstruction of Sunset Park North Section of the Brooklyn Waterfront Greenway.</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2018-09-06T00:00:00</design_start><budget_forecast>46296000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>20345000.00</total_budget_changes><forecast_completion>2027-03-16T00:00:00</forecast_completion><latest_schedule_changes>701</latest_schedule_changes><total_schedule_changes>1096</total_schedule_changes></row><row _id="row-gytf-3rpv.jur8" _uuid="00000000-0000-0000-BFA6-A29EA7DE4690" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-gytf-3rpv.jur8"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>1178</pid><project_name>New water main work in 7th avenue between 14th street and 34th street, and other locations as shown on page 3 of attached CPI</project_name><description>Distribution water main replacement along 7th Avenue between 14th Street and 34th Street</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Design</current_phase><design_start>2021-05-03T00:00:00</design_start><budget_forecast>69718000.00</budget_forecast><total_budget_changes>1335000.00</total_budget_changes><total_schedule_changes>181</total_schedule_changes></row><row _id="row-vwhb_5ukn_u4rk" _uuid="00000000-0000-0000-8564-647D6F740E46" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-vwhb_5ukn_u4rk"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>1178</pid><project_name>New water main work in 7th avenue between 14th street and 34th street, and other locations as shown on page 3 of attached CPI</project_name><description>Distribution water main replacement along 7th Avenue between 14th Street and 34th Street</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Design</current_phase><design_start>2021-05-03T00:00:00</design_start><budget_forecast>69718000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>1335000.00</total_budget_changes><forecast_completion>2026-08-26T00:00:00</forecast_completion><total_schedule_changes>181</total_schedule_changes></row><row _id="row-a6du~w2qp_xi24" _uuid="00000000-0000-0000-337F-6F170EA2CA50" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-a6du~w2qp_xi24"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>1178</pid><project_name>New water main work in 7th avenue between 14th street and 34th street, and other locations as shown on page 3 of attached CPI</project_name><description>Distribution water main replacement along 7th Avenue between 14th Street and 34th Street</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Design</current_phase><design_start>2021-05-03T00:00:00</design_start><budget_forecast>69838000.00</budget_forecast><latest_budget_changes>120000.00</latest_budget_changes><total_budget_changes>1335000.00</total_budget_changes><forecast_completion>2026-08-26T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>181</total_schedule_changes></row><row _id="row-8dav-xxv9_sa72" _uuid="00000000-0000-0000-6D66-CD7CA6700E22" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-8dav-xxv9_sa72"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1178</pid><project_name>New water main work in 7th avenue between 14th street and 34th street, and other locations as shown on page 3 of attached CPI</project_name><description>Distribution water main replacement along 7th Avenue between 14th Street and 34th Street</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Design</current_phase><design_start>2021-05-03T00:00:00</design_start><budget_forecast>71053000.00</budget_forecast><latest_budget_changes>1215000.00</latest_budget_changes><total_budget_changes>1335000.00</total_budget_changes><forecast_completion>2026-08-26T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>181</total_schedule_changes></row><row _id="row-nk9z.hb2z_kagh" _uuid="00000000-0000-0000-352C-8DCAB2F5A6FE" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-nk9z.hb2z_kagh"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1178</pid><project_name>New water main work in 7th avenue between 14th street and 34th street, and other locations as shown on page 3 of attached CPI</project_name><description>Distribution water main replacement along 7th Avenue between 14th Street and 34th Street</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Design</current_phase><design_start>2021-05-03T00:00:00</design_start><budget_forecast>71053000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>1335000.00</total_budget_changes><forecast_completion>2027-02-23T00:00:00</forecast_completion><latest_schedule_changes>181</latest_schedule_changes><total_schedule_changes>181</total_schedule_changes></row><row _id="row-hxjg.gvmr_de4x" _uuid="00000000-0000-0000-FAE8-AF359C9CAE0B" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-hxjg.gvmr_de4x"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>1179</pid><project_name>Staten Island 3 Garage - HVAC Replacement</project_name><description>Replacement of HVAC System and Roof at Staten Island District 3 DSNY Garage and Boro Repair Shop</description><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>Sanitation</client_agency><current_phase>Construction</current_phase><design_start>2017-07-14T00:00:00</design_start><budget_forecast>25244000.00</budget_forecast><total_budget_changes>460000.00</total_budget_changes><forecast_completion>2022-07-01T00:00:00</forecast_completion><total_schedule_changes>409</total_schedule_changes></row><row _id="row-mqdd.dkdm.4avk" _uuid="00000000-0000-0000-43C7-6385AC27B385" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-mqdd.dkdm.4avk"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>1179</pid><project_name>Staten Island 3 Garage - HVAC Replacement</project_name><description>Replacement of HVAC System and Roof at Staten Island District 3 DSNY Garage and Boro Repair Shop</description><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>Sanitation</client_agency><current_phase>Construction</current_phase><design_start>2017-07-14T00:00:00</design_start><budget_forecast>25216000.00</budget_forecast><latest_budget_changes>-28000.00</latest_budget_changes><total_budget_changes>460000.00</total_budget_changes><forecast_completion>2022-07-01T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>409</total_schedule_changes></row><row _id="row-fdbk-pez9_5agx" _uuid="00000000-0000-0000-3C01-8CC6AC181809" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-fdbk-pez9_5agx"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>1179</pid><project_name>Staten Island 3 Garage - HVAC Replacement</project_name><description>Replacement of HVAC System and Roof at Staten Island District 3 DSNY Garage and Boro Repair Shop</description><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>Sanitation</client_agency><current_phase>Construction</current_phase><design_start>2017-07-14T00:00:00</design_start><budget_forecast>25239000.00</budget_forecast><latest_budget_changes>23000.00</latest_budget_changes><total_budget_changes>460000.00</total_budget_changes><forecast_completion>2022-12-16T00:00:00</forecast_completion><latest_schedule_changes>168</latest_schedule_changes><total_schedule_changes>409</total_schedule_changes></row><row _id="row-pjwr~6x3z.tfjd" _uuid="00000000-0000-0000-8084-A78CA184F162" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-pjwr~6x3z.tfjd"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1179</pid><project_name>Staten Island 3 Garage - HVAC Replacement</project_name><description>Replacement of HVAC System and Roof at Staten Island District 3 DSNY Garage and Boro Repair Shop</description><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>Sanitation</client_agency><current_phase>Construction</current_phase><design_start>2017-07-14T00:00:00</design_start><budget_forecast>25289000.00</budget_forecast><latest_budget_changes>50000.00</latest_budget_changes><total_budget_changes>460000.00</total_budget_changes><forecast_completion>2022-12-16T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>409</total_schedule_changes></row><row _id="row-xfqp~7tik-wgyn" _uuid="00000000-0000-0000-DF7A-9AF341498F6D" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-xfqp~7tik-wgyn"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1179</pid><project_name>Staten Island 3 Garage - HVAC Replacement</project_name><description>Replacement of HVAC System and Roof at Staten Island District 3 DSNY Garage and Boro Repair Shop</description><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>Sanitation</client_agency><current_phase>Construction</current_phase><design_start>2017-07-14T00:00:00</design_start><budget_forecast>25704000.00</budget_forecast><latest_budget_changes>415000.00</latest_budget_changes><total_budget_changes>460000.00</total_budget_changes><forecast_completion>2023-08-14T00:00:00</forecast_completion><latest_schedule_changes>241</latest_schedule_changes><total_schedule_changes>409</total_schedule_changes></row><row _id="row-m6jz.wusv.2ztv" _uuid="00000000-0000-0000-D84E-823241A72DFF" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-m6jz.wusv.2ztv"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>1180</pid><project_name>Reconstruction of Regulator HP06</project_name><description>Project REG-HP06 is for the reconstruction of Regulator HP06 . The work shall include, but is not limited to, the following items:  1. Reconstruction of the existing Diversion Chamber (see attachment labeled 'REG-HP06 As-builts'). 2. Reconstruction of the existing Regulator Chamber (see attachment labeled 'REG-HP06 As-builts'). 3. Rehabilitation of the existing Interceptor (scope previously included in PS-312MX) 4. Replacement of existing instrumentation and monitoring systems, as needed (i.e., sensors, probes, conduits, cables, etc.). 5. Restoration of construction areas as needed (i.e., roadways, sidewalks, etc.) 6. Implementation of an approved plan to maintain regulator and interceptor operations during construction. 7. Shop drawings, as-built drawings, and equipment information.</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Design</current_phase><design_start>2020-10-27T00:00:00</design_start><budget_forecast>54926000.00</budget_forecast><total_budget_changes>8706000.00</total_budget_changes><forecast_completion>2025-08-15T00:00:00</forecast_completion><total_schedule_changes>-64</total_schedule_changes></row><row _id="row-dxx4_wc5t-7x78" _uuid="00000000-0000-0000-805B-6A83603B6201" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-dxx4_wc5t-7x78"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>1180</pid><project_name>Reconstruction of Regulator HP06</project_name><description>Project REG-HP06 is for the reconstruction of Regulator HP06 . The work shall include, but is not limited to, the following items:  1. Reconstruction of the existing Diversion Chamber (see attachment labeled 'REG-HP06 As-builts'). 2. Reconstruction of the existing Regulator Chamber (see attachment labeled 'REG-HP06 As-builts'). 3. Rehabilitation of the existing Interceptor (scope previously included in PS-312MX) 4. Replacement of existing instrumentation and monitoring systems, as needed (i.e., sensors, probes, conduits, cables, etc.). 5. Restoration of construction areas as needed (i.e., roadways, sidewalks, etc.) 6. Implementation of an approved plan to maintain regulator and interceptor operations during construction. 7. Shop drawings, as-built drawings, and equipment information.</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction Procurement</current_phase><design_start>2020-10-27T00:00:00</design_start><budget_forecast>64254000.00</budget_forecast><latest_budget_changes>9328000.00</latest_budget_changes><total_budget_changes>8706000.00</total_budget_changes><forecast_completion>2025-04-16T00:00:00</forecast_completion><latest_schedule_changes>-121</latest_schedule_changes><total_schedule_changes>-64</total_schedule_changes></row><row _id="row-nsmc-wnxn-cwgn" _uuid="00000000-0000-0000-5DA8-4B66D90D2EB0" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-nsmc-wnxn-cwgn"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>1180</pid><project_name>Reconstruction of Regulator HP06</project_name><description>Project REG-HP06 is for the reconstruction of Regulator HP06 . The work shall include, but is not limited to, the following items:  1. Reconstruction of the existing Diversion Chamber (see attachment labeled 'REG-HP06 As-builts'). 2. Reconstruction of the existing Regulator Chamber (see attachment labeled 'REG-HP06 As-builts'). 3. Rehabilitation of the existing Interceptor (scope previously included in PS-312MX) 4. Replacement of existing instrumentation and monitoring systems, as needed (i.e., sensors, probes, conduits, cables, etc.). 5. Restoration of construction areas as needed (i.e., roadways, sidewalks, etc.) 6. Implementation of an approved plan to maintain regulator and interceptor operations during construction. 7. Shop drawings, as-built drawings, and equipment information.</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction</current_phase><design_start>2020-10-27T00:00:00</design_start><budget_forecast>63827000.00</budget_forecast><latest_budget_changes>-427000.00</latest_budget_changes><total_budget_changes>8706000.00</total_budget_changes><forecast_completion>2025-06-12T00:00:00</forecast_completion><latest_schedule_changes>57</latest_schedule_changes><total_schedule_changes>-64</total_schedule_changes></row><row _id="row-t954~cty5_esrm" _uuid="00000000-0000-0000-CF39-86B1823ECE2F" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-t954~cty5_esrm"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1180</pid><project_name>Reconstruction of Regulator HP06</project_name><description>Project REG-HP06 is for the reconstruction of Regulator HP06 . The work shall include, but is not limited to, the following items:  1. Reconstruction of the existing Diversion Chamber (see attachment labeled 'REG-HP06 As-builts'). 2. Reconstruction of the existing Regulator Chamber (see attachment labeled 'REG-HP06 As-builts'). 3. Rehabilitation of the existing Interceptor (scope previously included in PS-312MX) 4. Replacement of existing instrumentation and monitoring systems, as needed (i.e., sensors, probes, conduits, cables, etc.). 5. Restoration of construction areas as needed (i.e., roadways, sidewalks, etc.) 6. Implementation of an approved plan to maintain regulator and interceptor operations during construction. 7. Shop drawings, as-built drawings, and equipment information.</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction</current_phase><design_start>2020-10-27T00:00:00</design_start><budget_forecast>63632000.00</budget_forecast><latest_budget_changes>-195000.00</latest_budget_changes><total_budget_changes>8706000.00</total_budget_changes><forecast_completion>2025-06-12T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>-64</total_schedule_changes></row><row _id="row-9c8i-v4yi.kfxe" _uuid="00000000-0000-0000-EE0F-893ECC0C6DC0" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-9c8i-v4yi.kfxe"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1180</pid><project_name>Reconstruction of Regulator HP06</project_name><description>Project REG-HP06 is for the reconstruction of Regulator HP06 . The work shall include, but is not limited to, the following items:  1. Reconstruction of the existing Diversion Chamber (see attachment labeled 'REG-HP06 As-builts'). 2. Reconstruction of the existing Regulator Chamber (see attachment labeled 'REG-HP06 As-builts'). 3. Rehabilitation of the existing Interceptor (scope previously included in PS-312MX) 4. Replacement of existing instrumentation and monitoring systems, as needed (i.e., sensors, probes, conduits, cables, etc.). 5. Restoration of construction areas as needed (i.e., roadways, sidewalks, etc.) 6. Implementation of an approved plan to maintain regulator and interceptor operations during construction. 7. Shop drawings, as-built drawings, and equipment information.</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction</current_phase><design_start>2020-10-27T00:00:00</design_start><budget_forecast>63632000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>8706000.00</total_budget_changes><forecast_completion>2025-06-12T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>-64</total_schedule_changes></row><row _id="row-5pjw~qwr6.bcre" _uuid="00000000-0000-0000-23CD-E9F681EE48BE" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-5pjw~qwr6.bcre"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>1181</pid><project_name>SAFE ROUTES TO SCHOOL MANHATTAN</project_name><description>SAFE ROUTES TO SCHOOLS - MANHATTAN</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2018-06-25T00:00:00</design_start><budget_forecast>44746000.00</budget_forecast><total_budget_changes>7175000.00</total_budget_changes><forecast_completion>2024-11-27T00:00:00</forecast_completion><total_schedule_changes>505</total_schedule_changes></row><row _id="row-65vb.vxbi~7ebi" _uuid="00000000-0000-0000-7616-126E3804E21C" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-65vb.vxbi~7ebi"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>1181</pid><project_name>SAFE ROUTES TO SCHOOL MANHATTAN</project_name><description>SAFE ROUTES TO SCHOOLS - MANHATTAN</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2018-06-25T00:00:00</design_start><budget_forecast>44846000.00</budget_forecast><latest_budget_changes>100000.00</latest_budget_changes><total_budget_changes>7175000.00</total_budget_changes><forecast_completion>2025-04-24T00:00:00</forecast_completion><latest_schedule_changes>148</latest_schedule_changes><total_schedule_changes>505</total_schedule_changes></row><row _id="row-mviu~i7fg-dxy7" _uuid="00000000-0000-0000-88D6-E89D50734216" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-mviu~i7fg-dxy7"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>1181</pid><project_name>SAFE ROUTES TO SCHOOL MANHATTAN</project_name><description>SAFE ROUTES TO SCHOOLS - MANHATTAN</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2018-06-25T00:00:00</design_start><budget_forecast>45246000.00</budget_forecast><latest_budget_changes>400000.00</latest_budget_changes><total_budget_changes>7175000.00</total_budget_changes><forecast_completion>2025-07-09T00:00:00</forecast_completion><latest_schedule_changes>76</latest_schedule_changes><total_schedule_changes>505</total_schedule_changes></row><row _id="row-2uiv~xjaq~8wnv" _uuid="00000000-0000-0000-16B1-BC73F2173202" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-2uiv~xjaq~8wnv"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1181</pid><project_name>SAFE ROUTES TO SCHOOL MANHATTAN</project_name><description>SAFE ROUTES TO SCHOOLS - MANHATTAN</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2018-06-25T00:00:00</design_start><budget_forecast>51921000.00</budget_forecast><latest_budget_changes>6675000.00</latest_budget_changes><total_budget_changes>7175000.00</total_budget_changes><forecast_completion>2026-04-16T00:00:00</forecast_completion><latest_schedule_changes>281</latest_schedule_changes><total_schedule_changes>505</total_schedule_changes></row><row _id="row-u8gd_udr4_mqc5" _uuid="00000000-0000-0000-4BFD-8092BFA2A1A3" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-u8gd_udr4_mqc5"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1181</pid><project_name>SAFE ROUTES TO SCHOOL MANHATTAN</project_name><description>SAFE ROUTES TO SCHOOLS - MANHATTAN</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2018-06-25T00:00:00</design_start><budget_forecast>51921000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>7175000.00</total_budget_changes><forecast_completion>2026-04-16T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>505</total_schedule_changes></row><row _id="row-k53a_yxj7~j3cy" _uuid="00000000-0000-0000-AEB3-75ADAE2B117F" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-k53a_yxj7~j3cy"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>1182</pid><project_name>Comprehensive Renovation and Expansion</project_name><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>Libraries-QBPL</client_agency><current_phase>Design</current_phase><design_start>2021-10-06T00:00:00</design_start><budget_forecast>41255000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-15454000.00</total_budget_changes><forecast_completion>2025-08-08T00:00:00</forecast_completion><total_schedule_changes>428</total_schedule_changes></row><row _id="row-acn7.cxie-5pn5" _uuid="00000000-0000-0000-18C4-113D427579EC" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-acn7.cxie-5pn5"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>1182</pid><project_name>Comprehensive Renovation and Expansion</project_name><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>Libraries-QBPL</client_agency><current_phase>Design</current_phase><design_start>2021-10-06T00:00:00</design_start><budget_forecast>25691000.00</budget_forecast><latest_budget_changes>-15564000.00</latest_budget_changes><total_budget_changes>-15454000.00</total_budget_changes><forecast_completion>2026-01-12T00:00:00</forecast_completion><latest_schedule_changes>157</latest_schedule_changes><total_schedule_changes>428</total_schedule_changes></row><row _id="row-zp35.wckd~28ta" _uuid="00000000-0000-0000-CB54-E5AAA86851AE" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-zp35.wckd~28ta"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1182</pid><project_name>Comprehensive Renovation and Expansion</project_name><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>Libraries-QBPL</client_agency><current_phase>Design</current_phase><design_start>2021-10-06T00:00:00</design_start><budget_forecast>25801000.00</budget_forecast><latest_budget_changes>110000.00</latest_budget_changes><total_budget_changes>-15454000.00</total_budget_changes><forecast_completion>2026-09-07T00:00:00</forecast_completion><latest_schedule_changes>238</latest_schedule_changes><total_schedule_changes>428</total_schedule_changes></row><row _id="row-3uuy-j7vf-aspe" _uuid="00000000-0000-0000-9EE6-B24789CDAEC2" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-3uuy-j7vf-aspe"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1182</pid><project_name>Comprehensive Renovation and Expansion</project_name><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>Libraries-QBPL</client_agency><current_phase>Design</current_phase><design_start>2021-10-06T00:00:00</design_start><budget_forecast>25801000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-15454000.00</total_budget_changes><forecast_completion>2026-10-10T00:00:00</forecast_completion><latest_schedule_changes>33</latest_schedule_changes><total_schedule_changes>428</total_schedule_changes></row><row _id="row-6yg5.j4he~bpmv" _uuid="00000000-0000-0000-1641-4954F093A3E8" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-6yg5.j4he~bpmv"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>1183</pid><project_name>Staten Island North Shore Recreation Center</project_name><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>Parks &amp; Recreation</client_agency><current_phase>Design</current_phase><design_start>2022-04-18T00:00:00</design_start><budget_forecast>98367000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>500000.00</total_budget_changes></row><row _id="row-rit4~3iph-nesm" _uuid="00000000-0000-0000-7D73-D1D990E31AEE" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-rit4~3iph-nesm"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1183</pid><project_name>Staten Island North Shore Recreation Center</project_name><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>Parks &amp; Recreation</client_agency><current_phase>Design</current_phase><design_start>2022-04-18T00:00:00</design_start><budget_forecast>98867000.00</budget_forecast><latest_budget_changes>500000.00</latest_budget_changes><total_budget_changes>500000.00</total_budget_changes></row><row _id="row-4swc.rkz3.65q7" _uuid="00000000-0000-0000-447E-3B58867C99CD" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-4swc.rkz3.65q7"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1183</pid><project_name>Staten Island North Shore Recreation Center</project_name><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>Parks &amp; Recreation</client_agency><current_phase>Design</current_phase><design_start>2022-04-18T00:00:00</design_start><budget_forecast>98867000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>500000.00</total_budget_changes></row><row _id="row-y3rj.hh3c.nves" _uuid="00000000-0000-0000-646E-5C29DD846099" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-y3rj.hh3c.nves"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>1185</pid><project_name>GI - GRAVESEND BAY CSO - PHASE I</project_name><description>GREEN INFRASTRUCTURE IN OH-015 GRAVESEND BAY CSO PH 1</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Design</current_phase><design_start>2017-08-01T00:00:00</design_start><budget_forecast>42586000.00</budget_forecast><total_budget_changes>21181000.00</total_budget_changes><forecast_completion>2025-10-14T00:00:00</forecast_completion><total_schedule_changes>302</total_schedule_changes></row><row _id="row-g8yd~wu8m_c4hd" _uuid="00000000-0000-0000-2AB5-3B21ED263095" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-g8yd~wu8m_c4hd"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>1185</pid><project_name>GI - GRAVESEND BAY CSO - PHASE I</project_name><description>GREEN INFRASTRUCTURE IN OH-015 GRAVESEND BAY CSO PH 1</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Design</current_phase><design_start>2017-08-01T00:00:00</design_start><budget_forecast>37633000.00</budget_forecast><latest_budget_changes>-4953000.00</latest_budget_changes><total_budget_changes>21181000.00</total_budget_changes><forecast_completion>2025-10-14T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>302</total_schedule_changes></row><row _id="row-8d5h.achw_drub" _uuid="00000000-0000-0000-527F-98BAE0B8A90C" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-8d5h.achw_drub"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>1185</pid><project_name>GI - GRAVESEND BAY CSO - PHASE I</project_name><description>GREEN INFRASTRUCTURE IN OH-015 GRAVESEND BAY CSO PH 1</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Design</current_phase><design_start>2017-08-01T00:00:00</design_start><budget_forecast>41237000.00</budget_forecast><latest_budget_changes>3604000.00</latest_budget_changes><total_budget_changes>21181000.00</total_budget_changes><forecast_completion>2026-08-12T00:00:00</forecast_completion><latest_schedule_changes>302</latest_schedule_changes><total_schedule_changes>302</total_schedule_changes></row><row _id="row-qi5j-v6wf-t6pw" _uuid="00000000-0000-0000-0398-1E80433E9465" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-qi5j-v6wf-t6pw"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1185</pid><project_name>GI - GRAVESEND BAY CSO - PHASE I</project_name><description>GREEN INFRASTRUCTURE IN OH-015 GRAVESEND BAY CSO PH 1</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Design</current_phase><design_start>2017-08-01T00:00:00</design_start><budget_forecast>47788000.00</budget_forecast><latest_budget_changes>6551000.00</latest_budget_changes><total_budget_changes>21181000.00</total_budget_changes><forecast_completion>2026-08-12T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>302</total_schedule_changes></row><row _id="row-zg76~snyd-t37j" _uuid="00000000-0000-0000-16B5-A7CB1365F535" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-zg76~snyd-t37j"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1185</pid><project_name>GI - GRAVESEND BAY CSO - PHASE I</project_name><description>GREEN INFRASTRUCTURE IN OH-015 GRAVESEND BAY CSO PH 1</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Design</current_phase><design_start>2017-08-01T00:00:00</design_start><budget_forecast>63767000.00</budget_forecast><latest_budget_changes>15979000.00</latest_budget_changes><total_budget_changes>21181000.00</total_budget_changes><forecast_completion>2026-08-12T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>302</total_schedule_changes></row><row _id="row-vjbp~7a95_bzjf" _uuid="00000000-0000-0000-3ADC-F7AEE91E6FD9" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-vjbp~7a95_bzjf"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>1186</pid><project_name>CONSTRUCTION OF A FLOOD PROTECTION SYSTEM FROM EAST 25TH ST TO EAST 30TH ST ALONG THE EAST SIDE OF MANHATTAN</project_name><description>CONSTRUCTION OF A FLOOD PROTECTION SYSTEM FROM EAST 25TH ST. TO EAST 30TH ST. ALONG THE EAST SIDE OF MANHATTAN</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Health &amp; Hospitals Corporation (HHC)</client_agency><current_phase>Design</current_phase><design_start>2022-02-22T00:00:00</design_start><budget_forecast>90000000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>5000000.00</total_budget_changes><forecast_completion>2027-11-21T00:00:00</forecast_completion><total_schedule_changes>333</total_schedule_changes></row><row _id="row-5zbj-ax93~zj5w" _uuid="00000000-0000-0000-1D83-5E3D0A321CF3" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-5zbj-ax93~zj5w"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1186</pid><project_name>CONSTRUCTION OF A FLOOD PROTECTION SYSTEM FROM EAST 25TH ST TO EAST 30TH ST ALONG THE EAST SIDE OF MANHATTAN</project_name><description>CONSTRUCTION OF A FLOOD PROTECTION SYSTEM FROM EAST 25TH ST. TO EAST 30TH ST. ALONG THE EAST SIDE OF MANHATTAN</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Health &amp; Hospitals Corporation (HHC)</client_agency><current_phase>Design</current_phase><design_start>2022-02-24T00:00:00</design_start><budget_forecast>95000000.00</budget_forecast><latest_budget_changes>5000000.00</latest_budget_changes><total_budget_changes>5000000.00</total_budget_changes><forecast_completion>2028-10-19T00:00:00</forecast_completion><latest_schedule_changes>333</latest_schedule_changes><total_schedule_changes>333</total_schedule_changes></row><row _id="row-pm3z_ctht_p4wn" _uuid="00000000-0000-0000-F53C-71C538A865B2" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-pm3z_ctht_p4wn"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1186</pid><project_name>CONSTRUCTION OF A FLOOD PROTECTION SYSTEM FROM EAST 25TH ST TO EAST 30TH ST ALONG THE EAST SIDE OF MANHATTAN</project_name><description>CONSTRUCTION OF A FLOOD PROTECTION SYSTEM FROM EAST 25TH ST. TO EAST 30TH ST. ALONG THE EAST SIDE OF MANHATTAN</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Health &amp; Hospitals Corporation (HHC)</client_agency><current_phase>Design</current_phase><design_start>2022-02-24T00:00:00</design_start><budget_forecast>95000000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>5000000.00</total_budget_changes><forecast_completion>2028-10-19T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>333</total_schedule_changes></row><row _id="row-8sub.4tg5.iw3y" _uuid="00000000-0000-0000-4A33-2D0438C55998" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-8sub.4tg5.iw3y"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>1187</pid><project_name>CITYWIDE RESILENCY MEASURES-Lower Manhattan Two Bridges</project_name><description>Installation of Brooklyn Bridge - Montgomery Coastal Resilience from Robert F. Wagner Sr. Place to Montgomery Street</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Mayors Office of Resiliency (MOR)</client_agency><current_phase>Design</current_phase><design_start>2019-02-22T00:00:00</design_start><budget_forecast>499827000.00</budget_forecast><total_budget_changes>34901000.00</total_budget_changes><total_schedule_changes>161</total_schedule_changes></row><row _id="row-jkvx_xhpn~8mh2" _uuid="00000000-0000-0000-63D1-FB62D5890FF5" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-jkvx_xhpn~8mh2"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>1187</pid><project_name>CITYWIDE RESILENCY MEASURES-Lower Manhattan Two Bridges</project_name><description>Installation of Brooklyn Bridge - Montgomery Coastal Resilience from Robert F. Wagner Sr. Place to Montgomery Street</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Mayors Office of Resiliency (MOR)</client_agency><current_phase>Construction Procurement</current_phase><design_start>2019-02-22T00:00:00</design_start><budget_forecast>528495000.00</budget_forecast><latest_budget_changes>28668000.00</latest_budget_changes><total_budget_changes>34901000.00</total_budget_changes><forecast_completion>2026-05-14T00:00:00</forecast_completion><total_schedule_changes>161</total_schedule_changes></row><row _id="row-6scz_3y4g.dxg3" _uuid="00000000-0000-0000-9603-E1A3EACC4B4D" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-6scz_3y4g.dxg3"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>1187</pid><project_name>CITYWIDE RESILENCY MEASURES-Lower Manhattan Two Bridges</project_name><description>Installation of Brooklyn Bridge - Montgomery Coastal Resilience from Robert F. Wagner Sr. Place to Montgomery Street</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Mayors Office of Resiliency (MOR)</client_agency><current_phase>Construction Procurement</current_phase><design_start>2019-02-22T00:00:00</design_start><budget_forecast>535530000.00</budget_forecast><latest_budget_changes>7035000.00</latest_budget_changes><total_budget_changes>34901000.00</total_budget_changes><forecast_completion>2026-09-24T00:00:00</forecast_completion><latest_schedule_changes>133</latest_schedule_changes><total_schedule_changes>161</total_schedule_changes></row><row _id="row-b336_p2ct.fe27" _uuid="00000000-0000-0000-00C5-0C4A5F01C00F" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-b336_p2ct.fe27"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1187</pid><project_name>CITYWIDE RESILENCY MEASURES-Lower Manhattan Two Bridges</project_name><description>Installation of Brooklyn Bridge - Montgomery Coastal Resilience from Robert F. Wagner Sr. Place to Montgomery Street</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Mayors Office of Resiliency (MOR)</client_agency><current_phase>Construction</current_phase><design_start>2019-02-22T00:00:00</design_start><budget_forecast>534728000.00</budget_forecast><latest_budget_changes>-802000.00</latest_budget_changes><total_budget_changes>34901000.00</total_budget_changes><forecast_completion>2026-10-22T00:00:00</forecast_completion><latest_schedule_changes>28</latest_schedule_changes><total_schedule_changes>161</total_schedule_changes></row><row _id="row-6885_igc4~cda4" _uuid="00000000-0000-0000-7587-302108810B60" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-6885_igc4~cda4"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1187</pid><project_name>CITYWIDE RESILENCY MEASURES-Lower Manhattan Two Bridges</project_name><description>Installation of Brooklyn Bridge - Montgomery Coastal Resilience from Robert F. Wagner Sr. Place to Montgomery Street</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Mayors Office of Resiliency (MOR)</client_agency><current_phase>Construction</current_phase><design_start>2019-02-22T00:00:00</design_start><budget_forecast>534728000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>34901000.00</total_budget_changes><forecast_completion>2026-10-22T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>161</total_schedule_changes></row><row _id="row-qqd5.6q9h~hhjz" _uuid="00000000-0000-0000-1F6F-95DF29B09445" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-qqd5.6q9h~hhjz"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>1188</pid><project_name>Rockaway Operational Headquarters</project_name><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>Parks &amp; Recreation</client_agency><current_phase>Design</current_phase><design_start>2022-03-18T00:00:00</design_start><budget_forecast>36404000.00</budget_forecast><latest_budget_changes>136000.00</latest_budget_changes><total_budget_changes>136000.00</total_budget_changes><total_schedule_changes>0</total_schedule_changes></row><row _id="row-sn5m_sdbw_dz5v" _uuid="00000000-0000-0000-8991-AF53ADC1D68E" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-sn5m_sdbw_dz5v"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1188</pid><project_name>Rockaway Operational Headquarters</project_name><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>Parks &amp; Recreation</client_agency><current_phase>Design</current_phase><design_start>2022-03-18T00:00:00</design_start><budget_forecast>36404000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>136000.00</total_budget_changes><forecast_completion>2025-08-11T00:00:00</forecast_completion><total_schedule_changes>0</total_schedule_changes></row><row _id="row-37jg.wmr3~hjue" _uuid="00000000-0000-0000-EB55-6425A99E22D0" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-37jg.wmr3~hjue"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1188</pid><project_name>Rockaway Operational Headquarters</project_name><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>Parks &amp; Recreation</client_agency><current_phase>Construction</current_phase><design_start>2022-03-18T00:00:00</design_start><budget_forecast>36404000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>136000.00</total_budget_changes><forecast_completion>2025-08-11T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>0</total_schedule_changes></row><row _id="row-z85m-xhix-ungz" _uuid="00000000-0000-0000-5384-8F1F18C43510" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-z85m-xhix-ungz"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>1189</pid><project_name>EDGEMERE (PHASE C1) - (INCLUDING SEQ002562/200406)</project_name><description>New streets, sidewalks, storm and sanitary sewers and water mains: 43rd, 44th, and 45th Streets north of Beach Channel Drive, including sections of Hantz Road, Norton Avenue, Edgemere Drive and Conch Road within this area.</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><budget_forecast>31588000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-10000.00</total_budget_changes></row><row _id="row-6qkm~5du6~2uy5" _uuid="00000000-0000-0000-DE6F-F373F6C7712A" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-6qkm~5du6~2uy5"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1189</pid><project_name>EDGEMERE (PHASE C1) - (INCLUDING SEQ002562/200406)</project_name><description>New streets, sidewalks, storm and sanitary sewers and water mains: 43rd, 44th, and 45th Streets north of Beach Channel Drive, including sections of Hantz Road, Norton Avenue, Edgemere Drive and Conch Road within this area.</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><budget_forecast>31578000.00</budget_forecast><latest_budget_changes>-10000.00</latest_budget_changes><total_budget_changes>-10000.00</total_budget_changes></row><row _id="row-4kym~epwz-dk9f" _uuid="00000000-0000-0000-4DA7-E8E92578539D" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-4kym~epwz-dk9f"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1189</pid><project_name>EDGEMERE (PHASE C1) - (INCLUDING SEQ002562/200406)</project_name><description>New streets, sidewalks, storm and sanitary sewers and water mains: 43rd, 44th, and 45th Streets north of Beach Channel Drive, including sections of Hantz Road, Norton Avenue, Edgemere Drive and Conch Road within this area.</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><budget_forecast>31578000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-10000.00</total_budget_changes></row><row _id="row-durg-22a8_umg6" _uuid="00000000-0000-0000-9DA9-6BDDE5ABD9EE" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-durg-22a8_umg6"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>1190</pid><project_name>Brkyln District 17/18 Garage: HVAC Replacement</project_name><description>Roof andThe project for which services are required is the rehabilitation of the Brooklyn Districts 17 and 18 Sanitation Garage, located at 10502 Avenue D, Brooklyn, NY 11236. Block: 8136/Lot: 1. The 159,500 total gross square foot, masonry-veneered and steel framed facility is located in eastern Brooklyn at the intersection of the Avenue D and the 105th St. This building was completed in 1991 and was last renovated in 1998.  The main objective of this project is to extend the useful life of this facility through rehabilitation of the building Roofing, and HVAC systems and adding a Solar Ready Systems. The rehabilitation shall include the following: replacement of the roof (membrane, select areas of decking, select roof drains and domes, select skylights and coordination for future solar panel locations), structural work (stiffening of the existing structural steel frame, supports for new HVAC equipment and solar panels and select parapet replacement), select replacement of building systems (electrical, fire protection and HVAC (including BMS)), building expansion joints and architectural renovation of the entire building to repair water damage.  The funding for solar program provided by DCAS.   Scope of Work:  The rehabilitation shall include the following: replacement of the roof (membrane, select areas of decking, select roof drains and domes, select skylights and coordination for future solar panel locations), structural work (stiffening of the existing structural steel frame, supports for new HVAC equipment and solar panels and select parapet replacement), select replacement of building systems (electrical, fire protection and HVAC (including BMS)),</description><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>Sanitation</client_agency><current_phase>Construction Procurement</current_phase><design_start>2017-05-11T00:00:00</design_start><budget_forecast>34158000.00</budget_forecast><total_budget_changes>-709000.00</total_budget_changes><forecast_completion>2024-06-30T00:00:00</forecast_completion><total_schedule_changes>123</total_schedule_changes></row><row _id="row-8gs9~hu3s~4rw8" _uuid="00000000-0000-0000-1940-C08CE3924475" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-8gs9~hu3s~4rw8"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1318</pid><project_name>COMPONENT REHAB OF BRIDGES 21A</project_name><description>COMPONENT REHAB OF BRIDGES 21A</description><category>Bridges</category><managing_agency>DOT</managing_agency><client_agency>n/a</client_agency><current_phase>Construction Procurement</current_phase><design_start>2019-02-19T00:00:00</design_start><budget_forecast>37129602.00</budget_forecast><latest_budget_changes>4025602.00</latest_budget_changes><total_budget_changes>4025602.00</total_budget_changes></row><row _id="row-vri3~e8hz-8iqk" _uuid="00000000-0000-0000-9B00-8BA5028F4757" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-vri3~e8hz-8iqk"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>1190</pid><project_name>Brkyln District 17/18 Garage: HVAC Replacement</project_name><description>Roof andThe project for which services are required is the rehabilitation of the Brooklyn Districts 17 and 18 Sanitation Garage, located at 10502 Avenue D, Brooklyn, NY 11236. Block: 8136/Lot: 1. The 159,500 total gross square foot, masonry-veneered and steel framed facility is located in eastern Brooklyn at the intersection of the Avenue D and the 105th St. This building was completed in 1991 and was last renovated in 1998.  The main objective of this project is to extend the useful life of this facility through rehabilitation of the building Roofing, and HVAC systems and adding a Solar Ready Systems. The rehabilitation shall include the following: replacement of the roof (membrane, select areas of decking, select roof drains and domes, select skylights and coordination for future solar panel locations), structural work (stiffening of the existing structural steel frame, supports for new HVAC equipment and solar panels and select parapet replacement), select replacement of building systems (electrical, fire protection and HVAC (including BMS)), building expansion joints and architectural renovation of the entire building to repair water damage.  The funding for solar program provided by DCAS.   Scope of Work:  The rehabilitation shall include the following: replacement of the roof (membrane, select areas of decking, select roof drains and domes, select skylights and coordination for future solar panel locations), structural work (stiffening of the existing structural steel frame, supports for new HVAC equipment and solar panels and select parapet replacement), select replacement of building systems (electrical, fire protection and HVAC (including BMS)),</description><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>Sanitation</client_agency><current_phase>Construction Procurement</current_phase><design_start>2017-05-11T00:00:00</design_start><budget_forecast>33215000.00</budget_forecast><latest_budget_changes>-943000.00</latest_budget_changes><total_budget_changes>-709000.00</total_budget_changes><forecast_completion>2024-06-30T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>123</total_schedule_changes></row><row _id="row-ec6t-zati~xjia" _uuid="00000000-0000-0000-A17D-EF55974618D8" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ec6t-zati~xjia"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>1190</pid><project_name>Brkyln District 17/18 Garage: HVAC Replacement</project_name><description>Roof andThe project for which services are required is the rehabilitation of the Brooklyn Districts 17 and 18 Sanitation Garage, located at 10502 Avenue D, Brooklyn, NY 11236. Block: 8136/Lot: 1. The 159,500 total gross square foot, masonry-veneered and steel framed facility is located in eastern Brooklyn at the intersection of the Avenue D and the 105th St. This building was completed in 1991 and was last renovated in 1998.  The main objective of this project is to extend the useful life of this facility through rehabilitation of the building Roofing, and HVAC systems and adding a Solar Ready Systems. The rehabilitation shall include the following: replacement of the roof (membrane, select areas of decking, select roof drains and domes, select skylights and coordination for future solar panel locations), structural work (stiffening of the existing structural steel frame, supports for new HVAC equipment and solar panels and select parapet replacement), select replacement of building systems (electrical, fire protection and HVAC (including BMS)), building expansion joints and architectural renovation of the entire building to repair water damage.  The funding for solar program provided by DCAS.   