[{"job_filing_number":"X01443396-I1","filing_status":"Approved","house_no":"2815","street_name":"DEWEY AVENUE","borough":"Bronx","block":"5564","lot":"1","bin":"2091477","commmunity_board":"210","work_on_floor":"Roof","applicant_professional_title":"PE","applicant_license":"090133","applicant_first_name":"NICHOLAS","applicants_middle_initial":"D","applicant_last_name":"BARILE","owner_s_business_name":"NYC Housing Authority","applicant_street_name":"309 BAILEY ROAD","city":"PURLING","state":"NY","zip":"12470","filing_representative_first_name":"MICHELE","filing_representative_last_name":"PIEKARZ","filing_representative_business_name":"CONSTRUCTION PERMIT SERVICES","filing_representative_street_name":"470 Headquarters Plaza, 2nd Fl N Twr","filing_representative_city":"Morristown","filing_representative_state":"NJ","filing_representative_zip":"07960","sprinkler_work_type":"NO","plumbing_work_type":"NO","standpipe":"NO","antenna":"YES","sign":"NO","curb_cut":"NO","fence":"NO","scaffold":"NO","shed":"NO","initial_cost":"38000","total_construction_floor_area":"36.92","review_building_code":"2022","little_e":"No","unmapped_cco_street":"No","in_compliance_with_nycecc":"No","exempt_from_nycecc":"No","building_type":"Other","existing_dwelling_units":"70","proposed_dwelling_units":"70","specialinspectionrequirement":"Fire-Resistant Penetrations and Joints,Post-installed Anchors,Structural Steel - Details,Structural Steel - High Strength Bolting,Tenant Protection Plan Compliance","special_inspection_agency_number":"003692","progressinspectionrequirement":"Final","filing_date":"2026-08-24T00:00:00.000","current_status_date":"2026-09-01T13:25:45.000","boiler_equipment_work_type_":"NO","earth_work_work_type_":"NO","foundation_work_type_":"NO","general_construction_work_type_":"NO","mechanical_systems_work_type_":"NO","place_of_assembly_work_type_":"NO","protection_mechanical_methods_work_type_":"NO","sidewalk_shed_work_type_":"NO","structural_work_type_":"NO","support_of_excavation_work_type_":"No","temporary_place_of_assembly_work_type_":"NO","green_roof_work_type_":"NO","solar_work_type_":"NO","full_demolition_work_type_":"NO","suspended_scaffold_work_type_":"NO","job_type":"Alteration","latitude":"40.821131","longitude":"-73.822724","postcode":"10465","council_district":"13","census_tract":"144","bbl":"2055640001","nta":"Throgs Neck-Schuylerville","approved_date":"2026-09-01T09:25:45.000","applicant_business_name":"ELEVATED ENGINEERING, PLLC","owner_first_name":"Scott","owner_last_name":"Groom","owner_type":"NYCHA/HHC Owned and Operated","job_description":"Modification to T-Mobile site. Relocate 4 antenna sectors on the roof. Install 4 kickbacks and 1 cable tray on the roof.","filing_review_type":"Standard Plan Examination"}]
