[{"job_filing_number":"B01035931-I1","filing_status":"Permit Entire","house_no":"178","street_name":"WILLIAMS AVENUE","borough":"Brooklyn","block":"3716","lot":"30","bin":"3252556","commmunity_board":"305","work_on_floor":"Open Space, Open Space","applicant_professional_title":"PE","applicant_license":"090339","applicant_first_name":"Malgorzata","applicant_last_name":"Wilson","owner_s_business_name":"PR","applicant_street_name":"152 CUBA HILL RD","city":"HUNTINGTON","state":"NY","zip":"11743","filing_representative_first_name":"Timothy","filing_representative_last_name":"Dumbleton","filing_representative_business_name":"MICROGRID NETWORKS LLC","filing_representative_street_name":"1074 Grand Street","filing_representative_city":"Brooklyn","filing_representative_state":"NY","filing_representative_zip":"11211","sprinkler_work_type":"NO","plumbing_work_type":"NO","standpipe":"NO","antenna":"NO","sign":"NO","curb_cut":"NO","fence":"NO","scaffold":"NO","shed":"NO","initial_cost":"794000","total_construction_floor_area":"8000","review_building_code":"2022","little_e":"No","unmapped_cco_street":"No","in_compliance_with_nycecc":"No","exempt_from_nycecc":"No","building_type":"Other","existing_stories":"1","existing_height":"0","existing_dwelling_units":"0","proposed_no_of_stories":"1","proposed_height":"0","proposed_dwelling_units":"0","specialinspectionrequirement":"Concrete - Cast-In-Place,Excavations - Sheeting, Shoring, and Bracing,Masonry,Post-installed Anchors,Structural Steel - Details,Structural Steel - High Strength Bolting,Structural Steel - Welding,Subgrade Inspections,Subsurface Conditions – Fill Placement & In-Place Density,Subsurface Investigations (Borings/Test Pits),Underpinning","special_inspection_agency_number":"00930","progressinspectionrequirement":"Final,Footing and Foundation,Preliminary","filing_date":"2024-05-23T00:00:00.000","current_status_date":"2026-09-01T14:21:01.000","first_permit_date":"2025-12-29T00:00:00.000","boiler_equipment_work_type_":"NO","earth_work_work_type_":"YES","foundation_work_type_":"YES","general_construction_work_type_":"YES","mechanical_systems_work_type_":"NO","place_of_assembly_work_type_":"NO","protection_mechanical_methods_work_type_":"NO","sidewalk_shed_work_type_":"NO","structural_work_type_":"YES","support_of_excavation_work_type_":"No","temporary_place_of_assembly_work_type_":"NO","green_roof_work_type_":"NO","solar_work_type_":"NO","full_demolition_work_type_":"NO","suspended_scaffold_work_type_":"NO","job_type":"Alteration","latitude":"40.671918","longitude":"-73.899743","postcode":"11207","council_district":"37","census_tract":"1144","bbl":"3037160030","nta":"East New York (North)","approved_date":"2025-03-10T15:46:29.000","applicant_business_name":"FOCUS STRUCTURAL ENGINEERING","owner_first_name":"Tibi","owner_last_name":"Zicherman","owner_type":"Individual","job_description":"STRUCTURAL WORK as per plans filed herewith. Concrete supports for ground mounted 5 MW(22MWh) energy storage system and structural steel framing system for NFPA 15, in outdoor space. no change in use, egress or occupancy","filing_review_type":"Standard Plan Examination"}]