Scope of Work:  The rehabilitation shall include the following: replacement of the roof (membrane, select areas of decking, select roof drains and domes, select skylights and coordination for future solar panel locations), structural work (stiffening of the existing structural steel frame, supports for new HVAC equipment and solar panels and select parapet replacement), select replacement of building systems (electrical, fire protection and HVAC (including BMS)),</description><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>Sanitation</client_agency><current_phase>Construction</current_phase><design_start>2017-05-11T00:00:00</design_start><budget_forecast>33187000.00</budget_forecast><latest_budget_changes>-28000.00</latest_budget_changes><total_budget_changes>-709000.00</total_budget_changes><forecast_completion>2024-10-31T00:00:00</forecast_completion><latest_schedule_changes>123</latest_schedule_changes><total_schedule_changes>123</total_schedule_changes></row><row _id="row-hkqc~n869~tnsb" _uuid="00000000-0000-0000-B4E3-19AC7B734742" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-hkqc~n869~tnsb"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1190</pid><project_name>Brkyln District 17/18 Garage: HVAC Replacement</project_name><description>Rehabilitation includes replacement of the roof and select areas of roof drains and domes, structural work; stiffening of structural steel frame supports for new HVAC equipment, solar panels, and select parapet replacements, including fire alarm system work, and select replacement of building systems. Offices, locker rooms, and bathrooms will be phased and temporarily partitioned to allow for overhead HVAC work.</description><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>Sanitation</client_agency><current_phase>Construction</current_phase><design_start>2017-05-11T00:00:00</design_start><budget_forecast>33449000.00</budget_forecast><latest_budget_changes>262000.00</latest_budget_changes><total_budget_changes>-709000.00</total_budget_changes><forecast_completion>2024-10-31T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>123</total_schedule_changes></row><row _id="row-4uwn.n3tt-iu53" _uuid="00000000-0000-0000-04C6-FCD870FF482A" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-4uwn.n3tt-iu53"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1190</pid><project_name>Brkyln District 17/18 Garage: HVAC Replacement</project_name><description>Rehabilitation includes replacement of the roof and select areas of roof drains and domes, structural work; stiffening of structural steel frame supports for new HVAC equipment, solar panels, and select parapet replacements, including fire alarm system work, and select replacement of building systems. Offices, locker rooms, and bathrooms will be phased and temporarily partitioned to allow for overhead HVAC work.</description><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>Sanitation</client_agency><current_phase>Construction</current_phase><design_start>2017-05-11T00:00:00</design_start><budget_forecast>33449000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-709000.00</total_budget_changes><forecast_completion>2024-10-31T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>123</total_schedule_changes></row><row _id="row-fzhx.qmdm_3th5" _uuid="00000000-0000-0000-C058-35FF1D714874" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-fzhx.qmdm_3th5"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>1191</pid><project_name>EASTERN PARKWAY LIBRARY MAJOR RENOVATIONS</project_name><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>Libraries-BPL</client_agency><current_phase>Design</current_phase><design_start>2018-06-28T00:00:00</design_start><budget_forecast>35381000.00</budget_forecast><total_budget_changes>493000.00</total_budget_changes><forecast_completion>2024-12-08T00:00:00</forecast_completion><total_schedule_changes>389</total_schedule_changes></row><row _id="row-b8e9.kqmc-pjaw" _uuid="00000000-0000-0000-9695-DF7F6B4B6832" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-b8e9.kqmc-pjaw"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>1191</pid><project_name>EASTERN PARKWAY LIBRARY MAJOR RENOVATIONS</project_name><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>Libraries-BPL</client_agency><current_phase>Design</current_phase><design_start>2018-06-28T00:00:00</design_start><budget_forecast>35469000.00</budget_forecast><latest_budget_changes>88000.00</latest_budget_changes><total_budget_changes>493000.00</total_budget_changes><forecast_completion>2025-07-31T00:00:00</forecast_completion><latest_schedule_changes>235</latest_schedule_changes><total_schedule_changes>389</total_schedule_changes></row><row _id="row-nb2s~s3s5-utm3" _uuid="00000000-0000-0000-DF02-1AA53711BF35" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-nb2s~s3s5-utm3"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>1191</pid><project_name>EASTERN PARKWAY LIBRARY MAJOR RENOVATIONS</project_name><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>Libraries-BPL</client_agency><current_phase>Design</current_phase><design_start>2018-06-28T00:00:00</design_start><budget_forecast>35549000.00</budget_forecast><latest_budget_changes>80000.00</latest_budget_changes><total_budget_changes>493000.00</total_budget_changes><forecast_completion>2025-07-31T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>389</total_schedule_changes></row><row _id="row-du6p_njjw.iaz8" _uuid="00000000-0000-0000-8758-A2FBF02457B6" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-du6p_njjw.iaz8"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1191</pid><project_name>EASTERN PARKWAY LIBRARY MAJOR RENOVATIONS</project_name><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>Libraries-BPL</client_agency><current_phase>Design</current_phase><design_start>2018-06-28T00:00:00</design_start><budget_forecast>35874000.00</budget_forecast><latest_budget_changes>325000.00</latest_budget_changes><total_budget_changes>493000.00</total_budget_changes><forecast_completion>2026-01-01T00:00:00</forecast_completion><latest_schedule_changes>154</latest_schedule_changes><total_schedule_changes>389</total_schedule_changes></row><row _id="row-uay6.gudv~3qsp" _uuid="00000000-0000-0000-9F07-AA269EDD2ECF" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-uay6.gudv~3qsp"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1191</pid><project_name>EASTERN PARKWAY LIBRARY MAJOR RENOVATIONS</project_name><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>Libraries-BPL</client_agency><current_phase>Design</current_phase><design_start>2018-06-28T00:00:00</design_start><budget_forecast>35874000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>493000.00</total_budget_changes><forecast_completion>2026-01-01T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>389</total_schedule_changes></row><row _id="row-hw9e_eeex_zkpw" _uuid="00000000-0000-0000-7DD8-26EB57092066" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-hw9e_eeex_zkpw"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>1192</pid><project_name>Orchard Beach Maintenance and Operations Building Site Work &amp; New Construction</project_name><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>Parks &amp; Recreation</client_agency><current_phase>Design</current_phase><design_start>2022-03-18T00:00:00</design_start><budget_forecast>40870000.00</budget_forecast><latest_budget_changes>-980000.00</latest_budget_changes><total_budget_changes>-30000.00</total_budget_changes><total_schedule_changes>0</total_schedule_changes></row><row _id="row-pf8y~tv9q-iw5h" _uuid="00000000-0000-0000-3D57-C999DE2C4C2F" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-pf8y~tv9q-iw5h"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1192</pid><project_name>Orchard Beach Maintenance and Operations Building Site Work &amp; New Construction</project_name><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>Parks &amp; Recreation</client_agency><current_phase>Design</current_phase><design_start>2022-03-18T00:00:00</design_start><budget_forecast>41820000.00</budget_forecast><latest_budget_changes>950000.00</latest_budget_changes><total_budget_changes>-30000.00</total_budget_changes><forecast_completion>2025-06-02T00:00:00</forecast_completion><total_schedule_changes>0</total_schedule_changes></row><row _id="row-dxxv_96yp.22t2" _uuid="00000000-0000-0000-CC7B-EAD4D718EE98" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-dxxv_96yp.22t2"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1192</pid><project_name>Orchard Beach Maintenance and Operations Building Site Work &amp; New Construction</project_name><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>Parks &amp; Recreation</client_agency><current_phase>Construction</current_phase><design_start>2022-03-18T00:00:00</design_start><budget_forecast>41820000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-30000.00</total_budget_changes><forecast_completion>2025-06-02T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>0</total_schedule_changes></row><row _id="row-su8r_ix9m-pyy8" _uuid="00000000-0000-0000-A929-48A4B0B950C6" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-su8r_ix9m-pyy8"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>1193</pid><project_name>Coney Island Beach Operations HQ at West 25th Street</project_name><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>Parks &amp; Recreation</client_agency><current_phase>Design</current_phase><design_start>2021-02-18T00:00:00</design_start><budget_forecast>56506000.00</budget_forecast><total_budget_changes>370000.00</total_budget_changes><forecast_completion>2026-12-04T00:00:00</forecast_completion><total_schedule_changes>134</total_schedule_changes></row><row _id="row-6vrh~6wy2_4gyk" _uuid="00000000-0000-0000-39EA-E8DBD055C7B6" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-6vrh~6wy2_4gyk"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>1193</pid><project_name>Coney Island Beach Operations HQ at West 25th Street</project_name><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>Parks &amp; Recreation</client_agency><current_phase>Design</current_phase><design_start>2021-02-18T00:00:00</design_start><budget_forecast>56506000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>370000.00</total_budget_changes><forecast_completion>2027-02-24T00:00:00</forecast_completion><latest_schedule_changes>82</latest_schedule_changes><total_schedule_changes>134</total_schedule_changes></row><row _id="row-jr76-yc2a~m8yx" _uuid="00000000-0000-0000-E213-C17ADC563B6B" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-jr76-yc2a~m8yx"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>1193</pid><project_name>Coney Island Beach Operations HQ at West 25th Street</project_name><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>Parks &amp; Recreation</client_agency><current_phase>Design</current_phase><design_start>2021-02-18T00:00:00</design_start><budget_forecast>56506000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>370000.00</total_budget_changes><forecast_completion>2027-03-23T00:00:00</forecast_completion><latest_schedule_changes>27</latest_schedule_changes><total_schedule_changes>134</total_schedule_changes></row><row _id="row-wiba_vh58.zj8n" _uuid="00000000-0000-0000-2631-D71CC17F048F" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-wiba_vh58.zj8n"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1193</pid><project_name>Coney Island Beach Operations HQ at West 25th Street</project_name><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>Parks &amp; Recreation</client_agency><current_phase>Design</current_phase><design_start>2021-02-18T00:00:00</design_start><budget_forecast>56876000.00</budget_forecast><latest_budget_changes>370000.00</latest_budget_changes><total_budget_changes>370000.00</total_budget_changes><forecast_completion>2027-03-23T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>134</total_schedule_changes></row><row _id="row-wht3.2idu_qw2q" _uuid="00000000-0000-0000-6C4E-8A3979CD90CC" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-wht3.2idu_qw2q"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1193</pid><project_name>Coney Island Beach Operations HQ at West 25th Street</project_name><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>Parks &amp; Recreation</client_agency><current_phase>Design</current_phase><design_start>2021-02-18T00:00:00</design_start><budget_forecast>56876000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>370000.00</total_budget_changes><forecast_completion>2027-04-17T00:00:00</forecast_completion><latest_schedule_changes>25</latest_schedule_changes><total_schedule_changes>134</total_schedule_changes></row><row _id="row-quze.9e5s.5edj" _uuid="00000000-0000-0000-D5ED-438C88950D27" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-quze.9e5s.5edj"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>1194</pid><project_name>NYPD Firearms and Tactics Facility</project_name><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>Police</client_agency><current_phase>Design</current_phase><design_start>2018-09-18T00:00:00</design_start><budget_forecast>281500000.00</budget_forecast><total_budget_changes>3365000.00</total_budget_changes><forecast_completion>2026-11-24T00:00:00</forecast_completion><total_schedule_changes>328</total_schedule_changes></row><row _id="row-gk8v.gwpy-ycnm" _uuid="00000000-0000-0000-C59E-C155BE741AD9" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-gk8v.gwpy-ycnm"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>1194</pid><project_name>NYPD Firearms and Tactics Facility</project_name><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>Police</client_agency><current_phase>Design</current_phase><design_start>2018-09-18T00:00:00</design_start><budget_forecast>281500000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>3365000.00</total_budget_changes><forecast_completion>2027-02-09T00:00:00</forecast_completion><latest_schedule_changes>77</latest_schedule_changes><total_schedule_changes>328</total_schedule_changes></row><row _id="row-hrrb.dh6g~3u2d" _uuid="00000000-0000-0000-1AB3-830A1447237E" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-hrrb.dh6g~3u2d"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>1194</pid><project_name>NYPD Firearms and Tactics Facility</project_name><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>Police</client_agency><current_phase>Design</current_phase><design_start>2018-09-18T00:00:00</design_start><budget_forecast>283965000.00</budget_forecast><latest_budget_changes>2465000.00</latest_budget_changes><total_budget_changes>3365000.00</total_budget_changes><forecast_completion>2027-02-16T00:00:00</forecast_completion><latest_schedule_changes>7</latest_schedule_changes><total_schedule_changes>328</total_schedule_changes></row><row _id="row-7abx~9ie6.9xxm" _uuid="00000000-0000-0000-9874-614CF48E08ED" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-7abx~9ie6.9xxm"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1194</pid><project_name>NYPD Firearms and Tactics Facility</project_name><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>Police</client_agency><current_phase>Design</current_phase><design_start>2018-09-18T00:00:00</design_start><budget_forecast>284865000.00</budget_forecast><latest_budget_changes>900000.00</latest_budget_changes><total_budget_changes>3365000.00</total_budget_changes><forecast_completion>2027-06-08T00:00:00</forecast_completion><latest_schedule_changes>112</latest_schedule_changes><total_schedule_changes>328</total_schedule_changes></row><row _id="row-jdh2~j2d2~r3bd" _uuid="00000000-0000-0000-B34A-88F1BF965B1F" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-jdh2~j2d2~r3bd"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1194</pid><project_name>NYPD Firearms and Tactics Facility</project_name><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>Police</client_agency><current_phase>Design</current_phase><design_start>2018-09-18T00:00:00</design_start><budget_forecast>284865000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>3365000.00</total_budget_changes><forecast_completion>2027-10-18T00:00:00</forecast_completion><latest_schedule_changes>132</latest_schedule_changes><total_schedule_changes>328</total_schedule_changes></row><row _id="row-c5ua_kxwx-fika" _uuid="00000000-0000-0000-5C37-7798869E394E" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-c5ua_kxwx-fika"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>1198</pid><project_name>GI - GRAVESEND BAY CSO - PHASE II</project_name><description>GREEN INFRASTRUCTURE IN OH-015 GRAVESEND BAY CSO PH 2</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Design</current_phase><design_start>2017-10-30T00:00:00</design_start><budget_forecast>41327000.00</budget_forecast><total_budget_changes>13699000.00</total_budget_changes><forecast_completion>2024-11-10T00:00:00</forecast_completion><total_schedule_changes>29</total_schedule_changes></row><row _id="row-wp78.jwga-dee9" _uuid="00000000-0000-0000-8A25-20A3A8D8F363" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-wp78.jwga-dee9"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>1198</pid><project_name>GI - GRAVESEND BAY CSO - PHASE II</project_name><description>GREEN INFRASTRUCTURE IN OH-015 GRAVESEND BAY CSO PH 2</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Design</current_phase><design_start>2017-10-30T00:00:00</design_start><budget_forecast>41398000.00</budget_forecast><latest_budget_changes>71000.00</latest_budget_changes><total_budget_changes>13699000.00</total_budget_changes><forecast_completion>2024-11-10T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>29</total_schedule_changes></row><row _id="row-q778_2hyc-p4h7" _uuid="00000000-0000-0000-A7ED-58A78CBE313F" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-q778_2hyc-p4h7"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>1210</pid><project_name>Woodhaven Blvd SBS Phase B</project_name><description>HWQ100SBB, Woodhaven Blvd – SBS – Phase B, calls for capital improvements along Woodhaven Blvd between Union Turnpike and 107th Avenue in the borough of Queens. These improvements include but are not limited to median widening, building out neck downs, normalizing intersections and other features to increase safety and support the Woodhaven SBS.</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2021-07-12T00:00:00</design_start><budget_forecast>50748000.00</budget_forecast><latest_budget_changes>10000.00</latest_budget_changes><total_budget_changes>-20000.00</total_budget_changes><forecast_completion>2028-10-14T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>15</total_schedule_changes></row><row _id="row-9cme.r4z5~id35" _uuid="00000000-0000-0000-0C5A-017514AE28EB" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-9cme.r4z5~id35"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>1210</pid><project_name>Woodhaven Blvd SBS Phase B</project_name><description>HWQ100SBB, Woodhaven Blvd – SBS – Phase B, calls for capital improvements along Woodhaven Blvd between Union Turnpike and 107th Avenue in the borough of Queens. These improvements include but are not limited to median widening, building out neck downs, normalizing intersections and other features to increase safety and support the Woodhaven SBS.</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2021-07-12T00:00:00</design_start><budget_forecast>50748000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-20000.00</total_budget_changes><forecast_completion>2028-10-14T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>15</total_schedule_changes></row><row _id="row-dz3a.vuu2~nxyt" _uuid="00000000-0000-0000-4060-8CA60C321517" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-dz3a.vuu2~nxyt"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1210</pid><project_name>Woodhaven Blvd SBS Phase B</project_name><description>HWQ100SBB, Woodhaven Blvd – SBS – Phase B, calls for capital improvements along Woodhaven Blvd between Union Turnpike and 107th Avenue in the borough of Queens. These improvements include but are not limited to median widening, building out neck downs, normalizing intersections and other features to increase safety and support the Woodhaven SBS.</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2021-07-12T00:00:00</design_start><budget_forecast>50718000.00</budget_forecast><latest_budget_changes>-30000.00</latest_budget_changes><total_budget_changes>-20000.00</total_budget_changes><forecast_completion>2028-02-10T00:00:00</forecast_completion><latest_schedule_changes>-247</latest_schedule_changes><total_schedule_changes>15</total_schedule_changes></row><row _id="row-h93r-kbbi-4bv3" _uuid="00000000-0000-0000-D66E-23C8D5598DE2" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-h93r-kbbi-4bv3"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1210</pid><project_name>Woodhaven Blvd SBS Phase B</project_name><description>HWQ100SBB, Woodhaven Blvd – SBS – Phase B, calls for capital improvements along Woodhaven Blvd between Union Turnpike and 107th Avenue in the borough of Queens. These improvements include but are not limited to median widening, building out neck downs, normalizing intersections and other features to increase safety and support the Woodhaven SBS.</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2021-07-12T00:00:00</design_start><budget_forecast>50718000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-20000.00</total_budget_changes><forecast_completion>2028-10-29T00:00:00</forecast_completion><latest_schedule_changes>262</latest_schedule_changes><total_schedule_changes>15</total_schedule_changes></row><row _id="row-86de-pjt3~g773" _uuid="00000000-0000-0000-9EE7-4035295D4046" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-86de-pjt3~g773"><date_reported_as_of>2021-07-01T00:00:00</date_reported_as_of><pid>1213</pid><project_name>RECONSTRUCTION OF EMPIRE BLVD/BED-796</project_name><description>Empire Boulevard Safety Improvements</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Construction</current_phase><design_start>2013-04-09T00:00:00</design_start><budget_forecast>25658000.00</budget_forecast><total_budget_changes>8554000.00</total_budget_changes><forecast_completion>2022-11-07T00:00:00</forecast_completion><total_schedule_changes>223</total_schedule_changes></row><row _id="row-bhjp.5wqj-njz2" _uuid="00000000-0000-0000-73C0-90F344D30068" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-bhjp.5wqj-njz2"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>1213</pid><project_name>RECONSTRUCTION OF EMPIRE BLVD/BED-796</project_name><description>Empire Boulevard Safety Improvements</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Construction</current_phase><design_start>2013-04-09T00:00:00</design_start><budget_forecast>25948000.00</budget_forecast><latest_budget_changes>290000.00</latest_budget_changes><total_budget_changes>8554000.00</total_budget_changes><forecast_completion>2022-11-07T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>223</total_schedule_changes></row><row _id="row-b5dy~smy5-gqww" _uuid="00000000-0000-0000-75C0-2572A7CBE0C3" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-b5dy~smy5-gqww"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>1213</pid><project_name>RECONSTRUCTION OF EMPIRE BLVD/BED-796</project_name><description>Empire Boulevard Safety Improvements</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Construction</current_phase><design_start>2013-04-09T00:00:00</design_start><budget_forecast>34178000.00</budget_forecast><latest_budget_changes>8230000.00</latest_budget_changes><total_budget_changes>8554000.00</total_budget_changes><forecast_completion>2022-11-07T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>223</total_schedule_changes></row><row _id="row-wwxb.knbg~nmvm" _uuid="00000000-0000-0000-40F5-2A4E1955ED4C" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-wwxb.knbg~nmvm"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1213</pid><project_name>RECONSTRUCTION OF EMPIRE BLVD/BED-796</project_name><description>Empire Boulevard Safety Improvements</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Construction</current_phase><design_start>2013-04-09T00:00:00</design_start><budget_forecast>34212000.00</budget_forecast><latest_budget_changes>34000.00</latest_budget_changes><total_budget_changes>8554000.00</total_budget_changes><forecast_completion>2023-06-18T00:00:00</forecast_completion><latest_schedule_changes>223</latest_schedule_changes><total_schedule_changes>223</total_schedule_changes></row><row _id="row-cu9d_k7ef~ap34" _uuid="00000000-0000-0000-0020-96B1AEE50557" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-cu9d_k7ef~ap34"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1213</pid><project_name>RECONSTRUCTION OF EMPIRE BLVD/BED-796</project_name><description>Empire Boulevard Safety Improvements</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Construction</current_phase><design_start>2013-04-09T00:00:00</design_start><budget_forecast>34212000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>8554000.00</total_budget_changes><forecast_completion>2023-06-18T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>223</total_schedule_changes></row><row _id="row-g3dx.3b27~d6jn" _uuid="00000000-0000-0000-2C42-422C9B89E3F4" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-g3dx.3b27~d6jn"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1214</pid><project_name>Harper Street Administration Building Reconstruction</project_name><description>The main scope of this project is to construct a new Administration and Personnel Building at the northwest corner, limiting relocation and operational disruptions during construction as wells as to accommodate future growth.</description><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><budget_forecast>133033000.00</budget_forecast><latest_budget_changes>400000.00</latest_budget_changes><total_budget_changes>400000.00</total_budget_changes></row><row _id="row-6rgg_7bge_6xw3" _uuid="00000000-0000-0000-E3A6-DC045337BE97" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-6rgg_7bge_6xw3"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1214</pid><project_name>Harper Street Administration Building Reconstruction</project_name><description>The main scope of this project is to construct a new Administration and Personnel Building at the northwest corner, limiting relocation and operational disruptions during construction as wells as to accommodate future growth.</description><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><budget_forecast>133033000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>400000.00</total_budget_changes></row><row _id="row-tahq_bgk5.dzct" _uuid="00000000-0000-0000-31DF-AFAEF64B5F5D" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-tahq_bgk5.dzct"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>1215</pid><project_name>Reconstruction at 108 Street Pumping Station</project_name><description>Reconstruction at 108 Street Pumping Station</description><category>Wastewater Treatment</category><managing_agency>DEP</managing_agency><client_agency>BWT</client_agency><current_phase>Construction</current_phase><design_start>2017-07-28T00:00:00</design_start><budget_forecast>57851604.68</budget_forecast><total_budget_changes>129214.00</total_budget_changes><forecast_completion>2024-02-28T00:00:00</forecast_completion><total_schedule_changes>666</total_schedule_changes></row><row _id="row-piup-jq26-w8qi" _uuid="00000000-0000-0000-8453-F1BD133E89CF" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-piup-jq26-w8qi"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>1215</pid><project_name>Reconstruction at 108 Street Pumping Station</project_name><description>Reconstruction at 108 Street Pumping Station</description><category>Wastewater Treatment</category><managing_agency>DEP</managing_agency><client_agency>BWT</client_agency><current_phase>Construction</current_phase><design_start>2017-07-28T00:00:00</design_start><budget_forecast>57851604.68</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>129214.00</total_budget_changes><forecast_completion>2024-02-28T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>666</total_schedule_changes></row><row _id="row-kzqv~tzt6.ptmu" _uuid="00000000-0000-0000-82C8-456AE4C37854" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-kzqv~tzt6.ptmu"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1215</pid><project_name>Reconstruction at 108 Street Pumping Station</project_name><description>Reconstruction at 108 Street Pumping Station</description><category>Wastewater Treatment</category><managing_agency>DEP</managing_agency><client_agency>BWT</client_agency><current_phase>Construction</current_phase><design_start>2017-07-28T00:00:00</design_start><budget_forecast>57851604.68</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>129214.00</total_budget_changes><forecast_completion>2024-02-28T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>666</total_schedule_changes></row><row _id="row-msfn_j9fr-w87x" _uuid="00000000-0000-0000-9E62-E503B1357B9D" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-msfn_j9fr-w87x"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1215</pid><project_name>Reconstruction at 108 Street Pumping Station</project_name><description>Reconstruction at 108 Street Pumping Station</description><category>Wastewater Treatment</category><managing_agency>DEP</managing_agency><client_agency>BWT</client_agency><current_phase>Construction</current_phase><design_start>2017-07-28T00:00:00</design_start><budget_forecast>57980818.68</budget_forecast><latest_budget_changes>129214.00</latest_budget_changes><total_budget_changes>129214.00</total_budget_changes><forecast_completion>2025-12-25T00:00:00</forecast_completion><latest_schedule_changes>666</latest_schedule_changes><total_schedule_changes>666</total_schedule_changes></row><row _id="row-2t5t-mxw6.b9ye" _uuid="00000000-0000-0000-9FEC-FCCB7DB11B4D" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-2t5t-mxw6.b9ye"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>1216</pid><project_name>Reconstruction of Clearview Pump Station</project_name><description>Reconstruction of Clearview Pump Station</description><category>Wastewater Treatment</category><managing_agency>DEP</managing_agency><client_agency>BWT</client_agency><current_phase>Construction Procurement</current_phase><design_start>2015-12-24T00:00:00</design_start><budget_forecast>36225105.85</budget_forecast><total_budget_changes>802582.00</total_budget_changes><forecast_completion>2024-12-03T00:00:00</forecast_completion><total_schedule_changes>2</total_schedule_changes></row><row _id="row-hrev-35jr~2dmr" _uuid="00000000-0000-0000-F937-D438CBCE43F2" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-hrev-35jr~2dmr"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>1216</pid><project_name>Reconstruction of Clearview Pump Station</project_name><description>Reconstruction of Clearview Pump Station</description><category>Wastewater Treatment</category><managing_agency>DEP</managing_agency><client_agency>BWT</client_agency><current_phase>Construction Procurement</current_phase><design_start>2015-12-24T00:00:00</design_start><budget_forecast>37027687.85</budget_forecast><latest_budget_changes>802582.00</latest_budget_changes><total_budget_changes>802582.00</total_budget_changes><forecast_completion>2024-12-03T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>2</total_schedule_changes></row><row _id="row-3wmp.dxdc.d9dn" _uuid="00000000-0000-0000-536D-B05D738C718F" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-3wmp.dxdc.d9dn"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1216</pid><project_name>Reconstruction of Clearview Pump Station</project_name><description>Reconstruction of Clearview Pump Station</description><category>Wastewater Treatment</category><managing_agency>DEP</managing_agency><client_agency>BWT</client_agency><current_phase>Construction Procurement</current_phase><design_start>2015-12-24T00:00:00</design_start><budget_forecast>37027687.85</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>802582.00</total_budget_changes><forecast_completion>2024-12-03T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>2</total_schedule_changes></row><row _id="row-uvpe~72pf.ms8d" _uuid="00000000-0000-0000-A873-FE2E512399D3" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-uvpe~72pf.ms8d"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1216</pid><project_name>Reconstruction of Clearview Pump Station</project_name><description>Reconstruction of Clearview Pump Station</description><category>Wastewater Treatment</category><managing_agency>DEP</managing_agency><client_agency>BWT</client_agency><current_phase>Construction</current_phase><design_start>2015-12-24T00:00:00</design_start><budget_forecast>37027687.85</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>802582.00</total_budget_changes><forecast_completion>2024-12-05T00:00:00</forecast_completion><latest_schedule_changes>2</latest_schedule_changes><total_schedule_changes>2</total_schedule_changes></row><row _id="row-ikca-xyn6_f4wp" _uuid="00000000-0000-0000-236F-8E5F05461061" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ikca-xyn6_f4wp"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>1217</pid><project_name>QUEENS 8/10/12  GARAGE REHAB</project_name><description>Rehabilitation of the Queens 8/10/12 Garage located at Bergen Landing  at 130-23 150th Avenue Queens</description><category>Sanitation</category><managing_agency>DSNY</managing_agency><client_agency>DSNY</client_agency><current_phase>Design</current_phase><design_start>2020-03-02T00:00:00</design_start><budget_forecast>38498000.00</budget_forecast><total_budget_changes>8964000.00</total_budget_changes><forecast_completion>2028-06-30T00:00:00</forecast_completion><total_schedule_changes>273</total_schedule_changes></row><row _id="row-k5cr.pi3z-9z33" _uuid="00000000-0000-0000-B497-C3AD5C08BE49" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-k5cr.pi3z-9z33"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>1217</pid><project_name>QUEENS 8/10/12  GARAGE REHAB</project_name><description>Rehabilitation of the Queens 8/10/12 Garage located at Bergen Landing  at 130-23 150th Avenue Queens</description><category>Sanitation</category><managing_agency>DSNY</managing_agency><client_agency>DSNY</client_agency><current_phase>Design</current_phase><design_start>2020-03-02T00:00:00</design_start><budget_forecast>41567000.00</budget_forecast><latest_budget_changes>3069000.00</latest_budget_changes><total_budget_changes>8964000.00</total_budget_changes><forecast_completion>2028-06-30T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>273</total_schedule_changes></row><row _id="row-bsqm.t9w7_vbwd" _uuid="00000000-0000-0000-5BD5-E78A350AB37C" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-bsqm.t9w7_vbwd"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1217</pid><project_name>QUEENS 8/10/12  GARAGE REHAB</project_name><description>Rehabilitation of the Queens 8/10/12 Garage located at Bergen Landing  at 130-23 150th Avenue Queens</description><category>Sanitation</category><managing_agency>DSNY</managing_agency><client_agency>DSNY</client_agency><current_phase>Design</current_phase><design_start>2020-03-02T00:00:00</design_start><budget_forecast>41567000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>8964000.00</total_budget_changes><forecast_completion>2028-06-30T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>273</total_schedule_changes></row><row _id="row-ci4d-djk3~e7xh" _uuid="00000000-0000-0000-98FE-528EAF5C3CBE" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ci4d-djk3~e7xh"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1217</pid><project_name>QUEENS 8/10/12  GARAGE REHAB</project_name><description>Rehabilitation of the Queens 8/10/12 Garage located at Bergen Landing  at 130-23 150th Avenue Queens</description><category>Sanitation</category><managing_agency>DSNY</managing_agency><client_agency>DSNY</client_agency><current_phase>Design</current_phase><design_start>2020-03-02T00:00:00</design_start><budget_forecast>47462000.00</budget_forecast><latest_budget_changes>5895000.00</latest_budget_changes><total_budget_changes>8964000.00</total_budget_changes><forecast_completion>2029-03-30T00:00:00</forecast_completion><latest_schedule_changes>273</latest_schedule_changes><total_schedule_changes>273</total_schedule_changes></row><row _id="row-u6d5-cxm2.ihew" _uuid="00000000-0000-0000-F26F-80CAB8B3A0EF" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-u6d5-cxm2.ihew"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>1218</pid><project_name>Fort Greene Park Entrances, Paths, Plaza and Drainage Infrastructure Reconstruction</project_name><description>This project will reconstruct the entrances, paths, plaza and drainage infrastructure at Fort Greene Park.</description><category>Parks</category><managing_agency>DPR</managing_agency><client_agency>DPR</client_agency><current_phase>Design</current_phase><design_start>2021-02-22T00:00:00</design_start><budget_forecast>29284800.00</budget_forecast><total_budget_changes>0.00</total_budget_changes><total_schedule_changes>417</total_schedule_changes></row><row _id="row-r2fe~nicf~63sp" _uuid="00000000-0000-0000-EE0F-328CE6C2AF74" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-r2fe~nicf~63sp"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>1224</pid><project_name>Next Generation Data Platform Re-Architecture</project_name><description>Comprehensive modernization of  existing end-of-life DataShare and DataBridge platforms to guarantee DoITT can maintain ongoing support, evolution, and growth of the DoITT agency-integration and data-sharing eco-system</description><category>IT</category><managing_agency>DOITT</managing_agency><client_agency>DoITT</client_agency><current_phase>IT</current_phase><budget_forecast>92807744.77</budget_forecast><total_budget_changes>0.40</total_budget_changes><forecast_completion>2024-06-30T00:00:00</forecast_completion><total_schedule_changes>304</total_schedule_changes></row><row _id="row-xhxu-gtmr_wxzz" _uuid="00000000-0000-0000-EA5E-E3861759B403" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-xhxu-gtmr_wxzz"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>1224</pid><project_name>Next Generation Data Platform Re-Architecture</project_name><description>Comprehensive modernization of  existing end-of-life DataShare and DataBridge platforms to guarantee DoITT can maintain ongoing support, evolution, and growth of the DoITT agency-integration and data-sharing eco-system</description><category>IT</category><managing_agency>DOITT</managing_agency><client_agency>DoITT</client_agency><current_phase>IT</current_phase><budget_forecast>92807745.17</budget_forecast><latest_budget_changes>0.40</latest_budget_changes><total_budget_changes>0.40</total_budget_changes><forecast_completion>2023-04-30T00:00:00</forecast_completion><latest_schedule_changes>-427</latest_schedule_changes><total_schedule_changes>304</total_schedule_changes></row><row _id="row-geyc-3hrn_cp6r" _uuid="00000000-0000-0000-FEAB-EF1195C5A21D" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-geyc-3hrn_cp6r"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1224</pid><project_name>Next Generation Data Platform Re-Architecture</project_name><description>Comprehensive modernization of  existing end-of-life DataShare and DataBridge platforms to guarantee DoITT can maintain ongoing support, evolution, and growth of the DoITT agency-integration and data-sharing eco-system</description><category>IT</category><managing_agency>DOITT</managing_agency><client_agency>DoITT</client_agency><current_phase>IT</current_phase><budget_forecast>92807745.17</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.40</total_budget_changes><forecast_completion>2025-04-30T00:00:00</forecast_completion><latest_schedule_changes>731</latest_schedule_changes><total_schedule_changes>304</total_schedule_changes></row><row _id="row-kxkn-vcvk-asgs" _uuid="00000000-0000-0000-A3EA-D2FCB881DE80" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-kxkn-vcvk-asgs"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1224</pid><project_name>Next Generation Data Platform Re-Architecture</project_name><description>Comprehensive modernization of  existing end-of-life DataShare and DataBridge platforms to guarantee DoITT can maintain ongoing support, evolution, and growth of the DoITT agency-integration and data-sharing eco-system</description><category>IT</category><managing_agency>DOITT</managing_agency><client_agency>DoITT</client_agency><current_phase>IT</current_phase><budget_forecast>92807745.17</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.40</total_budget_changes><forecast_completion>2025-04-30T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>304</total_schedule_changes></row><row _id="row-zgbs.f684.2htw" _uuid="00000000-0000-0000-330B-DAAF540A3804" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-zgbs.f684.2htw"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>1226</pid><project_name>Varick Build-out</project_name><description>Build-out of Varick. Pending DCAS to execute the lease, which is expected this summer. Once executed DCAS will take over management of the capital project and work with the landlord to perform the work.</description><category>Other Government Facilities</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><budget_forecast>31462000.00</budget_forecast><total_budget_changes>0.00</total_budget_changes></row><row _id="row-xegx_649f~x5y9" _uuid="00000000-0000-0000-1CC0-EA77108F03D7" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-xegx_649f~x5y9"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>1226</pid><project_name>Varick Build-out</project_name><description>Build-out of Varick. Pending DCAS to execute the lease, which is expected this summer. Once executed DCAS will take over management of the capital project and work with the landlord to perform the work.</description><category>Other Government Facilities</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><budget_forecast>31462000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes></row><row _id="row-kbdy-ffiv.uhse" _uuid="00000000-0000-0000-3466-5CEFF106E2E5" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-kbdy-ffiv.uhse"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1226</pid><project_name>Varick Build-out</project_name><description>Build-out of Varick. Pending DCAS to execute the lease, which is expected this summer. Once executed DCAS will take over management of the capital project and work with the landlord to perform the work.</description><category>Other Government Facilities</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><budget_forecast>31462000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes></row><row _id="row-y4p8~kwrq-h8mi" _uuid="00000000-0000-0000-CD39-8DEE6BEAC167" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-y4p8~kwrq-h8mi"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1226</pid><project_name>Varick Build-out</project_name><description>Build-out of Varick. Pending DCAS to execute the lease, which is expected this summer. Once executed DCAS will take over management of the capital project and work with the landlord to perform the work.</description><category>Other Government Facilities</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction</current_phase><budget_forecast>31462000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes></row><row _id="row-fpws~i9fi-ccut" _uuid="00000000-0000-0000-5CE9-C9711F5582A5" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-fpws~i9fi-ccut"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1229</pid><project_name>70 MULBERRY STREET - RECONSTRUCTION</project_name><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><current_phase>Design</current_phase><design_start>2022-06-15T00:00:00</design_start><budget_forecast>169760000.00</budget_forecast><latest_budget_changes>300000.00</latest_budget_changes><total_budget_changes>1001000.00</total_budget_changes><forecast_completion>2028-02-01T00:00:00</forecast_completion><total_schedule_changes>50</total_schedule_changes></row><row _id="row-g2f2-k9ua~2z4t" _uuid="00000000-0000-0000-1D63-814F92E00CD3" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-g2f2-k9ua~2z4t"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1229</pid><project_name>70 MULBERRY STREET - RECONSTRUCTION</project_name><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><current_phase>Design</current_phase><design_start>2022-06-15T00:00:00</design_start><budget_forecast>170461000.00</budget_forecast><latest_budget_changes>701000.00</latest_budget_changes><total_budget_changes>1001000.00</total_budget_changes><forecast_completion>2028-03-22T00:00:00</forecast_completion><latest_schedule_changes>50</latest_schedule_changes><total_schedule_changes>50</total_schedule_changes></row><row _id="row-2rbx_42hr-wqs3" _uuid="00000000-0000-0000-A607-0FBD64973DB2" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-2rbx_42hr-wqs3"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>1230</pid><project_name>Construction of a New Training Academy</project_name><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>Corrections</client_agency><budget_forecast>222642000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes></row><row _id="row-5pkc_4wau~388p" _uuid="00000000-0000-0000-BDCE-44A65398F08C" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-5pkc_4wau~388p"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1230</pid><project_name>Construction of a New Training Academy</project_name><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>Corrections</client_agency><budget_forecast>222642000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes></row><row _id="row-aq2w.bqwr_puzw" _uuid="00000000-0000-0000-78EA-7D52DF027ED9" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-aq2w.bqwr_puzw"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1230</pid><project_name>Construction of a New Training Academy</project_name><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>Corrections</client_agency><budget_forecast>222642000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes></row><row _id="row-q7gc-tucc~b6jp" _uuid="00000000-0000-0000-000C-52C6936B5FA7" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-q7gc-tucc~b6jp"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>1232</pid><project_name>Design Build of ROW Green Infrastructure Precast Porous Concrete Panels: Stages 1,2 &amp; 3 of PHASE 4 OF THE OH-015 GRAVESEND BAY CSO TRIBUTARY AREA</project_name><description>Design Build - ROW Green Infrastructure Precast Porous Concrete Panels</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><budget_forecast>40006000.00</budget_forecast><latest_budget_changes>11320000.00</latest_budget_changes><total_budget_changes>11320000.00</total_budget_changes></row><row _id="row-zrfm_whmm-j8k7" _uuid="00000000-0000-0000-0A2C-8AC869561D97" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-zrfm_whmm-j8k7"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1232</pid><project_name>Design Build of ROW Green Infrastructure Precast Porous Concrete Panels: Stages 1,2 &amp; 3 of PHASE 4 OF THE OH-015 GRAVESEND BAY CSO TRIBUTARY AREA</project_name><description>Design Build - ROW Green Infrastructure Precast Porous Concrete Panels</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><budget_forecast>40006000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>11320000.00</total_budget_changes></row><row _id="row-pu8n-zfj2_wutz" _uuid="00000000-0000-0000-D5EB-36458DCC4A20" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-pu8n-zfj2_wutz"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1232</pid><project_name>Design Build of ROW Green Infrastructure Precast Porous Concrete Panels: Stages 1,2 &amp; 3 of PHASE 4 OF THE OH-015 GRAVESEND BAY CSO TRIBUTARY AREA</project_name><description>Design Build - ROW Green Infrastructure Precast Porous Concrete Panels</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><budget_forecast>40006000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>11320000.00</total_budget_changes></row><row _id="row-26k8_9qs6~ebki" _uuid="00000000-0000-0000-3DDF-9CA9C8061CEF" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-26k8_9qs6~ebki"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1234</pid><project_name>New Flyover Pedestrian Bridge</project_name><description>New Flyover Pedestrian Bridge</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2022-05-03T00:00:00</design_start><budget_forecast>186958000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2028-02-10T00:00:00</forecast_completion><total_schedule_changes>0</total_schedule_changes></row><row _id="row-8zcn~x7qp-yv3z" _uuid="00000000-0000-0000-DB57-116115EFEA5B" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-8zcn~x7qp-yv3z"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1234</pid><project_name>New Flyover Pedestrian Bridge</project_name><description>New Flyover Pedestrian Bridge</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2022-05-03T00:00:00</design_start><budget_forecast>186958000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2028-02-10T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>0</total_schedule_changes></row><row _id="row-dnq4-euwk.gb64" _uuid="00000000-0000-0000-D9DF-930139DBB2CD" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-dnq4-euwk.gb64"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1235</pid><project_name>444 Thomas Boyland Community Center</project_name><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>Human Services</client_agency><budget_forecast>127387000.00</budget_forecast><latest_budget_changes>382000.00</latest_budget_changes><total_budget_changes>382000.00</total_budget_changes></row><row _id="row-vza3.3hu5_mvqb" _uuid="00000000-0000-0000-D91E-A1FFA87FC2E4" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-vza3.3hu5_mvqb"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1235</pid><project_name>444 Thomas Boyland Community Center</project_name><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>Human Services</client_agency><current_phase>Design</current_phase><design_start>2023-02-15T00:00:00</design_start><budget_forecast>127387000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>382000.00</total_budget_changes></row><row _id="row-bxkg_bey8_576v" _uuid="00000000-0000-0000-E6E6-7D420286F3AD" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-bxkg_bey8_576v"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>1236</pid><project_name>4th Ave Safety Improvements - Phase B</project_name><description>Redesign of 4th Ave from Atlantic Ave to 64th Street.</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2022-03-28T00:00:00</design_start><budget_forecast>221588000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-21000.00</total_budget_changes><forecast_completion>2030-09-29T00:00:00</forecast_completion><total_schedule_changes>0</total_schedule_changes></row><row _id="row-dhq6-g4dt-i9ki" _uuid="00000000-0000-0000-82AB-44F6551E0F27" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-dhq6-g4dt-i9ki"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1236</pid><project_name>4th Ave Safety Improvements - Phase B</project_name><description>Redesign of 4th Ave from Atlantic Ave to 64th Street.</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2022-03-28T00:00:00</design_start><budget_forecast>221567000.00</budget_forecast><latest_budget_changes>-21000.00</latest_budget_changes><total_budget_changes>-21000.00</total_budget_changes><forecast_completion>2030-09-29T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>0</total_schedule_changes></row><row _id="row-am4v_d223_cwhd" _uuid="00000000-0000-0000-3E62-0CFA0F1597B7" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-am4v_d223_cwhd"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1236</pid><project_name>4th Ave Safety Improvements - Phase B</project_name><description>Redesign of 4th Ave from Atlantic Ave to 64th Street.</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2022-03-28T00:00:00</design_start><budget_forecast>221567000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-21000.00</total_budget_changes><forecast_completion>2030-09-29T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>0</total_schedule_changes></row><row _id="row-768m_9xvn.y947" _uuid="00000000-0000-0000-8AC9-2850DF857FE8" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-768m_9xvn.y947"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>1237</pid><project_name>79TH STREET CROSSTOWN SELECT BUS SERVICE</project_name><description>79TH STREET CROSSTOWN SELECT BUS SERVICE - BOROUGH OF MANHATTAN</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2019-08-27T00:00:00</design_start><budget_forecast>63933000.00</budget_forecast><total_budget_changes>3370000.00</total_budget_changes><forecast_completion>2026-06-19T00:00:00</forecast_completion><total_schedule_changes>737</total_schedule_changes></row><row _id="row-w247-yvpv_h9bz" _uuid="00000000-0000-0000-DA85-624408F70E3F" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-w247-yvpv_h9bz"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>1237</pid><project_name>79TH STREET CROSSTOWN SELECT BUS SERVICE</project_name><description>79TH STREET CROSSTOWN SELECT BUS SERVICE - BOROUGH OF MANHATTAN</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2019-08-27T00:00:00</design_start><budget_forecast>66833000.00</budget_forecast><latest_budget_changes>2900000.00</latest_budget_changes><total_budget_changes>3370000.00</total_budget_changes><forecast_completion>2027-06-25T00:00:00</forecast_completion><latest_schedule_changes>371</latest_schedule_changes><total_schedule_changes>737</total_schedule_changes></row><row _id="row-sxjy_3k7q~vc8h" _uuid="00000000-0000-0000-D1CB-E91AFC8A869F" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-sxjy_3k7q~vc8h"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1237</pid><project_name>79TH STREET CROSSTOWN SELECT BUS SERVICE</project_name><description>79TH STREET CROSSTOWN SELECT BUS SERVICE - BOROUGH OF MANHATTAN</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2019-08-27T00:00:00</design_start><budget_forecast>67303000.00</budget_forecast><latest_budget_changes>470000.00</latest_budget_changes><total_budget_changes>3370000.00</total_budget_changes><forecast_completion>2028-06-25T00:00:00</forecast_completion><latest_schedule_changes>366</latest_schedule_changes><total_schedule_changes>737</total_schedule_changes></row><row _id="row-d5x4-ifk8_sqtn" _uuid="00000000-0000-0000-8E59-092A6BEC7A7F" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-d5x4-ifk8_sqtn"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1237</pid><project_name>79TH STREET CROSSTOWN SELECT BUS SERVICE</project_name><description>79TH STREET CROSSTOWN SELECT BUS SERVICE - BOROUGH OF MANHATTAN</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Design</current_phase><design_start>2019-08-27T00:00:00</design_start><budget_forecast>67303000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>3370000.00</total_budget_changes><forecast_completion>2028-06-25T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>737</total_schedule_changes></row><row _id="row-bb2y-574j_awea" _uuid="00000000-0000-0000-4A7E-770B0EBCED00" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-bb2y-574j_awea"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1241</pid><project_name>NEW CONSTRUCTION CROSSROADS JUVENILE DETENTION</project_name><description>The scope of this project is the creation of approximately 73,320 square feet of space in a free-standing multi-level tower connected by bridges at third floor of the existing Crossroads building. The addition will house a warehouse, health care service, admission and transportation, education and vocation classrooms and workshops, and critical HVAC infrastructure to serve the new and existing facility, and miscellaneous support spaces. It is proposed the structure will be built on the south-west portion of the site.</description><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>Child Services</client_agency><current_phase>Design</current_phase><design_start>2022-08-01T00:00:00</design_start><budget_forecast>164205000.00</budget_forecast><latest_budget_changes>310000.00</latest_budget_changes><total_budget_changes>310000.00</total_budget_changes><forecast_completion>2029-03-01T00:00:00</forecast_completion><total_schedule_changes>0</total_schedule_changes></row><row _id="row-szvu_fknx.4nph" _uuid="00000000-0000-0000-07E2-656ABC9590FD" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-szvu_fknx.4nph"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1241</pid><project_name>NEW CONSTRUCTION CROSSROADS JUVENILE DETENTION</project_name><description>The scope of this project is the creation of approximately 73,320 square feet of space in a free-standing multi-level tower connected by bridges at third floor of the existing Crossroads building. The addition will house a warehouse, health care service, admission and transportation, education and vocation classrooms and workshops, and critical HVAC infrastructure to serve the new and existing facility, and miscellaneous support spaces. It is proposed the structure will be built on the south-west portion of the site.</description><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>Child Services</client_agency><current_phase>Design</current_phase><design_start>2022-08-01T00:00:00</design_start><budget_forecast>164205000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>310000.00</total_budget_changes><forecast_completion>2029-03-01T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>0</total_schedule_changes></row><row _id="row-5qtn-xc8t-858h" _uuid="00000000-0000-0000-C759-808B529867C4" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-5qtn-xc8t-858h"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1242</pid><project_name>NEW CONSTRUCTION HORIZON JUVENILE DETENTION CENTER</project_name><description>The scope of this project is the creation of approximately 72,500 square feet of space in a free-standing multi-level tower connected by bridges at the second floor of the existing Horizon building. The addition will house a commercial kitchen, dining hall, health care service, warehouse, education and vocation classrooms and workshops, and critical HVAC infrastructure to serve the new building and the existing facility, and miscellaneous support spaces. It is proposed the structure will be built on the north-east portion of the site.</description><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>Child Services</client_agency><budget_forecast>158635000.00</budget_forecast><latest_budget_changes>295000.00</latest_budget_changes><total_budget_changes>295000.00</total_budget_changes></row><row _id="row-xvxh~umtq.5ue6" _uuid="00000000-0000-0000-A7B8-19EB56F56636" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-xvxh~umtq.5ue6"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1242</pid><project_name>NEW CONSTRUCTION HORIZON JUVENILE DETENTION CENTER</project_name><description>The scope of this project is the creation of approximately 72,500 square feet of space in a free-standing multi-level tower connected by bridges at the second floor of the existing Horizon building. The addition will house a commercial kitchen, dining hall, health care service, warehouse, education and vocation classrooms and workshops, and critical HVAC infrastructure to serve the new building and the existing facility, and miscellaneous support spaces. It is proposed the structure will be built on the north-east portion of the site.</description><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>Child Services</client_agency><budget_forecast>158635000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>295000.00</total_budget_changes></row><row _id="row-bph8~9ngr~x9rq" _uuid="00000000-0000-0000-2E49-027718BF54E8" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-bph8~9ngr~x9rq"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>1243</pid><project_name>Reconstruction of Del Valle Square, Bronx</project_name><description>RECONSTRUCTION OF DEL VALLE SQUARE - UPGRADE &amp; EXPAND EXISTING PLAZA AND ENHANCE PEDESTRIAN SAFETY AND IMPROVE A COMMUNITY PUBLIC SPACE</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Construction Procurement</current_phase><design_start>2016-10-19T00:00:00</design_start><budget_forecast>31537000.00</budget_forecast><total_budget_changes>-4589000.00</total_budget_changes><forecast_completion>2024-09-17T00:00:00</forecast_completion><total_schedule_changes>421</total_schedule_changes></row><row _id="row-jcux.rsvt-jhuv" _uuid="00000000-0000-0000-12D5-22CA6D0655C8" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-jcux.rsvt-jhuv"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>1243</pid><project_name>Reconstruction of Del Valle Square, Bronx</project_name><description>RECONSTRUCTION OF DEL VALLE SQUARE - UPGRADE &amp; EXPAND EXISTING PLAZA AND ENHANCE PEDESTRIAN SAFETY AND IMPROVE A COMMUNITY PUBLIC SPACE</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Construction Procurement</current_phase><design_start>2016-10-19T00:00:00</design_start><budget_forecast>31775000.00</budget_forecast><latest_budget_changes>238000.00</latest_budget_changes><total_budget_changes>-4589000.00</total_budget_changes><forecast_completion>2024-09-17T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>421</total_schedule_changes></row><row _id="row-9fie~i5a8_888w" _uuid="00000000-0000-0000-006A-DD113484A741" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-9fie~i5a8_888w"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1243</pid><project_name>Reconstruction of Del Valle Square, Bronx</project_name><description>RECONSTRUCTION OF DEL VALLE SQUARE - UPGRADE &amp; EXPAND EXISTING PLAZA AND ENHANCE PEDESTRIAN SAFETY AND IMPROVE A COMMUNITY PUBLIC SPACE</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Construction</current_phase><design_start>2016-10-19T00:00:00</design_start><budget_forecast>26948000.00</budget_forecast><latest_budget_changes>-4827000.00</latest_budget_changes><total_budget_changes>-4589000.00</total_budget_changes><forecast_completion>2025-11-12T00:00:00</forecast_completion><latest_schedule_changes>421</latest_schedule_changes><total_schedule_changes>421</total_schedule_changes></row><row _id="row-dscz_w9fv_8ua3" _uuid="00000000-0000-0000-5F6E-92B983287EDB" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-dscz_w9fv_8ua3"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1243</pid><project_name>Reconstruction of Del Valle Square, Bronx</project_name><description>RECONSTRUCTION OF DEL VALLE SQUARE - UPGRADE &amp; EXPAND EXISTING PLAZA AND ENHANCE PEDESTRIAN SAFETY AND IMPROVE A COMMUNITY PUBLIC SPACE</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Transportation</client_agency><current_phase>Construction</current_phase><design_start>2016-10-19T00:00:00</design_start><budget_forecast>26948000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-4589000.00</total_budget_changes><forecast_completion>2025-11-12T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>421</total_schedule_changes></row><row _id="row-hqkr_q8c7-x2pc" _uuid="00000000-0000-0000-F332-A878DB3B8749" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-hqkr_q8c7-x2pc"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>1244</pid><project_name>Hart Island Demolition and Safety Improvements</project_name><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>Parks &amp; Recreation</client_agency><current_phase>Design</current_phase><design_start>2021-08-10T00:00:00</design_start><budget_forecast>53400000.00</budget_forecast><total_budget_changes>952000.00</total_budget_changes><forecast_completion>2022-08-09T00:00:00</forecast_completion><total_schedule_changes>246</total_schedule_changes></row><row _id="row-t97v-4jz9.4ist" _uuid="00000000-0000-0000-EB80-D449EB24A96B" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-t97v-4jz9.4ist"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>1244</pid><project_name>Hart Island Demolition and Safety Improvements</project_name><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>Parks &amp; Recreation</client_agency><current_phase>Design</current_phase><design_start>2021-08-10T00:00:00</design_start><budget_forecast>53600000.00</budget_forecast><latest_budget_changes>200000.00</latest_budget_changes><total_budget_changes>952000.00</total_budget_changes><forecast_completion>2022-12-18T00:00:00</forecast_completion><latest_schedule_changes>131</latest_schedule_changes><total_schedule_changes>246</total_schedule_changes></row><row _id="row-xjik~dim5~hbid" _uuid="00000000-0000-0000-07B0-4E72301F8416" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-xjik~dim5~hbid"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1244</pid><project_name>Hart Island Demolition and Safety Improvements</project_name><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>Parks &amp; Recreation</client_agency><current_phase>Construction</current_phase><design_start>2021-08-10T00:00:00</design_start><budget_forecast>54340000.00</budget_forecast><latest_budget_changes>740000.00</latest_budget_changes><total_budget_changes>952000.00</total_budget_changes><forecast_completion>2023-01-23T00:00:00</forecast_completion><latest_schedule_changes>36</latest_schedule_changes><total_schedule_changes>246</total_schedule_changes></row><row _id="row-hvz6_v9k8-wq4k" _uuid="00000000-0000-0000-86E6-2143842A4397" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-hvz6_v9k8-wq4k"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1244</pid><project_name>Hart Island Demolition and Safety Improvements</project_name><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>Parks &amp; Recreation</client_agency><current_phase>Construction</current_phase><design_start>2021-08-10T00:00:00</design_start><budget_forecast>54352000.00</budget_forecast><latest_budget_changes>12000.00</latest_budget_changes><total_budget_changes>952000.00</total_budget_changes><forecast_completion>2023-04-12T00:00:00</forecast_completion><latest_schedule_changes>79</latest_schedule_changes><total_schedule_changes>246</total_schedule_changes></row><row _id="row-c3mc_3dsj.uzgu" _uuid="00000000-0000-0000-B750-69FE41DD3ABC" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-c3mc_3dsj.uzgu"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1245</pid><project_name>Shirley Chisolm Recreation Center</project_name><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>Parks &amp; Recreation</client_agency><current_phase>Design</current_phase><design_start>2022-09-27T00:00:00</design_start><budget_forecast>139996000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes></row><row _id="row-n2cr-8r2x-nmrv" _uuid="00000000-0000-0000-40A9-12F8AB9758E7" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-n2cr-8r2x-nmrv"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1245</pid><project_name>Shirley Chisolm Recreation Center</project_name><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>Parks &amp; Recreation</client_agency><current_phase>Design</current_phase><design_start>2022-09-27T00:00:00</design_start><budget_forecast>139996000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2025-06-28T00:00:00</forecast_completion></row><row _id="row-4kjf~d67q~szc4" _uuid="00000000-0000-0000-64DD-27A51EC202E3" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-4kjf~d67q~szc4"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>1246</pid><project_name>Queens Museum of Art- Phase 2 Expansion</project_name><description>Queens Museum of Art - Phase 2</description><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>Cultural Affairs</client_agency><current_phase>Design</current_phase><design_start>2022-03-23T00:00:00</design_start><budget_forecast>29645000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>2841000.00</total_budget_changes><total_schedule_changes>184</total_schedule_changes></row><row _id="row-mmrk-grgn.v85w" _uuid="00000000-0000-0000-3A9C-0CD6EB2ECAB0" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-mmrk-grgn.v85w"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1246</pid><project_name>Queens Museum of Art- Phase 2 Expansion</project_name><description>Queens Museum of Art - Phase 2</description><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>Cultural Affairs</client_agency><current_phase>Design</current_phase><design_start>2022-03-23T00:00:00</design_start><budget_forecast>32486000.00</budget_forecast><latest_budget_changes>2841000.00</latest_budget_changes><total_budget_changes>2841000.00</total_budget_changes><forecast_completion>2026-04-28T00:00:00</forecast_completion><total_schedule_changes>184</total_schedule_changes></row><row _id="row-zbkw~7es3_zfcb" _uuid="00000000-0000-0000-A94F-4C71A6D7A247" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-zbkw~7es3_zfcb"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1246</pid><project_name>Queens Museum of Art- Phase 2 Expansion</project_name><description>Queens Museum of Art - Phase 2</description><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>Cultural Affairs</client_agency><current_phase>Design</current_phase><design_start>2022-03-23T00:00:00</design_start><budget_forecast>32486000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>2841000.00</total_budget_changes><forecast_completion>2026-10-29T00:00:00</forecast_completion><latest_schedule_changes>184</latest_schedule_changes><total_schedule_changes>184</total_schedule_changes></row><row _id="row-pvb8_2v97.w73b" _uuid="00000000-0000-0000-0D35-396142E33206" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-pvb8_2v97.w73b"><date_reported_as_of>2021-12-01T00:00:00</date_reported_as_of><pid>1247</pid><project_name>Nuyorican Poets Cafe Renovation</project_name><description>Project is to rehabilitate the Nuyorican Poet’s Café facility for expanded spaces and ADA accessibility. The base scope of work includes renovation with new finishes, power, and lighting to accommodate three flexible classroom/rehearsal spaces. Additional staff office space and an additional publicly-accessible performance space will be created as part of this renovation.</description><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>Cultural Affairs</client_agency><current_phase>Design</current_phase><design_start>2015-12-14T00:00:00</design_start><budget_forecast>25442000.00</budget_forecast><total_budget_changes>480000.00</total_budget_changes><forecast_completion>2025-10-20T00:00:00</forecast_completion><total_schedule_changes>128</total_schedule_changes></row><row _id="row-w2j6.j69i-pjtb" _uuid="00000000-0000-0000-4A54-C9FE69C2FF87" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-w2j6.j69i-pjtb"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>1247</pid><project_name>Nuyorican Poets Cafe Renovation</project_name><description>Project is to rehabilitate the Nuyorican Poet’s Café facility for expanded spaces and ADA accessibility. The base scope of work includes renovation with new finishes, power, and lighting to accommodate three flexible classroom/rehearsal spaces. Additional staff office space and an additional publicly-accessible performance space will be created as part of this renovation.</description><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>Cultural Affairs</client_agency><current_phase>Design</current_phase><design_start>2015-12-14T00:00:00</design_start><budget_forecast>25372000.00</budget_forecast><latest_budget_changes>-70000.00</latest_budget_changes><total_budget_changes>480000.00</total_budget_changes><forecast_completion>2025-10-20T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>128</total_schedule_changes></row><row _id="row-ik9k~rqkf.e53q" _uuid="00000000-0000-0000-BA52-62D848E8CEF7" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ik9k~rqkf.e53q"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1330</pid><project_name>GRAND CONCOURSE - ELEVATORS</project_name><description>CO293EV - 851 Grand Concourse - Elevators</description><category>Public Safety and Criminal Justice</category><managing_agency>DCAS</managing_agency><client_agency>DCAS/CTS</client_agency><current_phase>Design</current_phase><design_start>2023-08-29T00:00:00</design_start><budget_forecast>53400000.00</budget_forecast><forecast_completion>2026-11-20T00:00:00</forecast_completion></row><row _id="row-du9q~tbja_wbq5" _uuid="00000000-0000-0000-6A5F-C192766F8789" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-du9q~tbja_wbq5"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1247</pid><project_name>Nuyorican Poets Cafe Renovation</project_name><description>Project is to rehabilitate the Nuyorican Poet’s Café facility for expanded spaces and ADA accessibility. The base scope of work includes renovation with new finishes, power, and lighting to accommodate three flexible classroom/rehearsal spaces. Additional staff office space and an additional publicly-accessible performance space will be created as part of this renovation.</description><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>Cultural Affairs</client_agency><current_phase>Design</current_phase><design_start>2015-12-14T00:00:00</design_start><budget_forecast>25922000.00</budget_forecast><latest_budget_changes>550000.00</latest_budget_changes><total_budget_changes>480000.00</total_budget_changes><forecast_completion>2026-03-16T00:00:00</forecast_completion><latest_schedule_changes>147</latest_schedule_changes><total_schedule_changes>128</total_schedule_changes></row><row _id="row-ux5v_yqwy~bvu7" _uuid="00000000-0000-0000-D046-B29D87D75AD8" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ux5v_yqwy~bvu7"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1247</pid><project_name>Nuyorican Poets Cafe Renovation</project_name><description>Project is to rehabilitate the Nuyorican Poet’s Café facility for expanded spaces and ADA accessibility. The base scope of work includes renovation with new finishes, power, and lighting to accommodate three flexible classroom/rehearsal spaces. Additional staff office space and an additional publicly-accessible performance space will be created as part of this renovation.</description><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>Cultural Affairs</client_agency><current_phase>Construction Procurement</current_phase><design_start>2015-12-14T00:00:00</design_start><budget_forecast>25922000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>480000.00</total_budget_changes><forecast_completion>2026-02-25T00:00:00</forecast_completion><latest_schedule_changes>-19</latest_schedule_changes><total_schedule_changes>128</total_schedule_changes></row><row _id="row-v8np_76s9_b5g4" _uuid="00000000-0000-0000-8EF4-EAE0C69E1E7A" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-v8np_76s9_b5g4"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>1251</pid><project_name>EITS - Cybersecurity</project_name><description>Remediation of legacy systems that exist on System’s network. Legacy systems are those systems (including Operation Systems) which are no longer supported by the vendor and do not get security updates/patches</description><category>Health and Hospitals, IT</category><managing_agency>HHC</managing_agency><client_agency>HHC</client_agency><current_phase>IT</current_phase><budget_forecast>0.00</budget_forecast><total_budget_changes>50000000.00</total_budget_changes></row><row _id="row-dp58_ap4d~iqxi" _uuid="00000000-0000-0000-67CF-DCE1F4A1058C" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-dp58_ap4d~iqxi"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1251</pid><project_name>EITS - Cybersecurity</project_name><description>Remediation of legacy systems that exist on System’s network. Legacy systems are those systems (including Operation Systems) which are no longer supported by the vendor and do not get security updates/patches</description><category>Health and Hospitals, IT</category><managing_agency>HHC</managing_agency><client_agency>HHC</client_agency><current_phase>IT</current_phase><budget_forecast>50000000.00</budget_forecast><latest_budget_changes>50000000.00</latest_budget_changes><total_budget_changes>50000000.00</total_budget_changes></row><row _id="row-zrzb.c557_vjfc" _uuid="00000000-0000-0000-CB8D-2C1035929512" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-zrzb.c557_vjfc"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1251</pid><project_name>EITS - Cybersecurity</project_name><description>Remediation of legacy systems that exist on System’s network. Legacy systems are those systems (including Operation Systems) which are no longer supported by the vendor and do not get security updates/patches</description><category>Health and Hospitals, IT</category><managing_agency>HHC</managing_agency><client_agency>HHC</client_agency><current_phase>IT</current_phase><budget_forecast>50000000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>50000000.00</total_budget_changes></row><row _id="row-ig9e-8sz3.gpaw" _uuid="00000000-0000-0000-EE38-9887A8247982" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ig9e-8sz3.gpaw"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>1252</pid><project_name>STORM SEWER IN KING STREET, SI</project_name><description>NEW STORM SEWERS IN KING STREET BETWEEN PRESTON AVE AND RIDGECREST AVE, ETC., STATEN ISLAND</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Design</current_phase><design_start>2017-01-17T00:00:00</design_start><budget_forecast>81880000.00</budget_forecast><total_budget_changes>-1094000.00</total_budget_changes><forecast_completion>2026-08-24T00:00:00</forecast_completion><total_schedule_changes>732</total_schedule_changes></row><row _id="row-w84c.qkd2.ij2v" _uuid="00000000-0000-0000-B289-43DA0707DCC0" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-w84c.qkd2.ij2v"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1252</pid><project_name>STORM SEWER IN KING STREET, SI</project_name><description>NEW STORM SEWERS IN KING STREET BETWEEN PRESTON AVE AND RIDGECREST AVE, ETC., STATEN ISLAND</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Design</current_phase><design_start>2017-01-17T00:00:00</design_start><budget_forecast>80786000.00</budget_forecast><latest_budget_changes>-1094000.00</latest_budget_changes><total_budget_changes>-1094000.00</total_budget_changes><forecast_completion>2028-08-25T00:00:00</forecast_completion><latest_schedule_changes>732</latest_schedule_changes><total_schedule_changes>732</total_schedule_changes></row><row _id="row-imri_hecf.6uf3" _uuid="00000000-0000-0000-CB22-9B974B6791D5" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-imri_hecf.6uf3"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1252</pid><project_name>STORM SEWER IN KING STREET, SI</project_name><description>NEW STORM SEWERS IN KING STREET BETWEEN PRESTON AVE AND RIDGECREST AVE, ETC., STATEN ISLAND</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Design</current_phase><design_start>2017-01-17T00:00:00</design_start><budget_forecast>80786000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-1094000.00</total_budget_changes><forecast_completion>2028-08-25T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>732</total_schedule_changes></row><row _id="row-qnmr-d39r~xcvu" _uuid="00000000-0000-0000-9D07-1EADBE0BB5C7" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-qnmr-d39r~xcvu"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>1257</pid><project_name>BOMB SQUAD BUILDING RECONSTRUCTION</project_name><description>New building to replace existing Bomb Squad building damaged during Sandy storm. Two story building to house training, offices, lockers and vehicle storage. Existing building to be demolished and area to be landscaped upon completion of new building.</description><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>Police</client_agency><current_phase>Construction Procurement</current_phase><design_start>2014-04-15T00:00:00</design_start><budget_forecast>27445000.00</budget_forecast><total_budget_changes>218000.00</total_budget_changes><forecast_completion>2024-09-29T00:00:00</forecast_completion><total_schedule_changes>340</total_schedule_changes></row><row _id="row-qc73.eink-5ydq" _uuid="00000000-0000-0000-98C7-96A9EC2C18AB" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-qc73.eink-5ydq"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1257</pid><project_name>BOMB SQUAD BUILDING RECONSTRUCTION</project_name><description>New building to replace existing Bomb Squad building damaged during Sandy storm. Two story building to house training, offices, lockers and vehicle storage. Existing building to be demolished and area to be landscaped upon completion of new building.</description><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>Police</client_agency><current_phase>Construction Procurement</current_phase><design_start>2014-04-15T00:00:00</design_start><budget_forecast>27663000.00</budget_forecast><latest_budget_changes>218000.00</latest_budget_changes><total_budget_changes>218000.00</total_budget_changes><forecast_completion>2024-09-29T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>340</total_schedule_changes></row><row _id="row-gciz-p35n_bg9e" _uuid="00000000-0000-0000-8C6B-38CFEAC63DB0" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-gciz-p35n_bg9e"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1257</pid><project_name>BOMB SQUAD BUILDING RECONSTRUCTION</project_name><description>New building to replace existing Bomb Squad building damaged during Sandy storm. Two story building to house training, offices, lockers and vehicle storage. Existing building to be demolished and area to be landscaped upon completion of new building.</description><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>Police</client_agency><current_phase>Construction Procurement</current_phase><design_start>2014-04-15T00:00:00</design_start><budget_forecast>27663000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>218000.00</total_budget_changes><forecast_completion>2025-09-04T00:00:00</forecast_completion><latest_schedule_changes>340</latest_schedule_changes><total_schedule_changes>340</total_schedule_changes></row><row _id="row-aqqr-7zvz_744q" _uuid="00000000-0000-0000-22B5-8C83D330D868" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-aqqr-7zvz_744q"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>1260</pid><project_name>RECONSTRUCTION OF ROADWAYS AT RANDALL'S ISLAND</project_name><description>Reconstruction of Roadways at Randall's Island</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Parks &amp; Recreation</client_agency><current_phase>Design</current_phase><design_start>2016-11-10T00:00:00</design_start><budget_forecast>41208000.00</budget_forecast><total_budget_changes>0.00</total_budget_changes><forecast_completion>2025-02-22T00:00:00</forecast_completion><total_schedule_changes>699</total_schedule_changes></row><row _id="row-h2wb~kjw8_vbxd" _uuid="00000000-0000-0000-AD44-603F7CAC875E" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-h2wb~kjw8_vbxd"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1260</pid><project_name>RECONSTRUCTION OF ROADWAYS AT RANDALL'S ISLAND</project_name><description>Reconstruction of Roadways at Randall's Island</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Parks &amp; Recreation</client_agency><current_phase>Design</current_phase><design_start>2016-11-10T00:00:00</design_start><budget_forecast>41208000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2027-01-22T00:00:00</forecast_completion><latest_schedule_changes>699</latest_schedule_changes><total_schedule_changes>699</total_schedule_changes></row><row _id="row-5ufa_hd5k-3yvi" _uuid="00000000-0000-0000-9C9D-4965052BE679" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-5ufa_hd5k-3yvi"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1260</pid><project_name>RECONSTRUCTION OF ROADWAYS AT RANDALL'S ISLAND</project_name><description>Reconstruction of Roadways at Randall's Island</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Parks &amp; Recreation</client_agency><current_phase>Design</current_phase><design_start>2016-11-10T00:00:00</design_start><budget_forecast>41208000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2027-01-22T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>699</total_schedule_changes></row><row _id="row-5ht8.x6xq.a9sh" _uuid="00000000-0000-0000-55B0-8209ADF760C5" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-5ht8.x6xq.a9sh"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>1265</pid><project_name>Bellvue Shelter:400 East 30th st. Fire Alarm Alarm</project_name><description>Installation of new building wide fire alarm system at Bellevue Men's Shelter</description><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>Homeless Services</client_agency><current_phase>Design</current_phase><design_start>2018-06-14T00:00:00</design_start><budget_forecast>31019000.00</budget_forecast><total_budget_changes>-352000.00</total_budget_changes><forecast_completion>2025-03-10T00:00:00</forecast_completion><total_schedule_changes>256</total_schedule_changes></row><row _id="row-vc7b_v2ft~yepf" _uuid="00000000-0000-0000-223F-C30C0EFAB90B" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-vc7b_v2ft~yepf"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1265</pid><project_name>Bellvue Shelter:400 East 30th st. Fire Alarm Alarm</project_name><description>Installation of new building wide fire alarm system at Bellevue Men's Shelter</description><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>Homeless Services</client_agency><current_phase>Design</current_phase><design_start>2018-06-14T00:00:00</design_start><budget_forecast>30667000.00</budget_forecast><latest_budget_changes>-352000.00</latest_budget_changes><total_budget_changes>-352000.00</total_budget_changes><forecast_completion>2025-11-21T00:00:00</forecast_completion><latest_schedule_changes>256</latest_schedule_changes><total_schedule_changes>256</total_schedule_changes></row><row _id="row-q7uj.ywww~ikre" _uuid="00000000-0000-0000-A9C3-9331315D6F49" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-q7uj.ywww~ikre"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1265</pid><project_name>Bellvue Shelter:400 East 30th st. Fire Alarm Alarm</project_name><description>Installation of new building wide fire alarm system at Bellevue Men's Shelter</description><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>Homeless Services</client_agency><current_phase>Design</current_phase><design_start>2018-06-14T00:00:00</design_start><budget_forecast>30667000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>-352000.00</total_budget_changes><forecast_completion>2025-11-21T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>256</total_schedule_changes></row><row _id="row-ngcc-7s99.yfn5" _uuid="00000000-0000-0000-F4C9-40E5B5DB4D74" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ngcc-7s99.yfn5"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>1271</pid><project_name>NEW FIREHOUSE - EC268</project_name><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>Fire</client_agency><current_phase>Design</current_phase><design_start>2019-10-17T00:00:00</design_start><budget_forecast>34283000.00</budget_forecast><total_budget_changes>828000.00</total_budget_changes><forecast_completion>2025-03-07T00:00:00</forecast_completion><total_schedule_changes>227</total_schedule_changes></row><row _id="row-3zfq_q3cb~cgmj" _uuid="00000000-0000-0000-1BE3-F0DEC287EC8C" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-3zfq_q3cb~cgmj"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1271</pid><project_name>NEW FIREHOUSE - EC268</project_name><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>Fire</client_agency><current_phase>Design</current_phase><design_start>2019-10-17T00:00:00</design_start><budget_forecast>34442000.00</budget_forecast><latest_budget_changes>159000.00</latest_budget_changes><total_budget_changes>828000.00</total_budget_changes><forecast_completion>2025-10-20T00:00:00</forecast_completion><latest_schedule_changes>227</latest_schedule_changes><total_schedule_changes>227</total_schedule_changes></row><row _id="row-gujj_2ijd.322j" _uuid="00000000-0000-0000-88EE-9415382D1280" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-gujj_2ijd.322j"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1271</pid><project_name>NEW FIREHOUSE - EC268</project_name><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>Fire</client_agency><current_phase>Design</current_phase><design_start>2019-10-17T00:00:00</design_start><budget_forecast>35111000.00</budget_forecast><latest_budget_changes>669000.00</latest_budget_changes><total_budget_changes>828000.00</total_budget_changes><forecast_completion>2025-10-20T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>227</total_schedule_changes></row><row _id="row-x5vi-keii~sawp" _uuid="00000000-0000-0000-C2A1-69C53CB18A65" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-x5vi-keii~sawp"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>1273</pid><project_name>851 GRAND CONCOURSE - FACADE REPAIRS LOCAL LAW 11</project_name><description>Bronx County Courthouse, Exterior Rehabilitation, 851 Grand Concourse - Rehabilitation of the building's envelope, including but not limited to all roof areas, and brick and limestone exterior masonry.</description><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><current_phase>Design</current_phase><design_start>2019-07-23T00:00:00</design_start><budget_forecast>64442000.00</budget_forecast><total_budget_changes>0.00</total_budget_changes><forecast_completion>2026-03-17T00:00:00</forecast_completion><total_schedule_changes>77</total_schedule_changes></row><row _id="row-epmy~d4ii_kps7" _uuid="00000000-0000-0000-4CC1-A4C28558164F" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-epmy~d4ii_kps7"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1273</pid><project_name>851 GRAND CONCOURSE - FACADE REPAIRS LOCAL LAW 11</project_name><description>Bronx County Courthouse, Exterior Rehabilitation, 851 Grand Concourse - Rehabilitation of the building's envelope, including but not limited to all roof areas, and brick and limestone exterior masonry.</description><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><current_phase>Design</current_phase><design_start>2019-07-23T00:00:00</design_start><budget_forecast>64442000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2025-12-01T00:00:00</forecast_completion><latest_schedule_changes>-106</latest_schedule_changes><total_schedule_changes>77</total_schedule_changes></row><row _id="row-5hju~bjir_38w7" _uuid="00000000-0000-0000-F4BA-2022F6E35E3E" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-5hju~bjir_38w7"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1273</pid><project_name>851 GRAND CONCOURSE - FACADE REPAIRS LOCAL LAW 11</project_name><description>Bronx County Courthouse, Exterior Rehabilitation, 851 Grand Concourse - Rehabilitation of the building's envelope, including but not limited to all roof areas, and brick and limestone exterior masonry.</description><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><current_phase>Design</current_phase><design_start>2019-07-23T00:00:00</design_start><budget_forecast>64442000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2026-06-02T00:00:00</forecast_completion><latest_schedule_changes>183</latest_schedule_changes><total_schedule_changes>77</total_schedule_changes></row><row _id="row-s3g9~xicf.w764" _uuid="00000000-0000-0000-5EB6-433209E17F6E" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-s3g9~xicf.w764"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>1275</pid><project_name>Bronx 7/8 Slab re-construction including Swing space</project_name><description>Slab Replacement of Sanitation Garage facility to serve Bronx Community districts 7 and 8 to be located at 427 West 215th Street. Includes the Swing space.</description><category>Sanitation</category><managing_agency>DSNY</managing_agency><client_agency>DSNY</client_agency><current_phase>Design</current_phase><design_start>2021-07-07T00:00:00</design_start><budget_forecast>35579000.00</budget_forecast><total_budget_changes>9439000.00</total_budget_changes><forecast_completion>2025-06-30T00:00:00</forecast_completion><total_schedule_changes>184</total_schedule_changes></row><row _id="row-gfcb_nqvg-i3v2" _uuid="00000000-0000-0000-C0AD-14C9341609FD" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-gfcb_nqvg-i3v2"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1275</pid><project_name>Bronx 7/8 Slab re-construction including Swing space</project_name><description>Slab Replacement of Sanitation Garage facility to serve Bronx Community districts 7 and 8 to be located at 427 West 215th Street. Includes the Swing space.</description><category>Sanitation</category><managing_agency>DSNY</managing_agency><client_agency>DSNY</client_agency><current_phase>Design</current_phase><design_start>2021-07-07T00:00:00</design_start><budget_forecast>35579000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>9439000.00</total_budget_changes><forecast_completion>2025-06-30T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>184</total_schedule_changes></row><row _id="row-fxk2-pa73.ga2n" _uuid="00000000-0000-0000-446C-F99E6168ED7A" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-fxk2-pa73.ga2n"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1275</pid><project_name>Bronx 7/8 Slab re-construction including Swing space</project_name><description>Slab Replacement of Sanitation Garage facility to serve Bronx Community districts 7 and 8 to be located at 427 West 215th Street. Includes the Swing space.</description><category>Sanitation</category><managing_agency>DSNY</managing_agency><client_agency>DSNY</client_agency><current_phase>Construction Procurement</current_phase><design_start>2021-07-07T00:00:00</design_start><budget_forecast>45018000.00</budget_forecast><latest_budget_changes>9439000.00</latest_budget_changes><total_budget_changes>9439000.00</total_budget_changes><forecast_completion>2025-12-31T00:00:00</forecast_completion><latest_schedule_changes>184</latest_schedule_changes><total_schedule_changes>184</total_schedule_changes></row><row _id="row-5ejx-qbm6~h6x6" _uuid="00000000-0000-0000-FBEB-9274BC441015" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-5ejx-qbm6~h6x6"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>1277</pid><project_name>Hudson River Drainage Chamber Rehabilitation</project_name><description>Hudson River Drainage Chamber Rehabilitation</description><category>Water Supply</category><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2021-11-24T00:00:00</design_start><budget_forecast>54712269.33</budget_forecast><total_budget_changes>502287.00</total_budget_changes><forecast_completion>2028-03-31T00:00:00</forecast_completion><total_schedule_changes>-30</total_schedule_changes></row><row _id="row-djsd_e3i9~b9sv" _uuid="00000000-0000-0000-B0B6-7292F791FBD7" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-djsd_e3i9~b9sv"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1277</pid><project_name>Hudson River Drainage Chamber Rehabilitation</project_name><description>Hudson River Drainage Chamber Rehabilitation</description><category>Water Supply</category><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2021-11-24T00:00:00</design_start><budget_forecast>55214556.33</budget_forecast><latest_budget_changes>502287.00</latest_budget_changes><total_budget_changes>502287.00</total_budget_changes><forecast_completion>2028-02-29T00:00:00</forecast_completion><latest_schedule_changes>-31</latest_schedule_changes><total_schedule_changes>-30</total_schedule_changes></row><row _id="row-cwtu.t6un~n7ca" _uuid="00000000-0000-0000-123E-1D80326BA8E4" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-cwtu.t6un~n7ca"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1277</pid><project_name>Hudson River Drainage Chamber Rehabilitation</project_name><description>Hudson River Drainage Chamber Rehabilitation</description><category>Water Supply</category><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2021-11-24T00:00:00</design_start><budget_forecast>55214556.33</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>502287.00</total_budget_changes><forecast_completion>2028-03-01T00:00:00</forecast_completion><latest_schedule_changes>1</latest_schedule_changes><total_schedule_changes>-30</total_schedule_changes></row><row _id="row-d3p3_rp9s_gmuc" _uuid="00000000-0000-0000-7E11-CC4C2DFA33BF" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-d3p3_rp9s_gmuc"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>1278</pid><project_name>Reconstruction of Merriman Dam Spillway</project_name><description>Reconstruction of Merriman Dam Spillway</description><category>Water Supply</category><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2021-06-09T00:00:00</design_start><budget_forecast>43364864.25</budget_forecast><total_budget_changes>2201599.75</total_budget_changes><forecast_completion>2025-11-07T00:00:00</forecast_completion><total_schedule_changes>303</total_schedule_changes></row><row _id="row-tk6y-yapc~gv97" _uuid="00000000-0000-0000-479B-C799FB8F66A0" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-tk6y-yapc~gv97"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1278</pid><project_name>Reconstruction of Merriman Dam Spillway</project_name><description>Reconstruction of Merriman Dam Spillway</description><category>Water Supply</category><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2021-06-09T00:00:00</design_start><budget_forecast>45566464.00</budget_forecast><latest_budget_changes>2201599.75</latest_budget_changes><total_budget_changes>2201599.75</total_budget_changes><forecast_completion>2025-11-07T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>303</total_schedule_changes></row><row _id="row-fzjq-fyku_p3ke" _uuid="00000000-0000-0000-B8D7-7662FE72AB58" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-fzjq-fyku_p3ke"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1278</pid><project_name>Reconstruction of Merriman Dam Spillway</project_name><description>Reconstruction of Merriman Dam Spillway</description><category>Water Supply</category><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2021-06-09T00:00:00</design_start><budget_forecast>45566464.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>2201599.75</total_budget_changes><forecast_completion>2026-09-06T00:00:00</forecast_completion><latest_schedule_changes>303</latest_schedule_changes><total_schedule_changes>303</total_schedule_changes></row><row _id="row-6kny-3puu_8itq" _uuid="00000000-0000-0000-8CC1-71AA89D00F6D" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-6kny-3puu_8itq"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1279</pid><project_name>Reconstruction of the Main Sewage Pumps System at Owl's Head WRRF</project_name><description>Reconstruction of the Main Sewage Pumps System at Owls Head WRRF</description><category>Wastewater Treatment</category><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2022-03-01T00:00:00</design_start><budget_forecast>223426777.43</budget_forecast><latest_budget_changes>516777.43</latest_budget_changes><total_budget_changes>32731384.43</total_budget_changes><forecast_completion>2030-06-13T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>0</total_schedule_changes></row><row _id="row-b39m~wu5e-8dx7" _uuid="00000000-0000-0000-1EAB-7AFA7D566771" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-b39m~wu5e-8dx7"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1279</pid><project_name>Reconstruction of the Main Sewage Pumps System at Owl's Head WRRF</project_name><description>Reconstruction of the Main Sewage Pumps System at Owls Head WRRF</description><category>Wastewater Treatment</category><managing_agency>DEP</managing_agency><client_agency>DEP</client_agency><current_phase>Design</current_phase><design_start>2022-03-01T00:00:00</design_start><budget_forecast>255641384.43</budget_forecast><latest_budget_changes>32214607.00</latest_budget_changes><total_budget_changes>32731384.43</total_budget_changes><forecast_completion>2030-06-13T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>0</total_schedule_changes></row><row _id="row-4p75.zpuj.ti23" _uuid="00000000-0000-0000-9F6B-38B8431B2469" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-4p75.zpuj.ti23"><date_reported_as_of>2022-04-01T00:00:00</date_reported_as_of><pid>1280</pid><project_name>Flushing Meadows Corona Park Aquatic Center Roof Reconstruction</project_name><description>This project will reconstruct the roof of the Flushing Meadows Corona Park Aquatic Center.</description><category>Parks</category><managing_agency>DPR</managing_agency><client_agency>DPR</client_agency><current_phase>Design</current_phase><design_start>2022-02-10T00:00:00</design_start><budget_forecast>33146000.00</budget_forecast><total_budget_changes>0.00</total_budget_changes></row><row _id="row-puc2~r83i_5wzh" _uuid="00000000-0000-0000-8BEA-1DCCEB78DC53" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-puc2~r83i_5wzh"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1280</pid><project_name>Flushing Meadows Corona Park Aquatic Center Roof Reconstruction</project_name><description>This project will reconstruct the roof of the Flushing Meadows Corona Park Aquatic Center.</description><category>Parks</category><managing_agency>DPR</managing_agency><client_agency>DPR</client_agency><current_phase>Design</current_phase><design_start>2022-02-10T00:00:00</design_start><budget_forecast>33146000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes></row><row _id="row-c2gv_8s5a.7m7w" _uuid="00000000-0000-0000-61F5-40FC5A2B5C5F" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-c2gv_8s5a.7m7w"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1280</pid><project_name>Flushing Meadows Corona Park Aquatic Center Roof Reconstruction</project_name><description>This project will reconstruct the roof of the Flushing Meadows Corona Park Aquatic Center.</description><category>Parks</category><managing_agency>DPR</managing_agency><client_agency>DPR</client_agency><current_phase>Design</current_phase><design_start>2022-02-10T00:00:00</design_start><budget_forecast>33146000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes></row><row _id="row-ebwm-ypin_rhzz" _uuid="00000000-0000-0000-DCDC-5DC9EF0EF351" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ebwm-ypin_rhzz"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1285</pid><project_name>ASTORIA BLVD EB/ 278I( BQE WEST LEG)</project_name><description>"Total Design and Construction Support Services for the Rehabilitation of Astoria Blvd Eastbound Bridge over 278I (BQE West Leg) for the Borough of Queens
Project restarted on April 19, 2021 which was hold on May 7, 2020 due to covid-19 issue."</description><category>Bridges</category><managing_agency>DOT</managing_agency><client_agency>n/a</client_agency><current_phase>Design</current_phase><design_start>2019-05-23T00:00:00</design_start><budget_forecast>43110469.00</budget_forecast><latest_budget_changes>5463000.00</latest_budget_changes><total_budget_changes>13120816.00</total_budget_changes><forecast_completion>2026-12-16T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>-100</total_schedule_changes></row><row _id="row-f4vi~94tt_r43v" _uuid="00000000-0000-0000-5885-8D1920618BAE" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-f4vi~94tt_r43v"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1288</pid><project_name>Hunts Point Energy Resiliency</project_name><description>Emergency back-up power generation for Hunt's Point Produce Market; Solar + back-up battery installationEmergency back-up generator at 600 Food Center Drive  (servicing EDC tenants Citarella + Sultana)</description><category>Industrial Development, Schools</category><managing_agency>EDC</managing_agency><client_agency>EDC</client_agency><current_phase>Construction Procurement</current_phase><design_start>2019-06-01T00:00:00</design_start><budget_forecast>81712751.00</budget_forecast><total_budget_changes>-5200000.00</total_budget_changes><forecast_completion>2025-10-01T00:00:00</forecast_completion><total_schedule_changes>183</total_schedule_changes></row><row _id="row-mik7_kyn7.hjp3" _uuid="00000000-0000-0000-325B-7AC141AF5ADD" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-mik7_kyn7.hjp3"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1288</pid><project_name>Hunts Point Energy Resiliency</project_name><description>Emergency back-up power generation for Hunt's Point Produce Market; Solar + back-up battery installationEmergency back-up generator at 600 Food Center Drive  (servicing EDC tenants Citarella + Sultana)</description><category>Industrial Development, Schools</category><managing_agency>EDC</managing_agency><client_agency>EDC</client_agency><current_phase>Construction Procurement</current_phase><design_start>2019-06-01T00:00:00</design_start><budget_forecast>76512751.00</budget_forecast><latest_budget_changes>-5200000.00</latest_budget_changes><total_budget_changes>-5200000.00</total_budget_changes><forecast_completion>2026-04-02T00:00:00</forecast_completion><latest_schedule_changes>183</latest_schedule_changes><total_schedule_changes>183</total_schedule_changes></row><row _id="row-xsb5-ugqt_4akz" _uuid="00000000-0000-0000-6274-5840BF380F1C" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-xsb5-ugqt_4akz"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1289</pid><project_name>Hunts Point Meat Market</project_name><description>Capital improvements at the Hunts Point Cooperative Market, including emergency generators, condenser replacements, replacement of domestic hot water system, and partial facade and sidewalk repairs.</description><category>Industrial Development</category><managing_agency>EDC</managing_agency><client_agency>EDC</client_agency><current_phase>Design</current_phase><design_start>2022-11-01T00:00:00</design_start><budget_forecast>24643050.00</budget_forecast><total_budget_changes>257450.00</total_budget_changes><forecast_completion>2025-01-31T00:00:00</forecast_completion><total_schedule_changes>244</total_schedule_changes></row><row _id="row-ca3p.3rvx~gfqh" _uuid="00000000-0000-0000-DE1B-1CA594FD6178" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ca3p.3rvx~gfqh"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1289</pid><project_name>Hunts Point Meat Market</project_name><description>Capital improvements at the Hunts Point Cooperative Market, including emergency generators, condenser replacements, replacement of domestic hot water system, and partial facade and sidewalk repairs.</description><category>Industrial Development</category><managing_agency>EDC</managing_agency><client_agency>EDC</client_agency><current_phase>Design</current_phase><design_start>2022-11-01T00:00:00</design_start><budget_forecast>24900500.00</budget_forecast><latest_budget_changes>257450.00</latest_budget_changes><total_budget_changes>257450.00</total_budget_changes><forecast_completion>2025-10-02T00:00:00</forecast_completion><latest_schedule_changes>244</latest_schedule_changes><total_schedule_changes>244</total_schedule_changes></row><row _id="row-7qxg~i6ik~73vn" _uuid="00000000-0000-0000-B0C4-CCF634C3A599" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-7qxg~i6ik~73vn"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1290</pid><project_name>Pier 35 &amp; 36 Substructure Rehab</project_name><description>The repair of 1,570 piles, concrete pile caps and beams in advanced/severe condition. The repairs will be addressed in three phases through year 2028. There will be additional Design for future phases, Phase I design dates are captured below.</description><category>Industrial Development</category><managing_agency>EDC</managing_agency><client_agency>DSNY</client_agency><current_phase>Construction Procurement</current_phase><design_start>2021-04-14T00:00:00</design_start><budget_forecast>121736671.00</budget_forecast><total_budget_changes>-119030592.92</total_budget_changes><forecast_completion>2027-08-01T00:00:00</forecast_completion><total_schedule_changes>56</total_schedule_changes></row><row _id="row-fj4q~5cus~eh2z" _uuid="00000000-0000-0000-078B-DB3DCEB4C781" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-fj4q~5cus~eh2z"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1290</pid><project_name>Pier 35 &amp; 36 Substructure Rehab</project_name><description>The repair of 1,570 piles, concrete pile caps and beams in advanced/severe condition. The repairs will be addressed in three phases through year 2028. There will be additional Design for future phases, Phase I design dates are captured below.</description><category>Industrial Development</category><managing_agency>EDC</managing_agency><client_agency>DSNY</client_agency><current_phase>Construction Procurement</current_phase><design_start>2021-04-14T00:00:00</design_start><budget_forecast>2706078.08</budget_forecast><latest_budget_changes>-119030592.92</latest_budget_changes><total_budget_changes>-119030592.92</total_budget_changes><forecast_completion>2027-09-26T00:00:00</forecast_completion><latest_schedule_changes>56</latest_schedule_changes><total_schedule_changes>56</total_schedule_changes></row><row _id="row-higw~s2pc-ytxe" _uuid="00000000-0000-0000-E660-BF13D2764439" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-higw~s2pc-ytxe"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1291</pid><project_name>Manhattan Cruise Terminal Pile</project_name><description>Design and Construction administration services. The project will include a design level inspection, creating Design Drawing Documents, permitting, Developing Construction Drawings, Contractor Bid and procurement review and Construction administration services.</description><category>Industrial Development</category><managing_agency>EDC</managing_agency><client_agency>EDC</client_agency><current_phase>Design</current_phase><design_start>2022-04-29T00:00:00</design_start><budget_forecast>10002260.90</budget_forecast><total_budget_changes>-5678000.00</total_budget_changes><forecast_completion>2025-11-06T00:00:00</forecast_completion><total_schedule_changes>-44</total_schedule_changes></row><row _id="row-am6j~4bqn~4rby" _uuid="00000000-0000-0000-06AD-B8D97551ACEF" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-am6j~4bqn~4rby"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1291</pid><project_name>Manhattan Cruise Terminal Pile</project_name><description>Design and Construction administration services. The project will include a design level inspection, creating Design Drawing Documents, permitting, Developing Construction Drawings, Contractor Bid and procurement review and Construction administration services.</description><category>Industrial Development</category><managing_agency>EDC</managing_agency><client_agency>EDC</client_agency><current_phase>Design</current_phase><design_start>2022-04-29T00:00:00</design_start><budget_forecast>4324260.90</budget_forecast><latest_budget_changes>-5678000.00</latest_budget_changes><total_budget_changes>-5678000.00</total_budget_changes><forecast_completion>2025-09-23T00:00:00</forecast_completion><latest_schedule_changes>-44</latest_schedule_changes><total_schedule_changes>-44</total_schedule_changes></row><row _id="row-5wu4.zi68-amdt" _uuid="00000000-0000-0000-8D5A-8F12699A0A46" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-5wu4.zi68-amdt"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1292</pid><project_name>Replacement of the Main Sewage Pumps System at Coney Island WWTP</project_name><description>CI-119 - Replacement of the Main Sewage Pumps System at Coney Island WWTP</description><category>Wastewater Treatment</category><managing_agency>DEP</managing_agency><client_agency>BWT</client_agency><current_phase>Construction</current_phase><design_start>2018-08-26T00:00:00</design_start><budget_forecast>144573931.34</budget_forecast><total_budget_changes>56845.17</total_budget_changes><forecast_completion>2025-02-20T00:00:00</forecast_completion><total_schedule_changes>26</total_schedule_changes></row><row _id="row-xupb-9arw_bd2s" _uuid="00000000-0000-0000-1B8E-0EA2E42CB4DB" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-xupb-9arw_bd2s"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1292</pid><project_name>Replacement of the Main Sewage Pumps System at Coney Island WWTP</project_name><description>CI-119 - Replacement of the Main Sewage Pumps System at Coney Island WWTP</description><category>Wastewater Treatment</category><managing_agency>DEP</managing_agency><client_agency>BWT</client_agency><current_phase>Construction</current_phase><design_start>2018-08-26T00:00:00</design_start><budget_forecast>144630776.51</budget_forecast><latest_budget_changes>56845.17</latest_budget_changes><total_budget_changes>56845.17</total_budget_changes><forecast_completion>2025-03-18T00:00:00</forecast_completion><latest_schedule_changes>26</latest_schedule_changes><total_schedule_changes>26</total_schedule_changes></row><row _id="row-qdqf~3gbd-pgcz" _uuid="00000000-0000-0000-BFAA-81CC6833A690" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-qdqf~3gbd-pgcz"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1293</pid><project_name>Flushing Creek CSO Disinfection Project</project_name><description>CSO-FC-DF - Flushing Creek CSO Disinfection Project</description><category>Wastewater Treatment</category><managing_agency>DEP</managing_agency><client_agency>BWT</client_agency><current_phase>Design</current_phase><design_start>2021-03-04T00:00:00</design_start><budget_forecast>79711413.00</budget_forecast><total_budget_changes>-45000.00</total_budget_changes><forecast_completion>2029-01-18T00:00:00</forecast_completion><total_schedule_changes>0</total_schedule_changes></row><row _id="row-dxdn_a4pc_gesw" _uuid="00000000-0000-0000-4028-0B11652C46AF" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-dxdn_a4pc_gesw"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1293</pid><project_name>Flushing Creek CSO Disinfection Project</project_name><description>CSO-FC-DF - Flushing Creek CSO Disinfection Project</description><category>Wastewater Treatment</category><managing_agency>DEP</managing_agency><client_agency>BWT</client_agency><current_phase>Design</current_phase><design_start>2021-03-04T00:00:00</design_start><budget_forecast>79666413.00</budget_forecast><latest_budget_changes>-45000.00</latest_budget_changes><total_budget_changes>-45000.00</total_budget_changes><forecast_completion>2029-01-18T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>0</total_schedule_changes></row><row _id="row-dagw.rs4g-vhqt" _uuid="00000000-0000-0000-4CFB-CE3DEFF23196" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-dagw.rs4g-vhqt"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1296</pid><project_name>Reconstruction of 233rd Street and 154th Street PSs</project_name><description>PS-BX - Reconstruction of 233rd Street and 154th Street PSs</description><category>Wastewater Treatment</category><managing_agency>DEP</managing_agency><client_agency>BWT</client_agency><current_phase>Design</current_phase><design_start>2020-08-20T00:00:00</design_start><budget_forecast>54109384.00</budget_forecast><total_budget_changes>4295639.00</total_budget_changes><forecast_completion>2027-02-18T00:00:00</forecast_completion><total_schedule_changes>59</total_schedule_changes></row><row _id="row-gs9q_mn66.sfhk" _uuid="00000000-0000-0000-A0CF-12203791C6DE" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-gs9q_mn66.sfhk"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1296</pid><project_name>Reconstruction of 233rd Street and 154th Street PSs</project_name><description>PS-BX - Reconstruction of 233rd Street and 154th Street PSs</description><category>Wastewater Treatment</category><managing_agency>DEP</managing_agency><client_agency>BWT</client_agency><current_phase>Design</current_phase><design_start>2020-08-20T00:00:00</design_start><budget_forecast>58405023.00</budget_forecast><latest_budget_changes>4295639.00</latest_budget_changes><total_budget_changes>4295639.00</total_budget_changes><forecast_completion>2027-04-18T00:00:00</forecast_completion><latest_schedule_changes>59</latest_schedule_changes><total_schedule_changes>59</total_schedule_changes></row><row _id="row-jbgp_jkj7_6aah" _uuid="00000000-0000-0000-EF96-4A39096B9FFB" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-jbgp_jkj7_6aah"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1299</pid><project_name>851 GRAND CONCOURSE - HOUSING COURT RELOCATION</project_name><description>851 GRAND CONCOURSE - HOUSING COURT RELOCATION</description><category>Public Safety and Criminal Justice</category><managing_agency>DCAS</managing_agency><client_agency>DCAS</client_agency><current_phase>Design</current_phase><design_start>2019-09-10T00:00:00</design_start><budget_forecast>30091748.00</budget_forecast><total_budget_changes>252.00</total_budget_changes><forecast_completion>2026-04-15T00:00:00</forecast_completion><total_schedule_changes>-395</total_schedule_changes></row><row _id="row-p6tz-z7w5~hbzz" _uuid="00000000-0000-0000-A13E-2C1C99AD9C47" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-p6tz-z7w5~hbzz"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1299</pid><project_name>851 GRAND CONCOURSE - HOUSING COURT RELOCATION</project_name><description>851 GRAND CONCOURSE - HOUSING COURT RELOCATION</description><category>Public Safety and Criminal Justice</category><managing_agency>DCAS</managing_agency><client_agency>DCAS</client_agency><current_phase>Construction Procurement</current_phase><design_start>2019-09-10T00:00:00</design_start><budget_forecast>30092000.00</budget_forecast><latest_budget_changes>252.00</latest_budget_changes><total_budget_changes>252.00</total_budget_changes><forecast_completion>2025-03-16T00:00:00</forecast_completion><latest_schedule_changes>-395</latest_schedule_changes><total_schedule_changes>-395</total_schedule_changes></row><row _id="row-v8d8_rhfn.7f37" _uuid="00000000-0000-0000-B685-04D0D137AB6E" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-v8d8_rhfn.7f37"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1300</pid><project_name>Foundational Infrastructure Modernization</project_name><description>This foundational infrastructure project is to upgrade datacenter technologies that are end of life (EOL) and at risk of failure to a secure, resilient, monitored, and managed infrastructure for City agencies in hardened datacenters</description><category>IT</category><managing_agency>DOITT</managing_agency><current_phase>IT</current_phase><budget_forecast>111006253.31</budget_forecast><total_budget_changes>-1863793.78</total_budget_changes><forecast_completion>2023-12-31T00:00:00</forecast_completion></row><row _id="row-8uj7-mni4-pvvp" _uuid="00000000-0000-0000-6484-61AE34995281" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-8uj7-mni4-pvvp"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1300</pid><project_name>Foundational Infrastructure Modernization</project_name><description>This foundational infrastructure project is to upgrade datacenter technologies that are end of life (EOL) and at risk of failure to a secure, resilient, monitored, and managed infrastructure for City agencies in hardened datacenters</description><category>IT</category><managing_agency>DOITT</managing_agency><current_phase>IT</current_phase><budget_forecast>109142459.53</budget_forecast><latest_budget_changes>-1863793.78</latest_budget_changes><total_budget_changes>-1863793.78</total_budget_changes></row><row _id="row-577d~wvw3.2mm4" _uuid="00000000-0000-0000-15A9-55F180C3AA34" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-577d~wvw3.2mm4"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1301</pid><project_name>Haffen Park Courts, Synthetic Turf Field, Playground, Adult Fitness, and Landscape Reconstruction</project_name><description>This project will reconstruct the playground, landscape, tennis courts, basketball courts, synthetic turf ballfield, pavements, water and drainage systems, park lighting, plantings, and construct an adult fitness area at Haffen Park.</description><category>Parks</category><managing_agency>DPR</managing_agency><client_agency>DPR</client_agency><current_phase>Design</current_phase><design_start>2022-03-22T00:00:00</design_start><budget_forecast>35399000.00</budget_forecast><total_budget_changes>0.00</total_budget_changes></row><row _id="row-f3na.g74j~j3rq" _uuid="00000000-0000-0000-2D7A-2CEB6E3CBCAE" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-f3na.g74j~j3rq"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1301</pid><project_name>Haffen Park Courts, Synthetic Turf Field, Playground, Adult Fitness, and Landscape Reconstruction</project_name><description>This project will reconstruct the playground, landscape, tennis courts, basketball courts, synthetic turf ballfield, pavements, water and drainage systems, park lighting, plantings, and construct an adult fitness area at Haffen Park.</description><category>Parks</category><managing_agency>DPR</managing_agency><client_agency>DPR</client_agency><current_phase>Design</current_phase><design_start>2022-03-22T00:00:00</design_start><budget_forecast>35399000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes></row><row _id="row-mvad-4ji4_wwca" _uuid="00000000-0000-0000-52E1-03A82FC5648C" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-mvad-4ji4_wwca"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1302</pid><project_name>Hamilton Fish Recreation Center Reconstruction</project_name><description>This project will reconstruct Hamilton Fish Recreation Center.</description><category>Parks</category><managing_agency>DPR</managing_agency><client_agency>DPR</client_agency><current_phase>Design</current_phase><design_start>2021-06-11T00:00:00</design_start><budget_forecast>33745000.00</budget_forecast><total_budget_changes>0.00</total_budget_changes></row><row _id="row-9u68~ib4b-9mr8" _uuid="00000000-0000-0000-5D28-BC32359030EA" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-9u68~ib4b-9mr8"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1302</pid><project_name>Hamilton Fish Recreation Center Reconstruction</project_name><description>This project will reconstruct Hamilton Fish Recreation Center.</description><category>Parks</category><managing_agency>DPR</managing_agency><client_agency>DPR</client_agency><current_phase>Design</current_phase><design_start>2021-06-11T00:00:00</design_start><budget_forecast>33745000.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes></row><row _id="row-eyhg_tpzs-zcfe" _uuid="00000000-0000-0000-8E76-6592C10D0BF5" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-eyhg_tpzs-zcfe"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1303</pid><project_name>P.S. 5 - STATEN ISLAND Addition</project_name><description>ADDITION</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2021-01-20T00:00:00</design_start><budget_forecast>89765450.00</budget_forecast><total_budget_changes>0.00</total_budget_changes><forecast_completion>2025-09-03T00:00:00</forecast_completion><total_schedule_changes>0</total_schedule_changes></row><row _id="row-7zku~srgg-byqi" _uuid="00000000-0000-0000-CB64-C01CBA61E2EF" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-7zku~srgg-byqi"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1303</pid><project_name>P.S. 5 - STATEN ISLAND Addition</project_name><description>ADDITION</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2021-01-20T00:00:00</design_start><budget_forecast>89765450.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2025-09-03T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>0</total_schedule_changes></row><row _id="row-kj5x_irjd-nnah" _uuid="00000000-0000-0000-A7A9-8341621941AE" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-kj5x_irjd-nnah"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1304</pid><project_name>P.S. @ 6740 3RD AVENUE - BROOKLYN</project_name><description>NEW SCHOOL</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction Procurement</current_phase><design_start>2021-10-18T00:00:00</design_start><budget_forecast>83591880.00</budget_forecast><total_budget_changes>0.00</total_budget_changes><forecast_completion>2024-09-03T00:00:00</forecast_completion><total_schedule_changes>0</total_schedule_changes></row><row _id="row-e9z6.ydgd_awas" _uuid="00000000-0000-0000-EA06-8CDEC6AF4059" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-e9z6.ydgd_awas"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1304</pid><project_name>P.S. @ 6740 3RD AVENUE - BROOKLYN</project_name><description>NEW SCHOOL</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2021-10-18T00:00:00</design_start><budget_forecast>83591880.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2024-09-03T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>0</total_schedule_changes></row><row _id="row-vj26-qdtq-8gu6" _uuid="00000000-0000-0000-1756-642D43F854EF" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-vj26-qdtq-8gu6"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1305</pid><project_name>P.S. @ 763 PRESIDENT STREET - BROOKLYN</project_name><description>LEASE</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2021-05-12T00:00:00</design_start><budget_forecast>29739635.00</budget_forecast><total_budget_changes>0.00</total_budget_changes><forecast_completion>2024-09-03T00:00:00</forecast_completion><total_schedule_changes>0</total_schedule_changes></row><row _id="row-297z~r6n8_hjri" _uuid="00000000-0000-0000-B20C-7D952A657708" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-297z~r6n8_hjri"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1305</pid><project_name>P.S. @ 763 PRESIDENT STREET - BROOKLYN</project_name><description>LEASE</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2021-05-12T00:00:00</design_start><budget_forecast>29739635.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2024-09-03T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>0</total_schedule_changes></row><row _id="row-ktmp.umcy_vjyn" _uuid="00000000-0000-0000-035C-BC1AAB958092" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ktmp.umcy_vjyn"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1306</pid><project_name>P.S. @ 140 BEACH 112 STREET - QUEENS</project_name><description>LEASE</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2021-12-06T00:00:00</design_start><budget_forecast>26318427.00</budget_forecast><total_budget_changes>0.00</total_budget_changes><forecast_completion>2024-09-03T00:00:00</forecast_completion><total_schedule_changes>-366</total_schedule_changes></row><row _id="row-d8rt-vg9b.2vts" _uuid="00000000-0000-0000-E600-537566C28F0F" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-d8rt-vg9b.2vts"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1306</pid><project_name>P.S. @ 140 BEACH 112 STREET - QUEENS</project_name><description>LEASE</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2021-12-06T00:00:00</design_start><budget_forecast>26318427.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2023-09-03T00:00:00</forecast_completion><latest_schedule_changes>-366</latest_schedule_changes><total_schedule_changes>-366</total_schedule_changes></row><row _id="row-v2iq_3u3e_4ewi" _uuid="00000000-0000-0000-4349-9A99D19A973B" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-v2iq_3u3e_4ewi"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1307</pid><project_name>P.S. 174 - QUEENS Addition</project_name><description>ADDITION / EXISTING BUILDING-IPDVS</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2021-03-08T00:00:00</design_start><budget_forecast>69789264.00</budget_forecast><total_budget_changes>0.00</total_budget_changes><forecast_completion>2024-09-03T00:00:00</forecast_completion><total_schedule_changes>0</total_schedule_changes></row><row _id="row-6swg~s22i~yiki" _uuid="00000000-0000-0000-AAD5-436A736F21B4" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-6swg~s22i~yiki"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1307</pid><project_name>P.S. 174 - QUEENS Addition</project_name><description>ADDITION / EXISTING BUILDING-IPDVS</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2021-03-08T00:00:00</design_start><budget_forecast>69789264.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2024-09-03T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>0</total_schedule_changes></row><row _id="row-f237_z4qi_3gqx" _uuid="00000000-0000-0000-07CC-151B0ACA64B1" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-f237_z4qi_3gqx"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1308</pid><project_name>P.S. 26 - QUEENS Addition</project_name><description>ADDITION / EXISTING BUILDING WORK-FIRE ALARM</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2021-03-17T00:00:00</design_start><budget_forecast>81642786.00</budget_forecast><total_budget_changes>0.00</total_budget_changes><forecast_completion>2025-09-03T00:00:00</forecast_completion><total_schedule_changes>0</total_schedule_changes></row><row _id="row-ms2y~n7wu_pd8p" _uuid="00000000-0000-0000-C66C-B062B7597181" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ms2y~n7wu_pd8p"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1308</pid><project_name>P.S. 26 - QUEENS Addition</project_name><description>ADDITION / EXISTING BUILDING WORK-FIRE ALARM</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2021-03-17T00:00:00</design_start><budget_forecast>81642786.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2025-09-03T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>0</total_schedule_changes></row><row _id="row-pu9k_7yzp~x58g" _uuid="00000000-0000-0000-92FC-634E67F83DF6" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-pu9k_7yzp~x58g"><date_reported_as_of>2022-09-01T00:00:00</date_reported_as_of><pid>1309</pid><project_name>P.S. 160 - QUEENS Addition</project_name><description>ADDITION / EXISTING BUILDING WORK-IPDVS / EXISTING BUILDING WORK- ELECTRICAL SYSTEMS</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2021-07-21T00:00:00</design_start><budget_forecast>77952760.00</budget_forecast><total_budget_changes>0.00</total_budget_changes><forecast_completion>2025-09-03T00:00:00</forecast_completion><total_schedule_changes>0</total_schedule_changes></row><row _id="row-38y6-rb6s-ktq4" _uuid="00000000-0000-0000-F09B-E936FCD316C2" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-38y6-rb6s-ktq4"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1309</pid><project_name>P.S. 160 - QUEENS Addition</project_name><description>ADDITION / EXISTING BUILDING WORK-IPDVS / EXISTING BUILDING WORK- ELECTRICAL SYSTEMS</description><category>Schools</category><managing_agency>SCA</managing_agency><client_agency>DOE</client_agency><current_phase>Construction</current_phase><design_start>2021-07-21T00:00:00</design_start><budget_forecast>77952760.00</budget_forecast><latest_budget_changes>0.00</latest_budget_changes><total_budget_changes>0.00</total_budget_changes><forecast_completion>2025-09-03T00:00:00</forecast_completion><latest_schedule_changes>0</latest_schedule_changes><total_schedule_changes>0</total_schedule_changes></row><row _id="row-s8zh_2bah-6f28" _uuid="00000000-0000-0000-91AB-E6E3C04A7CA6" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-s8zh_2bah-6f28"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1363</pid><project_name>Ferry Terminal Floodproofing</project_name><description>The Project is a Design Build project to implement wet and dry flood protection measures at the Staten Island Ferry (SIF) terminals at St George and Whitehall and at the SIF Ferry Maintenance Facility (FMF).  The Project will help to protect these critical transit assets against the type of damage experienced during Hurricane Sandy. The primary focus of this work is the Staten Island Ferry’s two terminal complexes and its maintenance/storage facility for the ferryboats.</description><category>Ferries</category><managing_agency>DOT</managing_agency><client_agency>DOT</client_agency><current_phase>Construction Procurement</current_phase><design_start>2018-04-18T00:00:00</design_start><budget_forecast>31661448.00</budget_forecast><forecast_completion>2025-12-11T00:00:00</forecast_completion></row><row _id="row-brya_edeu-zm2t" _uuid="00000000-0000-0000-337B-95178257F748" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-brya_edeu-zm2t"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1364</pid><project_name>MMA - Metropolitan Museum Skylight Replacement for Museum Building Wings A, B, C</project_name><description>Replacement of 30,000 SF of old, inefficient skylights over the oldest 3 wings of the Museum, with high performing skylights; and upgrading of existing HVAC systems in the affected galleries.</description><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>Cultural Affairs</client_agency><current_phase>Construction Procurement</current_phase><design_start>2022-06-28T00:00:00</design_start><budget_forecast>38152000.00</budget_forecast><forecast_completion>2027-06-30T00:00:00</forecast_completion></row><row _id="row-h3jw.pxq4_b4p4" _uuid="00000000-0000-0000-1CCF-3CBCF2D0A8FE" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-h3jw.pxq4_b4p4"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1365</pid><project_name>60 CENTRE ST. - RECONSTRUCTION</project_name><description>New York County Courthouse, Building Envelope, 60 Centre Street - Restore the building envelope to ensure weather tightness and structural integrity. The work includes facades, roofs, the building’s site perimeter and landscaped areas, and specific electrical and plumbing systems, fire protection equipment and interior finishes affected by the moisture infiltration.</description><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>DCAS</client_agency><current_phase>Design</current_phase><design_start>2018-06-29T00:00:00</design_start><budget_forecast>77713000.00</budget_forecast><forecast_completion>2027-07-21T00:00:00</forecast_completion></row><row _id="row-s9a9-qbst~72n8" _uuid="00000000-0000-0000-5145-59F306AD1A10" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-s9a9-qbst~72n8"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1366</pid><project_name>Design and Construction of Borden Ave PS Force Main.</project_name><description>Design and Construction of Borden Ave PS Force Main which includes a new diversion chamber with a tide gate,42" gravity sewer, 36" &amp; 14"  force main etc.</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Design</current_phase><design_start>2022-11-10T00:00:00</design_start><budget_forecast>78781000.00</budget_forecast><forecast_completion>2028-06-07T00:00:00</forecast_completion></row><row _id="row-xbaj.nziz_qij8" _uuid="00000000-0000-0000-F4CC-0DF2D35FF5C1" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-xbaj.nziz_qij8"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1367</pid><project_name>Construction of a New Recreation Center at Tremont Park</project_name><description>The Department of Parks and Recreation, in consultation with local elected officials and community stakeholders, has identified the need for a new Recreation Center to be located at Walter Gladwin Park in the Tremont neighborhood. The purpose of the project is to provide a Parks run Recreation Center to serve the community in an area identified by the Agency as under-served.</description><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>Parks &amp; Recreation</client_agency><current_phase>Design</current_phase><design_start>2023-01-23T00:00:00</design_start><budget_forecast>90108000.00</budget_forecast></row><row _id="row-k8pz~jdu3-xm53" _uuid="00000000-0000-0000-2842-8262EEAA812E" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-k8pz~jdu3-xm53"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1368</pid><project_name>Construction of ROW Green Infrastructure in CI005 Phase 2</project_name><description>Construction of ROW Green Infrastructure in CI005 Phase 2</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction Procurement</current_phase><design_start>2022-06-27T00:00:00</design_start><budget_forecast>36486000.00</budget_forecast><forecast_completion>2025-08-27T00:00:00</forecast_completion></row><row _id="row-8eia-2wp8-kujn" _uuid="00000000-0000-0000-71EB-2DAC514F3E7D" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-8eia-2wp8-kujn"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1369</pid><project_name>Bellevue Men's Shelter: Bathroom Upgrade</project_name><description>Renovation of all bathroom facilities through out the building; to include new fixtures, ventilation, ADA compliance</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Homeless Services</client_agency><current_phase>Design</current_phase><design_start>2018-01-29T00:00:00</design_start><budget_forecast>25019000.00</budget_forecast><forecast_completion>2026-10-28T00:00:00</forecast_completion></row><row _id="row-as4k_6ynt_ut9n" _uuid="00000000-0000-0000-3803-5D27E95B5347" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-as4k_6ynt_ut9n"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1370</pid><project_name>STORM &amp; SANITARY SEWERS IN ALVERSON AVENUE, SI</project_name><description>STORM &amp; SANITARY SEWERS IN WEST CASTOR PLACE, SI</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction</current_phase><design_start>2014-06-16T00:00:00</design_start><budget_forecast>25486000.00</budget_forecast><forecast_completion>2024-07-16T00:00:00</forecast_completion></row><row _id="row-8xfj-6t7p~q6fg" _uuid="00000000-0000-0000-4BAD-CE98A93162BA" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-8xfj-6t7p~q6fg"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1371</pid><project_name>Brooklyn District 6 Sanitation Garage: Rehab.</project_name><description>General Rehab of Garage with exterior brick work. [No Roof work]</description><category>Other Government Facilities</category><managing_agency>DDC</managing_agency><client_agency>Sanitation</client_agency><current_phase>Construction Procurement</current_phase><design_start>2016-12-14T00:00:00</design_start><budget_forecast>27602000.00</budget_forecast><forecast_completion>2026-04-15T00:00:00</forecast_completion></row><row _id="row-ga6d-4yq7_5m4h" _uuid="00000000-0000-0000-5D79-B5A7AB093542" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-ga6d-4yq7_5m4h"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1372</pid><project_name>Construction of ROW Green Infrastructure in CI005 Phase 3</project_name><description>Construction of Right of Way Green Infrastructure in CI005 Phase 3</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction Procurement</current_phase><design_start>2022-06-08T00:00:00</design_start><budget_forecast>29363000.00</budget_forecast><forecast_completion>2025-06-01T00:00:00</forecast_completion></row><row _id="row-fcke-x3en_he4h" _uuid="00000000-0000-0000-920C-FAE3929F8A96" _position="0" _address="https://data.cityofnewyork.us/resource/n7gv-k5yt/row-fcke-x3en_he4h"><date_reported_as_of>2023-01-01T00:00:00</date_reported_as_of><pid>1373</pid><project_name>REPAIRS &amp; REHAB OF INTERCEPTING SEWERS, MN &amp; BX</project_name><description>Repair and Rehabilitation of Interceptor Sewers at Various Locations in the Boroughs of Manhattan and The Bronx.</description><category>Streets and Roadways</category><managing_agency>DDC</managing_agency><client_agency>Environmental Protection</client_agency><current_phase>Construction Procurement</current_phase><design_start>2012-12-10T00:00:00</design_start><budget_forecast>30611000.00</budget_forecast><forecast_completion>2024-06-13T00:00:00</forecast_completion></row></row></response>